A reservoir dam construction safety monitoring system based on the Internet
Through the Internet-based reservoir dam construction safety monitoring system, the deviation and damage of the reservoir dam are analyzed, the safety status of the lifting equipment is evaluated, and the drainage demand assessment is provided, the problem of insufficient safety monitoring in traditional systems is solved, and the problem of insufficient safety monitoring is achieved. Efficient safety monitoring and drainage management have been implemented to reduce accident risks.
Patent Information
- Application Number
- CN202410440792.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-04-12
AI Technical Summary
The traditional reservoir dam construction safety monitoring system cannot comprehensively collect and analyze the damage and deviation of reservoir dams, lacks intelligent support, insufficient safety monitoring of lifting equipment, cannot meet drainage needs, and poses a major safety hazard.
Design an Internet-based reservoir dam construction safety monitoring system to obtain three-dimensional models through the built main image acquisition module, analyze the offset and damage degree, and evaluate construction safety; lifting equipment video retrieval module obtains equipment posture and cargo placement Data, evaluate the safety of lifting equipment; the main data acquisition module has been built to obtain water level and water flow rate, evaluate drainage requirements, and the early warning module provides timely alarm and processing.
It improves the safety monitoring efficiency of reservoir dam construction, reduces safety hazards, enhances the safety of lifting equipment, meets the drainage needs during the construction process, provides timely and accurate early warning information, and avoids or reduces safety accidents.
Smart Images

Figure CN118411021B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of safety monitoring, and in particular is an Internet-based reservoir dam construction safety monitoring system. Background Art
[0002] As an important water conservancy infrastructure, the safety of reservoir dams is directly related to the safety of people's lives and property and economic and social stability. During the construction of reservoir dams, if the construction safety management is not in place, various safety accidents may occur, causing casualties and property losses. Therefore, ensuring the safety of reservoir dam construction is an important part of ensuring social harmony and stability.
[0003] The traditional reservoir dam construction safety monitoring system has the following problems: First, the traditional reservoir dam construction safety monitoring system cannot comprehensively collect the damage, cracks and displacement of the surface of the reservoir dam corresponding to the constructed main body during the reservoir dam construction process. It simply collects the current damage status of the reservoir dam through manual monitoring, relies on manual decision-making and manual operation, lacks sufficient intelligent support, is inefficient and prone to errors.
[0004] Second, lifting equipment plays an important role in the construction of reservoir dams. The construction safety of lifting equipment is directly related to whether the construction of reservoir dams can be completed smoothly. The traditional reservoir dam construction safety monitoring system does not collect data on lifting equipment during the lifting process, and does not evaluate the equipment safety of the lifting equipment itself and the safety of cargo placement. This is not conducive to the construction of reservoir dams and has great safety hazards.
[0005] Third, during the construction process of the reservoir dam, drainage operations are required to manage and control the water level and water pressure. The traditional reservoir dam construction safety monitoring system cannot provide drainage-related data and monitoring functions, and cannot meet the drainage needs during the construction process. When the reservoir dam is seriously flooded, it will cause partial damage to the reservoir dam and delay the construction progress of the reservoir dam. Summary of the invention
[0006] In view of this, the present invention aims to propose an Internet-based reservoir dam construction safety monitoring system, which analyzes the deviation and damage of the reservoir dam to obtain the construction safety assessment coefficient of the reservoir dam and evaluate the safety status of the reservoir dam, and issues an alarm reminder; analyzes the equipment posture data and cargo placement data of the lifting equipment to obtain the construction safety assessment coefficient of the lifting equipment and evaluate the safety status of the lifting equipment, and issues an alarm reminder; analyzes the water level of the reservoir dam, the water level pressure and water flow rate corresponding to each water level layer, as well as the surface area and volume, to obtain the drainage demand coefficient of the reservoir dam and evaluate the drainage demand of the reservoir dam, and performs drainage treatment, thereby effectively solving the problems raised in the above-mentioned background technology.
[0007] The purpose of the present invention can be achieved through the following technical solutions: A reservoir dam construction safety monitoring system based on the Internet, comprising the following modules: a constructed main body image acquisition module, used to scan and image the constructed main body corresponding to the reservoir dam, and obtain a three-dimensional model of the constructed main body corresponding to the reservoir dam.
[0008] The construction safety assessment module is used to obtain the positions of various monitoring equipment arranged on the constructed body corresponding to the reservoir dam, import them into the three-dimensional model of the constructed body corresponding to the reservoir dam, analyze the displacement and damage degree of the constructed body corresponding to the reservoir dam, and obtain the construction safety assessment coefficient of the constructed body corresponding to the reservoir dam.
[0009] The lifting equipment lifting video retrieval module is used to retrieve the lifting equipment's video of each cargo lifting, and obtain the equipment posture data and cargo placement data in the lifting equipment's video of each cargo lifting.
