A sediment gas lift device with multi-point pulse gas supply and its working method

Through the Venturi expansion-shrink-expanding structure and the design of the annular airflow mixing chamber, the problems of asymmetric air blow pipe arrangement and poor air intake uniformity in the silt and sand lifting device are solved, and efficient and accurate silt and sand lifting is achieved, reducing the Energy consumption.

CN118529794BActive Publication Date: 2024-11-12宜兴泉溪环保设备有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410776612.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-11-12
Estimated Expiration
2044-06-17

AI Technical Summary

Technical Problem

The existing silt and sand gas lifting devices have problems such as asymmetric arrangement of the air blow pipe, reduced effective area, and poor air intake uniformity, resulting in low gas lifting efficiency and waste of energy.

Method used

The Venturi expansion-shrink-shrink-shrink gas lift main structure and annular airflow mixing chamber design are designed to accelerate the gas lifting speed through the shrinking section and use the water reflux of the flared inlet section to erode the adherent silt sand. A multi-point pulse gas replenishment method is designed to Accurately control the intake volume and uniformity.

Benefits of technology

It significantly improves the efficiency of silt and sand gas improvement, reduces energy waste, and realizes intelligent and precise control of the gas extraction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118529794B_ABST
    Figure CN118529794B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of sewage treatment, and discloses a sediment gas lift device with multi-point pulse air supplementation, comprising a sedimentation tank, a sedimentation tank, a sand blowing mechanism, a gas lift mechanism, and an electric control cabinet. The working method is as follows: step (1): close the second control valve and the third control valve, open the first control valve, and the compressed air enters the gas lift main pipe, and then moves upward; step (2): close the first control valve and the third control valve, open the second control valve, and the compressed air enters the gas lift main pipe; step (3): close the second control valve and the first control valve, open the third control valve, and the compressed air enters the gas lift main pipe; step (4): close the third control valve, open the first control valve, and the compressed air enters the gas lift main pipe; step (5): repeat steps (1) to (4); step (6): recover the sediment obtained through the gas lift pipe through the sedimentation tank. The present invention can lift the sediment to a specified height in time and section, reduce energy waste, and improve gas lift efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of sewage treatment, and in particular relates to a sediment air stripping device with multi-point pulse air supply and a working method thereof. Background Art

[0002] The sediment lift device uses a compressed air pipe to inject compressed air into the lift main pipe. The compressed air mixes with the sediment and water mixture inside the lift main pipe, forming a lower-density mixture. This creates a density difference between the three-phase mixture of air, water, and sediment inside and outside the lift pipe. This forces the sediment and water mixture outside the main lift pipe into the lift main pipe, achieving the goal of using compressed air to lift the sediment mixture from a low level to a high level. This process effectively extracts sediment from the sediment and water mixture, providing a new approach for the efficient utilization of resources.

[0003] Patent CN207137444U discloses an air stripping device that combines a filter screen with a dredge pipe. On one hand, the filter screen is placed inside the air stripping main pipe to filter out impurities in the medium while ensuring the proper function of the main pipe. On the other hand, the dredge pipe extends into the main pipe with the pipe opening parallel to the filter screen. A blower is connected to the other side of the pipe to flush impurities from the filter screen surface.

[0004] Patent CN213111543U discloses a sludge airlift device featuring an improved air blowing pipe structure. This device utilizes multiple air blowing pipes distributed equidistantly around the annular housing. This multi-angle uniformity improves air supply uniformity. Compressed air is pumped into the airlift main pipe via an air pump. The compressed air enters the main pipe tangentially and then spirals upward inside the pipe, reducing the likelihood of sludge adhering to the inner wall of the main pipe. The device also incorporates a duckbill valve at the air blowing pipe opening to prevent the sludge mixture from flowing back into the pipe during shutdown.

[0005] In summary, the existing gas stripping devices and methods have the following three problems:

[0006] First, the air blowing pipe is only arranged at one level, making it impossible to precisely control parameters such as the air lifting height and speed;

[0007] Second, the air blowing pipe itself extends into the air lift main pipe, which reduces the effective area of ​​the air lift main pipe and hinders the rapid air lift of sediment.

