A water quality monitoring sampling device for deep water layer sampling
By using a floating base and a winding lifting assembly in the water quality monitoring and sampling equipment, combined with the design of counterweight soil and water inlet box, the rapid settlement of water samples and avoiding lifting loads is achieved, and the pulling overload of existing equipment is solved. The problem ensures the safety and efficiency of the sampling process.
Patent Information
- Application Number
- CN202410672245.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-05-28
AI Technical Summary
When the existing water quality monitoring and sampling equipment settles rapidly in the water body, the counterweight increases the lifting load of the sampling device after loading water, resulting in pulling overload and equipment damage.
A water quality monitoring and sampling equipment for deep water layer sampling was designed. The sampler was suspended on the water surface using a floating base and a winding lifting assembly. The water sample was driven into the water by placing weight soil and water inlet boxes in the sampling cylinder. The sampling cylinder is also deflected and the counterweight soil is driven to slide down to the horn cylinder, achieving rapid settlement and avoiding lifting loads.
The rapid settlement of the sampling cylinder is achieved, while avoiding the lifting load of the counterweight soil on the lifting rope when filling the water sample, preventing the pulling rope from being broken, ensuring the safety and efficiency of the sampling process.
Smart Images

Figure CN118482987B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water quality monitoring, and in particular to a water quality monitoring sampling device for sampling deep water layers. Background Art
[0002] Water quality monitoring is the process of monitoring and measuring the types of pollutants in water bodies, the concentrations of various pollutants and their changing trends, and evaluating the water quality. The monitoring scope is very wide, including unpolluted and polluted natural water and various industrial drainage. The main monitoring items can be divided into two categories: one is the comprehensive indicators reflecting the water quality, such as temperature, color, turbidity, pH value, conductivity, suspended solids, dissolved oxygen, chemical oxygen demand and biochemical oxygen demand; the other is some toxic substances, such as phenol, cyanide, arsenic, lead, chromium, cadmium, mercury and organic pesticides. In order to objectively evaluate the water quality of rivers and oceans, sampling equipment is needed to take water during the water quality monitoring process.
[0003] When sampling the deep water quality of a water body, a configuration block is generally configured on the sampling device to prompt the sampling device to quickly sink to the deep part of the water body for sampling. For example, CN216386431 U discloses a water quality monitoring sampling device, including a base, a waterproof box is fixedly connected to the top of one end of the base, a stepper motor is fixedly connected to the inside of the waterproof box, and two symmetrically arranged connecting frames are fixedly connected to the top of the base. A winding roller is rotatably connected between the two connecting frames, one end of the winding roller is fixedly connected to the output end of the stepper motor, and a rope is wound around the outside of the winding roller, one end of the rope is fixedly connected to a fixed frame, and the bottom of the fixed frame is fixedly connected to two symmetrically arranged counterweight boxes, and the bottom of the fixed frame is fixedly connected to the sampling box, which is extremely convenient to operate, effectively improves the efficiency of sampling, and meets people's needs. However, although the existing water quality monitoring sampling equipment can achieve the purpose of rapid sedimentation of the device after the counterweight is set, the counterweight increases the overall weight of the sampling device after taking water, which brings unnecessary load to the equipment for lifting the sampling device after filling water.
[0004] Therefore, a water quality monitoring sampling device for sampling deep water layers is introduced. Summary of the invention
[0005] The purpose of the present invention is to provide a water quality monitoring sampling equipment for deep water layer sampling, aiming to solve the problem in the above-mentioned background technology that when the existing water quality monitoring sampling equipment uses a counterweight to sink rapidly in the water body, the counterweight brings unnecessary load to the equipment when lifting the sampling device after filling with water.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a water quality monitoring sampling device for deep water layer sampling, comprising a floating platform base and an equipment cabin fixedly connected to the top of the middle plate of the floating platform base, the top of the equipment cabin is fixedly connected to a control box, a remote control antenna is fixedly connected to a corner of the top of the control box, the control box receives instructions through the remote control antenna to control the operation of the equipment, a winding and lifting assembly is fixedly connected to the bottom plate of the equipment cabin, and the winding and lifting assembly is fixedly connected to the sampler;
[0007] The sampler comprises a sampling tube fixedly connected to the winding and lifting assembly and a partition plate fixedly connected to the inner wall of the sampling tube, the partition plate divides the interior of the sampling tube into a first sampling chamber and a second sampling chamber adjacent to each other in upper and lower directions, a guide rod is fixedly connected to the middle between the upper and lower bottom plates of the first sampling chamber and the second sampling chamber, a buffer spring is fixedly connected to the lower end of the top plate of the first sampling chamber and the second sampling chamber outside the guide rod, a movable floating plate is fixedly connected to the lower end of the buffer spring, the movable floating plate is movably sleeved on the outer wall of the guide rod, and the second sampling chamber below the second sampling chamber is fixedly connected to the lower end of the top plate of the first sampling chamber and the second sampling chamber outside the guide rod. A deflection disc is movably arranged between the inner walls of the sampling tube, an adjusting slot is opened at the top on one side of the positioning axis of the deflection disc, a moving rod is movably engaged inside the adjusting slot, and after the top end of the moving rod movably passes through the bottom plate of the second sampling chamber, it is movably connected to the bottom of the moving float in the second sampling chamber, counterweight soil is placed on the top of the deflection disc away from the adjusting slot, and a water inlet box is fixedly connected to the side wall of the sampling tube on one side above the bottom plates of the first sampling chamber and the second sampling chamber, and a feeding pipe is fixedly connected to the side wall of the sampling tube on the side above the deflection disc.
