A concrete composite structure assembled building structure system

By integrating BIM modeling, collaborative platform, quality tracking system, automated design, visual display and operation and maintenance management modules in the prefabricated building system of concrete composite structures, the problems of low collaboration efficiency and inconvenient quality management and operation and maintenance management are solved, and the problems of low collaboration efficiency and inconvenient quality management and operation and maintenance management are achieved. Efficient design optimization and operation and maintenance management reduce costs and extend building life.

CN118246104BActive Publication Date: 2024-11-12ZHEJIANG JUXIN CONSTR CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410243279.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-11-12
Estimated Expiration
2044-03-04

AI Technical Summary

Technical Problem

There are problems in the prefabricated building structure system of concrete composite structures with low collaboration efficiency and difficulty in conducting comprehensive visual analysis, quality management and operation and maintenance management.

Method used

Adopt BIM modeling module, collaborative platform module, prefabricated quality tracking system, automated design module, visual display module, quality management module, simulation module, construction coordination optimization module and operation and maintenance management module, through scanner, image processing, radio frequency Technologies such as identification, artificial intelligence, virtual reality, sensors, the Internet of Things, big data analysis and deep learning to realize data visualization, collaboration, quality control, design optimization and operation and maintenance management.

Benefits of technology

It improves collaboration efficiency, optimizes design plans, enhances quality management and operation and maintenance management, reduces construction costs and maintenance costs, extends building life, and promotes sustainable development of buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118246104B_ABST
    Figure CN118246104B_ABST
Patent Text Reader

Abstract

The present invention discloses a concrete composite structure assembled building structure system, relates to the technical field of construction engineering, and solves the shortcomings of low collaboration efficiency, difficulty in comprehensive visualization analysis, quality management problems, and inconvenient operation and maintenance management in the existing concrete composite structure assembled building structure system; the present invention improves collaboration efficiency through a BIM modeling module and a collaboration platform module; reduces construction costs through an automated design module; achieves comprehensive visualization and analysis through a visualization display module and a multi-physical field simulation model; real-time monitoring and control of prefabricated components and construction processes through a prefabricated component quality tracking system and a quality management module; and realizes status monitoring and maintenance management of the concrete composite structure through an operation and maintenance management module; the present invention greatly improves the collaboration efficiency, visualization effect, quality, and difficulty of operation and maintenance management of the concrete composite structure assembled building structure system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction engineering, and more specifically to a concrete composite structure assembled building structure system. Background Art

[0002] With the global population growth and accelerated urbanization, the construction industry faces huge challenges and opportunities. Traditional construction methods are gradually unable to meet the needs of modern society due to their long time, high cost, low efficiency and great environmental impact. At the beginning of the 21st century, with the popularization of the concept of sustainable development and the rapid development of science and technology, prefabricated buildings began to receive widespread attention and application due to their advantages such as fast construction speed, easy quality control and low environmental impact. In particular, the concrete composite structure prefabricated building structure system has become an important development direction in the field of prefabricated buildings with its excellent bearing capacity and good economy.

[0003] The concrete composite structure prefabricated building structure system is a new type of building system developed with the support of modern engineering technology. It is produced in the factory through prefabricated concrete components and assembled on the construction site, so as to achieve the rapid construction of the building structure. This method not only greatly improves the efficiency of construction and reduces labor intensity, but also helps to improve the quality and precision of the building. With the advancement of computer technology, material science and automation technology, concrete composite structure prefabricated buildings have made significant technological progress in design, production and construction.

[0004] Although the concrete composite structure prefabricated building structure system has many advantages, it still faces a series of problems in its actual application. First, low collaboration efficiency is a major problem. Due to the lack of effective information exchange and coordination mechanism, it is difficult for all parties involved in the project to achieve efficient collaboration during the design, production and construction process, resulting in project schedule delays and increased costs. Secondly, under the existing technical conditions, it is difficult for the concrete composite structure prefabricated building system to achieve comprehensive visualization and analysis of the project, which limits the optimization of design and construction. Quality management is also a challenge. The quality control of prefabricated components and the guarantee of on-site installation accuracy require a higher level of technology and management. Finally, the inconvenience of operation and maintenance management makes it difficult to maintain and manage buildings during the use phase due to the lack of an effective information recording and transmission mechanism.

[0005] Therefore, the present invention discloses a concrete composite structure assembled building structure system. Summary of the invention

[0006] In view of the shortcomings of the prior art, the present invention discloses a concrete composite structure prefabricated building structure system, which solves the shortcomings of the existing concrete composite structure prefabricated building structure system, such as low collaboration efficiency, difficulty in comprehensive visual analysis, quality management problems and inconvenient operation and maintenance management.

[0007] In order to achieve the above technical effects, the present invention adopts the following technical solutions:

[0008] A concrete composite structure assembled building structure system, wherein the system comprises:

[0009] BIM modeling module: The BIM modeling module converts point cloud data of actual buildings into BIM models through a scanner and image processing method;

[0010] Collaboration platform module: The collaboration platform module allows multiple participants to edit and update the BIM model simultaneously through a cloud-based BIM project collaboration platform, and the cloud-based BIM project collaboration platform ensures the immutability and traceability of data through blockchain;

[0011] Prefabricated component quality tracking system: The prefabricated component quality tracking system realizes quality management and status tracking of prefabricated components through radio frequency identification and database management system;

[0012] An automated design module; the automated design module automatically generates a design scheme for a concrete composite structure through an optimization design algorithm based on artificial intelligence;

[0013] Visual display module; the visual display module visualizes the concrete composite structure through a virtual reality method;

[0014] Quality management module: The quality management module realizes real-time monitoring and control of the construction process of the concrete composite structure through a structural health monitoring system; the structural health monitoring system realizes monitoring of at least temperature, humidity and stress parameters through sensors, and realizes automatic alarm and adjustment functions through the Internet of Things and data analysis methods;

[0015] Simulation module; the simulation module performs collision detection, structural analysis and performance evaluation on the concrete composite structure in the design stage through a multi-physics field simulation model;

[0016] Construction coordination and optimization module: The construction coordination and optimization module realizes the coordination and optimization of construction progress and resources through an optimization scheduling algorithm based on deep learning;

[0017] Operation and maintenance management module: The operation and maintenance management module realizes the status monitoring and maintenance management of the concrete composite structure through a sensor network and a big data analysis method;

[0018] Among them, the output end of the BIM modeling module is connected to the input end of the collaboration platform module; the output end of the prefabricated part quality tracking system is connected to the input end of the automation design module; the output end of the automation design module is connected to the input end of the visualization display module, the output end of the quality management module is connected to the input end of the simulation module, the output end of the simulation module is connected to the input end of the construction coordination and optimization module, and the output end of the construction coordination and optimization module is connected to the input end of the operation and maintenance management module.

[0019] As a further technical solution of the present invention, the cloud-based BIM project collaboration platform includes a user management module, a project management module, a BIM model management module, a collaboration platform module, a data synchronization module, a cloud storage module and a blockchain module; the user management module manages user accounts and permissions through an identity authentication protocol and role-based access control; the project management module creates, manages and organizes projects through Internet forms and cloud storage and backup mechanisms; the BIM model management module implements file upload, download, version control and sharing functions of the BIM model through a file transfer protocol and a version control tool; the collaboration platform module implements collaboration and communication between multiple participants through a thread pool and a push notification protocol The data synchronization module ensures the data consistency and synchronization when multiple participants edit and update the BIM model through the web instant messaging protocol; the cloud storage module includes a file storage unit and a quick access unit; the file storage unit stores the BIM model file data on the cloud server through the object storage service; the quick access unit realizes quick access and downloading of BIM model files through the content distribution network CDN; the blockchain module includes a data unalterable unit and a data traceability unit; the data unalterable unit ensures the unalterability of BIM models and data through public chains, alliance chains and private chains; the data traceability unit realizes transparency and traceability of data through distributed ledgers and smart contracts.

