A method and system for controlling power consumption of intelligent digital venues
By dynamically adjusting the power supply strategy of energy-consuming equipment in large venues and finely managing energy supply according to the proportion coefficient of the number of spectators, the problem of energy waste caused by the lack of accuracy of the existing energy management system is solved, and more efficient energy utilization and cost reduction are achieved. .
Patent Information
- Application Number
- CN202410388531.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-04-01
AI Technical Summary
The existing energy management systems of large venues lack accuracy and cannot flexibly adjust energy supply according to actual usage, resulting in energy waste and increased costs.
By obtaining the seat layout map and sold seat information of the event, the seating areas are divided, and the power supply strategy of the energy-consuming equipment is dynamically adjusted according to the proportion coefficient of the number of spectators, including the control of air conditioning, lighting, ventilation and other equipment, and the composition of the energy-consuming equipment is optimized. and control strategies to achieve refined management.
While ensuring the movie-watching experience, it minimizes energy waste, improves energy utilization efficiency, meets the personalized needs of audiences in different regions, and improves the efficiency and reliability of energy management.
Smart Images

Figure CN118295277B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of artificial intelligence, and in particular to a method and system for controlling power supply energy consumption of an intelligent digital venue. Background Art
[0002] With the development of information and intelligent technology, energy management of large venues has become increasingly important. Existing large venues usually use BAS systems for energy management. BAS systems refer to building automation systems that use sensors, controllers and communication equipment to monitor and control various equipment and functions in the building, including lighting, air conditioning, power supply, ventilation, heating and environmental control. The core of this system is its controller, which is responsible for connecting various devices and sensors, collecting, processing and issuing control commands, and can interact with other devices or systems through the network or local communication, ultimately achieving intelligent decision-making and management as well as energy consumption control.
[0003] The energy management methods of existing BAS systems often lack precision and are unable to flexibly adjust energy supply according to the actual usage of the venue, resulting in energy waste and increased costs. This situation needs to be further improved. Summary of the invention
[0004] In order to solve the problem that the energy management method of the existing BAS system lacks precision, resulting in energy waste and increased costs, the present application provides a method and system for controlling power supply energy consumption of an intelligent digital venue, which adopts the following technical solutions:
[0005] In a first aspect, the present application provides a method for controlling power consumption of an intelligent digital venue, comprising the following steps:
[0006] Get the event seating layout and sold seats information;
[0007] According to the seating layout diagram of the event and the internal structure of the venue, the seats in the venue are divided into regions to obtain a set of seating regions, wherein each seating region in the set of seating regions corresponds to a group of energy-consuming devices;
[0008] According to the sold seat information, obtaining the audience number ratio coefficient of each seat area in the seat area set;
[0009] A target audience number ratio coefficient corresponding to a target seating area is obtained, and an energy-consuming device group corresponding to the target seating area is controlled to supply power according to the target audience number ratio coefficient. The target seating area is any seating area in the seating area set.
[0010] By adopting the above technical solution, the present application obtains the seat layout diagram and the sold seat information of the event, and then divides the seats into regions according to the seat layout diagram and the internal structure of the venue to obtain a set of seat regions, and each seat region corresponds to a group of energy-consuming devices. Then, according to the sold seat information, the audience number ratio coefficient of each seat region is obtained. Finally, the target audience number ratio coefficient corresponding to the target seat region is obtained, and the energy-consuming device group corresponding to the target seat region is controlled to supply power according to the coefficient. By adopting this method, the power supply strategy of energy-consuming devices in each region can be dynamically adjusted according to the actual audience number ratio of different seat regions. In areas with fewer spectators, the operating power of energy-consuming devices can be appropriately reduced or some devices can be turned off to achieve the purpose of energy saving and consumption reduction; while in areas with more spectators, the normal operation of energy-consuming devices can be guaranteed to maintain a comfortable viewing environment. Compared with the traditional static power supply method, this method can realize the refined management of power supply according to the actual use of the venue, while ensuring the viewing experience and minimizing unnecessary energy waste. In addition, through the division of seat areas and the control of corresponding energy-consuming device groups, this method can adjust the environmental parameters of different regions in a targeted manner to meet the personalized needs of audiences in different regions.
[0011] Optionally, the energy-consuming equipment group includes one or more of air-conditioning equipment, lighting equipment, ventilation equipment, sensor equipment, and audio equipment, wherein the control of the lighting equipment includes adjusting the brightness, color temperature and color of the light according to the activity type and atmosphere requirements.
[0012] By adopting the above technical solutions, this application further optimizes the composition and control strategy of the energy-consuming equipment group on the basis of the power supply energy consumption control of the intelligent digital venue. The energy-consuming equipment group includes one or more of air-conditioning equipment, lighting equipment, ventilation equipment, sensor equipment, and audio equipment. Through the coordinated control of multiple devices, the all-round adjustment of the environmental parameters in the venue can be achieved. Among them, for the control of lighting equipment, the brightness, color temperature and color of the light are also adjusted according to the type of activity and atmosphere requirements, so as to meet the light and shadow requirements of different activities. At the same time, the linkage control of air-conditioning equipment and ventilation equipment can ensure good air quality while meeting temperature requirements; the introduction of sensor equipment can collect environmental parameters in the venue in real time, and provide data support for the intelligent adjustment of energy-consuming equipment; and the optimized control of audio equipment can ensure the audience's auditory experience.
