Cloud-based CNC equipment management system and method

By introducing methods such as Bayesian networks, Markov random fields, and Lagrangian relaxation techniques into the CNC equipment management system, the deficiencies of the existing system in risk management, resource allocation, and energy consumption management have been solved, and a better solution has been achieved. Efficient risk assessment, resource optimization and energy consumption control improve production efficiency and energy utilization efficiency.

CN118485311BActive Publication Date: 2024-10-01NANTONG GEMEI IND CNC EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410926037.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-01
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

The existing CNC equipment management system lacks quantitative probability analysis capabilities in risk management and resource allocation decision-making, making it difficult to make optimal resource allocation in complex production lines, and there is a lack of refined adjustment in equipment energy consumption management.

Method used

Adopting a cloud-based CNC equipment management system, including equipment status monitoring module, project risk analysis module, production resource allocation module, equipment energy consumption control module and operation process optimization module, through Bayesian network, Markov random field and Lag Langri relaxation technology and other methods are used to conduct equipment failure risk assessment, resource optimization allocation and energy consumption management to achieve intelligent decision-making and scheduling.

Benefits of technology

It improves the reliability and decision-making accuracy of risk management, optimizes resource utilization and production efficiency, achieves refined energy consumption control, reduces energy consumption and achieves energy conservation and emission reduction goals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118485311B_ABST
    Figure CN118485311B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of numerical control equipment management, and specifically to a cloud-based numerical control equipment management system and method, wherein the system includes an equipment status monitoring module, a project risk analysis module, a production resource configuration module, an equipment energy consumption control module, an operation process optimization module, and a performance feedback integration module. The present invention, through the project risk analysis module, utilizes the Bayesian network to enhance the quantitative probability analysis capability of risk management, and improves the reliability and accuracy of risk assessment and decision-making. It enables enterprises to conduct risk management based on more accurate data, thereby reducing unexpected downtime and improving production continuity. By applying the Markov random field to the production resource configuration module, the system can effectively simulate and optimize the randomness and uncertainty of resource allocation in complex production lines. It improves resource utilization and production efficiency, and ensures the optimal allocation of production resources under rapidly changing market demand conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of numerical control equipment management, and in particular to a cloud-based numerical control equipment management system and method. Background Art

[0002] The field of CNC equipment management technology focuses on improving the efficiency of use and management of CNC machine tools and related equipment. It includes equipment monitoring, scheduling, maintenance, fault diagnosis and performance analysis. It optimizes production processes, improves equipment operating efficiency and reliability, reduces maintenance costs, and enhances the flexibility and adaptability of production lines through information technology and automation technology.

[0003] The cloud-based CNC equipment management system is a system that uses cloud computing technology to centrally manage and control CNC equipment. The cloud platform realizes real-time data collection, storage, analysis and processing, thereby realizing remote monitoring, status evaluation, fault prediction, maintenance scheduling and resource optimization configuration of CNC equipment. This allows enterprises to access equipment information from any location, optimize production scheduling and maintenance plans, achieve a higher level of automation and intelligent production, and speed up the response to market changes.

[0004] Although existing technologies have achieved optimization in CNC equipment management, such as remote monitoring and maintenance of equipment through cloud computing technology, they lack sufficient quantitative probability analysis capabilities to support risk management and resource allocation decisions, resulting in limited reliability and accuracy of decisions. At the same time, the system still finds it difficult to make optimal resource allocation decisions when faced with uncertainty and randomness in the production process. Especially in the resource allocation problem of complex production lines, there is a lack of effective methods to simulate the randomness and uncertainty of resource allocation, which affects the maximization of production efficiency and resource utilization. Finally, although the existing system focuses on the monitoring and control of equipment energy consumption, there is still room for improvement in the fine management of equipment workload and idle state, and the intelligent adjustment of equipment operation strategies to achieve energy conservation and emission reduction. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a cloud-based CNC equipment management system and method.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions: a cloud-based CNC equipment management system, the system includes an equipment status monitoring module, a project risk analysis module, a production resource allocation module, an equipment energy consumption control module, an operation process optimization module, and a performance feedback integration module;

[0007] The equipment status monitoring module collects the operating parameters of the CNC equipment, uploads them to the cloud database synchronously, formats and filters the collected data, and obtains the equipment data set;

[0008] The project risk analysis module uses the equipment data set to analyze abnormal modes and potential failure points in the operation of CNC equipment, evaluate the possibility and risk level of equipment failure, build a risk indicator system, and obtain equipment status analysis results;

[0009] The production resource allocation module simulates and evaluates the resource allocation of the production line according to the equipment status analysis results, adjusts the resource allocation strategy with reference to production priority and resource availability, optimizes production efficiency and resource utilization, and generates a resource allocation plan;

[0010] The equipment energy consumption control module monitors and analyzes the energy consumption pattern of the numerical control equipment according to the production plan in the resource allocation plan, identifies the energy-intensive equipment and links, adjusts the equipment working mode and load distribution, and constructs an energy consumption control plan;

[0011] The operation process optimization module uses energy consumption control scheme to optimize production process and operation plan, adjust the start time of production tasks and the working sequence of numerical control equipment, balance production efficiency and energy consumption, and obtain scheduling optimization results;

[0012] The performance feedback integration module records the operation data of the CNC equipment in a real-time monitoring manner based on the scheduling optimization results, analyzes equipment performance deviations and bottlenecks in the production process, collects improvement suggestions and feedback, and obtains performance monitoring information.

[0013] The present invention has improvements in that the equipment data set includes operating frequency, operating temperature range, real-time energy consumption index, and equipment start and stop status; the equipment status analysis result includes abnormal operation mode identification, potential fault prediction index, risk level classification, and fault occurrence probability; the resource allocation plan includes production line operation site reorganization, raw material supply path optimization, and key equipment priority sorting; the energy consumption control plan includes working mode energy-saving settings, key operation link energy consumption reduction strategies, and load dynamic distribution planning; the scheduling optimization results include production task rescheduling schedule, key equipment operation sequence adjustment, and production and energy consumption balance point determination; the performance monitoring information includes equipment operation deviation records, key production bottleneck identification, and improvement measure plan summary.

