Experimental system and method for realizing three-dimensional multiphase seepage during true triaxial loading
By designing a three-way multi-phase permeability test system during true three-axis loading, the three-way multi-phase permeability measurement is achieved using six loading head modules and constant current constant pressure pumps, the existing technology cannot measure three-way under high stress. The multiphase permeability problem improves the reliability and accuracy of measurement.
Patent Information
- Application Number
- CN202410827796.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-06-24
AI Technical Summary
The existing true three-axis test machine cannot simultaneously measure the three-way multiphase permeability under high stress state, and cannot effectively study the changes in the permeability of rocks under true three-axis stress conditions, which affects the reliability and application value of the research. .
A test system for realizing three-way multiphase seepage during true three-axis loading is designed, including a three-way multiphase seepage loading chamber and a fluid injection and measurement system. Six loading head modules are used to apply pressure from six directions, and The measurement of three-way multiphase seepage is achieved through a constant-flow constant-pressure pump and a fluid storage device, ensuring independent control of sealing pressure and seepage.
The simultaneous measurement of three-way multiphase permeability under true three-axis stress conditions ensures the sealing and measurement accuracy of the sample, and can accurately measure the permeability of the three main stress directions when the sealing pressure is not less than 25MPa. It surpasses the capabilities of existing true three-axis test machines.
Smart Images

Figure CN118533723B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of test equipment for rock mechanics and seepage mechanics, and in particular relates to a test system and method for realizing three-way multiphase seepage in a true triaxial loading process. Background Art
[0002] As shallow resources are gradually exhausted, resource mining and utilization are gradually moving to the deep earth. Some underground projects are as deep as one thousand meters or even several thousand meters underground. The rocks in this environment are in a more complex environment, and the stress state often shows anisotropic characteristics, that is, a true triaxial stress state with unequal three directions. At the same time, the permeability of deep rocks will also be affected by the stress state, so the permeability also shows anisotropy.
[0003] However, due to the limitation of test equipment, the current research on the permeability characteristics of rocks under high stress conditions by scholars at home and abroad is mostly based on traditional triaxial stress conditions, that is, the situation where the intermediate principal stress is equal to the minimum principal stress. This is obviously inconsistent with the actual engineering conditions, resulting in a certain degree of impact on the reliability and application value of the research results. Therefore, it is very necessary to study the changes in the three-dimensional multiphase permeability of rocks under true triaxial stress conditions. At present, dozens of rock true triaxial testing machines have been developed at home and abroad, but these existing true triaxial testing machines can often only realize the measurement of unidirectional single-phase permeability during the test process, but there is currently no true triaxial testing system that can simultaneously realize the measurement of three-dimensional multiphase permeability under high stress conditions. Summary of the invention
[0004] The purpose of the present invention is to address the gaps in existing test equipment and test methods and to provide a test system and test method that can achieve true triaxial three-directional multiphase seepage simultaneous measurement.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] A test system for realizing three-way multiphase seepage during true triaxial loading, comprising a three-way multiphase seepage loading chamber and a fluid injection and measurement system, wherein the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber;
[0007] The three-way multiphase seepage loading chamber includes a sample metal frame, a loading frame, an outer plate, a fluid injection module, a fluid recovery module and six loading pressure head modules; the sample metal frame is arranged at the center of the loading frame, the outer plate is arranged on the loading frame, the fluid injection module is arranged at the upper part of the loading frame, the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber through the fluid injection module, the fluid recovery module is arranged at the lower part of the loading frame, and the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber through the fluid recovery module; the loading pressure head modules are arranged in the loading frame from six directions of up and down, front and back, left and right, and the loading pressure heads of the six loading pressure head modules are arranged in the sample metal frame and in contact with the sample.
[0008] Furthermore, the fluid injection and measurement system includes a constant flow and constant pressure pump and a fluid storage device. The rear of the constant flow and constant pressure pump is connected to the fluid storage device. A fluid channel is arranged inside the loading pressure head module. The constant flow and constant pressure pump is connected to the three-way multiphase seepage loading chamber through the fluid channel.
[0009] Furthermore, a rubber sealing ring is arranged inside the metal frame of the sample.
[0010] Furthermore, a Y+ loading head module is installed on the upper part of the loading frame; the upper boundary of the loading frame and the Y+ loading head module are connected by an upper outer plate; a Y+ direction force and displacement sensor is arranged inside the Y+ loading head module; when conducting experiments, a Y+ static loading module is connected to the top of the Y+ loading head module; a Y+ fluid channel is arranged inside the Y+ loading head module; and the Y+ fluid channel is connected to a fluid injection module or a fluid recovery module.
