A prestressed structural system for flexible support water surface net protection

Through the prestressed structural system of flexible support water surface grid protection, the problem of waste entering the water body during bridge construction is solved. The design of tension load-bearing cables and bearing platforms is adopted to achieve effective prevention of waste and protection of water flow, ensuring that The water environment is safe.

CN118186945BActive Publication Date: 2024-11-26CHINA GEZHOUBA GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410541740.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-11-26
Estimated Expiration
2044-04-30

AI Technical Summary

Technical Problem

Existing bridge construction protection measures cannot effectively prevent construction waste from entering the water body without affecting the natural flow of water body. There are connection gaps in traditional pontoon bridges, which cannot completely prevent waste from entering.

Method used

The prestressed structural system adopts flexible support water surface grid protection, including installation foundation, load-bearing cable and load-bearing platform. By setting up installation foundations on both sides of the water body, the load-bearing cable is tightened to ensure that it is in a tension state, and the load-bearing cable is installed on the load-bearing cable. The platform prevents construction waste from entering the water body, and at the same time designs a water pump to remove surface water to ensure that the flow of the water is not affected.

Benefits of technology

Effectively prevent construction waste from entering the water body, while not affecting the natural flow of the water body, ensuring the safety of the water body environment, and achieving stable waste bearing and water body protection through multi-layer structure and tensioning mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118186945B_ABST
    Figure CN118186945B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of bridge construction protection, and specifically to a prestressed structural system for water surface netting protection with a flexible support, which comprises an installation foundation, a load-bearing cable and a bearing platform. The installation foundation is arranged on both sides of a water body in a first preset manner to ensure that a line between two installation foundations is parallel to a bridge, the load-bearing cable is arranged on the installation foundation, and a tensioning member is arranged to ensure that the load-bearing cable is in a tensioned state. A plurality of load-bearing cables are arranged and the plurality of load-bearing cables are in the same horizontal plane. The positions of a plurality of installation foundations are set to ensure that the horizontal plane where the plurality of load-bearing cables are located is directly below the bridge. The bearing platform is installed on the plurality of load-bearing cables to ensure that the bearing platform is in a horizontal state, and a certain distance is maintained between the bearing platform and the water surface. The bearing platform does not affect the natural flow of the water body, and the bearing platform can carry construction waste to prevent the construction waste from entering the water body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction protection, and in particular to a prestressed structural system for flexible support water surface netting protection. Background Art

[0002] In recent years, the society has gradually paid more attention to environmental protection issues, especially in bridge construction. People pay more attention to how to protect the ecological environment of water bodies and the safety of water resources during the construction process. Traditionally, floating bridges are built on the water surface to prevent construction waste from entering the water body. However, there are connection gaps in traditional floating bridges, which cannot completely prevent construction waste from entering the water body, which may pose a potential threat to water resources. That is, the existing protective measures cannot effectively prevent construction waste generated during the construction process from entering the water body without affecting the natural flow of the water body. Summary of the invention

[0003] The invention provides a prestressed structural system for a flexible support water surface netting protection, so as to solve the problem that the existing protection measures cannot prevent construction waste from entering the water body without affecting the natural flow of the water body.

[0004] The prestressed structural system of a flexible support water surface netting protection of the present invention adopts the following technical solutions:

[0005] A prestressed structural system for a flexible support water surface netting protection comprises an installation foundation, load-bearing cables and a bearing platform.

[0006] There are multiple installation foundations, each of which is fixedly installed on the bank of the water body, and the multiple installation foundations are arranged on both sides of the water body in a first preset manner; there are multiple load-bearing cables, each of which is installed between two installation foundations on both sides of the water surface, and each installation foundation is provided with a tensioning member, which is used to pull the end of the load-bearing cable; each installation foundation is provided with a locking member, which is used to fix the load-bearing cable to the end of the support rod; the bearing platform is installed on multiple load-bearing cables, and the bearing platform is used to bear construction waste.

[0007] Furthermore, the installation foundation includes a first fixed block and a support rod; the first fixed block is fixedly arranged on the shore; and the support rod is fixedly arranged on the upper end surface of the first fixed block.

[0008] Furthermore, the installation foundation also includes a second fixed block and a diagonal rod, the second fixed block is fixedly arranged on the shore, and the second fixed block is spaced apart from the first fixed block; the diagonal rod is arranged between the upper end of a support rod and the second fixed block.

[0009] Furthermore, the tensioning member includes a tensioning motor and a tensioning wheel. The tensioning motor is fixedly mounted on the upper end of the support rod, and the tensioning wheel is fixedly mounted on the power output shaft of the tensioning motor. The tensioning motor can drive the tensioning wheel to rotate, and the load-bearing cable can be wound around the tensioning wheel.