[0008] Third, due to the asymmetric distribution of the air intake pipe, the air intake uniformity of the air lift main pipe is poor, which affects the air lift uniformity and efficiency.

[0009] Therefore, to address the above problems, we proposed a sediment air lift device with multi-point pulse air supply, which adopts a Venturi expansion-contraction-expansion air lift main pipe structure, takes advantage of the small cross-sectional area of ​​the contraction section to accelerate the air lift speed, and uses the water backflow phenomenon on the wall of the expansion inlet section to flush away the sediment adhering to the wall of the expansion pipe; designs an air blowing sub-pipe structure, adopts an annular air flow mixing chamber, and sends compressed air into the air lift main pipe along the circumferentially symmetrical tapered air inlet. The uniformity of the air lift intake ensures the stability of the air lift flow field. Summary of the Invention

[0010] The present application provides a multi-point pulse air supply sediment lift device and its working method, which has a reasonable design, realizes intelligent and precise control of the sediment lift process, significantly reduces energy waste, contributes to the development of the sediment lift industry and environmental protection, and solves the problems raised in the background technology.

[0011] The technical solutions adopted by this patent are as follows:

[0012] A multi-point pulse air supply sediment lift device comprises: a sedimentation tank; a sedimentation tank; a sand blowing mechanism, arranged inside the sedimentation tank with its lower end located at the bottom of the sedimentation tank, for blowing up sediment inside the sedimentation tank; an air lift mechanism, connected between the sedimentation tank and the sedimentation tank, comprising an air lift main pipe arranged between the sedimentation tank and the sedimentation tank, the air lift main pipe being connected to the air blowing mechanism; and an electric control cabinet, for controlling the operation of the sand blowing mechanism and the air lift mechanism.

[0013] According to a further technical solution, the sand blowing mechanism includes a sand blowing pipe, and an outer end portion of the sand blowing pipe is connected to an air pump.

[0014] According to a further technical solution, the gas stripping main pipe includes: an inlet pipe; a gas stripping branch pipe assembly connected to the inlet pipe, wherein the inlet pipe is connected to one end of the gas stripping branch pipe assembly; and the other end of the gas stripping branch pipe assembly is connected to a gas stripping elbow.

[0015] According to a further technical solution, the inlet pipe includes a first inlet pipe and a first tube body; the first inlet pipe is in the shape of a trumpet that expands outward, and the first tube body is an expanded inlet section of a Venturi expansion-contraction-expansion structure.

[0016] In a further technical solution, the gas lift branch pipe assembly includes a plurality of branch pipe connecting sections and branch pipe main bodies connected in sequence; the first pipe body is connected to the branch pipe connecting section at the starting part, and the branch pipe main body at the terminal part is connected to the gas lift elbow;

[0017] The branch pipe connecting section is a contraction section of the Venturi expansion-contraction-expansion structure, and the branch pipe main body pipe is an expansion inlet section of the Venturi expansion-contraction-expansion structure.

[0018] A further technical solution is that the blowing mechanism includes: an air pump; an air blowing main pipe connected to the air pump; a plurality of air blowing branch pipes respectively connected to the air blowing main pipe; the air blowing branch pipes correspond to and are connected to the branch pipe connecting sections one by one; and a control valve is installed on each of the air blowing branch pipes.

[0019] According to a further technical solution, an air flow mixing chamber is provided at the connection position between the air blowing branch pipe and the branch pipe connecting section, and the end of the air flow mixing chamber is a tapered air inlet.