[0014] The present invention is improved in that the equipment status monitoring module includes a parameter collection and recording submodule, a data cloud uploading submodule, and an information preprocessing submodule;

[0015] The parameter collection and recording submodule collects the operating parameters of the numerical control equipment, records each data according to the timestamp, and generates a parameter collection record;

[0016] The data cloud upload submodule uploads the parameter collection records to the cloud database through a secure network protocol, including data verification and error detection, verifies the accuracy of the data after upload, and obtains cloud synchronization data;

[0017] The information preprocessing submodule preprocesses the cloud synchronization data through data cleaning, including removing redundant data, correcting error values, format unification and noise filtering, to obtain a device data set.

[0018] The present invention is improved in that the project risk analysis module includes an anomaly detection submodule, a risk level assessment submodule, and a fault warning indicator construction submodule;

[0019] The anomaly detection submodule uses a Bayesian network to analyze abnormal patterns in equipment operation, including sudden speed changes or temperature fluctuations, based on the equipment data set, to identify potential fault points, and to generate anomaly detection analysis results by comparing historical data with threshold settings to identify abnormal patterns that need to be analyzed again;

[0020] The risk level assessment submodule assesses the risk level of each fault point based on the anomaly detection analysis result, assigns a risk level to each fault point with reference to the possibility and potential impact of the fault, and obtains the risk level assessment result;

[0021] The fault warning indicator construction submodule monitors the equipment status in real time and warns of potential faults based on the risk level assessment results, including indicators, thresholds and response measures defined for each type of risk, automates risk management, and obtains equipment status analysis results.

[0022] The present invention is improved in that the production resource configuration module includes a production configuration analysis submodule, a resource reallocation submodule, and an efficiency improvement strategy submodule;

[0023] The production configuration analysis submodule evaluates the resource configuration and equipment operation efficiency of the current production line based on the equipment status analysis results through the Markov random field, including the resource usage status and production priority of each operation station of the production line, analyzes the matching degree between resource availability and production demand, and generates production configuration analysis results;

[0024] The Markov random field follows the formula:

[0025] Formula I

[0026] Calculate the resource allocation and equipment operation efficiency of the production line and generate production configuration analysis results;

[0027] in, For the given data When the random variable The conditional probability distribution of is a random variable, To observe the data, is the normalization constant, For all groups, is a potential function that evaluates a given resource configuration and actual operation data Next, group The configuration cost, is the weight coefficient, which is determined through historical data analysis and expert experience. is the sensitivity coefficient, which is determined by simulating multiple production scenarios and evaluating the response effects;

[0028] The resource reallocation submodule reselects the demand and priority of resource reallocation based on the production configuration analysis results, adjusts the raw material supply path, personnel allocation and equipment use plan, optimizes the overall resource configuration of the production line, and obtains a resource reallocation plan;

[0029] The efficiency improvement strategy submodule designs an efficiency improvement strategy in the production process based on the resource reallocation plan, including measures to simplify the operation process, shorten the equipment adjustment time and reduce resource waste, and obtains a resource allocation plan.

[0030] The present invention is improved in that the equipment energy consumption control module includes an energy consumption real-time tracking submodule, an energy-saving mode design submodule, and a dynamic load adjustment submodule;

[0031] The energy consumption real-time tracking submodule monitors the energy consumption of all equipment on the production line according to the resource allocation plan, records the operating status and energy consumption data of the equipment, analyzes the energy consumption pattern and peak usage period, and generates energy consumption monitoring information;

[0032] The energy-saving mode design submodule locates energy-intensive equipment and links based on energy consumption monitoring information through Lagrangian relaxation technology, formulates energy consumption optimization operations and production scheduling strategies, and obtains energy-saving mode design solutions;

[0033] The Lagrangian relaxation technique follows the formula:

[0034] Formula II

[0035] Calculate the equipment energy consumption optimization operation strategy and generate energy-saving mode design plan;

[0036] in, is the set of decision variables, is the Lagrange multiplier, determined by an optimization algorithm, is the energy consumption limit value, is the total energy consumption function of the equipment operation, is the energy consumption constraint function, is the environmental adjustment coefficient, determined through historical data analysis. is the evaluation function of the equipment’s impact on the environment, is the time efficiency weight, determined through environmental impact assessment, Evaluate functions for production demand elasticity;

[0037] The dynamic load regulation submodule dynamically adjusts the workload of production equipment based on the energy-saving mode design scheme, adjusts the equipment load according to production demand and energy consumption data, optimizes energy distribution and utilization efficiency, and builds an energy consumption control scheme.

[0038] The present invention is improved in that the operation process optimization module includes an operation process analysis submodule, a task scheduling optimization submodule, and an efficiency and energy saving coordination submodule;

[0039] The operation process analysis submodule collects data on the energy consumption control scheme, analyzes the current production process and operation plan, identifies existing efficiency bottlenecks and energy consumption anomalies, and generates production process analysis results;

[0040] The task scheduling optimization submodule introduces the information identified in the production process analysis results, and adjusts the start time of the production task and the working sequence of the equipment with reference to the raw material supply, personnel arrangement and machine availability factors to obtain an optimized task scheduling plan;

[0041] The efficiency and energy-saving coordination submodule is based on the optimized task scheduling scheme, through simulation and testing, iteratively refines and adjusts the production process, matches the efficiency and energy-saving effect in the production process, and obtains the scheduling optimization result.

[0042] The present invention is improved in that the performance feedback integration module includes a real-time data tracking submodule, a performance difference analysis submodule, and a feedback and improvement measure submodule;

[0043] The real-time data tracking submodule monitors the equipment operation data in real time based on the scheduling optimization results, records equipment performance deviations and bottlenecks in the production process, and generates real-time monitoring records;

[0044] The performance difference analysis submodule analyzes the equipment performance deviation based on the real-time monitoring records, identifies the difference between the equipment performance and the expected performance indicators, analyzes the bottleneck links in the production process, and the causes of the deviation and bottleneck, and obtains the performance difference analysis results;

[0045] The feedback and improvement measures submodule collects improvement opinions and feedback based on the performance difference analysis results, proposes improvement measures, and obtains performance monitoring information.

