Distribution network and charging and swapping facility collaborative planning method, system, equipment and medium

By building a collaborative planning model for distribution networks and charging and swapping facilities, and optimizing the location and operation plan of charging and swapping facilities, the impact of electric vehicle charging and swapping needs on traffic flow and grid load is solved, and the system's comprehensive benefits are achieved by the maximum Improve reliability and improve.

CN118521064BActive Publication Date: 2024-11-05ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410413658.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-05
Estimated Expiration
2044-04-08

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively coordinate the planning of distribution networks and charging and swapping facilities, which makes it difficult to optimize the impact of charging and swapping demand on traffic flow and grid load. The different types and sizes of electric vehicles pose challenges to the service capabilities of charging and swapping facilities. .

Method used

Build a collaborative planning model for distribution networks and charging and swapping facilities, consider the service capacity margin of charging and swapping stations, the distribution of traffic demands and distribution network constraints, and optimize the site selection and operation plan of charging and swapping facilities to maximize power distribution- Comprehensive benefits of the transportation system.

Benefits of technology

It improves the reliability and comprehensive benefits of the charging and swapping system, ensures that the charging and swapping needs of electric vehicles are met in special scenarios, and optimizes the resource allocation of the distribution network and transportation system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118521064B_ABST
    Figure CN118521064B_ABST
Patent Text Reader

Abstract

A method, system, equipment and medium for collaborative planning of distribution network and charging and swapping facilities. The method first aims to maximize the comprehensive benefits of the distribution-traffic system, constructs a collaborative planning model for distribution network and charging and swapping facilities that takes into account the service capacity margin constraints of charging and swapping stations and the different effects of small and medium-sized vehicles and large vehicles occupying traffic capacity in traffic behavior, and then solves the collaborative planning model to obtain the planned locations of various types of charging and swapping stations and the internal facility configuration plans of charging and swapping stations. The present invention not only optimizes the site selection and capacity operation plans of various types of charging and swapping stations, the capacity expansion plans of distribution network lines, and the allocation plans of various types of charging and swapping demands, but also considers the service capacity margin of charging and swapping facilities in special scenarios and the differences in charging demand and traffic weights between small and medium-sized vehicles and large vehicles, thereby improving the reliability of the charging and swapping system while maximizing its comprehensive benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of coordinated planning of distribution networks and charging and swapping facilities, and specifically relates to a method, system, device and storage medium for coordinated planning of distribution networks and charging and swapping facilities. Background Art

[0002] In recent years, as the use of electric vehicles has become more and more common, the demand for charging and battery replacement has gradually become diversified. The current mainstream charging and battery replacement modes for electric vehicles include AC slow charging mode, DC fast charging mode and battery replacement mode. The three charging and battery replacement modes have their own advantages and disadvantages. The slow charging mode has a slow charging speed but has the least impact on the distribution network. The fast charging mode has a faster charging speed but will aggravate the peak-to-valley difference of the grid load, which may cause certain damage to the distribution network. The battery replacement mode is the most convenient for electric vehicle users, but it has a higher demand for the number of batteries configured. Therefore, in actual production and life, it is necessary to optimize the charging and battery replacement stations and their internal charging facilities in order to achieve the best service effect for electric vehicle charging and battery replacement needs.

[0003] For the transportation network, the site selection, capacity determination and operation of charging and swapping facilities will significantly affect the traffic flow generated by the charging and swapping demand; for the distribution network, the access of charging and swapping stations will bring huge loads, and their planning schemes will also have a significant impact on the power flow of the distribution network. For electric vehicles, on the one hand, different types of vehicles will affect the distribution of traffic flow and charging demand, and on the other hand, different sizes of vehicles will lead to different traffic capacities occupied on the road, thus affecting traffic distribution. At the same time, charging and swapping facilities are the energy pillars of electric vehicles, and their service capabilities affect the normal operation of electric vehicles in the transportation network. In order to positively realize these effects, it is necessary to coordinate the planning of charging and swapping facilities with the transportation system, distribution network and service capabilities for electric vehicles. Summary of the invention

[0004] The purpose of the present invention is to address the above-mentioned problems existing in the prior art and to provide a method, system, device and storage medium for coordinated planning of distribution networks and charging and swapping facilities that maximizes the comprehensive benefits of the system while improving the reliability of the charging and swapping system.

[0005] To achieve the above objectives, the technical solution of the present invention is as follows:

[0006] In a first aspect, the present invention proposes a method for collaborative planning of a distribution network and charging and swapping facilities, comprising:

[0007] With the goal of maximizing the comprehensive benefits of the distribution-transportation system, a coordinated planning model for the distribution network and charging and swapping facilities is constructed. The constraints of the model include the service capacity margin constraint of the charging and swapping station, which takes into account the basic charging service demand of the charging and swapping station, the maximum daily operating time of the charging and swapping facilities, the power margin of the charging station energy storage, and the stock margin of the battery of the swapping station;

[0008] Solve the coordinated planning model of distribution network and charging and swapping facilities to obtain the planned locations of various types of charging and swapping stations and the internal facility configuration plans of charging and swapping stations.

[0009] The service capacity margin constraints of the charging and swapping station in the distribution network and charging and swapping facility collaborative planning model include:

[0010]

[0011]

[0012]

[0013]

[0014]

[0015]

[0016]

[0017] In the above formula, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, is the total traffic flow of road l in time period t, ω L is the lower limit of the proportion of charging demand satisfaction, are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, T UN is the unit time, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, respectively. M is the average daily maximum operating time of the charging facility, EO is the initial capacity of the energy storage system, is the charging and discharging power of the charging station at the distribution network node e during the cumulative time tn, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO、E SM 、E SO The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, and slow charging of large vehicles are T I is the power supply interruption time of the distribution network, RB t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t.