[0010] The lifting equipment safety analysis module is used to analyze the equipment posture data and cargo placement data of the lifting equipment in each cargo lifting video to obtain the construction safety assessment coefficient of the lifting equipment.
[0011] The constructed main body data collection module is used to collect the water level height of the reservoir dam corresponding to the constructed main body, the water level pressure and water flow rate corresponding to each water level height layer area.
[0012] The constructed entity data security assessment module is used to obtain the surface area and volume of the constructed entity corresponding to the reservoir dam to obtain the drainage demand coefficient of the constructed entity corresponding to the reservoir dam.
[0013] The early warning module is used to analyze the construction safety assessment coefficient of the constructed main body of the reservoir dam, the construction safety assessment coefficient of the lifting equipment and the drainage demand coefficient of the constructed main body of the reservoir dam, and to issue early warning.
[0014] The database is used to store the initial position coordinates of each monitoring device deployed on the constructed body corresponding to the reservoir dam, store the standard angle between the lifting equipment and the horizontal ground, store the distance difference between the safe water level of the constructed body corresponding to the reservoir dam and the height of the reservoir dam, and store the corresponding construction time and corresponding area of each water level height layer area of the constructed body corresponding to the reservoir dam.
[0015] In an alternative embodiment, the offset degree of the reservoir dam corresponding to the constructed body is analyzed as follows: a three-dimensional coordinate system is established by importing any point on the three-dimensional model corresponding to the reservoir dam, obtaining the current position coordinates of each monitoring device arranged on the constructed body corresponding to the reservoir dam, extracting the initial position coordinates of each monitoring device arranged on the constructed body corresponding to the reservoir dam from a database, comparing the current position coordinates of each monitoring device arranged on the constructed body corresponding to the reservoir dam with the initial position coordinates, and obtaining the offset distance of each monitoring device, which is recorded as d i , i represents the number corresponding to the i-th monitoring device, i=1,2,...,n, through the formula The offset degree ε of the reservoir dam corresponding to the constructed main body is obtained, and d0 represents the reference offset distance of the monitoring equipment on the preset reservoir dam.
[0016] In an alternative implementation, the damage degree of the reservoir dam corresponding to the constructed body is analyzed as follows: the obtained three-dimensional model of the reservoir dam corresponding to the constructed body is compared with the three-dimensional model corresponding to the reservoir dam design drawing, and all non-overlapping areas of the two are marked as damaged areas, and the volume of all non-overlapping areas is obtained by measurement and recorded as θ g , g represents the number corresponding to the g-th damaged area, g = 1, 2, ..., t.
[0017] Obtain an image of the main surface of the reservoir dam corresponding to the construction, obtain the grayscale image of the main surface of the reservoir dam corresponding to the construction through grayscale processing technology, and obtain the area corresponding to each crack on the main surface of the reservoir dam corresponding to the construction, which is recorded as c j , j represents the number corresponding to the jth crack, j = 1, 2, ..., m, through the formula The damage degree φ of the reservoir dam corresponding to the constructed body is obtained, c0 represents the reference area corresponding to the surface cracks of the preset reservoir dam corresponding to the constructed body, θ0 represents the allowable damage volume of the preset reservoir dam corresponding to the constructed body, m represents the number of surface cracks of the reservoir dam corresponding to the constructed body, t represents the number of damaged areas on the surface of the reservoir dam corresponding to the constructed body, and e is a natural constant.
[0018] In an alternative implementation, the construction safety assessment coefficient of the reservoir dam corresponding to the constructed main body is analyzed as follows: The construction safety assessment coefficient α of the constructed reservoir dam is obtained.
[0019] In an alternative embodiment, the equipment posture data of the lifting equipment in each cargo lifting video includes the degree of tilt and the degree of shaking.
[0020] The cargo placement data of the lifting equipment in each cargo lifting video includes the distance between the cargo placement position and the center point of the cargo placement area.
[0021] In an alternative embodiment, the equipment posture data and cargo placement data of the lifting equipment in each cargo lifting video are analyzed as follows: by observing the lifting equipment in each cargo lifting video, the vertical offset angle of the lifting equipment in each cargo lifting is obtained and recorded as b k , k represents the number corresponding to the kth lifting of the cargo, k=1,2,...,o, retrieve the standard angle between the lifting equipment and the horizontal ground from the database, record it as b0, and use the formula The tilt degree u of the lifting equipment when lifting the goods is obtained, and o is represented by the number of times the lifting equipment lifts the goods.
[0022] By observing the video of the lifting equipment lifting goods each time, the number of shaking times of the lifting equipment during each lifting of goods is obtained and recorded as f k , through the formula The shaking degree w of the lifting equipment when lifting goods is obtained, and f0 represents the preset standard shaking times of the lifting equipment.
[0023] By observing the video of the lifting equipment lifting cargo each time, the position where the lifting equipment places the cargo each time is obtained, and the distance between the position where the lifting equipment places the cargo each time and the center point of the preset cargo placement area is obtained, which is recorded as l k .
