A method for intelligently planning the placement of battery cells out of a station
By calculating the priority of the battery cell and updating its placement position and transportation path in real time, the problem of inability to adjust the placement position in time due to changes in the battery cell production capacity is solved, and the flexibility and efficiency of battery cell production are improved.
Patent Information
- Application Number
- CN202410951594.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-16
AI Technical Summary
The prior art cannot adjust the placement position and transportation path of the battery cell in a timely manner according to the dynamic changes in the production capacity of different battery cells in different time periods, resulting in the inability to meet the ever-changing production needs.
By collecting parameters such as warehouse capacity, conveying car speed and battery cell production capacity, the priority of each battery cell is calculated, and its optimal placement position and transportation path are determined based on the priority, and the placement position and transportation path of the battery cell are updated in real time. , to meet dynamically changing production needs.
The dynamic changes in different battery cell production capacity are achieved according to different time periods, and the battery cell placement position and transportation path are updated in real time, improving the flexibility and efficiency of battery cell production.
Smart Images

Figure CN118504784B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent battery cell production, and in particular to a method for intelligently planning and placing battery cells out of a station. Background Art
[0002] With the increasing application of mobile power in life and industry, for example, mobile power equipped with automotive-grade batteries has been widely used. In addition, mobile power is also increasingly used in the field of energy storage. Mobile power can be regarded as a collection of one or more batteries. In the related technology, the production capacity of different types of batteries is different, which is due to the number of orders placed by customers. After the battery cells are produced, they need to be stacked in the warehouse for a certain period of time before they can be shipped. The more batteries are shipped, the easier it should be to transport them. However, once the stacking position of the battery cells is determined, it will not be easily changed, because this involves issues such as the factory placement database and the re-planning of the conveyor vehicle route; but the production capacity of different batteries in different time periods changes dynamically, which results in the placement of the battery cells cannot be changed in time according to changes in orders. Summary of the invention
[0003] In order to overcome the shortcomings and deficiencies in the prior art, the purpose of the present invention is to provide a method for intelligently planning the outbound placement of battery cells, which can dynamically change the production capacity of different battery cells in different time periods, and re-update parameters such as the placement position of the battery cells and the transportation route of the transport vehicle in real time to meet the ever-changing battery cell production needs.
[0004] The present invention is achieved through the following technical solutions:
[0005] In a first aspect, the present invention provides a method for intelligently planning the placement of batteries out of a station, which comprises the following steps:
[0006] S100. Collect the parameters of warehouse capacity, transportation speed of conveyor carts, production capacity of different types of battery cells, and order quantity, and coordinate the space in the warehouse;
[0007] S200. Calculate the priority of each cell type based on the cell production capacity, order quantity, and transportation speed of the conveyor vehicle, and calculate the best placement position of each cell in the warehouse based on the priority, and present the placement position in the form of coordinates;
[0008] S300. Minimum path planning for the transport vehicle;
[0009] S400. Verify the correlation between the cell placement and the transport vehicle path planning. The verification formula is:
[0010]
[0011] in, It is The production capacity of battery cells, It is The shipping efficiency of battery cells, is the average value of all battery cell production capacity. It is the average efficiency of all battery cells shipped.
[0012] In combination with the first aspect, further, in step S200, the cell type priority is calculated, and the priority calculation formula is:
[0013]
[0014] in, For the Priority of battery cells, Indicates The production capacity of battery cells, Indicates The number of orders for battery cells, Indicates the total capacity of the warehouse;
[0015] According to the priority of the cell type, calculate the The coordinates of the battery cells stored in the warehouse , No. Horizontal coordinates of battery cells The calculation formula is:
[0016]
[0017] in, is the number of cell types, is the sum of all cell priorities, is the horizontal width of the warehouse;
[0018] No. Vertical coordinate of the battery cell The calculation formula is:
[0019]
[0020] in, is the longitudinal length of the warehouse, It is the gap between the cells.
[0021] In combination with the first aspect, further, in calculating the The coordinates of the battery cells stored in the warehouse Before, Set it as primary priority and substitute it into the following formula:
[0022]
[0023] in, is the speed of the conveyor trolley;
[0024] Will get Replace the absolute value of Horizontal coordinates of battery cells In the calculation formula .