[0018] The objective function of the distribution network and charging and swapping facility collaborative planning model includes:

[0019] f=max(I P -C D -C T )d-(C H +C N )[(1+α) γ -1] / αγ 2 ;

[0020]

[0021]

[0022]

[0023]

[0024]

[0025] In the above formula, I P The service income of charging and swapping stations is C D is the vehicle driving energy consumption cost, C T is the time cost, d is the number of typical days in a year, C H is the configuration cost of related facilities of charging and swapping stations, C N is the cost of expanding the distribution network, α is the discount rate, γ is the investment period, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are PI FC ,PI SC ,PI BCThey are the fast charging service revenue, slow charging service revenue, and battery charging service revenue of the charging and swapping station, CB t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, PR P The unit price of electricity purchase cost and operation cost of the charging and swapping station, is the power support obtained by the charging and swapping station at the distribution network node e from the power grid during time period t, T UN For unit time, PR D is the driving cost per unit distance of the vehicle, is the total traffic flow of road l in time period t, L l is the length of road l, PR T is the unit time cost, v T is the average vehicle speed, are the service durations of the charging and swapping services for small and medium-sized vehicles, large vehicles, small and medium-sized vehicles, large vehicles, and large vehicles at the charging and swapping station at the distribution network node e in time period t, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, PR FP , PR SP , PR BP are the unit configuration costs of fast charging piles, slow charging piles, and battery charging facilities, respectively. t,e is the battery swapping service demand satisfied by the charging and swapping station at the distribution network node e in time period t, PR US The battery loss cost generated by a single battery swap service at the battery swap station, PR N is the expansion cost of a single distribution network line, is the decision variable for whether to expand the capacity of distribution network line c.

[0026] The constraints of the distribution network and charging and swapping facility collaborative planning model also include charging traffic demand allocation constraints, swapping station planning and operation constraints, and distribution network constraints;

[0027] The traffic demand allocation constraints include:

[0028]

[0029]

[0030]

[0031]

[0032]

[0033]

[0034]

[0035]

[0036] In the above formula, is the total traffic flow of road l in time period t, are the traffic flows of small and medium-sized vehicles and large vehicles with a starting and ending point pair of od and traveling via path k in time period t, is the correlation matrix between path k and road l, are the traffic demands of small and medium-sized vehicles and large vehicles with the origin and destination pair od in time period t, VC l is the traffic capacity of road l, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, ω D The maximum proportion of charging and swapping demand for each road vehicle, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, υ M ,υ O are the traffic weight coefficients for small and medium-sized vehicles and large vehicles, respectively. are the decision variables for whether to plan a charging and swapping station at the distribution network node e, δ M is the coefficient M in the big-M method;

[0037] The charging and swapping station planning and operation constraints include:

[0038]

[0039]

[0040]

[0041]

[0042]

[0043]

[0044]

[0045]

[0046]

[0047]

[0048]

[0049]

[0050]

[0051]

[0052]

[0053] In the above formula, are respectively the active and reactive power support obtained by the charging and swapping station at the distribution network node e from the power grid in time period t, is the charging and discharging power of the energy storage system at the charging and swapping station at the distribution network node e in time period t, E FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are respectively: t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, T UN is the unit time, η F , η S , η B are the energy transfer efficiencies of fast charging, slow charging, and battery charging, θ F ,θ S ,θ B They are the power factor angles for fast charging, slow charging, and battery charging, respectively. are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, P FP , P SP , P BP They are the rated powers of fast charging piles, slow charging piles, and battery charging facilities. are the number of charging piles, slow charging piles, and battery charging facilities at the distribution network node e, respectively. t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t, NB e is the total number of batteries configured in the battery swap station at the distribution network node e, σ L , σ H They are the lower and upper limits of the energy state of the energy storage system, NE eis the number of energy storage systems configured in the charging station at the distribution network node e, EC is the unit capacity of the energy storage system, EO is the initial power of the energy storage system, are the decision variables for whether to build a fast charging station or a slow charging station at the charging and swapping station at the distribution network node e;

[0054] The distribution network constraints include power output constraints, power balance constraints, line transmission power constraints, line impedance constraints, and bus voltage constraints.

[0055] In a second aspect, the present invention proposes a distribution network and charging and swapping facility coordinated planning system, including a model building module and a model solving module;

[0056] The model building module is used to build a coordinated planning model of distribution network and charging and swapping facilities with the goal of maximizing the comprehensive benefits of the distribution-transportation system. The constraints of the model include the service capacity margin constraint of the charging and swapping station, which takes into account the basic charging service demand of the charging and swapping station, the maximum daily operating time of the charging and swapping facilities, and the power margin of the charging station energy storage and the stock margin of the battery of the swapping station;

[0057] The model solving module is used to solve the coordinated planning model of the distribution network and charging and swapping facilities to obtain the planned locations of various types of charging and swapping stations and the internal facility configuration plans of the charging and swapping stations.

[0058] The model building module includes a charging and swapping station service capacity margin constraint unit, and the charging and swapping station service capacity margin constraint unit is used to construct the following constraints:

[0059]

[0060]

[0061]

[0062]

[0063]

[0064]

[0065]

[0066] In the above formula, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, is the total traffic flow of road l in time period t, ω L is the lower limit of the proportion of charging demand satisfaction, are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, T UN is the unit time, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, respectively. M is the average daily maximum operating time of the charging facility, EO is the initial capacity of the energy storage system, is the charging and discharging power of the charging station at the distribution network node e during the cumulative time tn, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, and slow charging of large vehicles are T I is the power supply interruption time of the distribution network, RB t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t.

