A construction project surveying and mapping data management system
By constructing a delay response evaluation model and an autoregressive integral sliding average model, the response delay problem of the construction project surveying and mapping data management system in real-time data processing is solved, resource utilization is optimized, project efficiency is improved, and decision-making is supported.
Patent Information
- Application Number
- CN202410625100.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-20
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-05-20
AI Technical Summary
The existing construction project surveying and mapping data management system has response delays in real-time data processing, making it difficult to achieve efficient processing and updates in fast response occasions.
Build a delay response evaluation model, generate a delay response evaluation index by evaluating processing speed, emergency expansion and data value information, decide whether to build an autoregressive integral sliding average model, and evaluate the prediction ability of the model through residual inspection and leave method to optimize resources Utilize and improve project efficiency.
Effectively evaluate and optimize the response delay of existing systems, improve data processing efficiency, support decision-making and resource allocation, and improve the modernization level of project management.
Smart Images

Figure CN118505149B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data management, and more specifically, to a construction project surveying and mapping data management system. Background Art
[0002] A construction project surveying and mapping data management system aims to efficiently and accurately manage the large amount of surveying and mapping data generated in construction projects to ensure project quality and improve construction efficiency. Such a system usually needs to cover multiple links such as data collection, processing, storage, sharing and analysis.
[0003] For construction projects, the development and application of construction project surveying and mapping data management system can not only greatly improve work efficiency and data utilization, but also improve construction quality and the modernization level of project management. Specifically, its significance is mainly reflected in improving data accuracy and reliability, enhancing data analysis and decision-making support capabilities, optimizing resource allocation and reducing costs, strengthening project supervision and quality control, promoting knowledge accumulation and experience inheritance, and supporting sustainable development goals.
[0004] At present, although the construction project surveying and mapping data management system plays an important role in improving the efficiency of engineering projects, ensuring quality and promoting decision-making, it also faces some challenges and problems in practical applications, such as real-time data processing capabilities. In some situations that require rapid response, the system may find it difficult to achieve efficient real-time data processing and updating. Summary of the invention
[0005] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a construction project surveying and mapping data management system, which constructs a delayed response evaluation model to obtain an evaluation result of the response delay of the existing system to the surveying and mapping data in the construction project, and decides whether to construct an autoregressive integrated moving average model of the time series analysis algorithm according to the comparison between the evaluation result and the set time threshold, and then evaluates the prediction ability of the model through residual checking and holdout method, so as to obtain a management system with the function of predicting future trends, optimizing resource utilization, improving project efficiency and supporting decision making.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A construction project surveying and mapping data management system, including the following modules:
[0008] Data collection module, which monitors and collects processing speed information, emergency expansion information and data value information in the existing system and related real-time surveying and mapping data, including time series data sets of terrain changes, construction progress and resource consumption;
[0009] The response assessment module builds a delayed response assessment model to evaluate the response delay of the existing system to surveying and mapping data in construction projects;
[0010] Algorithm module, collects time series analysis data to build an autoregressive integrated moving average model, draws time series graphs, obtains parameter values, and outputs multiple built models;
[0011] The result processing module uses residual checking and holdout method to evaluate the predictive ability of the model and output the optimal result.
[0012] In a preferred embodiment, a delayed response evaluation model is constructed, and the specific process is to collect processing speed information, emergency expansion information and data value information in the existing system, wherein the processing speed information includes a processing speed coefficient, calibrated as S cl , the emergency expansion information includes the emergency expansion coefficient, calibrated as T yj , data value information includes data value coefficient, denoted as J sj ;
[0013] Processing speed factor S cl By collecting the data collection delay time, data transmission delay time and data processing delay time of the current system, they are calibrated as Y j , Y s and Y c , then the processing speed coefficient S cl =Y j +Y s +Y c ;
[0014] Emergency expansion coefficient T yj Collect the speed and efficiency of system expansion when adding data sources or processing requirements, and mark the increase of data sources in one minute as Z m The time it takes for the system to process all data within one minute is calibrated as T c , and calculate the average efficiency of the system in processing data in the past hour, calibrated as The encryption influence coefficient
[0015] Data value coefficient J sj By calculating the total economic investment of the current construction project, it is calibrated as M t , mark the project duration as X s , calculate the expected profit amount of the construction project and mark it as Y e , then the data value coefficient J sj =M t ×X s +Y e .
