A construction design data dynamic change filing method and system
By adopting dynamic change filing methods and systems in the construction industry, using permission models and dynamic identifiers to classify and integrate construction design data, the efficiency and security issues in change management are solved, and the security and safety of data transmission are achieved. Refined control is suitable for construction projects of different sizes and complexity.
Patent Information
- Application Number
- CN202410924211.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-11
AI Technical Summary
In the construction industry, the change management of design data has problems such as low efficiency, insufficient security, and difficult traceability. Especially in the case of multiple participants and complex data transmission, how to ensure the accuracy, completeness and accuracy of the change information? Security becomes a problem.
Adopt a dynamic change filing method and system for construction design data, classify the design data through the authority model, and use dynamic identifiers and hash tables for data integration and comparison to ensure the integrity and security of the data during transmission. security and achieve granular control over data access and changes.
It significantly improves the security of data transmission, optimizes the efficiency of change management, reduces manual errors and delays, adapts to construction projects of different sizes and complexity, and is compatible with existing construction management systems.
Smart Images

Figure CN118468412B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of dynamic data change, and in particular, to a method and system for dynamically changing construction design data. Background Art
[0002] In the construction industry, change management of design data is a crucial link. As the project progresses, construction design data often need to be adjusted and optimized according to actual conditions. These changes may involve structural adjustments, material replacements, design changes, etc. However, traditional change management methods often have problems such as low efficiency, insufficient security, and difficulty in traceability. Especially when multiple parties are involved and complex data transmission is involved, how to ensure the accuracy, integrity and security of change information has become a technical problem. Summary of the invention
[0003] The purpose of the present disclosure is to provide a method and system for dynamically changing construction design data, aiming to solve the above-mentioned problems.
[0004] According to a first aspect of an embodiment of the present disclosure, a dynamic change filing method for construction design data is provided, the method comprising: S1, obtaining construction design data, grading the construction design data based on an authority model, obtaining a plurality of graded design data, and obtaining authority identifiers corresponding to and different from the plurality of graded design data; S2, obtaining first change application information, obtaining a first dynamic identifier based on the authority model, and associating the first change application information with the first dynamic identifier; obtaining second change application information, integrating the second change application information with the first change application information into comprehensive change data, and obtaining a second dynamic identifier associated with the comprehensive change data based on the authority model and the first dynamic identifier; obtaining third change application information, integrating the third change application information, the second change application information, and the first change application information into comprehensive change data, and obtaining a third dynamic identifier associated with the comprehensive change data based on the authority model and the second dynamic identifier; S3, comparing the third dynamic identifier with a plurality of authority identifiers, obtaining an authority identifier matching the third dynamic identifier, and obtaining graded design data corresponding to the authority identifier; S4, inserting the comprehensive change data into the graded design data obtained in S3.
[0005] Preferably, the authority model includes a first calculation model and a second calculation model, and S1 includes: based on the first calculation model, the construction design data is classified to obtain a plurality of classified design data, and authority identifiers corresponding to the plurality of classified design data and different from each other are obtained.
[0006] Preferably, the first calculation model includes a first expression and a second expression; wherein the first expression is: ,in, To design data for classification, For construction design data vector, is the grading standard mapping function; the second expression is: ,in, is the permission identifier, is a hash function, It is a summary of construction design data. A random salt value.
[0007] Preferably, S2 includes: acquiring a first dynamic identifier based on a second calculation model, acquiring a second dynamic identifier based on the second calculation model and the first dynamic identifier, and acquiring a third dynamic identifier based on the second calculation model and the second dynamic identifier.
[0008] Preferably, the second calculation model can be expressed as: ;in, is the new dynamic identifier, is the previous dynamic identifier, is the current timestamp, The information vector for the current change request, Design data for changes.