[0013] Optionally, obtaining the audience number ratio coefficient of each seat area in the seat area set according to the sold seat information specifically includes the following steps:
[0014] According to the sold seat information, the number of sold seats in each seat area and the total number of sold seats in the venue are obtained;
[0015] Calculate the initial audience ratio coefficient of each seating area based on the number of seats sold in each seating area and the total number of seats sold in the venue;
[0016] Obtaining the average number of seats sold and the average number of actual spectators in each seating area in several past events, and calculating the historical deviation coefficient of the number of spectators in each seating area, wherein the historical deviation coefficient of the number of spectators reflects the historical deviation degree between the actual number of spectators and the number of seats sold in each seating area;
[0017] The adjustment factor corresponding to the current activity type is obtained, and the initial audience number ratio coefficient of each seating area is adaptively adjusted according to the adjustment factor and the historical deviation coefficient of the audience number of each seating area to obtain a corrected audience number ratio coefficient, wherein the adjustment factor is set according to the activity type and the venue historical data.
[0018] By adopting the above technical solution, this application uses an adaptive adjustment mechanism to fully consider the actual usage and historical deviation characteristics of different seating areas, dynamically optimize the audience ratio coefficient, and thus make the control strategy of energy-consuming equipment more accurate and intelligent. Compared with the method of simply determining the audience ratio coefficient based on the sold seat information, this application can effectively reduce the deviation between the actual audience number and the estimated value, improve the efficiency and reliability of venue energy consumption management, and at the same time, through the setting of adjustment factors, make the solution more adaptable and flexible, and can meet the personalized needs of different types of activities and venues.
[0019] Optionally, the step of obtaining a target audience number ratio coefficient corresponding to a target seating area and controlling the energy-consuming device group corresponding to the target seating area to supply power according to the target audience number ratio coefficient specifically includes the following steps:
[0020] Obtaining the target audience number ratio coefficient and activity time information corresponding to the target seat area, and setting the operation rules of the energy-consuming device group according to the activity time information, wherein the operation rules include the device startup time, the device shutdown time and the power adjustment range;
[0021] The operating state of the energy-consuming device group is adjusted in real time according to the operating rules, and the operating power of the energy-consuming device group corresponding to the target seat area is dynamically adjusted according to the target audience number ratio coefficient, so as to achieve fine control of the energy-consuming device group.
[0022] By adopting the above technical solutions, this application adopts a dynamic control strategy based on time and rules, fully considers the actual time characteristics of the event, reasonably arranges the start and stop time and power adjustment of the equipment, and avoids unnecessary energy waste. For example, start the equipment in advance before the event starts to ensure that the venue environment is in the best state; shut down or reduce the power of the equipment in time after the event to reduce waste heat. At the same time, by limiting the power adjustment range, energy consumption can be minimized while meeting the audience's comfort requirements. Compared with the method of simply controlling the power supply of equipment based on the audience number ratio coefficient, it can achieve refined management of the venue's energy consumption, further improving the intelligence level and energy-saving benefits of the venue's energy management.
[0023] Optionally, setting the operation rules of the energy-consuming device group according to the activity time information specifically includes the following steps:
[0024] Get the start and end time of the event;
[0025] Calculate the duration of the activity according to the start time and the end time, and divide the duration into a warm-up phase, a running phase, and an end phase;
[0026] In the preheating stage, start the air conditioning equipment in the energy-consuming equipment group in advance, calculate the required preheating time according to the ambient temperature and the target temperature, and control the air conditioning equipment to run in advance to achieve comfortable temperature conditions before the event starts. At the same time, according to the sunshine conditions and the lighting conditions of the venue, control the brightness of the lighting equipment in the energy-consuming equipment group to change gradually during the preheating stage to create a lighting atmosphere;
[0027] During the operation phase, the operating power of the air conditioning equipment and ventilation equipment in the energy-consuming equipment group is dynamically adjusted according to the target audience number ratio coefficient, and feedback control is performed in combination with real-time temperature data. The parameters of the lighting equipment and audio equipment in the energy-consuming equipment group are controlled according to the activity type and time period;
[0028] At the end of the event, based on the changing trend of the number of spectators, the air-conditioning and ventilation equipment are controlled to gradually reduce their operating power, and the brightness of the lighting equipment is controlled to gradually increase to guide the audience to leave in an orderly manner.
[0029] By adopting the above technical solution, this application obtains the start and end time of the event, conducts a full-process and phased fine control of the operation of energy-consuming equipment, and adopts targeted strategies at different stages to minimize energy waste and improve energy efficiency. At the same time, by optimizing the start and stop time of the equipment and the power adjustment range, the comfort needs of the audience can be met while achieving the energy-saving goal.
[0030] Optionally, before obtaining the target audience number ratio coefficient corresponding to the target seat area, the method further includes the following steps:
[0031] Dividing each seat area in the seat area set into a common seat area and a special seat area, wherein the special seat area includes at least one of a VIP seat area, a seat area for persons with disabilities, and a seat area for infants and young children;
[0032] For the special seating area, a special control strategy for the corresponding energy-consuming device group is set;
[0033] The special control strategies include:
[0034] According to the VIP identity information, adjust the target temperature of the air conditioning equipment in the energy-consuming equipment group corresponding to the VIP seating area, and adjust the lighting mode of the lighting equipment corresponding to the VIP seating area;
[0035] According to the needs of the disabled, priority is given to ensuring the power supply of ventilation equipment and lighting equipment in the energy-consuming equipment group corresponding to the disabled seating area;
[0036] According to the needs of infants, the target temperature of the air-conditioning equipment corresponding to the infant seating area is adjusted, and the volume of the audio equipment in the energy-consuming equipment group corresponding to the infant seating area is reduced.
[0037] By adopting the above technical solution, this application divides the seating area set into ordinary seating areas and special seating areas. The special seating areas include VIP seating areas, disabled seating areas and infant seating areas. For VIP seating areas, the target temperature of air-conditioning equipment and the lighting mode of lighting equipment are adjusted according to the VIP identity information to provide a more distinguished and comfortable viewing environment. For disabled seating areas, priority is given to ensuring the power supply of ventilation equipment and lighting equipment to meet the special needs of disabled people, reflecting social care. For infant seating areas, the target temperature of air-conditioning equipment and the volume of audio equipment are adjusted to create safe, comfortable and quiet viewing conditions for infants. By adopting precise control strategies for different segments of the population, the quality of venue services is improved to meet the differentiated needs of different audience groups.
