A kind of intelligent management and control method and device of labor attendance, and storage medium
By judging the match between the satellite positioning signal strength of the mobile terminal and the mark information, determining its location and managing the attendance database, it solves the problem of false attendance in the open work area and achieves accurate labor attendance management.
Patent Information
- Application Number
- CN202410349105.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-03-26
AI Technical Summary
Existing technology makes it difficult to accurately determine the location of mobile terminals in open work areas, leading to frequent false attendance situations, especially in the absence of stable power supply and network.
By judging the satellite positioning signal strength of the mobile terminal, if the signal strength is sufficient, satellite positioning is used to obtain location information; if the signal is insufficient, the location is determined by matching the mark information, and based on this, the corresponding attendance database is determined for labor attendance management.
It improves the positioning efficiency and accuracy of mobile terminals, reduces false attendance, and realizes intelligent labor attendance management in open work areas.
Smart Images

Figure CN118351607B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent attendance technology, and in particular to an intelligent management and control method and device for labor attendance, and a storage medium. Background Art
[0002] In the prior art, for closed areas with stable power supply and network, it is only necessary to install ordinary attendance machines to realize labor attendance. However, for some open work areas, the existing attendance machines are not up to the task. For example, in construction areas such as highways and waterways, in the absence of stable power supply and network on site, it is difficult to meet the attendance requirements by installing ordinary attendance machines.
[0003] At present, for attendance in open work areas, the problem of labor attendance in individual open work areas can be solved by using mobile terminals for attendance. However, practice has found that mobile terminal attendance can only be applied to individual open areas at present, and when the satellite positioning signal of the mobile terminal is weak, it is difficult to determine the location of the mobile terminal. If the location of the mobile terminal is directly determined by the user, false attendance is likely to occur. Therefore, it is necessary to propose a new intelligent management and control method for labor attendance to accurately determine the work area where the mobile terminal is located and reduce false attendance, thereby realizing labor attendance in open work areas. Summary of the invention
[0004] The present invention provides an intelligent management and control method and device for labor attendance, and a storage medium, which can accurately determine the working area where a mobile terminal is located and reduce the situation of false attendance, thereby realizing labor attendance in an open working area.
[0005] In order to solve the above technical problems, the first aspect of the present invention discloses an intelligent management and control method for labor attendance, the method comprising:
[0006] Determine whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold, and if the satellite positioning signal is greater than or equal to the signal strength threshold, obtain the location information of the mobile terminal according to the satellite positioning signal;
[0007] If the satellite positioning signal is less than the signal strength threshold, obtaining first marking information in the working area where the mobile terminal is located, matching the first marking information with pre-stored second marking information, obtaining third marking information matching the first marking information, and determining the location information of the mobile terminal according to the third marking information;
[0008] Determine the corresponding attendance database according to the location information of the mobile terminal;
[0009] Obtain an attendance request triggered for a user, the attendance request at least including the attendance personnel information of the user; determine whether there is pre-stored data corresponding to the attendance personnel information in the attendance database; if there is pre-stored data corresponding to the attendance personnel information in the attendance database, modify the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request.
[0010] As an optional implementation, in the first aspect of the present invention, after modifying the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request, the method further includes:
[0011] Acquire work progress data of the target work area corresponding to the attendance database, wherein the work progress data includes project advancement sequence data, project workload data, and project consumption time data;
[0012] According to the work progress data, using a preset attendance analysis model, determine the reasonable arrangement data of project personnel in the target work area;
[0013] Determine the personnel arrangement rationality parameters of the target work area according to the attendance database and the reasonable arrangement data of the project personnel;
[0014] The preset attendance analysis model is obtained by the following method:
[0015] Acquire historical work progress data of multiple work areas of the same engineering type as the target work area, wherein the historical work progress data at least includes: project advancement sequence data, project workload data, project consumption time data, and project personnel arrangement data;
[0016] According to all the historical work progress data, the predetermined basic attendance analysis model is trained to obtain the converged basic attendance analysis model, and the converged basic attendance analysis model is determined as the preset attendance analysis model.
[0017] As an optional implementation, in the first aspect of the present invention, the number of the users is greater than or equal to 1, and the attendance information in the attendance database includes: information of at least one personal device of each of the users;
[0018] The method further comprises:
[0019] For the information of each personal device of each user in the attendance database, obtain the information of multiple public devices corresponding to the information of the personal device, and determine the matching parameters between the information of the personal device and the information of each public device corresponding to the information of the personal device based on the information of the personal device and the information of all the public devices corresponding to the information of the personal device; determine the usage parameters corresponding to the information of the personal device based on the work progress data and the information of the personal device; determine the public device demand parameters corresponding to the information of the personal device based on the matching parameters between the usage parameters corresponding to the information of the personal device and the information of each public device corresponding to the information of the personal device;
[0020] The public equipment demand corresponding to the target work area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipments of all the users in the attendance database.
[0021] As an optional implementation, in the first aspect of the present invention, the information of the personal device includes type information of the personal device and usage area information of the personal device;
[0022] The target working area includes a plurality of sub-areas, and each of the sub-areas is provided with a plurality of the public devices;
[0023] The method further comprises:
[0024] For each of the sub-areas, determining a partition parameter corresponding to the sub-area according to the sub-area and the usage area information of all the personal devices of all the users in the attendance database, wherein the partition parameter is used to represent the usage frequency of the personal devices in the sub-area;
[0025] And, for the information of each personal device of each user in the attendance database, determining the usage parameters corresponding to the information of the personal device according to the work progress data and the information of the personal device, including:
[0026] For each of the personal equipment information of each of the users in the attendance database, determining the usage parameters of the personal equipment corresponding to the personal equipment information according to the work progress data and the type information of the personal equipment in the personal equipment information;
[0027] And, determining the public equipment demand corresponding to the target work area according to the public equipment demand parameter corresponding to the information of all the personal equipment of all the users in the attendance database includes:
[0028] For each of the sub-areas, the public equipment demand corresponding to the sub-area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipment of all the users in the attendance database and the partition parameter corresponding to the sub-area.
[0029] As an optional implementation, in the first aspect of the present invention, the attendance information in the attendance database includes: the type of work information of each of the users;
[0030] The method further comprises:
[0031] Acquire the advancement parameters of several sub-tasks in the target work area corresponding to the attendance database within a preset attendance cycle, wherein the advancement parameters include material usage parameters, finished product output parameters, and completed work ratio parameters;
[0032] For each of the sub-tasks, determining the completion quantity parameter of the sub-task within the attendance cycle according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-task;
[0033] For each of the users in the attendance database, determining a weight parameter of each of the sub-tasks corresponding to the user according to a predetermined relationship between the type of work information and the advancement parameter;
[0034] For each of the users in the attendance database, the workload parameter of the user in the attendance period is determined according to the weight parameter of each of the sub-tasks corresponding to the user and the completion parameter of each of the sub-tasks in the attendance period.
[0035] As an optional implementation, in the first aspect of the present invention, for each of the sub-tasks, determining the completion quantity parameter of the sub-task within the attendance cycle according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-task includes:
[0036] For each of the sub-tasks, a first completion quantity parameter is determined according to the material usage parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset material usage parameter, a second completion quantity parameter is determined according to the finished product output parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset finished product output parameter, a third completion quantity parameter is determined according to the completed work proportion parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset completed work proportion parameter, and a completion quantity parameter of the sub-task within the attendance cycle is determined according to the first completion quantity parameter, the second completion quantity parameter and the third completion quantity parameter;
[0037] And, for each user in the attendance database, according to the relationship between the predetermined job information and the advancement parameter, determining the weight parameter of each sub-job corresponding to the user, including:
[0038] For each of the users in the attendance database, a first association parameter is determined based on a predetermined relationship between the type of work information and material usage parameters, a second association parameter is determined based on a predetermined relationship between the type of work information and finished product output parameters, and a third association parameter is determined based on a predetermined relationship between the type of work information and the proportion of completed work parameters. A weight parameter for each of the sub-works corresponding to the user is determined based on the first association parameter, the second association parameter and the third association parameter.
[0039] As an optional embodiment, in the first aspect of the present invention, the method further comprises:
[0040] Acquire location information and matching information of each of the public devices in the target work area during the attendance period, wherein the matching information is used to indicate the type of personal device that matches the public device;
[0041] For each of the public devices, the usage information of the public device is determined based on the matching information of the public device and the advancement parameters of all the sub-tasks; the first relevance parameter of each user corresponding to the public device is determined based on the location information of the public device and the usage area information of all the personal devices of each user; the second relevance parameter of each user corresponding to the public device is determined based on the usage information of the public device and the information of all the personal devices of each user and the type of work information; the responsibility relevance parameter of each user corresponding to the public device is determined based on the first relevance parameter and the second relevance parameter of each user corresponding to the public device.
