A visual inspection device that is convenient for loading and unloading
By designing the collaborative work of the inspection platform and the conveyor unit, the automatic loading, inspection and unloading of workpieces in the visual inspection system is realized, which solves the problem of low efficiency in the existing technology and improves the working efficiency of the overall equipment.
Patent Information
- Application Number
- CN202410132651.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-01-31
AI Technical Summary
The existing visual inspection system has low efficiency during the loading and unloading process, and each mechanism works independently, resulting in low overall work efficiency.
A device including an inspection table, loading and conveying unit, visual inspection unit and unloading and conveying unit is designed. The rotating table and output mechanism realize the synchronous loading, inspection and unloading of workpieces, using mechanical arms, conveyor belts and gear systems. Work together to achieve automated processing of workpieces.
The synchronization of material loading, material transfer and visual inspection is achieved, which greatly improves the work efficiency of the overall equipment.
Smart Images

Figure CN118205860B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of visual inspection, and in particular to a visual inspection device which is convenient for loading and unloading materials. Background Art
[0002] The visual inspection system uses industrial cameras to replace human eyes to complete functions such as identification, measurement, and positioning. Generally, the visual inspection system is composed of a camera, lens, and light source. It can replace manual inspections of barcode characters, cracks, packaging, surface integrity, dents, etc. The use of a visual inspection system can effectively improve the inspection speed and accuracy of the production line, greatly increase production and quality, reduce labor costs, and prevent misjudgments caused by eye fatigue.
[0003] The Chinese patent with the announcement number CN211593982U discloses an AOI inspection device that is convenient for loading and unloading. The inspection device realizes the sequential transformation of the PCB board in the loading station, the inspection station, the repair station and the unloading station by driving a rotating motor, thereby avoiding the AOI inspection device from causing unexpected situations when the PCB board is loaded and unloaded. However, the loading mechanism, the inspection mechanism, the repair mechanism and the unloading mechanism on the inspection device all need to be separately set up and work separately, and the overall work efficiency is low. Therefore, we propose a visual inspection device that is convenient for loading and unloading to solve the above-mentioned problems. Summary of the invention
[0004] The purpose of the present invention is to provide a visual inspection device that is convenient for loading and unloading materials, so as to solve the problems raised in the above-mentioned background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] A visual inspection device for convenient loading and unloading, comprising a testing platform, a loading and conveying unit, a visual inspection unit and a unloading and conveying unit, wherein a control terminal with a PLC controller is arranged on the testing platform, a cavity is opened in the testing platform, a middle groove is opened in the middle of the testing platform, a fixed platform is installed above the middle groove, and a rotating platform 1 and a rotating platform 2 are rotatably arranged above and below the fixed platform respectively;
[0007] A loading station, a testing station, a repairing station and a unloading station are respectively arranged on the four directions of the rotating table 1. A mechanical arm is arranged on one side of the loading station and the repairing station on the testing table. An electric suction cup is installed on the movable end of the mechanical arm. A conveyor belt 1 is also arranged on one side of the repairing station on the testing table.
[0008] One end of the loading and conveying unit is located below the loading station, and is mounted on the inspection table through four pillars. The workpiece to be inspected is sent to the loading station through the loading and conveying unit, so that the workpiece can be raised to the height of the rotating table 2 for transfer;
[0009] The visual inspection unit is installed on the inspection table, and a camera is provided on the visual inspection unit. The camera is located above the inspection station and reciprocates along the length direction of the visual inspection unit to perform shooting inspection;
[0010] The material unloading and conveying unit is also installed on the inspection table, and one end of the material unloading and conveying unit is located below the material unloading station, and the rotating table 2 is rotatably arranged between the gaps of the material unloading and conveying unit;
[0011] An output mechanism 1 is arranged in the cavity, and the output mechanism 1 includes a fixed frame, a linkage shaft 1 and a linkage shaft 2. The fixed frame is installed between the inner walls of the cavity, and a rack is slidably arranged along the length direction of the fixed frame. The bottom of the rack is connected to a guide plate, and mutually meshing bevel gears 3 and 4 are also installed in the fixed frame. A gear shaft that rotates synchronously with the linkage shaft 2 is connected to the bevel gear 3, and a connecting bolt that is synchronized with the linkage shaft 2 is arranged on the bevel gear 4, and one end of the connecting bolt moves between the inner walls of the guide plate. The top of the linkage shaft 1 is connected to the visual detection unit for output, and a transmission gear meshing with the rack is installed on its bottom end;
[0012] One end of linkage shaft 2 extends into the middle groove and is connected to gear 2 on this end through a key shaft. Gear 1 and gear 3 that mesh with each other are rotatably arranged on one side wall of the middle groove. A moving component is arranged on one side of gear 2, and displacement adjustment of gear 2 is realized by the moving component so as to make gear 2 mesh with gear 1. The moving component is installed on one side wall of the middle groove, and a swing handle is arranged on the other end of the moving component through a torsion spring. A cam and a driving member that rotate synchronously therewith are connected to one side of gear 3 through linkage shaft 3, and the cam is always arranged in contact with the top surface of the swing handle. A linkage shaft 4 is also rotatably arranged at the middle position of the middle groove, and the top of the linkage shaft 4 is connected and fixed to the rotating table 2, and a driven member that intermittently moves with the driving member is arranged on the outer wall of the linkage shaft 4, and the intermittent 90-degree rotation process of the rotating table 2 can be realized through the cooperation of the driving member and the driven member.
[0013] A fixed box 2 is also installed on the bottom wall of the middle groove, and a top block is movably arranged above the fixed box 2 through a lifting plate. Coaxially movable swing arm assemblies and lifting assemblies are respectively arranged on both sides of the fixed box 2. The other end of the swing arm assembly is coaxially connected to the swing handle, and the other end of the lifting assembly is arranged between the lifting plate and one of the pillars 1.
[0014] In one embodiment, the loading and conveying unit includes a conveying platform 1 and a conveyor belt 2, the bottom surface of the conveying platform 1 is fixed to the top of the four pillars 1 by bolts, the rotating platform 2 is in rotational contact with one end of the conveying platform 1, a screw rod 1 is rotatably arranged on one end of the conveying platform along its width direction, one end of the screw rod 1 is connected to a rotating motor 2, and the rotating motor 2 is installed on one side of the outer wall of the conveying platform 1, wherein the screw rod 1 is a bidirectional screw rod, the conveyor belt 2 is installed between the inner walls of the conveying platform 1 and its upper surface is flush, and a rotating motor 3 for driving work is installed on one side of the conveyor belt 2 on the outer wall of the conveying platform 1;
[0015] Two protective frames that move relative to each other are arranged on the top surface of the conveyor platform 1, and a photosensitive sensor is also embedded on the top surface of the conveyor platform 1. Both ends of the protective frames are arranged in an "L" shape. A screw rod 1 passes through one end of the protective frame and is threadedly driven therewith. A contact sensor 1 is embedded on the other end of the protective frame. Both the contact sensor 1 and the photosensitive sensor are connected to the PLC controller through electrical signals.
[0016] In one embodiment, the loading and conveying unit further comprises a moving block and a lever, a groove 1 is provided on the protective frame along its length direction, an electric push rod 1 is installed at one end of the groove 1, the moving block is installed on the movable end of the electric push rod 1, one end of the lever is rotatably arranged on the moving block, and the lever rotates 90 degrees each time;
[0017] When the push rod portion of the electric push rod 1 is at its longest length, the push rod is arranged parallel to the length direction of the protective frame;
[0018] When the photosensor is triggered, the lever rotates 90 degrees outside the groove one, and at the same time, the push rod portion of the electric push rod one begins to shorten its length. During this process, when the contact sensor one is triggered, the push rod portion of the electric push rod one resumes its lengthening, and at the same time, the lever rotates 90 degrees inside the groove one to reset.