[0009] Preferably, S3 includes: S31, using a hash table to store permission identifiers; S32, calculating a hash value of a third dynamic identifier; S33, using the hash value as an index to search for a corresponding permission identifier in the hash table; S34, obtaining a permission identifier that matches the third dynamic identifier, and obtaining hierarchical design data corresponding to the permission identifier.
[0010] Preferably, S4 includes: S41, comparing the hierarchical design data obtained in S3 with the integrated change data to obtain overlapping data therebetween; S42, copying the overlapping data in the hierarchical design data to obtain new overlapping data, and replacing the new overlapping data with the integrated change data.
[0011] A dynamic change filing system for construction design data is also provided, the system comprising: a first processing module, used to obtain construction design data, and also used to classify the construction design data based on the authority model to obtain multiple hierarchical design data, and obtain authority identifiers corresponding to the multiple hierarchical design data and different from each other; a dynamic change module, used to obtain first change application information, and also used to obtain a first dynamic identifier based on the authority model, and also used to associate the first change application information with the first dynamic identifier; also used to obtain second change application information, and also used to integrate the second change application information with the first change application information into comprehensive change data, and also used to obtain the first dynamic identifier based on the authority model and the first dynamic identifier. The first dynamic identifier is used to obtain the second dynamic identifier associated with the comprehensive change data; it is also used to obtain the third change application information, and is also used to integrate the third change application information, the second change application information and the first change application information into the comprehensive change data, and is also used to obtain the third dynamic identifier associated with the comprehensive change data based on the authority model and the second dynamic identifier; a matching processing module is used to compare the third dynamic identifier with multiple authority identifiers, obtain the authority identifier that matches the third dynamic identifier, and is also used to obtain the hierarchical design data corresponding to the authority identifier; a change filing module is used to insert the comprehensive change data into the hierarchical design data obtained by the matching processing module.
[0012] Preferably, the matching processing module includes: an initialization unit for using a hash table to store the permission identifier; a calculation unit for calculating the hash value of the third dynamic identifier; an index unit for using the hash value as an index to search for the corresponding permission identifier in the hash table, and an acquisition unit for acquiring the permission identifier that matches the third dynamic identifier and acquiring the hierarchical design data corresponding to the permission identifier.
[0013] Preferably, the change filing module includes: an overlapping comparison unit, used to compare the hierarchical design data obtained in S3 with the comprehensive change data to obtain overlapping data between the two; a full coverage unit, used to copy the overlapping data in the hierarchical design data and obtain new overlapping data, and replace the new overlapping data with the comprehensive change data.
[0014] The present disclosure provides a method and system for dynamic change filing of construction design data. By introducing first, second and third dynamic identifiers, the integrity of data can be verified during data transmission, effectively preventing data leakage or tampering during transmission, thereby significantly improving the security of data transmission; further, by hierarchical processing of construction design data and assigning unique authority identifiers to each level of data, the technical solution realizes refined control of data access and changes, which can not only prevent unauthorized access and modification, but also ensure that only users with corresponding permissions can change the construction design data; further, through the dynamic change filing method, the technical solution can efficiently process multiple change applications, while ensuring the security of data transmission, optimizing transmission efficiency, especially when processing a large number or frequent change applications, and accurately matching and inserting the comprehensive change data into the corresponding hierarchical design data, which greatly improves the efficiency of change management and reduces errors and delays in manual operations; further, the dynamic change filing system designed by the technical solution can adapt to construction projects of different scales and complexities, and is compatible with existing construction management systems, which makes the solution widely applicable and can meet the needs of different projects.
[0015] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:
[0017] Figure 1 It is a schematic diagram of the steps of the method for dynamically changing the filing of construction design data disclosed in the present invention;
[0018] Figure 2 It is a schematic diagram of step S3 in the method for dynamically changing the filing of construction design data disclosed in the present invention;
[0019] Figure 3 It is a schematic diagram of step S4 in the method for dynamically changing the filing of construction design data disclosed in the present invention;
[0020] Figure 4 It is a block diagram of an electronic device shown in an embodiment of the present disclosure.