[0024] In an alternative embodiment, the construction safety assessment coefficient of the lifting equipment is analyzed as follows: The construction safety assessment coefficient β of the lifting equipment is obtained, and l0 is represented by the allowable offset distance of the lifting equipment when placing the goods when lifting the goods.
[0025] In an alternative implementation, the drainage demand coefficient of the reservoir dam corresponding to the constructed main body is analyzed as follows: the surface area and volume of the reservoir dam corresponding to the constructed main body are obtained by using the three-dimensional model of the constructed reservoir dam main body, and the surface area and volume of the reservoir dam corresponding to the constructed main body are recorded as S and v respectively, and the formula is used to calculate the drainage demand coefficient of the reservoir dam corresponding to the constructed main body. The weight γ of the built main body corresponding to the reservoir dam in the overall construction of the reservoir dam is obtained, and S0 and v0 respectively represent the standard surface area and standard volume of the built main body in the three-dimensional model corresponding to the reservoir dam design drawing.
[0026] Obtain the water level height H of the constructed main body corresponding to the reservoir dam, extract the minimum distance difference between the safe water level of the constructed main body corresponding to the reservoir dam and the safe distance range of the reservoir dam main body height from the database, record it as H′, and obtain the safe water level height H0 of the constructed main body corresponding to the reservoir dam through the formula H0=HH′.
[0027] Obtain the water level pressure F of each water level layer area of the reservoir dam corresponding to the constructed main body h ,h represents the number corresponding to the hth water level height layer area, h=1,2,...,q.
[0028] Extract the construction time corresponding to each water level layer area of the built main body of the reservoir dam from the database, obtain the solidity of each water level layer area of the built main body of the reservoir dam, and obtain the tolerable pressure F′ of each water level layer area of the built main body of the reservoir dam h .
[0029] Get the water flow velocity V of each water level layer area of the reservoir dam corresponding to the built main body h .
[0030] Extract the area corresponding to each water level layer of the reservoir dam corresponding to the built main body from the database and record it as A h , by analyzing the formula Get the impact force F of each water level layer area of the reservoir dam corresponding to the built main body h ″, ρ represents the preset water density, and Cd represents the preset resistance coefficient of the dam structure.
[0031] In an alternative implementation, the analysis of the drainage demand coefficient of the reservoir dam corresponding to the constructed main body also includes: by analyzing the formula The drainage demand coefficient δ of the reservoir dam corresponding to the constructed main body is obtained, and q is expressed as the number of water level height layer areas.
[0032] In an alternative embodiment, the early warning module includes comparing the construction safety assessment coefficient of the constructed body corresponding to the reservoir dam with a preset construction safety assessment reference coefficient of the constructed reservoir dam. When the construction safety assessment coefficient of the constructed body corresponding to the reservoir dam is less than the preset construction safety assessment reference coefficient of the constructed reservoir dam, the constructed body corresponding to the reservoir dam is in a dangerous state, and an alarm reminder is issued.
[0033] The construction safety assessment coefficient of the lifting equipment is compared with the preset construction safety assessment reference coefficient of the lifting equipment. When the construction safety assessment coefficient of the lifting equipment is less than the preset construction safety assessment reference coefficient of the lifting equipment, the lifting equipment is in a dangerous construction state, and an alarm reminder is issued.
[0034] The drainage demand coefficient of the reservoir dam corresponding to the constructed body is compared with the preset minimum drainage demand coefficient of the reservoir dam corresponding to the constructed body. When the drainage demand coefficient of the reservoir dam corresponding to the constructed body is greater than or equal to the preset minimum drainage demand coefficient of the reservoir dam corresponding to the constructed body, the reservoir dam is drained.
[0035] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention obtains the construction safety assessment coefficient of the reservoir dam and evaluates the construction safety status of the reservoir dam by analyzing the deviation and damage degree of the corresponding constructed body of the reservoir dam, thereby simplifying the complex assessment method, effectively improving the construction safety monitoring efficiency of the reservoir dam, and providing sufficient intelligent support through Internet technology. The system can promptly detect potential safety hazards and provide timely and accurate early warning information to the construction management department, thereby effectively avoiding or reducing the occurrence of safety accidents.
[0036] 2. The present invention obtains the construction safety assessment coefficient of the lifting equipment and evaluates the construction safety status of the lifting equipment by analyzing the equipment posture data and cargo placement data of the lifting equipment, thereby improving the accuracy of construction safety monitoring, greatly reducing the potential safety hazards of the lifting equipment during use, and improving the safety of the lifted cargo. The safety monitoring of the lifting equipment can help discover and eliminate lifting equipment failures and avoid construction delays caused by lifting equipment failures.