[0020] As a further technical solution of the present invention, the prefabricated parts quality tracking system includes a prefabricated parts information management module, a prefabricated parts production process management module, a prefabricated parts quality inspection module and a prefabricated parts assembly tracking module; the prefabricated parts information management module includes a prefabricated parts registration unit, a prefabricated parts identification unit and a prefabricated parts status update unit; the prefabricated parts registration unit records and stores at least type, size and material information of the prefabricated parts by using a database management system; the prefabricated parts identification unit assigns a unique identification code to each prefabricated part by using a radio frequency identification method; the prefabricated parts status update unit updates the production progress, quality inspection results and assembly status information of the prefabricated parts in real time through an object relational mapping framework; the prefabricated parts production process management module includes a production counter The system comprises a production planning unit, a quality control unit and a production process tracking unit; the production planning unit formulates and manages the production plan of prefabricated parts through the project management tool JIRA, and compares it with the actual production progress; the quality control unit monitors and records at least temperature, humidity and vibration parameters in the production process of prefabricated parts through sensors and data acquisition systems; the production process tracking unit tracks the position and process of prefabricated parts on the production line through a barcode scanning method; the prefabricated part quality inspection module inspects and analyzes prefabricated parts through a laser scanner and a data analysis method; the prefabricated part assembly tracking module records the assembly position and connection status of each prefabricated part during the actual assembly process through a radio frequency identification reader / writer, and updates the assembly status in the database in real time.

[0021] As a further technical solution of the present invention, the optimization design algorithm based on artificial intelligence automatically adjusts the coefficients and cross-sectional areas of different components and the compressive strength of concrete under the condition of the type and number of components of the given concrete composite structure through the strength constraint function to meet the total strength requirement; the formula expression of the strength constraint function is:

[0022]

[0023] In formula (1), N represents the The strength coefficient of each component is used to control the contribution of different components to the overall strength. The weight of different components in the overall strength can be controlled by adjusting the size of the coefficient N. θ represents the The cross-sectional area of ​​each component; the larger the cross-sectional area θ, the higher the bearing capacity of the component; t is the compressive strength of concrete, which is used to indicate the compressive capacity of the component; z represents the minimum strength requirement of the structure; the optimization design algorithm based on artificial intelligence adjusts the coefficients and unit volume costs of different components through the cost function, and automatically finds the design solution that minimizes the cost function; the formula expression of the cost function is:

[0024]

[0025] In formula (2), S represents the The cost coefficient of each component is used to control the contribution of each component to the overall cost; the weight of different components in the overall cost can be controlled by adjusting the size of the coefficient S; m represents the The volume of a component; u represents the component Cost per unit volume.

[0026] As a further technical solution of the present invention, the working principle steps of the virtual reality method in the concrete composite structure prefabricated building structure system are as follows:

[0027] Step 1: Data acquisition and modeling;

[0028] Generate virtual reality modeling data through building information modeling;

[0029] Step 2: Modeling conversion and optimization;

[0030] The geometric information is converted into a three-dimensional model by a virtual reality modeling method, and at least lighting and texture optimization processing is performed;

[0031] Step 3: Interaction and navigation design;

[0032] The virtual reality engine UE enables users to browse, select and operate concrete composite structures;

[0033] Step 4: Virtual reality rendering;

[0034] The modeling data is processed by a computer graphics library, including at least lighting calculation, shadow generation and material mapping;

[0035] Step 5: Equipment and sensing technology;

[0036] Enable interaction and experience through sensors and virtual reality devices;

[0037] Step 6: Real-time rendering and display;

[0038] Real-time rendering and display are performed through computer graphics and real-time rendering methods.

[0039] As a further technical solution of the present invention, the structural health monitoring system includes a data acquisition module, a data processing and analysis module, a decision support module and a data visualization module; the data acquisition module includes a sensor deployment unit and a transmission unit; the sensor deployment unit realizes real-time monitoring of the environment and stress state during the construction of the concrete composite structure through temperature sensors, humidity sensors and stress sensors; the transmission unit transmits the data collected by the sensor to the central data processing center in real time through a wireless sensor network; the data processing and analysis module includes a data preprocessing unit and a state analysis unit; the data preprocessing unit cleans and processes the original data through average filtering, outlier detection and linear interpolation; the state analysis unit analyzes the preprocessed data through anomaly detection and time series analysis methods; the decision support module includes an automatic alarm unit and an adjustment suggestion unit; when the monitored data exceeds the preset safety range, the automatic alarm unit automatically generates alarm information through rule-based alarms, natural language processing and statistical methods; the adjustment suggestion unit proposes adjustment suggestions based on data analysis results and prediction models through knowledge graphs and recommendation systems; the visualization display module displays the monitoring data and analysis results in real time through a data visualization library.

[0040] As a further technical solution of the present invention, the multi-physics field simulation model includes a collision detection module, a structural analysis module and a performance evaluation module; the collision detection module realizes collision detection between components through a geometric intersection detection method; the geometric intersection detection method determines the relationship between geometric bodies through ray tracing, boundary volume hierarchy and line segment intersection judgment method; the structural analysis module includes a finite element modeling unit, a dynamic analysis unit and a structural strength evaluation unit; the finite element modeling unit realizes discrete modeling of concrete composite structures through mathematical statistics methods; the dynamic analysis unit analyzes the vibration characteristics and dynamic response of concrete composite structures through modal analysis and response spectrum analysis methods. Calculations should be performed; the structural strength assessment unit assesses the strength, stiffness and stability of the structure by means of a finite element analysis method; the performance assessment module comprises a seismic performance assessment unit, a thermal performance assessment unit and a fire performance assessment unit; the seismic performance assessment unit assesses the seismic performance index of the concrete composite structure by means of seismic input and structural response analysis methods, and the seismic performance index at least includes peak acceleration and inter-story displacement; the thermal performance assessment unit simulates and assesses the thermal performance of the concrete composite structure by means of numerical simulation methods and data mining methods; the fire performance assessment unit assesses the fire performance index of the concrete composite structure by means of a heat transfer model and combustion performance test equipment.

[0041] As a further technical solution of the present invention, the optimization scheduling algorithm based on deep learning analyzes the dependencies and resource requirements of construction tasks through a linear programming method; the linear programming method minimizes the total time and the number of resource conflicts through a construction sequence automatic adjustment function; the formula expression of the construction sequence automatic adjustment function is:

[0042]

[0043] In formula (3), r represents the number of construction tasks; b represents the binary variable of the execution of the i-th task, which is used to determine whether task i is carried out; g represents the duration of the i-th task, which is used to calculate the total time; δ represents the degree of conflict between the i-th task and the j-th task, which is used to measure the degree of resource conflict; ε represents the binary variable of the resource conflict between the i-th task and the j-th task, which is used to calculate the number of resource conflicts; represents the dependency relationship between the i-th task and the j-th task, and is used to consider the order between tasks; the optimization scheduling algorithm based on deep learning learns historical construction data through a deep learning model; the deep learning model maximizes resource utilization through a gradient descent algorithm; the gradient descent algorithm determines the resource allocation quantity for each task through a resource allocation optimization function; the formula expression of the resource allocation optimization function is:

[0044]

[0045] In formula (4), 1 represents the resource demand of the i-th task; σ represents the baseline resource demand of the i-th task; k represents the number of resources allocated to the i-th task, which is used to determine the resource allocation of the task; τ represents the upper limit of the i-th task resources, which is used to limit the scope of resource allocation; the deep learning-based optimization scheduling algorithm minimizes the number of collisions through a spatial analysis method; the spatial analysis method determines whether a collision occurs between tasks through a collision detection and adjustment function, and avoids collisions by adjusting the positions of the tasks; the formula expression of the collision detection and adjustment function is:

[0046]

[0047] In formula (5), n represents the binary variable of collision between the i-th task and the j-th task, which is used to calculate the number of collisions; A binary variable representing the adjustment between the i-th task and the j-th task to avoid collision, which is used to decide whether the position of the task needs to be adjusted; ω represents the spatial distance between the i-th task and the j-th task, which is used to evaluate the spatial relationship between tasks.