[0021] Reference numerals:
[0022] 700-electronic device, 701-processor, 702-memory, 703-multimedia component, 704-input / output (I / O) interface, 705-communication component, DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0024] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0026] In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "upper", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the inventive product is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0027] like Figures 1 to 3As shown, a dynamic change filing method for construction design data, the method includes: S1, obtaining construction design data, grading the construction design data based on an authority model, obtaining multiple graded design data, and obtaining authority identifiers corresponding to and different from the multiple graded design data; S2, obtaining first change application information, obtaining a first dynamic identifier based on the authority model, and associating the first change application information with the first dynamic identifier; obtaining second change application information, integrating the second change application information with the first change application information into comprehensive change data, and obtaining a second dynamic identifier associated with the comprehensive change data based on the authority model and the first dynamic identifier; obtaining third change application information, integrating the third change application information, the second change application information and the first change application information into comprehensive change data, and obtaining a third dynamic identifier associated with the comprehensive change data based on the authority model and the second dynamic identifier; S3, comparing the third dynamic identifier with multiple authority identifiers, obtaining an authority identifier matching the third dynamic identifier, and obtaining graded design data corresponding to the authority identifier; S4, inserting the comprehensive change data into the graded design data obtained in S3.
[0028] In this embodiment, it should be noted that in S1, first, the construction design data is obtained, and a preset authority model is used to perform hierarchical processing on the construction design data, so that the design data can be divided into multiple different levels of design data, and each level of data has different sensitivity and importance; a unique authority identifier is assigned to each level of design data, and these authority identifiers facilitate subsequent data access and change control.
[0029] In S2, the first change application information, the second change application information and the third change application information are located at different data nodes on the data transmission path. The data transmission of the comprehensive change data must pass through all nodes on the transmission path. At the same time, this method performs dynamic change filing for at least three change application information; specifically, when the first change application information of the node is received, a first dynamic identifier is generated for the first change application information based on the authority model, and this identifier is associated with the change application information, so that the two are transmitted together; another node receives the transmitted first change application information and the first dynamic identifier, and determines whether the entire first change application information is missing and leaked through the first dynamic identifier, such as using the authority model to perform inversion, obtain the inversion result, and compare the inversion result with the first change application information, so as to complete the judgment of data integrity. Generally, only after determining whether the first change application information is complete, the second dynamic identifier is obtained based on the authority model and the first dynamic identifier, which greatly improves the security of data transmission; similarly, the third node receives the transmitted comprehensive change data and the second dynamic identifier, and determines whether the entire comprehensive change data is missing and leaked through the second dynamic identifier, and obtains the third dynamic identifier based on the authority model and the second dynamic identifier.
[0030] In S3, the third dynamic identifier is compared with the different permission identifiers previously assigned to the design data of different levels. Since the third dynamic identifier and the permission identifier are both obtained by the permission model, the matching permission identifier can be used to quickly determine in which specific hierarchical design data of the entire construction design data the comprehensive change data is located, that is, to quickly and reliably indicate which part of the construction design data the application change information and permission are used to modify.
[0031] Finally, in S4, the comprehensive change data is inserted into the hierarchical design data determined in S3. In this way, the dynamic change of the construction design data is completed, and it is ensured that the change is carried out under the premise of complying with the authority setting.
[0032] In summary, in the dynamic change filing method for the entire construction design data, by introducing the first, second, and third dynamic identifiers, the integrity of the data can be verified during the data transmission process, effectively preventing the leakage or tampering of the data during the transmission process, thereby significantly improving the security of data transmission; further, by hierarchical processing of the construction design data and assigning unique authority identifiers to each level of data, the technical solution realizes refined control of data access and changes, which can not only prevent unauthorized access and modification, but also ensure that only users with corresponding permissions can change the construction design data; further, through the dynamic change filing method, the technical solution can efficiently process multiple change applications, while ensuring the security of data transmission, optimizing the transmission efficiency, especially when processing a large number or frequent change applications, and accurately matching and inserting the comprehensive change data into the corresponding hierarchical design data, which greatly improves the efficiency of change management and reduces errors and delays in manual operations; further, the dynamic change filing system designed by the technical solution can adapt to construction projects of different scales and complexities, and is compatible with the existing construction management system, which makes the solution widely applicable and can meet the needs of different projects.
