Mechanism and method for load test of boiler lifting platform

By hanging U-shaped plastic pipes in the detection area of ​​the boiler lifting platform and filling water, and recording the deformation of the bracket using the hinge shaft and torsion spring mechanism, the problem of poor detection effect in the existing technology is solved, and the support structure of the boiler lifting platform is realized The precise deformation resistance assessment.

CN118500709BActive Publication Date: 2024-11-08JIANGSU HAITAI POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410844864.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-11-08
Estimated Expiration
2044-06-27

AI Technical Summary

Technical Problem

The prior art cannot effectively detect the deformation resistance of the maintenance platform and support structure of the boiler lifting platform, resulting in poor detection effect.

Method used

A detection mechanism including U-shaped plastic pipe and U-shaped water pipe is designed. By hanging U-shaped plastic pipes in four detection areas and filling water with water pumps, the U-shaped plastic pipe gradually becomes heavier, and the detection mechanism passes through the hinge shaft and The torsion spring mechanism records the deformation of the bracket, and uses the distance scale and the angle offset of the arc plate to accurately detect the deformation resistance of the bracket.

Benefits of technology

The inspection effect is improved, and the bearing capacity of the bracket can be evaluated more accurately, ensuring that the entire infrastructure can withstand the loads of boilers and lifting platforms. The inspection results are intuitive and accurate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118500709B_ABST
    Figure CN118500709B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of test and detection technology, and in particular, provides a mechanism and method for a boiler lifting platform load test. The mechanism for the boiler lifting platform load test comprises a maintenance platform, supports fixed on the four corners of the bottom of the maintenance platform, and a detection mechanism located below the maintenance platform. A detection area is formed between every two of the supports, and four detection areas are formed between four of the supports. A set of the detection mechanism is arranged in each of the detection areas. The detection mechanism comprises a U-shaped plastic pipe and a U-shaped water pipe arranged in the U-shaped plastic pipe. The U-shaped plastic pipe comprises a U-shaped bending portion and vertical portions integrally bent on both sides of the bending portion. The two vertical portions are respectively close to the supports on both sides of the detection area, and the bottom ends of the vertical portions are closed, so that slight changes in the supports can be detected. Compared with the prior art, the detection effect is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of test and detection, and in particular to a mechanism and method for a boiler lifting platform load test. Background Art

[0002] After the boiler lifting platform is installed, a load test is required to ensure the safe and reliable operation of the lifting platform. In the previous test process, the sand and gravel are first loaded into woven bags, and then the sand and gravel in the woven bags are evenly transported to the maintenance platform by manpower. The test is carried out after the rated load is reached. After the test is completed, the bagged sand and gravel need to be transported out again. This detection method is extremely inconvenient. In order to solve this technical problem, the Chinese patent application number 201611081758.8 discloses a mechanism and method for load testing of boiler lifting platforms. The mechanism includes water hoses or water pipes evenly arranged on the boiler lifting platform. A switch is set on the water hose or water pipe. When the switch is turned on, a set amount of water is passed into the water hose or water pipe. By using the mass of water to test the load of the lifting platform, it is not only convenient to obtain materials, but also has low labor costs. However, the following technical defects still exist in actual testing:

[0003] First of all, the water hose or water pipe is only located on the platform, and only the platform lifting is inspected during the inspection. As we all know, under normal circumstances, at least four supports are required to support the platform, and a maintenance platform is also required to provide a lifting platform. The load of the lifting platform is actually applied to the maintenance platform, and then the maintenance platform acts on the four supports. Therefore, it is only necessary to detect the anti-deformation capacity of the four supports and the anti-deformation capacity of the maintenance platform to know the load-bearing capacity of the lifting platform. Obviously, the existing technology cannot realize these two detection technologies, and the detection effect is poor. Summary of the invention