[0019] In one embodiment, the visual inspection unit further includes a fixing box 1, an adjustment seat, and a bevel gear 1 and a bevel gear 2 that are meshed with each other;
[0020] Two vertical plates are installed on one side wall of the fixed box one, and the bottom end of the vertical plates is fixed on the detection table, and a bottom plate connected as an integral body is also arranged on the bottom wall of the fixed box one, bevel gear one is rotatably arranged on the bottom plate, bevel gear two is rotatably arranged on one end of the fixed box one, and screw rod two connected and fixed to the bevel gear two through an axis is also rotatably arranged in the fixed box one, an integrated slide plate is arranged on the adjustment seat, the slide plate slides between the inner walls of the fixed box one, and screw rod two penetrates the slide plate and is threadedly transmitted with it, the adjustment seat is slidably arranged along the length direction of the fixed box one, a mounting plate is arranged on the bottom wall of the adjustment seat, a camera is embedded in the bottom surface of the mounting plate, and an external power supply connected to the camera is installed on the top of the mounting plate, and the external power supply and the PLC controller are connected by electrical signals.
[0021] In one embodiment, the unloading conveying unit includes a conveying platform 2 and a conveying platform 3;
[0022] Conveyor platform 2 is installed on the inspection platform through four pillars 2. Conveyor belt 3 is installed on conveyor platform 2 along its length direction. Conveyor platform 3 is fixedly installed above conveyor platform 2, and a push plate that moves along the length direction of conveyor platform 3 is provided at one end of conveyor platform 3. A linear motor is installed on the end wall of conveyor platform 3 on one side of the push plate.
[0023] In one embodiment, the bevel gear 4 is connected to the concave surface of the fixing frame via an axis, a rotating handle synchronized with the bevel gear 4 is connected to the top surface of the bevel gear 4 via an axis, one end of the connecting bolt is screwed to the other end of the rotating handle via a thread, a guide hole is provided on the guide plate along its length direction, the other end of the connecting bolt slides between the inner walls of the guide hole, and the guide plate and the rack are arranged perpendicular to each other;
[0024] An axle seat is installed on the top surface of the testing table. The linkage shaft 1 passes through the axle seat and is rotatably arranged between the inner walls of the axle seat. The top of the linkage shaft 1 is connected and fixed to the bottom wall of the bevel gear 1 as a whole. The bottom end of the linkage shaft 1 is fixed to the transmission gear through a key connection.
[0025] In one embodiment, a key shaft is connected to one end of the gear 2 facing the linkage shaft 2 through a key, and the other end of the key shaft is inserted between the inner walls of the linkage shaft 2 and can be slidably arranged along the inner wall of the linkage shaft 2, and the key shaft never separates from the linkage shaft 2. When the gear 2 is meshed with the gear 1, the connection line from the center of the gear 2 to the center of the gear 1 is arranged at a vertical angle to the connection line from the middle of the gear 3 to the center of the gear 1.
[0026] The moving assembly includes a side plate and a clamping assembly. One end of the side plate is fixed to the side wall of the middle groove by screws. An electric push rod 2 arranged along its length direction is installed on the side plate by screws. The clamping assembly includes two moving plates. The push rod portion of the electric push rod 2 passes through the two moving plates and is fixed thereto. The distance between the two moving plates is fixed and the gear 2 is limited between the two moving plates. Two limit clamps are also installed on the side wall of one side of the side plate. The two moving plates reciprocate between the two limit clamps, and one of the moving plates is in sliding contact with the outer surface of the linkage shaft 2.
[0027] In one embodiment, the driving member includes a turntable and a handle, an arc piece is welded on the outer wall of the turntable, one end of the handle is welded on the turntable and the handle is arranged in an arc shape, and a bolt is threadedly connected to one end of the handle;
[0028] The follower is a hollow hemispherical structure, with four arc grooves on the follower, and a bolt groove between two adjacent arc grooves. The arc piece is in intermittent contact with the arc groove, and the bolt is also in intermittent contact with the bolt groove. When the arc piece is in contact with the arc groove for movement, the bolt is not in contact with the bolt groove, and when the bolt is in contact with the bolt groove for movement, the arc piece is not in contact with the arc groove.
[0029] In one embodiment, both sides of the interior of the second fixed box are provided with limit shafts for lifting and lowering in the vertical direction, the top ends of the two limit shafts are connected to the bottom surface of the top block, the lifting plate is fixed between the outer walls of the two limit shafts, and the lifting plate is provided with a guide groove arranged along its length direction, and a guide member is slidably arranged on one side of the guide groove;
[0030] The swing arm assembly includes a connecting handle 1 and a connecting handle 2, one end of the connecting handle 1 and one end of the connecting handle 2 are connected and fixed as a whole through an axis, and the connecting handle 1 and the connecting handle 2 are always in a state of being parallel to each other, and a synchronous shaft 1 is connected between the other end of the connecting handle 1 and the swing arm, and the synchronous shaft 1 is arranged to penetrate the end of the side plate and rotate between the inner walls of the side plate;
[0031] The lifting assembly includes a lifting arm, a connecting handle three and a connecting piece. A synchronous shaft two is connected between one end of the lifting arm and one end of the connecting handle two. The synchronous shaft two penetrates the fixed box two and is rotatably set between the inner walls of the fixed box two. A guide bolt is threadedly connected to one end of the connecting handle three. One end of the guide bolt penetrates the guide piece and slides between the inner walls of the guide groove. The other end of the connecting handle three is rotatably set on the side wall of one of the pillars one through an axis connection. The connecting piece includes two U-shaped seats fixed as a whole through an axis connection. One end of the lifting arm is connected to one of the U-shaped seats through an axis connection. The connecting handle three is rotatably set between the side walls of the other U-shaped seat through an axis connection.
[0032] In one embodiment, when the gear 1 rotates, the gear 3 rotates accordingly and drives the driving member and the cam to rotate synchronously. During the time of one rotation of the driving member, the arc piece and the bolt contact and move with the arc groove and the bolt groove respectively, so that the driven member intermittently completes the process of the driven member driving the rotating table 2 to rotate 90 degrees first and then remain stationary;
[0033] At the same time, the cam continuously controls the up and down movement of the swing handle, so that the top block can achieve up and down reciprocating movement under the cooperation of the swing arm assembly and the lifting assembly;
[0034] When the rotating table 2 rotates 90 degrees, the top block is at the lowest position. When the rotating table 2 rotates 90 degrees and remains stationary, the top block completes the reciprocating motion of first up and then down. In addition, during the time when the top block descends, the rotating table 1 also completes the process of rotating 90 degrees.
[0035] In the first time period of gear three's rotation, after gear three rotates 180 degrees, gear one pauses, and the position of gear two is adjusted to mesh with gear one, and then gear one continues to be driven to output. When gear three enters the second time period, while turntable two completes its rotation, the camera also synchronously completes a visual inspection.
[0036] Among them, in the initial state of gear three, the bolt and the bolt groove are in a state of just contact.
[0037] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0038] 1. By setting up the second-class structure of the output mechanism, firstly, through the cooperation of gear one and gear three, the driving member can intermittently drive the driven member, while the cam continuously controls the reciprocating swing of the swing handle, so that the reciprocating up and down motion of the top block is realized through the cooperation of the swing arm assembly and the lifting assembly. When the driven member is driven to rotate, the top block remains at the lowest position and does not move. When the driven member rotates and remains stationary, the top block completes the lifting process of first up and then down, so that the process of loading and transferring the workpiece to the next process can be completed simultaneously.
[0039] 2. By setting up the output mechanism 1 and the moving component and other structures, the meshing state of gear 2 and gear 1 is first realized by the moving component, and then, while gear 1 continues to drive gear 3, it also drives gear 2 synchronously, so that the visual inspection work can also be completed synchronously during the loading and transferring process.
[0040] In summary, the present invention can effectively achieve the synchronization of material loading, material transfer and visual inspection, greatly improving the working efficiency of the overall equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The technical solution and other beneficial effects of the present application will be made apparent by describing in detail the specific implementation methods of the present application in conjunction with the accompanying drawings.
