A method and system for intelligent production scheduling based on big data
The big data intelligent production scheduling method is used to analyze order and production line loss data, optimize production line management and material scheduling, solve the problems of unreasonable production arrangements and delay risks in the existing technology, and improve production efficiency and product quality.
Patent Information
- Application Number
- CN202410822083.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-25
AI Technical Summary
Existing order production scheduling management technology cannot reasonably arrange production based on order information, resulting in improper matching of production lines, reducing production efficiency, increasing the risk of delays, and being unable to effectively manage material scheduling, affecting the accuracy of production scheduling.
Adopting an intelligent production scheduling method based on big data, by preprocessing order information and analyzing production line loss data, we conduct supervision and evaluation of production line material loss, rationally divide production lines, and optimize production by combining the impact of material retrieval on stable production lines. Scheduling, improving production efficiency and product quality, and reducing the risk of delays.
It improves the flexibility and efficiency of order production, enhances the accuracy of production line management, reduces the risk of production delays, and improves the production quality of pre-processed orders and the rationality of overall production scheduling.
Smart Images

Figure CN118396189B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of production scheduling, and in particular to a method and system for intelligent production scheduling based on big data. Background Art
[0002] At present, most industrial manufacturing enterprises have sales departments placing sales orders, and the production departments implement production planning for sales orders. Generally, sales orders are only scheduled according to customers / orders / delivery dates, and which orders are usually produced on a daily basis.
[0003] However, in the existing order production scheduling management technology, it is impossible to make reasonable production arrangements based on the order information, and it is impossible to reasonably match the production lines for the processing orders, thereby reducing the production scheduling efficiency of the orders. It is also impossible to analyze the situation in combination with the material scheduling, thereby increasing the risk of order delays, which is not conducive to the reasonable production scheduling of the orders, and thus it is impossible to implement accurate management of the orders.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a method and system for intelligent production scheduling based on big data to solve the technical defects mentioned above. The present invention analyzes the pre-processing order situation and preliminarily conducts production line material loss supervision and evaluation analysis on the processing loss data of the production line, so as to carry out reasonable production line management and division according to the material loss of the production line, so as to arrange the pre-processing order reasonably. When the production line loss performance is normal, the processing performance data of the stable production line is subjected to production line scheduling refinement division evaluation analysis, and combined with the analysis of the impact of material retrieval of the stable production line to improve the accuracy of the analysis results, and further divides it according to the processing situation of the stable production line, so as to improve the production quality and production efficiency of the pre-processing order, and reduce the risk of production delays.
[0006] The object of the present invention can be achieved by the following technical solutions: A big data-based intelligent production scheduling system, comprising a scheduling production platform, a production information unit, an order processing unit, a production management unit, a production scheduling unit, a production line tracking unit, a material scheduling unit, and a display response unit;
[0007] The production information unit is used to collect order information of unproduced orders, the order information indicating the available time for production, and send the order information to the order processing unit;
[0008] After receiving the order information, the order processing unit immediately performs order production division operation on the order signal, and sends the obtained expedited order and normal order to the production management unit and the display response unit;
[0009] After receiving the expedited order, the production management unit immediately collects the production demand data of the expedited order, the production demand data includes the order time and the production material demand value, and performs order arrangement management analysis on the production demand data, sends the obtained pre-processed order to the production scheduling unit, and sends the obtained scheduling signal to the display response unit;
[0010] After receiving the pre-processing order, the production scheduling unit immediately collects the processing loss data of the production line corresponding to the pre-processing order. The processing loss data includes the production loss value and the production qualified efficiency value, and performs production line material loss supervision evaluation and analysis on the processing loss data. The obtained normal signal is sent to the production line tracking unit and the material scheduling unit, and the obtained pipe adjustment signal is sent to the display response unit;
[0011] After receiving the normal signal, the material scheduling unit immediately collects the material scheduling data of the stable production line. The material scheduling data includes the material scheduling risk coefficient and the scheduling incentive value, and performs material scheduling control demand supervision analysis on the material scheduling data, and sends the obtained material scheduling influence coefficient TD to the production line tracking unit;
[0012] After receiving the normal signal and the material scheduling influence coefficient TD, the production line tracking unit immediately collects the processing performance data of the production line, which includes the pollution risk value and the facility risk value, and performs detailed division, evaluation and analysis of the production line scheduling, and sends the obtained stable signal and optimized signal to the display response unit.