[0033] Specifically, the authority model includes a first calculation model and a second calculation model, and S1 includes: based on the first calculation model, the construction design data is classified to obtain multiple classified design data, and the authority identifiers corresponding to the multiple classified design data and different from each other are obtained.
[0034] In this embodiment, it should be noted that the first calculation model is mainly used to classify construction design data and generate different authority identifiers for each graded design data. The classification may be based on factors such as the sensitivity, importance, and modification frequency of the design data. The generation of authority identifiers needs to ensure uniqueness and security.
[0035] Specifically, the first calculation model includes a first expression and a second expression; wherein the first expression is: ,in, To design data for classification, For construction design data vector, is the grading standard mapping function; the second expression is: ,in, is the permission identifier, is a hash function, It is a summary of construction design data. A random salt value.
[0036] In this embodiment, it should be noted that in the first expression, it is assumed that the construction design data can be represented as a vector , where each element represents a different attribute of the data (such as construction stage, consumables usage, material type, as well as sensitivity, importance and modification frequency, etc.). The classification standard can be expressed as a mapping function , it will The various attributes of are mapped to different hierarchical levels to obtain different hierarchical design data; for example:
[0037] 1 function M(D):
[0038] 2 if D.fileType == 'sketch' and not D.sensitive and not D.critical:
[0039] 3 return 1
[0040] 4 elif D.sensitive and not D.critical:
[0041] 5 return 2
[0042] 6 elif D.critical and D.sensitive:
[0043] 7 return 3
[0044] 8 else:
[0045] 9 return 0 # Indicates unclassified or other special cases.
[0046] The above D represents the construction design drawings of the data. If the file type is a sketch and is not marked as sensitive or critical, it is classified as Level 1; Level 1 represents non-sensitive, non-critical design sketches or preliminary ideas. If the file contains sensitive information but is not a critical structural or electrical design, it is classified as Level 2; Level 2 represents design documents that contain some sensitive information but are not very critical. If the file is a critical structural design drawing or electrical wiring diagram and contains highly sensitive information, it is classified as Level 3; Level 3 represents highly sensitive and critical structural design drawings, electrical wiring diagrams, etc.
[0047] In the second expression, for each hierarchical design data, a unique authority identifier I is generated. This identifier can be combined with the hierarchical design data and the construction design data summary through the hash function H. and a random salt value To generate. The hash function can use SHA-256 because it is a widely accepted and well-tested secure hash algorithm. The hash value generated by SHA-256 has a length of 256 bits, which provides sufficient security to ensure the uniqueness and security of the authority identification. By using the SHA-256 algorithm, we can ensure that each unique input combination ( , and ) will generate a unique hash value as a permission identifier.
[0048] Specifically, S2 includes: acquiring a first dynamic identifier based on a second computing model, acquiring a second dynamic identifier based on the second computing model and the first dynamic identifier, and acquiring a third dynamic identifier based on the second computing model and the second dynamic identifier.
[0049] In this embodiment, it should be noted that the second calculation model is mainly used to generate a new dynamic identifier based on the permission model and the previous dynamic identifier. The generation of the dynamic identifier needs to take into account the user permissions, the content of the application information and the previous dynamic identifier to ensure the relevance of continuous change applications and the continuity of permission verification.
[0050] Specifically, the second calculation model can be expressed as:
[0051] ;in, is the new dynamic identifier, is the previous dynamic identifier, is the current timestamp, The information vector for the current change request. Design data for changes.