[0048] As a further technical solution of the present invention, the operation and maintenance management module includes a disease detection submodule, a predictive maintenance plan submodule and a real-time data analysis submodule; the disease detection submodule monitors the disease condition of the concrete composite structure through a sensor network and a convolutional neural network; the predictive maintenance plan submodule includes a data analysis and modeling unit and a maintenance demand prediction unit; according to the disease detection results and the structure usage, the data analysis and modeling unit analyzes and models the disease detection data, structure usage data and historical maintenance records through a big data analysis method; based on the data analysis results and maintenance specifications, the maintenance demand prediction unit predicts the future maintenance needs of the structure through a time series analysis method and generates a corresponding maintenance plan; the real-time data analysis submodule monitors the operating status of the concrete composite structure in real time through a wireless communication network, and obtains abnormal conditions or potential problems through an outlier detection method; the outlier detection method detects and identifies abnormal values ​​in the data through distance measurement, statistical analysis and threshold setting.

[0049] Positive beneficial effects:

[0050] The present invention enables multiple participants to edit and update the BIM model at the same time through the BIM modeling module and the collaboration platform module, and ensures the immutability and traceability of data through the blockchain, thereby improving the collaboration efficiency. The design scheme of the concrete composite structure is automatically generated through the automated design module, the design scheme is optimized, the waste of building materials is reduced, and the construction cost is reduced. The concrete composite structure is presented in virtual reality through the visualization display module and the simulation module, and the collision detection, structural analysis and performance evaluation of the concrete composite structure in the design stage are performed through the multi-physical field simulation model to achieve comprehensive visualization and analysis. The prefabricated parts quality tracking system and the quality management module are used to realize real-time monitoring and control of prefabricated components and construction processes, thereby improving the quality and safety of the building. The sensor network and big data analysis method in the operation and maintenance management module are used to realize the state monitoring and maintenance management of the concrete composite structure, extend the building life, reduce maintenance costs, and promote the sustainable development of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work, among which:

[0052] Figure 1 A framework diagram of a concrete composite structure assembled building structure system of the present invention;

[0053] Figure 2 A schematic diagram of the process steps of the virtual reality method of the present invention;

[0054] Figure 3 This is an architecture diagram of the operation and maintenance management module of the present invention;

[0055] Figure 4 It is a principle framework diagram of the prefabricated parts quality tracking system of the present invention;

[0056] Figure 5 A step diagram of the operation process of the optimization design algorithm based on artificial intelligence of the present invention;

[0057] Figure 6 This is a step diagram of the operation process of the deep learning-based optimization scheduling algorithm of the present invention. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] like Figure 1-Figure 6 As shown, a concrete composite structure assembled building structure system comprises:

[0060] BIM modeling module: The BIM modeling module converts point cloud data of actual buildings into BIM models through a scanner and image processing method;

[0061] Collaboration platform module: The collaboration platform module allows multiple participants to edit and update the BIM model simultaneously through a cloud-based BIM project collaboration platform, and the cloud-based BIM project collaboration platform ensures the immutability and traceability of data through blockchain;

[0062] Prefabricated component quality tracking system: The prefabricated component quality tracking system realizes quality management and status tracking of prefabricated components through radio frequency identification and database management system;

[0063] An automated design module; the automated design module automatically generates a design scheme for a concrete composite structure through an optimization design algorithm based on artificial intelligence;

[0064] Visual display module; the visual display module visualizes the concrete composite structure through a virtual reality method;

[0065] Quality management module: The quality management module realizes real-time monitoring and control of the construction process of the concrete composite structure through a structural health monitoring system; the structural health monitoring system realizes monitoring of at least temperature, humidity and stress parameters through sensors, and realizes automatic alarm and adjustment functions through the Internet of Things and data analysis methods;

[0066] Simulation module; the simulation module performs collision detection, structural analysis and performance evaluation on the concrete composite structure in the design stage through a multi-physics field simulation model;

[0067] Construction coordination and optimization module: The construction coordination and optimization module realizes the coordination and optimization of construction progress and resources through an optimization scheduling algorithm based on deep learning;

[0068] Operation and maintenance management module: The operation and maintenance management module realizes the status monitoring and maintenance management of the concrete composite structure through a sensor network and a big data analysis method;

[0069] Among them, the output end of the BIM modeling module is connected to the input end of the collaboration platform module; the output end of the prefabricated part quality tracking system is connected to the input end of the automation design module; the output end of the automation design module is connected to the input end of the visualization display module, the output end of the quality management module is connected to the input end of the simulation module, the output end of the simulation module is connected to the input end of the construction coordination and optimization module, and the output end of the construction coordination and optimization module is connected to the input end of the operation and maintenance management module.

[0070] In the above embodiment, the cloud-based BIM project collaboration platform includes a user management module, a project management module, a BIM model management module, a collaboration platform module, a data synchronization module, a cloud storage module and a blockchain module; the user management module manages user accounts and permissions through an identity authentication protocol and role-based access control; the project management module creates, manages and organizes projects through Internet forms and cloud storage and backup mechanisms; the BIM model management module implements file upload, download, version control and sharing functions of the BIM model through a file transfer protocol and a version control tool; the collaboration platform module implements collaboration and communication between multiple participants through a thread pool and a push notification protocol; The data synchronization module ensures data consistency and synchronization when multiple participants edit and update BIM models through the web instant messaging protocol; the cloud storage module includes a file storage unit and a quick access unit; the file storage unit stores BIM model file data on the cloud server through the object storage service; the quick access unit realizes quick access and downloading of BIM model files through the content distribution network CDN; the blockchain module includes a data unalterable unit and a data traceability unit; the data unalterable unit ensures the unalterability of BIM models and data through public chains, alliance chains and private chains; the data traceability unit realizes transparency and traceability of data through distributed ledgers and smart contracts.

[0071] In a specific embodiment, in the system, each participant first logs in to the cloud-based BIM project collaboration platform, and then begins the BIM design and collaboration phase. During the design phase, each participant can upload, download and edit BIM model data on the platform, and can synchronize and update the data to the central database on the platform in real time. In this way, all participants can view, review and modify BIM model data at any time to ensure its uniformity throughout the design, manufacturing and construction process.

[0072] During the collaboration phase, the cloud-based BIM project collaboration platform also provides functions such as discussion areas, information exchange, and version control to facilitate communication and collaboration among all parties involved. In addition, the platform also uses blockchain technology to ensure data security and privacy, protect intellectual property rights, and prevent the injection and tampering of false data, thereby establishing a safe and reliable BIM collaboration environment.

[0073] The working principle of the cloud-based BIM project collaboration platform is based on cloud computing technology, which stores BIM model data on cloud servers and provides remote access and collaboration for multiple users and multiple devices. The platform uses distributed database and blockchain technology to ensure data security, reliability and traceability.

[0074] In the concrete composite structure prefabricated building structure system, the positive benefits of the cloud-based BIM project collaboration platform include:

[0075] Improve collaboration efficiency: All parties involved can update BIM model data synchronously in real time, reduce communication and error costs, and improve collaboration efficiency.