[0067] The model building module also includes an objective function unit, which is used to build the following objective function:

[0068] f=max(I P -C D -C T )d-(C H +C N )[(1+α) γ -1] / αγ 2 ;

[0069]

[0070]

[0071]

[0072]

[0073]

[0074] In the above formula, I P The service income of charging and swapping stations is C D is the vehicle driving energy consumption cost, C T is the time cost, d is the number of typical days in a year, CH is the configuration cost of related facilities of charging and swapping stations, C N is the cost of expanding the distribution network, α is the discount rate, γ is the investment period, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are PI FC ,PI SC ,PI BC They are the fast charging service revenue, slow charging service revenue, and battery charging service revenue of the charging and swapping station, CB t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, PR P The unit price of electricity purchase cost and operation cost of the charging and swapping station, is the power support obtained by the charging and swapping station at the distribution network node e from the power grid during time period t, T UN For unit time, PR D is the driving cost per unit distance of the vehicle, is the total traffic flow of road l in time period t, L l is the length of road l, PR T is the unit time cost, v T is the average vehicle speed, are the service durations of the charging and swapping services for small and medium-sized vehicles, large vehicles, small and medium-sized vehicles, large vehicles, and large vehicles at the charging and swapping station at the distribution network node e in time period t, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, PR FP , PR SP , PR BP are the unit configuration costs of fast charging piles, slow charging piles, and battery charging facilities, respectively. t,e is the battery swapping service demand satisfied by the charging and swapping station at the distribution network node e in time period t, PR US The battery loss cost generated by a single battery swap service at the battery swap station, PR N is the expansion cost of a single distribution network line, is the decision variable for whether to expand the capacity of distribution network line c.

[0075] The model building module also includes a traffic demand allocation constraint unit, a charging and swapping station planning and operation constraint unit, and a distribution network constraint unit;

[0076] The traffic assignment constraint unit is used to construct the following constraints:

[0077]

[0078]

[0079]

[0080]

[0081]

[0082]

[0083]

[0084]

[0085] In the above formula, is the total traffic flow of road l in time period t, are the traffic flows of small and medium-sized vehicles and large vehicles with a starting and ending point pair of od and traveling via path k in time period t, is the correlation matrix between path k and road l, are the traffic demands of small and medium-sized vehicles and large vehicles with the origin and destination pair od in time period t, VC l is the traffic capacity of road l, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, ω D The maximum proportion of charging and swapping demand for each road vehicle, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, υ M ,υ O are the traffic weight coefficients for small and medium-sized vehicles and large vehicles, respectively. are the decision variables for whether to plan a charging and swapping station at the distribution network node e, δ M is the coefficient M in the big-M method;

[0086] The charging and swapping station planning and operation constraint unit is used to construct the following constraints:

[0087]

[0088]

[0089]

[0090]

[0091]

[0092]

[0093]

[0094]

[0095]

[0096]

[0097]

[0098]

[0099]

[0100]

[0101]

[0102] In the above formula, are respectively the active and reactive power support obtained by the charging and swapping station at the distribution network node e from the power grid in time period t, is the charging and discharging power of the energy storage system at the charging and swapping station at the distribution network node e in time period t, E FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are respectively: t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, T UN is the unit time, η F , η S , η B are the energy transfer efficiencies of fast charging, slow charging, and battery charging, θ F ,θ S ,θ B They are the power factor angles for fast charging, slow charging, and battery charging, respectively. are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, P FP , P SP , P BP They are the rated powers of fast charging piles, slow charging piles, and battery charging facilities. are the number of charging piles, slow charging piles, and battery charging facilities at the distribution network node e, respectively. t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t, NB e is the total number of batteries configured in the battery swap station at the distribution network node e, σ L , σ H They are the lower and upper limits of the energy state of the energy storage system, NE e is the number of energy storage systems configured in the charging station at the distribution network node e, EC is the unit capacity of the energy storage system, EO is the initial power of the energy storage system, are the decision variables for whether to build a fast charging station or a slow charging station at the charging and swapping station at the distribution network node e;

[0103] The distribution network constraint unit is used to construct power output constraints, power balance constraints, line transmission power constraints, line impedance constraints, and bus voltage constraints.

[0104] In a third aspect, the present invention provides a device for collaborative planning of distribution networks and charging and swapping facilities, including a processor and a memory;

[0105] The memory is used to store computer program code and transmit the computer program code to the processor;

[0106] The processor is used to execute the aforementioned method for coordinated planning of distribution networks and charging and swapping facilities according to the instructions in the computer program code.

[0107] In a fourth aspect, the present invention provides a computer storage medium having a computer program stored thereon;

[0108] When the computer program is executed by the processor, the steps of the aforementioned method for coordinated planning of distribution networks and charging and swapping facilities are implemented.

[0109] Compared with the prior art, the present invention has the following beneficial effects:

[0110] 1. The present invention provides a coordinated planning method for distribution networks and charging and swapping facilities, which regards electric vehicles, charging and swapping facilities and distribution-transportation coupling networks as a whole, takes maximizing the comprehensive benefits of the distribution-transportation system as the goal, and constructs a coordinated planning model for distribution networks and charging and swapping facilities. The method takes into account the service capacity margin of charging and swapping stations in special scenarios, so that when equipment in the charging and swapping stations needs to be repaired or the power supply of the distribution network is interrupted, the distribution-transportation coupling system still has sufficient service capacity to meet the charging and swapping needs of electric vehicles, thereby improving the reliability of the charging and swapping system and maximizing the comprehensive benefits of the distribution-transportation system.

[0111] 2. The present invention provides a coordinated planning method for distribution networks and charging and swapping facilities. In terms of charging demand and traffic demand, the differences in charging demand and traffic weights between small and medium-sized electric vehicles and large electric vehicles are taken into account, and corresponding traffic weights are set for small and medium-sized electric vehicles and large electric vehicles to reflect their impact on traffic capacity in traffic behavior.

[0112] 3. The present invention provides a coordinated planning method for distribution networks and charging and swapping facilities, which constrains the traffic distribution and planning operation of electric vehicle fast charging stations, slow charging stations, swapping stations and distribution networks, and specifically considers the corresponding capacity expansion of distribution network lines, optimizes the site selection and capacity operation plans of various charging and swapping facilities, the capacity expansion plans of distribution network lines, and the allocation plans of various charging and swapping needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0113] Figure 1 The figure is an overall flow chart of the method of the present invention.