[0020] The present invention also provides a multi-point pulse air supply sediment lift working mode, using the aforementioned sediment lift device, the sediment lift branch pipe assembly in the sediment lift device includes three groups of branch pipe connecting sections and branch pipe main pipes connected in sequence: a first branch pipe connecting section and a first branch pipe main pipe, a second branch pipe connecting section and a second branch pipe main pipe, and a third branch pipe connecting section and a third branch pipe main pipe; the first branch pipe connecting section is connected to a first air blowing branch pipe, the second branch pipe connecting section is connected to a second air blowing branch pipe, and the third branch pipe connecting section is connected to a third air blowing branch pipe; the first air blowing branch pipe is provided with a first tapered air inlet, the second air blowing branch pipe is provided with a second tapered air inlet, and the third air blowing branch pipe is provided with a third tapered air inlet; the first air blowing branch pipe is provided with a first control valve, the second air blowing branch pipe is provided with a second control valve, and the third air blowing branch pipe is provided with a third control valve;

[0021] The gas stripping formula is as follows:

[0022] (1)

[0023] (2)

[0024] (3)

[0025] in, The density of the air-water-sediment three-phase mixture outside the gas lift main pipe, unit ; is the submerged depth of the bottom end of the sand blowing pipe, in units of ; is the density of the air-water-sediment three-phase mixture in the air lift main, in units of ; is the lifting height of the gas lift device, unit ; is the unit of air consumption, unit ; is the safety factor, which is 1.2; is the lifting flow of the air lift pump, unit ; is the acceleration due to gravity, unit ; is the efficiency coefficient, generally .

[0026] The submerged depth of the airlift main at the bottom of the sediment pool is , the submerged depth of the outlet of the third tapered air inlet is , the submerged depth of the outlet of the second tapered air inlet is , the submerged depth of the outlet of the first tapered air inlet is The third blowing pipe needs to achieve the air increase for The second blowing pipe needs to achieve the air increase height for The first blowing pipe needs to achieve the air increase for ;

[0027] The operation method of the sediment stripping device is: the density of the air-water-sediment three-phase mixture outside the gas stripping main pipe is known to be , the vertical extraction speed of sediment in the air lift main is At the beginning, the first control valve, the second control valve, and the third control valve are all closed, and the initial time is defined as ;

[0028] Step 1): When the mixture of sediment and water is at the submerged depth When the second and third control valves are kept closed, the first control valve is opened, and the compressed air enters the air lift main pipe through the first air blowing branch pipe and then moves upward;

[0029] Step 2): When the mixture of sediment and water reaches the flooding depth Time, that is, the time elapsed When the pressure is too high, close the first control valve, keep the third control valve closed, open the second control valve, and the compressed air enters the air lift main pipe through the second air blowing branch pipe;

[0030] Step 3): When the mixture of sediment and water reaches the flooding depth Time, that is, the time elapsed When the pressure is too high, close the second control valve, keep the first control valve closed, open the third control valve, and the compressed air enters the air lift main pipe through the third air blowing branch pipe;

[0031] Step 4): When the mixture of mud and water reaches the horizontal surface, that is, after time When the pressure is too high, close the third control valve, keep the second control valve closed, open the first control valve, and the compressed air enters the air lift main pipe through the first air blowing branch pipe;

[0032] Step 5): Repeat steps 1) to 4) to complete the pulse sediment extraction process;

[0033] Step 6): Finally, the sediment enters the recovery sedimentation tank through the air lift main pipe 4 and is recovered.

[0034] By adopting the above technical solution, compared with the existing technology, the beneficial effects of the technology of this patent are:

[0035] The present invention achieves precise control of the compressed air intake volume by arranging air blowing sub-pipe structures of different sizes at different submergence depths of the air lift main pipe. An air flow mixing chamber is set in the middle of the air blowing sub-pipe to further mix and evenly disperse the compressed air. Compressed air is sent into the interior of the air lift main pipe from all sides through multiple symmetrically arranged tapered air inlets, and the air flow is evenly replenished inside the air lift main pipe. At the same time, the form of punching holes on the wall can avoid the air blowing pipe itself from hindering the lifting of sediment, and the air lift efficiency is greatly improved. Finally, the compressed air is controlled by a control valve to enter the air lift main pipe at a certain rhythm, and the sediment can be lifted to the specified height in time and sections. This air lift method can greatly reduce energy waste and effectively improve efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0037] Figure 1 This is a schematic structural diagram of the overall device in one embodiment of the present invention;