[0042] In the attached picture:
[0043] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0044] Figure 2 yes Figure 1 A right view structural diagram of ;
[0045] Figure 3 It is a schematic diagram of the top view of the structure of the present invention (excluding the fixed platform and the rotating platform);
[0046] Figure 4 It is a schematic diagram of the installation position of the visual detection unit and the output mechanism 2 of the present invention;
[0047] Figure 5 It is a structural schematic diagram of the feeding and conveying unit of the present invention;
[0048] Figure 6 is a structural schematic diagram of a visual detection unit of the present invention;
[0049] Figure 7 It is a structural schematic diagram of the material unloading and conveying unit of the present invention;
[0050] Figure 8 It is a schematic diagram of the top view of the output mechanism 1 and the output mechanism 2 of the present invention;
[0051] Fig. 9 It is a structural schematic diagram of the output mechanism 1 of the present invention;
[0052] Fig.10 It is a structural schematic diagram of the output mechanism 2 of the present invention;
[0053] Fig.11 yes Fig.10 Another perspective structural diagram of;
[0054] Fig.12 is a schematic diagram of the structure of the mobile assembly of the present invention;
[0055] Fig.13 It is a connection diagram of the linkage shaft 2, the key shaft and the gear 2 of the present invention;
[0056] Fig.14 It is a bottom view structural schematic diagram of the fixed platform and the rotating platform 2 of the present invention;
[0057] Fig.15 It is a schematic diagram of the structure of the mechanical arm of the present invention;
[0058] Fig.16It is a schematic diagram of the state of the gear within three rotation cycles of the present invention.
[0059] In the figure: 1, testing platform; 11, control terminal; 12, conveyor belt 1; 13, rotating platform 1; 131, through hole 1; 14, fixed platform; 141, through hole 2; 15, rotating platform 2; 151, through hole 3; 16, cavity; 2, feeding and conveying unit; 21, conveyor platform 1; 22, protective frame; 221, contact sensor 1; 222, moving block; 223, lever; 23, screw 1; 24, conveyor belt 2; 25, photosensitive sensor device; 26, fixed slot; 261, limit block; 3, visual inspection unit; 31, vertical plate; 32, fixed box 1; 321, bottom plate; 322, screw 2; 33, adjustment seat; 34, bevel gear 1; 35, bevel gear 2; 36, mounting plate; 361, camera; 4, unloading conveying unit; 41, conveyor platform 2; 411, conveyor belt 3; 42, conveyor platform 3; 43, push plate; 5, output mechanism 1; 51, fixed frame; 52 , bevel gear three; 521, gear shaft; 53, bevel gear four; 531, handle; 54, connecting bolt; 55, rack; 551, guide plate; 56, transmission gear; 57, linkage shaft one; 58, synchronous wheel set; 59, linkage shaft two; 6, output mechanism two; 61, gear one; 62, gear two; 621, key shaft; 63, linkage shaft three; 631, driving member; 632, gear three; 633, cam; 64, side plate; 641 , clamping assembly; 642, limit clamp; 643, swing handle; 65, follower; 651, linkage shaft four; 66, fixed box two; 661, limit shaft; 662, top block; 663, lifting plate; 664, guide member; 67, swing arm assembly; 671, connecting handle one; 672, connecting handle two; 68, lifting assembly; 681, lifting arm; 682, connecting handle three; 683, connecting member; 7, mechanical arm; 71, electric suction cup. DETAILED DESCRIPTION
[0060] The disclosure below provides many different embodiments or examples to realize the different structures of the present application. In order to simplify the disclosure of the present application, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present application. In addition, the present application can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplification and clarity, which itself does not indicate the relationship between the various embodiments and / or settings discussed. In addition, the various specific processes and material examples provided by the present application, but those of ordinary skill in the art can appreciate the application of other processes and / or the use of other materials.
[0061] like Figure 1-4 and Fig.15As shown, the present invention provides a technical solution: a visual inspection device that is convenient for loading and unloading, comprising a detection table 1, a loading and conveying unit 2, a visual inspection unit 3, a unloading and conveying unit 4, and an output mechanism 1 5 and an output mechanism 2 6;
[0062] A control terminal 11 with a PLC controller is fixedly installed on the top surface of the testing platform 1 by bolts, and two sets of mechanical arms 7 are installed on the testing platform 1 by bolts, an electric suction cup 71 is installed on the movable end of the mechanical arm 7, and the bottom end of the mechanical arm 7 is fixed to the testing platform 1 by bolts, and a conveyor belt 12 is also installed on the top surface of the testing platform 1, and a rotating motor 1 is installed on the outer wall of the testing platform 1 outside the conveyor belt 12 by bolts, and the output shaft of the rotating motor 1 is connected to the conveyor belt and drives it.
[0063] A middle groove is provided in the middle of the testing platform 1, and a rotating platform 13, a fixed platform 14 and a rotating platform 2 15 are arranged above the middle groove in order from top to bottom. The rotating platform 13 is rotatably arranged on the fixed platform 14 through an axis connection (the motor driving the rotating platform 13 to rotate is installed inside the fixed platform 14, not shown in the figure), and each rotation angle of the rotating platform 13 and the rotating platform 2 15 is 90 degrees. The fixed platform 14 is installed on the testing platform 1 through four cylinders.
[0064] like Fig.14 As shown, four through holes 131 are opened on the rotating table 13, and the four through holes 131 are respectively located at the loading station, the inspection station, the repair station and the unloading station. Four through holes 3 151 are also opened on the rotating table 2 15, and the four through holes 3 151 are also respectively located at these four stations. Two through holes 2 141 are opened on the fixed table 14, which are respectively located at the loading station and the unloading station. The length, width and height of through hole 131 and through hole 3 151 are equal.
[0065] The loading and conveying unit 2 is located on the lower side of the loading station, one group of robotic arms 7 is installed on one side of the loading and conveying unit 2, the visual inspection unit 3 is located on the upper side of the inspection station, another group of robotic arms 7 is installed on one side of the visual inspection unit 3 and reciprocates between the repair station and the conveyor belt 12 in a 90-degree rotation manner, and the unloading and conveying unit 4 is located on the lower side of the unloading station.
[0066] An output mechanism 26 is provided at the bottom of the rotating table 2 15 to drive its rotation. The output mechanism 15 is installed inside the detection table 1 and is linked with the output mechanism 26. The synchronous linkage between the output mechanism 15 and the output mechanism 26 is used to control the lifting process of the top block 662, the intermittent rotation process of the rotating table 2 15 and the reciprocating movement process of the camera 361.
[0067] It needs to be further explained that the workpiece is grabbed by the robot arm 7 to the loading and conveying unit 2, and is sent to the loading station by the loading and conveying unit 2, and then lifted up by the top block 662, so that the workpiece rises to one of the through holes 131, and then the turntable 13 rotates 90 degrees to send it to the inspection station for visual inspection. If there is any abnormality after inspection by the visual inspection unit 3, when the turntable 13 transfers the workpiece to the repair station, another group of robot arms 7 will directly grab it and transfer it to the conveyor belt 12 for repair. If there is no abnormality after inspection, after passing the repair station, it will continue to rotate 90 degrees with the turntable 13 to fall to the unloading station, and finally be sent out by the unloading conveying unit 4.
[0068] like Figure 5 As shown, the loading and conveying unit 2 includes a conveying platform 1 21, a protective frame 22, a conveyor belt 24 and a photosensitive sensor 25;
[0069] The conveying platform 21 is installed on the detection platform 1 through four pillars, and the rotating platform 21 is in rotational contact with one end of the conveying platform 21. A screw seat is installed at the middle position of the end wall of one end of the conveying platform 21 through a screw, and a screw 23 is penetrated in the screw seat and is rotatably arranged with it. The screw 23 is a bidirectional screw, and the part where the screw 23 is connected to the screw seat has no thread setting and realizes the rotation connection relationship with the screw seat through a bearing ring. Both ends of the screw 23 are rotatably arranged on the outer walls of both sides of the conveying platform 21, and a rotating motor 2 connected to the screw 23 and driven is installed on one of the outer walls by screws. The conveyor belt 24 is installed between the inner walls of the conveying platform 21 and its top surface is flush, and a rotating motor 3 driving the conveyor belt 24 is installed on the outer wall of the conveying platform 21 by bolts.