[0038] Optionally, after obtaining the target audience number ratio coefficient corresponding to the target seating area and controlling the energy-consuming device group corresponding to the target seating area to supply power according to the target audience number ratio coefficient, the method further comprises the following steps:
[0039] Acquire airflow distribution data in the venue, and identify airflow dead corner areas in the venue according to the airflow distribution data;
[0040] Determining whether the target seat area is located in the airflow blind spot area;
[0041] If the target seat area is located in the airflow dead angle area, the target audience number ratio coefficient is multiplied by the preset airflow dead angle weight to obtain an adjusted target audience number ratio coefficient;
[0042] According to the adjusted target audience number ratio coefficient, the operating parameters of the ventilation equipment and air-conditioning equipment in the energy-consuming equipment group corresponding to the target seating area located in the airflow dead corner area are controlled to improve the ventilation and temperature conditions in the airflow dead corner area.
[0043] By adopting the above technical solution, the present application obtains the airflow distribution data in the venue and identifies the airflow dead corner area based on the data. Then, it is determined whether the target seat area is located in the airflow dead corner area. If the target seat area is located in the airflow dead corner area, the target audience number ratio coefficient is multiplied by the preset airflow dead corner weight to obtain the adjusted target audience number ratio coefficient. Finally, according to the adjusted target audience number ratio coefficient, the operating parameters of the ventilation equipment and air-conditioning equipment corresponding to the seat area located in the airflow dead corner area are controlled. Special optimization control of the seats in the airflow dead corner area can effectively improve the ventilation and temperature conditions in the airflow dead corner area.
[0044] Optionally, after controlling the operating parameters of the ventilation equipment and the air conditioning equipment corresponding to the seating area located in the airflow dead angle area according to the adjusted target audience number ratio coefficient, the method further comprises the following steps:
[0045] Acquiring human thermal comfort data of the target seat area, wherein the human thermal comfort data includes temperature, humidity, air flow velocity and radiation temperature;
[0046] Comparing the human body thermal comfort data with a target thermal comfort range, and calculating a comfort deviation value;
[0047] Determining whether the comfort deviation value exceeds a preset deviation threshold corresponding to the target seat area;
[0048] If the comfort deviation value exceeds the preset deviation threshold, the comfort feedback control is triggered, and the comfort feedback control calculates the adjustment range of the air-conditioning equipment and the adjustment range of the ventilation equipment according to the comfort deviation value;
[0049] According to the calculated adjustment amplitude, the operating parameters of the air-conditioning equipment and ventilation equipment corresponding to the target seating area are controlled. At the same time, the energy consumption data of the air-conditioning equipment and ventilation equipment are associated with the comfort feedback control effect, and the energy consumption and comfort optimization model is updated. The energy consumption and comfort optimization model is used to control the energy consumption of the energy-consuming equipment group corresponding to the target seating area.
[0050] By adopting the above technical solution, this application obtains the human thermal comfort data of different areas in the venue, including temperature, humidity, air flow velocity and radiation temperature, and calculates the predicted average voting value of each area accordingly. Then, the predicted average voting value is compared with the target thermal comfort range to calculate the comfort deviation value. When the comfort deviation value exceeds the preset threshold, the comfort feedback control is triggered, the adjustment amplitude of the air-conditioning equipment and the ventilation equipment is calculated according to the deviation value, and its operating parameters are dynamically adjusted to achieve real-time optimization of the environment in the venue. At the same time, the solution also associates the energy consumption data of the air-conditioning equipment and the ventilation equipment with the human thermal comfort control effect, updates the energy consumption and comfort optimization model, and uses it for subsequent energy consumption control. The adaptive control strategy based on human thermal comfort feedback fully considers the actual comfort of the audience, dynamically adjusts the environmental parameters according to the comfort deviation, provides greater flexibility and adaptability, and can cope with the dynamic changes in the internal environment of the venue and maintain a better comfort level.
[0051] Optionally, after controlling the operating parameters of the air conditioning equipment and ventilation equipment corresponding to the target seat area according to the calculated adjustment amplitude, the method further includes the following steps:
[0052] Obtaining the carbon dioxide concentration in the target seat area, and determining whether the carbon dioxide concentration exceeds a preset health threshold;
[0053] If the carbon dioxide concentration exceeds a preset health threshold, calculating a ventilation deficiency index of the target seat area, wherein the ventilation deficiency index represents the degree of ventilation demand of the target seat area;
[0054] The ventilation deficiency index is multiplied by the target audience number ratio coefficient and the preset weight to obtain the target ventilation frequency of the ventilation equipment in the target seat area, and the control strategy of the ventilation equipment and the air-conditioning equipment is adjusted according to the target ventilation frequency.
[0055] By adopting the above-mentioned technical scheme, the present application further introduces carbon dioxide concentration monitoring and ventilation deficiency index calculation, establishes a ventilation optimization control strategy based on air quality, effectively improves the air environment in the venue, and ensures the health and comfort of the audience. First, the carbon dioxide concentration in the target seating area is obtained, and it is determined whether it exceeds the preset health threshold. When the carbon dioxide concentration exceeds the standard, it means that the air quality in the area is poor and ventilation needs to be strengthened. The present application introduces the concept of ventilation deficiency index, which is used to characterize the degree of ventilation demand in the target seating area. According to the ventilation deficiency index, the target ventilation times of the ventilation equipment in the target seating area are calculated, and the control strategies of the ventilation equipment and air-conditioning equipment are adjusted accordingly, so as to increase the ventilation intensity and improve the air quality.