[0037] 3. The present invention analyzes the drainage demand coefficient of the reservoir dam, which is beneficial to timely discovering and identifying safety hazards, greatly reducing the occurrence of safety accidents, providing drainage-related data and monitoring functions, meeting the drainage demand during the construction process, and ensuring the construction safety of the reservoir dam. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0039] Figure 1 It is a schematic diagram of the connection of various modules of the system of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] The present invention proposes an Internet-based reservoir dam construction safety monitoring system, comprising a built main body image acquisition module, a construction safety assessment module, a lifting equipment lifting video retrieval module, a lifting equipment safety analysis module, a built main body data acquisition module, a built main body data safety assessment module, an early warning module and a database.
[0042] The above-mentioned constructed entity image acquisition module is connected to the construction safety assessment module, the lifting equipment lifting video retrieval module is connected to the lifting equipment safety analysis module, the constructed entity data acquisition module is connected to the constructed entity data safety assessment module, the early warning module is respectively connected to the construction safety assessment module, the lifting equipment safety analysis module and the constructed entity data safety assessment module, and the database is respectively connected to the construction safety assessment module, the lifting equipment safety analysis module and the constructed entity data safety assessment module.
[0043] For the connection relationship between modules, see Figure 1 .
[0044] The constructed main body image acquisition module is used to scan and image the constructed main body corresponding to the reservoir dam, and obtain a three-dimensional model of the constructed main body corresponding to the reservoir dam.
[0045] The construction safety assessment module is used to obtain the positions of various monitoring equipment arranged on the constructed body corresponding to the reservoir dam, import them into the three-dimensional model of the constructed body corresponding to the reservoir dam, analyze the deviation and damage degree of the constructed body corresponding to the reservoir dam, and obtain the construction safety assessment coefficient of the constructed body corresponding to the reservoir dam.
[0046] The analysis of the offset of the reservoir dam corresponding to the built body is as follows: a three-dimensional coordinate system is established by importing any point on the three-dimensional model of the reservoir dam corresponding to the built body, obtaining the current position coordinates of each monitoring device arranged on the built body corresponding to the reservoir dam, extracting the initial position coordinates of each monitoring device arranged on the built body corresponding to the reservoir dam from the database, comparing the current position coordinates of each monitoring device arranged on the built body corresponding to the reservoir dam with the initial position coordinates, and obtaining the offset distance of each monitoring device, which is recorded as d i , i represents the number corresponding to the i-th monitoring device, i=1,2,...,n, through the formula The offset degree ε of the reservoir dam corresponding to the constructed main body is obtained, and d0 represents the reference offset distance of the monitoring equipment on the preset reservoir dam.
[0047] The damage degree analysis of the constructed main body of the reservoir dam is as follows: the 3D model of the constructed main body of the reservoir dam is compared with the 3D model corresponding to the design drawing of the reservoir dam, and all non-overlapping areas of the two are marked as damaged areas. The volume of all non-overlapping areas is obtained by measurement and recorded as θ g , g represents the number corresponding to the g-th damaged area, g = 1, 2, ..., t.
[0048] Obtain an image of the main surface of the reservoir dam corresponding to the construction, obtain the grayscale image of the main surface of the reservoir dam corresponding to the construction through grayscale processing technology, and obtain the area corresponding to each crack on the main surface of the reservoir dam corresponding to the construction, which is recorded as c j , j represents the number corresponding to the jth crack, j = 1, 2, ..., m, through the formula The damage degree φ of the reservoir dam corresponding to the constructed body is obtained, c0 represents the reference area corresponding to the surface cracks of the preset reservoir dam corresponding to the constructed body, θ0 represents the allowable damage volume of the preset reservoir dam corresponding to the constructed body, m represents the number of surface cracks of the reservoir dam corresponding to the constructed body, t represents the number of damaged areas on the surface of the reservoir dam corresponding to the constructed body, and e is a natural constant.
[0049] It should be noted that the area corresponding to each crack on the surface of the constructed main body of the reservoir dam is obtained by extracting each pixel point from the grayscale image of the constructed main body surface of the reservoir dam, and obtaining the grayscale value of each pixel point in the grayscale image of the constructed main body surface of the reservoir dam. If the grayscale value of each pixel point in the grayscale image of the constructed main body surface of the reservoir dam is less than the grayscale value threshold of the pixel point in the grayscale image corresponding to the surface of the reservoir dam, the pixel point is marked as an edge point, the position of each edge point is counted, and each edge point is connected with the edge point at its adjacent position to form each largest closed image contour, and each closed image contour is recorded as a crack, and the area of each crack is obtained according to the number of pixels corresponding to each crack.
[0050] The construction safety assessment coefficient of the above-mentioned reservoir dam corresponding to the built main body is analyzed as follows: Through the analysis formula The construction safety assessment coefficient α of the constructed reservoir dam is obtained.