[0008] Furthermore, a drainage valve tube is fixedly connected to the side wall of the sampling tube on the other side above the bottom plate of the first sampling chamber and the second sampling chamber, a horn is fixedly connected to the bottom of the sampling tube, and air holes are evenly spaced on the side wall at the connection between the sampling tube and the horn, and the air holes are arranged away from the water inlet box.
[0009] Furthermore, when the movable float is suspended adjacent to the water inlet box port, the buffer spring maintains a normal relaxation state. At this time, the deflection disc maintains a horizontal setting state, and the lower end of the movable rod is located at the end of the adjustment slot close to the center of the deflection disc.
[0010] Furthermore, a water inlet is provided on the outer wall of the water inlet box away from one end of the side wall of the sampling tube, and an L-shaped slot is fixedly connected to the inner wall of the water inlet box adjacent to the water inlet below the water inlet, and a sealing plate is movably engaged in the L-shaped slot, and a medicine storage tube is movably connected to the bottom of the water inlet box, and one-way water inlet filter holes are evenly spaced on the side wall of the medicine storage tube, and an air outlet pipe is fixedly connected to the outer wall of one side of the medicine storage tube near the bottom, a limiting cylinder is fixedly connected to the bottom plate of the water inlet box, an annular air cushion is fixedly connected to the bottom plate of the limiting cylinder, a counterweight pressure plate is fixedly connected to the top of the annular air cushion, an air guide hose is fixedly connected to the bottom of the annular air cushion, the air guide hose extends through and extends to the outside of the bottom plate of the water inlet box, and the end of the air guide hose is movably sleeved on the outer wall of the air outlet pipe port, a winding wheel is fixedly connected to the top of the limiting cylinder and the lower end of the top plate of the water inlet box, and an adjusting rope is fixedly connected to the top of the sealing plate, and after the adjusting rope is S-shaped and wound around the outside of the winding wheel, its end is fixedly connected to the side wall of the straight rod at the top of the counterweight pressure plate.
[0011] Furthermore, the winding and lifting assembly includes a portal frame fixedly connected to the bottom plate of the equipment cabin and a winding roller fixedly and movably arranged between the side walls of the portal frame, a lifting rope is wound around the outer wall of the winding roller, the lifting rope extends through and extends to the outside of the equipment cabin end shell, and guide wheels are fixedly connected to the outer walls of both sides of the equipment cabin end shell respectively, a positioning ring is fixedly connected to the side wall of the middle plate of the floating platform base between the guide wheels, the lifting rope outside the equipment cabin end shell is S-shaped and passes through the guide wheel and out of the positioning ring, and the bottom end of the lifting rope is fixedly connected to the top of the sampling tube.
[0012] Furthermore, an adjusting screw is movably arranged between the side walls of the portal frame above the winding roller, a moving block is movably sleeved on the outer wall of the adjusting screw, the top of the moving block is movably engaged with the through hole on the top plate of the portal frame, the bottom of the moving block is fixedly connected to a fixed suspension rod, the bottom of the end of the fixed suspension rod is fixedly connected to a limiting ring, the limiting ring is sleeved on the outside of the lifting rope, and a toggle plate is fixedly connected to the outer wall of the shaft rod at the end of the winding roller outside the side wall of one end of the portal frame, and a dot counter is fixedly connected to the outer wall of the portal frame adjacent to the toggle plate, and the dot counter is electrically connected to the control box.
[0013] Furthermore, the limit ring is a hollow structure with an installation cavity arranged inside it, a positioning rod is movably arranged on the bottom plate of the inner ring of the limit ring, an arc plate is fixedly connected to the top of the positioning rod, a spring rod is movably arranged on the top plate of the inner ring of the limit ring corresponding to the arc plate, a positioning clamp plate is fixedly connected to the bottom of the spring rod, the positioning clamp plate is suspended above the arc plate, and the bottom of the positioning clamp plate is evenly fixedly connected with limiting conical teeth, fixed pulleys are fixedly connected on the outer wall of the inner ring of the limit ring and the inner wall of the outer ring in the installation cavity, connecting ropes are fixedly connected on both sides of the bottom of the positioning rod extending into the installation cavity, and the connecting ropes are fixedly connected to the two sides of the top of the spring rod after passing through the fixed pulley.
[0014] Furthermore, pushing members are provided on the side walls at the tail ends of both sides of the floating platform base, and a heat dissipation support plate is fixedly connected to the outer wall of the control box on the same side of the pushing members. A heat dissipation channel connected to the control box and the equipment compartment is provided inside the heat dissipation support plate, and the top end of the heat dissipation channel extends and is suspended above the heat dissipation support plate, and a photovoltaic panel is fixedly connected to the top of the heat dissipation support plate.
[0015] Furthermore, the pushing member includes a rotating shaft that movably passes through the tail side walls on both sides of the floating platform base and a propeller fixedly connected to the end of the rotating shaft. The tail side walls on both sides of the floating platform base outside the propeller are respectively fixedly connected to isolation cylinders, and water-permeable holes are spaced apart on the side walls of the isolation cylinders.