[0056] In a second aspect, the present application provides an intelligent digital venue power supply energy consumption control system, including:
[0057] The seat information acquisition module is used to obtain the seat layout diagram of the event and the information of the seats sold;
[0058] A seat area division module is used to divide the seats in the venue into areas according to the seat layout diagram of the event and the internal structure of the venue to obtain a seat area set, each seat area in the seat area set corresponds to a group of energy-consuming devices;
[0059] An audience number ratio coefficient acquisition module is used to acquire the audience number ratio coefficient of each seat area in the seat area set according to the sold seat information;
[0060] The power supply energy consumption control module is used to obtain the target audience number ratio coefficient corresponding to the target seat area, and control the energy consumption device group corresponding to the target seat area to supply power according to the target audience number ratio coefficient. The target seat area is any seat area in the seat area set.
[0061] In summary, the present application includes at least one of the following beneficial technical effects:
[0062] 1. The present application obtains the seat layout diagram and sold seat information of the event, and then divides the seats into regions according to the seat layout diagram and the internal structure of the venue to obtain a set of seat regions, each seat region corresponds to a group of energy-consuming devices, then obtains the audience number ratio coefficient of each seat region according to the sold seat information, and finally obtains the target audience number ratio coefficient corresponding to the target seat region, and controls the energy-consuming device group corresponding to the target seat region to supply power according to the coefficient, and can dynamically adjust the power supply strategy of the energy-consuming devices in each region according to the actual audience number ratio of different seat regions; in areas with fewer spectators, the operating power of the energy-consuming devices can be appropriately reduced or some devices can be turned off, so as to achieve the purpose of energy saving and consumption reduction; while in areas with more spectators, the normal operation of the energy-consuming devices can be guaranteed to maintain a comfortable viewing environment; compared with the traditional static power supply method, this method can realize the refined management of power supply according to the actual use of the venue, and minimize unnecessary energy waste while ensuring the viewing experience; in addition, through the division of seat regions and the control of the corresponding energy-consuming device groups, the method can adjust the environmental parameters of different regions in a targeted manner to meet the personalized needs of audiences in different regions;
[0063] 2. This application uses an adaptive adjustment mechanism to fully consider the actual usage and historical deviation characteristics of different seating areas, dynamically optimize the audience ratio coefficient, and thus make the control strategy of energy-consuming equipment more accurate and intelligent; compared with the method of simply determining the audience ratio coefficient based on the sold seat information, this application can effectively reduce the deviation between the actual audience number and the estimated value, improve the efficiency and reliability of venue energy consumption management, and at the same time, through the setting of adjustment factors, make the scheme more adaptable and flexible, and can meet the personalized needs of different types of activities and venues;
[0064] 3. This application obtains the start and end time of the event, conducts full-process and stage-by-stage refined control over the operation of energy-consuming equipment, and adopts targeted strategies at different stages to minimize energy waste and improve energy utilization efficiency; at the same time, by optimizing the start and stop time of the equipment and the power adjustment range, the comfort needs of the audience can be met while achieving energy-saving goals. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1 This is an exemplary flow chart of a method for controlling power consumption of an intelligent digital venue according to an embodiment of the present application;
[0066] Figure 2 It is a flowchart of step S130 in the method for controlling power supply energy consumption of an intelligent digital venue in an embodiment of the present application;
[0067] Figure 3 It is a flowchart of step S140 in the power supply energy consumption control method of the intelligent digital venue in the embodiment of the present application;
[0068] Figure 4 It is a flow chart for a special seating area in the power supply energy consumption control method of an intelligent digital venue in an embodiment of the present application;
[0069] Figure 5 It is a flow chart for airflow dead corner area in the power supply energy consumption control method of the intelligent digital venue in the embodiment of the present application;
[0070] Figure 6 It is a flow chart for human comfort in the power supply energy consumption control method of the intelligent digital venue in the embodiment of the present application;
[0071] Figure 7 It is a flow chart for ventilation demand in the power supply energy consumption control method of the intelligent digital venue in the embodiment of the present application;
[0072] Figure 8 It is a module schematic diagram of the intelligent digital venue power supply energy consumption control system according to the embodiment of the present application;
[0073] Fig. 9 It is a diagram of the internal structure of the electronic device according to the embodiment of the present application. DETAILED DESCRIPTION
[0074] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more listed items.
[0075] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.
[0076] The present application provides a method and system for controlling power supply energy consumption in an intelligent digital venue, which dynamically adjusts the power supply strategy of energy-consuming equipment in each area according to the actual proportion of the number of spectators in different seating areas, thereby minimizing unnecessary energy waste and reducing costs.
[0077] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.
[0078] The embodiment of the present application provides a method, which is executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. In this embodiment, the terminal device is an electronic device, but is not limited to this, and can also be a smart tablet, a computer, etc. The terminal device and the server can be directly or indirectly connected through wired or wireless communication, and the embodiment of the present application does not limit this.
[0079] Reference Figure 1 , Figure 1 It is an exemplary flow chart of a method for controlling power supply energy consumption of an intelligent digital venue according to an embodiment of the present application.
[0080] A method for controlling power consumption of an intelligent digital venue comprises the following steps:
[0081] S110: Obtaining the seating layout diagram and sold seat information of the event.
[0082] The event seat layout is a seat distribution map for a specific event, which shows the location, number, and area division of all seats in the venue, and is usually provided by the venue management system or ticketing system. Specifically, this application obtains the event seat layout and sold seat information by connecting to the ticketing system.
[0083] S120, dividing the seats in the venue into regions according to the activity seat layout diagram and the internal structure of the venue to obtain a seat region set, wherein each seat region in the seat region set corresponds to a group of energy-consuming devices.