[0051] It should be supplemented that the present invention obtains the construction safety assessment coefficient of the reservoir dam and evaluates the construction safety status of the reservoir dam by analyzing the deviation and damage degree of the corresponding constructed body of the reservoir dam, thereby simplifying the complex assessment method, effectively improving the construction safety monitoring efficiency of the reservoir dam, and providing sufficient intelligent support through Internet technology. The system can promptly discover potential safety hazards and provide timely and accurate early warning information to the construction management department, thereby effectively avoiding or reducing the occurrence of safety accidents.
[0052] The lifting equipment lifting video retrieval module is used to retrieve the lifting equipment's video of each time the cargo is lifted, and obtain the equipment posture data and cargo placement data in the lifting equipment's video of each time the cargo is lifted.
[0053] The equipment posture data of the above-mentioned lifting equipment in each cargo lifting video includes the degree of tilt and the degree of shaking.
[0054] The cargo placement data in each cargo lifting video of the lifting equipment includes the distance between the cargo placement position and the center point of the cargo placement area.
[0055] The lifting equipment safety analysis module is used to analyze the equipment posture data and cargo placement data of the lifting equipment in each cargo lifting video to obtain the construction safety assessment coefficient of the lifting equipment.
[0056] The equipment posture data and cargo placement data of the lifting equipment in each cargo lifting video are analyzed as follows: By observing the lifting equipment in each cargo lifting video, the vertical offset angle of the lifting equipment during each cargo lifting is obtained and recorded as b k , k represents the number corresponding to the kth lifting of the cargo, k=1,2,...,o, retrieve the standard angle between the lifting equipment and the horizontal ground from the database, record it as b0, and use the formula The tilt degree u of the lifting equipment when lifting the goods is obtained, and o is represented by the number of times the lifting equipment lifts the goods.
[0057] It should be noted that the vertical offset angle of the lifting equipment during each cargo lifting is obtained by observing the video of the lifting equipment during each cargo lifting, obtaining each lifting image of the lifting equipment in each cargo lifting video, and recording the angle between the top part of each lifting image in the video of the lifting equipment lifting the cargo and the vertical direction as all the vertical offset angles of the lifting equipment in each cargo lifting video, and selecting the largest vertical offset angle as the vertical offset angle of the lifting equipment during each cargo lifting video.
[0058] By observing the video of the lifting equipment lifting goods each time, the number of shaking times of the lifting equipment during each lifting of goods is obtained and recorded as f k, through the formula The shaking coefficient w of the lifting equipment when lifting goods is obtained, and f0 represents the preset allowable shaking times of the lifting equipment.
[0059] It should be noted that the number of times the lifting equipment shakes each time the cargo is lifted is obtained as follows: obtain the vertical offset angles of the lifting equipment in each video of the cargo lifting, compare the vertical offset angles of the lifting equipment in each video of the cargo lifting with the preset allowable offset angle, screen out the vertical offset angles of the lifting equipment in each video of the cargo lifting that are greater than the allowable offset angle, and record them as the reference offset angles of the lifting equipment in each video of the cargo lifting, count the time points corresponding to the images to which the reference offset angles in each video of the cargo lifting belong, sort the time points according to the sorted reference offset angles of the lifting equipment in each video of the cargo lifting, and use the time points of the sorted reference offset angles and the adjacent reference offset angle time points to form a video time period, count each video time period, and if there is an image with a vertical offset angle of 0 in a certain video time period, add 1 to the number of times the lifting equipment shakes in that lifting video, and then count the number of times the lifting equipment shakes in each lifting video.
[0060] By observing the video of the lifting equipment lifting cargo each time, the position where the lifting equipment places the cargo each time is obtained, and the distance between the position where the lifting equipment places the cargo each time and the center point of the preset cargo placement area is obtained, which is recorded as l k .
[0061] The construction safety assessment coefficient of the lifting equipment is analyzed as follows: The construction safety assessment coefficient β of the lifting equipment is obtained, and l0 is represented by the allowable offset distance of the lifting equipment when placing the goods when lifting the goods.
[0062] It should be supplemented that, the present invention obtains the construction safety assessment coefficient of the lifting equipment and evaluates the construction safety status of the lifting equipment by analyzing the equipment posture data and cargo placement data of the lifting equipment, thereby improving the accuracy of construction safety monitoring, greatly reducing the safety hazards of the lifting equipment during use, and improving the safety of the lifted cargo. The safety monitoring of the lifting equipment can help discover and eliminate lifting equipment failures and avoid construction delays caused by lifting equipment failures.
[0063] The constructed main body data collection module is used to collect the water level height of the constructed main body corresponding to the reservoir dam, the water level pressure and water flow rate corresponding to each water level height layer area.
[0064] The constructed main body data security assessment module is used to obtain the surface area, volume and construction time of each part of the constructed main body corresponding to the reservoir dam, so as to obtain the drainage demand coefficient of the constructed main body corresponding to the reservoir dam.