[0042] The second aspect of the present invention discloses an intelligent management and control device for labor attendance, the device comprising:
[0043] A satellite positioning module, used to determine whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold, and if the satellite positioning signal is greater than or equal to the signal strength threshold, obtain the location information of the mobile terminal according to the satellite positioning signal;
[0044] a marker positioning module, configured to, when the satellite positioning signal is less than the signal strength threshold, obtain first marker information in the working area where the mobile terminal is located, match the first marker information with pre-stored second marker information, obtain third marker information matching the first marker information, and determine the location information of the mobile terminal according to the third marker information;
[0045] The attendance management and control module is used to determine the corresponding attendance database according to the location information of the mobile terminal; and obtain an attendance request triggered for a user, wherein the attendance request at least includes the attendance personnel information of the user; determine whether there is pre-stored data corresponding to the attendance personnel information in the attendance database, and if there is pre-stored data corresponding to the attendance personnel information in the attendance database, modify the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request.
[0046] As an optional implementation, in the second aspect of the present invention, the device further includes:
[0047] A data acquisition module, wherein the data acquisition module is used to obtain the work progress data of the target work area corresponding to the attendance database after the attendance management and control module modifies the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request, wherein the work progress data includes project advancement sequence data, project workload data, and project consumption time data;
[0048] A personnel analysis module, wherein the personnel analysis module is used to:
[0049] According to the work progress data, using a preset attendance analysis model, determine the reasonable arrangement data of project personnel in the target work area;
[0050] Determine the personnel arrangement rationality parameters of the target work area according to the attendance database and the reasonable arrangement data of the project personnel;
[0051] The preset attendance analysis model is obtained by the following method:
[0052] Acquire historical work progress data of multiple work areas of the same engineering type as the target work area, wherein the historical work progress data at least includes: project advancement sequence data, project workload data, project consumption time data, and project personnel arrangement data;
[0053] According to all the historical work progress data, the predetermined basic attendance analysis model is trained to obtain the converged basic attendance analysis model, and the converged basic attendance analysis model is determined as the preset attendance analysis model.
[0054] As an optional implementation, in the second aspect of the present invention, the number of the users is greater than or equal to 1, and the attendance information in the attendance database includes: information of at least one personal device of each of the users;
[0055] The data acquisition module is also used to acquire information of each personal device of each user in the attendance database, and obtain information of multiple public devices corresponding to the information of the personal device;
[0056] Furthermore, the device further comprises a device analysis module, wherein the device analysis module is used to:
[0057] For the information of each personal device of each user in the attendance database, determine the matching parameters between the information of the personal device and the information of each public device corresponding to the information of the personal device according to the information of the personal device and the information of all the public devices corresponding to the information of the personal device; determine the usage parameters corresponding to the information of the personal device according to the work progress data and the information of the personal device; determine the public device demand parameters corresponding to the information of the personal device according to the matching parameters between the usage parameters corresponding to the information of the personal device and the information of each public device corresponding to the information of the personal device;
[0058] The public equipment demand corresponding to the target work area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipments of all the users in the attendance database.
[0059] As an optional implementation, in the second aspect of the present invention, the information of the personal device includes type information of the personal device and usage area information of the personal device;
[0060] The target working area includes a plurality of sub-areas, and each of the sub-areas is provided with a plurality of the public devices;
[0061] The device analysis module is also used for:
[0062] For each of the sub-areas, determining a partition parameter corresponding to the sub-area according to the sub-area and the usage area information of all the personal devices of all the users in the attendance database, wherein the partition parameter is used to represent the usage frequency of the personal devices in the sub-area;
[0063] Furthermore, the device analysis module determines the specific manner in which the usage parameters corresponding to the information of each personal device of each user in the attendance database are determined according to the work progress data and the information of the personal device, including:
[0064] For each of the personal equipment information of each of the users in the attendance database, determining the usage parameters of the personal equipment corresponding to the personal equipment information according to the work progress data and the type information of the personal equipment in the personal equipment information;
[0065] Furthermore, the equipment analysis module determines the specific manner in which the public equipment demand corresponding to the target work area according to the public equipment demand parameters corresponding to the information of all the personal equipment of all the users in the attendance database comprises:
[0066] For each of the sub-areas, the public equipment demand corresponding to the sub-area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipment of all the users in the attendance database and the partition parameter corresponding to the sub-area.
[0067] As an optional implementation, in the second aspect of the present invention, the attendance information in the attendance database includes: the type of work information of each of the users;
[0068] The device further includes a parameter acquisition module, and the parameter acquisition module is used to:
[0069] Acquire the advancement parameters of several sub-tasks in the target work area corresponding to the attendance database within a preset attendance cycle, wherein the advancement parameters include material usage parameters, finished product output parameters, and completed work ratio parameters;
[0070] The device further comprises a work analysis module, wherein the work analysis module is used to:
[0071] For each of the sub-tasks, determining the completion quantity parameter of the sub-task within the attendance cycle according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-task;
[0072] For each of the users in the attendance database, determining a weight parameter of each of the sub-tasks corresponding to the user according to a predetermined relationship between the type of work information and the advancement parameter;
[0073] For each of the users in the attendance database, the workload parameter of the user in the attendance period is determined according to the weight parameter of each of the sub-tasks corresponding to the user and the completion parameter of each of the sub-tasks in the attendance period.
[0074] As an optional implementation, in the second aspect of the present invention, the work analysis module determines, for each of the sub-works, a specific method of determining the completion amount parameter of the sub-work within the attendance cycle according to the material usage parameter, the finished product output parameter, and the completed work ratio parameter in the advancement parameter of the sub-work, including:
[0075] For each of the sub-tasks, a first completion quantity parameter is determined according to the material usage parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset material usage parameter, a second completion quantity parameter is determined according to the finished product output parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset finished product output parameter, a third completion quantity parameter is determined according to the completed work proportion parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset completed work proportion parameter, and a completion quantity parameter of the sub-task within the attendance cycle is determined according to the first completion quantity parameter, the second completion quantity parameter and the third completion quantity parameter;
[0076] Furthermore, the work analysis module determines, for each user in the attendance database, a specific method of determining a weight parameter of each sub-work corresponding to the user according to a predetermined relationship between work type information and advancement parameters, including:
[0077] For each of the users in the attendance database, a first association parameter is determined based on a predetermined relationship between the type of work information and material usage parameters, a second association parameter is determined based on a predetermined relationship between the type of work information and finished product output parameters, and a third association parameter is determined based on a predetermined relationship between the type of work information and the proportion of completed work parameters. A weight parameter for each of the sub-works corresponding to the user is determined based on the first association parameter, the second association parameter and the third association parameter.
[0078] As an optional implementation, in the second aspect of the present invention, the device further includes an information acquisition module, and the information acquisition module is used to:
[0079] Acquire location information and matching information of each of the public devices in the target work area during the attendance period, wherein the matching information is used to indicate the type of personal device that matches the public device;
[0080] The device further includes a responsibility division module, wherein the responsibility division module is configured to:
[0081] For each of the public devices, the usage information of the public device is determined based on the matching information of the public device and the advancement parameters of all the sub-tasks; the first relevance parameter of each user corresponding to the public device is determined based on the location information of the public device and the usage area information of all the personal devices of each user; the second relevance parameter of each user corresponding to the public device is determined based on the usage information of the public device and the information of all the personal devices of each user and the type of work information; the responsibility relevance parameter of each user corresponding to the public device is determined based on the first relevance parameter and the second relevance parameter of each user corresponding to the public device.
[0082] The third aspect of the present invention discloses another intelligent management and control device for labor attendance, the device comprising:
[0083] A memory storing executable program code;
[0084] a processor coupled to the memory;
[0085] The processor calls the executable program code stored in the memory to execute the intelligent management and control method for labor attendance disclosed in the first aspect of the present invention.
[0086] The fourth aspect of the present invention discloses a computer storable medium, wherein the computer storage medium stores computer instructions. When the computer instructions are called, they are used to execute the intelligent management and control method of labor attendance disclosed in the first aspect of the present invention.