[0070] A fixed groove 26 is also provided on the top surface of the conveying platform 21, and two limit blocks 261 are slidably arranged in the fixed groove 26. A photosensitive sensor 25 connected to the PLC controller through electrical signals is also provided at the position between the fixed groove 26 and the conveyor belt 24. The photosensitive sensor 25 is embedded in the top surface of the conveying platform 21 to determine whether there is a workpiece passing through. Two symmetrically arranged protective frames 22 are also slidably arranged on the top surface of the conveying platform 21, and one end of the protective frame 22 is also arranged in contact with the top surface of the rotating platform 2 15. Both ends of the protective frame 22 are arranged in an "L" shape, and a screw 23 passes through one end of the protective frame 22 and is threadedly driven therewith. A contact sensor 221 connected to the PLC controller through electrical signals is embedded on the other end of the protective frame 22, and the bottom wall of the protective frame 22 is connected to the limit block 261 as a whole.
[0071] Among them, a groove 1 is also provided on the protective frame 22 along its length direction, and a moving block 222 is movably arranged in the groove 1 through an electric push rod 1. A reciprocating 90-degree rotating lever 223 is also rotatably arranged between the inner walls of the moving block 222. The motor part of the electric push rod 1 is built between the inner walls of the protective frame 22, and the moving block 222 is embedded with a rotating motor (not shown in the figure) for controlling the rotation of the lever 223.
[0072] When the push rod portion of the electric push rod 1 is at its longest length, the lever 223 is parallel to the length direction of the protective frame 22 (ie, Figure 5 As shown), and at this time, the distance between the end of the lever 223 away from the electric push rod one and one end of the groove one is 1 cm, so that the lever 223 can be smoothly rotated out of the groove one; when the push rod portion of the electric push rod one is at the shortest length, the moving block 222 is in contact with one end of the groove one, and the length direction of the lever 223 and the protective frame 22 are in a vertical state. In the process of the push rod portion of the electric push rod one changing from the shortest length to the longest length, the lever 223 will also change from a vertical state to a parallel state, and stop when the push rod portion reaches the longest length.
[0073] It should be further explained that the PLC controller is used to control the start of the rotating motor 2 and its output direction, so that the movement and adjustment of the protective frame 22 can be controlled. After adjusting to the appropriate position, the rotating motor 2 is stopped, and then the rotating motor 3 is started by the PLC controller to drive the conveyor belt 24 to enter the working state. The workpieces are placed one by one on the conveyor belt 24 through the mechanical arm 7 on the side, and move to the side where the upper material station is located along the transmission direction of the conveyor belt 24. When the workpiece passes over the photosensitive sensor 25, the signal of the photosensitive sensor 25 is interrupted due to being blocked, until the workpiece completely moves over the photosensitive sensor 25, the signal is reconnected, and the workpiece is also moved out of the conveyor belt 24. At this time (that is, at the photosensitive sensor 25 signal is reconnected), the lever 223 rotates 90 degrees to the outside of the groove and then stops, and then the push rod part of the electric push rod 1 starts to move back (that is, the length is shortened), so that after the lever 223 contacts one end of the workpiece, it drives it to continue to move onto the rotary table 2 15, until the other end of the workpiece contacts the contact sensor 1 221 on the protective frame 22, the contact sensor 1 221 is triggered. At this time, the workpiece is already located at the loading station, and at this time the PLC controller immediately controls the electric push rod 1 to change its movement direction (that is, to extend the length of its push rod part again), and at the same time, it also immediately controls the lever 223 to rotate 90 degrees to make it move back into the groove, and automatically stops when the push rod part of the electric push rod 1 is extended to the longest length.
[0074] like Figure 6 As shown, the visual inspection unit 3 includes a fixing box 1 32, an adjustment seat 33, a bevel gear 1 34, a bevel gear 2 35 and a camera 361;
[0075] Two vertically arranged vertical plates 31 are installed on the top surface of the detection table 1 by screws, and a fixing box 32 is horizontally installed on the side walls on the same side of the two vertical plates 31 by screws, and a bottom plate 321 is also installed on the bottom wall of the fixing box 32 by screws, and a bevel gear 1 34 is rotatably arranged on the bottom plate 321, and a bevel gear 2 35 is rotatably arranged on one end of the fixing box 1 32, and the bevel gear 1 34 is meshed with the bevel gear 2 35. A through hole 4 is opened on the fixing box 1 32 along its length direction, and a screw 2 322 is rotatably arranged in the through hole 4, and one end of the screw 2 322 is fixed to the side wall of the bevel gear 2 35 as a whole by an axis connection.
[0076] An adjustment seat 33 is slidably provided along the length direction of the fixed box 32, and an integrated slide plate is provided between the top wall and the bottom wall of the adjustment seat 33. The slide plate is slidably provided along the inner wall of the through hole 4, and the screw rod 2 322 penetrates the slide plate and is threadedly transmitted therewith. A mounting plate 36 is installed on the bottom wall of the adjustment seat 33 by screws, and a camera 361 is embedded in the bottom surface of the mounting plate 36, and an external power supply connected to the camera 361 through a wire is installed on the top of the mounting plate 36 by screws, and the external power supply and the PLC controller are connected by electrical signals.
[0077] It needs to be further explained that after the workpiece located at the loading station rotates 90 degrees with the turntable 13 and moves to the inspection station, at this time, the meshing transmission between the bevel gear 1 34 and the bevel gear 2 35 synchronously drives the rotation of the screw 2 322, so that the adjustment seat 33 drives the camera 361 to move from far to near to the inspection station and moves back to the original position and stops after completing the visual inspection. Then, the PLC controller determines whether the robot arm 7 on the side of the repair station enters the working state through the result of the visual inspection unit 3, and controls the workpiece to continue to rotate 90 degrees to the repair station. If there is an abnormality in the workpiece after inspection, the robot arm 7 will directly suck it from the repair station and place it on the conveyor belt 12 on the side for transmission.
[0078] like Figure 7 As shown, the unloading conveying unit 4 includes a conveying platform 2 41 and a conveying platform 3 42;
[0079] The conveyor platform 2 41 is installed on the detection platform 1 through four pillars 2. A conveyor belt 3 411 is installed on the conveyor platform 2 41. A rotating motor 5 is installed on the outer wall of the conveyor platform by bolts. The rotating motor 5 is connected to the conveyor belt 3 411 and drives it. The conveyor platform 3 42 is installed above the conveyor platform 2 41 and fixed to it by bolts. A weight sensor (not shown in the figure) connected to the PLC controller through an electrical signal is built into the top surface of the conveyor platform 3 42 for detecting whether there is a workpiece falling on the conveyor platform 3 42. When the detection value of the weight sensor changes, the PLC controller starts the push plate 43 to work, wherein the rotating platform 2 15 is rotatably set in the gap between the conveyor platform 2 41 and the conveyor platform 3 42, the fixed platform 14 is located above the top of the conveyor platform 3 42, and a push plate 43 is set at one end of the conveyor platform 3 42, and a linear motor is installed on one side of the push plate 43 on the end wall of the conveyor platform 3 42 by screws.
[0080] It should be further explained that if there is no abnormality in the workpiece after inspection, the workpiece rotates 90 degrees from the repair station to the unloading station with the rotating table 13, and the workpiece automatically falls onto the conveyor table 3 42. Subsequently, the PLC controller controls the linear motor to start, so that the push plate 43 reciprocates once, thereby pushing the workpiece onto the conveyor belt 3 411 and resetting it, and the workpiece is transported forward with the conveyor belt 3 411.