[0016] In a preferred embodiment, the delayed response evaluation model is constructed by weighting the processing speed information, the emergency expansion information and the data value information to generate the delayed response evaluation index YC pg , the corresponding coefficients are processing speed coefficient S cl , Emergency expansion coefficient T yj , data value coefficient J sj , the formula is YC pg =α1×S cl +α2×T yj +α3×J sj , α1, α2, and α3 are the weight coefficients of the corresponding indicators, all of which are greater than 0.
[0017] In a preferred embodiment, when the delayed response evaluation index YC pg When the time is greater than the set time threshold, the data processing method in the existing data management system is improved by artificial intelligence, a data modeling signal is generated, and subsequent model construction and evaluation are carried out;
[0018] When the delayed response evaluation index YC pg When the time is less than or equal to the set time threshold, the data processing method in the existing system is maintained, and the evaluation results are directly output without further evaluation.
[0019] In a preferred embodiment, an autoregressive integrated moving average model is applied through a time series analysis algorithm to assist the existing system in predicting future data trends;
[0020] The construction method of the autoregressive integrated moving average model is as follows:
[0021] Step A1, data collection and preprocessing, collect relevant real-time surveying and mapping data, ensure the quality and integrity of the data, clean the data, handle missing values and outliers, and transform the data to ensure its stability;
[0022] Step A2: exploratory data analysis: draw a time series graph to observe the changing trend of the data over time, and draw an autocorrelation graph and a partial autocorrelation graph to analyze the autocorrelation of the data;
[0023] Step A3, determining model parameters and model fitting, identifying parameters p and q using autocorrelation diagrams and partial autocorrelation diagrams, and fitting multiple autoregressive integrated moving average models using a statistical software package to obtain the optimal model.
[0024] In a preferred embodiment, the constructed model is evaluated, and the model fit is evaluated by comparing the information criteria and residual diagnosis of different models, and the model with the smallest value is selected for further verification. The residual check and the holdout method are used to evaluate the predictive ability of the model. The specific verification steps are as follows:
[0025] Step B1, residual check, analyze the residuals of the selected model to ensure that they are distributed in white noise;
[0026] Step B2, divide the time series data into a training set and a test set;
[0027] Step B3, using the fitted autoregressive integrated moving average model to predict the test set and compare it with the actual value in the test set;
[0028] Step B4: If the prediction performance of the model does not meet expectations, retrain the model and use the results of the test set as data to adjust the parameters of the autoregressive integrated moving average model.
[0029] Technical effects and advantages of the present invention:
[0030] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a construction project surveying and mapping data management system, which constructs a delayed response evaluation model to obtain an evaluation result of the response delay of the existing system to the surveying and mapping data in the construction project, and decides whether to construct an autoregressive integrated moving average model of the time series analysis algorithm according to the comparison between the evaluation result and the set time threshold, and then evaluates the prediction ability of the model through residual checking and holdout method, so as to obtain a management system with the function of predicting future trends, optimizing resource utilization, improving project efficiency and supporting decision making. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 The present invention is a flow chart of a construction project surveying and mapping data management system. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] The present invention provides a construction project surveying and mapping data management system, which constructs a delayed response evaluation model to obtain an evaluation result of the response delay of an existing system to surveying and mapping data in a construction project, and determines whether to construct an autoregressive integrated moving average model of a time series analysis algorithm according to a comparison between the evaluation result and a set time threshold, and then evaluates the prediction ability of the model through residual checking and holdout method, thereby obtaining a management system capable of predicting future trends, optimizing resource utilization, improving project efficiency and supporting decision making.