[0046] A cloud-based numerical control equipment management method, the cloud-based numerical control equipment management method is executed based on the above-mentioned cloud-based numerical control equipment management system, and comprises the following steps:

[0047] S1: Collect and synchronize the operating parameters of CNC equipment to the cloud database, including operating frequency, operating temperature range, real-time energy consumption indicators and equipment start and stop status, mark each data with a timestamp, and generate a device parameter record set;

[0048] S2: preprocessing the device parameter record set, including removing redundant data, correcting error values, unifying the format and filtering noise, to obtain an optimized device data set;

[0049] S3: using the optimized equipment data set to analyze abnormal modes and potential failure points in the operation of the CNC equipment, including speed mutations and temperature fluctuations, identifying abnormal modes that need to be analyzed by comparing with historical data and thresholds, and building an equipment status analysis framework;

[0050] S4: Based on the equipment status analysis framework, risk assessment is performed according to the possibility of failure and potential impact, and a risk level is assigned to each potential failure point to obtain a risk assessment result;

[0051] S5: Based on the risk assessment results, perform a configuration analysis of production resources, evaluate the resource usage and priority of the production line, and the degree of matching between resources and production needs, reselect the priority and demand of resource allocation, and obtain a resource configuration plan;

[0052] S6: Using the resource allocation scheme, monitor the energy consumption patterns of all equipment on the production line, record the operating status and energy consumption data, analyze the energy-intensive equipment and links, and adjust the equipment workload and operation strategy accordingly, optimize energy use, and build an energy consumption control scheme;

[0053] S7: In combination with the energy consumption control solution, monitor the equipment operation data in real time, record equipment performance deviations and bottlenecks in the production process, collect improvement suggestions and feedback, and generate a performance monitoring framework.

[0054] Compared with the prior art, the advantages and positive effects of the present invention are:

[0055] In the present invention, the quantitative probability analysis capability of risk management is enhanced by using the Bayesian network through the project risk analysis module, and the reliability and accuracy of risk assessment and decision-making are improved. Enterprises can perform risk management based on more accurate data, thereby reducing unexpected downtime and improving production continuity. By applying the Markov random field to the production resource allocation module, the system can effectively simulate and optimize the randomness and uncertainty of resource allocation in complex production lines. It improves resource utilization and production efficiency, and ensures the optimal allocation of production resources under rapidly changing market demand conditions. Refined control is achieved for energy consumption management through the equipment energy consumption control module. By intelligently adjusting the equipment workload and operation strategy, not only energy consumption is reduced, but also energy conservation and emission reduction goals are achieved while ensuring production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] Figure 1 A module diagram of a cloud-based numerical control equipment management system is proposed for the present invention;

[0057] Figure 2 A cloud-based numerical control equipment management system framework diagram is proposed for the present invention;

[0058] Figure 3 A schematic diagram of a device status monitoring module in a cloud-based numerical control device management system proposed by the present invention;

[0059] Figure 4 A schematic diagram of a project risk analysis module in a cloud-based numerical control equipment management system is provided for the present invention;

[0060] Figure 5 A schematic diagram of a production resource configuration module in a cloud-based numerical control equipment management system proposed by the present invention;

[0061] Figure 6 A schematic diagram of an equipment energy consumption control module in a cloud-based numerical control equipment management system proposed by the present invention;

[0062] Figure 7 A schematic diagram of a work process optimization module in a cloud-based numerical control equipment management system proposed by the present invention;

[0063] Figure 8 A schematic diagram of a performance feedback integration module in a cloud-based numerical control equipment management system proposed by the present invention;

[0064] Fig. 9 A flow chart of a cloud-based CNC equipment management method is proposed for the present invention. DETAILED DESCRIPTION

[0065] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0066] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined. Example

[0067] See also Figure 1 ,The present invention provides a technical solution: a cloud-based CNC equipment management system, the system includes an equipment status monitoring module, a project risk analysis module, a production resource allocation module, an equipment energy consumption control module, an operation process optimization module, and a performance feedback integration module;

[0068] The equipment status monitoring module collects the operating parameters of the CNC equipment, uploads them to the cloud database synchronously, formats and filters the collected data, and obtains the equipment data set;

[0069] The project risk analysis module uses equipment data sets to analyze abnormal modes and potential failure points in the operation of CNC equipment, evaluate the possibility and risk level of equipment failure, build a risk indicator system, and obtain equipment status analysis results;

[0070] The production resource allocation module simulates and evaluates the resource allocation of the production line based on the equipment status analysis results, adjusts the resource allocation strategy with reference to production priorities and resource availability, optimizes production efficiency and resource utilization, and generates a resource allocation plan;

[0071] The equipment energy consumption control module monitors and analyzes the energy consumption pattern of CNC equipment according to the production plan in the resource allocation plan, identifies energy-intensive equipment and links, adjusts the equipment working mode and load distribution, and builds an energy consumption control plan;

[0072] The operation process optimization module uses energy consumption control solutions to optimize production processes and operation plans, adjust the start time of production tasks and the working sequence of CNC equipment, balance production efficiency and energy consumption, and obtain scheduling optimization results;

[0073] Based on the scheduling optimization results, the performance feedback integration module records the operating data of CNC equipment through real-time monitoring, analyzes equipment performance deviations and bottlenecks in the production process, collects improvement suggestions and feedback, and obtains performance monitoring information.