[0013] Preferably, the order production division operation process of the order processing unit is as follows:
[0014] Set the monitoring cycle and set it as the time threshold, obtain the available production time of each production order within the time threshold, the available production time represents the difference between the completion date of the production order and the current time, subtract the actual production time required for the production order from the available production time, and set the value obtained as the production buffer time. Compare and analyze the production buffer time with the stored preset production buffer time threshold:
[0015] If the production buffer time is less than or equal to the preset production buffer time threshold, the production order corresponding to the production buffer time less than or equal to the preset production buffer time threshold is set as an expedited order;
[0016] If the production buffer time is greater than a preset production buffer time threshold, the production order corresponding to the production buffer time greater than the preset production buffer time threshold is set as a normal order.
[0017] Preferably, the order arrangement management and analysis process of the production management unit is as follows:
[0018] Obtain the order time of the expedited order within the time threshold, obtain the difference between the current time and the order time of the expedited order, set the difference between the current time and the order time of the expedited order as the waiting production time, obtain the maximum value of the waiting production time, and set the expedited order corresponding to the maximum value of the waiting production time as the pre-processing order;
[0019] Obtain the production material demand value of the pre-processed order within the time threshold, and at the same time obtain the reserve quantity of the production materials corresponding to the pre-processed order within the time threshold, and set the value obtained by subtracting the production material demand value from the reserve quantity of the production materials corresponding to the pre-processed order as the emergency material value, and compare and analyze the emergency material value with the preset emergency material value threshold entered and stored internally:
[0020] If the emergency material value is greater than or equal to the preset emergency material value threshold, no signal is generated;
[0021] If the emergency material value is less than the preset emergency material value threshold, a dispatch signal is generated.
[0022] Preferably, the production line material loss supervision, evaluation and analysis process of the production scheduling unit is as follows:
[0023] S1: Divide the time threshold into i sub-time periods, where i is a natural number greater than zero, and obtain the production loss value of the production line in each sub-time period. The production loss value represents the proportion of the damaged processing material in the total processing material loss of the production line. A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the production loss value as the Y-axis. The production loss value curve is drawn by plotting points, and the area enclosed by the production loss value curve and the X-axis and the change trend value of the production loss value curve are obtained. The product value obtained by normalizing the area enclosed by the production loss value curve and the X-axis and the change trend value of the production loss value curve is set as the loss assessment value;
[0024] S2: Obtain the pollution risk value of the production line in each sub-time period. The pollution risk value represents the product of the number of values corresponding to the processing pollution data of the production line exceeding the preset threshold and the duration after data normalization. The processing pollution data represents the sewage growth rate and dust concentration, and then construct a set A of pollution treatment values, obtain the mean of set A, and set the mean of set A as the treatment evaluation coefficient. The loss assessment value and the treatment evaluation coefficient are labeled SH and CP respectively.
[0025] S3: The production management and adjustment evaluation coefficient GT is obtained according to the formula, and the production management and adjustment evaluation coefficient GT is compared and analyzed with the preset production management and adjustment evaluation coefficient threshold value stored in the internal input:
[0026] If the ratio between the production pipe adjustment evaluation coefficient GT and the preset production pipe adjustment evaluation coefficient threshold is less than 1, a normal signal is generated;
[0027] If the ratio between the production pipe adjustment evaluation coefficient GT and the preset production pipe adjustment evaluation coefficient threshold is greater than or equal to 1, a pipe adjustment signal is generated.
[0028] Preferably, the material scheduling and control demand supervision and analysis process of the material scheduling unit is as follows:
[0029] The production line corresponding to the normal signal is set as the stable production line, and the material scheduling risk coefficient of the stable production line within the time threshold is obtained. The material scheduling risk coefficient represents the ratio of the number of material scheduling delays in the total number of historical material scheduling of the stable production line, and the product value obtained after data normalization of the delay duration. The total number of historical production orders of the stable production line within the time threshold is obtained, and the number of delayed orders due to material scheduling delays of the stable production line within the time threshold is obtained. The ratio between the number of delayed orders and the total number of historical production orders is set as the scheduling incentive value, and the material scheduling risk coefficient and the scheduling incentive value are labeled CT and TY respectively;
[0030] According to the formula The material scheduling influence coefficient of the stable production line is obtained, where f1 and f2 are the preset weight factor coefficients of the material scheduling risk coefficient and the scheduling incentive value respectively, f3 is the preset fault tolerance factor coefficient, f1, f2 and f3 are all greater than zero, and TD is the material scheduling influence coefficient of the stable production line.