[0114] Figure 2 This is a diagram of the power distribution-transportation coupling system described in the present invention.

[0115] Figure 3 This is a topological structure diagram of the example described in Example 1.

[0116] Figure 4 This is the time-of-use electricity price diagram for power grid electricity purchase in the example described in Example 1.

[0117] Figure 5 This is a planned location map of various types of charging and swapping stations in the example described in Example 1.

[0118] Figure 6 This is a structural diagram of the system described in Example 2.

[0119] Figure 7 This is a structural diagram of the device described in Example 3. DETAILED DESCRIPTION

[0120] The present invention is further described in detail below in conjunction with specific implementations and drawings.

[0121] The present invention proposes a method, system, device and storage medium for collaborative planning of distribution network and charging and swapping facilities. The method is aimed at a distribution-traffic coupling system (such as Figure 2 As shown in the figure, a coordinated planning model of distribution network and charging and swapping facilities is constructed. In fast charging stations and slow charging stations, fast charging piles and slow charging piles provide charging services for electric vehicles. At the same time, energy storage systems are configured in charging stations, and the mode of charging during the load valley period (low electricity price) and discharging during the peak period (high electricity price) is adopted to reduce the cost of purchasing electricity and play the role of peak shaving and valley filling. In the battery swapping station, the battery swapping facilities provide battery swapping services for electric vehicles, and the battery charging facilities charge the batteries. In terms of charging demand and traffic demand, the differences in charging demand and traffic weights between small and medium-sized electric vehicles and large electric vehicles are taken into account. Optimize the site selection and capacity operation plan of various charging and swapping facilities, the expansion plan of distribution network lines, and the allocation plan of various charging and swapping needs. At the same time, consider the service capacity margin constraints of charging and swapping facilities in special scenarios, so as to improve the reliability of charging and swapping stations while maximizing the comprehensive benefits of the charging and swapping system.

[0122] Embodiment 1:

[0123] This embodiment takes the 34-node distribution network and 20-node transportation network as the research object, and considers 2 fast charging stations, 2 slow charging stations and 2 battery swap stations. The topological structure is as follows: Figure 3As shown, the coordinated planning method of distribution network and charging and swapping facilities is used to determine the planning locations of various types of charging and swapping stations and the internal facility configuration plans of the charging and swapping stations. Among them, the unit configuration costs of fast charging piles, slow charging piles, and battery charging facilities are 30,000 yuan, 10,000 yuan, and 20,000 yuan respectively; the battery loss cost generated by a single battery replacement service is 10 yuan; the capacity expansion cost of a single distribution network line is 200,000 yuan; the unit time is 1 hour; the driving cost per unit distance is 0.2 yuan / km; the unit time cost is 10 yuan / hour; the average vehicle speed is 50 km / h; the investment period is 10 years; the discount rate is 0.05; the typical number of days in a year is 365 days; the rated voltage of the distribution network is 10 kV, and the upper and lower limits of the distribution network bus voltage are 10.5 kV and 9.5 kV respectively; the average fast charging, slow charging, and battery replacement energy demands of small and medium-sized vehicles are 25 kWh, 15 kWh, and 40 kWh respectively; the average fast charging and slow charging energy demands of large vehicles are 50 kWh and 20 kWh respectively. The energy requirements for battery replacement are as follows: the energy transmission efficiency of fast charging, slow charging, and battery charging are all 0.9; the power factor of fast charging, slow charging, and battery charging are all 0.9; the rated power of fast charging piles, slow charging piles, and battery charging facilities are 100 kW, 20 kW, and 60 kW, respectively; the average time for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement is 0.25 hours, 0.5 hours, 0.75 hours, 1 hour, and 0.5 hours, respectively; the average time for a single fast charge, slow charge, and battery replacement is 0.25 hours, 1 hour, and 0.5 hours, respectively; electric vehicles that generate charging and battery replacement needs among all vehicles The maximum ratio of quantity is 0.2; the service income of fast charging, slow charging and battery charging are 2.6 yuan / kWh, 2.2 yuan / kWh and 80 yuan / time respectively; the traffic weight coefficients of small and medium-sized vehicles and large vehicles are 1 and 2 respectively; the unit installation capacity of the energy storage system is 500 kWh, the maximum discharge power and maximum charging power of a single energy storage system are both 500 kW, the initial power of a single energy storage system is 200 kWh, the upper and lower limits of the energy state of the energy storage system are 0.85 and 0.15 respectively, and the price of a single energy storage system is 150,000 yuan; the average maximum daily operating time of the charging facility is 22 hours; the power supply interruption time of the distribution network is 0.2 hours; the time-of-use electricity price purchased from the upper power grid is as follows Figure 4 shown.

[0124] like Figure 1 As shown, a method for collaborative planning of distribution network and charging and swapping facilities is performed in the following steps:

[0125] 1. To maximize the comprehensive benefits of the distribution-transportation system, a coordinated planning model for distribution networks and charging and swapping facilities is constructed;

[0126] The objective function of the model includes:

[0127]

[0128]

[0129]

[0130]

[0131]

[0132]