[0011] Furthermore, a Y-loading head module is installed at the lower part of the loading frame; the lower boundary of the loading frame and the Y-loading head module are connected by a lower outer plate; a Y-direction force and displacement sensor is arranged inside the Y-loading head module; when conducting experiments, a Y-static loading module is connected to the top of the Y-loading head module; a Y-fluid channel is arranged inside the Y-loading head module; and the Y-fluid channel is connected to a fluid injection module or a fluid recovery module.
[0012] Furthermore, an X+ loading head module is installed on the right side of the loading frame; the right boundary of the loading frame and the X+ loading head module are connected by a right outer plate; X+ direction force and displacement sensors are arranged inside the X+ loading head module; when conducting experiments, an X+ static loading module is connected to the top of the X+ loading head module; an X+ fluid channel is arranged inside the X+ loading head module; and the X+ fluid channel is connected to a fluid injection module or a fluid recovery module.
[0013] Furthermore, an X-loading head module is installed on the left side of the loading frame; the left boundary of the loading frame and the X-loading head module are connected by a left outer plate; X-direction force and displacement sensors are arranged inside the X-loading head module; when conducting experiments, an X-static loading module is connected to the top of the X-loading head module; an X-fluid channel is arranged inside the X-loading head module; and the X-fluid channel is connected to a fluid injection module or a fluid recovery module.
[0014] Furthermore, a Z+ loading head module is installed at the front of the loading frame; the front boundary of the loading frame and the Z+ loading head module are connected by a front outer plate; a Z+ direction force and displacement sensor is arranged inside the Z+ loading head module; when conducting experiments, a Z+ static loading module is connected to the top of the Z+ loading head module; a Z+ fluid channel is arranged inside the Z+ loading head module; and the Z+ fluid channel is connected to a fluid injection module or a fluid recovery module.
[0015] Furthermore, a Z-loading head module is installed at the rear of the loading frame; the rear boundary of the loading frame and the Z-loading head module are connected by a rear outer plate; a Z-direction force and displacement sensor is arranged inside the Z-loading head module; when conducting experiments, a Z-static loading module is connected to the top of the Z-loading head module; a Z-fluid channel is arranged inside the Z-loading head module; and the Z-fluid channel is connected to a fluid injection module or a fluid recovery module.
[0016] A test method for a test system for realizing three-way multiphase seepage during true triaxial loading, comprising the following test steps:
[0017] S1. Sample preparation stage: The rock blocks are processed into standard cubic rock samples of 100mm×100mm×100mm. The length of each side of the sample is 6mm longer than the side length of the indenter. This length is the reserved distance for the indenter to prevent the indenters from colliding in different directions during the loading process. Then, the standard cubic rock samples are chamfered to reduce the stress concentration problem during the loading process and to achieve effective sealing of the sample boundaries in the seepage test. The 12 edges are chamfered at an angle of 45° and a chamfer depth of 3mm.
[0018] S2, sample installation stage: first install the rubber sealing ring in the metal frame of the true triaxial three-way multiphase seepage loading chamber, and then use a special loading and unloading device to install the prepared sample 7 into the metal frame; secondly, install the Y-loading head module at the bottom of the loading frame; then install the metal frame with sample 7 on the Y-loading head module; then install the loading head modules in the remaining five directions and all seepage pipes;
[0019] S3, Equipment inspection stage: Turn on the hydraulic source, computer and oscilloscope, and observe whether all displacement sensors, force sensors and seepage pipes are abnormal. If there is no abnormality, proceed to the next step;
[0020] S4, preload application stage: servo controls six loading heads in the three directions of X, Y, and Z to symmetrically and slowly apply force to 10kN. After the loading is completed and stabilized for one minute, proceed to the next step;
[0021] S5, static loading stage: using force control mode, loading to the first preset stress state at different loading speeds according to the test plan design;
[0022] S6, sealing pressure loading stage: using the sealing pressure booster pump to load to a preset pressure state at a constant speed;
[0023] S7, three-way multiphase seepage loading stage: after reaching the preset stress state and sealing pressure, use a constant flow and constant pressure pump to inject different flow fluids at different flow rates in each principal stress direction in turn, and calculate the permeability in each direction after the seepage stabilizes; after completing the seepage experiment under the current stress state, turn off the constant flow and constant pressure pump to release the pore pressure;
[0024] S8, subsequent test stage: after completing the three-way multiphase seepage test of the previous preset stress state, the force control mode is adopted, and different loading speeds are used according to the test scheme design to load to the second preset stress state; and the corresponding three-way multiphase seepage loading is carried out under this stress state, and so on;
[0025] S9, unloading stage: after the test is completed, first turn off the constant flow and constant pressure pump to stop the seepage loading, then turn off the sealing pressure booster pump to reduce the sealing pressure to zero, and then slowly, symmetrically and synchronously reduce the stress in the three directions of X, Y and Z to zero to avoid unloading too quickly or unsynchronized unloading in the three directions to form deviation stress that damages the specimen;
[0026] S10, end of test: after unloading is completed, take out the sample, observe the sample shape, and complete the test;
[0027] S11. Clean the debris of the pressure head and the sample in the pressure chamber, and turn off the water and electricity.