[0016] Furthermore, an annular groove is provided on the outer wall of one side of the fixed end of the isolation cylinder, and an adjusting tooth ring is movably engaged in the annular groove, a first gear is fixedly connected to the outer wall of the rotating shaft corresponding to the adjusting tooth ring, and a second gear is movably provided on the side walls of the tail part of the floating platform base on both sides above the first gear, the lower end of the second gear is meshed with the first gear, and the top end of the second gear extends through the annular groove, and the top end of the second gear is meshed with the inner teeth of the adjusting tooth ring, and reinforcing rods are fixedly connected to the upper and lower end side walls of the adjusting tooth ring away from the floating platform base, the reinforcing rods are arranged to fit the outer wall of the isolation cylinder, and a mounting ring is fixedly connected to the end of the reinforcing rod, the mounting ring is movably sleeved on the outside of the isolation cylinder, and crushing cutter heads are fixedly connected to the outer wall of the mounting ring at even intervals.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] The present invention provides a water quality monitoring sampling device for deep water layer sampling. Through the cooperation of a floating platform base and a winding and lifting component, the sampler is suspended on the water surface to lift and collect water samples. Based on the weight of the counterweight soil placed on the sampling tube inside the sampling tube, the sampling tube is prompted to sink rapidly in the water body. After reaching the water layer of a specified depth, the water inlet box is opened under the push of the gas generated by the reaction of water and powder, so that the water sample flows into the inner cavity of the sampling tube for storage. While the water sample flows in, based on the cooperation of the moving float plate and the moving rod, the deflection disk is driven to deflect, so that the counterweight soil on the top of the deflection disk automatically slides into the horn tube and is deposited to the bottom of the water as it contacts the water flow. While achieving the purpose of rapid sinking of the sampling tube, it avoids the load on the lifting rope to lift the sampling tube caused by the weight of the counterweight soil when the sampling tube is full of water samples, and prevents the lifting rope from being overloaded and broken. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0020] Figure 2 It is a schematic diagram of the installation structure of the winding lifting assembly and the sampler of the present invention;
[0021] Figure 3 It is a schematic diagram of the installation structure of the winding roller, the shifting plate and the dot counter of the present invention;
[0022] Figure 4 It is a schematic diagram of the cross-sectional structure of the sampler of the present invention;
[0023] Figure 5 It is a schematic diagram of the assembly structure of the deflection disc, the partition plate and the movable floating plate of the present invention;
[0024] Figure 6 It is a schematic diagram of the structure of the water inlet box of the present invention;
[0025] Figure 7 It is a schematic diagram of the structure of the limiting ring of the present invention;
[0026] Figure 8 It is a schematic diagram of the structure of the push member of the present invention;
[0027] Fig. 9 It is a schematic cross-sectional structural diagram of a push member of the present invention.
[0028] In the figure: 1, floating platform base; 2, equipment cabin; 3, control box; 4, remote control antenna; 5, winding and lifting assembly; 51, door frame; 52, winding roller; 53, lifting rope; 54, adjusting screw rod; 55, moving block; 56, fixed suspension rod; 57, limiting ring; 571, installation cavity; 572, positioning rod; 573, arc plate; 574, spring rod; 575, positioning splint; 576, limiting bevel gear; 577, fixed pulley; 578, connecting rope; 58, toggle plate; 59, dot counter; 6, guide wheel; 7, positioning ring; 8, sampler; 81, sampling tube; 811, partition plate; 812, first sampling cavity; 813, second sampling cavity; 814, drainage valve pipe; 815, horn; 82, guide rod; 83, buffer spring Spring; 84, mobile float; 85, deflection disc; 851, adjustment slide; 86, moving rod; 87, counterweight soil; 88, water inlet box; 8801, water inlet; 8802, L-shaped slot; 8803, sealing plate; 881, medicine storage tube; 882, one-way water inlet filter hole; 883, air outlet pipe; 884, limit cylinder; 885, annular air cushion; 886, counterweight pressure plate; 887, air guide hose; 888, adjustment rope; 89, feeding pipe; 9, pushing member; 91, rotating shaft; 92, propeller; 93, isolation cylinder; 931, water permeable hole; 932, annular groove; 94, adjustment gear ring; 95, first gear; 96, second gear; 97, reinforcing rod; 98, mounting ring; 99, crushing cutter head; 10, heat dissipation support plate; 11, photovoltaic panel. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figure 1 and Figure 2 A water quality monitoring sampling device for deep water layer sampling comprises a floating platform base 1 and an equipment cabin 2 fixedly connected to the top of the middle plate of the floating platform base 1, the top of the equipment cabin 2 is fixedly connected to a control box 3, the control box 3 is provided with existing system components such as a control microcomputer, a power module, a drive execution module, a data processing module, a power distribution module and a calculation module, the equipment is driven to move on the water surface by receiving remote control instructions, and the sampling equipment is automatically lifted and lowered to perform deep water layer water quality sampling activities, a remote control antenna 4 is fixedly connected at a corner of the top of the control box 3, and the control box 3 receives instructions through the remote control antenna 4 to control the operation of the equipment, a pusher 9 is provided on the side wall at the tail of both sides of the floating platform base 1, and a heat dissipation support plate 10 is fixedly connected to the outer wall of the control box 3 on the same side of the pusher 9, a heat dissipation channel connected to the control box 3 and the equipment cabin 2 is provided inside the heat dissipation support plate 10, the top end of the heat dissipation channel extends and is suspended above the heat dissipation support plate 10, and a photovoltaic panel 11 is fixedly connected to the top of the heat dissipation support plate 10, and the photovoltaic panel 11 is electrically connected to the control box 3.