[0031] Preferably, the production line scheduling refinement division evaluation and analysis process of the production line tracking unit is as follows:
[0032] T1: Obtain the qualified production efficiency value of the stable production line in each sub-time period, compare and analyze the qualified production efficiency value with the stored preset qualified production efficiency value threshold, obtain the number of sub-time periods corresponding to the qualified production efficiency value greater than the preset qualified production efficiency value threshold, and set the ratio of the number of sub-time periods corresponding to the qualified production efficiency value greater than the preset qualified production efficiency value threshold to the total number of sub-time periods as the efficiency risk value;
[0033] T2: The ratio of the failure frequency of the stable production line within the time threshold to the mean failure interval duration is obtained after data normalization, and is set as the failure risk value. At the same time, the facility risk value of the stable production line within the time threshold is obtained. The facility risk value indicates that the proportion of the operating time corresponding to the operating temperature exceeding the preset operating temperature threshold in the operating time of the processing equipment in the stable production line is greater than the proportion of the number of processing equipment corresponding to the preset threshold. The product value of the failure risk value and the facility risk value after data normalization is set as the production line impact value, and the efficiency risk value and the production line impact value are labeled XF and CY respectively;
[0034] T3: According to the formula The production performance evaluation coefficient of the stable production line is obtained, where v1 is the preset error factor coefficient, v1 is greater than zero, and J is the production performance evaluation coefficient. The production performance evaluation coefficient J is compared with the preset production performance evaluation coefficient threshold value stored in the internal input for analysis:
[0035] If the ratio between the production performance evaluation coefficient J and the preset production performance evaluation coefficient threshold is less than 1, a stable signal is generated;
[0036] If the ratio between the production performance evaluation coefficient J and the preset production performance evaluation coefficient threshold is greater than or equal to 1, an optimization signal is generated.
[0037] The beneficial effects of the present invention are as follows:
[0038] (1) The present invention makes a preliminary classification of the information of unproduced orders so as to make reasonable production adjustments according to the information of unproduced orders, thereby improving the production flexibility and production efficiency of unproduced orders, and at the same time helps to improve the production scheduling effect of unproduced orders. Through a progressive analysis, the present invention further performs production sorting and advance material scheduling management for expedited orders to improve production efficiency. At the same time, the present invention performs in-depth production line matching for pre-processed orders to improve the production efficiency of pre-processed orders and the rationality of overall order scheduling.
[0039] (2) The present invention analyzes the pre-processing order situation and preliminarily conducts a production line material loss supervision assessment analysis on the processing loss data of the production line, so as to conduct reasonable production line management and division according to the material loss of the production line, so as to arrange the pre-processing order reasonably. When the production line loss performance is normal, the processing performance data of the stable production line is subjected to production line scheduling refinement division assessment analysis, and combined with the analysis of the impact of material retrieval of the stable production line to improve the accuracy of the analysis results, and further divides the stable production line according to the processing situation, so as to improve the production quality and production efficiency of the pre-processing order, while reducing the risk of production delays. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present invention will be further described below in conjunction with the accompanying drawings;
[0041] Figure 1 It is a flowchart of the system of the present invention;
[0042] Figure 2 It is a reference diagram of the method of the present invention. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Embodiment 1
[0044] See also Figure 1 to Figure 2 As shown, the present invention is a method for intelligent production scheduling based on big data, comprising the following steps:
[0045] Step 1: Perform order production division operation on the order information of unproduced orders, and divide the unproduced orders into expedited orders and normal orders, so as to reasonably carry out order production;
[0046] Step 2: Perform order arrangement management and analysis on the production demand data of the expedited order, send the obtained pre-processed order to step 3, and perform early warning feedback processing on the obtained scheduling signal, so as to manage and pre-store the production materials of the pre-processed order according to the information feedback, so as to ensure the production stability of the pre-processed order;
[0047] Step 3: Collect the processing loss data of the production line corresponding to the pre-processing order, and conduct supervision, evaluation and analysis of the material loss of the production line. If a normal signal is obtained, proceed to step 4 and step 5. If a management adjustment signal is obtained, early warning feedback processing is performed to optimize and adjust the material scheduling in a timely manner to reduce the impact of material scheduling on production line production;
[0048] Step 4: Perform material scheduling control demand supervision analysis on the material scheduling data through information feedback, obtain the material scheduling influence coefficient TD and proceed to step 5;