[0065] The analysis of the drainage demand coefficient of the reservoir dam corresponding to the built main body is as follows: through the three-dimensional model of the built reservoir dam main body, the surface area and volume of the reservoir dam corresponding to the built main body are obtained, and the surface area and volume of the reservoir dam corresponding to the built main body are recorded as S and v respectively, and the formula is used The weight γ of the constructed main body corresponding to the reservoir dam in the overall construction of the reservoir dam is obtained. S0 and v0 represent the standard surface area and standard volume of the constructed main body in the three-dimensional model corresponding to the reservoir dam design drawing, respectively.
[0066] Obtain the water level height H of the constructed main body corresponding to the reservoir dam, extract the minimum distance difference between the safe water level of the constructed main body corresponding to the reservoir dam and the safe distance range of the reservoir dam main body height from the database, record it as H′, and obtain the safe water level height H0 of the constructed main body corresponding to the reservoir dam through the formula H0=HH′.
[0067] Obtain the water level pressure F of each water level layer area of the reservoir dam corresponding to the constructed main body h ,h represents the number corresponding to the hth water level height layer area, h=1,2,...,q.
[0068] Extract the construction time corresponding to each water level layer area of the built main body of the reservoir dam from the database, obtain the solidity of each water level layer area of the built main body of the reservoir dam, and obtain the tolerable pressure F′ of each water level layer area of the built main body of the reservoir dam h .
[0069] It should be noted that the method for obtaining the tolerable pressure of each water level layer area corresponding to the constructed main body of the reservoir dam is as follows: the corresponding construction time of each water level layer area corresponding to the constructed main body of the reservoir dam is obtained through the corresponding construction time of each water level layer area, and the area of each water level layer area is obtained according to the three-dimensional model of the constructed main body of the reservoir dam, and the area is obtained by multiplying it with the time required for the dam main body per unit area to reach the safety and solidity, and the time required for each water level layer area to reach the safety and solidity is obtained, and the formula is used to calculate the time required for each water level layer area to reach the safety and solidity. Get the solidity R of the reservoir dam corresponding to each water level height layer area of the built main body h , R′ 安 It is expressed as the safety and solidity of the dam body per unit area, T h It is expressed as the construction time corresponding to the h-th water level layer area, T′ hIt is expressed as the time required for the hth water level layer area to reach a safe and solid level. By comparing the solidity of the reservoir dam corresponding to each water level layer area of the constructed body with the preset reservoir dam corresponding to each solidity range's tolerable pressure, the tolerable pressure of the reservoir dam corresponding to each water level layer area of the constructed body is screened out.
[0070] Get the water flow velocity V of each water level layer area of the reservoir dam corresponding to the built main body h .
[0071] Extract the area corresponding to each water level layer of the reservoir dam corresponding to the built main body from the database and record it as A h , by analyzing the formula Get the impact force F of each water level layer area of the reservoir dam corresponding to the built main body h ″, ρ represents the preset water density, and Cd represents the preset resistance coefficient of the dam structure.
[0072] The analysis of the drainage demand coefficient of the above-mentioned reservoir dam corresponding to the constructed main body also includes: through the analysis formula The drainage demand coefficient δ of the reservoir dam corresponding to the constructed main body is obtained, and q is expressed as the number of water level height layer areas.
[0073] It should be noted that the present invention, by analyzing the drainage demand coefficient of the reservoir dam, is helpful to timely discover and identify safety hazards, greatly reduces the occurrence of safety accidents, provides drainage-related data and monitoring functions, meets the drainage needs during the construction process, and ensures the construction safety of the reservoir dam.
[0074] The early warning module is used to analyze the construction safety assessment coefficient of the constructed main body corresponding to the reservoir dam, the construction safety assessment coefficient of the lifting equipment and the drainage demand coefficient of the constructed main body corresponding to the reservoir dam, and issue an early warning.
[0075] The early warning module includes comparing the construction safety assessment coefficient of the constructed main body corresponding to the reservoir dam with the preset construction safety assessment reference coefficient of the constructed reservoir dam. When the construction safety assessment coefficient of the constructed main body corresponding to the reservoir dam is less than the preset construction safety assessment reference coefficient of the constructed reservoir dam, the constructed main body corresponding to the reservoir dam is in a dangerous state, and an alarm reminder is issued at this time.
[0076] The construction safety assessment coefficient of the lifting equipment is compared with the preset construction safety assessment reference coefficient of the lifting equipment. When the construction safety assessment coefficient of the lifting equipment is less than the preset construction safety assessment reference coefficient of the lifting equipment, the lifting equipment is in a dangerous construction state, and an alarm reminder is issued.
[0077] The drainage demand coefficient of the reservoir dam corresponding to the constructed body is compared with the preset minimum drainage demand coefficient of the reservoir dam corresponding to the constructed body. When the drainage demand coefficient of the reservoir dam corresponding to the constructed body is greater than or equal to the preset minimum drainage demand coefficient of the reservoir dam corresponding to the constructed body, the reservoir dam is drained.