[0087] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0088] In an embodiment of the present invention, it is determined whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold. If the satellite positioning signal is greater than or equal to the signal strength threshold, the location information of the mobile terminal is obtained according to the satellite positioning signal; if the satellite positioning signal is less than the signal strength threshold, the first marking information of the working area where the mobile terminal is located is obtained, the first marking information is matched with the pre-stored second marking information to obtain the third marking information matching the first marking information, and the location information of the mobile terminal is determined according to the third marking information; the corresponding attendance database is determined according to the location information of the mobile terminal; an attendance request triggered for the user is obtained; it is determined whether there is pre-stored data corresponding to the attendance personnel information in the attendance database; if there is pre-stored data corresponding to the attendance personnel information in the attendance database, the attendance information of the user in the attendance database is modified according to the attendance personnel information in the attendance request. It can be seen that the present invention is applied to attendance in an open working area. First, the satellite positioning signal of the mobile terminal is compared with the preset signal strength threshold. If the satellite positioning signal is strong, the mobile terminal is positioned accordingly. If the satellite positioning signal is weak, the mobile terminal is positioned by comparing the marking information of the working area where the mobile terminal is located with the pre-stored marking information. This can enrich the positioning methods of the mobile terminal and improve the positioning efficiency and accuracy of the mobile terminal. Based on the located position of the mobile terminal, a corresponding attendance database is determined to provide intelligent management and control of labor attendance of personnel in the open working area. Both of the above two positioning methods can accurately obtain the position coordinates of the mobile terminal without artificial selection, effectively reducing the occurrence of false attendance. BRIEF DESCRIPTION OF THE DRAWINGS
[0089] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0090] Figure 1 It is a flow chart of an intelligent management and control method for labor attendance disclosed in an embodiment of the present invention;
[0091] Figure 2 It is a structural schematic diagram of an intelligent management and control device for labor attendance disclosed in an embodiment of the present invention;
[0092] Figure 3 It is a structural schematic diagram of another intelligent management and control device for labor attendance disclosed in an embodiment of the present invention;
[0093] Figure 4 It is a structural schematic diagram of another intelligent management and control device for labor attendance disclosed in an embodiment of the present invention. DETAILED DESCRIPTION
[0094] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0095] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.
[0096] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0097] The present invention discloses an intelligent management and control method and device for labor attendance, and a storage medium, which can accurately determine the working area where a mobile terminal is located in an open working area and reduce the situation of false attendance, thereby realizing labor attendance in the open working area. The following are detailed descriptions.
[0098] Embodiment 1
[0099] See also Figure 1 , Figure 1 It is a flow chart of an intelligent management and control method for labor attendance disclosed in an embodiment of the present invention. Figure 1 The described intelligent management and control method for labor attendance can be applied to an intelligent management and control device for labor attendance, and the intelligent management and control device for labor attendance can be integrated in a mobile terminal, a cloud server or a local server, which is not limited in the embodiments of the present invention. Figure 1 As shown, the intelligent management and control method of labor attendance may include the following operations:
[0100] 101. Determine whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold.
[0101] In the embodiment of the present invention, the mobile terminal may be a mobile terminal such as a mobile phone, a tablet computer, a laptop computer, etc. carried by a user, or may be a mobile attendance electronic device specially designed for attendance.
[0102] 102. If the satellite positioning signal is greater than or equal to the signal strength threshold, obtain location information of the mobile terminal according to the satellite positioning signal.
[0103] In the embodiment of the present invention, for open attendance areas, such as highways, water canals, wind power towers, signal towers, etc., it is often difficult to perform attendance by installing ordinary attendance machines due to the harsh geographical environment and poor communication signals. In this case, attendance can be performed by a mobile terminal that is easy for users to carry. When using a mobile terminal to perform attendance, if the user directly determines the attendance location, false attendance is likely to occur. Therefore, if the satellite positioning signal of the mobile terminal can meet the positioning conditions, for example, the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold, the satellite positioning signal is directly used to obtain the location information of the mobile terminal. This method of determining the location information of the mobile terminal by non-human means can reduce the occurrence of false attendance.
[0104] 103. If the satellite positioning signal is less than the signal strength threshold, obtain the first marking information in the working area where the mobile terminal is located, match the first marking information with the pre-stored second marking information, obtain the third marking information matching the first marking information, and determine the location information of the mobile terminal according to the third marking information.
[0105] In an optional embodiment, the above-mentioned first marking information may be image information of at least one marking position in the working area photographed by a mobile terminal, and the marking position may be a landmark position in the working area determined in advance. For example, for a highway construction site, mountains, villages, lakes, and other geographical locations near the highway that are difficult to be unique may be selected as landmark positions. At this time, the above-mentioned second marking information may be an image of at least one of the above-mentioned marking positions acquired in advance, and the third marking information is an image of at least one marking position in the second marking information that matches the first marking information.
[0106] In this optional embodiment, step 103 may include the following operations:
[0107] The image information of at least one marked position in the working area where the mobile terminal is located is captured, the image information of the marked position is matched with the pre-stored standard marked position image information, the target standard marked position image information matching the image information of the marked position is obtained, and the position of the mobile terminal is determined according to the target standard marked position image information. The first marking information includes the image information of at least one marked position. The second marking information is the pre-stored standard marked position image information, and the third marking information is the target standard marked position image information.
[0108] It can be seen that in this optional embodiment, when the satellite positioning signal of the mobile terminal is difficult to use to accurately determine the location of the mobile terminal, the location of the mobile terminal can be quickly determined by image matching. Specifically, the marked position is a unique mark in the corresponding work area, so the first marking information can only be obtained when the mobile terminal is actually located in the work area, thereby effectively reducing the occurrence of false attendance.
[0109] In another optional embodiment, the first marking information may be marking information issued by a marking device pre-placed in the working area and obtained by the mobile terminal through a wireless network, wherein the marking device is a device with certain permissions, and only managers with certain permissions can install or modify the marking device. For example, the marking device may be a key device, and a piece of encrypted location information is sent to the mobile terminal through a key device. At this time, the second marking information may be at least one pre-stored key for indicating the location, and the third marking information may be a key that matches the encrypted information.
[0110] In this optional embodiment, step 103 may include the following operations:
[0111] Acquire first tag information emitted by a tag device pre-placed in the attendance location through a wireless network, the wireless network including at least one of a wifi network, a bluetooth network, and an NFC wireless network; match the first tag information with pre-stored second tag information to obtain second tag information matching the first tag information, and determine the location of the mobile terminal based on the second tag information matching the first tag information.
[0112] It can be seen that in this optional embodiment, the marking device is a device located in the working area that can only be modified by people with relevant authority. The mobile terminal is positioned through communication between the mobile terminal and the marking device. At this time, the location of the mobile terminal can be determined without the need for human selection, thereby effectively reducing the occurrence of false attendance.
[0113] 104. Determine a corresponding attendance database according to the location information of the mobile terminal.
[0114] In the embodiment of the present invention, specifically, each target work area corresponds to an attendance database, and the attendance database stores attendance information and various data related to the target work area, wherein the attendance information is used to record the staff arranged in the corresponding target work area and the staff who can enter the target work area to work. When the position of the mobile terminal is determined, the target work area where the mobile terminal is located is determined, and the corresponding attendance database is further determined.
[0115] 105. Obtain the attendance request triggered by the user; determine whether there is pre-stored data corresponding to the attendance personnel information in the attendance database. If there is pre-stored data corresponding to the attendance personnel information in the attendance database, modify the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request.
[0116] In the embodiment of the present invention, specifically, the attendance request at least includes the attendance personnel information of the user. Optionally, the attendance request triggered by the user can be the user's biometric information obtained through the corresponding device or mobile terminal, such as at least one of face recognition information, fingerprint information, iris information, and voiceprint information that can uniquely indicate the user's identity. The attendance request triggered by the user can be one or more of a work record request, a leave record request, a leave request, a leave cancellation request, a work equipment application request, and a request to modify attendance information. Optionally, the pre-stored data in the attendance database can be a list of staff members arranged in the target work area and a list of staff members who can enter the target work area to work. The attendance personnel information is compared with the pre-stored data in the attendance database. If the pre-stored data corresponding to the attendance personnel information exists in the attendance database, it means that the user who triggers the attendance request belongs to the staff member arranged in the target work area or the staff member who can enter the target work area to work, that is, the user who triggers the attendance request meets the attendance requirements. At this time, the user's attendance information is modified in the attendance database to complete the attendance for the user. The attendance request can be triggered by the user or by other users for the user.