[0004] In order to detect the anti-deformation capabilities of the maintenance platform and four supports where the lifting platform is located and improve the detection effect, the present invention provides a mechanism for a boiler lifting platform load test, including a maintenance platform, brackets fixed on the four corners of the bottom of the maintenance platform, and a detection mechanism located below the maintenance platform, a detection area is formed between every two brackets, and four detection areas are formed between four brackets, and a set of the detection mechanism is arranged in each detection area, the detection mechanism includes a U-shaped plastic pipe and a U-shaped water pipe arranged in the U-shaped plastic pipe, the U-shaped plastic pipe includes a U-shaped bending portion and vertical portions integrally bent on both sides of the bending portion, the two vertical portions are respectively close to the brackets on both sides of the detection area, and the bottom ends of the vertical portions are closed;

[0005] The detection mechanism further includes a first hinge shaft and a second hinge shaft arranged at upper and lower sides of the ends of the two vertical parts, and a first detection seat connected to the first hinge shaft and a second detection seat connected to the second hinge shaft, the first hinge shaft is sleeved with a first torsion spring, one end of the first torsion spring is pressed against the inner surface of the first detection seat to deflect the first detection seat upward, and the other end of the first torsion spring is pressed against the vertical part;

[0006] Similarly, a second torsion spring is sleeved on the second hinge shaft, one end of the second torsion spring is connected to the inner surface of the second detection seat to deflect the second detection seat downward, and the other end of the second torsion spring is pressed against the vertical portion;

[0007] A connecting hole is provided in the middle of the curved portion, an injection pipe is provided in the connecting hole, one end of the injection pipe enters the U-shaped plastic pipe along the connecting hole and is connected to the middle of the U-shaped water pipe, and the other end of the injection pipe extends vertically downward and passes through the outside of the U-shaped plastic pipe;

[0008] A hanging hole is provided on the free end of the second detection seat, and a hanging piece is provided on the support frame, and the hanging piece is connected to the hanging hole through a pin shaft.

[0009] As a further preferred embodiment, the two vertical parts of the U-shaped plastic pipe are parallel to each other, and the U-shaped water pipe is arranged in the U-shaped plastic pipe along the U-shaped contour.

[0010] As a further preferred embodiment, the U-shaped water pipe is a reducer which gradually becomes thicker from the middle to both ends, wherein the thin tube portion in the middle is located in the bending portion of the U-shaped plastic pipe, and the thick tube portions at both ends extend into the bending portions on both sides of the U-shaped plastic pipe, and the injection pipe is connected to the middle position of the thin tube diameter of the U-shaped water pipe.

[0011] As a further preferred embodiment, the U-shaped profile of the U-shaped plastic tube is welded with an arc plate on its front and rear sides respectively, and a detection cavity is formed between the two arc plates. The first hinge shaft and the second hinge shaft are fixed between the two arc plates, and one end of the first detection seat transferred to the first hinge shaft is located in the detection cavity, and one end of the second detection seat transferred to the second hinge shaft is located in the detection cavity. The first detection seat is provided with a distance scale, and the distance scale faces forward and faces the inner surface of the front arc plate.

[0012] As a further preference, a suspension rope is connected to the middle position of the arc-shaped plate, and the other end of the suspension rope is connected to a suspension hook.

[0013] The method of load test of lifting platform includes the following experimental steps:

[0014] Step s01, hinge two hangers at the same height on all the supports, the free ends of the hangers are provided with pins matching the hanging holes on the second detection seats, and eight second detection seats and eight hangers are connected together by inserting the pins into the hanging holes.

[0015] Step s02, connecting the injection pipes on the four U-shaped plastic pipes together through a pipeline to share a water inlet pipe, and connecting the outer end of the water inlet pipe to a water pump;

[0016] Step s03, start the water pump in step s02, inject water into the four injection pipes simultaneously through the water inlet pipe, and inject water into the four U-shaped water pipes simultaneously through the four injection pipes, observe the change state of the first detection seat on the four U-shaped plastic pipes, and judge the deformation resistance of the support frame when bearing different loads according to the position relationship between the distance scale and the arc plate on the same side.

[0017] According to the above detection method, the installation positions of the eight second detection seats on the four U-shaped plastic tubes are consistent, and the installation positions of the eight hangers on the four support frames are consistent.