[0034] Example
[0035] like Figure 1 As shown, a construction project surveying and mapping data management system includes the following modules:
[0036] Data collection module, which monitors and collects processing speed information, emergency expansion information and data value information in the existing system and related real-time surveying and mapping data, including time series data sets of terrain changes, construction progress and resource consumption;
[0037] The response assessment module builds a delayed response assessment model to evaluate the response delay of the existing system to surveying and mapping data in construction projects;
[0038] Algorithm module, collects time series analysis data to build an autoregressive integrated moving average model, draws time series graphs, obtains parameter values, and outputs multiple built models;
[0039] The result processing module uses residual checking and holdout method to evaluate the predictive ability of the model and output the optimal result.
[0040] Specifically, when constructing an autoregressive integrated moving average model through a time series analysis algorithm, the specific steps for drawing a time series graph are to use pip to install Pandas and Matplotlib libraries on a computer, use Pandas to read time series data, parse the date into a datetime object, and set it as the index of DataFrame, and use Matplotlib library to draw a time series graph through the DataFrame object, and finally obtain a time series graph showing data changes over time. In actual use, due to factors such as equipment cost and complexity of real-time monitoring, the present invention is based on the normal operation of the existing construction project surveying and mapping data management system and the relatively stable monitoring environment, and is carried out under the premise of continuously monitoring the response of the construction project surveying and mapping data management system to real-time data, which may lead to the phenomenon of rationality changes at a certain monitoring moment.
[0041] The response evaluation module builds a delayed response evaluation model. The specific process is to collect processing speed information, emergency expansion information and data value information in the existing system. The processing speed information includes the processing speed coefficient, which is calibrated as S cl , the emergency expansion information includes the emergency expansion coefficient, calibrated as T yj , data value information includes data value coefficient, denoted as J sj ;
[0042] Processing speed factor S cl By collecting the data collection delay time, data transmission delay time and data processing delay time of the current system, they are calibrated as Y j , Y s and Y c, then the processing speed coefficient S cl =Y j +Y s +Y c ;
[0043] Emergency expansion coefficient T yj Collect the speed and efficiency of system expansion when adding data sources or processing requirements, and mark the increase of data sources in one minute as Z m The time it takes for the system to process all data within one minute is calibrated as T c , and calculate the average efficiency of the system in processing data in the past hour, calibrated as The encryption influence coefficient
[0044] Data value coefficient J sj By calculating the total economic investment of the current construction project, it is calibrated as M t , mark the project duration as X s , calculate the expected profit amount of the construction project and mark it as Y e , then the data value coefficient J sj =M t ×X s +Y e ;
[0045] The delayed response evaluation model is constructed by weighting the processing speed information, emergency expansion information and data value information to generate the delayed response evaluation index YC pg , the corresponding coefficients are processing speed coefficient S cl , Emergency expansion coefficient T yj , data value coefficient J sj , the formula is YC pg =α1×S cl +α2×T yj +α3×J sj ;
[0046] At the same time, α1, α2, and α3 are all greater than 0 and are set according to actual conditions. For example, the expert weighting method is adopted, that is, experts in related fields are invited to determine the weights of various indicators through professional opinion surveys and comprehensive evaluations to ensure that the weight coefficients can accurately reflect the importance of various indicators in the delayed response evaluation. In addition, it is also possible to consider using a variety of methods such as hierarchical analysis method and fuzzy comprehensive evaluation method to determine the weight coefficients to ensure the objectivity and scientificity of the weight coefficients. I will not go into details here.
[0047] The delayed response evaluation index obtained from the delayed response evaluation model is used to reflect the response delay of the existing system to the surveying and mapping data in the construction project. The larger its value is, the longer the response delay of the existing system is. The longer the processing time required for the additional data in the face of emergency situations is, the greater the value of the data association is, and the higher the economic loss may be.