[0028] The beneficial effects of the present invention are:
[0029] Compared with the existing true triaxial testing machines, the advantage of the present invention is that it can simultaneously realize three-way multiphase seepage test under true triaxial stress conditions; under the action of sealing pressure, the sealing ring fits tightly against the inner wall of the triaxial chamber frame, the side of the sample pad and the 12 edges of the sample to ensure the sealing between the adjacent surfaces of the sample, and can realize simultaneous measurement of permeability in three principal stress directions, and the sealing pressure is not less than 25MPa, with an accuracy of ±0.2MPa; seepage and sealing require two sets of independently controlled plunger pump systems; the seepage loading device adopts a fully digital dynamic servo controller, which can inject fluids (gases) of different flow rates (pressures) according to different flow rates, with a maximum output pressure of 25MPa, which is unattainable by other existing true triaxial testing machines. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the internal structure of the true triaxial three-way multiphase seepage loading chamber of the present invention;
[0031] Figure 2 The internal structure of the true triaxial three-way multiphase seepage loading chamber of the present invention is shown in FIG. Figure 2 ;
[0032] Figure 3 It is a schematic diagram of the connection between the true triaxial three-way multiphase seepage loading chamber and the fluid injection and measurement system of the present invention.
[0033] Description of reference numerals:
[0034] 1. Three-way multiphase seepage loading chamber; 2. Sample metal frame; 3. Loading frame;
[0035] 4. Outer panel; 4-1. Upper outer panel, 4-2. Lower outer panel, 4-3. Right outer panel, 4-4. Left outer panel, 4-5. Front outer panel, 4-6. Rear outer panel;
[0036] 5. Fluid channel; 5-1.Y+fluid channel, 5-2.Y-fluid channel, 5-3.X+fluid channel, 5-4.X-fluid channel, 5-5.Z+fluid channel, 5-6.Z-fluid channel;
[0037] 6. Loading head; 6-1.Y+ loading head, 6-2.Y- loading head, 6-3.X+ loading head, 6-4.X- loading head, 6-5.Z+ loading head, 6-6.Z- loading head;
[0038] 7. Sample; 8. Rubber sealing ring; 9. Fluid injection and measurement system; 10. Constant flow and pressure pump; 11. Fluid storage device. DETAILED DESCRIPTION
[0039] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0040] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "left", "right", "horizontal", "inner", "outer", "one side", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or a circuit connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] Example 1
[0042] like Figure 1-3 As shown, a test system for realizing three-way multiphase seepage during true triaxial loading includes a three-way multiphase seepage loading chamber 1 and a fluid injection and measurement system 9.
[0043] The three-way multiphase seepage loading chamber 1 includes a sample metal frame 2, a loading frame 3, an outer plate 4, a fluid injection module, a fluid recovery module and six loading pressure head modules; the sample metal frame 2 is arranged at the center of the loading frame 3, the outer plate 4 is arranged on the loading frame 3, the fluid injection module is arranged at the upper part of the loading frame 3, the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber 1 through the fluid injection module, the fluid recovery module is arranged at the lower part of the loading frame 3, and the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber 1 through the fluid recovery module; the loading pressure head modules are arranged in the loading frame 3 from six directions of up, down, front, back, left and right, and the loading pressure heads 6 of the six loading pressure head modules are arranged in the sample metal frame 2 and in contact with the sample 7.
[0044] The fluid injection and measurement system 9 mainly includes a constant flow and constant pressure pump 10 and a fluid storage device 11. The rear of the constant flow and constant pressure pump 10 is connected to the fluid storage device 11. A fluid channel 5 is arranged inside the loading pressure head module. The constant flow and constant pressure pump 10 is connected to the three-way multiphase seepage loading chamber 1 through the fluid channel 5.