[0076] Ensure data security: The platform uses blockchain technology to ensure the security, reliability and traceability of data and prevent the injection and tampering of false data.

[0077] Enhance partner trust: The platform provides a secure and reliable BIM collaboration environment, protects intellectual property rights, and enhances trust among partners.

[0078] Improve decision-making efficiency: Through multiple functions on the platform, such as version control and information exchange, decisions can be made quickly and decision-making efficiency can be improved.

[0079] Reduce costs: Through cloud computing technology, the platform can realize data sharing and storage, reducing data storage and maintenance costs.

[0080] In the above embodiment, the prefabricated parts quality tracking system includes a prefabricated parts information management module, a prefabricated parts production process management module, a prefabricated parts quality inspection module and a prefabricated parts assembly tracking module; the prefabricated parts information management module includes a prefabricated parts registration unit, a prefabricated parts identification unit and a prefabricated parts status update unit; the prefabricated parts registration unit records and stores at least type, size and material information of the prefabricated parts by using a database management system; the prefabricated parts identification unit assigns a unique identification code to each prefabricated part by using a radio frequency identification method; the prefabricated parts status update unit updates the production progress, quality inspection results and assembly status information of the prefabricated parts in real time through an object relational mapping framework; the prefabricated parts production process management module includes a production planning unit , quality control unit and production process tracking unit; the production planning unit formulates and manages the production plan of prefabricated parts through the project management tool JIRA, and compares it with the actual production progress; the quality control unit monitors and records at least temperature, humidity and vibration parameters in the prefabricated parts production process through sensors and data acquisition systems; the production process tracking unit tracks the position and process of prefabricated parts on the production line through a barcode scanning method; the prefabricated parts quality inspection module inspects and analyzes prefabricated parts through a laser scanner and data analysis method; the prefabricated parts assembly tracking module records the assembly position and connection status of each prefabricated parts during the actual assembly process through a radio frequency identification reader / writer, and updates the assembly status in the database in real time.

[0081] In a specific embodiment, the prefabricated parts quality tracking system collects and stores basic information of prefabricated parts, including design parameters, material composition, production batches, etc., through the prefabricated parts information management module. This information is bound to each prefabricated part through QR codes, RFID tags, etc. to ensure the accuracy and accessibility of the information. The prefabricated parts production process management module monitors every link from production to transportation. Through the sensors and cameras installed on the production line, the production status of the prefabricated parts, such as temperature, humidity, vibration and other data, as well as the visual information of the production process, are collected in real time to ensure that the production process meets the specification requirements. After the prefabricated parts are produced, they are inspected by the prefabricated parts quality inspection module, including dimensional accuracy, strength grade, surface quality and other aspects. The inspection results are also recorded and bound to the prefabricated parts information for traceability and review. When the prefabricated parts arrive at the construction site and begin to be assembled, the prefabricated parts assembly tracking module tracks its assembly status and position by scanning the QR code or RFID tag on the prefabricated parts. At the same time, the prefabricated parts assembly tracking module can record the problems and solutions in the assembly process to provide a reference for subsequent quality management.

[0082] In the concrete composite structure prefabricated building structure system, by monitoring and managing the entire life cycle of prefabricated parts, quality problems in the production and assembly process can be discovered in time, so that corrective measures can be taken in advance to ensure the quality of the final structure. In addition, each prefabricated part has detailed information records and quality inspection reports. Once a problem occurs, it can be quickly traced back to the specific production batch, production link or even the source of the material, which is convenient for quickly locating the problem and taking corresponding measures. Secondly, by real-time monitoring of the production and assembly status of prefabricated parts, project managers can more effectively allocate human and material resources, reduce waiting time and waste, and improve construction efficiency. At the same time, the entire prefabricated part quality tracking system provides rich data support for project management. Using these data, scientific analysis and prediction of project progress, quality control and other aspects can be carried out, thereby improving the level of project management and the accuracy of decision-making. Finally, by demonstrating the quality control and management of the entire process of prefabricated parts from production to assembly, customers' confidence in project quality can be increased and the market competitiveness of enterprises can be enhanced.

[0083] In the above embodiment, the artificial intelligence-based optimization design algorithm automatically adjusts the coefficients and cross-sectional areas of different components and the compressive strength of concrete to meet the total strength requirements under the given component types and quantities of the concrete composite structure through the strength constraint function; the formula expression of the strength constraint function is:

[0084]

[0085] In formula (1), N represents the The strength coefficient of each component is used to control the contribution of different components to the overall strength. The weight of different components in the overall strength can be controlled by adjusting the size of the coefficient N. θ represents the The cross-sectional area of ​​each component; the larger the cross-sectional area θ, the higher the bearing capacity of the component; t is the compressive strength of concrete, which is used to indicate the compressive capacity of the component; z represents the minimum strength requirement of the structure; the optimization design algorithm based on artificial intelligence adjusts the coefficients and unit volume costs of different components through the cost function, and automatically finds the design solution that minimizes the cost function; the formula expression of the cost function is:

[0086]

[0087] In formula (2), S represents the The cost coefficient of each component is used to control the contribution of each component to the overall cost; the weight of different components in the overall cost can be controlled by adjusting the size of the coefficient S; m represents the The volume of a component; u represents the component Cost per unit volume.

[0088] In a specific embodiment, the operating hardware environment of the optimization design algorithm based on artificial intelligence is configured as follows:

[0089] CPU: Intel Xeon Processor or AMD EPYC with high core count to support parallel computing. GPU: NVIDIA Tesla or AMD Radeon Pro series to accelerate large-scale parallel processing tasks, especially deep learning calculations. Memory: 128GB or more to support complex data processing and storage requirements. Storage: High-speed SSD hard drive, providing sufficient data read and write speed and storage space.

[0090] In the concrete composite structure prefabricated building structure system, the operation process of the optimization design algorithm based on artificial intelligence is as follows:

[0091] Y1. Data collection and preprocessing: Collect basic project requirements, geographic environment data, material parameters and other information, and perform data cleaning and standardization.

[0092] Y2. Initialize design parameters: According to project requirements and preset conditions, set preliminary design parameters as input of the algorithm.

[0093] Y3. Algorithm iterative optimization:

[0094] I: Use algorithms to iteratively optimize the design solution.

[0095] Ii: In each iteration, the algorithm evaluates the performance of the current design solution, including structural stability, cost-effectiveness, environmental impact, etc.

[0096] III: Adjust design parameters based on the evaluation results and generate new design solutions.

[0097] Y4. Selection of the optimal solution: After multiple rounds of iterations, the algorithm will propose several optimal design solutions that meet the requirements.

[0098] Y5. Result verification and output: Select the optimal solution, conduct detailed structural analysis and simulation tests, confirm the feasibility and safety of the solution, and finally output the design documents and construction drawings. In the specific implementation, the test data example table of the optimization design algorithm based on artificial intelligence is shown in Table 1:

[0099] Table 1 Test data of optimization design algorithm based on artificial intelligence

[0100]

[0101] As can be seen from the above table, with the iterative optimization of the algorithm, the weight of the structure is gradually reduced, the material cost and energy consumption are also reduced accordingly, and the structural stability is improved. In the end, the algorithm selects a design scheme that achieves the best balance between weight, cost, energy consumption and stability. In the specific implementation, the artificial intelligence algorithm can quickly generate a large number of design schemes, and screen and optimize them according to needs, which greatly improves the design efficiency. Secondly, the artificial intelligence algorithm can find novel design schemes that are difficult to find by traditional methods through learning and analyzing a large amount of data, expanding the innovation space of the design. At the same time, it can comprehensively consider multiple design indicators, such as structural safety, stability, material utilization, cost, etc., to generate a more comprehensive and optimized design solution. Finally, the artificial intelligence algorithm reduces the influence of human subjective factors on design decisions and improves the objectivity and scientificity of the design; in the specific implementation, the data test comparison table of the optimization design algorithm based on artificial intelligence and the traditional algorithm is shown in Table 2:

[0102] Table 2 Data test comparison table of optimization design algorithm based on artificial intelligence

[0103] Design Algorithms Structural safety score Structural stability score Material utilization Traditional Algorithms 85 78 72% Artificial Intelligence Algorithms 92 85 78%

[0104] It can be seen from the above table that the optimization design algorithm based on artificial intelligence has obvious improvements in structural safety score and material utilization compared with traditional algorithms, and also significantly shortens the design time.