[0084] Among them, the energy-consuming equipment group includes one or more of air-conditioning equipment, lighting equipment, ventilation equipment, sensor equipment, and audio equipment. Among them, the control of lighting equipment includes adjusting the brightness, color temperature and color of the light according to the activity type and atmosphere requirements, so as to adopt different lighting atmospheres according to different types of activities to create a suitable atmosphere and environmental atmosphere.
[0085] Specifically, the internal structure of the venue refers to the physical layout and distribution of facilities in the venue, such as the auditorium, stage, entrances and exits, air conditioning locations, lighting fixture locations, ventilation duct layout, audio equipment locations, etc. The seating area set refers to the set formed by dividing the seats in the venue into several areas. Each area contains a part of the seats and corresponds to a specific set of energy-consuming devices. The energy-consuming device group refers to a group of devices associated with each seating area, including air conditioning, lighting, ventilation, sensors, audio, etc., which are used to provide environmental regulation and energy management services for the area.
[0086] S130. Obtain the audience number ratio coefficient of each seat area in the seat area set according to the sold seat information.
[0087] Specifically, the audience ratio coefficient refers to the ratio of the number of sold seats in a certain seating area to the total number of seats in the area, reflecting the audience density and population distribution in the area. The higher the audience ratio coefficient, the greater the audience density in the area, and the corresponding energy-consuming equipment may need to provide a greater power supply and service intensity. For areas with a lower audience ratio coefficient, the power supply and service intensity of energy-consuming equipment can be reduced accordingly to achieve energy saving.
[0088] S140: Obtain a target audience number ratio coefficient corresponding to the target seating area, and control the energy-consuming device group corresponding to the target seating area to supply power according to the target audience number ratio coefficient.
[0089] Specifically, the target seat area is any seat area in the seat area set. The power supply strategy of the corresponding energy-consuming equipment is dynamically adjusted according to the actual audience ratio in the target seat area, thereby reducing energy waste. For example, the seat area is set in advance for a single energy-consuming equipment or multiple energy-consuming equipment on the venue space graphic, so that the seats can be attributed to the coverage range of one or several energy-consuming equipment. After the seats and energy-consuming equipment are bound, the energy-consuming equipment can be adjusted according to the number of audience members present; then the energy-consuming equipment switch rule template setting function is provided, and the number ratio coefficient is set according to the divided area. When the number ratio is at different setting values, it is defined to turn on or off the energy-consuming equipment in the area, or adjust the power of the energy-consuming equipment, so as to achieve the energy-wasting situation that the energy-consuming equipment is fully turned on when there are very few people or no people in the area.
[0090] In one embodiment, if Figure 2 As shown, in step S130, according to the sold seat information, the audience number ratio coefficient of each seat area in the seat area set is obtained, which specifically includes:
[0091] S131. According to the sold seat information, obtain the number of sold seats in each seat area and the total number of sold seats in the venue.
[0092] S132. Calculate the initial audience number ratio coefficient of each seating area according to the number of seats sold in each seating area and the total number of seats sold in the venue.
[0093] S133, obtaining the average actual number of spectators in each seating area in several past events, and calculating the historical deviation coefficient of the number of spectators in each seating area.
[0094] Among them, the historical deviation coefficient of the number of spectators reflects the historical deviation degree between the actual number of spectators in each seating area and the number of seats sold.
[0095] S134, obtaining an adjustment factor corresponding to the current activity type, and adaptively adjusting the initial audience number ratio coefficient of each seating area according to the adjustment factor and the audience number historical deviation coefficient of each seating area to obtain a corrected audience number ratio coefficient.
[0096] Among them, an adjustment factor is introduced in the adaptive adjustment to control the influence of the historical deviation coefficient of the audience number on the corrected audience number ratio coefficient. The adjustment factor is set according to the activity type and the venue's historical data.
[0097] Specifically, the attendance rates of different types of events vary greatly. For some types of events, such as important sports events, celebrity concerts, etc., the actual attendance rate of ticket buyers is usually high, and the deviation between the number of seats sold and the actual number of spectators is small. For other types of events, such as academic lectures and small performances, the actual attendance rate of ticket buyers may be low, and the deviation between the number of seats sold and the actual number of spectators is large. Setting different adjustment factors for different types of events can more accurately reflect the actual number of spectators and improve the estimation accuracy of the audience ratio coefficient. At the same time, through the historical data accumulated from the long-term operation of the venue, the ticket sales and actual number of spectators for different types of events and different seating areas are recorded. These data contain regular information about the attendance rate of the audience. By analyzing the historical data of the venue, the characteristics of the attendance rate of the audience for different types of events and different seating areas can be summarized, and the correlation pattern between the number of seats sold and the actual number of spectators can be found, which can provide a reference for the setting of the adjustment factor.
[0098] It is understandable that since different seats, such as some areas with bad locations, may often have more unauthorized entrants or empty seats, the historical deviation coefficient reflects the deviation between the actual number of spectators and the number of seats sold in each seating area, and the adjustment factor is based on the event type and the venue's corresponding historical data, reflecting the data distribution and attendance deviation of different types of activities in the venue.
[0099] In one embodiment, if Figure 3 As shown, in step S140, the target audience number ratio coefficient corresponding to the target seat area is obtained, and the energy-consuming device group corresponding to the target seat area is controlled to supply power according to the target audience number ratio coefficient, specifically including:
[0100] S141. Obtain the target audience number ratio coefficient and activity time information corresponding to the target seat area, and set the operation rules of the energy-consuming device group according to the activity time information. The operation rules include device startup time, device shutdown time and power adjustment range.
[0101] S142. Adjust the operating status of the energy-consuming device group in real time according to the operating rules, and dynamically adjust the operating power of the energy-consuming device group corresponding to the target seat area according to the target audience number ratio coefficient, so as to achieve fine control of the energy-consuming device group.
[0102] Among them, the operation rules of the energy-consuming equipment group are set according to the activity time information, including:
[0103] S1411. Obtain the start time and end time of the activity session.