[0078] It should be noted that when a reservoir dam is draining water, when the water level of the reservoir dam corresponding to the constructed main body is less than or equal to the water level for stopping drainage, the reservoir dam will stop draining water.
[0079] It should be noted that the method for obtaining the height of the water level for stopping drainage is: extracting from the database the maximum distance difference between the safe water level of the constructed body of the reservoir dam and the safe distance range of the height of the reservoir dam body, record it as H″, and obtain the height of the water level H1 for stopping drainage of the constructed body of the reservoir dam corresponding to the constructed body through the formula H1=HH″.
[0080] The database is used to store the initial position coordinates of each monitoring device deployed on the constructed body corresponding to the reservoir dam, store the standard angle between the lifting equipment and the horizontal ground, store the distance difference between the safe water level of the constructed body corresponding to the reservoir dam and the height of the reservoir dam body, and store the construction time and corresponding area of each water level height layer area corresponding to the constructed body of the reservoir dam.
[0081] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. An Internet-based reservoir dam construction safety monitoring system, characterized in that: The system includes: The built main body image acquisition module is used to scan and image the built main body corresponding to the reservoir dam to obtain a three-dimensional model of the built main body corresponding to the reservoir dam; The construction safety assessment module is used to obtain the positions of various monitoring devices arranged on the built body corresponding to the reservoir dam, import them into the three-dimensional model of the built body corresponding to the reservoir dam, analyze the displacement and damage degree of the built body corresponding to the reservoir dam, and obtain the construction safety assessment coefficient of the built body corresponding to the reservoir dam; A lifting equipment lifting video retrieval module is used to retrieve the lifting equipment's lifting cargo videos, and obtain the equipment posture data and cargo placement data in the lifting equipment's lifting cargo videos; The lifting equipment safety analysis module is used to analyze the equipment posture data and cargo placement data of the lifting equipment in each cargo lifting video to obtain the construction safety assessment coefficient of the lifting equipment; The constructed main body data collection module is used to collect the water level height of the reservoir dam corresponding to the constructed main body, the water level pressure and water flow rate corresponding to each water level height layer area; The constructed entity data security assessment module is used to obtain the surface area and volume of the constructed entity corresponding to the reservoir dam to obtain the drainage demand coefficient of the constructed entity corresponding to the reservoir dam; The early warning module is used to analyze the construction safety assessment coefficient of the reservoir dam corresponding to the built main body, the construction safety assessment coefficient of the lifting equipment and the drainage demand coefficient of the reservoir dam corresponding to the built main body, and issue an early warning; The database is used to store the initial position coordinates of each monitoring device arranged on the built main body corresponding to the reservoir dam, store the standard angle between the lifting equipment and the horizontal ground, store the distance difference between the safe water level of the built main body corresponding to the reservoir dam and the height of the reservoir dam, and store the corresponding construction time and corresponding area of each water level height layer area corresponding to the built main body of the reservoir dam; The deviation analysis of the reservoir dam corresponding to the constructed main body is as follows: A three-dimensional coordinate system is established by importing any point on the three-dimensional model of the built main body corresponding to the reservoir dam, obtaining the current position coordinates of each monitoring device arranged on the built main body corresponding to the reservoir dam, extracting the initial position coordinates of each monitoring device arranged on the built main body corresponding to the reservoir dam from the database, comparing the current position coordinates of each monitoring device arranged on the built main body corresponding to the reservoir dam with the initial position coordinates, and obtaining the offset distance of each monitoring device, which is recorded as , Indicates The number corresponding to each monitoring device, , through the formula Get the offset of the reservoir dam corresponding to the built main body , It is expressed as the preset reference offset distance of the monitoring equipment on the reservoir dam; The damage analysis of the reservoir dam corresponding to the constructed main body is as follows: The obtained 3D model of the constructed main body of the reservoir dam is compared with the 3D model of the reservoir dam design drawing, and all non-overlapping areas of the two are marked as damaged areas. The volume of all non-overlapping areas is obtained by measurement and recorded as , Indicates The number corresponding to the damaged area, ; Obtain the image of the main surface of the reservoir dam corresponding to the construction, obtain the grayscale image of the main surface of the reservoir dam corresponding to the construction through grayscale processing technology, and obtain the area corresponding to each crack on the main surface of the reservoir dam corresponding to the construction, which is recorded as , Indicates The number corresponding to the crack, , through the formula Get the damage degree of the reservoir dam corresponding to the built main body , It is represented by the reference area corresponding to the surface cracks of the pre-built reservoir dam. It is expressed as the allowable damage volume of the preset reservoir dam corresponding to the constructed main body. It is expressed as the number of surface cracks corresponding to the constructed main body of the reservoir dam. It is expressed as the number of damaged areas on the surface of the reservoir