[0105] In the above embodiment, the working principle steps of the virtual reality method in the concrete composite structure prefabricated building structure system are as follows:

[0106] Step 1: Data acquisition and modeling;

[0107] Generate virtual reality modeling data through building information modeling;

[0108] Step 2: Modeling conversion and optimization;

[0109] The geometric information is converted into a three-dimensional model by a virtual reality modeling method, and at least lighting and texture optimization processing is performed;

[0110] Step 3: Interaction and navigation design;

[0111] The virtual reality engine UE enables users to browse, select and operate concrete composite structures;

[0112] Step 4: Virtual reality rendering;

[0113] The modeling data is processed by a computer graphics library, including at least lighting calculation, shadow generation and material mapping;

[0114] Step 5: Equipment and sensing technology;

[0115] Enable interaction and experience through sensors and virtual reality devices;

[0116] Step 6: Real-time rendering and display;

[0117] Real-time rendering and display are performed through computer graphics and real-time rendering methods.

[0118] In a specific embodiment, first, the system acquires relevant data of the concrete composite structure, including design drawings, BIM models and other information. After processing and conversion, these data are used for the presentation of the virtual reality environment. Then, based on the acquired data, the system creates a virtual environment, which includes the three-dimensional model, material, lighting and other elements of the concrete composite structure, so that users can experience and observe it in person in virtual reality. Users enter the virtual environment through virtual reality devices (such as head-mounted displays), and can freely move, rotate, zoom, and interact with the concrete composite structure, such as viewing details, adjusting structural parameters, etc. Finally, the system renders the scene in real time according to the user's operation to ensure that the user has a smooth and realistic experience in the virtual reality environment.

[0119] In the concrete composite structure prefabricated building structure system, the virtual reality method can help designers and engineers understand and display the concrete composite structure more intuitively, and promote the formulation and optimization of design decisions. In addition, users can better perceive the spatial layout and proportion of the concrete composite structure in the virtual reality environment, which helps to find potential problems and make suggestions for improvement. Secondly, through virtual reality simulation, workers and construction personnel can conduct training and drills in a safe environment to improve work efficiency and safety. At the same time, using virtual reality technology, different participants can communicate and collaborate in a unified virtual environment to reduce misunderstandings and communication barriers. Finally, the virtual reality method can reduce the cost of making and modifying physical models, while improving design and construction efficiency, which helps save project costs. .

[0120] In the above embodiment, the structural health monitoring system includes a data acquisition module, a data processing and analysis module, a decision support module and a data visualization module; the data acquisition module includes a sensor deployment unit and a transmission unit; the sensor deployment unit realizes real-time monitoring of the environment and stress state during the construction of the concrete composite structure through temperature sensors, humidity sensors and stress sensors; the transmission unit transmits the data collected by the sensor to the central data processing center in real time through a wireless sensor network; the data processing and analysis module includes a data preprocessing unit and a state analysis unit; the data preprocessing unit cleans and processes the original data through average filtering, outlier detection and linear interpolation; the state analysis unit analyzes the preprocessed data through anomaly detection and time series analysis methods; the decision support module includes an automatic alarm unit and an adjustment suggestion unit; when the monitored data exceeds the preset safety range, the automatic alarm unit automatically generates alarm information through rule-based alarms, natural language processing and statistical methods; the adjustment suggestion unit proposes adjustment suggestions based on data analysis results and prediction models through knowledge graphs and recommendation systems; the visualization display module displays the monitoring data and analysis results in real time through a data visualization library.

[0121] In a specific embodiment, in a concrete composite structure prefabricated building structure system, a structural health monitoring system realizes monitoring and evaluation of the structural health status through modules such as data collection, processing, analysis, decision support and visualization. In a specific embodiment, the working principle of the structural health monitoring system is as follows:

[0122] R1. Data acquisition: The sensor network will monitor various data of the concrete composite structure in real time, such as strain, displacement, temperature, etc., and transmit the data to the data acquisition module.

[0123] R2. Data processing and analysis: The data acquisition module transmits the collected raw data to the data processing and analysis module, processes, cleans and analyzes the data, and extracts relevant features and indicators of the structural health status.

[0124] R3. Decision support: Based on the results of data processing and analysis, the decision support module will evaluate and predict the health status of the structure and provide recommendations and decision support for structural maintenance, repair or reinforcement.

[0125] R4. Data visualization: Finally, the data visualization module will display the monitored data and analysis results to users in the form of intuitive charts, curves or three-dimensional models, helping users to understand the health status of the structure more intuitively.

[0126] In specific implementation, the structural health monitoring system can monitor the state changes of concrete composite structures in real time, detect potential problems in time, and reduce the risk of accidents. In addition, through continuous monitoring and analysis, the system can detect signs of damage and aging of the structure in advance, which helps to formulate preventive maintenance plans and extend the service life of the structure. Secondly, the data analysis and decision support provided by the structural health monitoring system can help managers make more scientific and accurate decisions, optimize maintenance and repair plans, and avoid unnecessary losses. At the same time, by monitoring the health status of the structure, the system can improve the safety and stability of the building and ensure the safety of users and the surrounding environment. Finally, the structural health monitoring system converts the structural status into data, which helps to establish archives and historical records and provide a reference for future maintenance management.

[0127] In the above embodiment, the multi-physics field simulation model includes a collision detection module, a structural analysis module and a performance evaluation module; the collision detection module realizes collision detection between components through a geometric intersection detection method; the geometric intersection detection method determines the relationship between geometric bodies through ray tracing, boundary volume hierarchy and line segment intersection judgment method; the structural analysis module includes a finite element modeling unit, a dynamic analysis unit and a structural strength evaluation unit; the finite element modeling unit realizes discretization modeling of concrete composite structures through mathematical statistics methods; the dynamic analysis unit performs vibration characteristics and dynamic response of concrete composite structures through modal analysis and response spectrum analysis methods. calculation; the structural strength evaluation unit evaluates the strength, stiffness and stability of the structure by finite element analysis method; the performance evaluation module includes a seismic performance evaluation unit, a thermal performance evaluation unit and a fire performance evaluation unit; the seismic performance evaluation unit evaluates the seismic performance index of the concrete composite structure by earthquake input and structural response analysis method, and the seismic performance index at least includes peak acceleration and inter-story displacement; the thermal performance evaluation unit simulates and evaluates the thermal performance of the concrete composite structure by numerical simulation method and data mining method; the fire performance evaluation unit evaluates the fire performance index of the concrete composite structure by heat transfer model and combustion performance test equipment.

[0128] In a specific embodiment, in a concrete composite structure prefabricated building structure system, the working principle of the multi-physics field simulation model is to achieve a comprehensive evaluation and optimization of the structure by integrating the simulation and analysis of different physical fields. Specifically, the collision detection module is mainly used to detect the collision between components during the assembly process to avoid conflicts and damage during the assembly process; the structural analysis module is used to simulate the stress conditions of the structure under different load conditions, including stress performance and deformation conditions; the performance evaluation module is used to evaluate the performance indicators of the structure such as safety, stability and durability.