[0010] Furthermore, the locking member is a locking sleeve, which is fixedly connected to the upper end of the support rod and installed on the outside of the load-bearing cable. The locking sleeve can fix the load-bearing cable to the support rod when the load-bearing cable is tensioned, and the locking sleeve can make the load-bearing cable disengage from the tensioning wheel.

[0011] Furthermore, a cutting knife is provided on the locking sleeve, and when the locking sleeve fixes the load-bearing cable, the cutting knife can cut the load-bearing cable.

[0012] Furthermore, a mounting platform is provided on the support rod, and the locking sleeve and the tensioning motor are both mounted on the mounting platform.

[0013] Furthermore, the bearing platform includes a bearing cloth and a mounting ring, a plurality of mounting rings are provided, the plurality of mounting rings are all mounted on the bearing cloth, and the mounting rings can be mounted on the load-bearing cables.

[0014] Furthermore, a tensioning rope is arranged on the tensioning wheel, one end of which can be connected to a mounting ring at the end of the load-bearing cloth, and the tensioning rope can be tensioned by the tensioning wheel after the locking sleeve fixes the load-bearing rope.

[0015] Furthermore, a water extraction pipe is arranged on the upper surface of the carrier cloth, and the water extraction pipe can extract water falling on the surface of the carrier cloth from the carrier cloth.

[0016] The beneficial effects of the present invention are as follows: a prestressed structural system for a flexible support water surface netting protection of the present invention comprises an installation foundation, a load-bearing cable and a bearing platform. When a bridge is constructed, in order to prevent construction waste from entering the water body, the installation foundation is arranged on both sides of the water body in a first preset manner to ensure that the line between the two installation foundations is parallel to the bridge, the load-bearing cable is arranged on the installation foundation, and a tensioning member is arranged to ensure that the load-bearing cable is in a tensioned state, and multiple load-bearing cables are arranged and the multiple load-bearing cables are in the same horizontal plane. Through the position setting of multiple installation foundations, it is ensured that the horizontal plane where the multiple load-bearing cables are located is directly below the bridge, and by installing the bearing platform on multiple load-bearing cables, it is ensured that the bearing platform is in a horizontal state, and there is a certain distance between the bearing platform and the water surface, the bearing platform does not affect the natural flow of the water body, and the bearing platform can carry construction waste to prevent construction waste from entering the water body. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 A top view of a prestressed structural system for a flexible support water surface netting protection provided by an embodiment of the present invention;

[0019] Figure 2 A schematic diagram of the structure of a prestressed structural system for a flexible support with a net hanging on the water surface provided by an embodiment of the present invention, with the pumping pipe hidden;

[0020] Figure 3 A schematic diagram of the structures of support rods, tensioning motors, tensioning wheels, mounting platforms, mounting rings, load-bearing cables, etc. in a prestressed structural system for a flexible support for surface netting protection provided by an embodiment of the present invention;

[0021] Figure 4 A schematic diagram of the structure of a support rod, a tensioning motor, a tensioning wheel, etc. in a prestressed structural system of a flexible support for surface netting protection provided by an embodiment of the present invention;

[0022] Figure 5 A schematic structural diagram of an installation foundation in a prestressed structural system for water surface netting protection of a flexible support provided in an embodiment of the present invention.

[0023] In the figure: 110, load-bearing cable; 120, first fixed block; 130, support rod; 140, second fixed block; 150, inclined rod; 210, tensioning motor; 220, tensioning wheel; 230, locking sleeve; 240, mounting platform; 250, auxiliary plate; 260, bearing cloth; 270, mounting ring; 280, water pump; 290, water pump. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] The serial numbers of the components herein, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings). In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc. are based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present invention.

[0026] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0027] like Figures 1 to 5 As shown, a prestressed structural system for a flexible support water surface netting protection provided by an embodiment of the present invention includes an installation foundation, a load-bearing cable 110 and a bearing platform.

[0028] There are multiple installation foundations, each of which is fixedly set on the bank of the water body, and the multiple installation foundations are arranged on both sides of the water body in a first preset manner. In the specific setting, the number of installation foundations is set to an even number, wherein the first preset manner is that two installation foundations are a group, and the two installation foundations in the same group are distributed on both sides of the water body, and the line between the two installation foundations in the same group is parallel to the bridge, and the multiple groups of installation foundations are arranged in parallel and at intervals, and the horizontal plane formed by the multiple groups of installation foundations is directly below the bridge.