[0049] Step 5: Perform detailed division and evaluation analysis of production line scheduling through progressive and information fusion methods, perform discriminant analysis on the obtained production performance evaluation coefficient J, perform early warning feedback processing on the obtained stable signal and optimization signal, and analyze the impact of material retrieval on the stable production line to improve the accuracy of the analysis results, and further divide it according to the processing situation of the stable production line to improve the production quality and efficiency of the pre-processed orders, while reducing the risk of production delays. Embodiment 2
[0050] A big data-based intelligent production scheduling system, comprising a scheduling production platform, a production information unit, an order processing unit, a production management unit, a production scheduling unit, a production line tracking unit, a material scheduling unit and a display response unit, wherein the scheduling production platform is connected to the production information unit in a one-way communication manner, the production information unit is connected to the order processing unit in a one-way communication manner, the order processing unit is connected to the production management unit and the display response unit in a one-way communication manner, the production management unit is connected to the production scheduling unit and the display response unit in a one-way communication manner, the production scheduling unit is connected to the production line tracking unit, the material scheduling unit and the display response unit in a one-way communication manner, the material scheduling unit is connected to the production line tracking unit in a one-way communication manner, and the production line tracking unit is connected to the display response unit in a one-way communication manner;
[0051] When the scheduling production platform generates a scheduling instruction, the scheduling instruction is sent to the production information unit. After receiving the scheduling instruction, the production information unit immediately collects the order information of the unproduced orders, which indicates the available production time, and sends the order information to the order processing unit. After receiving the order information, the order processing unit immediately performs an order production division operation on the order signal, so as to make reasonable production adjustments to the unproduced orders according to the feedback, so as to improve the production flexibility and production efficiency of the unproduced orders, and at the same time help to improve the production scheduling effect of the unproduced orders. The specific order production division operation process is as follows:
[0052] Set the monitoring cycle and set it as the time threshold, obtain the available production time of each production order within the time threshold, the available production time represents the difference between the completion date of the production order and the current time, subtract the actual production time required for the production order from the available production time, and set the value obtained as the production buffer time. Compare and analyze the production buffer time with the stored preset production buffer time threshold:
[0053] If the production buffer time is less than or equal to the preset production buffer time threshold, the production order corresponding to the production buffer time less than or equal to the preset production buffer time threshold is set as an expedited order;
[0054] If the production buffer time is longer than the preset production buffer time threshold, the production order corresponding to the production buffer time longer than the preset production buffer time threshold is set as a normal order, and the expedited order and the normal order are sent to the production management unit and the display response unit. After receiving the expedited order and the normal order, the display response unit immediately divides the orders corresponding to the expedited order and the normal order so as to reasonably produce the order;
[0055] After receiving the expedited order, the production management unit immediately collects the production demand data of the expedited order, which includes the order time and the production material demand value, and performs order arrangement management analysis on the production demand data, so as to further sort the production and schedule the materials for the expedited order to improve production efficiency. The specific order arrangement management analysis process is as follows:
[0056] Obtain the order time of the expedited order within the time threshold, obtain the difference between the current time and the order time of the expedited order, set the difference between the current time and the order time of the expedited order as the waiting production time, obtain the maximum value of the waiting production time, set the expedited order corresponding to the maximum value of the waiting production time as the pre-processing order, and send the pre-processing order to the production scheduling unit;
[0057] The production material demand value of the preprocessing order within the time threshold is obtained, and the reserve quantity of the production material corresponding to the preprocessing order within the time threshold is obtained. The value obtained by subtracting the production material demand value from the reserve quantity of the production material corresponding to the preprocessing order is set as the emergency material value. It should be noted that the emergency material value is an influencing parameter reflecting the supply risk of the production material of the preprocessing order. The larger the value of the emergency material value, the higher the scheduling demand for the production material of the preprocessing order. The emergency material value is compared and analyzed with the preset emergency material value threshold value stored internally:
[0058] If the emergency material value is greater than or equal to the preset emergency material value threshold, no signal is generated;
[0059] If the emergency material value is less than the preset emergency material value threshold, a scheduling signal is generated and sent to the display response unit. After receiving the scheduling signal, the display response unit immediately displays the preset warning text corresponding to the scheduling signal, so as to manage and pre-store the production materials of the pre-processing order according to the information feedback to ensure the production stability of the pre-processing order.