[0129] The working principle of the multi-physics field simulation model is based on finite element analysis and other methods. The physical properties, material properties, mechanical properties and other parameters of the structure are input into the model, and the response and performance prediction of the structure under different working conditions are realized through computer simulation. Through simulation analysis, problems in structural design can be discovered in time, the structural design scheme can be optimized, and the safety, reliability and construction efficiency of the structure can be improved.

[0130] In specific implementation, the multi-physics field simulation model can help engineers discover structural problems in a timely manner during the design phase and reduce risks and costs during the construction process; in addition, the multi-physics field simulation model can optimize the structural design and improve the overall performance of the structure, including safety, stability and durability; secondly, the multi-physics field simulation model can guide the construction process of prefabricated building structures to ensure safety and effectiveness during the assembly process; at the same time, the multi-physics field simulation model can provide a reference basis for subsequent structural monitoring and maintenance, thereby extending the service life of the structure.

[0131] In the above embodiment, the deep learning-based optimization scheduling algorithm analyzes the dependencies and resource requirements of construction tasks through a linear programming method; the linear programming method minimizes the total time and the number of resource conflicts through a construction sequence automatic adjustment function; the formula expression of the construction sequence automatic adjustment function is:

[0132]

[0133] In formula (3), r represents the number of construction tasks; b represents the binary variable of the execution of the i-th task, which is used to determine whether task i is carried out; g represents the duration of the i-th task, which is used to calculate the total time; δ represents the degree of conflict between the i-th task and the j-th task, which is used to measure the degree of resource conflict; ε represents the binary variable of the resource conflict between the i-th task and the j-th task, which is used to calculate the number of resource conflicts; represents the dependency relationship between the i-th task and the j-th task, and is used to consider the order between tasks; the optimization scheduling algorithm based on deep learning learns historical construction data through a deep learning model; the deep learning model maximizes resource utilization through a gradient descent algorithm; the gradient descent algorithm determines the resource allocation quantity for each task through a resource allocation optimization function; the formula expression of the resource allocation optimization function is:

[0134]

[0135] In formula (4), 1 represents the resource demand of the i-th task; σ represents the baseline resource demand of the i-th task; k represents the number of resources allocated to the i-th task, which is used to determine the resource allocation of the task; τ represents the upper limit of the i-th task resources, which is used to limit the scope of resource allocation; the deep learning-based optimization scheduling algorithm minimizes the number of collisions through a spatial analysis method; the spatial analysis method determines whether a collision occurs between tasks through a collision detection and adjustment function, and avoids collisions by adjusting the positions of the tasks; the formula expression of the collision detection and adjustment function is:

[0136]

[0137] In formula (5), n represents the binary variable of collision between the i-th task and the j-th task, which is used to calculate the number of collisions; A binary variable representing the adjustment between the i-th task and the j-th task to avoid collision, which is used to decide whether the position of the task needs to be adjusted; ω represents the spatial distance between the i-th task and the j-th task, which is used to evaluate the spatial relationship between tasks.

[0138] In a specific embodiment, the construction coordination and optimization module adopts an optimization scheduling algorithm based on deep learning, with the goal of achieving effective coordination and optimization of construction progress and resources. The algorithm automatically adjusts the construction plan by analyzing historical construction data, current project status, and resource availability to ensure that the project is completed on time while reducing costs. In a specific implementation, the operating hardware environment of the optimization scheduling algorithm based on deep learning includes:

[0139] CPU: A high-performance multi-core processor such as Intel Xeon or AMD EPYC series.

[0140] GPU: A high-performance graphics processor used to accelerate deep learning computations, such as the NVIDIA Tesla series.

[0141] Memory: Large-capacity memory, 128 GB or more is recommended, to support large-scale data processing and model training.

[0142] Storage: High-speed solid-state drive (SSD) provides fast data reading and writing capabilities.

[0143] In the concrete composite structure prefabricated building structure system, the operation process of the optimization scheduling algorithm based on deep learning is:

[0144] T1. Data preparation: Collect historical construction data, including construction progress, resource usage, weather conditions, etc., and perform preprocessing.

[0145] T2. Feature selection: Determine the key factors that affect construction progress and resource allocation as input features of the model.

[0146] T3. Model training: Use historical data to train deep learning models to learn the relationship between construction progress and resource allocation.

[0147] T4. Optimized scheduling: Based on the current project status and resource conditions, the model predicts the optimal construction plan and resource allocation plan.

[0148] T5. Execution and feedback: Apply the optimized plan to the actual construction, and collect the execution results and feed them back to the model for subsequent model adjustment and optimization.

[0149] In the specific implementation, the test data table of the optimization scheduling algorithm based on deep learning is shown in Table 3:

[0150] Table 3 Test data of the optimization scheduling algorithm based on deep learning

[0151]

[0152] As can be seen from the table above, by applying the deep learning-based optimization scheduling algorithm, the deviation of construction progress and the waste rate of resources have been significantly improved. This proves that the algorithm is able to:

[0153] In the concrete composite structure prefabricated building structure system, the optimization scheduling algorithm based on deep learning is used to coordinate and optimize the construction progress and resources. Its working principle is to learn and analyze the data in the construction process through the deep learning model, predict the time and resource requirements of different tasks, and optimize the construction plan to achieve the best construction progress and resource utilization efficiency. The algorithm can make adjustments based on real-time construction conditions and feedback information, realize dynamic optimization scheduling, and improve construction efficiency and quality.

[0154] In specific implementation, the algorithm based on deep learning can perform intelligent scheduling based on real-time data, respond to changes and problems in the construction process in a timely manner, and ensure the progress and quality of construction. In addition, by accurately predicting task time and resource requirements, it optimizes resource allocation and utilization, avoids resource waste, and improves construction efficiency. Secondly, the algorithm is adaptive and can make flexible adjustments according to different construction scenarios and needs to adapt to complex construction environments. At the same time, by optimizing the scheduling algorithm, the quality and safety of construction operations can be improved, and errors and accidents can be reduced. In specific implementation, the data test comparison example table of the optimization scheduling algorithm based on deep learning compared with the traditional algorithm in construction coordination optimization is shown in Table 4:

[0155] Table 4 Data test comparison example table

[0156]

[0157] In Data Table 4, the optimization scheduling algorithm based on deep learning can more accurately predict and adjust the construction progress, reducing the progress deviation from 10 days to 3 days, improving construction efficiency and the possibility of timely completion of the project. Through smarter resource allocation and scheduling, the algorithm based on deep learning reduces the resource waste rate from 20% to 8%, effectively reducing the waste of materials and human resources. The optimized scheduling scheme not only improves the efficiency of resource use, but also significantly reduces project costs, thereby achieving a doubling of cost savings. Higher construction efficiency, lower resource waste rate and significant cost savings have jointly improved customer and participant satisfaction from 6 points to 9 points. By reducing construction progress deviation and resource waste rate, as well as significantly improving cost savings and project satisfaction, the algorithm based on deep learning has brought significant improvements and efficient management to prefabricated building construction projects. This intelligent construction coordination optimization method can not only improve construction efficiency, but also provide strong data support for project managers and decision makers, and promote the construction industry to develop in a more intelligent and efficient direction.