[0038] Figure 2 This is a structural diagram of an air lift main pipe and an air blowing mechanism in one embodiment of the present invention;

[0039] Figure 3 This is a schematic structural diagram of the air lift main pipe, the first tapered air inlet, and the first air flow mixing chamber in one embodiment of the present invention;

[0040] Figure 4 A schematic diagram of the submerged height of the gas lift main in one embodiment of the present invention;

[0041] Figure 5 This is an operational flow chart of a working mode of sediment air lift with multi-point pulse air supply in one embodiment of the present invention;

[0042] In the figure: 1. Sedimentation tank; 2. Sediment tank; 3. Sand blowing pipe; 4. Air lift main pipe; 41. First inlet pipe; 42. First pipe body; 43. First branch pipe connecting section; 44. First branch pipe main pipe; 45. Second branch pipe connecting section; 46. Second branch pipe main pipe; 47. Third branch pipe connecting section; 48. Third branch pipe main pipe; 49. Exhaust hole; 5. Air blowing main pipe; 6. Third air blowing branch pipe; 61. Third control valve; 62. Third tapered air inlet; 63. Third air flow mixing chamber; 7. Second air blowing branch pipe; 71. Second control valve; 72. Second tapered air inlet; 73. Second air flow mixing chamber; 8. First air blowing branch pipe; 81. First control valve; 82. First tapered air inlet; 83. First air flow mixing chamber; 9. Electric control cabinet. DETAILED DESCRIPTION

[0043] The preferred embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the preferred embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. Instead, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.

[0044] Example 1

[0045] like Figure 1 、 Figure 2 As shown, a multi-point pulse air supply sediment lift device includes: a sedimentation tank 1, the sedimentation tank 1 is used to store the sediment obtained in the air lift main pipe 4.

[0046] The sediment pool 2 is used to store water containing sediment. A sand blowing mechanism is arranged inside the sediment pool 2 and has its lower end located at the bottom of the sediment pool 2. The sand blowing mechanism includes a sand blowing pipe 3, and the outer end of the sand blowing pipe 3 is connected to an air pump.

[0047] The sand blowing pipe is used to disperse the mud and sand that is pushed around in the sediment pool, helping to better disperse the mud and sand, thereby reducing the probability of clogging in the air lift main. The air lift main 4 is used to lift the mud and sand from the bottom of the sediment pool upward for collection in the settling tank 1. The air blowing pipe 5 is mainly used to deliver compressed air to the interior of the air lift main 4, forming a low-density three-phase mixture of air, water, and mud at the top of the air lift main 4. The mixture has a high density outside the air lift main 4 and a low density inside the pipe. According to Henry's law, driven by pressure, the mud and water mixture climbs upward along the pipe, ultimately completing the mud lift process. The compressed air introduced into the air blowing pipe 5 is distributed through the first air blowing sub-pipe 8, the second air blowing sub-pipe 7, and the third air blowing sub-pipe 6 to different heights of the air lift main 4 for air replenishment.

[0048] The air lift mechanism connects the sedimentation tank and the sedimentation tank. The air lift mechanism includes an air lift main pipe located between the sedimentation tank and the sedimentation tank, and the air lift main pipe is connected to an air blowing mechanism. The air lift main pipe 4 includes an inlet pipe and an air lift branch pipe assembly connected to the inlet pipe. The inlet pipe is connected to one end of the air lift branch pipe assembly, and the other end of the air lift branch pipe assembly is connected to an air lift elbow. The inlet pipe includes a first inlet pipe 41 and a first pipe body 42. The first inlet pipe 41 is shaped like a trumpet, expanding outward. The first pipe body 42 is the flared inlet section of a Venturi expansion-contraction-expansion structure. The air lift branch pipe assembly includes multiple sets of sequentially connected branch pipe connecting sections and branch pipe main bodies. The first pipe body 42 is connected to the branch pipe connecting section at the beginning, and the branch pipe main body at the end is connected to the air lift elbow. The branch pipe connecting section is the constricted section of the Venturi expansion-contraction-expansion structure, and the branch pipe main body is the flared inlet section of the Venturi expansion-contraction-expansion structure.