[0048] When the delayed response evaluation index YC pg When it is greater than the set time threshold, it means that the existing system cannot respond quickly to the real-time construction project surveying and mapping data, and the data processing method in the existing data management system should be improved by artificial intelligence, data modeling signals should be generated, and subsequent model construction and evaluation should be carried out;
[0049] When the delayed response evaluation index YC pg When it is less than or equal to the set time threshold, it means that the existing system can quickly respond to the real-time construction project surveying and mapping data, maintain the data processing method in the existing system, and directly output the evaluation results without subsequent evaluation.
[0050] The algorithm module uses the time series analysis algorithm and the autoregressive integrated moving average model to assist the existing system in predicting future data trends and achieve more efficient project management;
[0051] The method for constructing the autoregressive integrated moving average model of the present invention is as follows:
[0052] Step A1, data collection and preprocessing, collect relevant real-time surveying and mapping data, including time series data sets of terrain changes, construction progress, and resource consumption, ensure the quality and integrity of the data, clean the data, handle missing values and outliers, and transform the data to ensure its stability;
[0053] Step A2: exploratory data analysis: draw a time series graph to observe the trend of data over time, check whether the data rises or falls over time or has obvious periodic patterns. At this time, differentiate the data, draw autocorrelation graphs and partial autocorrelation graphs, analyze the autocorrelation of the data, and provide a basis for the subsequent determination of model parameters.
[0054] Step A3, determine model parameters and model fitting, use autocorrelation diagram and partial autocorrelation diagram to identify parameters p and q, specifically: find the number of significant non-zero bars in the partial autocorrelation diagram (i.e., points that drop rapidly to near zero) as the value of the autoregressive term p, similarly, find the number of significant non-zero bars in the autocorrelation diagram as the value of the moving average term q, use the identified parameters (p, d, q) as the starting point, build the model, and finally fit multiple autoregressive integrated moving average models using a statistical software package (such as statsmodels in Python) to obtain the optimal model.
[0055] The result processing module evaluates the constructed model and evaluates the model fit by comparing the information criteria and residual diagnostics of different models, such as Akaike Information Criterion AIC and Bayesian Information Criterion BIC, the formulas are and Where k is the number of model parameters, is the maximum likelihood estimate of the model, n is the number of data points, and the model with the smallest value is selected for further verification. The residual check and holdout method are used to evaluate the predictive ability of the model. The specific verification steps are as follows:
[0056] Step B1, residual check, analyze the residuals of the selected model to ensure that they are white noise distributed (i.e., the residuals are independent of each other and have constant variance);
[0057] Step B2: Divide the time series data into two parts: a training set and a test set. Common split ratios include 70% of the data for training and 30% for testing, or adjust according to the specific needs of the project.
[0058] Step B3, using the fitted autoregressive integrated moving average model to predict the test set and compare it with the actual value in the test set;
[0059] Step B4: If the prediction performance of the model does not meet expectations, retrain the model and use the results of the test set as data to adjust the parameters of the autoregressive integrated moving average model.
[0060] The above formulas are all dimensionless and calculated numerically. Specific dimension removal can be achieved by various means such as standardization, which will not be elaborated here. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0061] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented using software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, an ATA hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state ATA hard disk.
[0062] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0063] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0064] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0065] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0066] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0067] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: U disk, mobile ATA hard disk, read-only memory (ROM), random access memory (RAM), magnetic disk or optical disk, and other media that can store program codes.