[0117] It can be seen that the intelligent management and control method for labor attendance in the embodiment of the present invention is implemented. For attendance in an open working area, the satellite positioning signal of the mobile terminal is first compared with the preset signal strength threshold. If the satellite positioning signal is strong, the mobile terminal is positioned accordingly. If the satellite positioning signal is weak, the mobile terminal is positioned by comparing the marking information of the working area where the mobile terminal is located with the pre-stored marking information. This can enrich the positioning methods of the mobile terminal and improve the positioning efficiency and accuracy of the mobile terminal; and determine the corresponding attendance database based on the position of the located mobile terminal, so as to provide intelligent management and control of labor attendance of personnel in the open working area; and the above two positioning methods can accurately obtain the position coordinates of the mobile terminal without artificial selection, effectively reducing the occurrence of false attendance.
[0118] In an optional embodiment, after modifying the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request, the method may further include:
[0119] Obtain the work progress data of the target work area corresponding to the attendance database, the work progress data includes project advancement sequence data, project workload data, and project consumption time data;
[0120] According to the work progress data, use the preset attendance analysis model to determine the reasonable arrangement data of project personnel in the target work area;
[0121] According to the attendance database and project personnel, reasonable arrangement data is determined to determine the rationality parameters of personnel arrangement in the target work area.
[0122] In this optional embodiment, the preset attendance analysis model is obtained by the following method:
[0123] Acquire historical work progress data of multiple work areas of the same project type as the target work area, the historical work progress data at least including: project advancement sequence data, project workload data, project consumption time data, and project personnel arrangement data;
[0124] According to all historical work progress data, the predetermined basic attendance analysis model is trained to obtain a converged basic attendance analysis model, and the converged basic attendance analysis model is determined as the preset attendance analysis model.
[0125] In this optional embodiment, the work progress data is used to indicate the overall work progress in the target work area. The reasonable staff arrangement corresponding to the target work area can be determined through the work progress. For example, for the construction of a signal tower, the current work progress is the pouring of the base. Before the base is poured, other work such as construction, installation of equipment, and debugging of equipment cannot be carried out. At this time, the reasonable staff arrangement should be composed of material transportation personnel, pouring personnel, pouring equipment operators, and corresponding management personnel. In addition, the number of material transportation personnel and the number of pouring personnel must also match. Otherwise, a large amount of concrete and other materials may be transported, but there are not enough pouring personnel to carry out the pouring work, which not only affects work efficiency but also may cause material loss.
[0126] In this optional embodiment, the work progress data includes project advancement sequence data, project workload data, and project consumption time data, wherein the project advancement sequence data is used to indicate the advancement sequence of each project in the target work area. For example, for the installation work area of a wind turbine, the road surface needs to be repaired first, followed by the construction base, then the fuselage is installed, and finally the equipment is debugged. The project workload data is used to indicate the size of the corresponding project workload, thereby providing a basis for personnel arrangement. For example, a large workload requires more staff. The project consumption time data is used to indicate the estimated working time consumed by the corresponding project, thereby providing a basis for personnel arrangement. For example, for a work with a tight schedule, more staff need to be arranged to prevent overdue.
[0127] In this optional embodiment, the reasonable arrangement data of project personnel may be one or more of the number of staff, a list of staff, the number of staff of each type of work, the number of staff required for each project, etc. The reasonableness parameter of personnel arrangement is used to indicate the degree of matching between the information of the staff recorded in the attendance database corresponding to the target work area and the current work progress.
[0128] In this optional embodiment, further optionally, the personnel arrangement adjustment parameters can be determined based on the attendance database, project personnel reasonable arrangement data and personnel arrangement rationality parameters, and the personnel arrangement adjustment parameters are used to provide arrangements for the staff in the target work area.
[0129] This optional embodiment is illustrated as follows:
[0130] The work progress data in target work area 1 includes:
[0131] Project advancement sequence data: {Project A, Project B, Project C, Project D};
[0132] Project workload data: {Project A = 0, Project B = 85, Project C = 25, Project D = 0};
[0133] Project time consumption data: {Project A = 100, Project B = 20, Project C = 40, Project D = 100};
[0134] Input the project advancement sequence data, project workload data, and project consumption time data into the preset attendance analysis model to obtain the reasonable arrangement data of project personnel: {Project A = 0, Project B = 15, Project C = 0, Project D = 0};
[0135] The attendance information statistics recorded in the attendance database are: {item A = 2, item B = 10, item C = 1, item D = 0};
[0136] The personnel arrangement rationality parameter = 60. If the qualified score of the personnel arrangement rationality parameter is 85, it means that the personnel arrangement in the current target work area is not reasonable and timely adjustments to the personnel arrangement are required.
[0137] Staff arrangement adjustment parameters: {Project A=-2, Project B=5, Project C=-1, Project D=0}, which means that the staff of Project A needs to be reduced by 2 people, the staff of Project B needs to be increased by 5 people, the staff of Project C needs to be reduced by 1 person, and the staff of Project D will not be adjusted.
[0138] It can be seen that the implementation of the intelligent management and control method of labor attendance in this optional embodiment can determine whether the staff arrangement in the target work area is reasonable based on the work progress data and attendance information in the target work area, and provide adjustment plans when the staff arrangement is unreasonable, thereby achieving more efficient intelligent management and control of labor attendance in open work areas.
[0139] In another optional embodiment, the number of users is greater than or equal to 1, and the attendance information in the attendance database includes: information of at least one personal device of each user;
[0140] The method may further include:
[0141] For each personal device information of each user in the attendance database, obtain the information of multiple public devices corresponding to the information of the personal device, and determine the matching parameters between the information of the personal device and the information of each public device corresponding to the information of the personal device based on the information of the personal device and the information of all public devices corresponding to the information of the personal device; determine the usage parameters corresponding to the information of the personal device based on the work progress data and the information of the personal device; determine the public device demand parameters corresponding to the information of the personal device based on the matching parameters between the usage parameters corresponding to the information of the personal device and the information of each public device corresponding to the information of the personal device;
[0142] The public equipment demand corresponding to the target work area is determined according to the public equipment demand parameters corresponding to the information of all personal equipment of all users in the attendance database.
[0143] In this optional embodiment, when the user triggers the attendance request, he can input the information of the personal equipment he needs to use, such as electric drill, cutting machine, cart, water gun, wrench, screwdriver, pliers, etc. Public equipment refers to the equipment provided in the target work area to provide support for the use of personal equipment, such as electric drill and cutting machine need power box to provide support, water gun need water pipe interface or water storage vehicle to provide support, various types of screwdriver need to provide corresponding types of screws, among which some special personal equipment need various public equipment to provide support. Matching parameters are used to measure the matching degree between personal equipment and public equipment, for example, the matching between electric drill and power supply, the matching between electric drill and corresponding drill bit, and the matching between water gun and water pipe interface. Usage parameters are used to indicate the usage or frequency of use of corresponding personal equipment. According to the work progress data, some personal equipment is used more frequently, while other personal equipment is also used, but the frequency of use is lower. Public equipment demand parameters are used to indicate the demand for public equipment corresponding to personal equipment. For example, for water guns with higher usage frequency, their water consumption is higher, and the required water pipe interface and water storage vehicle are required in large quantities. The demand for public equipment is used to indicate the overall demand for various public equipment in the corresponding target work area. For example, the target work area requires X power boxes, Y water storage trucks, and Z screw boxes of various models.
[0144] It can be seen that the implementation of the intelligent management and control method of labor attendance in this optional embodiment can obtain all personal device information, determine the usage of each personal device based on the work progress data, and determine the demand for public equipment based on the relationship between personal devices and public equipment, thereby providing a reasonable equipment support plan for work in the target work area, reducing the occurrence of reduced work efficiency due to insufficient equipment supply, and thus achieving more efficient intelligent management and control of labor attendance in open work areas.
[0145] In this optional embodiment, further optionally, the information of the personal device includes type information of the personal device and usage area information of the personal device;
[0146] The target working area includes several sub-areas, each of which is provided with several public equipments;
[0147] The method may further include:
[0148] For each sub-area, determine the partition parameter corresponding to the sub-area according to the usage area information of all personal devices of all users in the sub-area and the attendance database, and the partition parameter is used to represent the usage of personal devices in the sub-area, such as the number and type of personal devices in the sub-area;
[0149] And, for the information of each personal device of each user in the attendance database, determine the usage parameters corresponding to the information of the personal device according to the work progress data and the information of the personal device, including:
[0150] For each personal device information of each user in the attendance database, determine the usage parameters of the personal device corresponding to the personal device information according to the work progress data and the type information of the personal device in the personal device information;
[0151] And, according to the public equipment demand parameters corresponding to the information of all personal equipment of all users in the attendance database, the public equipment demand corresponding to the target work area is determined, including:
[0152] For each sub-area, the public equipment demand corresponding to the sub-area is determined according to the public equipment demand parameters corresponding to the information of all personal equipment of all users in the attendance database and the partition parameters corresponding to the sub-area.