[0074] The equipment data set includes operating frequency, operating temperature range, real-time energy consumption indicators, and equipment start and stop status. The equipment status analysis results include abnormal operating mode identification, potential fault prediction index, risk level classification, and failure probability. The resource allocation plan includes production line operation site reorganization, raw material supply path optimization, and key equipment priority sorting. The energy consumption control plan includes working mode energy-saving settings, key operation link energy consumption reduction strategies, and load dynamic distribution planning. The scheduling optimization results include production task rescheduling schedule, key equipment operation sequence adjustment, and production and energy consumption balance point determination. Performance monitoring information includes equipment operation deviation records, key production bottleneck identification, and improvement measures plan summary.

[0075] See also Figure 2 and Figure 3 ,The equipment status monitoring module includes parameter acquisition and recording submodule, data cloud uploading submodule, and information preprocessing submodule;

[0076] The parameter collection and recording submodule collects the operating parameters of the CNC equipment and records each data item according to the timestamp. The specific process of generating parameter collection records is as follows:

[0077] The parameter collection and recording submodule is based on the cloud data integration strategy and adopts the time series database InfluxDB for parameter collection and recording. The writeAPI of InfluxDB is used to record the operating parameters of CNC equipment, such as temperature, speed and power, by timestamp. The HTTP protocol and JSON formatted data are used for efficient storage to generate parameter collection records.

[0078] The data cloud upload submodule uploads the parameter collection records to the cloud database through a secure network protocol, including data verification and error detection, and verifies the accuracy of the data after upload. The specific process of obtaining cloud synchronization data is as follows:

[0079] The data cloud upload submodule is designed based on RESTful API, uses HTTPS protocol and JSON Web Tokens for security authentication, uploads parameter collection records to the cloud database through the cURL command line tool, uses the MD5 algorithm for data verification, and uses the error detection mechanism of the TCP / IP protocol stack to verify the integrity and accuracy of the data transmission process and obtain cloud synchronization data.

[0080] The information preprocessing submodule preprocesses the cloud synchronization data through data cleaning, including removing redundant data, correcting error values, format unification and noise filtering. The specific process of obtaining the device data set is as follows:

[0081] The information preprocessing submodule operates based on the data cleaning algorithm Pandas library, uses DataFrame to load cloud synchronization data, adopts the drop_duplicates method to remove redundant data, uses the fillna function to correct error values, unifies the format through the astype method, and uses the sliding window method combined with the median filter to filter out noise to obtain the device data set.

[0082] See also Figure 2 and Figure 4 ,The project risk analysis module includes an anomaly detection submodule, a risk level assessment submodule, and a fault warning indicator construction submodule;

[0083] The anomaly detection submodule uses the Bayesian network to analyze abnormal patterns in equipment operation, including sudden speed changes or temperature fluctuations, based on the equipment data set, to identify potential fault points. By comparing historical data and threshold settings, it identifies abnormal patterns that need to be analyzed again. The specific process of generating anomaly detection analysis results is as follows:

[0084] The anomaly detection submodule performs abnormal pattern analysis based on the device data set, uses Python language and PyMC3 library to implement the Bayesian network model, defines the network structure, including setting nodes to represent device operating parameters such as speed and temperature, and edges to represent the dependency between parameters. The MCMC method is used for parameter estimation, and the number of iterations is set to 10,000 to ensure convergence. By comparing with the thresholds in the historical data set, speed mutations and abnormal temperature fluctuations are identified to generate anomaly detection analysis results.

[0085] The risk level assessment submodule assesses the risk level of each fault point based on the anomaly detection analysis results, and assigns a risk level to each fault point with reference to the possibility and potential impact of the fault. The specific process for obtaining the risk level assessment results is as follows:

[0086] The risk level assessment submodule conducts risk level assessment based on the anomaly detection analysis results. It uses Python language and Scikit-learn library to implement the decision tree classifier and define the classifier parameters, including setting the maximum depth to 5 to limit the model complexity and prevent overfitting. It uses the characteristic data of the fault point as input, such as the duration and impact range of the abnormal pattern, and applies information gain as the feature selection criterion to assign a risk level to each fault point and obtain the risk level assessment result.

[0087] The fault warning indicator construction submodule monitors the equipment status in real time and warns of potential faults based on the risk level assessment results, including indicators, thresholds and response measures defined for each type of risk, automated risk management, and the specific process of obtaining equipment status analysis results is as follows:

[0088] The fault warning indicator construction submodule constructs fault warning indicators based on the risk level assessment results, uses Python language and Pandas library for data processing, defines warning indicators for each type of risk, such as temperature thresholds and speed change rates, sets trigger conditions for response measures, such as temperature exceeding preset thresholds or speed change rates being abnormal, uses the DataFrame.apply method to apply functions to each risk level, automatically marks the device status to be monitored, and customizes response measures to obtain device status analysis results.

[0089] See also Figure 2 and Figure 5 ,The production resource configuration module includes the production configuration analysis submodule, the resource reallocation submodule, and the efficiency improvement strategy submodule;

[0090] The production configuration analysis submodule evaluates the resource configuration and equipment operation efficiency of the current production line based on the equipment status analysis results through the Markov random field, including the resource usage status and production priority of each operation station of the production line, and analyzes the matching degree between resource availability and production demand. The specific process of generating the production configuration analysis results is as follows:

[0091] The production configuration analysis submodule performs resource allocation and equipment operation efficiency evaluation based on the equipment status analysis results. It uses Python language and PyStan library to implement the Markov random field model and define the model structure, including setting the resource usage and production priority of each operation station on the production line as model nodes, and the mutual influence between nodes as edges. The Hamiltonian Monte Carlo sampling method is used to estimate the model parameters, and the sampling number is set to 5000 to ensure model convergence. It compares resource availability and production demand to generate production configuration analysis results.