[0133] In the above formula, I P The service income of charging and swapping stations is C D is the vehicle driving energy consumption cost, C T is the time cost, d is the number of typical days in a year, C H is the configuration cost of related facilities of charging and swapping stations, C N is the cost of expanding the distribution network, α is the discount rate, γ is the investment period, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are PI FC ,PI SC ,PI BC They are the fast charging service revenue, slow charging service revenue, and battery charging service revenue of the charging and swapping station, VB t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, PR P The unit price of electricity purchase cost and operation cost of the charging and swapping station, is the power support obtained by the charging and swapping station at the distribution network node e from the power grid during time period t, T UN For unit time, PR D is the driving cost per unit distance of the vehicle, is the total traffic flow of road l in time period t, L l is the length of road l, PR T is the unit time cost, v T is the average vehicle speed, are the service durations of the charging and swapping services for small and medium-sized vehicles, large vehicles, small and medium-sized vehicles, large vehicles, and large vehicles at the charging and swapping station at the distribution network node e in time period t, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, PR FP , PR SP , PR BP are the unit configuration costs of fast charging piles, slow charging piles, and battery charging facilities, respectively. t,e is the battery swapping service demand satisfied by the charging and swapping station at the distribution network node e in time period t, PR US The battery loss cost generated by a single battery swap service at the battery swap station, PR N is the expansion cost of a single distribution network line, is the decision variable for whether to expand the capacity of distribution network line c. Then expand the capacity of line c. Then the capacity of line c will not be expanded.

[0134] Service Capacity Margin Constraint

[0135] The charging and swapping facilities of the charging and swapping station need to meet the basic charging service needs. In terms of the charging and swapping service capacity margin, it is necessary to consider the time for regular repair and maintenance of various charging and swapping facilities during daily operation and when the distribution network fails, the energy storage system in the charging station needs to have enough power to cope with the charging needs of electric vehicles when the distribution network cannot supply power in a short period of time, and the swapping station needs to have enough batteries to cope with the battery swapping needs. Therefore, the service capacity margin constraints of the coordinated planning model of the distribution network and charging and swapping facilities include:

[0136] Lower limit constraint on charging service demand:

[0137]

[0138] Daily operating time constraints for fast charging piles, slow charging piles and battery charging facilities (to ensure the operation and maintenance time of the facilities):

[0139]

[0140]

[0141]

[0142] Charging station energy storage capacity margin constraints:

[0143]

[0144]

[0145] Battery inventory margin constraints at battery swap stations:

[0146]

[0147] In the above formula, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, is the total traffic flow of road l in time period t, ω L is the lower limit of the proportion of charging demand satisfaction, are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, T UN is the unit time, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, respectively. M is the average daily maximum operating time of the charging facility, EO is the initial capacity of the energy storage system, is the charging and discharging power of the charging station at the distribution network node e during the cumulative time tn, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period r, respectively. FM 、E FO 、E SM 、E SO The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, and slow charging of large vehicles are T I is the power supply interruption time of the distribution network, RB t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t.

[0148] Traffic demand allocation constraints

[0149] At the traffic level, vehicles of different sizes occupy different spaces on the road. Therefore, when modeling traffic flow, it is necessary to consider the impact of different traffic capacities occupied by different vehicles on traffic allocation problems. Therefore, the present invention sets corresponding traffic weights for small and medium-sized vehicles and large vehicles to reflect the impact of their traffic capacity on traffic behavior. In the distribution-transportation system, the site selection and capacity setting of various types of charging and swapping stations will significantly affect the spatiotemporal distribution of charging and swapping demand, thereby affecting the distribution of traffic flow in the transportation network. Therefore, the traffic demand allocation constraints of the coordinated planning model of the distribution network and charging and swapping facilities include:

[0150] Constraints on the relationship between traffic demand and road traffic flow:

[0151]

[0152]

[0153] Road traffic capacity constraints:

[0154]

[0155] Constraints on the relationship between charging and swapping demand and traffic flow:

[0156]

[0157]

[0158] Planning constraints for various types of charging and swapping demands, that is, various types of charging and swapping demands can only be generated at the nodes where the corresponding charging and swapping stations are located:

[0159]

[0160]

[0161]

[0162] In the above formula, is the total traffic flow of road l in time period t, are the traffic flows of small and medium-sized vehicles and large vehicles with a starting and ending point pair of od and traveling via path k in time period t, is the correlation matrix between path k and road l, when When , path k passes through road l, otherwise it does not pass through. are the traffic demands of small and medium-sized vehicles and large vehicles with the origin and destination pair od in time period t, VC l is the traffic capacity of road l, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, ω D The maximum proportion of charging and swapping demand for each road vehicle, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, υ M ,υ O are the traffic weight coefficients of small and medium-sized vehicles and large vehicles, respectively, representing the traffic flow occupied by each vehicle. They are the decision variables for whether to plan a charging and swapping station at the distribution network node e. When they are 1, they respectively indicate that a fast charging station, a slow charging station and a swapping station are built at the distribution network node e. Otherwise, they are not built. M is the coefficient M in the big-M method.

[0163] Planning and operation constraints of charging and swapping stations

[0164] Since the current battery swap technology is mostly used for small and medium-sized electric vehicles, the battery swap service for large electric vehicles is not considered in this invention. The planning and operation constraints of the coordinated planning model of the distribution network and charging and swapping facilities include:

[0165] Power balance constraints of charging and swapping stations:

[0166]

[0167]

[0168] Service capacity constraints of fast charging stations, slow charging stations, and battery swap stations:

[0169]

[0170]

[0171]

[0172]

[0173]

[0174]

[0175] Battery charging strategy constraints of battery swap stations:

[0176]

[0177]

[0178]

[0179] Energy state constraints of energy storage system:

[0180]

[0181] Energy storage system charging and discharging power constraints:

[0182]

[0183]

[0184] Energy storage system configuration location constraints:

[0185]

[0186] Constraints on the number of charging and swapping facilities:

[0187]

[0188]

[0189]

[0190] In the above formula, are respectively the active and reactive power support obtained by the charging and swapping station at the distribution network node e from the power grid in time period t, is the charging and discharging power of the energy storage system at the charging and swapping station at the distribution network node e in time period t. When its value is greater than zero, it indicates energy storage discharging, and when it is less than zero, it indicates energy storage charging. FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are respectively: t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, T UN is the unit time, η F , η S , η B are the energy transfer efficiencies of fast charging, slow charging, and battery charging, θ F ,θ S ,θ B They are the power factor angles for fast charging, slow charging, and battery charging, respectively. are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, P FP , P SP , P BP They are the rated powers of fast charging piles, slow charging piles, and battery charging facilities. are the number of charging piles, slow charging piles, and battery charging facilities at the distribution network node e, respectively. t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t, NB e is the total number of batteries configured in the battery swap station at the distribution network node e, σ L , σ H They are the lower and upper limits of the energy state of the energy storage system, NE eis the number of energy storage systems configured in the charging station at the distribution network node e, EC is the unit capacity of the energy storage system, EO is the initial power of the energy storage system, are the decision variables for whether to build a fast charging station, a slow charging station, or a battery swap station at the charging and swapping station in the distribution network node e, ψ FC , SC , BS They are the number of fast charging stations, the number of slow charging stations, and the number of battery swap stations.