[0018] According to the above detection method, a hanging ring is welded at the middle position of each of the four sides of the maintenance platform, and the hook is hung upward on the corresponding hanging ring, so that the bent parts at the top ends of the four U-shaped plastic tubes are suspended in the corresponding detection area.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. Place four U-shaped plastic tubes in four test areas in turn, and hang the second test seats on both sides of the U-shaped plastic tube on the inner wall of the support frame on the same side through the hanging holes. The injection pipes on the four U-shaped plastic tubes are all vertically downward, and then connect the four injection pipes to the water pipes respectively, and make the water pipes share a water pump. Start the water pump to inject water into the four injection pipes at the same time. The four injection pipes inject water into the U-shaped water pipes in the four U-shaped plastic tubes at the same time, so that the four U-shaped plastic tubes gradually become heavier. Since the four U-shaped plastic tubes are hung in four test areas respectively, the four U-shaped plastic tubes will transfer gravity to the second test seat while gaining weight. The second detection seat is connected to the support frame by means of a transfer, so the self-weight generated by the four U-shaped plastic pipes will be transferred from the second detection seat to the supports on both sides, and continue to supply water to the U-shaped water pipes. When the weight G of the total water supply of the four U-shaped water pipes approaches or exceeds the weight G of the boiler plus the lifting platform, the degree of change of the four supports is observed. Since the load-bearing area is located in the detection area, if some or some of the supports are bent and deformed, they will bend inward toward the detection area, proving that the rated load-bearing capacity of the support frame has been reached. At the same time, it is also known that the entire infrastructure cannot bear the load of the boiler and the lifting platform to be installed. Compared with the existing technology, since four detection areas are used as the detection points for load, and the structures of the four U-shaped plastic pipes on the four detection areas are consistent, the detection effect is improved during detection.

[0021] 2. A first detection seat is hinged on both sides of each U-shaped plastic tube, and the free ends of the two first detection seats are supported by one end of the first torsion spring and pressed against the inner surface of the two supports on the same side. Once some or one of the supports are bent inwardly, the deformation will be fed back to the free end of the first detection seat, so that the first detection seat rotates around the first hinge axis. The bending deformation of the support can be intuitively observed according to the rotation amount of the first detection seat. A distance scale is provided on the first detection seat. When the first detection seat rotates, it will rotate with the distance scale, and the distance scale will be angularly offset relative to the arc plate. According to the data change after the distance scale is angularly offset relative to the arc plate, slight changes in the support can be detected. Compared with the prior art, the detection effect is more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A schematic diagram of a load test mechanism for a boiler lifting platform provided in an embodiment of the present invention;

[0023] Figure 2 The load test mechanism for the boiler lifting platform provided in the embodiment of the present invention is composed of Figure 1 The schematic diagram of the internal structure after the cutaway is shown;

[0024] Figure 3 A schematic diagram of the load test mechanism and method for a boiler lifting platform provided in an embodiment of the present invention;

[0025] Figure 4 A schematic diagram of the enlarged portion A of the boiler lifting platform load test mechanism and method provided in the embodiment of the present invention;

[0026] Figure 5 A three-dimensional schematic diagram of the use principle of the boiler lifting platform load testing mechanism and method provided in an embodiment of the present invention.

[0027] In the figure: 1. maintenance platform; 2. support frame; 3. detection mechanism; 4. detection area; 5. U-shaped plastic pipe; 6. U-shaped water pipe; 7. bending part; 8. vertical part; 9. first hinge axis; 10. second hinge axis; 11. first detection seat; 12. second detection seat; 13. first torsion spring; 14. second torsion spring; 15. hook; 16. connecting hole; 17. injection pipe; 18. hanging hole; 19. arc plate; 20. detection cavity; 21. distance scale; 22. pendant; 23. pin; 24. hanging ring. DETAILED DESCRIPTION

[0028] The above and other embodiments and advantages of the present invention are described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments.