[0060] Embodiment 3: After receiving the pre-processing order, the production scheduling unit immediately collects the processing loss data of the production line corresponding to the pre-processing order, the processing loss data includes the production loss value and the production qualified efficiency value, and performs production line material loss supervision evaluation and analysis on the processing loss data, so as to reasonably manage and divide the production line according to the material loss of the production line, so as to reasonably arrange the production of the pre-processing order. The specific production line material loss supervision evaluation and analysis process is as follows:
[0061] The time threshold is divided into i sub-time periods, where i is a natural number greater than zero, and the production loss value of the production line in each sub-time period is obtained. The production loss value represents the proportion of the damaged processing material in the total processing material loss of the production line. A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the production loss value as the Y-axis. The production loss value curve is drawn by plotting points, and the area enclosed by the production loss value curve and the X-axis and the change trend value of the production loss value curve are obtained. The product value obtained by normalizing the area enclosed by the production loss value curve and the X-axis and the change trend value of the production loss value curve is set as the loss assessment value. It should be noted that the larger the value of the loss assessment value is, the higher the demand for production materials required by the production line is.
[0062] The pollution risk value of the production line in each sub-time period is obtained. The pollution risk value represents the product of the number of values corresponding to the processing pollution data of the production line exceeding the preset threshold and the duration after data normalization. The processing pollution data represents the sewage growth rate, dust concentration, etc., and then a set A of pollution treatment values is constructed, the mean of the set A is obtained, and the mean of the set A is set as the treatment evaluation coefficient. It should be noted that the larger the value of the treatment evaluation coefficient, the higher the production material demand of the production line. The loss assessment value and the treatment evaluation coefficient are labeled SH and CP respectively;
[0063] According to the formula The production pipe adjustment assessment coefficient is obtained, where a1 and a2 are the preset proportional factor coefficients of the loss assessment value and the processing assessment coefficient respectively. The proportional factor coefficient is used to correct the deviation of various parameters in the formula calculation process, so as to make the calculation result more accurate. a3 is the preset correction factor coefficient. a1, a2 and a3 are all greater than zero. GT is the production pipe adjustment assessment coefficient. The production pipe adjustment assessment coefficient GT is compared and analyzed with the preset production pipe adjustment assessment coefficient threshold value stored in the internal input:
[0064] If the ratio between the production management and adjustment evaluation coefficient GT and the preset production management and adjustment evaluation coefficient threshold is less than 1, a normal signal is generated and sent to the production line tracking unit and the material scheduling unit;
[0065] If the ratio between the production pipe adjustment evaluation coefficient GT and the preset production pipe adjustment evaluation coefficient threshold is greater than or equal to 1, a pipe adjustment signal is generated and sent to the display response unit. After receiving the pipe adjustment signal, the display response unit immediately marks the production line corresponding to the pipe adjustment signal in red, so as to timely adjust the production line with abnormal material loss according to the information feedback to reduce the material loss;
[0066] After receiving the normal signal, the material scheduling unit immediately collects the material scheduling data of the stable production line. The material scheduling data includes the material scheduling risk coefficient and the scheduling incentive value, and performs material scheduling control demand supervision analysis on the material scheduling data to determine whether the impact of material scheduling on production is too high, so as to optimize and adjust the material scheduling in time to reduce the impact of material scheduling on production line production. The specific material scheduling control demand supervision analysis process is as follows:
[0067] The production line corresponding to the normal signal is set as the stable production line, and the material scheduling risk coefficient of the stable production line within the time threshold is obtained. The material scheduling risk coefficient represents the proportion of the number of material scheduling delays in the total number of historical material scheduling of the stable production line, and the product value obtained after data normalization of the delay duration. The total number of historical production orders of the stable production line within the time threshold is obtained, and the number of delayed orders due to material scheduling delays of the stable production line within the time threshold is obtained. The ratio between the number of delayed orders and the total number of historical production orders is set as the scheduling incentive value. It should be noted that the larger the values of the material scheduling risk coefficient and the scheduling incentive value, the greater the impact of material scheduling on production line production, and the greater the demand for material scheduling decision-making and regulation. The material scheduling risk coefficient and the scheduling incentive value are labeled CT and TY respectively;
[0068] According to the formula The material scheduling influence coefficient of the stable production line is obtained, where f1 and f2 are the preset weight factor coefficients of the material scheduling risk coefficient and the scheduling incentive value respectively, f3 is the preset fault tolerance factor coefficient, f1, f2 and f3 are all greater than zero, TD is the material scheduling influence coefficient of the stable production line, and the material scheduling influence coefficient TD is sent to the production line tracking unit. Embodiment 3