[0092] Markov random field follows the formula:

[0093] Formula I

[0094] Calculate the resource allocation and equipment operation efficiency of the production line and generate production configuration analysis results;

[0095] in, For the given data When the random variable The conditional probability distribution of represents the probability of various resource configuration states when the actual operation data of the production line is known. is a random variable, representing the resource configuration status of the production line, such as the equipment operation status and resource allocation of each operation site. Observation data represents the actual observed data of equipment operating efficiency, such as the actual operating time of the equipment, the energy consumed, etc. is a normalization constant used to ensure that the probability distribution The sum of is 1. is the set of all clusters, representing the combination of all factors that may affect the efficiency of resource allocation in the production line. is a potential function that evaluates a given resource configuration and actual operation data Next, group Configuration cost, taking into account the newly added weight coefficient and sensitivity coefficient . It is the weight coefficient, which is determined through historical data analysis and expert experience. It is used to adjust the impact weight of different resource allocation factors in the total cost evaluation, so that the model can flexibly adjust the importance of each factor according to the specific needs of the actual production line. It is the sensitivity coefficient, which is determined by simulating multiple production scenarios and evaluating the response effects. It is used to adjust the model's sensitivity to changes in the production line, such as the intensity of response to abnormal data, so that the model can more accurately identify and respond to sudden changes in the production process.

[0096] The execution process is as follows:

[0097] Collect actual operation data of the production line , and the current resource configuration status of each job site .

[0098] Determine the weight coefficient based on historical production data and expert experience , including identifying which resource allocation factors have the greatest impact on production efficiency and assigning corresponding weights accordingly. At the same time, by simulating different production scenarios, the sensitivity coefficients are determined. , to adjust the model's response sensitivity to production line changes.

[0099] Using the Markov random field model, the model structure is defined, including setting the resource usage and production priority of each operation station of the production line as the model node, and the mutual influence between the nodes, that is, As an edge.

[0100] The Hamiltonian Monte Carlo sampling method is used to estimate the model parameters and the number of sampling is set to ensure the model convergence, so as to calculate the given observation data. Under various resource configuration states The conditional probability distribution of .

[0101] According to the conditional probability distribution calculated by the model, the matching degree between resource availability and production demand is analyzed to identify the optimal state of resource allocation. The model results are used to guide the resource reallocation and optimization of the production line, aiming to improve overall production efficiency and resource utilization.

[0102] Apply the optimized resource allocation plan to the production line and implement corresponding adjustment measures, including but not limited to resource reconfiguration of work sites, adjustment of equipment working sequences, etc., to maximize production efficiency.

[0103] The resource reallocation submodule reselects the demand and priority of resource reallocation based on the production configuration analysis results, adjusts the raw material supply path, personnel allocation and equipment use plan, optimizes the overall resource allocation of the production line, and obtains the specific process of resource reallocation plan as follows:

[0104] The resource reallocation submodule reselects resource reallocation requirements and priorities based on the results of production configuration analysis. It uses Python language and NetworkX library for graph theory analysis to build a production line resource configuration network, including raw material supply paths, personnel allocation, and equipment usage plans as nodes. Edges represent the flow relationship between resources. The shortest path algorithm is used to optimize the raw material supply path, and the greedy algorithm is used to optimize the allocation of personnel and equipment to obtain a resource reallocation plan.

[0105] The efficiency improvement strategy submodule designs efficiency improvement strategies in the production process based on the resource reallocation plan, including measures to simplify the operation process, shorten the equipment adjustment time and reduce resource waste. The specific process of obtaining the resource allocation plan is as follows:

[0106] The efficiency improvement strategy submodule designs efficiency improvement strategies in the production process based on the resource reallocation plan, uses Python language and Pandas library to process data, and analyzes the possibility of simplifying the operation process. For example, it automatically identifies the steps that can be simplified in the process through the apply method of DataFrame, uses custom functions to reduce equipment adjustment time, and optimizes the order of equipment use through sorting algorithms to reduce waiting time. The strategy test uses simulated annealing algorithm to find the global optimal solution for resource utilization and obtain a resource allocation plan.

[0107] See also Figure 2 and Figure 6 ,The equipment energy consumption control module includes the energy consumption real-time tracking submodule, the energy saving mode design submodule, and the dynamic load regulation submodule;

[0108] The real-time energy consumption tracking submodule monitors the energy consumption of all equipment on the production line according to the resource allocation plan, records the operating status and energy consumption data of the equipment, analyzes the energy consumption pattern and peak usage period, and generates the specific process of energy consumption monitoring information as follows:

[0109] The real-time energy consumption tracking submodule monitors energy consumption based on the resource allocation plan. It uses Python language with Prometheus monitoring tool and Grafana dashboard for data visualization. It configures Prometheus to monitor all equipment on the production line and uses node_exporter to collect equipment operating status and energy consumption data, such as current and power consumption. It sets the data capture frequency to once a minute and uses Grafana for real-time data visualization to display energy consumption patterns and peak usage periods and generate energy consumption monitoring information.

[0110] The energy-saving mode design submodule locates energy-intensive equipment and links based on energy consumption monitoring information through Lagrangian relaxation technology, formulates energy consumption optimization operations and production scheduling strategies, and obtains the specific process of energy-saving mode design scheme as follows:

[0111] The energy-saving mode design submodule designs energy-saving modes based on energy consumption monitoring information. The Lagrangian relaxation technology is implemented using the optimization toolbox included in the MATLAB software. The optimization problem is defined as reducing the total energy consumption of energy-intensive equipment and links. The energy consumption optimization operation strategy and production scheduling are set as variables. The constraints are that the continuity of the production process and product quality standards are not affected. The quadprog function is used to solve the optimization problem. By adjusting the working mode and load distribution of the production equipment, the energy-saving mode design scheme is obtained.

[0112] The Lagrangian relaxation technique is based on the formula:

[0113] Formula II

[0114] Calculate the equipment energy consumption optimization operation strategy and generate energy-saving mode design plan;

[0115] in, is a set of decision variables, including equipment working mode and load intensity, is the Lagrange multiplier, which is determined by the optimization algorithm and used to adjust the weight of the energy consumption constraint. The dual problem is solved by dual programming, so that Minimize defaults, is the energy consumption limit value, which indicates the energy consumption target of the production process. is the total energy consumption function of the equipment operation, is the energy consumption constraint function, ensuring that the energy consumption of the device does not exceed the limit. The environmental adjustment factor is determined by analyzing historical data based on the environmental impact rating of the equipment, such as emissions or energy efficiency rating. is the evaluation function of the equipment’s impact on the environment, The time efficiency weight is determined through environmental impact assessment. Specifically, it analyzes the time sensitivity of the production line. It is determined based on the urgency of the delivery date or the rate of change of the production window, the historical execution of the production plan and the fluctuation of market demand, reflecting the importance of production demand elasticity. Evaluate the function for production demand elasticity.