[0029] In one embodiment, Figure 1-Figure 5 As shown:

[0030] The present embodiment provides a mechanism for load testing of a boiler lifting platform, including a maintenance platform 1 and support frames 2 fixed on the four corners of the bottom of the maintenance platform 1. The maintenance platform 1, supported by the four support frames 2, forms an infrastructure for installing the lifting platform or installing the boiler by the lifting platform. For the assembly of the lifting platform and the boiler, the load formed on the infrastructure can be detected by the detection mechanism 3 of the present invention.

[0031] like Figure 3 or Figure 5 As shown, since a detection area 4 is formed between every two supports 2 , four detection areas 4 are formed between the four supports 2 . In order to improve the detection effect, the inventors set a set of detection mechanisms 3 in each detection area 4 .

[0032] like Figure 1 , Figure 2As shown, the detection mechanism 3 includes a U-shaped plastic tube 5 and a U-shaped water pipe 6 arranged in the U-shaped plastic tube 5. The U-shaped plastic tube 5 includes a U-shaped curved portion 7 and vertical portions 8 integrally bent on both sides of the curved portion 7. The two vertical portions 8 are respectively close to the support frames 2 on both sides of the detection area 4, and the bottom ends of the vertical portions 8 are closed. When in use, the four U-shaped plastic tubes 5 with the internal U-shaped water pipes 6 are hung in each detection area 4, so that the vertical portions 8 on both sides of the U-shaped plastic tube 5 are parallel to the two inner sides of the detection area 4. Figure 1 , Figure 2 As shown, the detection mechanism 3 also includes a first hinge shaft 9 and a second hinge shaft 10 arranged on the upper and lower sides of the ends of the two vertical parts 8, as well as a first detection seat 11 connected to the first hinge shaft 9 and a second detection seat 12 connected to the second hinge shaft 10. Since the first hinge shaft 9 is sleeved with a first torsion spring 13, one end of the first torsion spring 13 is pressed against the inner surface of the first detection seat 11 to deflect the first detection seat 11 upward, and the other end of the first torsion spring 13 is pressed against the vertical part 8; similarly, the second hinge shaft 10 is sleeved with a second torsion spring 14, one end of the second torsion spring 14 is connected to the inner surface of the second detection seat 12 to deflect the second detection seat 12 downward, and the other end of the second torsion spring 14 is pressed against the vertical part 8.

[0033] A connecting hole 16 is provided in the middle of the curved portion 7, and an injection pipe 17 is provided in the connecting hole 16. One end of the injection pipe 17 enters the U-shaped plastic tube 5 along the connecting hole 16 and is connected to the middle of the U-shaped water pipe 6, and the other end of the injection pipe 17 extends vertically downward and passes through the outside of the U-shaped plastic tube 5; the two vertical portions 8 of the U-shaped plastic tube 5 are parallel to each other, and the U-shaped water pipe 6 is arranged in the U-shaped plastic tube 5 along the U-shaped contour.

[0034] In summary, during the above-mentioned inspection, the four U-shaped plastic tubes 5 are placed in the four inspection areas 4 in turn, and the second inspection seats 12 on both sides of the U-shaped plastic tube 5 are respectively hung on the inner wall of the bracket 2 on the same side through the hanging holes 18. At this time, the first inspection seats 11 on both sides of the U-shaped plastic tube 5 are respectively supported on the inner wall of the bracket 2 on the same side under the support of the first torsion spring 13, and the bending part 7 of the U-shaped plastic tube 5 is hung on the four sides of the maintenance platform 1. At this time, the injection pipes 17 on the four U-shaped plastic tubes 5 are all vertically downward, and then the four injection pipes 17 are respectively connected to the water pipes, and the water pipes share a water pump, and the water pump is started to inject water into the four injection pipes 17 at the same time. The four injection pipes 17 inject water into the U-shaped water pipes 6 in the four U-shaped plastic tubes 5 at the same time, so that the four U-shaped plastic tubes 5 gradually become heavier. Since the four U-shaped plastic tubes 5 are respectively Suspended in four detection areas 4, the four U-shaped plastic tubes 5 will transfer gravity to the second detection seat 12 when they gain weight. The second detection seat 12 is connected to the support frame 2 by means of a transfer. Therefore, the self-weight generated by the four U-shaped plastic tubes 5 will be transferred from the second detection seat 12 to the support frames 2 on both sides, and continue to supply water to the U-shaped water pipe 6. When the weight G of the total water supply of the four U-shaped water pipes 6 approaches or exceeds the weight G1 of the boiler plus the lifting platform, the degree of change of the four support frames 2 is observed. Since the load-bearing area is located in the detection area 4, if some or some of the support frames 2 are bent and deformed, they will bend inward toward the direction of the detection area 4. At this time, it is proved that the rated load-bearing capacity of the support frame 2 has been reached, and it is also known that the entire infrastructure cannot bear the load of the boiler and the lifting platform to be installed. Compared with the prior art, since four detection areas 4 are used as the detection points for load-bearing, and the structures of the four U-shaped plastic tubes 5 on the four detection areas 4 are consistent, the detection effect is improved during detection. The U-shaped plastic tube 5 is U-shaped and bent, and the force generated by its own weight is fed back to the two supports 2 on the same side through the vertical parts 8 on both sides at the same time. The four U-shaped plastic tubes 5 are fed back to the four supports 2 at the same time. After water is injected at the same time, four detection parts are formed at one time to refer to whether the four supports 2 are deformed, making the load test detection method of infrastructure more intuitive.