[0069] After receiving the normal signal and the material scheduling influence coefficient TD, the production line tracking unit immediately collects the processing performance data of the production line, which includes the pollution risk value and the facility risk value, and performs production line scheduling refinement division evaluation and analysis on the processing performance data, and further divides it from the processing situation of the stable production line, so as to improve the production quality and production efficiency of the pre-processed orders, and reduce the risk of production delays. The specific production line scheduling refinement division evaluation and analysis process is as follows:
[0070] Obtain the qualified production efficiency value of the stable production line in each sub-time period, compare and analyze the qualified production efficiency value with the stored preset qualified production efficiency value threshold, obtain the number of sub-time periods corresponding to the qualified production efficiency value greater than the preset qualified production efficiency value threshold, and set the ratio of the number of sub-time periods corresponding to the qualified production efficiency value greater than the preset qualified production efficiency value threshold to the total number of sub-time periods as the efficiency risk value. It should be noted that the larger the value of the efficiency risk value, the greater the risk of abnormal production performance of the stable production line;
[0071] The ratio of the failure frequency of the stable production line within the time threshold to the mean failure interval duration is obtained after data normalization, and is set as the failure risk value. At the same time, the facility risk value of the stable production line within the time threshold is obtained. The facility risk value indicates that the proportion of the operating time corresponding to the operating temperature exceeding the preset operating temperature threshold in the operating time of the processing equipment in the stable production line is greater than the proportion of the number of processing equipment corresponding to the preset threshold. The product value of the failure risk value and the facility risk value obtained after data normalization is set as the production line impact value. It should be noted that the larger the value of the production line impact value, the greater the risk of abnormal production performance of the stable production line. The efficiency risk value and the production line impact value are labeled XF and CY respectively;
[0072] According to the formula Obtain the production performance evaluation coefficient of the stable production line, where v1 is the preset error factor coefficient, v1 is greater than zero, and J is the production performance evaluation coefficient. The production performance evaluation coefficient J is compared and analyzed with the preset production performance evaluation coefficient threshold value stored internally: if the ratio between the production performance evaluation coefficient J and the preset production performance evaluation coefficient threshold value is less than 1, a stable signal is generated;
[0073] If the ratio between the production performance evaluation coefficient J and the preset production performance evaluation coefficient threshold is greater than or equal to 1, an optimization signal is generated, and the stable signal and the optimization signal are sent to the display response unit. After receiving the stable signal and the optimization signal, the display response unit immediately marks the stable production line corresponding to the stable signal as green, and sorts the stable production lines corresponding to the stable signal according to the production performance evaluation coefficient J from small to large, and immediately marks the stable production line corresponding to the optimization signal as yellow, and sorts the stable production lines corresponding to the optimization signal according to the production performance evaluation coefficient J from small to large, so as to adjust and arrange the production of the stable production line in time according to the information feedback, so as to improve the rationality and reliability of the production scheduling of the production line;
[0074] It should be noted that the drawings of the embodiments disclosed in the present invention only involve structures related to the embodiments disclosed in the present invention, and other structures can refer to common designs. In the absence of conflicts, the same embodiment and different embodiments of the present invention can be combined with each other;
[0075] In summary, the present invention makes a preliminary division of the information of unproduced orders so as to make reasonable production adjustments according to the information of unproduced orders, so as to improve the production flexibility and production efficiency of unproduced orders, and at the same time help to improve the production scheduling effect of unproduced orders, and analyzes in a progressive manner, further performs production sorting and advance material scheduling management for expedited orders to improve production efficiency, and at the same time performs in-depth production line matching for pre-processed orders to improve the production efficiency of pre-processed orders and the rationality of overall order scheduling, and analyzes according to the pre-processed order situation, and preliminarily performs production line material loss supervision and evaluation analysis on the processing loss data of the production line, so as to reasonably manage and divide the production line according to the material loss of the production line, so as to reasonably arrange the production of pre-processed orders, and when the production line loss performance is normal, the processing performance data of the stable production line is subjected to production line scheduling refinement division evaluation analysis, and is analyzed in combination with the impact of material retrieval on the stable production line to improve the accuracy of the analysis results, and is further divided according to the processing situation of the stable production line, so as to improve the production quality and production efficiency of the pre-processed orders, and at the same time reduce the risk of production delays.
[0076] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0077] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.