[0031] In order to solve the problem that the existing water quality monitoring sampling equipment uses a counterweight to quickly settle in the water body, the counterweight will bring unnecessary load to the equipment when pulling the sampling device after filling with water. Figure 1-Figure 5 , provide the following preferred technical solutions:
[0032] A winding and lifting assembly 5 is fixedly connected to the bottom plate of the equipment cabin 2, and the winding and lifting assembly 5 is fixedly connected to the sampler 8; the winding and lifting assembly 5 includes a door frame 51 fixedly connected to the bottom plate of the equipment cabin 2 and a winding roller 52 fixedly and movably arranged between the side walls of the door frame 51, one end of the winding roller 52 is connected to the driving motor, and a lifting rope 53 is wound around the outer wall of the winding roller 52, and the lifting rope 53 extends through and extends to the outside of the end shell of the equipment cabin 2, and guide wheels 6 are fixedly connected to the outer walls of the end shell of the equipment cabin 2 on both sides, and a positioning ring 7 is fixedly connected to the side wall of the middle plate of the floating platform base 1 between the guide wheels 6. The lifting rope 53 outside the end shell of the equipment cabin 2 is S-shaped and passes through the guide wheel 6 and passes through the positioning ring 7. The bottom end of the lifting rope 53 is fixedly connected to the top of the sampling tube 81, and the lifting rope 53 controls the sedimentation depth of the sampling tube 81 by winding and releasing it through the winding roller 52.
[0033] An adjusting screw rod 54 is movably provided between the side walls of the portal frame 51 above the winding roller 52, one end of which is connected to the driving motor, and a moving block 55 is movably sleeved on the outer wall of the adjusting screw rod 54, the top of which is movably engaged in the through hole on the top plate of the portal frame 51, and a fixed suspension rod 56 is fixedly connected to the bottom of the moving block 55, and a limit ring 57 is fixedly connected to the bottom of the end of the fixed suspension rod 56, and the limit ring 57 is sleeved on the outside of the lifting rope 53, and a toggle plate 58 is fixedly connected to the outer wall of the shaft rod at the end of the winding roller 52 outside the side wall of one end of the portal frame 51, and a dot counter 59 is fixedly connected to the outer wall of the portal frame 51 adjacent to the toggle plate 58, and the dot counter 59 is electrically connected to the control box 3, and the number of revolutions of the winding roller 52 is calculated by the dot counter 59, and the winding and unwinding length of the lifting rope 53 is calculated and monitored in combination with the circumference of the winding roller 52.
[0034] The sampler 8 includes a sampling tube 81 fixedly connected to the winding and lifting assembly 5 and a partition plate 811 fixedly connected to the inner wall of the sampling tube 81, the partition plate 811 divides the interior of the sampling tube 81 into a first sampling chamber 812 and a second sampling chamber 813 adjacent to each other in upper and lower directions, a one-way exhaust pipe is arranged on the side walls of the first sampling chamber 812 and the second sampling chamber 813 near the top plate, a guide rod 82 is fixedly connected to the middle part between the upper and lower bottom plates of the first sampling chamber 812 and the second sampling chamber 813, a buffer spring 83 is fixedly connected to the lower end of the top plate of the first sampling chamber 812 and the second sampling chamber 813 outside the guide rod 82, a movable floating plate 84 is fixedly connected to the lower end of the buffer spring 83, the movable floating plate 84 is movably sleeved on the outer wall of the guide rod 82, and the second sampling chamber 812 and the second sampling chamber 813 are fixedly connected to the lower end of the top plate of the first sampling chamber 812 and the second sampling chamber 813. A deflection disc 85 is movably arranged between the inner walls of the sampling tube 81 below the sample cavity 813, and an adjusting slot 851 is provided at the top on one side of the positioning axis of the deflection disc 85. A moving rod 86 is movably engaged inside the adjusting slot 851. After the top end of the moving rod 86 movably passes through the bottom plate of the second sampling cavity 813, it is movably connected to the bottom of the moving float 84 in the second sampling cavity 813. Counterweight soil 87 is placed on the top of the deflection disc 85 away from the adjusting slot 851, and a water inlet box 88 is fixedly connected to the side walls of the sampling tube 81 on one side above the bottom plates of the first sampling cavity 812 and the second sampling cavity 813, respectively. A feeding pipe 89 is fixedly connected to the side wall of the sampling tube 81 on the side above the deflection disc 85, and a sealing cap is threadedly connected to the outer wall of the feeding pipe 89 port.
[0035] Drain valve pipe 814 is fixedly connected to the side wall of the sampling tube 81 on the other side above the bottom plate of the first sampling chamber 812 and the second sampling chamber 813, respectively, and a horn 815 is fixedly connected to the bottom of the sampling tube 81. The tip of the horn 815 is set to reduce the water resistance of the sampling tube 81 when it sinks. After the counterweight soil 87 sinks into the horn 815, it is discharged from the port at its bottom, maintaining a distance from the port of the water inlet box 88 to prevent muddy water from entering the port of the water inlet box 88 after the counterweight soil 87 sinks. Air holes are evenly spaced on the side walls of the connection between the sampling tube 81 and the horn 815, and the air holes are set away from the water inlet box 88; when the movable float 84 is suspended adjacent to the upper side of the water inlet box 88 port, the buffer spring 83 maintains a normal relaxation state. At this time, the deflection disc 85 maintains a horizontal setting state, and the lower end of the moving rod 86 is located at the end of the adjusting slide groove 851 close to the center of the deflection disc 85.