[0191] Distribution network constraints

[0192] The distribution network is responsible for providing power support for various types of charging facilities. The charging load brought by the access of these facilities will significantly affect the power flow distribution of the distribution network. Therefore, the distribution network constraints of the coordinated planning model of the distribution network and charging and swapping facilities include:

[0193] Power output constraints:

[0194]

[0195]

[0196] Power balance constraints:

[0197]

[0198]

[0199] Line transmission power constraints:

[0200]

[0201] Line impedance constraints:

[0202]

[0203]

[0204]

[0205]

[0206] Bus voltage constraints:

[0207]

[0208]

[0209]

[0210] In the above formula, are the active and reactive power supports obtained by the charging and swapping station at the distribution network node e from the power grid in time period t, c is all the distribution network lines connected to the distribution network node e, are the active and reactive power transmitted in time period t after the capacity expansion of distribution network line c, are respectively the active and reactive basic loads connected to the distribution network node e in time period t, is the capacity of distribution network line c before expansion, is the decision variable for whether to expand the capacity of distribution network line c. Then line c is expanded, if Then line c is not expanded, LC A The capacity of the distribution network line expansion is are the resistance and reactance of the distribution network line c after expansion, are the resistance and reactance of distribution network line c before capacity expansion, They are the combined resistance and reactance of the original cable and the newly built cable after the capacity of the distribution network line c is expanded. are the resistance and reactance of the expansion cable of distribution network line c, ΔU t,c is the voltage drop of distribution network line c in time period t, U N is the rated voltage of the distribution network busbar, a and b are the two ends of the distribution network line c, U t,a , U t,b are the bus voltages of nodes a and b in the distribution network in time period t, U m , U M They are the lower and upper limits of the bus voltage of the distribution network, U t,e is the voltage of the distribution network node e in time period t.

[0211] 2. Use Matlab / Cplex to solve the coordinated planning model of distribution network and charging and swapping facilities, and obtain the planned locations of various types of charging and swapping stations. Figure 5 The internal facility configuration scheme of the charging and swapping station is shown in Table 1:

[0212] Table 1 Internal facilities configuration plan of charging and swapping station

[0213]

[0214] The distribution network and charging and swapping facility collaborative planning method considering service margin (method 1) of the present invention and the charging and swapping facility planning method based on flow capture maximization (method 2) are applied to a 34-node distribution network-20-node transportation network example for comparison. The economic index comparison results are shown in Table 2:

[0215] Table 2 Comparison results of economic indicators

[0216]

[0217] Method 2 does not consider the impact of the planning scheme of charging and swapping facilities on traffic flow distribution, but only plans for the existing traffic flow distribution in order to maximize the capture of charging demand in traffic flow. The above results show that the coordinated planning method of distribution network and charging and swapping facilities considering service margin proposed in the present invention achieves the effect of improving the comprehensive benefits of the system under the premise of ensuring the service capacity margin of the charging and swapping station.

[0218] Embodiment 2:

[0219] like Figure 6 As shown, a distribution network and charging and swapping facility collaborative planning system includes a model building module and a model solving module.

[0220] The model building module is used to build a distribution network and charging and swapping facility collaborative planning model with the goal of maximizing the comprehensive benefits of the distribution-transportation system, including an objective function unit, a charging and swapping station service capacity margin constraint unit, a traffic demand allocation constraint unit, a charging and swapping station planning and operation constraint unit, and a distribution network constraint unit;

[0221] The objective function unit is used to construct the objective function as described in Example 1;

[0222] The charging and swapping station service capacity margin constraint unit is used to construct the charging and swapping station service capacity margin constraint as described in Example 1;

[0223] The traffic assignment constraint unit is used to construct the traffic assignment constraint as described in Example 1;

[0224] The charging and swapping station planning and operation constraint unit is used to construct the charging and swapping station planning and operation constraints as described in Example 1;

[0225] The distribution network constraint unit is used to construct the distribution network constraints as described in Example 1, including power output constraints, power balance constraints, line transmission power constraints, line impedance constraints, and bus voltage constraints;

[0226] The model solving module is used to solve the coordinated planning model of the distribution network and charging and swapping facilities using Matlab / Cplex to obtain the planned locations of various types of charging and swapping stations and the internal facility configuration plans of the charging and swapping stations.

[0227] Embodiment 3:

[0228] like Figure 7As shown, a distribution network and charging and swapping facility collaborative planning device includes a processor and a memory; the memory is used to store computer program code and transmit the computer program code to the processor; the processor is used to execute a distribution network and charging and swapping facility collaborative planning method described in Example 1 according to the instructions in the computer program code.

[0229] Embodiment 4:

[0230] A computer storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the steps of a method for coordinated planning of a distribution network and charging and swapping facilities described in this solution are implemented.