[0158] In the above embodiment, the operation and maintenance management module includes a disease detection submodule, a predictive maintenance plan submodule and a real-time data analysis submodule; the disease detection submodule monitors the disease condition of the concrete composite structure through a sensor network and a convolutional neural network; the predictive maintenance plan submodule includes a data analysis and modeling unit and a maintenance demand prediction unit; according to the disease detection results and the structure usage, the data analysis and modeling unit analyzes and models the disease detection data, structure usage data and historical maintenance records through a big data analysis method; based on the data analysis results and maintenance specifications, the maintenance demand prediction unit predicts the future maintenance needs of the structure through a time series analysis method and generates a corresponding maintenance plan; the real-time data analysis submodule monitors the operating status of the concrete composite structure in real time through a wireless communication network, and obtains abnormal conditions or potential problems through an outlier detection method; the outlier detection method detects and identifies abnormal values ​​in the data through distance measurement, statistical analysis and threshold setting.

[0159] In a specific embodiment, in the operation and maintenance management module, the disease detection submodule uses a sensor network (such as crack sensors, corrosion sensors, etc.) and image recognition technology to regularly or continuously monitor key parts of the building structure in order to promptly detect potential diseases such as cracks and corrosion. These data are transmitted back to the central database in real time for preliminary analysis. The predictive maintenance plan submodule is based on machine learning and data analysis technology. This module conducts in-depth analysis of the collected disease data, combines factors such as the building's use history and environmental conditions, predicts possible problems in the future, and formulates corresponding repair and maintenance plans. In this way, measures can be taken before the problem occurs to avoid greater losses. The real-time data analysis submodule collects and analyzes the building's use status and environmental data (such as temperature, humidity, wind speed, etc.) in real time, and compares it with historical data to evaluate the current health status of the building. Through big data analysis, this module can provide instant feedback on the stability and safety of the building.

[0160] In the concrete composite structure prefabricated building structure system, the operation and maintenance management module significantly reduces the risk of accidents and ensures the safety of personnel and property by timely discovering and dealing with potential defects in the building structure. In addition, regular maintenance and timely repairs can effectively prevent small problems from turning into big problems, thereby extending the service life of the building and improving the return on investment. Secondly, through predictive maintenance plans, intervention can be carried out at the early stage of the problem, avoiding the high cost of large-scale maintenance and achieving economical and efficient maintenance management. At the same time, the maintenance plan formulated based on data analysis can allocate maintenance resources more reasonably, avoid waste of resources, and improve the efficiency of maintenance work. In addition, the stable and reliable building use experience reduces the interruption of use caused by maintenance, thereby improving user satisfaction and trust. Finally, through effective operation and maintenance management, resource waste and environmental impact are reduced, supporting the transformation of the construction industry to sustainable development.

[0161] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that these specific embodiments are only illustrative, and those skilled in the art may omit, replace, and change the details of the above methods and systems in various ways without departing from the principles and essence of the present invention. For example, merging the above method steps so as to perform substantially the same functions in substantially the same manner to achieve substantially the same results is within the scope of the present invention. Therefore, the scope of the present invention is limited only by the appended claims.

Claims

1. A concrete composite structure assembled building structure system, Features: The system comprises: BIM modeling module: The BIM modeling module converts point cloud data of actual buildings into BIM models through a scanner and image processing method; Collaboration platform module: The collaboration platform module allows multiple participants to edit and update the BIM model simultaneously through a cloud-based BIM project collaboration platform, and the cloud-based BIM project collaboration platform ensures the immutability and traceability of data through blockchain; Prefabricated component quality tracking system: The prefabricated component quality tracking system realizes quality management and status tracking of prefabricated components through radio frequency identification and database management system; An automated design module; the automated design module automatically generates a design scheme for a concrete composite structure through an optimization design algorithm based on artificial intelligence; Visual display module; the visual display module visualizes the concrete composite structure through a virtual reality method; Quality management module: The quality management module realizes real-time monitoring and control of the construction process of the concrete composite structure through a structural health monitoring system; the structural health monitoring system realizes monitoring of at least temperature, humidity and stress parameters through sensors, and realizes automatic alarm and adjustment functions through the Internet of Things and data analysis methods; Simulation module; the simulation module performs collision detection, structural analysis and performance evaluation on the concrete composite structure in the design stage through a multi-physics field simulation model; Construction coordination and optimization module: The construction coordination and optimization module realizes the coordination and optimization of construction progress and resources through an optimization scheduling algorithm based on deep learning; Operation and maintenance management module: The operation and maintenance management module realizes the status monitoring and maintenance management of the concrete composite structure through a sensor network and a big data analysis method; Among them, the output end of the BIM modeling module is connected to the input end of the collaboration platform module; the output end of the prefabricated component quality tracking system is connected to the input end of the automated design module; the output end of the automated design module is connected to the input end of the visualization display module, the output end of the quality management module is connected to the input end of the simulation module, the output end of the simulation module is connected to the input end of the construction coordination and optimization module, and the output end of the construction coordination and optimization module is connected to the input end of the operation and maintenance management module; The artificial intelligence-based optimization design algorithm automatically adjusts the coefficients and cross-sectional areas of different components and the compressive strength of concrete to meet the total strength requirements under the given types and quantities of components of the concrete composite structure through the strength constraint function; the formula expression of the strength constraint function is: In formula (1), N represents the The strength coefficient of each component is used to control the contribution of different components to the overall strength. The weight of different components in the overall strength can be controlled by adjusting the size of the coefficient N. θ represents the The cross-sectional area of ​​each component; the larger the cross-sectional area θ, the higher the bearing capacity of the component; t is the compressive strength of concrete, which is used to indicate the compressive capacity of the component; z represents the minimum strength requirement of the structure; the optimization design algorithm based on artificial intelligence adjusts the coefficients and unit volume costs of different components through the cost function, and automatically finds the design solution that minimizes the cost function; the formula expression of the cost function is: In formula (2), S represents the The cost coefficient of each component is used to control the contribution of each component to the overall cost; the weight of different components in the overall cost can be controlled by adjusting the size of the coefficient S; m represents the The volume of a component; u represents the component Cost per unit volume; The deep learning-based optimization scheduling algorithm analyzes the dependencies and resource requirements of construction tasks through a linear programming method; the linear programming method minimizes the total time and the number of resource conflicts through a construction sequence automatic adjustment function; the formula expression of the construction sequence automatic adjustment function is: In formula (3), r represents the number of construction tasks; b represents the binary variable of the execution of the i-th task, which is used to determine whether task i is performed; g represents the duration of the i-th task, which is used to calculate the total time; δ represents the degree of conflict between the i-th task and the j-th task, which is used to measure the degree of resource conflict; ε represents the binary variable of the resource conflict between the i-th task and the j-th task, which is used to calculate the number of resource conflicts; θ represents the dependency relationship between the i-th task and the j-th task, which is used to consider the order between tasks; the deep learning-based optimization scheduling algorithm learns historical construction data through a deep learning model; the deep learning model maximizes resource utilization through a gradient descent algorithm; the gradient descent algorithm determines the resource allocation quantity of each task through a resource allocation optimization function; the formula expression of the resource allocation optimization function is: In formula (4), 1 represents the resource demand of the i-th task; σ represents the baseline resource demand of the i-th task; k represents the number of resources allocated to the i-th task, which is used to determine the resource allocation of the task; τ represents the upper limit of the i-th task resources, which is used to limit the scope of resource allocation; the deep learning-based optimization scheduling algorithm minimizes the number of collisions through a spatial analysis method; the spatial analysis method determines whether a collision occurs between tasks through a collision detection and adjustment function, and avoids collisions by adjusting the positions of the tasks; the formula expression of the collision detection and adjustment function is: In formula (5), n represents the binary variable of collision between the i-th task and the j-th task, which is used to calculate the number of collisions; A binary variable representing the adjustment between the i-th task and the j-th task to avoid collision, which is used to decide whether the position of the task needs to be adjusted; ω represents the spatial distance between the i-th task and the j-th task, which is used to evaluate the spatial relationship between tasks.