[0025] In combination with the first aspect, further, between step S300 and step S400, step S301 is further included:
[0026] Calculate the weighted average between the speed of the transport trolley and the priority of the battery cell to obtain the weighted average speed of the transport trolley. The calculation formula of the weighted average speed is:
[0027]
[0028] in, The weighted average speed of the transport vehicle, is the initial velocity of the transport trolley.
[0029] In combination with the first aspect, further, in step S300, the calculation formula for the minimum path of the transport vehicle is:
[0030]
[0031] in, is a positive integer, It is the outbound location of the warehouse.
[0032] In a second aspect, the present invention provides a computer device, including a processor and a storage medium;
[0033] The storage medium is used to store instructions;
[0034] The processor is used to operate according to the instructions to execute the steps of any one of the above methods.
[0035] Beneficial effects of the present invention:
[0036] The method for intelligently planning the outbound placement of battery cells of the present invention is based on the statistics of battery cell production data and can update parameters such as the placement position of battery cells and the transportation path of AGV vehicles in real time according to the dynamic changes in the production capacity of different battery cells in different time periods, so as to meet the ever-changing battery cell production needs. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0038] Figure 1 The present invention is a flowchart of the steps of the method for intelligently planning the placement of batteries at the exit. DETAILED DESCRIPTION
[0039] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below.
[0040] With the increasing application of mobile power in life and industry, for example, mobile power equipped with automotive-grade batteries has been widely used. In addition, mobile power is also increasingly used in the field of energy storage. Mobile power can be regarded as a collection of one or more batteries. In the related technology, the production capacity of different types of batteries is different, which is due to the number of orders placed by customers. After the battery cells are produced, they need to be stacked in the warehouse for a certain period of time before they can be shipped. The more batteries are shipped, the easier it should be to transport them. However, once the stacking position of the battery cells is determined, it will not be easily changed, because this involves issues such as the factory placement database and the re-planning of the conveyor vehicle route; but the production capacity of different batteries in different time periods changes dynamically, which results in the placement of the battery cells cannot be changed in time according to changes in orders.
[0041] In order to solve the above problems, this embodiment discloses a method for intelligently planning the placement of batteries at a station, which includes the following steps:
[0042] S100. Collect the parameters of warehouse capacity, transportation speed of conveyor carts, production capacity of different types of battery cells, and order quantity, and coordinate the space in the warehouse;
[0043] S200. Calculate the priority of each cell type based on the cell production capacity, order quantity, and transportation speed of the conveyor vehicle, and calculate the best placement position of each cell in the warehouse based on the priority, and present the placement position in the form of coordinates;
[0044] S300. Minimum path planning for the transport vehicle;
[0045] S400. Verify the correlation between the cell placement and the transport vehicle path planning. The verification formula is:
[0046]
[0047] in, It is The production capacity of battery cells, It is The shipping efficiency of battery cells, is the average value of all battery cell production capacity. It is the average efficiency of all battery cells shipped.
[0048] In this embodiment, the transport vehicle is preferably an AGV vehicle.
[0049] Furthermore, in step S200, the cell type priority is calculated, and the priority calculation formula is:
[0050]
[0051] in, For the Priority of battery cells, Indicates The production capacity of the battery cell, in units of pieces / second, pieces / minute or pieces / hour, Indicates The order quantity of the battery cell, in pieces, Indicates the total capacity of the warehouse, in pieces;
[0052] According to the priority of the cell type, calculate the The coordinates of the battery cells stored in the warehouse , No. Horizontal coordinates of battery cells The calculation formula is:
[0053]
[0054] in, is the number of cell types, is the sum of all cell priorities, is the horizontal width of the warehouse, in meters;
[0055] No. Vertical coordinate of the battery cell The calculation formula is:
[0056]
[0057] in, is the longitudinal length of the warehouse, It is the placement gap between battery cells, and the unit is meter.