[0035] In connection with the above, since a first detection seat 11 is hinged on both sides of each U-shaped plastic tube 5, and the free ends of the two first detection seats 11 are supported by one end of the first torsion spring 13 and are pressed against the inner surfaces of the two support frames 2 on the same side, once some or a certain support frame 2 is bent inwardly, the deformation will be fed back to the free end of the first detection seat 11, so that the first detection seat 11 rotates around the first hinge shaft 9. The bending deformation of the support frame 2 can be intuitively observed according to the rotation amount of the first detection seat 11. A distance scale 21 is provided on the first detection seat 11. When the first detection seat 11 rotates, it will rotate with the distance scale 21. The distance scale 21 will be angularly offset relative to the arc plate 19. According to the data change after the distance scale 21 is angularly offset relative to the arc plate 19, slight changes in the support frame 2 can be detected. Compared with the prior art, the test detection means provided by the present invention has a more intuitive detection method and a more accurate detection effect.

[0036] like Figures 1 to 4 As shown, the U-shaped profile of the U-shaped plastic tube 5 is welded with an arc plate 19 on both the front and rear sides, and a detection cavity 20 is formed between the two arc plates 19. The first hinge shaft 9 and the second hinge shaft 10 are fixed between the two arc plates 19. One end of the first detection seat 11 transferred to the first hinge shaft 9 is located in the detection cavity 20, and one end of the second detection seat 12 transferred to the second hinge shaft 10 is located in the detection cavity 20. The first detection seat 11 is provided with a distance scale 21, which faces forward and faces the inner surface of the front arc plate 19. A suspension rope is connected to the middle position of the arc plate 19, and a suspension hook 15 is connected to the other end of the suspension rope. When the U-shaped plastic tube 5 is hung to the detection area 4, the top end of the U-shaped plastic tube 5 is hung on the four sides of the maintenance platform 1 through the hook 15. The detection cavity 20 formed by the two arc-shaped plates 19 is not only used to improve the strength of the U-shaped plastic tube 5 when a large amount of water is injected into the U-shaped water pipe 6 to prevent the U-shaped plastic tube 5 from deforming itself, but also the detection cavity 20 is used to fix the second hinge shaft 10, and the detection cavity 20 is also used to form a smooth guide for the deflection of the first detection seat 11 and the second detection seat 12. When the first detection seat 11 is deflected due to the bending of the support frame 2 on the same side, the deflection angle of the first detection seat 11 is based on the change in the distance between the distance scale 21 and the inner edge of the arc-shaped plate 19.