[0104] S1412. Calculate the duration of the activity session according to the start time and the end time, and divide the duration into a warm-up phase, a running phase, and an end phase.
[0105] S1413. During the preheating stage, start the air-conditioning equipment in the energy-consuming equipment group in advance, calculate the required preheating time based on the ambient temperature and the target temperature, and control the air-conditioning equipment to run in advance to achieve comfortable temperature conditions before the event starts. According to the sunshine conditions and the lighting conditions of the venue, control the brightness of the lighting equipment in the energy-consuming equipment group to change gradually during the preheating stage to create a lighting atmosphere.
[0106] S1414. During the operation phase, the operating power of the air conditioning equipment and ventilation equipment in the energy-consuming equipment group is dynamically adjusted according to the target audience number ratio coefficient, and feedback control is performed in combination with real-time temperature data. The parameters of the lighting equipment and audio equipment in the energy-consuming equipment group are controlled according to the activity type and time period.
[0107] S1415. At the end of the event, based on the changing trend of the number of spectators, control the air conditioning and ventilation equipment to gradually reduce their operating power, and control the brightness of the lighting equipment to gradually increase, so as to guide the spectators to leave in an orderly manner.
[0108] Among them, the equipment startup time, equipment shutdown time and power adjustment range in the stage operation rules are set and optimized according to the venue's historical operation data and experience model to achieve a balance between energy saving and comfort.
[0109] In one embodiment, if Figure 4 As shown, before step S130, the method further includes the following steps:
[0110] S410. Divide each seat area in the seat area set into a common seat area and a special seat area, wherein the special seat area includes at least one of a VIP seat area, a seat area for persons with disabilities, and a seat area for infants and young children.
[0111] S420. For special seating areas, set a special control strategy for the corresponding energy-consuming device group.
[0112] Among them, special control strategies include:
[0113] S421. According to the VIP identity information, adjust the target temperature of the air-conditioning equipment in the energy-consuming equipment group corresponding to the VIP seating area, and adjust the lighting mode of the lighting equipment corresponding to the VIP seating area.
[0114] S422. Based on the needs of the disabled, priority is given to ensuring the power supply to the ventilation equipment and lighting equipment in the energy-consuming equipment group corresponding to the disabled seating area.
[0115] S423. According to the needs of infants and young children, adjust the target temperature of the air-conditioning equipment corresponding to the infant and young child seating area, and reduce the volume of the audio equipment in the energy-consuming equipment group corresponding to the infant and young child seating area.
[0116] In one embodiment, if Figure 5 As shown, after step S130, the method further includes the following steps:
[0117] S510: Acquire airflow distribution data in the venue, and identify airflow dead corner areas in the venue according to the airflow distribution data.
[0118] Specifically, airflow distribution data can be collected in real time through the sensor network deployed in the venue, including parameters such as wind speed, wind direction, temperature, and humidity in each area. By analyzing the airflow distribution data, airflow blind spots inside the venue can be identified, that is, areas with poor ventilation, poor air circulation, and uneven temperature distribution.
[0119] S520: Determine whether the target seat area is located in an airflow blind spot area.
[0120] S530: If the target seat area is located in an airflow dead angle area, the target audience number ratio coefficient is multiplied by a preset airflow dead angle weight to obtain an adjusted target audience number ratio coefficient.
[0121] Specifically, by presetting airflow dead-spot weights, the degree of adverse impact of airflow dead-spot areas is quantified, thereby increasing the priority and weight of the corresponding areas in energy consumption control.
[0122] S540. According to the adjusted target audience number ratio coefficient, the operating parameters of the ventilation equipment and the air conditioning equipment in the energy consuming equipment group corresponding to the target seat area located in the airflow dead corner area are controlled to improve the ventilation and temperature conditions in the airflow dead corner area.
[0123] In one embodiment, if Figure 6 As shown, after step S540, the method further includes the following steps:
[0124] S610: Acquire human thermal comfort data in the target seat area, where the human thermal comfort data includes temperature, humidity, air flow velocity, and radiation temperature.
[0125] S620: Compare the human thermal comfort data with the target thermal comfort range, and calculate the comfort deviation value.
[0126] S630: Determine whether the comfort deviation value exceeds a preset deviation threshold corresponding to the target seat area.
[0127] S640: If the comfort deviation value exceeds the preset deviation threshold, the comfort feedback control is triggered, and the comfort feedback control calculates the adjustment range of the air-conditioning equipment and the adjustment range of the ventilation equipment according to the comfort deviation value.
[0128] S650. Based on the calculated adjustment amplitude, the operating parameters of the air-conditioning equipment and ventilation equipment corresponding to the target seating area are controlled. At the same time, the energy consumption data of the air-conditioning equipment and ventilation equipment are associated with the comfort feedback control effect, and the energy consumption and comfort optimization model is updated. The energy consumption and comfort optimization model is used to control the energy consumption of the energy-consuming equipment group corresponding to the target seating area.
[0129] Among them, different seat areas correspond to different preset deviation thresholds.
[0130] Specifically, according to the adjustment range of the air conditioning equipment and the ventilation equipment calculated in step S640, the operating parameters of these equipment are adjusted accordingly, such as the temperature setting, wind speed, and air outlet mode of the air conditioner, and the air supply volume and ventilation frequency of the ventilation equipment. While adjusting the operating parameters of the equipment, the real-time energy consumption data of the air conditioning equipment and the ventilation equipment, such as electric power and energy consumption, are collected and recorded. The energy consumption data is correlated with the comfort feedback control effect in advance, and a mathematical model or mapping relationship between energy consumption and comfort is established. Then, after each acquisition of real-time energy consumption data, the model between energy consumption and comfort is updated.