[0058] Furthermore, in calculating The coordinates of the battery cells stored in the warehouse Before, Set it as primary priority and substitute it into the following formula:
[0059]
[0060] in, is the speed of the conveyor trolley in meters per second;
[0061] Will get Replace the absolute value of Horizontal coordinates of battery cells In the calculation formula .because The calculation formula is the absolute value of the sine function, which is expressed by the above formula Within a certain value When , the normal distribution that satisfies the priority is relevant.
[0062] Furthermore, between step S300 and step S400, step S301 is also included:
[0063] Calculate the weighted average between the speed of the transport trolley and the priority of the battery cell to obtain the weighted average speed of the transport trolley. The calculation formula of the weighted average speed is:
[0064]
[0065] in, The weighted average speed of the transport vehicle, is the initial speed of the transport trolley. The speed of the transport trolley is continuously adjusted through weighted average to meet the ever-changing production needs.
[0066] In combination with the first aspect, further, in step S300, the calculation formula for the minimum path of the transport vehicle is:
[0067]
[0068] in, is a positive integer, It is the outbound location of the warehouse.
[0069] Example 2
[0070] This embodiment provides a computer device, including a processor and a storage medium;
[0071] The storage medium is used to store instructions;
[0072] The processor is used to operate according to the instructions to execute the steps of any method described in Example 1.
[0073] Example 3
[0074] An embodiment of the present invention further provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of the method described in Embodiment 1 are implemented.
[0075] In summary, the method for intelligent planning of outbound placement of battery cells in this embodiment is based on the statistics of battery cell production data and can update parameters such as the placement position of battery cells and the transportation path of AGV vehicles in real time according to the dynamic changes in the production capacity of different battery cells in different time periods, so as to meet the ever-changing battery cell production needs.
[0076] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0077] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0078] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0079] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention, rather than to limit the scope of protection of the present invention. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the essence and scope of the technical solution of the present invention.
Claims
1. A method for intelligently planning the placement of battery cells out of a station, characterized in that: The following steps are involved: S100. Collect the parameters of warehouse capacity, transportation speed of conveyor carts, production capacity of different types of battery cells, and order quantity, and coordinate the space in the warehouse; S200. Calculate the priority of each cell type based on the cell production capacity, order quantity, and transportation speed of the conveyor vehicle, and calculate the best placement position of each cell in the warehouse based on the priority, and present the placement position in the form of coordinates; S300. Minimum path planning for the transport vehicle; In step S200, the cell type priority is calculated, and the priority calculation formula is: in, For the Priority of battery cells, Indicates The production capacity of battery cells, Indicates The number of orders for battery cells, Indicates the total capacity of the warehouse; According to the priority of the cell type, calculate the The coordinates of the battery cells stored in the warehouse , No. Horizontal coordinates of battery cells The calculation formula is: in, is the number of cell types, is the sum of all cell priorities, is the horizontal width of the warehouse; No. Vertical coordinate of the battery cell The calculation formula is: in, is the longitudinal length of the warehouse, It is the placement gap between the cells; In calculating The coordinates of the battery cells stored in the warehouse Before, Set it as primary priority and substitute it into the following formula: in, is the speed of the conveyor trolley; Will get Replace the absolute value of Horizontal coordinates of battery cells In the calculation formula .
2. A method for intelligently planning the placement of batteries out of a station according to claim 1, characterized in that: In step S300, the calculation formula for the minimum path of the transport vehicle is: in, is a positive integer, It is the outbound location of the warehouse.
3. A method for intelligently planning the placement of battery cells out of a station according to claim 1, characterized in that: The method further includes step S400: verifying the correlation between the battery cell placement position and the transport vehicle path planning, and the verification formula is: in, It is The production capacity of battery cells, It is The shipping efficiency of similar batteries, is the average value of all battery cell production capacity. It is the average efficiency of all battery cells shipped.
4. A method for intelligently planning the placement of battery cells out of a station according to claim 3, characterized in that: Between step S300 and step S400, step S301 is also included: Calculate the weighted average between the speed of the transport trolley and the priority of the battery cell to obtain the weighted average speed of the transport trolley. The calculation formula of the weighted average speed is: in, The weighted average speed of the transport vehicle, is the initial velocity of the transport trolley.