[0036] Specifically, the device is placed on the water surface of the detection area, a certain amount of counterweight soil 87 is obtained from the field, the crushed counterweight soil 87 is placed on the top of the deflection disc 85 from the feeding pipe 89 and then sealed, and the control box 3 is given an operation instruction through the remote control, and the control box 3 controls the device to automatically swim to the sampling operation point on the water surface and hover, and the lifting rope 53 is released by the winding roller 52, and the counterweight soil 87 is pulled by gravity, so that the sampling tube 81 at the bottom of the lifting rope 53 sinks to the depth of the water body. After the sampling tube 81 reaches the sampling depth, the lifting rope 53 is stopped to make the sampling tube 81 suspended in the water body at the specified depth, and the water inlet box 88 is opened. The water body to be sampled enters the first sampling cavity 812 and the second sampling cavity 813 of the sampling tube 81 from the port of the water inlet box 88, so as to synchronously collect and sample the water bodies at different layers at the specified depth. After the sampled water body enters the first sampling cavity 812 and the second sampling cavity 813, the mobile floating plate 84 is impacted by the buoyancy of the water body and moves upward along the guide rod 82. The floating plate 84 moves upward and compresses the buffer spring 83, and the moving rod 86 moves upward at the same time. When the moving rod 86 moves upward, its bottom slides along the adjusting slot 851 toward the edge of the deflection disc 85, and drives the deflection disc 85 to deflect, so that the counterweight soil 87 on the top of the deflection disc 85 automatically slides into the horn 815, and is deposited on the bottom of the water when it contacts the water flow. After the first sampling chamber 812 and the second sampling chamber 813 are filled with water samples, the water inlet box 88 is automatically closed, and the winding roller 52 is used to collect the water sample. The water sample stored in the sampling tube 81 can be pulled up by winding the lifting rope 53, and the remote control device can obtain the water sample by swimming to the shore. The counterweight soil 87 is automatically slid down and sunk to the bottom of the water by filling the first sampling chamber 812 and the second sampling chamber 813 with water, thereby achieving the purpose of rapid sinking of the sampling tube 81 and avoiding the load on the lifting rope 53 caused by the weight of the counterweight soil 87 when the sampling tube 81 is full of water samples, thereby preventing the lifting rope 53 from being overloaded and broken.
[0037] Furthermore, in order to ensure the accuracy of deep water sample extraction by the sampling tube 81, Figure 2 and Figure 6 As shown, this embodiment provides the following technical solutions:
[0038] A water inlet 8801 is provided on the outer wall of the water inlet box 88 away from the side wall of the sampling tube 81, an L-shaped slot 8802 is fixedly connected to the inner wall of the water inlet box 88 adjacent to the water inlet 8801, a sealing plate 8803 is movably engaged in the L-shaped slot 8802, a medicine storage tube 881 is movably connected to the bottom of the water inlet box 88, one-way water inlet filter holes 882 are evenly spaced on the side wall of the medicine storage tube 881, an air outlet pipe 883 is fixedly connected to the outer wall of one side of the medicine storage tube 881 near the bottom, a limiting cylinder 884 is fixedly connected to the bottom plate of the limiting cylinder 884, an annular air cushion 885 is fixedly connected to the bottom plate of the limiting cylinder 884, and a counterweight pressure plate 88 is fixedly connected to the top of the annular air cushion 885 6. The counterweight plate 886 is suspended a certain distance above the annular air cushion 885 by a block to form a transfer space. After reaching the water layer at a specified depth, the counterweight plate 886 is controlled to move upward. An air guide hose 887 is fixedly connected to the bottom of the annular air cushion 885. The air guide hose 887 extends through and extends to the outside of the bottom plate of the water inlet box 88, and the end of the air guide hose 887 is movably clamped on the outer wall of the port of the air outlet pipe 883. The top of one side of the limiting cylinder 884 and the lower end of the top plate of the water inlet box 88 are fixedly connected to the winding wheel, and the top of the sealing plate 8803 is fixedly connected to the adjusting rope 888. After the adjusting rope 888 is passed through the outside of the winding wheel in an S shape, its end is fixedly connected to the side wall of the straight rod at the top of the counterweight plate 886.
[0039] Specifically, when the sampling tube 81 is immersed in water, the sealing plate 8803 is engaged in the L-shaped slot 8802 under the action of gravity to block the water inlet 8801 and prevent water samples of non-specified depths from entering the sampling tube 81. During the sedimentation process of the sampling tube 81, water slowly penetrates into the interior through the one-way water inlet filter hole 882 on the side wall of the medicine storage tube 881, and the water slowly contacts the powder in the medicine storage tube 881 to generate gas. The gas is filled into the annular air cushion 885 through the gas guide hose 887, and the annular air cushion 885 is automatically inflated slowly. After the sampling tube 81 sinks to the designated location in the deep water layer and waits for a certain period of time, the annular air cushion 885 is filled with slow gas, thereby lifting the counterweight pressure plate 886 to slide toward the top port of the limit tube 884, and the counterweight pressure plate 886 moves up, driving the adjustment rope 888 based on the winding wheel The sealing plate 8803 is pulled upward to automatically release the sealing plate 8803 from the water inlet 8801, allowing the water sample to flow into the sampling tube 81 from the water inlet 8801. While the sampling tube 81 is filled with water samples, the gas in the medicine storage tube 881 continuously flows into the annular air cushion 885. Restricted by the port block of the limiting tube 884 and the counterweight pressure plate 886, the gas in turn prompts the air guide hose 887 to detach from the socket of the air outlet pipe 883. Under the action of gravity, the counterweight pressure plate 886 squeezes the annular air cushion 885 downward to deflate, so that the sealing plate 8803 automatically moves down and resets under the drive of gravity, and automatically seals the water inlet 8801 again, thereby preventing water samples from non-specified deep water layers from mixing into the sampling tube 81 when the sampling tube 81 moves upward, thereby ensuring the purity and accuracy of the water sample collection at the guiding depth, and being easy to use.