[0131] In one embodiment, if Figure 7 As shown, after step S650, the method further includes the following steps:
[0132] S710: Obtain the carbon dioxide concentration in the target seat area, and determine whether the carbon dioxide concentration exceeds a preset health threshold.
[0133] S720: If the carbon dioxide concentration exceeds a preset health threshold, a ventilation deficiency index of the target seat area is calculated, where the ventilation deficiency index represents the degree of ventilation demand of the target seat area.
[0134] S730: Multiply the insufficient ventilation index by the target audience number ratio coefficient and the preset weight to obtain the target ventilation frequency of the ventilation equipment in the target seat area, and adjust the control strategy of the ventilation equipment and the air-conditioning equipment according to the target ventilation frequency.
[0135] The target ventilation rate is equal to the ventilation deficiency index multiplied by the target audience ratio coefficient multiplied by the preset weight.
[0136] The implementation principle of an intelligent digital venue power supply energy consumption control method in an embodiment of the present application is as follows: the present application obtains a seat layout diagram and sold seat information of an activity session, and then divides the seats into areas according to the seat layout diagram and the internal structure of the venue to obtain a set of seat areas, each seat area corresponds to a group of energy-consuming devices, then obtains the audience number ratio coefficient of each seat area according to the sold seat information, and finally obtains the target audience number ratio coefficient corresponding to the target seat area, and controls the energy-consuming device group corresponding to the target seat area to supply power according to the coefficient, and can dynamically adjust the power supply strategy of the energy-consuming devices in each area according to the actual audience number ratio of different seat areas, thereby minimizing unnecessary energy waste and reducing costs.
[0137] In the second aspect, the present application provides an intelligent digital venue power supply energy consumption control system. The intelligent digital venue power supply energy consumption control system of the present application is described below in combination with the above-mentioned intelligent digital venue power supply energy consumption control method. Figure 8 , Figure 8 It is a module schematic diagram of an intelligent digital venue power supply energy consumption control system according to an embodiment of the present application.
[0138] An intelligent digital venue power supply energy consumption control system, comprising:
[0139] The seat information acquisition module 810 is used to obtain the seat layout diagram of the event and the sold seat information;
[0140] The seat area division module 820 is used to divide the seats in the venue into areas according to the seat layout diagram of the event and the internal structure of the venue to obtain a seat area set, each seat area in the seat area set corresponds to a group of energy-consuming devices;
[0141] The audience number ratio coefficient acquisition module 830 is used to acquire the audience number ratio coefficient of each seat area in the seat area set according to the sold seat information;
[0142] The power supply energy consumption control module 840 is used to obtain the target audience number ratio coefficient corresponding to the target seat area, and control the energy consumption device group corresponding to the target seat area to supply power according to the target audience number ratio coefficient. The target seat area is any seat area in the seat area set.
[0143] In one embodiment, the present application provides an electronic device, which may be a server, and its internal structure diagram may be as follows: Fig. 9As shown. The electronic device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the electronic device is used to store data. The network interface of the electronic device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for controlling power supply energy consumption of an intelligent digital venue is implemented.
[0144] Those skilled in the art will understand that Fig. 9 The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the electronic device to which the scheme of the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.
[0145] In one embodiment, an electronic device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0146] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the above-mentioned computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), tape, floppy disk, flash memory or optical memory, etc. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0147] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for controlling power consumption of an intelligent digital venue, characterized in that: The steps include: Get the event seating layout and sold seats information; According to the seating layout diagram of the event and the internal structure of the venue, the seats in the venue are divided into regions to obtain a set of seating regions, wherein each seating region in the set of seating regions corresponds to a group of energy-consuming devices; According to the sold seat information, obtaining the audience number ratio coefficient of each seat area in the seat area set; A target audience number ratio coefficient corresponding to a target seating area is obtained, and an energy-consuming device group corresponding to the target seating area is controlled to supply power according to the target audience number ratio coefficient. The target seating area is any seating area in the seating area set.
2. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 1, characterized in that: The energy consumption equipment group includes one or more of air conditioning equipment, lighting equipment, ventilation equipment, sensor equipment, and audio equipment, wherein the control of the lighting equipment includes adjusting the brightness, color temperature and color of the light according to the activity type and atmosphere requirements.
3. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 1, characterized in that: The step of obtaining the audience number ratio coefficient of each seat area in the seat area set according to the sold seat information specifically comprises the following steps: According to the sold seat information, the number of sold seats in each seat area and the total number of sold seats in the venue are obtained; Calculate the initial audience ratio coefficient of each seating area based on the number of seats sold in each seating area and the total number of seats sold in the venue; Obtain the average number of seats sold and the average number of actual spectators in each seating area in several past events, and calculate the historical deviation coefficient of the number of spectators in each seating area; The adjustment factor corresponding to the current activity type is obtained, and the initial audience number ratio coefficient of each seating area is adaptively adjusted according to the adjustment factor and the historical deviation coefficient of the audience number of each seating area to obtain a corrected audience number ratio coefficient, wherein the adjustment factor is set according to the activity type and the venue historical data.
4. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 1, characterized in that: The step of obtaining a target audience number ratio coefficient corresponding to the target seat area and controlling the energy-consuming device group corresponding to the target seat area to supply power according to the target audience number ratio coefficient specifically includes the following steps: Obtaining the target audience number ratio coefficient and activity time information corresponding to the target seat area, and setting the operation rules of the energy-consuming device group according to the activity time information, wherein the operation rules include the device startup time, the device shutdown time and the power adjustment range; The operating state of the energy-consuming device group is adjusted in real time according to the operating rules, and the operating power of the energy-consuming device group corresponding to the target seat area is dynamically adjusted according to the target audience number ratio coefficient, so as to achieve fine control of the energy-consuming device group.
5. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 4 is characterized in that: The step of setting the operation rules of the energy-consuming device group according to the activity time information specifically includes the following steps: Get the start and end time of the event; Calculate the duration of the activity according to the start time and the end time, and divide the duration into a warm-up phase, a running phase, and an end phase; In the preheating stage, the air conditioning equipment in the energy-consuming equipment group is started in advance, and the required preheating time is calculated according to the ambient temperature and the preset target temperature, and the air conditioning equipment is controlled to run in advance to achieve comfortable temperature conditions before the event starts. In addition, according to the sunshine conditions and the lighting conditions of the venue, the brightness of the lighting equipment in the energy-consuming equipment group is controlled to change gradually during the preheating stage to create a lighting atmosphere; During the operation phase, the operating power of the air conditioning equipment and ventilation equipment in the energy-consuming equipment group is dynamically adjusted according to the target audience number ratio coefficient, and feedback control is performed in combination with real-time temperature data. The parameters of the lighting equipment and audio equipment in the energy-consuming equipment group are controlled according to the activity type and time period; At the end of the event, based on the changing trend of the number of spectators, the air-conditioning and ventilation equipment are controlled to gradually reduce their operating power, and the brightness of the lighting equipment is controlled to gradually increase to guide the audience to leave in an orderly manner.
6. The method for controlling power consumption of an intelligent digital venue according to claim 1, characterized in that: Before obtaining the target audience number ratio coefficient corresponding to the target seat area, the method further includes the following steps: Dividing each seat area in the seat area set into a common seat area and a special seat area, wherein the special seat area includes at least one of a VIP seat area, a seat area for persons with disabilities, and a seat area for infants and young children; For the special seating area, a special control strategy for the corresponding energy-consuming device group is set; The special control strategies include: According to the VIP identity information, adjust the target temperature of the air conditioning equipment in the energy-consuming equipment group corresponding to the VIP seating area, and adjust the lighting mode of the lighting equipment corresponding to the VIP seating area; According to the needs of the disabled, priority is given to ensuring the power supply of ventilation equipment and lighting equipment in the energy-consuming equipment group corresponding to the disabled seating area; According to the needs of infants, the target temperature of the air-conditioning equipment corresponding to the infant seating area is adjusted, and the volume of the audio equipment in the energy-consuming equipment group corresponding to the infant seating area is reduced.
7. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 1, characterized in that: After obtaining the target audience number ratio coefficient corresponding to the target seat area and controlling the energy-consuming device group corresponding to the target seat area to supply power according to the target audience number ratio coefficient, the method further comprises the following steps: Acquire airflow distribution data in the venue, and identify airflow dead corner areas in the venue according to the airflow distribution data; Determining whether the target seat area is located in the airflow blind spot area; If the target seat area is located in the airflow blind spot area, the target audience number ratio coefficient is multiplied by a preset airflow blind spot weight to obtain an adjusted target audience number ratio coefficient; According to the adjusted target audience number ratio coefficient, the operating parameters of the ventilation equipment and air-conditioning equipment in the energy-consuming equipment group corresponding to the target seating area located in the airflow dead corner area are controlled to improve the ventilation and temperature conditions in the airflow dead corner area.
8. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 7 is characterized in that: After controlling the operating parameters of the ventilation equipment and the air conditioning equipment corresponding to the seating area located in the airflow dead angle area according to the adjusted target audience number ratio coefficient, the method further comprises the following steps: Acquiring human thermal comfort data of the target seat area, wherein the human thermal comfort data includes temperature, humidity, air flow velocity and radiation temperature; Comparing the human body thermal comfort data with a target thermal comfort range, and calculating a comfort deviation value; Determining whether the comfort deviation value exceeds a preset deviation threshold corresponding to the target seat area; If the comfort deviation value exceeds the preset deviation threshold, the comfort feedback control is triggered, and the comfort feedback control calculates the adjustment range of the air-conditioning equipment and the adjustment range of the ventilation equipment according to the comfort deviation value; According to the calculated adjustment amplitude, the operating parameters of the air-conditioning equipment and ventilation equipment corresponding to the target seating area are controlled. At the same time, the energy consumption data of the air-conditioning equipment and ventilation equipment are associated with the comfort feedback control effect, and the energy consumption and comfort optimization model is updated. The energy consumption and comfort optimization model is used to control the energy consumption of the energy-consuming equipment group corresponding to the target seating area.
9. The method for controlling power supply energy consumption of an intelligent digital venue according to claim 8 is characterized in that: After controlling the operating parameters of the air conditioning equipment and ventilation equipment corresponding to the target seat area according to the calculated adjustment amplitude, the method further includes the following steps: Obtaining the carbon dioxide concentration in the target seat area, and determining whether the carbon dioxide concentration exceeds a preset health threshold; If the carbon dioxide concentration exceeds a preset health threshold, calculating a ventilation deficiency index of the target seat area, wherein the ventilation deficiency index represents the degree of ventilation demand of the target seat area; The ventilation deficiency index is multiplied by the target audience number ratio coefficient and the preset weight to obtain the target ventilation frequency of the ventilation equipment in the target seat area, and the control strategy of the ventilation equipment and the air-conditioning equipment is adjusted according to the target ventilation frequency.
10. An intelligent digital venue power supply energy consumption control system, characterized in that: include: The seat information acquisition module is used to obtain the seat layout diagram of the event and the information of the seats sold; A seat area division module is used to divide the seats in the venue into areas according to the seat layout diagram of the event and the internal structure of the venue to obtain a seat area set, each seat area in the seat area set corresponds to a group of energy-consuming devices; An audience number ratio coefficient acquisition module is used to acquire the audience number ratio coefficient of each seat area in the seat area set according to the sold seat information; The power supply energy consumption control module is used to obtain the target audience number ratio coefficient corresponding to the target seat area, and control the energy consumption device group corresponding to the target seat area to supply power according to the target audience number ratio coefficient. The target seat area is any seat area in the seat area set.