[0029] There are multiple load-bearing cables 110, each of which is set between two installation foundations on both sides of the water surface. In the specific setting, the number of load-bearing cables 110 is half the number of installation foundations, and each load-bearing cable 110 is set between two installation foundations in the same group, ensuring that each load-bearing cable 110 is parallel to the bridge, multiple load-bearing cables 110 are in the same horizontal plane, the horizontal plane where multiple load-bearing cables 110 are located is directly below the bridge, and the horizontal plane where multiple load-bearing cables 110 are located is above the water surface. A tensioning member is set on each installation foundation, and the tensioning member is used to pull the end of the load-bearing cable 110. On the two installation foundations in the same group, the two tensioning members pull the load-bearing cable 110 into a taut state. A locking member is set on each installation foundation, and the locking member is used to fix the load-bearing cable 110 to the end of the support rod 130. On the two installation foundations in the same group, the two locking members fix the load-bearing cable 110 in a taut state, ensuring that multiple load-bearing cables 110 are stably in the same horizontal plane. The carrying platform is installed on multiple load-bearing cables 110. The carrying platform is used to carry construction waste. By installing the carrying platform on multiple load-bearing cables 110, it is ensured that the carrying platform is above the water surface to prevent affecting the natural flow of the water body. At the same time, the carrying platform can carry construction waste to prevent construction waste from entering the water body.

[0030] A prestressed structural system for water surface netting protection with a flexible support of the present invention, when building a bridge, in order to prevent construction waste from entering the water body, installation foundations are set on both sides of the water body in a first preset manner to ensure that the connection line between the two installation foundations is parallel to the bridge, and the load-bearing cable 110 is set on the installation foundation. By setting a tensioning member, it is ensured that the load-bearing cable 110 is in a tensioned state, and by setting a plurality of load-bearing cables 110, and the plurality of load-bearing cables 110 are in the same horizontal plane, through the position setting of a plurality of installation foundations, it is ensured that the horizontal plane where the plurality of load-bearing cables 110 are located is directly below the bridge, and by installing a bearing platform on a plurality of load-bearing cables 110, it is ensured that the bearing platform is in a horizontal state, and there is a certain distance between the bearing platform and the water surface, the bearing platform does not affect the natural flow of the water body, and the bearing platform can carry construction waste to prevent construction waste from entering the water body.

[0031] In one embodiment, the installation base includes a first fixed block 120 and a support rod 130; the first fixed block 120 is fixedly arranged on the shore, the support rod 130 is fixedly arranged on the upper end surface of the first fixed block 120, and the tensioner is installed on the upper end of the support rod 130, and the locking member is installed on the upper end of the support rod 130. In a specific setting, the first fixed block 120 is a concrete block, and the first fixed block 120 can be prefabricated in a concrete prefabrication yard. According to the location of the bridge erection, the manufactured first fixed block 120 is transported to both sides of the water body, and the first fixed block 120 is maintained on both sides of the water body to ensure that the first fixed block 120 has a high hardness. At the same time, before the first fixed block 120 is transported, the upper surface is checked to ensure that the first fixed block 120 meets the manufacturing standards. After digging pits on both sides of the water body, the first fixed block 120 is buried on the shore to ensure that the upper end of the first fixed block 120 is in a horizontal state. A hole is punched on the upper end surface of the first fixed block 120, and a support plate is welded to the lower end surface of the support rod 130, and the support plate is fixed to the upper end surface of the first fixed block 120 by expansion bolts, while ensuring that the support rod 130 is in a vertical state, thereby ensuring that the support rod 130 is in a stable state.

[0032] In one embodiment, the installation base further includes a second fixed block 140 and a diagonal brace 150. The second fixed block 140 is fixedly arranged on the shore, and the second fixed block 140 is arranged at intervals from the first fixed block 120. In a specific setting, the second fixed block 140 is a concrete block, and the second fixed block 140 can be prefabricated in a concrete prefabrication yard. According to the location of the bridge erection, the manufactured second fixed block 140 is transported to both sides of the water body, and the second fixed block 140 is maintained on both sides of the water body to ensure that the second fixed block 140 has a high hardness. At the same time, before the second fixed block 140 is transported, the upper surface is checked to be flat to ensure that the second fixed block 140 meets the manufacturing standards. After digging pits on both sides of the water body, the second fixed block 140 is buried on the shore, ensuring that the upper end of the second fixed block 140 is in a horizontal state, and the second fixed block 140 is arranged at intervals from the first fixed block 120. The diagonal brace 150 is arranged between the upper end of a support rod 130 and the second fixed block 140. The upper end surface of the second fixing block 140 is punched, and a first fixing anchor point is installed on the second fixing block 140. A second fixing anchor point is installed on the side wall of the support rod 130 near the upper end, and both ends of the inclined tie rod 150 are connected to the first fixing anchor point and the second fixing anchor point respectively, wherein the connection is fixed with fixing bolts, and the use of the inclined tie rod 150 can increase the stability of the support rod 130.