[0040] like Figure 2 , Figure 4 and Figure 7 As shown, in order to prevent the lifting rope 53 from affecting the winding and tightening effect of the winding roller 52 when it is loose, this embodiment provides the following technical solutions:
[0041] The limiting ring 57 is a hollow structure with an installation cavity 571 provided inside. A positioning rod 572 is movably provided on the bottom plate of the inner ring of the limiting ring 57. An arc plate 573 is fixedly connected to the top of the positioning rod 572. A spring rod 574 is movably provided on the top plate of the inner ring of the limiting ring 57 corresponding to the arc plate 573. A positioning clamping plate 575 is fixedly connected to the bottom of the spring rod 574. The positioning clamping plate 575 is suspended above the arc plate 573, and the bottom of the positioning clamping plate 575 is evenly spaced and fixedly connected to limiting bevel teeth 576. Fixed pulleys 577 are fixedly connected on the outer wall of the inner ring and the inner wall of the outer ring of the limiting ring 57 in the installation cavity 571. Connecting ropes 578 are fixedly connected to the two sides of the bottom of the positioning rod 572 extending into the installation cavity 571. After the connecting rope 578 passes through the fixed pulley 577, the ends are fixedly connected to the two sides of the top of the spring rod 574.
[0042] Specifically, when sampling water quality, the sampling tube 81 is immersed in the center to drag the lifting rope 53. Under the action of gravity, the lifting rope 53 squeezes the arc plate 573 downward, so that the positioning rod 572 moves downward and slides into the installation cavity 571. When the positioning rod 572 moves downward, it drives the connecting rope 578 to stretch the spring rod 574. The spring rod 574 slides upward under the traction, so that the positioning clamping plate 575 at the bottom of the spring rod 574 is separated from the lifting rope 53, and the limiting cone tooth 576 at the bottom of the positioning clamping plate 575 is automatically released to prevent the lifting rope 53 from being pulled upward. The pressure of the lowering rope 53 is limited, and the lifting rope 53 can smoothly raise and lower the sampling tube 81 driven by the winding roller 52. When the sampling tube 81 is not in use and placed on the floating platform base 1, the lifting rope 53 is in a relaxed state and loses the downward pressure on the arc plate 573. The spring rod 574 automatically moves down and resets under the action of its own spring to push the limiting bevel tooth 576 at the bottom of the positioning clamp 575 to squeeze the lifting rope 53, thereby preventing the lifting rope 53 from being excessively relaxed and causing the winding misalignment on the winding roller 52 and affecting normal use.
[0043] like Figure 1 , Figure 8 and Fig. 9 As shown, in order to prevent debris and aquatic plants in the water from affecting the movement of the equipment, this implementation provides the following technical solutions:
[0044] The pushing member 9 includes a rotating shaft 91 that is movably arranged to penetrate the side walls at the rear of both sides of the floating platform base 1 and a propeller 92 that is fixedly connected to the end of the rotating shaft 91. One end of the rotating shaft 91 is connected to a rotating motor inside the floating platform base 1. Isolation cylinders 93 are fixedly connected to the side walls at the rear of both sides of the floating platform base 1 outside the propeller 92. Water-permeable holes 931 are spaced apart on the side walls of the isolation cylinder 93.
[0045] An annular groove 932 is provided on the outer wall of one side of the fixed end of the isolation cylinder 93, and an adjusting toothed ring 94 is movably engaged in the annular groove 932. A first gear 95 is fixedly connected to the outer wall of the rotating shaft 91 corresponding to the adjusting toothed ring 94. A second gear 96 is movably provided on the side walls of the tail part of the floating platform base 1 on both sides above the first gear 95. The lower end of the second gear 96 is meshed with the first gear 95, and the top end of the second gear 96 extends through the annular groove 932, and the top end of the second gear 96 is meshed with the inner teeth of the adjusting toothed ring 94. Reinforcing rods 97 are fixedly connected to the upper and lower end side walls of the adjusting toothed ring 94 away from the floating platform base 1, respectively. The reinforcing rod 97 is arranged to fit the outer wall of the isolation cylinder 93, and a mounting ring 98 is fixedly connected to the end of the reinforcing rod 97. The mounting ring 98 is movably sleeved on the outside of the isolation cylinder 93, and crushing cutter heads 99 are fixedly connected to the outer wall of the mounting ring 98 at uniform intervals.
[0046] Specifically, when the floating platform base 1 is suspended on the water surface, the isolation cylinder 93 is completely immersed in the water, and the rotating shaft 91 drives the propeller 92 in the isolation cylinder 93 to rotate, so as to push the floating platform base 1 to slide forward on the water surface. By adjusting the speed of the rotating motors on both sides of the floating platform base 1, the speed difference of the propeller 92 pushing the floating platform base 1 forward is used to realize left and right turns. When the propeller 92 pushes the water inside the isolation cylinder 93 to spray out from its port to push the floating platform base 1 forward in the reverse direction, the water outside the isolation cylinder 93 enters from the water permeable hole 931 to supplement, and the isolation cylinder 93 is used to push the propeller 92 to push the floating platform base 1 forward. The propeller 92 is isolated to prevent suspended debris in the water from entangled with the propeller 92 and affecting the movement of the equipment. When the rotating shaft 91 rotates, the first gear 95 and the second gear 96 are engaged, so that the second gear 96 pushes the adjusting gear ring 94 to rotate synchronously in the annular groove 932 on the outer wall of the isolation tube 93. The adjusting gear ring 94 drives the mounting ring 98 to rotate at the port of the isolation tube 93 based on the reinforcing rod 97, so as to push the crushing cutter head 99 to rotate, strike and crush the water plants and other debris at the port of the isolation tube 93 to prevent them from being drawn into the isolation tube 93 and interfering with the propeller 92.