[0045] As a preferred embodiment of the present invention, a rubber sealing ring 8 is arranged inside the sample metal frame 2 to ensure the sealing of the sample 7;
[0046] Specifically, a Y+ loading head module 6-1 is installed on the upper part of the loading frame 3; the upper boundary of the loading frame 3 and the Y+ loading head module 6-1 are connected by an upper outer plate 4-1; a Y+ direction force and displacement sensor is arranged inside the Y+ loading head module 6-1; when conducting experiments, a Y+ static loading module is connected to the top of the Y+ loading head module 6-1; a Y+ fluid channel 5-1 is arranged inside the Y+ loading head module 6-1; the Y+ fluid channel 5-1 is connected to a constant flow and constant pressure pump 10;
[0047] A Y-loading pressure head module 6-2 is installed at the lower part of the loading frame 3; the lower boundary of the loading frame 3 and the Y-loading pressure head module 6-2 are connected by a lower outer plate 4-2; a Y-direction force and displacement sensor is arranged inside the Y-loading pressure head module 6-2; when conducting experiments, a Y-static loading module is connected to the top of the Y-loading pressure head module 6-2; a Y-fluid channel 5-2 is arranged inside the Y-loading pressure head module 6-2; the Y-fluid channel 5-2 is connected to a constant flow and constant pressure pump 10;
[0048] An X+ loading head module 6-3 is installed on the right side of the loading frame 3; the right boundary of the loading frame 3 and the X+ loading head module 6-3 are connected by a right outer plate 4-3; an X+ direction force and displacement sensor is arranged inside the X+ loading head module 6-3; when conducting experiments, an X+ static loading module is connected to the top of the X+ loading head module 6-3; an X+ fluid channel 5-3 is arranged inside the X+ loading head module 6-3; the X+ fluid channel 5-3 is connected to a constant flow and constant pressure pump 10;
[0049] An X-loading pressure head module 6-4 is installed on the left side of the loading frame 3; the left boundary of the loading frame 3 and the X-loading pressure head module 6-4 are connected by a left outer plate 4-4; an X-direction force and displacement sensor is arranged inside the X-loading pressure head module 6-4; when conducting an experiment, an X-static loading module is connected to the top of the X-loading pressure head module 6-4; an X-fluid channel 5-4 is arranged inside the X-loading pressure head module 6-4; the X-fluid channel 5-4 is connected to a constant flow and constant pressure pump 10;
[0050] A Z+ loading head module 6-5 is installed at the front of the loading frame 3; the front boundary of the loading frame 3 and the Z+ loading head module 6-5 are connected by a front outer plate 4-5; a Z+ direction force and displacement sensor is arranged inside the Z+ loading head module 6-5; when conducting an experiment, a Z+ static loading module is connected to the top of the Z+ loading head module 6-5; a Z+ fluid channel 5-5 is arranged inside the Z+ loading head module 6-5; the Z+ fluid channel 5-5 is connected to a constant flow and constant pressure pump 10;
[0051] A Z-loading head module 6-6 is installed at the rear of the loading frame 3; the rear boundary of the loading frame 3 and the Z-loading head module 6-6 are connected by a rear outer plate 4-6; a Z-direction force and displacement sensor is arranged inside the Z-loading head module 6-6; when conducting experiments, a Z-static loading module is connected to the top of the Z-loading head module 6-6; a Z-fluid channel 5-6 is arranged inside the Z-loading head module 6-6; and the Z-fluid channel 5-6 is connected to a constant flow and constant pressure pump 10.
[0052] Example 2
[0053] This embodiment discloses a test method based on a test system for realizing three-way multiphase seepage during true triaxial loading, and the specific steps are as follows:
[0054] S1. Sample preparation stage: the rock block is processed into a standard cubic rock sample 7 of 100mm×100mm×100mm. The length of each side of the sample 7 is 6mm longer than the side length of the indenter. This length is the reserved distance for the indenter to prevent the indenters from colliding in different directions during the loading process. Then, the standard cubic rock sample is chamfered to reduce the stress concentration problem during the loading process and to achieve effective sealing of the sample boundary in the seepage test. The 12 edges are chamfered at an angle of 45° and a chamfer depth of 3mm.