dam corresponding to the constructed main body. is a natural constant; The construction safety assessment coefficient of the reservoir dam corresponding to the built main body is analyzed as follows: By analyzing the formula Obtain the construction safety assessment coefficient of the constructed reservoir dam ; The equipment posture data and cargo placement data of the lifting equipment in each cargo lifting video are analyzed as follows: By observing the video of the lifting equipment lifting the cargo each time, the vertical deviation angle of the lifting equipment during each lifting of the cargo is obtained and recorded as , Indicates The number corresponding to the cargo lifted this time, , retrieve the standard angle between the lifting equipment and the horizontal ground from the database and record it as , through the formula Get the tilt degree of the lifting equipment when lifting goods , Indicates the number of times the lifting equipment lifts the cargo; By observing the video of the lifting equipment lifting goods each time, the number of shaking times of the lifting equipment during each lifting of goods is obtained and recorded as , through the formula Get the degree of shaking of the lifting equipment when lifting goods , It is expressed as the preset standard shaking times of the lifting equipment; By observing the video of the lifting equipment lifting the cargo each time, the position where the lifting equipment places the cargo each time is obtained, and the distance between the position where the lifting equipment places the cargo each time and the center point of the preset cargo placement area is obtained, which is recorded as ; The construction safety assessment coefficient of the lifting equipment is analyzed as follows: By analyzing the formula Obtain the construction safety assessment coefficient of the lifting equipment , It indicates the allowable offset distance for placing cargo when lifting the cargo. The drainage demand coefficient of the reservoir dam corresponding to the constructed main body is analyzed as follows: Through the acquired three-dimensional model of the built reservoir dam body, the surface area and volume of the reservoir dam corresponding to the built body are obtained, and the surface area and volume of the reservoir dam corresponding to the built body are recorded as and , through the formula Get the weight of the built entity corresponding to the reservoir dam in the overall construction of the reservoir dam , , They respectively represent the standard surface area and standard volume of the constructed main body in the three-dimensional model corresponding to the design drawings of the reservoir and dam; Get the water level height of the reservoir dam corresponding to the constructed main body , extract the minimum distance difference between the safe water level of the reservoir dam corresponding to the built main body and the safe distance range of the reservoir dam main body height from the database, and record it as , through the formula Get the safe water level height of the reservoir dam corresponding to the built main body ; Obtain the water level pressure of each water level layer area of the reservoir dam corresponding to the constructed main body , Indicates The number corresponding to each water level layer area, ; Extract the construction time of each water level layer area of the reservoir dam corresponding to the built main body from the database, obtain the solidity of each water level layer area of the reservoir dam corresponding to the built main body, and obtain the tolerable pressure of each water level layer area of the reservoir dam corresponding to the built main body ; Obtain the water flow velocity of each water level layer area of the reservoir dam corresponding to the constructed main body ; The area corresponding to each water level layer of the built main body of the reservoir dam is extracted from the database and recorded as , by analyzing the formula Get the impact force of each water level layer of the reservoir dam corresponding to the built main body , Expressed as the default water density, It is expressed as the resistance coefficient of the preset dam structure; The analysis of the drainage demand coefficient of the reservoir dam corresponding to the constructed main body also includes: By analyzing the formula Get the drainage demand coefficient of the reservoir dam corresponding to the constructed main body , Expressed as the number of water level layer areas.
2. The Internet-based reservoir dam construction safety monitoring system according to claim 1 is characterized by: The equipment posture data of the lifting equipment in each cargo lifting video includes the degree of tilt and the degree of shaking; The cargo placement data of the lifting equipment in each cargo lifting video includes the distance between the cargo placement position and the center point of the cargo placement area.
3. The Internet-based reservoir dam construction safety monitoring system according to claim 1 is characterized by: The early warning module includes comparing the construction safety assessment coefficient of the reservoir dam corresponding to the built main body with the preset construction safety assessment reference coefficient of the built reservoir dam. When the construction safety assessment coefficient of the reservoir dam corresponding to the built main body is less than the preset construction safety assessment reference coefficient of the built reservoir dam, the built main body corresponding to the reservoir dam is in a dangerous state, and an alarm reminder is issued at this time; Compare the construction safety assessment coefficient of the lifting equipment with the preset construction safety assessment reference coefficient of the lifting equipment. When the construction safety assessment coefficient of the lifting equipment is less than the preset construction safety assessment reference coefficient of the lifting equipment, the lifting equipment is in a dangerous construction state, and an alarm is issued at this time; The drainage demand coefficient of the reservoir dam corresponding to the constructed body is compared with the preset minimum drainage demand coefficient of the reservoir dam corresponding to the constructed body. When the drainage demand coefficient of the reservoir dam corresponding to the constructed body is greater than or equal to the preset minimum drainage demand coefficient of the reservoir dam corresponding to the constructed body, the reservoir dam is drained.