[0052] In this embodiment, it should be noted that It is a timestamp added when a new identifier is generated to ensure the uniqueness of each identifier and improve security; It is the current change application information vector, which may contain key information such as the content of the change, the applicant, and the application time; is the previous dynamic identifier. When the first dynamic identifier is generated, this value is empty or a preset initial value. Similarly, the above hash function calculation is performed.
[0053] Specifically, S3 includes: S31, using a hash table to store permission identifiers; S32, calculating a hash value of a third dynamic identifier; S33, using this hash value as an index to search for a corresponding permission identifier in the hash table; S34, obtaining a permission identifier that matches the third dynamic identifier, and obtaining hierarchical design data corresponding to the permission identifier.
[0054] In this embodiment, it should be noted that, in S31, a hash table is created to store permission identifiers and their associated hierarchical design data. A hash table is a data structure that uses a hash function to map a key (here, the permission identifier or its hash value) to a value (hierarchical design data or other related information); further, in S32, a hash value of the third dynamic identifier is calculated. This is usually to reduce the use of storage space, improve retrieval efficiency, and increase security. The hash function converts the third dynamic identifier into a hash value of a fixed length, which will be used as an index of the hash table; further, in S33, using the hash value calculated in the previous step, the system searches the hash table for the corresponding permission identifier. The design of the hash table makes this search process very fast, with a time complexity close to O(1), that is, the search time is basically independent of the amount of data; further, in S34, once a permission identifier that matches the hash value of the third dynamic identifier is found in the hash table, the system can retrieve the hierarchical design data associated with the permission identifier.
[0055] Specifically, S4 includes: S41, comparing the hierarchical design data obtained in S3 with the comprehensive change data to obtain overlapping data therebetween; S42, copying the overlapping data in the hierarchical design data to obtain new overlapping data, and replacing the new overlapping data with the comprehensive change data.
[0056] In this embodiment, it should be noted that in S41, the hierarchical design data previously retrieved from the hash table is compared with the comprehensive change data. The comprehensive change data may contain information that needs to be modified, added or deleted from the original design. Overlapping data refers to the part that exists in both the hierarchical design data and the comprehensive change data, that is, the data elements shared by both. These overlapping data may be design elements that need to be changed. Through comparison, the system can identify which data is overlapping, that is, which design elements appear in both the original design and the change request. In S42, when overlapping data is identified, the system will copy these overlapping data and create copies of them, called "new overlapping data". This is done to preserve the integrity of the original design data while allowing changes to be processed; next, the system will use the corresponding parts in the comprehensive change data to replace these new overlapping data, so that the original design data remains unchanged, and the new overlapping data reflects the changed state; this processing method allows the system to apply changes without destroying the original data, which is convenient for tracking change history, version control, and possible undo operations.
[0057] A dynamic change filing system for construction design data is also provided, the system comprising: a first processing module, used to obtain construction design data, and also used to classify the construction design data based on the authority model to obtain multiple hierarchical design data, and obtain authority identifiers corresponding to the multiple hierarchical design data and different from each other; a dynamic change module, used to obtain first change application information, and also used to obtain a first dynamic identifier based on the authority model, and also used to associate the first change application information with the first dynamic identifier; also used to obtain second change application information, and also used to integrate the second change application information with the first change application information into comprehensive change data, and also used to obtain the first dynamic identifier based on the authority model and the first dynamic identifier. The first dynamic identifier is used to obtain the second dynamic identifier associated with the comprehensive change data; it is also used to obtain the third change application information, and is also used to integrate the third change application information, the second change application information and the first change application information into the comprehensive change data, and is also used to obtain the third dynamic identifier associated with the comprehensive change data based on the authority model and the second dynamic identifier; a matching processing module is used to compare the third dynamic identifier with multiple authority identifiers, obtain the authority identifier that matches the third dynamic identifier, and is also used to obtain the hierarchical design data corresponding to the authority identifier; a change filing module is used to insert the comprehensive change data into the hierarchical design data obtained by the matching processing module.