[0153] In this optional embodiment, most of the public equipment is difficult to move and can only provide support for personal equipment used by staff working around it. Therefore, if only the overall public equipment demand of the target work area is considered, it is difficult to ensure that both the left and right sub-areas in the target work area can get enough public equipment support. Therefore, in this optional embodiment, the use area information of personal equipment is obtained, and the public equipment demand in each sub-area is analyzed according to the use area of the personal equipment, which is more in line with actual requirements.
[0154] This optional embodiment is illustrated as follows:
[0155] In target work area 1, the attendance database includes:
[0156] User 1: {username, water gun, sub-area 1};
[0157] User 2: {username, cutting machine, sub-area 2};
[0158] User 3: {user name, electric drill, sub-area 1 & sub-area 2};
[0159] …
[0160] User N: {user name, type of personal device N, sub-area N}.
[0161] For the sub-area N, a partition parameter N1 corresponding to the sub-area N is determined according to the sub-area N and the usage area information of all personal devices of all users in the attendance database.
[0162] For personal device N, the usage parameter N2 of the personal device corresponding to personal device N is determined based on the work progress data and the type information of personal device N, and the public device demand parameter N3 corresponding to personal device N is determined based on the matching parameters between the usage parameter N2 and the information of each public device corresponding to personal device N.
[0163] For sub-area N, the public equipment demand NX corresponding to sub-area N is determined according to the public equipment demand parameter corresponding to the information of all personal equipment of all users in the attendance database and the partition parameter N1 corresponding to sub-area N.
[0164] It can be seen that the implementation of the intelligent management and control method of labor attendance in this optional embodiment can obtain all personal equipment information, determine the usage of each personal device based on the work progress data, and determine the demand for public equipment based on the relationship between personal devices and public equipment. Finally, based on the usage area and sub-area division of personal devices, the demand for public equipment in each sub-area is determined, thereby providing a more reasonable equipment support plan for work in the target work area, reducing the occurrence of reduced work efficiency due to insufficient equipment supply, and thus achieving more efficient intelligent management and control of labor attendance in open work areas.
[0165] In yet another optional embodiment, the attendance information in the attendance database includes: job type information of each user;
[0166] The method may further include:
[0167] Obtaining the advancement parameters of several sub-tasks in the target work area corresponding to the attendance database within the preset attendance cycle, the advancement parameters including material usage parameters, finished product output parameters and completed work ratio parameters;
[0168] For each sub-task, determine the completion volume parameter of the sub-task within the attendance cycle based on the material usage parameter, finished product output parameter and completed work ratio parameter in the advancement parameter of the sub-task;
[0169] For each user in the attendance database, the weight parameter of each sub-job corresponding to the user is determined according to the relationship between the predetermined job type information and the advancement parameter;
[0170] For each user in the attendance database, the workload parameter of the user in the attendance period is determined according to the weight parameter of each sub-task corresponding to the user and the completion volume parameter of each sub-task in the attendance period.
[0171] In this optional embodiment, an intelligent management and control method for labor attendance that analyzes the workload of staff members in an attendance cycle (e.g., the time period between work hours and off-get off work hours) is provided, and the workload parameter is used to measure the workload of the corresponding user in the attendance cycle. There are several sub-tasks in progress in the target work area, such as laying floor tiles, suspended ceilings, weak current wiring, water pipe installation, etc. The advancement parameter of each sub-task is used to indicate the advancement degree of the corresponding sub-task, and the completion parameter is used to quantitatively indicate the advancement degree of the sub-task. The weight parameter is used to indicate the role played by the corresponding user in the sub-task. For example, the floor tile laying work is composed of two skilled workers and one laborer, and the weight parameters corresponding to the skilled worker and the laborer are different. In addition, the laborer may also assist in the suspended ceiling work, so the laborer also has a corresponding weight parameter in the suspended ceiling work.
[0172] This optional embodiment is illustrated as follows:
[0173] During the preset attendance period:
[0174] The advancement parameters of sub-task 1 include: material usage parameter 120, finished product output parameter 60, and completed work ratio parameter 36%;
[0175] The advancement parameters of sub-task 2 include: material usage parameter 4000, finished product output parameter 2800, and completed work ratio parameter 60%;
[0176] …
[0177] The advancement parameters of sub-task N include: material usage parameter N1, finished product output parameter N2, and completed work ratio parameter N3;
[0178] According to the material usage parameter of sub-task 1, which is 120, the finished product output parameter, which is 60, and the completed work ratio parameter, which is 36%, the completion volume parameter of sub-task 1 within the attendance cycle is determined to be 100.
[0179] According to the material usage parameter of sub-task 2, 4000, the finished product output parameter, 2800, and the completed work ratio parameter, 60%, the completion parameter of sub-task 1 within the attendance cycle is determined to be 87;
[0180] …
[0181] According to the material usage parameter N1, the finished product output parameter N2, and the completed work ratio parameter N3 of the sub-task N, the completion quantity parameter of the sub-task N within the attendance cycle is determined to be N4;
[0182] For user 1, according to the relationship between the predetermined job type information and the advancement parameter, determine the weight parameter Q11 of sub-task 1 corresponding to user 1, the weight parameter Q12 of sub-task 2 corresponding to user 1, ..., the weight parameter Q1N of sub-task N corresponding to user 1;
[0183] For user 2, according to the relationship between the predetermined job type information and the advancement parameter, determine the weight parameter Q21 of sub-task 1 corresponding to user 2, the weight parameter Q22 of sub-task 2 corresponding to user 2, ..., the weight parameter Q2N of sub-task N corresponding to user 2;
[0184] …
[0185] For user 1, according to the weight parameter of each sub-task corresponding to user 1 and the completion parameter of each sub-task within the attendance period, determine the workload parameter of user 1 within the attendance period: 95;
[0186] For user 2, according to the weight parameter of each sub-task corresponding to user 2 and the completion parameter of each sub-task within the attendance period, determine the workload parameter of user 2 within the attendance period: 91;
[0187] …
[0188] For user N, the workload parameter for user N in the attendance period is determined based on the weight parameter of each sub-task corresponding to user N and the completion parameter of each sub-task in the attendance period: 98.
[0189] It can be seen that the implementation of the intelligent management and control method of labor attendance in this optional embodiment can determine the workload of each staff member based on the progress of each sub-work in the target work area and the job information of each staff member, so as to obtain the performance and work completion status of each staff member during work, thereby realizing more efficient intelligent management and control of labor attendance in open work areas.
[0190] In another optional embodiment, for each sub-task, the completion amount parameter of the sub-task within the attendance cycle is determined according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-task, which may include:
[0191] For each sub-task, a first completion quantity parameter is determined according to the material usage parameter in the advancement parameter of the sub-task and the influencing factor corresponding to the preset material usage parameter, a second completion quantity parameter is determined according to the finished product output parameter in the advancement parameter of the sub-task and the influencing factor corresponding to the preset finished product output parameter, a third completion quantity parameter is determined according to the completed work proportion parameter in the advancement parameter of the sub-task and the influencing factor corresponding to the preset completed work proportion parameter, and the completion quantity parameter of the sub-task within the attendance period is determined according to the first completion quantity parameter, the second completion quantity parameter and the third completion quantity parameter;
[0192] And, for each user in the attendance database, according to the relationship between the predetermined job type information and the advancement parameter, the weight parameter of each sub-job corresponding to the user is determined, which may include:
[0193] For each user in the attendance database, a first association parameter is determined based on a predetermined relationship between the type of work information and the material usage parameter, a second association parameter is determined based on a predetermined relationship between the type of work information and the finished product output parameter, and a third association parameter is determined based on a predetermined relationship between the type of work information and the proportion of completed work parameter. The weight parameter of each sub-job corresponding to the user is determined based on the first association parameter, the second association parameter and the third association parameter.
[0194] In this optional embodiment, different types of sub-tasks have different completion parameters. For example, for the sub-task of laying floor tiles, the amount of tiles used can be a good measure of the amount of work completed. Therefore, for the sub-task of laying floor tiles, its completion parameter is mainly determined by its material usage parameter, and the impact factor corresponding to its preset material usage parameter is larger; for the sub-task of road repair, the length of the road that has been repaired can be a good measure of the amount of work completed. Therefore, for the sub-task of road repair, its completion parameter is mainly determined by its completed work proportion parameter, and the impact factor corresponding to its preset completed work proportion parameter is larger; for the sub-task of weak current machine room construction, the number of built machine rooms can be a good measure of the amount of work completed. Therefore, for the sub-task of weak current machine room construction, its completion parameter is mainly determined by its finished product output parameter, and the impact factor corresponding to its preset finished product output parameter is larger.