Claims

1. A method for collaborative planning of distribution network and charging and swapping facilities, characterized in that: The method comprises: With the goal of maximizing the comprehensive benefits of the distribution-transportation system, a coordinated planning model for the distribution network and charging and swapping facilities is constructed. The constraints of the model include the service capacity margin constraint of the charging and swapping station, which takes into account the charging service demand of the charging and swapping station, the maximum daily operating time of the charging and swapping facilities, the power margin of the charging station energy storage, and the stock margin of the battery of the swapping station; The objective function of the distribution network and charging and swapping facility collaborative planning model includes: f=max(I P -C D -C T )d-(C H +C N )[(1+a) γ -1] / ag 2 ; In the above formula, I P The service income of charging and swapping stations is C D is the vehicle driving energy consumption cost, C T is the time cost, d is the number of typical days in a year, C H is the configuration cost of related facilities of charging and swapping stations, C N is the cost of expanding the distribution network, α is the discount rate, γ is the investment period, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO The average energy requirements for each small and medium-sized vehicle fast charging, large vehicle fast charging, small and medium-sized vehicle slow charging, and large vehicle slow charging, PI FC ,PI SC ,PI BC They are the fast charging service revenue, slow charging service revenue, and battery charging service revenue of the charging and swapping station, CB t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, PR P The unit price of electricity purchase cost and operation cost of the charging and swapping station, is the power support obtained by the charging and swapping station at the distribution network node e from the power grid during time period t, T UN For unit time, PR D is the driving cost per unit distance of the vehicle, is the total traffic flow of the road in time period t, L l For the length of the road, PR T is the unit time cost, v T is the average vehicle speed, are the service durations of the charging and swapping services for small and medium-sized vehicles, large vehicles, small and medium-sized vehicles, large vehicles, and large vehicles at the charging and swapping station at the distribution network node e in time period t, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, PR FP , PR SP , PR BP are the unit configuration costs of fast charging piles, slow charging piles, and battery charging facilities, respectively. t,e is the battery swapping service demand satisfied by the charging and swapping station at the distribution network node e in time period t, PR US The battery loss cost generated by a single battery swap service at the battery swap station, PR N is the expansion cost of a single distribution network line, is the decision variable for whether to expand the capacity of distribution network line c; The service capacity margin constraints of the charging and swapping station in the distribution network and charging and swapping facility collaborative planning model include: In the above formula, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, is the total traffic flow of road l in time period t, ω L is the lower limit of the proportion of charging demand satisfaction, are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, T UN is the unit time, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, respectively. M is the average daily maximum operating time of the charging facility, EO is the initial capacity of the energy storage system, is the charging and discharging power of the charging station at the distribution network node e during the cumulative time tn, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, and slow charging of large vehicles are T I is the power supply interruption time of the distribution network, RB t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t; Solve the coordinated planning model of distribution network and charging and swapping facilities to obtain the planned locations of various types of charging and swapping stations and the internal facility configuration plans of charging and swapping stations.

2. A method for collaborative planning of distribution network and charging and swapping facilities according to claim 1, characterized in that: The constraints of the distribution network and charging and swapping facility collaborative planning model also include traffic demand allocation constraints, charging and swapping station planning and operation constraints, and distribution network constraints; The traffic demand allocation constraints include: In the above formula, is the total traffic flow of the road in time period t, are the traffic flows of small and medium-sized vehicles and large vehicles with a starting and ending point pair of od and traveling via path k in time period t, is the correlation matrix between path k and road l, are the traffic demands of small and medium-sized vehicles and large vehicles with the origin and destination pairs od in time period t, VC l is the traffic capacity of road l, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, ω D The maximum proportion of charging and swapping demand for each road vehicle, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, υ M ,υ O are the traffic weight coefficients for small and medium-sized vehicles and large vehicles, respectively. are the decision variables for whether to plan a charging and swapping station at the distribution network node e, δ M is the coefficient M in the big-M method; The charging and swapping station planning and operation constraints include: In the above formula, are respectively the active and reactive power support obtained by the charging and swapping station at the distribution network node e from the power grid in time period t, is the charging and discharging power of the energy storage system at the charging and swapping station at the distribution network node e in time period t, E FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are respectively: t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, T UN is the unit time, η F , η S , η B are the energy transfer efficiencies of fast charging, slow charging, and battery charging, θ F ,θ S ,θ B They are the power factor angles for fast charging, slow charging, and battery charging, respectively. are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, P FP , P SP , P BP They are the rated powers of fast charging piles, slow charging piles, and battery charging facilities. are the number of charging piles, slow charging piles, and battery charging facilities at the distribution network node e, respectively. t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t, NB e is the total number of batteries configured in the battery swap station at the distribution network node e, σ L , σ H They are the lower and upper limits of the energy state of the energy storage system, NE e is the number of energy storage systems configured in the charging station at the distribution network node e, EC is the unit capacity of the energy storage system, EO is the initial power of the energy storage system, are the decision variables for whether to build a fast charging station or a slow charging station at the charging and swapping station at the distribution network node e; The distribution network constraints include power output constraints, power balance constraints, line transmission power constraints, line impedance constraints, and bus voltage constraints.