[0058] Specifically, the matching processing module includes: an initialization unit, used to use a hash table to store the permission identifier; a calculation unit, used to calculate the hash value of the third dynamic identifier; an index unit, used to use this hash value as an index to find the corresponding permission identifier in the hash table, and an acquisition unit, used to obtain the permission identifier that matches the third dynamic identifier and obtain the hierarchical design data corresponding to the permission identifier.
[0059] Specifically, the change filing module includes: an overlapping comparison unit, which is used to compare the hierarchical design data obtained by S3 with the comprehensive change data to obtain overlapping data between the two; a full coverage unit, which is used to copy the overlapping data in the hierarchical design data and obtain new overlapping data, and replace the new overlapping data with the comprehensive change data.
[0060] Regarding the dynamic change filing system for construction design data in the above-mentioned embodiment, the specific method of executing the operation has been described in detail in the embodiment of the dynamic change filing method for construction design data, and will not be elaborated here.
[0061] Figure 4 1 is a block diagram of an electronic device for a construction design data dynamic change filing method according to an exemplary embodiment. Figure 4As shown, the electronic device 700 may include: a processor 701 , a memory 702 . The electronic device 700 may also include one or more of a multimedia component 703 , an input / output (I / O) interface 704 , and a communication component 705 .
[0062] The processor 701 is used to control the overall operation of the electronic device 700 to complete all or part of the steps in the above-mentioned construction design data dynamic change filing method. The memory 702 is used to store various types of data to support the operation of the electronic device 700. These data may include instructions for any application or method used to operate on the electronic device 700, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 702 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk. The multimedia component 703 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 702 or sent through the communication component 705. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 704 provides an interface between the processor 701 and other interface modules, and the other interface modules may be keyboards, mice, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 705 is used for wired or wireless communication between the electronic device 700 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G, 4G, NB-IOT, eMTC or other 5G, etc., or a combination of one or more of them, is not limited here. Therefore, the corresponding communication component 705 may include: Wi-Fi module, Bluetooth module, NFC module, etc.
[0063] In an exemplary embodiment, the electronic device 700 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned power control method.
[0064] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned power control method are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 702 including program instructions, and the above-mentioned program instructions can be executed by the processor 701 of the electronic device 700 to complete the above-mentioned power control method.
[0065] In another exemplary embodiment, a computer program product is further provided. The computer program product includes a computer program executable by a programmable device. The computer program has a code portion for executing the above power control method when executed by the programmable device.
[0066] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0067] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
[0068] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.
Claims
1. A method for dynamically changing the filing of construction design data, characterized in that: The method comprises: S1. Acquire construction design data, classify the construction design data based on the authority model, obtain a plurality of graded design data, and obtain authority identifiers corresponding to the plurality of graded design data and different from each other; S2. Obtain first change application information, obtain a first dynamic identifier based on the authority model, and associate the first change application information with the first dynamic identifier; Acquire second change application information, integrate the second change application information with the first change application information into comprehensive change data, and acquire a second dynamic identifier associated with the comprehensive change data based on the authority model and the first dynamic identifier; Acquire third change application information, integrate the third change application information, the second change application information and the first change application information into comprehensive change data, and acquire a third dynamic identifier associated with the comprehensive change data based on the authority model and the second dynamic identifier; S3, comparing the third dynamic identifier with multiple permission identifiers, obtaining a permission identifier that matches the third dynamic identifier, and obtaining hierarchical design data corresponding to the permission identifier; S4. Insert the comprehensive change data into the hierarchical design data obtained in S3.
2. The method for dynamically changing the construction design data according to claim 1, characterized in that: The permission model includes a first calculation model and a second calculation model, and S1 includes: The first calculation model is used to classify the construction design data to obtain a plurality of classified design data, and authority identifiers corresponding to the plurality of classified design data and different from each other are obtained.