[0195] In this optional embodiment, the weight parameter of each sub-work corresponding to the user is determined according to the relationship between the type of work information and the advancement parameter of the sub-work, and the advancement parameter includes material usage parameter, finished product output parameter and completed work proportion parameter. Therefore, the relationship between the specific type of work information and the advancement parameter of the sub-work is the relationship between the type of work information and the material usage parameter, the finished product output parameter and the completed work proportion parameter respectively. For example, for a tiler, the completion of his work is mainly related to the amount of floor tiles used, so the weight parameter of his corresponding floor tile sub-work is mainly determined by the first associated parameter; for a weak current worker, the completion of his work is mainly related to the completed weak current construction work, so the weight parameter of his corresponding weak current construction sub-work is mainly determined by the third associated parameter.
[0196] It can be seen that the intelligent management and control method of labor attendance implemented in this optional embodiment can more accurately determine the progress of each sub-work according to the material usage parameters, finished product output parameters and completed work proportion parameters of each sub-work in the target work area. At the same time, according to the relationship between each staff member's job type information and the material usage parameters, finished product output parameters and completed work proportion parameters, the weight parameters of each sub-work corresponding to each staff member can be more accurately determined, so as to more accurately obtain the performance and work completion status of each staff member during work, thereby realizing more efficient intelligent management and control of labor attendance in open work areas.
[0197] In yet another optional embodiment, the method may further include:
[0198] Obtain the location information and matching information of each public device in the target work area during the attendance period;
[0199] For each public device, the usage information of the public device is determined based on the matching information of the public device and the advancement parameters of all sub-tasks; the first relevance parameter of each user corresponding to the public device is determined based on the location information of the public device and the usage area information of all personal devices of each user; the second relevance parameter of each user corresponding to the public device is determined based on the usage information of the public device and the information of all personal devices of each user and the type of work information; the responsibility relevance parameter of each user corresponding to the public device is determined based on the first relevance parameter and the second relevance parameter of each user corresponding to the public device.
[0200] In this optional embodiment, the matching information is used to indicate the type of personal device that matches the public device. For example, for a public device such as a power box, the matching information indicates all personal devices that require power and whose rated power does not exceed the upper limit of the power that the power box can provide. The responsibility correlation parameter is used to indicate the degree of responsibility between the public device and each user. If a public device is damaged within a certain period of time, the relevant persons who may have caused the damage can be determined based on the responsibility correlation parameter of each user corresponding to the public device, and then the specific responsible persons can be further determined.
[0201] In this optional embodiment, the first correlation parameter is used to indicate the degree of connection between the public device and each user in terms of region, and the second correlation parameter is used to indicate the degree of connection between the public device and each user in terms of usage. The usage information of the public device is used to indicate the usage of the public device. For example, the usage information indicates which personal devices will use the public device in each sub-job and how often or how much it is used. The usage information of the public device is combined with the information of the user's personal device and the type of work information to determine the degree of connection between each user corresponding to the public device in terms of usage, that is, the second correlation parameter.
[0202] It can be seen that the implementation of the intelligent management and control method of labor attendance in this optional embodiment can determine the degree of responsibility between the public equipment and each user based on the degree of connection between the public equipment and each user in terms of region and the degree of connection between the public equipment and each user in terms of usage. Once public equipment is damaged, the scope of responsible personnel can be determined in time to achieve more reasonable attendance, thereby realizing more efficient intelligent management and control of labor attendance in open working areas.
[0203] Embodiment 2
[0204] See also Figure 2 , Figure 2 Schematic diagram of the structure of an intelligent management and control device for labor attendance disclosed in an embodiment of the present invention. Figure 2 As shown, the intelligent management and control device for labor attendance may include:
[0205] The satellite positioning module 201 is used to determine whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold, and if the satellite positioning signal is greater than or equal to the signal strength threshold, obtain the location information of the mobile terminal according to the satellite positioning signal;
[0206] The marker positioning module 202 is used to obtain first marker information in the working area where the mobile terminal is located when the satellite positioning signal is less than the signal strength threshold, match the first marker information with the pre-stored second marker information, obtain third marker information matching the first marker information, and determine the location information of the mobile terminal according to the third marker information;
[0207] The attendance management and control module 203 is used to determine the corresponding attendance database according to the location information of the mobile terminal; and obtain the attendance request triggered by the user, the attendance request at least includes the user's attendance personnel information; determine whether there is pre-stored data corresponding to the attendance personnel information in the attendance database, if there is pre-stored data corresponding to the attendance personnel information in the attendance database, then modify the user's attendance information in the attendance database according to the attendance personnel information in the attendance request.
[0208] It can be seen that implementation Figure 2 The described device, for attendance in an open working area, first compares the satellite positioning signal of the mobile terminal with a preset signal strength threshold. If the satellite positioning signal is strong, the mobile terminal is positioned accordingly. If the satellite positioning signal is weak, the mobile terminal is positioned by comparing the marking information of the working area where the mobile terminal is located with the pre-stored marking information. This can enrich the positioning methods of the mobile terminal and improve the positioning efficiency and accuracy of the mobile terminal. Based on the located position of the mobile terminal, a corresponding attendance database is determined to provide intelligent management and control of labor attendance of personnel in the open working area. Both of the above-mentioned two positioning methods can accurately obtain the position coordinates of the mobile terminal without artificial selection, effectively reducing the occurrence of false attendance.
[0209] In an optional embodiment, if Figure 3 As shown, the device may also include:
[0210] A data acquisition module 204, which is used to acquire the work progress data of the target work area corresponding to the attendance database after the attendance control module 203 modifies the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request, and the work progress data includes project advancement sequence data, project workload data, and project consumption time data;
[0211] The personnel analysis module 205 is used to:
[0212] According to the work progress data, use the preset attendance analysis model to determine the reasonable arrangement data of project personnel in the target work area;
[0213] According to the attendance database and project personnel reasonable arrangement data, determine the personnel arrangement rationality parameters of the target work area;
[0214] Among them, the preset attendance analysis model is obtained by the following method:
[0215] Acquire historical work progress data of multiple work areas of the same project type as the target work area, the historical work progress data at least including: project advancement sequence data, project workload data, project consumption time data, and project personnel arrangement data;
[0216] According to all historical work progress data, the predetermined basic attendance analysis model is trained to obtain a converged basic attendance analysis model, and the converged basic attendance analysis model is determined as the preset attendance analysis model.
[0217] It can be seen that the device described in the implementation of this optional embodiment can determine whether the staff arrangement in the target work area is reasonable based on the work progress data and attendance information in the target work area, and provide adjustment plans when the staff arrangement is unreasonable, thereby achieving more efficient intelligent management and control of labor attendance in open work areas.
[0218] In another optional embodiment, Figure 3 As shown, the number of users is greater than or equal to 1, and the attendance information in the attendance database includes: information of at least one personal device of each user;
[0219] The data acquisition module 204 is also used to acquire information of multiple public devices corresponding to the information of each personal device of each user in the attendance database;
[0220] Furthermore, the apparatus may further include a device analysis module 206, wherein the device analysis module 206 is configured to:
[0221] For each personal device information of each user in the attendance database, determine the matching parameters between the personal device information and the information of each public device corresponding to the personal device information based on the personal device information and the information of all public devices corresponding to the personal device information; determine the usage parameters corresponding to the personal device information based on the work progress data and the personal device information; determine the public device demand parameters corresponding to the personal device information based on the matching parameters between the usage parameters corresponding to the personal device information and the information of each public device corresponding to the personal device information;
[0222] The public equipment demand corresponding to the target work area is determined according to the public equipment demand parameters corresponding to the information of all personal equipment of all users in the attendance database.
[0223] It can be seen that the device described in the implementation of this optional embodiment can obtain all personal device information, determine the usage of each personal device based on the work progress data, and determine the demand for public equipment based on the relationship between personal devices and public equipment, thereby providing a reasonable equipment support plan for work in the target work area, reducing the occurrence of reduced work efficiency due to insufficient equipment supply, and thus achieving more efficient intelligent management and control of labor attendance in open work areas.