[0033] In one embodiment, the diagonal brace 150, the support rod 130 and the load-bearing cable 110 are all galvanized. The galvanizing treatment can increase the service life of the diagonal brace 150, the support rod 130 and the load-bearing cable 110, thereby preventing the diagonal brace 150, the support rod 130 and the load-bearing cable 110 from being corroded in a humid environment.

[0034] In one of the embodiments, the tensioning member includes a tensioning motor 210 and a tensioning wheel 220. The tensioning motor 210 is fixedly mounted on the upper end of the support rod 130, and the tensioning wheel 220 is fixedly mounted on the power output shaft of the tensioning motor 210. The tensioning motor 210 can drive the tensioning wheel 220 to rotate, and the load-bearing cable 110 can be wound around the tensioning wheel 220. In the initial state, on any set of installation foundations, the load-bearing cable 110 is wound around the tensioning wheel 220 on one of the support rods 130. After the support rods 130 and the tensioning motor 210 are all installed, a drone is used to tow one end of the load-bearing cable 110 to the other side of the water body. In other embodiments, staff can also use a small boat to tow one end of the load-bearing cable 110 to the other side of the water body. Then the load-bearing cable 110 is fixed to the tensioning wheel 220 on the other support rod 130, and the tensioning motors 210 on the two support rods 130 are started. The two tensioning motors 210 drive the tensioning wheels 220 to rotate in opposite directions, gradually tensioning the load-bearing cable 110.

[0035] In one of the embodiments, the locking member is a locking sleeve 230, which is fixedly connected to the upper end of the support rod 130, and the locking sleeve 230 is installed on the outside of the load-bearing cable 110. The locking sleeve 230 can fix the load-bearing cable 110 on the support rod 130 when the load-bearing cable 110 is tensioned, and the locking sleeve 230 can make the load-bearing cable 110 disengage from the tensioning wheel 220. In a specific setting, a self-centering chuck is provided in the locking sleeve 230. After the load-bearing cable 110 is tensioned, the self-centering chuck in the locking sleeve 230 gradually clamps the load-bearing cable 110. After the self-centering chuck in the locking sleeve 230 clamps the load-bearing cable 110, the load-bearing cable 110 no longer slides relative to the locking sleeve 230, ensuring that the load-bearing cable 110 can be in a stable state.

[0036] In one embodiment, a cutting knife is provided on the locking sleeve 230, and when the locking sleeve 230 fixes the load-bearing cable 110, the cutting knife can cut the load-bearing cable 110. In a specific configuration, the cutting knife can slide along the cross-sectional direction of the locking sleeve 230, and when the cutting knife slides along the cross-sectional direction of the locking sleeve 230, the load-bearing cable 110 can be cut off, so that the load-bearing cable 110 is out of contact with the tensioning wheel 220.

[0037] In one embodiment, a mounting platform 240 is provided on the support rod 130, and the locking sleeve 230 and the tensioning motor 210 are both installed on the mounting platform 240. A plurality of auxiliary plates 250 are provided between the lower end surface of the mounting platform 240 and the peripheral side wall of the support rod 130, and the auxiliary plates 250 are connected to the peripheral side wall of the support rod 130 by welding, and the auxiliary plates 250 are connected to the mounting platform 240 by welding. In other embodiments, the auxiliary plates 250 and the support rod 130 can be fixed by rivets, and the auxiliary plates 250 and the mounting platform 240 can be fixed by rivets. The mounting platform 240 can increase the stability of the locking sleeve 230 and the tensioning motor 210 on the support rod 130.

[0038] In one embodiment, the bearing platform includes a bearing cloth 260 and a mounting ring 270. A plurality of mounting rings 270 are provided, and the plurality of mounting rings 270 are all installed on the bearing cloth 260, and the mounting rings 270 can be installed on the load-bearing cable 110. Specifically, the mounting ring 270 can slide on the load-bearing cable 110. When the bearing cloth 260 is installed on the load-bearing cable 110, firstly, all the plurality of mounting rings 270 are installed on the bearing cloth 260, and then the plurality of mounting rings 270 are buckled one by one on the tensioned load-bearing cable 110. Specifically, a snap ring is provided on the mounting ring 270, and the snap ring can be directly buckled on the load-bearing cable 110, and the snap ring can slide along the load-bearing cable 110. By providing the snap ring, the efficiency of connecting the bearing cloth 260 to the load-bearing cable 110 can be improved.