Claims
1. An intelligent production scheduling system based on big data, It is characterized in that It includes a scheduling production platform, a production information unit, an order processing unit, a production management unit, a production scheduling unit, a production line tracking unit, a material scheduling unit, and a display response unit; When the scheduling production platform generates a scheduling instruction, the scheduling instruction is sent to the production information unit; The production information unit is used to collect order information of unproduced orders and send the order information to the order processing unit; After receiving the order information, the order processing unit immediately performs order production division operation on the order signal to obtain expedited orders and normal orders; The production management unit is used to perform order arrangement management analysis on the production demand data of the expedited order, send the obtained pre-processed order to the production scheduling unit, and send the obtained scheduling signal to the display response unit; The production scheduling unit is used to perform production line material loss supervision, evaluation and analysis on the processing loss data of the pre-processed order, obtain a normal signal and a pipe adjustment signal, and send the normal signal to the production line tracking unit and the material scheduling unit; send the pipe adjustment signal to the display response unit, and the display response unit immediately marks the production line corresponding to the pipe adjustment signal in red after receiving the pipe adjustment signal; The material scheduling unit is used to perform material scheduling control demand supervision analysis on the material scheduling data, and send the obtained material scheduling influence coefficient TD to the production line tracking unit; The production line tracking unit is used to perform production line scheduling refinement division evaluation and analysis on the processing performance data, and send the obtained stable signal and optimized signal to the display response unit; After receiving the stable signal and the optimized signal, the display response unit immediately marks the stable production line corresponding to the stable signal as green, and sorts the stable production lines corresponding to the stable signal in ascending order according to the production performance evaluation coefficient J, and immediately marks the stable production line corresponding to the optimized signal as yellow, and sorts the stable production lines corresponding to the optimized signal in ascending order according to the production performance evaluation coefficient J; The order production division operation process of the order processing unit is as follows: Set the monitoring cycle and set it as the time threshold, obtain the available production time of each production order within the time threshold, the available production time represents the difference between the completion date of the production order and the current time, subtract the actual production time required for the production order from the available production time, and set the value obtained as the production buffer time. Compare and analyze the production buffer time with the stored preset production buffer time threshold: If the production buffer time is less than or equal to the preset production buffer time threshold, the production order corresponding to the production buffer time less than or equal to the preset production buffer time threshold is set as an expedited order; If the production buffer time is longer than the preset production buffer time threshold, the production order corresponding to the production buffer time longer than the preset production buffer time threshold is set as a normal order; The order arrangement management analysis process of the production management unit is as follows: Obtain the order time of the expedited order within the time threshold, obtain the difference between the current time and the order time of the expedited order, and set it as the waiting production time, obtain the maximum value of the waiting production time, and set the expedited order corresponding to the maximum value of the waiting production time as the pre-processing order; The production material demand value of the pre-processed order within the time threshold is obtained, and the reserve quantity of the production material corresponding to the pre-processed order within the time threshold is obtained, and the value obtained by subtracting the production material demand value from the reserve quantity of the production material corresponding to the pre-processed order is set as the emergency material value; The emergency material value is used to compare and analyze with the preset emergency material value threshold value entered and stored in the production management unit: If the emergency material value is greater than or equal to the preset emergency material value threshold, no signal is generated; If the emergency material value is less than the preset emergency material value threshold, a dispatch signal is generated; The production line material loss supervision, assessment and analysis process of the production scheduling unit is as follows: S1: Divide the time threshold into i sub-time periods, where i is a natural number greater than zero, and obtain the production loss value of the production line in each sub-time period. The production loss value represents the proportion of the damaged processing material in the total processing material loss of the production line. A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the production loss value as the Y-axis. The production loss value curve is drawn by plotting points, and the area enclosed by the production loss value curve and the X-axis and the change trend value of the production loss value curve are obtained. The product value obtained by normalizing the area enclosed by the production loss value curve and the X-axis and the change trend value of the production loss value curve is set as the loss assessment value; S2: Obtain the pollution risk value of the production line in each sub-time period. The pollution risk value represents the product of the number of values corresponding to the processing pollution data of the production line exceeding the preset threshold and the duration after data normalization. The processing pollution data represents the sewage growth rate and dust concentration. Then, a set A of pollution risk values is constructed, and the mean of the set