[0224] In yet another optional embodiment, the information of the personal device includes type information of the personal device and usage area information of the personal device;
[0225] The target working area includes several sub-areas, each of which is provided with several public equipments;
[0226] The above-mentioned device analysis module 206 can also be used for:
[0227] For each sub-area, determine a partition parameter corresponding to the sub-area according to the usage area information of all personal devices of all users in the sub-area and the attendance database, where the partition parameter is used to represent the usage frequency of the personal devices in the sub-area;
[0228] Furthermore, the device analysis module 206 determines the specific manner in which the usage parameters corresponding to the information of each personal device of each user in the attendance database are determined according to the work progress data and the information of the personal device, including:
[0229] For each personal device information of each user in the attendance database, determine the usage parameters of the personal device corresponding to the personal device information according to the work progress data and the type information of the personal device in the personal device information;
[0230] Furthermore, the device analysis module 206 determines the specific method of determining the public device demand corresponding to the target work area according to the public device demand parameters corresponding to the information of all personal devices of all users in the attendance database, including:
[0231] For each sub-area, the public equipment demand corresponding to the sub-area is determined according to the public equipment demand parameters corresponding to the information of all personal equipment of all users in the attendance database and the partition parameters corresponding to the sub-area.
[0232] It can be seen that the device described in the implementation of this optional embodiment can also obtain all personal device information, determine the usage of each personal device based on the work progress data, and determine the demand for public equipment based on the relationship between personal devices and public equipment. Finally, based on the usage area and sub-area division of personal devices, the demand for public equipment in each sub-area is determined, thereby providing a more reasonable equipment support plan for work in the target work area, reducing the occurrence of reduced work efficiency due to insufficient equipment supply, and thus achieving more efficient intelligent management and control of labor attendance in open work areas.
[0233] In yet another optional embodiment, Figure 3 As shown, the attendance information in the attendance database includes: the type of work information of each user;
[0234] The device may further include a parameter acquisition module 207, wherein the parameter acquisition module 207 is used to:
[0235] Obtaining the advancement parameters of several sub-tasks in the target work area corresponding to the attendance database within the preset attendance cycle, the advancement parameters including material usage parameters, finished product output parameters and completed work ratio parameters;
[0236] The device may further include a work analysis module 208, wherein the work analysis module 208 is used to:
[0237] For each sub-task, determine the completion volume parameter of the sub-task within the attendance cycle based on the material usage parameter, finished product output parameter and completed work ratio parameter in the advancement parameter of the sub-task;
[0238] For each user in the attendance database, the weight parameter of each sub-job corresponding to the user is determined according to the relationship between the predetermined job type information and the advancement parameter;
[0239] For each user in the attendance database, the workload parameter of the user in the attendance period is determined according to the weight parameter of each sub-task corresponding to the user and the completion volume parameter of each sub-task in the attendance period.
[0240] It can be seen that the device described in the implementation of this optional embodiment can determine the workload of each staff member based on the progress of each sub-work in the target work area and the job information of each staff member, so as to obtain the performance and work completion status of each staff member during work, thereby realizing more efficient intelligent management and control of labor attendance in open work areas.
[0241] In another optional embodiment, the work analysis module 208 determines the specific method of the completion amount parameter of each sub-work within the attendance cycle according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-work, including:
[0242] For each sub-task, a first completion quantity parameter is determined according to the material usage parameter in the advancement parameter of the sub-task and the influencing factor corresponding to the preset material usage parameter, a second completion quantity parameter is determined according to the finished product output parameter in the advancement parameter of the sub-task and the influencing factor corresponding to the preset finished product output parameter, a third completion quantity parameter is determined according to the completed work proportion parameter in the advancement parameter of the sub-task and the influencing factor corresponding to the preset completed work proportion parameter, and the completion quantity parameter of the sub-task within the attendance period is determined according to the first completion quantity parameter, the second completion quantity parameter and the third completion quantity parameter;
[0243] Furthermore, the work analysis module 208 determines the specific method of weighting parameters of each sub-work corresponding to each user in the attendance database according to the relationship between the predetermined work type information and the advancement parameter, including:
[0244] For each user in the attendance database, a first association parameter is determined based on a predetermined relationship between the type of work information and the material usage parameter, a second association parameter is determined based on a predetermined relationship between the type of work information and the finished product output parameter, and a third association parameter is determined based on a predetermined relationship between the type of work information and the proportion of completed work parameter. The weight parameter of each sub-job corresponding to the user is determined based on the first association parameter, the second association parameter and the third association parameter.
[0245] It can be seen that the device described in the implementation of this optional embodiment can more accurately determine the progress of each sub-task based on the material usage parameters, finished product output parameters and completed work proportion parameters of each sub-task in the target work area. At the same time, based on the relationship between each staff member's job type information and the material usage parameters, finished product output parameters and completed work proportion parameters, the weight parameters of each sub-task corresponding to each staff member can be more accurately determined, so as to more accurately obtain the performance and work completion status of each staff member during work, thereby realizing more efficient intelligent management and control of labor attendance in open work areas.
[0246] In yet another optional embodiment, Figure 3 As shown, the device may further include an information acquisition module 209, and the information acquisition module 209 is used to:
[0247] Obtaining location information and matching information of each public device in the target work area during the attendance period, where the matching information is used to indicate the type of personal device that matches the public device;
[0248] The device may further include a responsibility division module 210, wherein the responsibility division module 210 is configured to:
[0249] For each public device, the usage information of the public device is determined based on the matching information of the public device and the advancement parameters of all sub-tasks; the first relevance parameter of each user corresponding to the public device is determined based on the location information of the public device and the usage area information of all personal devices of each user; the second relevance parameter of each user corresponding to the public device is determined based on the usage information of the public device and the information of all personal devices of each user and the type of work information; the responsibility relevance parameter of each user corresponding to the public device is determined based on the first relevance parameter and the second relevance parameter of each user corresponding to the public device.
[0250] It can be seen that the implementation of the device described in this optional embodiment can determine the degree of responsibility between the public equipment and each user based on the degree of connection between the public equipment and each user in terms of region and the degree of connection between the public equipment and each user in terms of usage. Once public equipment is damaged, the scope of responsible personnel can be determined in a timely manner to achieve more reasonable attendance, thereby realizing more efficient intelligent management and control of labor attendance in open working areas.
[0251] Embodiment 3
[0252] See also Figure 4 , Figure 4 Schematic diagram of another intelligent management and control device for labor attendance disclosed in an embodiment of the present invention. Figure 4 As shown, the intelligent management and control device for labor attendance may include:
[0253] A memory 301 storing executable program codes;
[0254] a processor 302 coupled to the memory 301;
[0255] The processor 302 calls the executable program code stored in the memory 301 to execute the steps of the intelligent management and control method for labor attendance described in the first embodiment of the present invention.
[0256] Embodiment 4
[0257] An embodiment of the present invention discloses a computer storable medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps in the intelligent management and control method for labor attendance described in the first embodiment of the present invention.
[0258] Embodiment 5
[0259] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps in the intelligent management and control method for labor attendance described in Example 1.
[0260] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.
[0261] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or partly contributed to the prior art in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.
[0262] Finally, it should be noted that the intelligent management and control method and device for labor attendance disclosed in the embodiment of the present invention only discloses the preferred embodiments of the present invention, which are only used to illustrate the technical solution of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some of the technical features therein can be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An intelligent management and control method for labor attendance, characterized in that: The method comprises: Determine whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold, and if the satellite positioning signal is greater than or equal to the signal strength threshold, obtain the location information of the mobile terminal according to the satellite positioning signal; If the satellite positioning signal is less than the signal strength threshold, obtaining first marking information in the working area where the mobile terminal is located, matching the first marking information with pre-stored second marking information, obtaining third marking information matching the first marking information, and determining the location information of the mobile terminal according to the third marking information; The first marking information includes image information of at least one marking position in the working area captured by the mobile terminal, the second marking information includes an image of at least one marking position acquired in advance, and the third marking information is an image of at least one marking position in the second marking information that matches the first marking information; Determine the corresponding attendance database according to the location information of the mobile terminal; Obtaining an attendance request triggered for a user, the attendance request at least including the attendance personnel information of the user; determining whether there is pre-stored data corresponding to the attendance personnel information in the attendance database, and if there is pre-stored data corresponding to the attendance personnel information in the attendance database, modifying the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request; Acquire work progress data of the target work area corresponding to the attendance database, wherein the work progress data includes project advancement sequence data, project workload data, and project consumption time data; According to the work progress data, using a preset attendance analysis model, determine the reasonable arrangement data of project personnel in the target work area; Determine the personnel arrangement rationality parameters of the target work area according to the attendance database and the reasonable arrangement data of the project personnel; The preset attendance analysis model is obtained by the following method: Acquire historical work progress data of multiple work areas of the same engineering type as the target work area, wherein the historical work progress data at least includes: project advancement sequence data, project workload data, project consumption time data, and project personnel arrangement data; According to all the historical work progress data, the predetermined basic attendance analysis model is trained to obtain the converged basic attendance analysis model, and the converged basic attendance analysis model is determined as the preset attendance analysis model; And, the number of the users is greater than or equal to 1, and the attendance information in the attendance database includes: information of at least one personal device of each of the users; The method further comprises: For the information of each personal device of each user in the attendance database, obtain the information of multiple public devices corresponding to the information of the personal device, and determine the matching parameters between the information of the personal device and the information of each public device corresponding to the information of the personal device based on the information of the personal device and the information of all the public devices corresponding to the information of the personal device; determine the usage parameters corresponding to the information of the personal device based on the work progress data and the information of the personal device; determine the public device demand parameters corresponding to the information of the personal device based on the matching parameters between the usage parameters corresponding to the information of the personal device and the information of each public device corresponding to the information of the personal device; The public equipment demand corresponding to the target work area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipments of all the users in the attendance database.