[0055] S2, sample installation stage: first install the rubber sealing ring 8 in the metal frame 2 of the true triaxial three-way multiphase seepage loading chamber 1, and then use a special loading and unloading device to install the prepared sample 7 into the metal frame 2; secondly, install the Y-loading head module 6-2 at the lower part of the loading frame 3; then install the metal frame 2 with the sample 7 onto the Y-loading head module 6-2; then install the loading head modules in the remaining five directions and all seepage pipes by a special device;
[0056] S3, Equipment inspection stage: Turn on the hydraulic source, computer and oscilloscope, and observe whether all displacement sensors, force sensors and seepage pipes are abnormal. If there is no abnormality, proceed to the next step;
[0057] S4, preload application stage: servo controls six loading heads 6 in the three directions of X, Y and Z to symmetrically and slowly apply force to about 10kN. After the loading is completed and stabilized for one minute, the next step is carried out;
[0058] S5, static loading stage: using force control mode, loading to the first preset stress state at different loading speeds according to the test plan design;
[0059] S6, sealing pressure loading stage: using the sealing pressure booster pump to load to a preset pressure state at a constant speed;
[0060] S7, three-way multiphase seepage loading stage: after reaching the preset stress state and sealing pressure, use the constant flow and constant pressure pump 10 to inject different flow (pressure) fluids (gases) in each principal stress direction at different flow rates, and calculate the permeability in each direction after the seepage is stable; after completing the seepage experiment at the current stress state, turn off the constant flow and constant pressure pump 10 to release the pore pressure;
[0061] S8, subsequent test stage: after completing the three-way multiphase seepage test of the previous preset stress state, the force control mode is adopted, and different loading speeds are used according to the test scheme design to load to the second preset stress state; and the corresponding three-way multiphase seepage loading is carried out under this stress state, and so on;
[0062] S9, unloading stage: after the test is completed, the constant flow and constant pressure pump is turned off first to stop the seepage loading, and then the sealing pressure booster pump is turned off to reduce the sealing pressure to zero, and then the stress in the three directions of X, Y, and Z is slowly, symmetrically and synchronously reduced to zero to avoid the deviation stress caused by unloading too quickly or unsynchronized unloading in the three directions to damage the sample 7;
[0063] S10, end of test: after unloading is completed, take out the sample 7, observe the sample shape, and complete the test;
[0064] S11. Clean the debris of the pressure head and the sample in the pressure chamber, and turn off the water and electricity.
[0065] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A test method for a test system for realizing three-way multiphase seepage during true triaxial loading, characterized in that: The test system includes: a three-way multiphase seepage loading chamber and a fluid injection and measurement system, wherein the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber; The three-way multiphase seepage loading chamber comprises a sample metal frame, a loading frame, an outer plate, a fluid injection module, a fluid recovery module and six loading head modules; the sample metal frame is arranged at the center of the loading frame, a rubber sealing ring is arranged inside the sample metal frame, the outer plate is arranged on the loading frame, the fluid injection module is arranged at the upper part of the loading frame, the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber through the fluid injection module, the fluid recovery module is arranged at the lower part of the loading frame, and the fluid injection and measurement system is connected to the three-way multiphase seepage loading chamber through the fluid recovery module; the loading head modules are arranged in the loading frame from six directions of up, down, front, back, left and right, and the loading heads of the six loading head modules are arranged in the sample metal frame and in contact with the sample; force sensors and displacement sensors are arranged inside each of the loading head modules; a static loading module is connected to the top of each of the loading head modules; The fluid injection and measurement system comprises a constant flow and constant pressure pump and a fluid storage device, the rear of the constant flow and constant pressure pump is connected to the fluid storage device, each loading head module is provided with a fluid channel inside, and the constant flow and constant pressure pump is connected to the three-way multiphase seepage loading cabin through the fluid channel; The test method includes the following test steps: S1. Sample preparation stage: The rock blocks are processed into standard cubic rock samples of 100mm×100mm×100mm. The length of each side of the sample is 6mm longer than the side length of the indenter. The 6mm length is the reserved distance for the indenter to prevent the indenters from colliding in different directions during the loading process. Then, the standard cubic rock samples are chamfered to reduce the stress concentration problem during the loading process and to achieve effective sealing of the sample boundaries in the seepage test. The 12 edges are chamfered at an angle of 45° and a chamfer depth of 3mm. S2, sample installation stage: first install the rubber sealing ring in the metal frame of the true triaxial three-way multiphase seepage loading chamber, and then use a special loading and unloading