[0081] like Figure 8-9 As shown, the output mechanism 1 5 includes a fixing frame 51, a bevel gear 3 52, a bevel gear 4 53, a connecting bolt 54, a rack 55, a transmission gear 56, a linkage shaft 1 57 and a linkage shaft 2 59;
[0082] A cavity 16 is provided on one side of the interior of the test bench 1, and a fixing frame 51 is provided in a "U"-shaped structure and is fixed between the inner walls of the cavity 16 by screws, and a groove 2 is provided on the fixing frame 51, and a guide rod is fixedly inserted between the side walls of the groove 2, and a rack 55 slides on the guide rod, and a guide plate 551 vertically provided thereto is installed on the bottom wall of the rack 55 by screws, and a guide hole is provided on the guide plate 551, and a connecting bolt 54 is slidably provided in the guide hole, and the connecting bolt 54 is screwed to one end of the rotating handle 531 by a thread, and the bevel gear 4 53 is synchronously connected to the other end of the rotating handle 531 by an axis, and the bevel gear 4 53 is connected to the rotating device by an axis. It is placed on a fixed frame 51, and a bevel gear three 52 is rotatably set on the inner wall of one side of the fixed frame 51. The bevel gear four 53 is meshed with the bevel gear three 52, and a gear shaft 521 is connected to the side wall of the bevel gear three 52. The gear shaft 521 penetrates the fixed frame 51, and a linkage shaft two 59 is rotatably set on the outer wall of one side of the fixed frame 51. A synchronous wheel set 58 is installed between the linkage shaft two 59 and the gear shaft 521. The synchronous wheel set 58 includes two synchronous wheels and a synchronous belt. The two synchronous wheels are respectively installed on the linkage shaft two 59 and the gear shaft 521 by key connection, and the synchronous belt is installed between the two synchronous wheels.
[0083] A transmission gear 56 is also meshed on one side of the rack 55. The transmission gear 56 is located directly below the bevel gear 34 and a linkage shaft 57 is connected therebetween. The outer sleeve of the linkage shaft 57 is provided with a shaft seat. An integrated convex ring (not shown in the figure) is provided on the linkage shaft 57. The convex ring is rotatably arranged between the inner walls of the shaft seat to ensure that the position of the linkage shaft 57 will not be displaced. The shaft seat is fixed to the top surface of the inspection table 1 by screws.
[0084] It should be further explained that, through the linkage shaft 2 59 as the power input, the synchronous wheel set 58 is utilized to drive the gear shaft 521 to rotate synchronously, and then drive the meshing transmission of the bevel gear 3 52 and the bevel gear 4 53, the turning handle 531 rotates synchronously with the bevel gear 3 52, and with the continuous circular motion of the turning handle 531, the connecting bolt 54 continuously reciprocates in the through hole 4, so that the guide plate 551 synchronously drives the rack 55 to reciprocate along the straight line direction, and then controls the forward and reverse rotation motion of the transmission gear 56, and the bevel gear 1 34 rotates synchronously with the transmission gear 56 in the forward and reverse directions through the action of the linkage shaft 1 57, thereby realizing the automatic reciprocating motion of the adjustment seat 33.
[0085] by Fig. 9 Taking the state shown in FIG. 1 as an example, the bevel gear 4 53 rotates clockwise, and when the connecting bolt 54 rotates clockwise with the rotating handle 531 and moves from the left end of the through hole 4 to the middle position of the through hole 4, the rack 55 moves to the Fig. 9As shown in the figure, the transmission gear 56 rotates counterclockwise, and when the connecting bolt 54 continues to move from the middle position of the through hole 4 to the right end of the through hole 4, the rack 55 moves accordingly. Fig. 9 The downward movement shown causes the transmission gear 56 to rotate clockwise.
[0086] like Figure 10-13 As shown, the output mechanism 2 6 includes a gear 1 61, a gear 2 62, a gear 3 632, a driving member 631, a driven member 65, a moving assembly, a swing arm assembly 67 and a lifting assembly 68;
[0087] Gear three 632 is installed just above gear one 61 and meshes with gear one 61. Gear one 61 and gear three 632 are both rotatably arranged on one side wall of the middle groove. A driving motor (this driving motor is a rotating motor) connected to gear one 61 is installed on one side inner wall of the cavity 16 by bolts.
[0088] A linkage shaft three 63 synchronized with the gear three 632 passes through the middle, and a driving member 631 is installed on one end of the linkage shaft three 63. The driving member 631 includes a turntable and a handle 531. An arc piece connected as one body is welded on the outer wall of the turntable. The arc piece is arranged toward the driven member 65 and is in intermittent rotational contact with the driven member 65. The handle 531 is welded on the turntable and is arranged in an arc-shaped structure. A bolt is also screwed at one end of the handle 531, and the bolt is also in intermittent contact with the driven member 65. The other end of the linkage shaft three 63 is rotatably arranged on the side wall of the middle groove and a bearing ring is embedded on the side wall of the middle groove at the connection point of this end. A cam 633 synchronized with the linkage shaft three 63 is also installed.
[0089] Gear 2 62 is located on one side of gear 1 61. When gear 2 62 is meshed with gear 1 61, the connection line from the center of gear 2 62 to the center of gear 1 61 is set at a vertical angle to the connection line from the middle of gear 3 632 to the center of gear 1 61. Gear 2 62 is movably set on one end of linkage shaft 2 59. Gear 2 62 can be meshed with gear 1 61 through the linear motion of the moving component.
[0090] The moving assembly includes a side plate 64 and a clamping assembly 641. The clamping assembly 641 includes two moving plates. One end of the side plate 64 is fixed to one side wall of the middle groove by screws. An electric push rod 2 is fixedly installed on the side plate 64 by screws. The two moving plates are both installed on the push rod part of the electric push rod 2 and are connected as a whole, that is, the two moving plates perform synchronous displacement movement with the extension or shortening of the electric push rod 2. The gear 2 62 is limited between the two moving plates. Two limit clamps 642 are also installed on the side plate 64 by screws. Contact sensors 2 (not shown in the figure) connected to the PLC controller through electrical signals are embedded on the opposite side walls of the two limit clamps 642 for controlling the displacement distance of the clamping assembly 641. One of the moving plates is in sliding contact with the outer surface of the linkage shaft 2 59. A swing handle 643 is rotatably provided on the side wall at one end of the side plate 64. The top surface of the swing handle 643 is always in contact with the cam 633.
[0091] A linkage shaft 4 651 is rotatably arranged on the bottom wall of the middle groove through a bearing ring, and a follower 65 is installed on the outer wall of the linkage shaft 4 651. The position of the follower 65 is fixed, and the follower 65 is a hollow hemispherical structure. An arc groove and a bolt groove are respectively opened on the follower 65. The arc groove is in intermittent contact with the arc piece on the driving member 631, and the bolt groove is in intermittent contact with the bolt on the driving member 631. The top of the linkage shaft 4 651 is connected to the center of the bottom wall of the rotating table 2 15 as a whole.
[0092] A vertically arranged fixed box 2 66 is also installed on the bottom wall of the middle groove by bolts, and both sides of the interior of the fixed box 2 66 are movably provided with limit shafts 661 along the vertical direction, and a top block 662 connected as one body is installed on the top wall of the two limit shafts 661, and the top block 662 can move up and down in the through hole 3 151 on the rotating table 2 15, and a lifting plate 663 is fixed between the two limit shafts 661 by screws, and a guide groove arranged along the length direction of the lifting plate 663 is opened on the side wall at one end, and a guide member 664 of a "U"-shaped structure is slidably arranged in the length direction of the guide groove, and the two ends of the guide member 664 slide along the top surface and the bottom surface of the lifting plate 663 respectively. In addition, a swing arm assembly 67 and a lifting assembly 68 are respectively arranged on both sides of the fixed box.