2. A concrete composite structure prefabricated building structure system according to claim 1, Features: The cloud-based BIM project collaboration platform includes a user management module, a project management module, a BIM model management module, a collaboration platform module, a data synchronization module, a cloud storage module and a blockchain module; the user management module manages user accounts and permissions through an identity authentication protocol and role-based access control; The project management module creates, manages and organizes projects through Internet forms and cloud storage and backup mechanisms; the BIM model management module realizes file upload, download, version control and sharing functions of BIM models through file transfer protocols and version control tools; the collaboration platform module realizes collaboration and communication between multiple participants through thread pools and push notification protocols; the data synchronization module ensures data consistency and synchronization when multiple participants edit and update BIM models through web instant messaging protocols; the cloud storage module includes a file storage unit and a quick access unit; the file storage unit stores BIM model file data on a cloud server through an object storage service; the quick access unit realizes quick access and download of BIM model files through a content distribution network CDN; the blockchain module includes a data tamper-proof unit and a data traceability unit; the data tamper-proof unit ensures the tamper-proofness of BIM models and data through public chains, alliance chains and private chains; the data traceability unit realizes data transparency and traceability through distributed ledgers and smart contracts.

3. A concrete composite structure prefabricated building structure system according to claim 1, Features: The prefabricated component quality tracking system includes a prefabricated component information management module, a prefabricated component production process management module, a prefabricated component quality inspection module and a prefabricated component assembly tracking module; The prefabricated part information management module includes a prefabricated part registration unit, a prefabricated part identification unit and a prefabricated part status update unit; the prefabricated part registration unit records and stores at least the type, size and material information of the prefabricated part by using a database management system; the prefabricated part identification unit assigns a unique identification code to each prefabricated part by using a radio frequency identification method; the prefabricated part status update unit updates the production progress, quality inspection results and assembly status information of the prefabricated part in real time through an object-relational mapping framework; the prefabricated part production process management module includes a production planning unit, a quality control unit and a production process tracking unit; the production planning unit updates the production progress, quality inspection results and assembly status information of the prefabricated part in real time through a project management tool The production plan of prefabricated parts is formulated and managed by JIRA, and compared with the actual production progress; the quality control unit monitors and records at least temperature, humidity and vibration parameters in the production process of prefabricated parts through sensors and data acquisition systems; the production process tracking unit tracks the position and process of prefabricated parts on the production line through barcode scanning methods; the prefabricated part quality inspection module inspects and analyzes prefabricated parts through laser scanners and data analysis methods; the prefabricated part assembly tracking module records the assembly position and connection status of each prefabricated part during the actual assembly process through a radio frequency identification reader / writer, and updates the assembly status in the database in real time.

4. A concrete composite structure prefabricated building structure system according to claim 1, Features: The working principle steps of the virtual reality method in the concrete composite structure prefabricated building structure system are as follows: Step 1: Data acquisition and modeling; Generate virtual reality modeling data through building information modeling; Step 2: Modeling conversion and optimization; The geometric information is converted into a three-dimensional model by a virtual reality modeling method, and at least lighting and texture optimization processing is performed; Step 3: Interaction and navigation design; The virtual reality engine UE enables users to browse, select and operate concrete composite structures; Step 4: Virtual reality rendering; The modeling data is processed by a computer graphics library, including at least lighting calculation, shadow generation and material mapping; Step 5: Equipment and sensing technology; Enable interaction and experience through sensors and virtual reality devices; Step 6: Real-time rendering and display; Real-time rendering and display are performed through computer graphics and real-time rendering methods.

5. A concrete composite structure prefabricated building structure system according to claim 1, Features: The structural health monitoring system includes a data acquisition module, a data processing and analysis module, a decision support module and a data visualization module; the data acquisition module includes a sensor deployment unit and a transmission unit; the sensor deployment unit realizes real-time monitoring of the environment and stress state during the construction of the concrete composite structure through temperature sensors, humidity sensors and stress sensors; the transmission unit transmits the data collected by the sensor to the central data processing center in real time through a wireless sensor network; the data processing and analysis module includes a data preprocessing unit and a state analysis unit; the data preprocessing unit cleans and processes the original data through average filtering, outlier detection and linear interpolation; the state analysis unit analyzes the preprocessed data through anomaly detection and time series analysis methods; the decision support module includes an automatic alarm unit and an adjustment suggestion unit; when the monitored data exceeds the preset safety range, the automatic alarm unit automatically generates alarm information through rule-based alarms, natural language processing and statistical methods; The adjustment suggestion unit makes adjustment suggestions based on data analysis results and prediction models through the knowledge graph and recommendation system; The visualization display module displays the monitoring data and analysis results in real time through the data visualization library.

6. A concrete composite structure prefabricated building structure system according to claim 1, Features: The multi-physics field simulation model includes a collision detection module, a structural analysis module and a performance evaluation module; the collision detection module realizes collision detection between components through a geometric intersection detection method; the geometric intersection detection method determines the relationship between geometric bodies through ray tracing, boundary volume hierarchy and line segment intersection judgment method; the structural analysis module includes a finite element modeling unit, a dynamic analysis unit and a structural strength evaluation unit; the finite element modeling unit realizes discretization modeling of concrete composite structures through mathematical statistics methods; the dynamic analysis unit calculates the vibration characteristics and dynamic response of concrete composite structures through modal analysis and response spectrum analysis methods; The structural strength evaluation unit evaluates the strength, stiffness and stability of the structure by means of a finite element analysis method; the performance evaluation module includes a seismic performance evaluation unit, a thermal performance evaluation unit and a fire performance evaluation unit; the seismic performance evaluation unit evaluates the seismic performance index of the concrete composite structure by means of earthquake input and structural response analysis method, and the seismic performance index at least includes peak acceleration and inter-story displacement; the thermal performance evaluation unit simulates and evaluates the thermal performance of the concrete composite structure by means of a numerical simulation method and a data mining method; the fire performance evaluation unit evaluates the fire performance index of the concrete composite structure by means of a heat transfer model and a combustion performance test device.

7. A concrete composite structure prefabricated building structure system according to claim 1, Features: The operation and maintenance management module includes a disease detection submodule, a predictive maintenance plan submodule and a real-time data analysis submodule; the disease detection submodule monitors the disease condition of the concrete composite structure through a sensor network and a convolutional neural network; the predictive maintenance plan submodule includes a data analysis and modeling unit and a maintenance demand prediction unit; according to the disease detection results and the structure usage, the data analysis and modeling unit analyzes and models the disease detection data, structure usage data and historical maintenance records through a big data analysis method; based on the data analysis results and maintenance specifications, the maintenance demand prediction unit predicts the future maintenance needs of the structure through a time series analysis method and generates a corresponding maintenance plan; the real-time data analysis submodule monitors the operating status of the concrete composite structure in real time through a wireless communication network, and obtains abnormal conditions or potential problems through an outlier detection method; the outlier detection method detects and identifies abnormal values ​​in the data through distance measurement, statistical analysis and threshold setting.

Citation Information

Patent Citations

  • BIM-based fabricated building data collaborative management method and system

    CN108595594A

  • BIM-based Fabricated concrete building design and construction method

    CN114036622A

  • Fabricated component installation management method applying BIM (Building Information Modeling)

    CN116596705A

  • Collaboration system for construction management utilizing shared computing platforms

    US20200042915A1

  • Intelligent assembled building whole construction process simulation method based on BIM and two-dimensional code

    WO2022257100A1