[0047] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0048] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the invention, and the scope of the invention is defined by the appended claims and their equivalents.
Claims
1. A water quality monitoring sampling device for sampling deep water layers, comprising a floating platform base (1) and an equipment cabin (2) fixedly connected to the top of the middle plate of the floating platform base (1), the top of the equipment cabin (2) is fixedly connected to a control box (3), a remote control antenna (4) is fixedly connected at one corner of the top of the control box (3), and the control box (3) receives instructions through the remote control antenna (4) to control the operation of the device, characterized in that: A winding and lifting assembly (5) is fixedly connected to the bottom plate of the equipment cabin (2), and the winding and lifting assembly (5) is fixedly connected to the sampler (8); The sampler (8) comprises a sampling tube (81) fixedly connected to the winding and lifting assembly (5) and a partition plate (811) fixedly connected to the inner wall of the sampling tube (81); the partition plate (811) divides the interior of the sampling tube (81) into a first sampling chamber (812) and a second sampling chamber (813) adjacent to each other in upper and lower directions; a guide rod (82) is fixedly connected at the middle between the upper and lower bottom plates of the first sampling chamber (812) and the second sampling chamber (813); and a buffer is fixedly connected at the lower end of the top plate of the first sampling chamber (812) and the second sampling chamber (813) outside the guide rod (82). The spring (83) and the lower end of the buffer spring (83) are fixedly connected with a movable floating plate (84), and the movable floating plate (84) is movably sleeved on the outer wall of the guide rod (82). A deflection disc (85) is movably arranged between the inner wall of the sampling tube (81) below the second sampling cavity (813), and an adjustment slide groove (851) is provided on the top of the deflection disc (85) on one side of the positioning axis. A movable rod (86) is movably engaged inside the adjustment slide groove (851). After the top end of the movable rod (86) movably passes through the bottom plate of the second sampling cavity (813), it is movably connected to the movable floating plate in the second sampling cavity (813). A counterweight soil (87) is placed on the bottom of the plate (84) and the top of the deflection disc (85) away from the regulating chute (851). A water inlet box (88) is fixedly connected to the side wall of the sampling tube (81) on one side above the bottom plate of the first sampling chamber (812) and the second sampling chamber (813). A feeding pipe (89) is fixedly connected to the side wall of the sampling tube (81) on one side above the deflection disc (85). A drainage valve pipe (814) is fixedly connected to the side wall of the sampling tube (81) on the other side above the bottom plate of the first sampling chamber (812) and the second sampling chamber (813). The bottom of the tube (81) is fixedly connected with a horn (815), and the side wall of the connection between the sampling tube (81) and the horn (815) is evenly spaced with air holes, and the air holes are arranged away from the water inlet box (88). When the movable floating plate (84) moves upward, it drives the movable rod (86) to move upward. When the movable rod (86) moves upward, its bottom slides along the adjustment slide groove (851) toward the edge of the deflection disc (85), and drives the deflection disc (85) to deflect, so that the counterweight soil (87) on the top of the deflection disc (85) automatically slides into the horn (815) and is deposited to the bottom of the water when it contacts the water flow.
2. A water quality monitoring sampling device for deep water layer sampling as claimed in claim 1, characterized in that: When the movable floating plate (84) is suspended adjacent to the upper end of the water inlet box (88), the buffer spring (83) maintains a normal relaxed state. At this time, the deflection disc (85) maintains a horizontal setting state, and the lower end of the movable rod (86) is located at the end of the regulating slide groove (851) close to the center of the deflection disc (85).
3. The water quality monitoring sampling equipment for deep water layer sampling according to claim 1, characterized in that: The water inlet box (88) is provided with a water inlet (8801) on the outer wall of one end away from the side wall of the sampling tube (81); an L-shaped slot (8802) is fixedly connected to the inner wall of the water inlet box (88) below the water inlet (8801); a sealing plate (8803) is movably engaged in the L-shaped slot (8802); a medicine storage tube (881) is movably connected to the bottom of the water inlet box (88); one-way water inlet filter holes (882) are evenly spaced on the side wall of the medicine storage tube (881); an air outlet pipe (883) is fixedly connected to the outer wall of one side of the medicine storage tube (881) near the bottom; a limiting tube (884) is fixedly connected to the bottom plate of the water inlet box (88); a sealing plate (884) is movably engaged in the L-shaped slot (8802); a medicine storage tube (881) is movably connected to the bottom of the water inlet box (88); one-way water inlet filter holes (882) are evenly spaced on the side wall of the medicine storage tube (881); an air outlet pipe (883) is fixedly connected to the bottom plate of the water inlet box (88); a limiting tube (884) is fixedly connected to the bottom plate of the limiting tube (884); An annular air cushion (885) is fixedly connected, a counterweight pressure plate (886) is fixedly connected to the top of the annular air cushion (885), an air guide hose (887) is fixedly connected to the bottom of the annular air cushion (885), the air guide hose (887) extends through and extends to the outside of the bottom plate of the water inlet box (88), and the end of the air guide hose (887) is movably sleeved on the outer wall of the port of the air outlet pipe (883), the top of one side of the limiting cylinder (884) and the lower end of the top plate of the water inlet box (88) are fixedly connected to a winding wheel, and an adjusting rope (888) is fixedly connected to the top of the sealing plate (8803), and the adjusting rope (888) is S-shaped and passed through the outside of the winding wheel, and the end of the adjusting rope is fixedly connected to the side wall of the straight rod at the top of the counterweight pressure plate (886).