[0093] The swing arm assembly 67 includes a connecting handle 1 671 and a connecting handle 2 672. One end of the connecting handle 1 671 is connected to one end of the connecting handle 2 672 through an axis, and the connecting handle 1 671 and the connecting handle 2 672 are in a parallel setting state. The other end of the connecting handle 1 671 is rotatably set on one end of the side plate 64 and is connected to one end of the swing arm through a synchronization shaft 1. The synchronization shaft 1 is rotatable and penetrates through one end of the side plate 64. In addition, a torsion spring for resetting the swing handle 643 is installed on the synchronization shaft 1 (not shown in the figure, the torsion spring is installed inside the side plate 64), thereby ensuring that the swing handle 643 can always be in contact with the cam 633. The other end of the connecting handle 2 672 is rotatably set on one side of the fixed box 2 66.
[0094] The lifting assembly 68 includes a lifting arm 681, a connecting handle three 682 and a connecting piece 683, one end of the lifting arm 681 is rotatably set on the other side of the fixed box two 66, and one end of the lifting arm 681 is connected to one end of the connecting handle two 672 through a synchronous shaft two, and the synchronous shaft two rotates and penetrates the fixed box two 66, one end of the connecting handle three 682 is rotatably set on the side wall of one of the pillars one through an axis connection, and the other end of the connecting handle three 682 is threadedly connected with a guide bolt, which penetrates the guide piece 664 and slides between the inner walls of the guide groove, and the connecting piece 683 includes two U-shaped seats fixed as a whole by an axis connection, one of the U-shaped seats is connected to one end of the lifting arm 681 by an axis, and the connecting handle three 682 is rotatably set between the side walls of the other U-shaped seat through an axis connection.
[0095] In addition, it should be noted that a key shaft 621 is integrally provided on one end of the gear 2 62 , and the key shaft 621 is inserted between the inner walls of the linkage shaft 2 59 in a straight line direction, and the end of the key shaft 621 located inside the linkage shaft 2 59 never separates from the linkage shaft 2 59 .
[0096] It should be further explained that the driving motor is started by the PLC controller to control the rotation output of the gear 1 61;
[0097] Driving state one: with the rotation of gear one 61, gear three 632 rotates synchronously under the meshing action, and then the linkage shaft three 63, driving member 631 and cam 633 rotate synchronously therewith, wherein, when the driving member 631 rotates one circle with gear one 61, when the arc piece and the arc groove rotate and contact, the follower 65 does not rotate, and when the bolt rotates with the turntable and enters the bolt groove, the arc piece also leaves the arc groove. At this time, with the movement of the bolt, the follower 65 rotates accordingly, that is, within the time when gear three 632 rotates one circle, the follower 65 rotates 90 degrees within the time when gear three 632 rotates half a circle, and the position of the follower 65 remains unchanged during the other half circle, so that the rotating table two 15 connected to the linkage shaft four 651 also intermittently completes the process of rotating 90 degrees.
[0098] Driving state two: in the process of synchronous rotation of cam 633 with linkage shaft three 63, the up and down movement of swing handle 643 is continuously controlled, and one end of swing arm assembly 67 is coaxially connected to swing handle 643, so that swing arm assembly 67 performs swinging motion synchronously, and the other end of swing arm assembly 67 is coaxially connected to lifting arm 681, so that when lifting arm 681 swings up and down when swing arm assembly 67, one end of lifting arm 681 (the end connected coaxially) changes angle synchronously, so that the other end of lifting arm 681 drives connecting member 683 to move in the vertical direction, because the position of one end of connecting handle three 682 is always fixed on pillar one, and the other end of connecting handle three 682 can be slidably adjusted on one side of lifting plate 663, so the movement of connecting member 683 can ensure that in the vertical direction, through the cooperation between lifting arm 681 and connecting handle three 682, the lifting and lowering movement of lifting plate 663 in the vertical direction is controlled, thereby controlling the lifting and lowering adjustment process of top block 662.
[0099] In short, when the wide end (the end with a larger diameter) of the cam 633 moves to a vertical downward state, the end of the swing handle 643 in contact with it is in a state of being in a downward direction. Fig.10 The state shown is tilted upward, and the other end of the swing handle 643 drives the swing arm assembly 67 to Fig.10 In the state shown, the lifting arm 681 tilts downward, and then the end connected to the connecting piece 683 moves downward, and the connecting handle 3 682 drives the lifting plate 663 to move downward. At this time, the top block 662 moves downward synchronously with the limit shaft 661, and the top surface of the top block 662 is flush with the lower surface of the through hole 3 151. When the narrow end (the end with a smaller diameter) of the cam 633 moves to the vertical downward state, the end of the swing handle 643 that contacts it is in a state of being ... Fig.10 The state shown below is tilted, and the other end of the swing handle 643 drives the swing arm assembly 67 to Fig.10In the state shown, the lifting arm 681 tilts upward, and then the end connected to the connecting piece 683 moves upward, and the connecting handle 682 drives the lifting plate 663 to move upward. At this time, the top block 662 moves upward synchronously with the limit shaft 661, and pushes the workpiece on the loading station into the through hole 131. At this time, the top surface of the top block 662 is flush with the lower surface of the through hole 131.
[0100] Driving state three: start the electric push rod 2 through the PLC controller, so that the clamping component 641 moves and adjusts with the electric push rod 2, thereby synchronously driving the movement and adjustment of the gear 2 62. In the initial state, one end of the clamping component 641 is in contact with the gear 2. Fig.10 The limit clamp 642 on the right side of the drawing is in contact, and the gear 2 62 and the gear 1 61 are not meshing with each other; when the clamping assembly 641 moves with the electric push rod 2 from Fig.10 As shown, when the right side moves to contact with the left limit clamp 642, gear 2 62 and gear 1 61 are just in meshing state. Afterwards, since gear 2 62 and gear 1 61 are already in meshing state, gear 2 62 rotates and simultaneously drives linkage shaft 2 59 to rotate and output.
[0101] like Fig.16 As shown, within the rotation period of the gear three 632 (i.e., the time for one rotation, denoted as t), the initial state of the gear three 632 is at a position where the bolt just contacts the bolt groove;
[0102] In the first cycle t: in the first 0.5t, the bolt cooperates with the bolt slot, and the rotary table 15 rotates 90 degrees. In the second 0.5t, the arc piece cooperates with the arc slot, and the rotary table 15 remains stationary. At the same time, in the second 0.5t, the top block 662 takes 0.25t to complete the rising and falling processes, and in the 0.25t time when the top block 662 descends, the rotary table 13 completes the rotation of 90 degrees. In the 0.5t second, the gear 1 61 pauses for 5 seconds. In this 5-second period, the clamping assembly 641 completes the position adjustment of the gear 2 62, so that it moves to the position where it meshes with the gear 1 61 and stops.
[0103] After the second cycle t starts: in the first 0.5t time, the turntable 2 15 completes a 90 degree rotation as in the first cycle, and at the same time, the camera 361 completes a reciprocating detection work. In the next 0.5t time, the movement process and state of the turntable 2 15, the top block 662 and the turntable 1 13 are consistent with those of the first cycle.
[0104] Working principle:
[0105] First, the workpiece is transported in a straight line along the loading and conveying unit 2. After passing the photosensitive sensor 25, the workpiece is sent to contact with one end of the protective frame 22 by the lever 223. The contact sensor 221 is triggered, and the lever 223 is reset immediately. At this time, the workpiece is located at the loading station.
[0106] Next, the top block 662 is pushed upward by the lifting assembly 68, and the workpiece is lifted into the through hole 131. Then, the top block 662 is reset. Then, under the action of the driving member 631 and the driven member 65, the rotary table 15 rotates 90 degrees. Then, the rotary table 13 also rotates 90 degrees, and the workpiece located at the loading station is transferred to the inspection station. At the same time, the next workpiece is moved to the loading station, and the process of loading and transferring to the inspection station is completed in this cycle.