[0049] The air blowing mechanism includes an air pump, a main air blowing pipe 5 connected to the air pump, and multiple branch air blowing pipes connected to the main air blowing pipe 5. Each branch air blowing pipe corresponds to and is connected to the branch pipe connecting section. A control valve is installed on each branch air blowing pipe. An airflow mixing chamber is located at the junction of the branch air blowing pipes and the branch pipe connecting section, with a tapered air inlet at the end of the mixing chamber.

[0050] In this embodiment, the branch pipe connecting section and the branch pipe body are divided into three sections: a first branch pipe connecting section 43 and a first branch pipe body 44, a second branch pipe connecting section 45 and a second branch pipe body 46, and a third branch pipe connecting section 47 and a third branch pipe body 48. The first branch pipe connecting section 43 is connected to the first blow branch pipe 8, the second branch pipe connecting section 45 is connected to the second blow branch pipe 7, and the third branch pipe connecting section 47 is connected to the third blow branch pipe 6. The first blow branch pipe 8 has a first tapered air inlet 82, the second blow branch pipe 7 has a second tapered air inlet 72, and the third blow branch pipe 6 has a third tapered air inlet 62. The first blow branch pipe 8 has a first control valve 81, the second blow branch pipe 7 has a second control valve 71, and the third blow branch pipe 6 has a third control valve 61. The first air flow mixing chamber 83 is between the first tapered air inlet 82 and the first branch pipe connecting section 43, the second air flow mixing chamber 73 is between the second tapered air inlet 72 and the second branch pipe connecting section 45, and the third air flow mixing chamber 63 is between the third tapered air inlet 62 and the third branch pipe connecting section 47.

[0051] The electrical control cabinet is used to control the operation of the sand blowing mechanism and the air lift mechanism. The electrical control cabinet is assembled in a closed or semi-closed metal cabinet or on a screen according to the electrical wiring requirements, with switchgear, measuring instruments, protective electrical appliances, and auxiliary equipment. Its layout meets the requirements for the normal operation of the sediment air lift device. In this patent, the electrical control cabinet 9 controls the air pumps in the air blowing mechanism and the sand blowing mechanism, as well as controls the opening and closing of the first control valve 81, the second control valve 71, and the third control valve 61 in the air blowing mechanism. It adjusts the compressed air intake mode at different times and different air lift positions to achieve a pulsed air supply mode, effectively avoiding the problem of sediment blockage during the continuous operation of the air lift. The exhaust hole is used to discharge the compressed air in the pipe.

[0052] like Figure 3 、 Figure 4 As shown, the first inlet pipe 41 is the inlet for the two-phase mixture of sediment and water. Its structure is designed to expand outward in a trumpet shape to improve the flowability of the air lift main pipe. The pipe wall of the branch main pipe of the air lift main pipe is a flared inlet section with a Venturi expansion-contraction-expansion structure. The water then flows into the constricted section. Due to the smaller cross-sectional area and increased flow rate, the water flow near the wall where the expansion inlet section transitions to the constricted section is obstructed through the constricted section, resulting in backflow. The backflowing water can flush away sediment adhering to the pipe wall, reducing the probability of blockage within the air lift main pipe. Since the third branch main pipe 48 does not have a constricted structure at its upper portion and is a straight pipe section with a constant inner diameter, the backflow phenomenon is not obvious. The pipe wall of the branch pipe connection section of the air lift main is a Venturi constriction. The flow rate of the air-water-sediment three-phase mixture suddenly increases at this point. On the one hand, the air-water-sediment three-phase mixture flows at a high speed in the constriction section, thereby generating a low-pressure area, which forms a suction force on the compressed air in the blowing branch pipe, speeding up the air replenishment speed and improving the sediment lifting effect. On the other hand, the high-speed water flow section in the constriction section reduces the probability of sediment adhering to the constriction pipe wall.