[0116] The execution process is as follows:

[0117] Obtain equipment operating status, energy consumption data, environmental emission data, and production demand change data.

[0118] Construct a modified Lagrangian relaxation model including all relevant parameters.

[0119] Determined through optimization methods and historical data , , The value of .

[0120] Find the optimal solution that minimizes total energy consumption while taking into account environmental impact and time efficiency .

[0121] Adjust the working mode and load intensity of the equipment according to the solution results and implement energy consumption optimization strategy.

[0122] The dynamic load regulation submodule dynamically adjusts the workload of production equipment based on the energy-saving mode design scheme, adjusts the equipment load according to production demand and energy consumption data, optimizes energy distribution and utilization efficiency, and builds the specific process of energy consumption control scheme as follows:

[0123] The dynamic load regulation submodule performs dynamic load regulation based on the energy-saving mode design scheme. It uses Python language and NumPy library for numerical calculations to analyze production demand and energy consumption data, such as the production task schedule and equipment power consumption records. It uses linear programming methods to optimize energy distribution and utilization efficiency. The objective function is defined as minimizing total energy consumption. The variable is the load intensity of each device at work. The constraint is to meet production demand while not exceeding the maximum load of the equipment. The linprog function in the SciPy library is used to solve the linear programming problem and construct an energy consumption control scheme.

[0124] See also Figure 2 and Figure 7 ,The operation process optimization module includes the operation process analysis submodule, the ,task scheduling optimization submodule, and the efficiency and energy saving coordination submodule;

[0125] The operation process analysis submodule collects data on the energy consumption control plan, analyzes the current production process and operation plan, identifies the existing efficiency bottlenecks and energy consumption abnormalities, and generates the specific process of production process analysis results as follows:

[0126] The operation process analysis submodule analyzes the production process and operation plan based on the data of the energy consumption control plan, and uses the Python language with the Pandas library to organize and analyze the energy consumption data. The custom analysis function is applied to each row of data in the DataFrame through the apply method. This function detects each link of the production line, identifies efficiency bottlenecks such as excessive waiting time and energy consumption anomalies such as operations with higher than average energy consumption, conducts a comprehensive evaluation of the production process, and generates production process analysis results.

[0127] The task scheduling optimization submodule introduces the information identified in the production process analysis results, and adjusts the start time of the production task and the working sequence of the equipment with reference to the factors of raw material supply, personnel arrangement and machine availability. The specific process of obtaining the optimized task scheduling plan is as follows:

[0128] The task scheduling optimization submodule introduces the information identified in the production process analysis results to optimize the task scheduling. It uses Python language with the optimize module in the SciPy library to define the objective function as minimizing the completion time and energy consumption of production tasks. The variables are the start time of production tasks and the working sequence of equipment. The constraints are raw material supply, personnel arrangement and machine availability. The linear programming method minimize is used to optimize and solve the objective function, adjust the start time of production tasks and the working sequence of equipment, and obtain the optimized task scheduling plan.

[0129] The efficiency and energy-saving coordination submodule is based on the optimized task scheduling scheme. Through simulation and testing, iteratively refines and adjusts the production process to match the efficiency and energy-saving effects of the production process. The specific process of obtaining the scheduling optimization result is as follows:

[0130] The efficiency and energy-saving coordination submodule iteratively refines and adjusts the production process based on the optimized task scheduling plan, uses the SimPy library to simulate and test the production process, defines the environment as the production line, and the events as production tasks and equipment operations, simulates the entire production process, and evaluates the matching degree of production efficiency and energy-saving effects through simulation results. It iteratively optimizes the production process and job plan based on simulation feedback, and continuously adjusts the execution details of production tasks and equipment use strategies to achieve better efficiency and energy-saving coordination and obtain scheduling optimization results.

[0131] See also Figure 2 and Figure 8,The performance feedback integration module includes the real-time data tracking submodule, the ,performance difference analysis submodule, and the feedback and improvement measures submodule;

[0132] The real-time data tracking submodule monitors the equipment operation data in real time based on the scheduling optimization results, records equipment performance deviations and bottlenecks in the production process, and generates real-time monitoring records in the following specific processes:

[0133] The real-time data tracking submodule monitors the equipment operation data in real time based on the scheduling optimization results. It uses Python language and InfluxDB time series database for data storage. It configures the collection task through Telegraf as the data collector, and regularly extracts operation data from the equipment control system, such as equipment operation speed, temperature, energy consumption and other indicators. The collection frequency is set to once every 30 seconds. The fast writing and query capabilities of InfluxDB are used to realize real-time recording of equipment performance deviations and bottlenecks in the production process, and generate real-time monitoring records.

[0134] The performance difference analysis submodule analyzes equipment performance deviations based on real-time monitoring records, identifies differences from expected performance indicators, analyzes bottlenecks in the production process, and the causes of deviations and bottlenecks. The specific process for obtaining performance difference analysis results is as follows:

[0135] The performance difference analysis submodule conducts in-depth analysis of equipment performance deviations based on real-time monitoring records. It uses Python language and Pandas library to process the collected data, aggregates and compares the data through merge and groupby methods, and identifies the differences between actual performance and expected performance indicators. For example, for equipment that exceeds the predetermined energy consumption range, statistical analysis methods such as standard deviation and variance analysis are used to identify the bottleneck links and causes of inefficiency and excessive energy consumption in the production process, and obtain performance difference analysis results.