2. The intelligent management and control method for labor attendance according to claim 1 is characterized in that: The personal device information includes the type information of the personal device and the usage area information of the personal device; The target working area includes a plurality of sub-areas, and each of the sub-areas is provided with a plurality of the public devices; The method further comprises: For each of the sub-areas, determining a partition parameter corresponding to the sub-area according to the sub-area and the usage area information of all the personal devices of all the users in the attendance database, wherein the partition parameter is used to represent the usage frequency of the personal devices in the sub-area; And, for the information of each personal device of each user in the attendance database, determining the usage parameters corresponding to the information of the personal device according to the work progress data and the information of the personal device, including: For each of the personal equipment information of each of the users in the attendance database, determining the usage parameters of the personal equipment corresponding to the personal equipment information according to the work progress data and the type information of the personal equipment in the personal equipment information; And, determining the public equipment demand corresponding to the target work area according to the public equipment demand parameter corresponding to the information of all the personal equipment of all the users in the attendance database includes: For each of the sub-areas, the public equipment demand corresponding to the sub-area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipment of all the users in the attendance database and the partition parameter corresponding to the sub-area.
3. The intelligent management and control method for labor attendance according to claim 2 is characterized in that: The attendance information in the attendance database includes: the type of work information of each user; The method further comprises: Acquire the advancement parameters of several sub-tasks in the target work area corresponding to the attendance database within a preset attendance cycle, wherein the advancement parameters include material usage parameters, finished product output parameters, and completed work ratio parameters; For each of the sub-tasks, determining the completion quantity parameter of the sub-task within the attendance cycle according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-task; For each of the users in the attendance database, determining a weight parameter of each of the sub-tasks corresponding to the user according to a predetermined relationship between the type of work information and the advancement parameter; For each of the users in the attendance database, the workload parameter of the user in the attendance period is determined according to the weight parameter of each of the sub-tasks corresponding to the user and the completion parameter of each of the sub-tasks in the attendance period.
4. The intelligent management and control method for labor attendance according to claim 3 is characterized in that: For each of the sub-tasks, determining the completion quantity parameter of the sub-task within the attendance cycle according to the material usage parameter, the finished product output parameter and the completed work ratio parameter in the advancement parameter of the sub-task, includes: For each of the sub-tasks, a first completion quantity parameter is determined according to the material usage parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset material usage parameter, a second completion quantity parameter is determined according to the finished product output parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset finished product output parameter, a third completion quantity parameter is determined according to the completed work proportion parameter in the advancement parameter of the sub-task and an influencing factor corresponding to the preset completed work proportion parameter, and a completion quantity parameter of the sub-task within the attendance cycle is determined according to the first completion quantity parameter, the second completion quantity parameter and the third completion quantity parameter; And, for each user in the attendance database, according to the relationship between the predetermined job information and the advancement parameter, determining the weight parameter of each sub-job corresponding to the user, including: For each of the users in the attendance database, a first association parameter is determined based on a predetermined relationship between the type of work information and material usage parameters, a second association parameter is determined based on a predetermined relationship between the type of work information and finished product output parameters, and a third association parameter is determined based on a predetermined relationship between the type of work information and the proportion of completed work parameters. A weight parameter for each of the sub-works corresponding to the user is determined based on the first association parameter, the second association parameter and the third association parameter.
5. The intelligent management and control method for labor attendance according to claim 3 is characterized in that: The method further comprises: Acquire location information and matching information of each of the public devices in the target work area during the attendance period, wherein the matching information is used to indicate the type of personal device that matches the public device; For each of the public devices, the usage information of the public device is determined based on the matching information of the public device and the advancement parameters of all the sub-tasks; the first relevance parameter of each user corresponding to the public device is determined based on the location information of the public device and the usage area information of all the personal devices of each user; the second relevance parameter of each user corresponding to the public device is determined based on the usage information of the public device and the information of all the personal devices of each user and the type of work information; the responsibility relevance parameter of each user corresponding to the public device is determined based on the first relevance parameter and the second relevance parameter of each user corresponding to the public device.
6. An intelligent management and control device for labor attendance, characterized in that: The device comprises: A satellite positioning module, used to determine whether the satellite positioning signal of the mobile terminal is greater than or equal to a preset signal strength threshold, and if the satellite positioning signal is greater than or equal to the signal strength threshold, obtain the location information of the mobile terminal according to the satellite positioning signal; a marker positioning module, configured to, when the satellite positioning signal is less than the signal strength threshold, obtain first marker information in the working area where the mobile terminal is located, match the first marker information with pre-stored second marker information, obtain third marker information matching the first marker information, and determine the location information of the mobile terminal according to the third marker information; The first marking information includes image information of at least one marking position in the working area captured by the mobile terminal, the second marking information includes an image of at least one marking position acquired in advance, and the third marking information is an image of at least one marking position in the second marking information that matches the first marking information; An attendance control module is used to determine the corresponding attendance database according to the location information of the mobile terminal; and obtain an attendance request triggered for a user, wherein the attendance request at least includes the attendance personnel information of the user; determine whether there is pre-stored data corresponding to the attendance personnel information in the attendance database, and if there is pre-stored data corresponding to the attendance personnel information in the attendance database, modify the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request; A data acquisition module, wherein the data acquisition module is used to obtain the work progress data of the target work area corresponding to the attendance database after the attendance management and control module modifies the attendance information of the user in the attendance database according to the attendance personnel information in the attendance request, wherein the work progress data includes project advancement sequence data, project workload data, and project consumption time data; A personnel analysis module, wherein the personnel analysis module is used to: According to the work progress data, using a preset attendance analysis model, determine the reasonable arrangement data of project personnel in the target work area; Determine the personnel arrangement rationality parameters of the target work area according to the attendance database and the reasonable arrangement data of the project personnel; The preset attendance analysis model is obtained by the following method: Acquire historical work progress data of multiple work areas of the same engineering type as the target work area, wherein the historical work progress data at least includes: project advancement sequence data, project workload data, project consumption time data, and project personnel arrangement data; According to all the historical work progress data, the predetermined basic attendance analysis model is trained to obtain the converged basic attendance analysis model, and the converged basic attendance analysis model is determined as the preset attendance analysis model; And, the number of the users is greater than or equal to 1, and the attendance information in the attendance database includes: information of at least one personal device of each of the users; The data acquisition module is also used to acquire information of multiple public devices corresponding to the information of each personal device of each user in the attendance database; Furthermore, the device further comprises a device analysis module, wherein the device analysis module is used to: For the information of each personal device of each user in the attendance database, determine the matching parameters between the information of the personal device and the information of each public device corresponding to the information of the personal device according to the information of the personal device and the information of all the public devices corresponding to the information of the personal device; determine the usage parameters corresponding to the information of the personal device according to the work progress data and the information of the personal device; determine the public device demand parameters corresponding to the information of the personal device according to the matching parameters between the usage parameters corresponding to the information of the personal device and the information of each public device corresponding to the information of the personal device; The public equipment demand corresponding to the target work area is determined according to the public equipment demand parameter corresponding to the information of all the personal equipments of all the users in the attendance database.
7. An intelligent management and control device for labor attendance, characterized in that: The device includes: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the intelligent management and control method for labor attendance as described in any one of claims 1-5.
8. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, which, when called, are used to execute the intelligent management and control method for labor attendance as described in any one of claims 1-5.
Citation Information
Patent Citations
Method and system for intelligently managing engineering personnel attendance based on GPS
CN107369222A
Method for evenly distributing workloads in power distribution networks on basis of improved BP neural network
CN108335228A
Attendance checking and time clock punching method and system of mobile terminal based on wireless network
CN108460854A
Face recognition attendance check method and device, computer device and memory medium
CN109285234A
Clocking cheating prevention method, device, computer device and storage medium
CN109492865A