[0037] The U-shaped water pipe 6 is a variable diameter pipe that gradually becomes thicker from the middle to the two ends, wherein the thin pipe diameter portion in the middle is located in the bending portion 7 of the U-shaped plastic pipe 5, and the thick pipe diameter portions at both ends extend into the bending portions 7 on both sides of the U-shaped plastic pipe 5, and the injection pipe 17 is connected to the middle position of the thin pipe diameter of the U-shaped water pipe 6. When water is injected into the U-shaped water pipe 6 from the middle, the water first flows into the tube cavities at the two ends of the U-shaped water pipe 6, and the water storage capacity in the tube cavities at the two ends is relatively large, thereby providing load to the inner surface of the two support frames 2 on the same side in a short time. If the load-bearing quality of the two support frames 2 is poor, the two support frames 2 are driven to bend inwardly and deform in a short time.

[0038] The method of load test of lifting platform includes the following experimental steps:

[0039] Step s01, hinge two hangers 22 at the same height on all the supports 2, and the free end of the hanger 22 is provided with a pin 23 matching the hanging hole 18 on the second detection seat 12, and the eight second detection seats 12 and the eight hangers 22 are connected together by inserting the pin 23 into the hanging hole 18.

[0040] Step s02, connect the injection pipes 17 on the four U-shaped plastic pipes 5 together through a pipeline to share a water inlet pipe, and connect the outer end of the water inlet pipe to a water pump;

[0041] Step s03, start the water pump in step s02, inject water into the four injection pipes 17 simultaneously through the water inlet pipe, and inject water into the four U-shaped water pipes 6 simultaneously through the four injection pipes 17, observe the change state of the first detection seat 11 on the four U-shaped plastic tubes 5, and judge the deformation resistance of the support frame 2 when bearing different loads according to the positional relationship between the distance scale 21 and the arc plate 19 on the same side.

[0042] According to the above detection method, the eight second detection seats 12 are installed at the same position on the four U-shaped plastic tubes 5 , and the eight hangers 22 are installed at the same position on the four support frames 2 .

[0043] According to the above detection method, the method of load testing of the lifting platform is characterized in that a hanging ring 24 is welded at the middle position of each of the four sides of the maintenance platform 1, and the hook 15 is hung upward on the corresponding hanging ring 24, so that the bending parts 7 at the top ends of the four U-shaped plastic tubes 5 are suspended in the corresponding detection area 4.

[0044] The above orientation designations do not represent the specific orientations of the components in this implementation scheme. This implementation scheme is only for the convenience of describing the scheme, and the orientations are described relatively with reference to the figures. In essence, the specific orientations of the components are described according to their actual installation and actual use as well as the customary orientations of technicians in this field. This is hereby explained.

[0045] The specific implementation methods described above further describe the invention purpose, technical solutions, and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the protection scope of the present invention. It is particularly pointed out that for those skilled in the art, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A mechanism for a boiler lifting platform load test, characterized in that: The invention comprises a maintenance platform (1), a support frame (2) fixed on the four corners of the bottom of the maintenance platform (1), and a detection mechanism (3) located below the maintenance platform (1), wherein a detection area (4) is formed between every two of the support frames (2), and four detection areas (4) are formed between the four support frames (2). A set of the detection mechanism (3) is arranged in each of the detection areas (4), and the detection mechanism (3) comprises a U-shaped plastic tube (5) and a U-shaped water pipe (6) arranged in the U-shaped plastic tube (5). The U-shaped plastic tube (5) comprises a U-shaped bending portion (7) and vertical portions (8) integrally bent on both sides of the bending portion (7), and the two vertical portions (8) are respectively close to the support frames (2) on both sides of the detection area (4), and the bottom ends of the vertical portions (8) are closed; The detection mechanism (3) further comprises a first hinge shaft (9) and a second hinge shaft (10) arranged at upper and lower sides of the ends of the two vertical parts (8), and a first detection seat (11) connected to the first hinge shaft (9) and a second detection seat (12) connected to the second hinge shaft (10), wherein the first hinge shaft (9) is sleeved with a first torsion spring (13), one end of the first torsion spring (13) is pressed against the inner surface of the first detection seat (11) to deflect the first detection seat (11) upward, and the other end of the first torsion spring (13) is pressed against the vertical part (8); Similarly, a second torsion spring (14) is sleeved on the second hinge shaft (10), one end of the second torsion spring (14) is connected to the inner surface of the second detection seat (12) to deflect the second detection seat (12) downward, and the other end of the second torsion spring (14) is pressed against the vertical portion (8); A connecting hole (16) is provided at the middle position of the curved portion (7), an injection pipe (17) is provided in the connecting hole (16), one end of the injection pipe (17) enters the U-shaped plastic pipe (5) along the connecting hole (16) and is connected to the middle position of the U-shaped water pipe (6), and the other end of the injection pipe (17) extends vertically downward and penetrates outside the U-shaped plastic pipe (5); A hanging hole (18) is provided on the free end of the second detection seat (12), and a hanging component (22) is provided on the support frame (2), and the hanging component (22) is connected to the hanging hole (18) via a pin shaft (23).