[0039] In one embodiment, a tensioning rope is provided on the tensioning wheel 220. When the tensioning wheel 220 rotates, the tensioning rope can be wound around the tensioning wheel 220, and one end of the tensioning rope can be connected to the mounting ring 270 at the end of the carrier cloth 260. The tensioning rope can be tensioned by the tensioning wheel 220 after the locking sleeve 230 fixes the load-bearing cable 110. Specifically, after the load-bearing cable 110 is separated from the tensioning wheel 220, one end of the tensioning rope is connected to the mounting ring 270 at the end of the carrier cloth 260, and the tensioning wheel 220 is driven by the tensioning motor 210 so that the tensioning rope is wound around the tensioning wheel 220, and the carrier cloth 260 is gradually pulled so that the carrier cloth 260 is in a flattened state.

[0040] In one embodiment, a water extraction pipe 280 is provided on the upper surface of the carrier fabric 260, and the water extraction pipe 280 can extract the water falling on the surface of the carrier fabric 260 from the carrier fabric 260. In a configuration, a water extraction pump 290 is provided on any bank of the water body, and the water extraction pump 290 is connected to the water extraction pipe 280. When rainwater or construction sewage falls on the carrier fabric 260, the water extraction pump 290 can extract the rainwater or construction sewage falling on the carrier fabric 260 from the carrier fabric 260 in time.

[0041] In one embodiment, the load-bearing cloth 260 is divided into two layers, wherein the lower layer is made of dense safety protection flat net, and the upper layer is made of coated PE woven cloth. When the bridge construction is completed, the material of the load-bearing cloth 260 can be recycled and reused to avoid environmental pollution caused by the discarded load-bearing cloth 260.

[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A prestressed structural system for flexible support water surface netting protection, characterized in that: include: An installation foundation, wherein a plurality of installation foundations are provided, each installation foundation is fixedly provided on the bank of a water body, and the plurality of installation foundations are arranged on both banks of the water body in a first preset manner; A load-bearing cable, wherein a plurality of load-bearing cables are provided, each load-bearing cable is provided between two installation bases on both sides of the water surface, and each installation base is provided with a tensioning member, which is used to pull the end of the load-bearing cable; each installation base is provided with a locking member, which is used to fix the load-bearing cable to the end of the support rod; The load-bearing platform is installed on multiple load-bearing cables. The load-bearing platform is used to carry construction waste. The installation foundation includes a first fixed block and a support rod. The first fixed block is fixedly arranged on the shore. The support rod is fixedly arranged on the upper end face of the first fixed block. The tensioning member includes a tensioning motor and a tensioning wheel. The tensioning motor is fixedly arranged on the upper end of the support rod. The tensioning wheel is fixedly arranged on the power output shaft of the tensioning motor. The tensioning motor can drive the tensioning wheel to rotate. The load-bearing cable can be wound around the tensioning wheel. The locking member is a locking sleeve. The locking sleeve is fixedly connected to the upper end of the support rod. The locking sleeve is installed on the outside of the load-bearing cable. The locking sleeve can fix the load-bearing cable on the support rod when the load-bearing cable is tensioned, and the locking sleeve The locking sleeve is provided with a cutting knife, and when the locking sleeve fixes the load-bearing cable, the cutting knife can cut the load-bearing cable. The bearing platform includes a bearing cloth and a mounting ring. A plurality of mounting rings are provided, and the plurality of mounting rings are all mounted on the bearing cloth, and the mounting ring can be mounted on the load-bearing cable. A tensioning rope is provided on the tensioning wheel, and one end of the tensioning rope can be connected to the mounting ring at the end of the bearing cloth. The tensioning rope can be tensioned by the tensioning wheel after the locking sleeve fixes the load-bearing cable.

2. According to claim 1, a prestressed structural system for flexible support water surface netting protection is characterized by: The installation foundation also includes a second fixing block and an inclined rod. The second fixing block is fixedly arranged on the shore and is spaced apart from the first fixing block. The inclined rod is arranged between an upper end of a support rod and the second fixing block.

3. According to claim 1, a prestressed structural system for flexible support water surface netting protection is characterized by: A mounting platform is arranged on the support rod, and the locking sleeve and the tensioning motor are both mounted on the mounting platform.

4. The prestressed structural system for the flexible support water surface netting protection according to claim 1 is characterized by: A water extraction pipe is arranged on the upper surface of the carrier cloth, and the water extraction pipe can extract the water falling on the surface of the carrier cloth from the carrier cloth.