[0107] In the process of the second rotation of the rotating table 15 by 90 degrees, the gear 2 62 has moved to the position meshing with the gear 1 61. As the gear 1 61 continues to drive, the rotating table 15 continuously rotates 90 degrees intermittently, and the top block 662 also continuously completes the intermittent lifting movement. Subsequently, the adjusting seat 33 controls the camera 361 to perform a reciprocating movement under the driving action of the linkage shaft 2 59, and completes the detection process of the workpiece on the detection station;
[0108] After detection, the camera 361 connects the detection signal to the PLC controller and controls the robot arm 7 on the side of the repair station through the PLC controller. If the workpiece is detected to be abnormal, then after the workpiece is adjusted from the detection station to the repair station, the robot arm 7 on the side sucks the workpiece through the electric suction cup 71 and places it on the conveyor belt 12 on the side. If the workpiece is detected to be normal, then after the workpiece is adjusted from the detection station to the repair station, the robot arm 7 on the side does not work. After the workpiece is adjusted from the repair station to the unloading station, the workpiece falls from the unloading station to the conveyor table three 42, and then is pushed to the conveyor table two 41 for transportation by the push plate 43.
[0109] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or mutual communication; it can be a direct connection, internal communication between two elements, or an interaction relationship between two elements. For ordinary technicians in this field, the meanings of the above terms in this application can be understood according to specific circumstances.
[0110] The above is a detailed introduction to a visual inspection device that is convenient for loading and unloading provided in an embodiment of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the technical solution and its core idea of the present application; ordinary technicians in this field should understand that: they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some of the technical features therein with equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A visual inspection device that is convenient for loading and unloading, characterized in that: include: A testing platform (1), wherein a control terminal (11) with a PLC controller is provided on the testing platform (1), a cavity (16) is provided in the testing platform (1), a middle groove is provided in the middle of the testing platform (1), a fixed platform (14) is installed above the middle groove, and a rotating platform (13) and a rotating platform (15) are rotatably provided above and below the fixed platform (14), respectively; A loading station, an inspection station, a repair station and an unloading station are respectively arranged on the four directions of the rotating table (13); a mechanical arm (7) is arranged on one side of the loading station and the repair station on the inspection table (1); an electric suction cup (71) is installed on the movable end of the mechanical arm (7); and a conveyor belt (12) is also arranged on one side of the repair station on the inspection table (1); A loading and conveying unit (2), one end of which is located below the loading station and is mounted on the inspection platform (1) via four support columns, and the workpiece to be inspected is delivered to the loading station via the loading and conveying unit (2), so that the workpiece can be raised to the height of the rotating platform (15) for transfer; A visual inspection unit (3), the visual inspection unit (3) being mounted on the inspection platform (1), and a camera (361) being provided on the visual inspection unit (3), the camera (361) being located above the inspection station and reciprocating along the length direction of the visual inspection unit (3) to perform photographing and inspection; A material unloading and conveying unit (4), the material unloading and conveying unit (4) is also mounted on the inspection platform (1), and one end of the material unloading and conveying unit (4) is located below the material unloading station, and a second rotating platform (15) is rotatably disposed in the gap between the material unloading and conveying unit (4); An output mechanism (5) is arranged in the cavity (16). The output mechanism (5) comprises a fixed frame (51), a linkage shaft (57) and a linkage shaft (59). The fixed frame (51) is installed between the inner walls of the cavity (16). A rack (55) is slidably arranged along the length direction of the fixed frame (51). The bottom of the rack (55) is connected to a guide plate (551). A bevel gear (52) and a bevel gear (53) meshing with each other are also arranged in the fixed frame (51). The bevel gear (52) is connected to a gear shaft (521) that rotates synchronously with the linkage shaft (59). The bevel gear (53) is provided with a connecting bolt (54) that is synchronized with the linkage shaft (59). One end of the connecting bolt (54) moves between the inner walls of the guide plate (551). The top of the linkage shaft (57) is connected to the visual detection unit (3) for output, and a transmission gear (56) meshing with the rack (55) is installed on its bottom. One end of the linkage shaft 2 (59) extends into the middle groove and is connected to the gear 2 (62) at this end via a key shaft (621). A gear 1 (61) and a gear 3 (632) that mesh with each other are rotatably arranged on one side wall of the middle groove. A moving assembly is arranged on one side of the gear 2 (62). The displacement adjustment of the gear 2 (62) is achieved by the moving assembly so that the gear 2 (62) meshes with the gear 1 (61). The moving assembly is installed on one side wall of the middle groove, and a swing handle (643) is arranged on the other end of the moving assembly via a torsion spring. The gear 3 (632) is rotated to rotate on the side wall of the middle groove. One side is connected to a cam (633) and a driving member (631) that rotate synchronously with the linkage shaft (63). The cam (633) is always arranged in contact with the top surface of the swing handle (643). A linkage shaft (651) is also rotatably arranged at the middle position of the middle groove. The top of the linkage shaft (651) is connected and fixed to the rotating table (15). A driven member (65) that intermittently moves with the driving member (631) is arranged on the outer wall of the linkage shaft (651). The cooperation between the driving member (631) and the driven member (65) can realize an intermittent 90-degree rotation process of the rotating table (15). A second fixing box (66) is also installed on the bottom wall of the middle groove. A top block (662) is movably arranged above the second fixing box (66) via a lifting plate (663). A swing arm assembly (67) and a lifting assembly (68) are respectively arranged on both sides of the second fixing box (66) so as to move coaxially. The other end of the swing arm assembly (67) is coaxially connected to the swing handle (643). The other end of the lifting assembly (68) is arranged between the lifting plate (663) and one of the first pillars. The driving member (631) comprises a rotating disk and a first rotating handle, an arc piece is welded to the outer wall of the rotating disk, one end of the first rotating handle is welded to the rotating disk and the first rotating handle is arranged in an arc-shaped structure, and a bolt is threadedly connected to one end of the first rotating handle; The follower (65) is a hollow hemispherical structure, and is provided with four arc grooves. A bolt groove is provided between two adjacent arc grooves. The arc piece is in intermittent contact with the arc groove, and the bolt is also in intermittent contact with the bolt groove. When the arc piece is in contact with the arc groove for movement, the bolt is not in contact with the bolt groove. When the bolt is in contact with the bolt groove for movement, the arc piece is not in contact with the arc groove. When the gear 1 (61) rotates, the gear 3 (632) rotates accordingly and drives the driving member (631) and the cam (633) to rotate synchronously. During the time of one rotation of the driving member (631), the arc piece and the bolt contact and move with the arc groove and the bolt groove respectively, so that the driven member (65) intermittently completes the process of driving the rotating table 2 (15) to rotate 90 degrees first and then remain stationary. At the same time, the cam (633) continuously controls the up and down movement of the swing handle (643), so that the top block (662) realizes up and down reciprocating movement under the cooperation of the swing arm assembly (67) and the lifting assembly (68); When the rotating table (15) rotates 90 degrees, the top block (662) is at the lowest position. When the rotating table (15) rotates 90 degrees and remains stationary, the top block (662) completes a reciprocating motion of first up and then down. In addition, during the time when the top block (662) descends, the rotating table (13) also completes the process of rotating 90 degrees. In the first time period of the rotation of gear three (632), after gear three (632) rotates 180 degrees, gear one (61) pauses, and at this time the position of gear two (62) is adjusted to mesh with gear one (61), and then gear one (61) is driven to output. When gear three (632) enters the second time period, while the rotating table two (15) completes its rotation, the camera (361) also synchronously completes a visual inspection task; Among them, in the initial state of gear three (632), the push bolt and the bolt groove are in a state of just contacting each other, and the lifting block (662) is used to lift the workpiece.