device to install the prepared sample into the metal frame; secondly, install the loading head module at the bottom of the loading frame; then install the metal frame with the sample on the loading head module; then install the loading head modules in the remaining five directions and all seepage pipes; S3, Equipment inspection stage: Turn on the hydraulic source, computer and oscilloscope, and observe whether all displacement sensors, force sensors and seepage pipes are abnormal. If there is no abnormality, proceed to the next step; S4, preload application stage: servo controls six loading heads in the three directions of X, Y, and Z to symmetrically and slowly apply force to 10 kN. After the loading is completed and stabilized for one minute, proceed to the next step; S5, static loading stage: using force control mode, loading to the first preset stress state at different loading speeds according to the test plan design; S6, sealing pressure loading stage: using the sealing pressure booster pump to load to a preset pressure state at a constant speed; S7, three-way multiphase seepage loading stage: after reaching the preset stress state and sealing pressure, use a constant flow and constant pressure pump to inject different flow fluids at different flow rates in each principal stress direction in turn, and calculate the permeability in each direction after the seepage stabilizes; after completing the seepage experiment under the current stress state, turn off the constant flow and constant pressure pump to release the pore pressure; S8, subsequent test stage: after completing the three-way multiphase seepage test of the previous preset stress state, the force control mode is adopted, and different loading speeds are used according to the test scheme design to load to the second preset stress state; and the corresponding three-way multiphase seepage loading is carried out under this stress state, and so on; S9, unloading stage: after the test is completed, first turn off the constant flow and constant pressure pump to stop the seepage loading, then turn off the sealing pressure booster pump to reduce the sealing pressure to zero, and then slowly, symmetrically and synchronously reduce the stress in the three directions of X, Y and Z to zero to avoid unloading too quickly or unsynchronized unloading in the three directions to form deviation stress that damages the specimen; S10, end of test: after unloading is completed, take out the sample, observe the sample shape, and complete the test; S11. Clean the debris of the pressure head and the sample in the pressure chamber, and turn off the water and electricity.
2. The test method of a test system for realizing three-way multiphase seepage during true triaxial loading according to claim 1, characterized in that: A Y+ loading head module is installed on the upper part of the loading frame; the upper boundary of the loading frame and the Y+ loading head module are connected by an upper outer plate; a Y+ fluid channel is arranged inside the Y+ loading head module; and the Y+ fluid channel is connected to the fluid injection module.
3. The test method of a test system for realizing three-way multiphase seepage during true triaxial loading according to claim 1, characterized in that: A Y-loading head module is installed at the lower part of the loading frame; the lower boundary of the loading frame and the Y-loading head module are connected by a lower outer plate; a Y-fluid channel is arranged inside the Y-loading head module; and the Y-fluid channel is connected to a fluid recovery module.
4. The test method of a test system for realizing three-way multiphase seepage during true triaxial loading according to claim 1, characterized in that: An X+ loading head module is installed on the right side of the loading frame; the right boundary of the loading frame and the X+ loading head module are connected by a right outer plate; an X+ fluid channel is arranged inside the X+ loading head module; and the X+ fluid channel is connected to a fluid injection module or a fluid recovery module.
5. The test method of a test system for realizing three-way multiphase seepage during true triaxial loading according to claim 1, characterized in that: An X-loading head module is installed on the left side of the loading frame; the left boundary of the loading frame and the X-loading head module are connected by a left outer plate; an X-fluid channel is arranged inside the X-loading head module; and the X-fluid channel is connected to a fluid injection module or a fluid recovery module.
6. The test method of a test system for realizing three-way multiphase seepage during true triaxial loading according to claim 1, characterized in that: A Z+ loading head module is installed at the front of the loading frame; the front boundary of the loading frame and the Z+ loading head module are connected by a front outer plate; a Z+ fluid channel is arranged inside the Z+ loading head module; and the Z+ fluid channel is connected to a fluid injection module or a fluid recovery module.
7. The test method of a test system for realizing three-way multiphase seepage during true triaxial loading according to claim 1, characterized in that: A Z-loading head module is installed at the rear of the loading frame; the rear boundary of the loading frame and the Z-loading head module are connected by a rear outer plate; a Z-fluid channel is arranged inside the Z-loading head module; and the Z-fluid channel is connected to a fluid injection module or a fluid recovery module.
Citation Information
Patent Citations
Method for testing coal sample seepage under true triaxial state
CN102735600A
Real-time testing method for three-dimensional permeability of deep rock
CN116124672A
Deep rock in-situ environment reconstruction and three-dimensional force thermo-acoustic shock flow multi-field test system
CN116296867A