[0053] The left side of the main air blowing pipe 5 is connected to three air blowing branch pipes. The air lifting height is mainly related to the dynamic water level and the submerged depth of the air blowing pipe. The first air blowing branch pipe 8 is submerged the deepest. A larger pressure difference is required to lift the same height, that is, a larger air volume needs to be provided to ensure a sufficiently low mixed liquid density in the pipe. Therefore, the overall structural dimensions of the third air blowing branch pipe 6, the second air blowing branch pipe 7, and the first air blowing branch pipe 8 increase in sequence according to the submerged depth.

[0054] The present invention arranges three different calibers of blowing pipe structures, namely coarse, medium and fine, from bottom to top on different planes in the vertical direction to control the intake volume of compressed air at different heights, and then adjusts the intake mode of compressed air at different times and different air lift positions by controlling the opening and closing of the control valve, thereby achieving a pulsed air lift effect, effectively avoiding the problem of sediment blockage during the continuous operation of the air lift, significantly reducing the energy consumption of the air lift and significantly improving the sediment air lift efficiency.

[0055] The air lift pipe of the present invention adopts the expansion-contraction-expansion structure of the Venturi. On the one hand, the air inlet of the blowing sub-pipe is arranged at the contraction position of the Venturi, and the characteristics of fast flow rate and low pressure in the contraction section are utilized to increase the vertical lifting speed of the sediment. On the other hand, the water backflow phenomenon on the wall surface of the expanded inlet section of the Venturi pipe is utilized to flush away the sediment on the wall surface, thereby reducing the residual sediment on the expanded wall surface and avoiding the accumulation of sediment and the subsequent blockage of the air lift pipe.

[0056] The present invention designs an air inlet branch pipe structure of the blowing pipe, sets an annular airflow mixing chamber in the middle area of ​​the blowing branch pipe, and evenly disperses the compressed air along the circumferential direction. At the same time, obliquely upward tapered air inlet holes are punched on the shrinkage wall of the air lift pipe, so that the compressed air enters the air lift pipe evenly through the six tapered air inlet holes, ensuring the uniformity of air supply, making the sediment air lift process uniform and smooth, and ensuring the accuracy of sediment air lift.

[0057] Example 2

[0058] The present invention also provides a working mode of sediment air lift with multi-point pulse air supplement, using the sediment air lift device in Example 1, and the air lift branch pipe assembly in the sediment air lift device includes three groups of branch pipe connecting sections and branch pipe main pipes connected in sequence: the first branch pipe connecting section and the first branch pipe main pipe, the second branch pipe connecting section and the second branch pipe main pipe, and the third branch pipe connecting section and the third branch pipe main pipe; the first branch pipe connecting section is connected to the first air blowing branch pipe, the second branch pipe connecting section is connected to the second air blowing branch pipe, and the third branch pipe connecting section is connected to the third air blowing branch pipe; there is a first tapered air inlet on the first air blowing branch pipe, a second tapered air inlet on the second air blowing branch pipe, and a third tapered air inlet on the third air blowing branch pipe; there is a first control valve on the first air blowing branch pipe, a second control valve on the second air blowing branch pipe, and a third control valve on the third air blowing branch pipe.

[0059] The gas stripping formula is as follows:

[0060] (1)

[0061] (2)

[0062] (3)

[0063] in, The density of the air-water-sediment three-phase mixture outside the gas lift main pipe, unit ; is the submerged depth of the bottom end of the sand blowing pipe, in units of ; is the density of the air-water-sediment three-phase mixture in the air lift main, in units of ; is the lifting height of the gas lift device, unit ; is the unit of air consumption, unit ; is the safety factor, which is 1.2; is the lifting flow of the air lift pump, unit ; is the acceleration due to gravity, unit ; is the efficiency coefficient, generally .