[0136] The feedback and improvement measures submodule collects improvement opinions and feedback based on the performance difference analysis results, and proposes improvement measures. The specific process of obtaining performance monitoring information is as follows:

[0137] The feedback and improvement measures submodule collects and organizes improvement opinions and feedback based on the performance difference analysis results. It uses Python language and Flask framework to build a simple feedback collection Web application, allowing production line staff and managers to submit improvement opinions and observed problems. Combined with the performance difference analysis results, it integrates opinions and suggestions from all parties and formulates specific improvement measures, such as adjusting the production line layout, replacing or repairing inefficient equipment, optimizing the production process, etc., to obtain performance monitoring information.

[0138] See also Fig. 9The cloud-based CNC equipment management method is implemented based on the above-mentioned cloud-based CNC equipment management system, and includes the following steps:

[0139] S1: Collect and synchronize the operating parameters of CNC equipment to the cloud database, including operating frequency, operating temperature range, real-time energy consumption indicators and equipment start and stop status, mark each data with a timestamp, and generate a device parameter record set;

[0140] S2: preprocessing the equipment parameter record set, including removing redundant data, correcting error values, unifying the format and filtering noise, to obtain an optimized equipment data set;

[0141] S3: Use the optimized equipment data set to analyze abnormal modes and potential failure points in the operation of CNC equipment, including speed mutations and temperature fluctuations. By comparing with historical data and thresholds, identify the abnormal modes that need to be analyzed and build an equipment status analysis framework;

[0142] S4: Based on the equipment status analysis framework, risk assessment is performed according to the possibility and potential impact of the failure, and a risk level is assigned to each potential failure point to obtain the risk assessment result;

[0143] S5: Based on the risk assessment results, conduct a configuration analysis of production resources, evaluate the resource usage and priority of the production line, and the degree of matching between resources and production needs, re-select the priority and needs of resource allocation, and obtain a resource configuration plan;

[0144] S6: Use resource allocation solutions to monitor the energy consumption patterns of all equipment on the production line, record operating status and energy consumption data, analyze energy-intensive equipment and links, and adjust equipment workloads and operating strategies accordingly, optimize energy use, and build energy consumption control solutions;

[0145] S7: Combined with the energy consumption control solution, monitor the equipment operation data in real time, record equipment performance deviations and bottlenecks in the production process, collect improvement suggestions and feedback, and generate a performance monitoring framework.

[0146] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. Cloud-based CNC equipment management system, characterized by: The system includes an equipment status monitoring module, a project risk analysis module, a production resource allocation module, an equipment energy consumption control module, an operation process optimization module, and a performance feedback integration module; The equipment status monitoring module collects the operating parameters of the CNC equipment, uploads them to the cloud database synchronously, formats and filters the collected data, and obtains the equipment data set; The project risk analysis module uses the equipment data set to analyze abnormal modes and potential failure points in the operation of CNC equipment, evaluate the possibility and risk level of equipment failure, build a risk indicator system, and obtain equipment status analysis results; The project risk analysis module includes an anomaly detection submodule, a risk level assessment submodule, and a fault warning indicator construction submodule; The anomaly detection submodule uses a Bayesian network to analyze abnormal patterns in equipment operation, including sudden speed changes or temperature fluctuations, based on the equipment data set, to identify potential fault points, and to generate anomaly detection analysis results by comparing historical data with threshold settings to identify abnormal patterns that need to be analyzed again; The risk level assessment submodule assesses the risk level of each fault point based on the anomaly detection analysis result, assigns a risk level to each fault point with reference to the possibility and potential impact of the fault, and obtains the risk level assessment result; The fault warning indicator construction submodule monitors the equipment status in real time and warns of potential faults based on the risk level assessment results, including indicators, thresholds and response measures defined for each type of risk, automates risk management, and obtains equipment status analysis results; The production resource allocation module simulates and evaluates the resource allocation of the production line according to the equipment status analysis results, adjusts the resource allocation strategy with reference to production priority and resource availability, optimizes production efficiency and resource utilization, and generates a resource allocation plan; The production resource configuration module includes a production configuration analysis submodule, a resource reallocation submodule, and an efficiency improvement strategy submodule; The production configuration analysis submodule evaluates the resource configuration and equipment operation efficiency of the current production line based on the equipment status analysis results through the Markov random field, including the resource usage status and production priority of each operation station of the production line, analyzes the matching degree between resource availability and production demand, and generates production configuration analysis results; The Markov random field follows the formula: Formula I Calculate the resource allocation and equipment operation efficiency of the production line and generate production configuration analysis results; in, For the given data When the random variable The conditional probability distribution of is a random variable, To observe the data, is the normalization constant, For all groups, is a potential function that evaluates a given resource configuration and actual operation data Next, group The configuration cost, is the weight coefficient, which is determined through historical data analysis and expert experience. is the sensitivity coefficient, which is determined by simulating multiple production scenarios and evaluating the response effects; The resource reallocation submodule reselects the demand and priority of resource reallocation based on the production configuration analysis results, adjusts the raw material supply path, personnel allocation and equipment use plan, optimizes the overall resource configuration of the production line, and obtains a resource reallocation plan; The efficiency improvement strategy submodule designs efficiency improvement strategies in the production process based on the resource reallocation plan, including measures to simplify the operation process, shorten the equipment adjustment time and reduce resource waste, and obtains a resource allocation plan; The equipment energy consumption control module monitors and analyzes the energy consumption pattern of the numerical control equipment according to the production plan in the resource allocation plan, identifies the energy-intensive equipment and links, adjusts the equipment working mode and load distribution, and constructs an energy consumption control plan; The equipment energy consumption control module includes an energy consumption real-time tracking submodule, an energy-saving mode design submodule, and a dynamic load adjustment submodule; The energy consumption real-time tracking submodule monitors the energy consumption of all equipment on the production line according to the resource allocation plan, records the operating status and energy consumption data of the equipment, analyzes the energy consumption pattern and peak usage period, and generates energy consumption monitoring information; The energy-saving mode design submodule locates energy-intensive equipment and links based on energy consumption monitoring information through Lagrangian relaxation technology, formulates energy consumption optimization operations and production scheduling strategies, and obtains energy-saving mode design solutions; The Lagrangian relaxation technique follows the formula: Formula II Calculate the equipment energy consumption optimization operation strategy and generate energy-saving mode design plan; in, is the set of decision variables, is the Lagrange multiplier, determined by an optimization algorithm, is the energy consumption limit value, is the total energy consumption function of the equipment operation, is the energy consumption constraint function, is the environmental adjustment coefficient, determined through historical data analysis. is the evaluation function of the equipment’s impact on the environment, is the time efficiency weight, determined through environmental impact assessment, Evaluate functions for production demand elasticity; The dynamic load regulation submodule dynamically adjusts the workload of production equipment based on the energy-saving mode design scheme, adjusts the equipment load according to production demand and energy consumption data, optimizes energy distribution and utilization efficiency, and builds an energy consumption control scheme; The operation process optimization module uses energy consumption control scheme to optimize production process and operation plan, adjust the start time of production tasks and the working sequence of numerical control equipment, balance production efficiency and energy consumption, and obtain scheduling optimization results; The performance feedback integration module records the operation data of the CNC equipment in a real-time monitoring manner based on the scheduling optimization results, analyzes equipment performance deviations and bottlenecks in the production process, collects improvement suggestions and feedback, and obtains performance monitoring information.