2. The mechanism for boiler lifting platform load test according to claim 1, characterized in that: The two vertical parts (8) of the U-shaped plastic pipe (5) are parallel to each other, and the U-shaped water pipe (6) is arranged inside the U-shaped plastic pipe (5) along the U-shaped contour.

3. The mechanism for load testing of boiler lifting platform according to claim 2, characterized in that: The U-shaped water pipe (6) is a variable diameter pipe that gradually becomes thicker from the middle to the two ends, wherein the thin pipe diameter portion is located in the bending portion (7) of the U-shaped plastic pipe (5), and the thick pipe diameter portions at both ends extend into the bending portions (7) on both sides of the U-shaped plastic pipe (5), and the injection pipe (17) is connected to the middle position of the thin pipe diameter of the U-shaped water pipe (6).

4. The mechanism for boiler lifting platform load test according to claim 3 is characterized in that: The U-shaped profile of the U-shaped plastic tube (5) is welded with an arc plate (19) on both the front and rear sides thereof, a detection cavity (20) is formed between the two arc plates (19), the first hinge shaft (9) and the second hinge shaft (10) are fixed between the two arc plates (19), one end of the first detection seat (11) connected to the first hinge shaft (9) is located in the detection cavity (20), and one end of the second detection seat (12) connected to the second hinge shaft (10) is located in the detection cavity (20), and a distance scale (21) is provided on the first detection seat (11), and the distance scale (21) faces forward and faces the inner surface of the front arc plate (19).

5. The mechanism for boiler lifting platform load test according to claim 4, characterized in that: A suspension rope is connected to the middle position of the arc-shaped plate (19), and the other end of the suspension rope is connected to a suspension hook (15).

6. A method for load testing a lifting platform, the method being applicable to the mechanism for load testing a boiler lifting platform as claimed in claim 5, characterized in that: The experimental steps include: Step s01, hinge two hangers (22) at the same height on all the supports (2), the free ends of the hangers (22) are provided with pins (23) matching the hanging holes (18) on the second detection seats (12), and eight second detection seats (12) and eight hangers (22) are connected together by inserting the pins (23) into the hanging holes (18); Step s02, connecting the injection pipes (17) on the four U-shaped plastic pipes (5) together through a pipeline to share a water inlet pipe, and connecting the outer end of the water inlet pipe to a water pump; Step s03, start the water pump in step s02, inject water into the four injection pipes (17) simultaneously through the water inlet pipe, and inject water into the four U-shaped water pipes (6) simultaneously through the four injection pipes (17), observe the change state of the first detection seat (11) on the four U-shaped plastic pipes (5), and judge the anti-deformation capacity of the support frame (2) when bearing different loads according to the positional relationship between the distance scale (21) and the arc plate (19) on the same side.

7. The method for load testing of a lifting platform according to claim 6, characterized in that: The eight second detection seats (12) are installed at the same position on the four U-shaped plastic tubes (5), and the eight hangers (22) are installed at the same position on the four support frames (2).

8. The method for load testing of a lifting platform according to claim 7, characterized in that: A hanging ring (24) is welded at the middle position of each of the four sides of the maintenance platform (1), and the hook (15) is hung upward on the corresponding hanging ring (24), so that the bent parts (7) at the top ends of the four U-shaped plastic tubes (5) are suspended in the corresponding detection area (4).