[0064] Depend on Figure 4 It can be seen that the submerged depth of the airlift main at the bottom of the sediment pool is , the submerged depth of the outlet of the third tapered air inlet is , the submerged depth of the outlet of the second tapered air inlet is , the submerged depth of the outlet of the first tapered air inlet is The third blowing pipe needs to achieve the air increase for The second blowing pipe needs to achieve the air increase height for The first blowing pipe needs to achieve the air increase for ;

[0065] like Figure 5 As shown in the figure, the operation method of the sediment stripping device is: the density of the air-water-sediment three-phase mixture outside the gas stripping main pipe is known to be , the vertical extraction speed of sediment in the air lift main is At the beginning, the first control valve, the second control valve, and the third control valve are all closed, and the initial time is defined as ;

[0066] Step 1): When the mixture of sediment and water is at the submerged depth When the second and third control valves are kept closed, the first control valve is opened, and the compressed air enters the air lift main pipe through the first air blowing branch pipe and then moves upward;

[0067] Step 2): When the mixture of sediment and water reaches the flooding depth Time, that is, the time elapsed When the pressure is too high, close the first control valve, keep the third control valve closed, open the second control valve, and the compressed air enters the air lift main pipe through the second air blowing branch pipe;

[0068] Step 3): When the mixture of sediment and water reaches the flooding depth Time, that is, the time elapsed When the pressure is too high, close the second control valve, keep the first control valve closed, open the third control valve, and the compressed air enters the air lift main pipe through the third air blowing branch pipe;

[0069] Step 4): When the mixture of sediment and water reaches the horizontal surface, that is, the submergence depth is 0, that is, after time When the pressure is too high, close the third control valve, keep the second control valve closed, open the first control valve, and the compressed air enters the air lift main pipe through the first air blowing branch pipe;

[0070] Step 5): Repeat steps 1) to 4) to complete the pulse sediment extraction process;

[0071] Step 6): Finally, the sediment enters the recovery sedimentation tank through the air lift main pipe 4 and is recovered.

[0072] Those skilled in the art will readily appreciate other embodiments of the present invention upon consideration of the specification and practice of the invention herein. This application is intended to cover any variations, uses, or adaptations of the present invention that follow the general principles of the invention and include common knowledge or customary techniques in the art not invented herein. The description and examples are to be considered as exemplary only, with the true scope and spirit of the invention being indicated by the appended claims.

[0073] It should be understood that the present invention is not limited to the exact construction described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.

Claims

1. A sediment gas lift device with multi-point pulse air supply, characterized in that: include: sedimentation tank; sediment pool; A sand blowing mechanism is arranged inside the sediment pool and has a lower end located at the bottom of the sediment pool, and is used to blow up the sediment inside the sediment pool; An air lift mechanism is connected between the settling tank and the sediment tank, and comprises an air lift main pipe arranged between the settling tank and the sediment tank, and an air blowing mechanism is connected to the air lift main pipe; An electric control cabinet, used for controlling the operation of the sand blowing mechanism and the air stripping mechanism; The gas lift main pipe comprises: an inlet pipe; a gas lift branch pipe assembly connected to the inlet pipe, wherein the inlet pipe is connected to one end of the gas lift branch pipe assembly; and the other end of the gas lift branch pipe assembly is connected to a gas lift elbow. The inlet pipe comprises a first inlet pipe and a first pipe body; the first inlet pipe is in a trumpet shape expanding outward, and the first pipe body is an expanded inlet section of a Venturi expansion-contraction-expansion structure; The gas lift branch pipe assembly comprises a plurality of groups of branch pipe connection sections and branch pipe main bodies connected in sequence; the first pipe body is connected to the branch pipe connection section at the starting part, and the branch pipe main body at the terminal part is connected to the gas lift elbow; the branch pipe connection section is a contraction section of a Venturi expansion-contraction-expansion structure, and the branch pipe main body is an expansion inlet section of a Venturi expansion-contraction-expansion structure; The air blowing mechanism comprises: an air pump; an air blowing main pipe connected to the air pump; a plurality of air blowing branch pipes respectively connected to the air blowing main pipe; the air blowing branch pipes correspond to and are connected to the branch pipe connecting sections one by one; and a control valve is installed on each of the air blowing branch pipes; The diameters of the plurality of air blowing sub-pipes increase as the submerged depth thereof increases.