2. The cloud-based CNC equipment management system according to claim 1, characterized in that: The equipment data set includes operating frequency, operating temperature range, real-time energy consumption index, and equipment start and stop status. The equipment status analysis results include abnormal operating mode identification, potential fault prediction index, risk level classification, and fault occurrence probability. The resource allocation plan includes production line operation site reorganization, raw material supply path optimization, and key equipment priority sorting. The energy consumption control plan includes working mode energy-saving settings, key operation link energy consumption reduction strategies, and load dynamic distribution planning. The scheduling optimization results include production task rescheduling schedule, key equipment operation sequence adjustment, and production and energy consumption balance point determination. The performance monitoring information includes equipment operation deviation records, key production bottleneck identification, and improvement measures plan summary.

3. The cloud-based CNC equipment management system according to claim 1, characterized in that: The equipment status monitoring module includes a parameter collection and recording submodule, a data cloud upload submodule, and an information preprocessing submodule; The parameter collection and recording submodule collects the operating parameters of the numerical control equipment, records each data according to the timestamp, and generates a parameter collection record; The data cloud upload submodule uploads the parameter collection records to the cloud database through a secure network protocol, including data verification and error detection, verifies the accuracy of the data after upload, and obtains cloud synchronization data; The information preprocessing submodule preprocesses the cloud synchronization data through data cleaning, including removing redundant data, correcting error values, format unification and noise filtering, to obtain a device data set.

4. The cloud-based CNC equipment management system according to claim 1, characterized in that: The operation process optimization module includes an operation process analysis submodule, a task scheduling optimization submodule, and an efficiency and energy saving coordination submodule; The operation process analysis submodule collects data on the energy consumption control scheme, analyzes the current production process and operation plan, identifies existing efficiency bottlenecks and energy consumption anomalies, and generates production process analysis results; The task scheduling optimization submodule introduces the information identified in the production process analysis results, and adjusts the start time of the production task and the working sequence of the equipment with reference to the raw material supply, personnel arrangement and machine availability factors to obtain an optimized task scheduling plan; The efficiency and energy-saving coordination submodule is based on the optimized task scheduling scheme, through simulation and testing, iteratively refines and adjusts the production process, matches the efficiency and energy-saving effect in the production process, and obtains the scheduling optimization result.

5. The cloud-based CNC equipment management system according to claim 1, characterized in that: The performance feedback integration module includes a real-time data tracking submodule, a performance difference analysis submodule, and a feedback and improvement measures submodule; The real-time data tracking submodule monitors the equipment operation data in real time based on the scheduling optimization results, records equipment performance deviations and bottlenecks in the production process, and generates real-time monitoring records; The performance difference analysis submodule analyzes the equipment performance deviation based on the real-time monitoring records, identifies the difference between the equipment performance and the expected performance indicators, analyzes the bottleneck links in the production process, and the causes of the deviation and bottleneck, and obtains the performance difference analysis results; The feedback and improvement measures submodule collects improvement opinions and feedback based on the performance difference analysis results, proposes improvement measures, and obtains performance monitoring information.

6. A cloud-based CNC equipment management method, characterized in that: The cloud-based CNC equipment management system according to any one of claims 1 to 5 is implemented, comprising the following steps: Collect and synchronize the operating parameters of CNC equipment to the cloud database, including operating frequency, operating temperature range, real-time energy consumption indicators and equipment start and stop status, mark each data with a timestamp, and generate a device parameter record set; Preprocessing the device parameter record set, including removing redundant data, correcting erroneous values, unifying the format and filtering out noise, to obtain an optimized device data set; Analyze abnormal modes and potential failure points in the operation of CNC equipment using the optimized equipment data set, including speed mutations and temperature fluctuations, identify abnormal modes that need to be analyzed by comparing with historical data and thresholds, and build an equipment status analysis framework; Based on the equipment status analysis framework, risk assessment is performed according to the possibility of failure and potential impact, and a risk level is assigned to each potential failure point to obtain a risk assessment result; According to the risk assessment results, perform a configuration analysis of production resources, evaluate the resource usage and priority of the production line, and the degree of matching between resources and production needs, re-select the priority and demand of resource allocation, and obtain a resource configuration plan; Using the resource allocation scheme, monitor the energy consumption patterns of all equipment on the production line, record the operating status and energy consumption data, analyze the energy-intensive equipment and links, and adjust the equipment workload and operation strategy accordingly, optimize energy use, and build an energy consumption control plan; In combination with the energy consumption control solution, the equipment operation data is monitored in real time, equipment performance deviations and bottlenecks in the production process are recorded, improvement suggestions and feedback are collected, and a performance monitoring framework is generated.