2. A visual inspection device that facilitates loading and unloading according to claim 1, characterized in that: The loading and conveying unit (2) comprises a conveying platform (21) and a conveying belt (24), the bottom surface of the conveying platform (21) is fixed to the top of four pillars (1) by bolts, the rotating platform (15) is in rotational contact with one end of the conveying platform (21), a screw (23) is rotatably arranged on one end of the conveying platform along its width direction, one end of the screw (23) is connected to a rotating motor (2), and the rotating motor (2) is installed on one side of the outer wall of the conveying platform (21), wherein the screw (23) is a bidirectional screw, the conveying belt (24) is installed between the inner walls of the conveying platform (21) and its upper surface is arranged flush, and a rotating motor (3) for driving the conveying belt (24) is installed on one side of the outer wall of the conveying platform (21); Two protective frames (22) are arranged on the top surface of the conveyor platform (21) so as to move relative to each other, and a photosensitive sensor (25) is also embedded on the top surface of the conveyor platform (21). Both ends of the protective frame (22) are arranged in an "L"-shaped structure. A screw (23) passes through one end of the protective frame (22) and is threadedly arranged therewith. A contact sensor (221) is embedded on the other end of the protective frame (22). Both the contact sensor (221) and the photosensitive sensor (25) are connected to a PLC controller via electrical signals.
3. A visual inspection device that facilitates loading and unloading according to claim 2, characterized in that: The loading and conveying unit (2) further comprises a moving block (222) and a lever (223); a groove (1) is provided on the protective frame (22) along its length direction; an electric push rod (1) is installed at one end of the groove; the moving block (222) is installed on the movable end of the electric push rod (1); one end of the lever (223) is rotatably arranged on the moving block (222); and the lever (223) rotates 90 degrees each time; When the push rod portion of the electric push rod 1 is at its longest length, the push rod (223) is arranged parallel to the length direction of the protective frame (22); When the light sensor (25) is triggered, the lever (223) rotates 90 degrees outward from the groove one, and at the same time, the push rod portion of the electric push rod one begins to shorten its length. During this process, when the contact sensor (221) is triggered, the push rod portion of the electric push rod one resumes its lengthening, and at the same time, the lever (223) rotates 90 degrees inward from the groove one to reset.
4. The visual inspection device for convenient loading and unloading according to claim 3 is characterized in that: The visual inspection unit (3) further comprises a fixing box 1 (32), an adjustment seat (33), and a bevel gear 1 (34) and a bevel gear 2 (35) which are meshed with each other; Two vertical plates (31) are installed on one side wall of the fixed box (32), the bottom end of the vertical plate (31) is fixed on the detection table (1), and a bottom plate (321) connected as one body is also arranged on the bottom wall of the fixed box (32), a bevel gear (34) is rotatably arranged on the bottom plate (321), a bevel gear (35) is rotatably arranged on one end of the fixed box (32), a screw (322) connected and fixed to the bevel gear (35) through an axis is also rotatably arranged in the fixed box (32), and a screw (322) is arranged on the adjusting seat (33). An integrated slide plate is provided, the slide plate slides between the inner walls of the fixing box (32), and the screw rod (322) penetrates the slide plate and is threadedly driven therewith, the adjustment seat (33) is slidably arranged along the length direction of the fixing box (32), a mounting plate (36) is arranged on the bottom wall of the adjustment seat (33), a camera (361) is embedded on the bottom surface of the mounting plate (36), and an external power supply connected to the camera (361) is installed on the top of the mounting plate (36), and the external power supply is connected to the PLC controller via an electrical signal.
5. The visual inspection device for convenient loading and unloading according to claim 4 is characterized in that: The unloading conveying unit (4) comprises a conveying platform 2 (41) and a conveying platform 3 (42); The conveyor platform 2 (41) is installed on the inspection platform (1) through four pillars 2, and a conveyor belt 3 (411) is installed on the conveyor platform 2 (41) along its length direction. The conveyor platform 3 (42) is fixedly installed above the conveyor platform 2 (41), and a push plate (43) is provided at one end of the conveyor platform 3 (42) to move along the length direction of the conveyor platform 3 (42), and a linear motor is installed on one side of the push plate (43) on the end wall of the conveyor platform 3 (42).
6. The visual inspection device for convenient loading and unloading according to claim 5 is characterized in that: The bevel gear (53) and the concave surface of the fixing frame (51) are connected by an axis, and a second rotating handle (531) is connected by an axis on the top surface of the bevel gear (53) and is synchronized therewith. One end of the connecting bolt (54) is screwed to the other end of the second rotating handle (531) by a thread, and a guide hole is opened on the guide plate (551) along its length direction, and the other end of the connecting bolt (54) slides between the inner walls of the guide hole, and the guide plate (551) and the rack (55) are arranged perpendicular to each other. A shaft seat is installed on the top surface of the detection table (1), and a linkage shaft 1 (57) passes through the shaft seat and is rotatably arranged between the inner walls of the shaft seat. The top of the linkage shaft 1 (57) is connected and fixed to the bottom wall of the bevel gear 1 (34) as a whole, and the bottom end of the linkage shaft 1 (57) is connected and fixed to the transmission gear (56) as a whole through a key connection.
7. The visual inspection device for convenient loading and unloading according to claim 6 is characterized in that: The second gear (62) is connected to a key shaft (621) at one end thereof facing the second linkage shaft (59) through a key, the other end of the key shaft (621) is inserted between the inner walls of the second linkage shaft (59) and can be slidably arranged along the inner wall of the second linkage shaft (59), and the key shaft (621) never separates from the second linkage shaft (59), and when the second gear (62) is meshed with the first gear (61), the connecting line from the center of the second gear (62) to the center of the first gear (61) and the connecting line from the middle of the third gear (632) to the center of the first gear (61) are arranged at a vertical angle; The moving assembly comprises a side plate (64) and a clamping assembly (641), one end of the side plate (64) is fixed to the side wall of the middle groove by screws, an electric push rod 2 is installed on the side plate (64) along its length direction by screws, the clamping assembly (641) comprises two moving plates, the push rod portion of the electric push rod 2 passes through the two moving plates and is fixed thereto, the distance between the two moving plates is fixed and the gear 2 (62) is limited between the two moving plates, two limit clamps (642) are also installed on one side wall of the side plate (64), the two moving plates reciprocate between the two limit clamps (642), and one of the moving plates is in sliding contact with the outer surface of the linkage shaft 2 (59).
8. The visual inspection device for convenient loading and unloading according to claim 7 is characterized in that: Both sides of the interior of the second fixed box (66) are provided with limit shafts (661) for lifting and lowering in the vertical direction, the top ends of the two limit shafts (661) are connected to the bottom surface of the top block (662), the lifting plate (663) is fixed between the outer walls of the two limit shafts (661), and the lifting plate (663) is provided with a guide groove arranged along its length direction, and a guide member (664) is slidably arranged on one side of the guide groove; The swing arm assembly (67) comprises a connecting handle 1 (671) and a connecting handle 2 (672), one end of the connecting handle 1 (671) and one end of the connecting handle 2 (672) are fixed as a whole via an axis connection, and the connecting handle 1 (671) and the connecting handle 2 (672) are always in a state of being parallel to each other, and a synchronous shaft 1 is connected between the other end of the connecting handle 1 (671) and the swing arm, and the synchronous shaft 1 is arranged to penetrate the end of the side plate (64) and is rotatably arranged between the inner walls of the side plate (64); The lifting assembly (68) comprises a lifting arm (681), a connecting handle (682) and a connecting piece (683), wherein a synchronous shaft (2) is connected between one end of the lifting arm (681) and one end of the connecting handle (672), wherein the synchronous shaft (2) penetrates the fixing box (66) and is rotatably disposed between the inner walls of the fixing box (66), wherein a guide bolt is threadedly connected to one end of the connecting handle (682), wherein one end of the guide bolt penetrates the guide piece (664) and slides between the inner walls of the guide groove, wherein the other end of the connecting handle (682) is rotatably disposed on the side wall of one of the pillars (1) via an axis connection, and the connecting piece (683) comprises two U-shaped seats fixed as one body via an axis connection, wherein one end of the lifting arm (681) is rotatably disposed between the side walls of the other U-shaped seat via an axis connection.