3. The method for dynamically changing the construction design data according to claim 2, characterized in that: The first calculation model includes a first expression and a second expression; wherein, The first expression is: ,in, To design data for classification, For construction design data vector, is the grading standard mapping function; The second expression is: ,in, is the permission identifier, is a hash function, It is a summary of construction design data. A random salt value.
4. The method for dynamically changing the construction design data according to claim 3, characterized in that: The S2 includes: acquiring a first dynamic identifier based on a second calculation model, acquiring a second dynamic identifier based on the second calculation model and the first dynamic identifier, and acquiring a third dynamic identifier based on the second calculation model and the second dynamic identifier.
5. The method for dynamically changing the construction design data according to claim 4, characterized in that: The second calculation model can be expressed as: ;in, is the new dynamic identifier, is the previous dynamic identifier, is the current timestamp, The information vector for the current change request, Design data for changes.
6. The method for dynamically changing the construction design data according to claim 1, characterized in that: The S3 includes: S31, using a hash table to store permission identifiers; S32, calculating a hash value of the third dynamic identifier; S33, using the hash value as an index, searching for the corresponding permission identifier in the hash table; S34. Obtain an authority identifier that matches the third dynamic identifier, and obtain hierarchical design data corresponding to the authority identifier.
7. The method for dynamically changing the construction design data according to claim 1, characterized in that: The S4 includes: S41, comparing the hierarchical design data obtained in S3 with the comprehensive change data to obtain overlapping data of the two; S42, copying the overlapping data in the hierarchical design data to obtain new overlapping data, and replacing the new overlapping data with the comprehensive change data.
8. A dynamic change filing system for construction design data, characterized in that: The system is used to execute the dynamic change filing method for construction design data according to any one of claims 1 to 7, and the system includes: A first processing module is used to obtain construction design data, and is also used to classify the construction design data based on the authority model to obtain a plurality of graded design data, and obtain authority identifiers corresponding to the plurality of graded design data and different from each other; A dynamic change module, used to obtain first change application information, and also used to obtain a first dynamic identifier based on a permission model, and also used to associate the first change application information with the first dynamic identifier; also used to obtain second change application information, and also used to integrate the second change application information with the first change application information into comprehensive change data, and also used to obtain the second dynamic identifier associated with the comprehensive change data based on the permission model and the first dynamic identifier; also used to obtain third change application information, and also used to integrate the third change application information, the second change application information and the first change application information into comprehensive change data, and also used to obtain the third dynamic identifier associated with the comprehensive change data based on the permission model and the second dynamic identifier; a matching processing module, used to compare the third dynamic identifier with the plurality of authority identifiers, obtain an authority identifier that matches the third dynamic identifier, and also used to obtain hierarchical design data corresponding to the authority identifier; The change filing module is used to insert the comprehensive change data into the hierarchical design data obtained by the matching processing module.
9. The construction design data dynamic change filing system according to claim 8, characterized in that: The matching processing module includes: An initialization unit for storing permission identifiers using a hash table; A calculation unit, configured to calculate a hash value of the third dynamic identifier; An index unit is used to use the hash value as an index to find the corresponding permission identifier in the hash table; The acquisition unit is used to acquire the authority identification that matches the third dynamic identifier, and acquire the hierarchical design data corresponding to the authority identification.
10. The construction design data dynamic change filing system according to claim 8, characterized in that: The change filing module includes: An overlapping comparison unit, used for comparing the hierarchical design data obtained by S3 with the comprehensive change data to obtain overlapping data of the two; The full coverage unit is used to copy the overlapping data in the hierarchical design data and obtain new overlapping data, and replace the new overlapping data with the comprehensive change data.
Citation Information
Patent Citations
Operation method of database, and related equipment
CN108924101A
Method and device for determining identification model, electronic equipment and storage medium
CN111476375A
Object identification method and device based on dynamic graph
CN112559310A
Data security management method and system
CN113962808A
Dynamic contact list display
US20100330972A1