3. A distribution network and charging and swapping facility collaborative planning system, characterized in that: The system includes a model building module and a model solving module; The model building module is used to build a distribution network and charging and swapping facility collaborative planning model with the goal of maximizing the comprehensive benefits of the distribution-transportation system. The constraints of the model include the service capacity margin constraint of the charging and swapping station, which takes into account the charging service demand of the charging and swapping station, the maximum daily operating time of the charging and swapping facility, and the power margin of the charging station energy storage and the stock margin of the battery of the swapping station; The model building module includes an objective function unit, which is used to build the following objective function: f=max(I P -C D -C T )d-(C H +C N )[(1+a) γ -1] / ag 2 ; In the above formula, I P is the service income of the charging and swapping station, CDD is the energy consumption cost of the vehicle, CT is the time cost, d is the number of typical days in a year, C H is the configuration cost of related facilities of charging and swapping stations, C N is the cost of expanding the distribution network, α is the discount rate, γ is the investment period, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are PI FC ,PI SC ,PI BC They are the fast charging service revenue, slow charging service revenue, and battery charging service revenue of the charging and swapping station, CB t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, PR P The unit price of electricity purchase cost and operation cost of the charging and swapping station, is the power support obtained by the charging and swapping station at the distribution network node e from the power grid during time period t, T UN For unit time, PR D is the driving cost per unit distance of the vehicle, is the total traffic flow of the road in time period t, L l is the length of road l, PR T is the unit time cost, v T is the average vehicle speed, are the service durations of the charging and swapping services for small and medium-sized vehicles, large vehicles, small and medium-sized vehicles, large vehicles, and large vehicles at the charging and swapping station at the distribution network node e in time period t, are the number of fast charging piles, slow charging piles, and battery charging facilities configured at the charging and swapping station at the distribution network node e, PR FP , PR SP , PR BP are the unit configuration costs of fast charging piles, slow charging piles, and battery charging facilities, respectively. t,e is the battery swapping service demand satisfied by the charging and swapping station at the distribution network node e in time period t, PR US The battery loss cost generated by a single battery swap service at the battery swap station, PR N is the expansion cost of a single distribution network line, is the decision variable for whether to expand the capacity of distribution network line c; The model building module further includes a charging and swapping station service capacity margin constraint unit, and the charging and swapping station service capacity margin constraint unit is used to construct the following constraints: In the above formula, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, is the total traffic flow of road l in time period t, ω L is the lower limit of the proportion of charging demand satisfaction, are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, T UN is the unit time, are the number of fast charging piles, the number of slow charging piles, and the number of battery charging facilities configured at the charging and swapping station at the distribution network node e, respectively. M is the average daily maximum operating time of the charging facility, EO is the initial capacity of the energy storage system, is the charging and discharging power of the charging station at the distribution network node e during the cumulative time tn, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, respectively. FM 、E FO 、E SM 、E SO The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, and slow charging of large vehicles are T I is the power supply interruption time of the distribution network, RB t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t; The model solving module is used to solve the coordinated planning model of the distribution network and charging and swapping facilities to obtain the planned locations of various types of charging and swapping stations and the internal facility configuration plans of the charging and swapping stations.

4. A distribution network and charging and swapping facility coordinated planning system according to claim 3, characterized in that: The model building module also includes a traffic demand allocation constraint unit, a charging and swapping station planning and operation constraint unit, and a distribution network constraint unit; The traffic assignment constraint unit is used to construct the following constraints: In the above formula, is the total traffic flow of the road in time period t, are the traffic flows of small and medium-sized vehicles and large vehicles with a starting and ending point pair of od and traveling via path k in time period t, is the correlation matrix between path k and road, are the traffic demands of small and medium-sized vehicles and large vehicles with the origin and destination pairs od in time period t, VC l is the traffic capacity of road l, is the number of charging and swapping demands undertaken by the charging and swapping facilities at the distribution network node e in time period t, ω D The maximum proportion of charging and swapping demand for each road vehicle, are the fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery swapping demand at the charging and swapping station at the distribution network node e in time period t, υ M ,υ O are the traffic weight coefficients for small and medium-sized vehicles and large vehicles, respectively. are the decision variables for whether to plan a charging and swapping station at the distribution network node e, δ M is the coefficient M in the big-M method; The charging and swapping station planning and operation constraint unit is used to construct the following constraints: In the above formula, are respectively the active and reactive power support obtained by the charging and swapping station at the distribution network node e from the power grid in time period t, is the charging and discharging power of the energy storage system at the charging and swapping station at the distribution network node e in time period t, E FM 、E FO 、E SM 、E SO 、E BC The average energy requirements for fast charging of small and medium-sized vehicles, fast charging of large vehicles, slow charging of small and medium-sized vehicles, slow charging of large vehicles, and battery replacement are respectively: t,e is the number of batteries charged by the battery swap station at the distribution network node e in time period t, T UN is the unit time, η F , η S , η B are the energy transfer efficiencies of fast charging, slow charging, and battery charging, θ F ,θ S ,θ B They are the power factor angles for fast charging, slow charging, and battery charging, respectively. are the number of fast charging piles, slow charging piles, and battery charging facilities put into operation at the charging and swapping station at the distribution network node e in time period t, P FP , P SP , P BP They are the rated powers of fast charging piles, slow charging piles, and battery charging facilities. are the number of charging piles, slow charging piles, and battery charging facilities at the distribution network node e, respectively. t,e is the number of batteries available for battery swapping service at the battery swapping station at the distribution network node e at the beginning of time period t, NB e is the total number of batteries configured in the battery swap station at the distribution network node e, σ L , σ H They are the lower and upper limits of the energy state of the energy storage system, NE e is the number of energy storage systems configured in the charging station at the distribution network node e, EC is the unit capacity of the energy storage system, EO is the initial power of the energy storage system, are the decision variables for whether to build a fast charging station or a slow charging station at the charging and swapping station at the distribution network node e; The distribution network constraint unit is used to construct power output constraints, power balance constraints, line transmission power constraints, line impedance constraints, and bus voltage constraints.

5. A device for collaborative planning of distribution network and charging and swapping facilities, characterized in that: including a processor and a memory; The memory is used to store computer program code and transmit the computer program code to the processor; The processor is used to execute a method for coordinated planning of distribution networks and charging and swapping facilities as described in any one of claims 1-2 according to instructions in the computer program code.

6. A computer storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of a method for coordinated planning of distribution networks and charging and swapping facilities described in any one of claims 1-2 are implemented.

Citation Information

Patent Citations

  • Multi-target synergic planning method considering charging station and distributed power supply for power distribution network

    CN110504708A

  • Mobile charging vehicle station planning method serving electric vehicle

    CN113077085A

  • Power traffic coupling network-oriented optical storage charging station planning method and system

    CN116611673A