A is obtained. The mean of the set A is set as the processing assessment coefficient. The loss assessment value and the processing assessment coefficient are labeled SH and CP respectively. S3: Obtain the production pipe adjustment assessment coefficient GT according to the formula, compare and analyze the production pipe adjustment assessment coefficient GT with the preset production pipe adjustment assessment coefficient threshold value recorded and stored internally, and obtain a normal signal and a pipe adjustment signal; The material scheduling and control demand supervision and analysis process of the material scheduling unit is as follows: The production line corresponding to the normal signal is set as the stable production line, and the material scheduling risk coefficient of the stable production line within the time threshold is obtained. The material scheduling risk coefficient represents the ratio of the number of material scheduling delays in the total number of historical material scheduling of the stable production line, and the product value obtained after data normalization of the delay duration. The total number of historical production orders of the stable production line within the time threshold is obtained, and the number of delayed orders due to material scheduling delays of the stable production line within the time threshold is obtained. The ratio between the number of delayed orders and the total number of historical production orders is set as the scheduling incentive value, and the material scheduling risk coefficient and the scheduling incentive value are labeled CT and TY respectively; According to the formula The material scheduling influence coefficient TD of the stable production line is obtained, wherein f1 and f2 are respectively the preset weight factor coefficients of the material scheduling risk coefficient and the scheduling incentive value, and f3 is the preset fault tolerance factor coefficient, and f1, f2 and f3 are all greater than zero; The production line scheduling refinement division evaluation and analysis process of the production line tracking unit is as follows: T1: Obtain the qualified production efficiency value of the stable production line in each sub-time period, compare and analyze the qualified production efficiency value with the stored preset qualified production efficiency value threshold, obtain the number of sub-time periods corresponding to the qualified production efficiency value greater than the preset qualified production efficiency value threshold, and set the ratio of the number of sub-time periods corresponding to the qualified production efficiency value greater than the preset qualified production efficiency value threshold to the total number of sub-time periods as the efficiency risk value; T2: The ratio of the failure frequency of the stable production line within the time threshold to the mean failure interval duration is obtained after data normalization, and is set as the failure risk value. At the same time, the facility risk value of the stable production line within the time threshold is obtained. The facility risk value indicates that the proportion of the operating time corresponding to the operating temperature exceeding the preset operating temperature threshold in the operating time of the processing equipment in the stable production line is greater than the proportion of the number of processing equipment corresponding to the preset threshold. The product value of the failure risk value and the facility risk value after data normalization is set as the production line impact value, and the efficiency risk value and the production line impact value are labeled XF and CY respectively; T3: Obtain the production performance evaluation coefficient J of the stable production line according to the formula, compare and analyze the production performance evaluation coefficient J with the preset production performance evaluation coefficient threshold value entered and stored internally, and obtain the stable signal and the optimized signal.
2. According to claim 1, a big data-based intelligent production scheduling system, It is characterized in that The order information indicates the available production time, the production demand data includes the order time and the production material demand value, the processing loss data includes the production loss value and the production qualified efficiency value, the material scheduling data includes the material scheduling risk coefficient and the scheduling incentive value, and the processing performance data includes the pollution risk value and the facility risk value.
3. A method for intelligent production scheduling based on big data, which is applied to the intelligent production scheduling system based on big data as described in claim 2, It is characterized in that The following steps are involved: Step 1: Perform order production division operation on the order information of unproduced orders, and divide the unproduced orders into expedited orders and normal orders; Step 2: Perform order arrangement management analysis on the production demand data of the expedited order, send the obtained pre-processed order to step 3, and perform early warning feedback processing on the obtained scheduling signal; Step 3: Collect the processing loss data of the production line corresponding to the pre-processing order, and conduct supervision, evaluation and analysis of the material loss of the production line. If a normal signal is obtained, proceed to step 4 and step 5. If a management adjustment signal is obtained, early warning feedback processing is performed; Step 4: Perform material scheduling control demand supervision analysis on the material scheduling data through information feedback, obtain the material scheduling influence coefficient TD and proceed to step 5; Step 5: Perform detailed division and evaluation analysis of production line scheduling through progressive and information fusion methods, perform discriminant analysis on the obtained production performance evaluation coefficient J, and perform early warning feedback processing on the obtained stable signal and optimization signal.
Citation Information
Patent Citations
Intelligent production planning and scheduling method and system, computer equipment and storage medium
CN117010613A
Scheduling method and device based on production plan, storage medium and electronic equipment
CN117077977A
Door and window production adjustment method and system based on order tracking
CN117172482A
Intelligent factory production scheduling optimization method based on big data
CN117522085A