4. The water quality monitoring sampling equipment for deep water layer sampling according to claim 1, characterized in that: The winding and lifting assembly (5) comprises a door frame (51) fixedly connected to the bottom plate of the equipment cabin (2) and a winding roller (52) fixedly and movably arranged between the side walls of the door frame (51); a lifting rope (53) is wound around the outer wall of the winding roller (52); the lifting rope (53) extends through and extends to the outside of the end shell of the equipment cabin (2); guide wheels (6) are fixedly connected to the outer walls of the end shell of the equipment cabin (2) on both sides; a positioning ring (7) is fixedly connected to the side wall of the middle plate of the floating platform base (1) between the guide wheels (6); the lifting rope (53) outside the end shell of the equipment cabin (2) is S-shaped and passes through the guide wheel (6) and passes through the positioning ring (7); the bottom end of the lifting rope (53) is fixedly connected to the top of the sampling tube (81).
5. A water quality monitoring sampling device for deep water layer sampling as claimed in claim 4, characterized in that: An adjusting screw rod (54) is movably arranged between the side walls of the portal frame (51) above the winding roller (52), a moving block (55) is movably sleeved on the outer wall of the adjusting screw rod (54), the top of the moving block (55) is movably engaged in a through hole on the top plate of the portal frame (51), the bottom of the moving block (55) is fixedly connected to a fixed suspension rod (56), the bottom of the end of the fixed suspension rod (56) is fixedly connected to a limiting ring (57), the limiting ring (57) is sleeved on the outside of the lifting rope (53), and a toggle plate (58) is fixedly connected to the outer wall of the shaft rod at the end of the winding roller (52) outside the side wall of one end of the portal frame (51), and a dot counter (59) is fixedly connected to the outer wall of the portal frame (51) adjacent to the toggle plate (58), and the dot counter (59) is electrically connected to the control box (3).
6. A water quality monitoring sampling device for deep water layer sampling as claimed in claim 5, characterized in that: The limiting ring (57) is a hollow structure, and an installation cavity (571) is arranged inside the limiting ring (57). A positioning rod (572) is movably arranged on the inner ring bottom plate of the limiting ring (57). The top of the positioning rod (572) is fixedly connected with an arc plate (573). A spring rod (574) is movably arranged on the inner ring top plate of the limiting ring (57) at a position corresponding to the arc plate (573). The bottom of the spring rod (574) is fixedly connected with a positioning clamping plate (575). The positioning clamping plate (575) is suspended on the arc plate. (573), and the bottom of the positioning clamp (575) is evenly spaced and fixedly connected with limiting bevel teeth (576), the inner ring outer wall and the outer ring inner wall of the limiting ring (57) in the installation cavity (571) are fixedly connected with fixed pulleys (577), and the bottom two sides of the positioning rod (572) extending into the installation cavity (571) are respectively fixedly connected with connecting ropes (578), and the ends of the connecting ropes (578) are fixedly connected to the two sides of the top of the spring rod (574) after passing through the fixed pulleys (577).
7. The water quality monitoring sampling equipment for deep water layer sampling according to claim 1, characterized in that: Pushing members (9) are arranged on the side walls at the tail ends of both sides of the floating platform base (1); a heat dissipation support plate (10) is fixedly connected to the outer wall of the control box (3) on the same side as the pushing member (9); a heat dissipation channel connected to the control box (3) and the equipment compartment (2) is arranged inside the heat dissipation support plate (10); the top end of the heat dissipation channel extends and is suspended above the heat dissipation support plate (10); and a photovoltaic panel (11) is fixedly connected to the top of the heat dissipation support plate (10).
8. The water quality monitoring sampling equipment for deep water layer sampling according to claim 7, characterized in that: The pushing member (9) comprises a rotating shaft (91) movably penetrating the side walls at the rear of both sides of the floating platform base (1) and a propeller (92) fixedly connected to the end of the rotating shaft (91); isolation cylinders (93) are respectively fixedly connected to the side walls at the rear of both sides of the floating platform base (1) outside the propeller (92); and water-permeable holes (931) are spaced apart on the side walls of the isolation cylinder (93).
9. A water quality monitoring sampling device for deep water layer sampling as claimed in claim 8, characterized in that: An annular groove (932) is provided on the outer wall of one side of the fixed end of the isolation cylinder (93), and an adjusting toothed ring (94) is movably engaged in the annular groove (932). A first gear (95) is fixedly connected to the outer wall of the rotating shaft (91) corresponding to the adjusting toothed ring (94). A second gear (96) is movably provided on the side walls of the rear part of both sides of the floating platform base (1) above the first gear (95). The lower end of the second gear (96) is meshed with the first gear (95), and the top end of the second gear (96) extends through the annular groove (932). In the groove (932), the top end of the second gear (96) meshes with the inner teeth of the adjusting toothed ring (94), and the upper and lower end side walls of the adjusting toothed ring (94) away from the floating platform base (1) are respectively fixedly connected with reinforcing rods (97), the reinforcing rod (97) is arranged in close contact with the outer wall of the isolation tube (93), and the end of the reinforcing rod (97) is fixedly connected with a mounting ring (98), the mounting ring (98) is movably sleeved on the outside of the isolation tube (93), and crushing cutter heads (99) are evenly spaced and fixedly connected to the outer wall of the mounting ring (98).