[0068] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A construction project surveying and mapping data management system, It is characterized in that Includes the following modules: Data collection module, which monitors and collects processing speed information, emergency expansion information and data value information in the existing system and related real-time surveying and mapping data, including time series data sets of terrain changes, construction progress and resource consumption; The response assessment module builds a delayed response assessment model to evaluate the response delay of the existing system to surveying and mapping data in construction projects; Algorithm module, collects time series analysis data to build an autoregressive integrated moving average model, draws time series graphs, obtains parameter values, and outputs multiple built models; The result processing module uses residual checking and holdout methods to evaluate the model's predictive ability and output the optimal result; Construct a delayed response evaluation model. The specific process is to collect processing speed information, emergency expansion information and data value information in the existing system. The processing speed information includes the processing speed coefficient, which is calibrated as S cl , the emergency expansion information includes the emergency expansion coefficient, calibrated as T yj , data value information includes data value coefficient, denoted as J sj ; Processing speed factor S cl By collecting the data collection delay time, data transmission delay time and data processing delay time of the current system, they are calibrated as Y j , Y s and Y c , then the processing speed coefficient S cl =Y j +Y s +Y c ; Emergency expansion coefficient T yj Collect the speed and efficiency of system expansion when adding data sources or processing requirements, and mark the increase of data sources in one minute as Z m The time it takes for the system to process all data within one minute is calibrated as T c , and calculate the average efficiency of the system in processing data in the past hour, calibrated as The encryption influence coefficient Data value coefficient J sj By calculating the total economic investment of the current construction project, it is calibrated as M t , mark the project duration as X s , calculate the expected profit amount of the construction project and mark it as Y e , then the data value coefficient J sj =M t ×X s +Y e ; The delayed response evaluation model is constructed by weighting the processing speed information, emergency expansion information and data value information to generate the delayed response evaluation index YC pg , the corresponding coefficients are processing speed coefficient S cl , Emergency expansion coefficient T yj , data value coefficient J sj , the formula is YC pg =α 1 ×S cl +α 2 ×T yj +α 3 ×J sj , α 1 , α 2 , α 3 are the weight coefficients of the corresponding indicators, all greater than 0; When the delayed response evaluation index YC pg When the time is greater than the set time threshold, the data processing method in the existing data management system is improved by artificial intelligence, a data modeling signal is generated, and subsequent model construction and evaluation are carried out; When the delayed response evaluation index YC pg When the time is less than or equal to the set time threshold, the data processing method in the existing system is maintained, and the evaluation results are directly output without further evaluation.
2. A construction project surveying and mapping data management system according to claim 1, Features: Through time series analysis algorithms, the autoregressive integrated moving average model is applied to assist the existing system in predicting future data trends; The construction method of the autoregressive integrated moving average model is as follows: Step A1, data collection and preprocessing, collect relevant real-time surveying and mapping data, ensure the quality and integrity of the data, clean the data, handle missing values and outliers, and transform the data to ensure its stability; Step A2: exploratory data analysis: draw a time series graph to observe the changing trend of the data over time, and draw an autocorrelation graph and a partial autocorrelation graph to analyze the autocorrelation of the data; Step A3, determining model parameters and model fitting, identifying parameters p and q using autocorrelation diagrams and partial autocorrelation diagrams, and fitting multiple autoregressive integrated moving average models using a statistical software package to obtain the optimal model.
3. A construction project surveying and mapping data management system according to claim 2, Features: The constructed model was evaluated by comparing the information criteria and residual diagnostics of different models to evaluate the model fit. The model with the smallest value was selected for further verification. The residual check and holdout method were used to evaluate the predictive ability of the model. The specific verification steps are as follows: Step B1, residual check, analyze the residuals of the selected model to ensure that they are distributed in white noise; Step B2, divide the time series data into a training set and a test set; Step B3, using the fitted autoregressive integrated moving average model to predict the test set and compare it with the actual value in the test set; Step B4: If the prediction performance of the model does not meet expectations, retrain the model and use the results of the test set as data to adjust the parameters of the autoregressive integrated moving average model.
Citation Information
Patent Citations
Information management system for surveying and mapping engineering
CN115423389A
QoS-constrained flow application delay ensuring method and system
CN116302578A
Twin platform construction method and device based on surveying and mapping data, equipment and medium
CN116502182A
Building construction optimization system based on big data and cloud computing
CN116862199A
Water environment monitoring and intelligent early warning system
CN117973613A