2. A sediment lift device with multi-point pulse air supply according to claim 1, characterized in that: The sand blowing mechanism comprises a sand blowing pipe, and the outer end of the sand blowing pipe is connected to an air pump.

3. The sediment gas lift device with multi-point pulse air supply according to claim 1, characterized in that: An air flow mixing chamber is provided at the connection position between the air blowing branch pipe and the branch pipe connecting section, and the end of the air flow mixing chamber is a gradually shrinking air inlet.

4. A multi-point pulse air supply sediment gas lift working mode, using the sediment gas lift device according to any one of claims 1 to 3, characterized in that: The gas lift branch pipe assembly in the sediment gas lift device includes three groups of branch pipe connection sections and branch pipe main pipes connected in sequence: a first branch pipe connection section and a first branch pipe main pipe, a second branch pipe connection section and a second branch pipe main pipe, and a third branch pipe connection section and a third branch pipe main pipe; The first branch pipe connecting section is connected with a first air blowing branch pipe, the second branch pipe connecting section is connected with a second air blowing branch pipe, and the third branch pipe connecting section is connected with a third air blowing branch pipe; the first air blowing branch pipe has a first gradually shrinking air inlet, the second air blowing branch pipe has a second gradually shrinking air inlet, and the third air blowing branch pipe has a third gradually shrinking air inlet; the first air blowing branch pipe is provided with a first control valve, the second air blowing branch pipe is provided with a second control valve, and the third air blowing branch pipe is provided with a third control valve; The gas lift formula is as follows: (1) (2) (3) in, is the density of the sediment-water two-phase mixed liquid outside the gas lift main pipe, in units ; is the submerged depth of the bottom of the sand blowing pipe, in units ; is the density of the three-phase mixture of air, water and sediment in the gas lift main pipe, in units of ; is the lifting height of the gas lift device, in units ; is the air consumption unit, unit ; is the safety factor, take 1.2; is the lifting flow of the air lifting pump, unit ; is the acceleration due to gravity, unit ; is the efficiency coefficient, and its value range is ; The submerged depth of the airlift main pipe at the bottom of the sediment pool is , the submerged depth of the outlet of the third tapered air inlet is , the submerged depth of the outlet of the second tapered air inlet is , the submerged depth of the outlet of the first tapered air inlet is The third blowing pipeline needs to achieve the air increase height for The second blowing pipeline needs to achieve the air increase height for The first blowing pipeline needs to achieve the air increase for ; The operation method of the sediment gas lift device is: the density of the air-water-sediment three-phase mixed liquid outside the gas lift main pipe is known to be , the vertical extraction speed of sediment in the gas lift main pipe is At the beginning, the first control valve, the second control valve, and the third control valve are all closed, and the initial time is defined as ; Step 1): When the mixture of silt and water is at the submerged depth When the second control valve and the third control valve are kept closed, the first control valve is opened, and the compressed air enters the air lift main pipe through the first air blowing branch pipe and then moves upward; Step 2): When the mixture of silt and water reaches the flooding depth time, that is, the time elapsed When the air pressure is too high, the first control valve is closed, the third control valve is kept closed, the second control valve is opened, and the compressed air enters the air lift main pipe through the second air blowing branch pipe; Step 3): When the mixture of silt and water reaches the flooding depth time, that is, the time elapsed When the air pressure is too high, the second control valve is closed, the first control valve is kept closed, the third control valve is opened, and the compressed air enters the air lift main pipe through the third air blowing branch pipe; Step 4): When the mixture of silt and water reaches the horizontal surface, that is, after a period of time When the air pressure is too low, the third control valve is closed, the second control valve is kept closed, the first control valve is opened, and the compressed air enters the air lift main pipe through the first air blowing branch pipe; Step 5): Repeat steps 1) to 4) to complete the pulse sediment extraction process; Step 6): Finally, the sediment enters the recovery sedimentation tank through the air lift main pipe and is recycled.