By pre-sampling the phase difference between current and voltage, inverting the instantaneous value of the voltage, and calculating the power of the drive motor, the problem of parasitic loops in the GIS isolation switch is solved, the accuracy and safety of diagnosis are improved, and fault warning is realized, simplifying the detection process. .
Patent Information
- Application Number
- CN202410993072.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-24
AI Technical Summary
Parasitic loops may be introduced in the power signal detection of the GIS isolation switch drive motor, causing safety hazards and affecting the normal operation of the power system and equipment safety.
By pre-sampling the phase difference between current and voltage, the functional formula of the phase difference change caused by the change in the effective value of the current is fitted, and the instantaneous value of the voltage is deduced to calculate the instantaneous sampling power of the drive motor to avoid parasitic loop problems caused by direct voltage sampling. Use baseline control charts for troubleshooting.
It improves the accuracy of mechanical status diagnosis of the isolating switch, avoids safety risks caused by parasitic loops, simplifies the detection process, reduces detection costs, and achieves highly sensitive fault early warning for small-scale variations.
Smart Images

Figure CN118534188B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electrical equipment detection, and in particular to a method and device for sampling the power of a driving motor of a GIS isolating switch, and a fault diagnosis method. Background Art
[0002] Gas Insulated Switchgear (GIS) plays an important role in the power system and is used to achieve the segmentation and isolation of electrical equipment. However, since the mechanical structure of the GIS disconnector is usually enclosed inside the casing and its internal state cannot be directly observed, the traditional fault diagnosis for open disconnectors is no longer applicable. In order to effectively monitor the mechanical state of the GIS disconnector, a state perception method is required. In this regard, the perception method based on the drive motor power is a major method. At present, there are the following problems in the perception method based on the drive motor power:
[0003] A. For the detection of drive motor current; it cannot reflect the phase change relationship between voltage and current, and the drive motor currents of different drive motor models have a certain degree of dispersion, resulting in unclear current characteristics.
[0004] B. Detection of power signals: When using a monitoring method based on the drive motor power in a GIS disconnector, voltage detection may introduce a parasitic loop, which may bring serious safety hazards. Parasitic loops can cause additional current to flow in the circuit, which may cause the following safety issues:
[0005] Driving motor circuit breaker tripping: If the parasitic circuit causes the voltage detection device to short-circuit, it may cause the driving motor circuit breaker to trip. This will prevent the disconnector from operating normally and may affect the normal operation of the power system.
[0006] Isolator malfunction: Parasitic circuits may cause erroneous voltage signals to be transmitted to the monitoring system, causing it to misjudge that the isolator needs to be operated. This may cause the isolator to malfunction, causing circuit abnormalities, and even equipment damage or casualties.
[0007] Fire and explosion hazard: If the parasitic loop causes the voltage detection device to be overloaded or short-circuited, high temperatures may be generated, causing fire or explosion. In this case, not only will the equipment be damaged, but it will also cause serious danger to the surrounding environment and personnel.
[0008] System instability: Parasitic loops may cause distortion of voltage and current waveforms in the circuit, making the system unstable. This may affect the normal operation of the power system and even cause system failure. Summary of the invention
[0009] In view of the above analysis, the present invention aims to provide a GIS isolating switch drive motor power sampling method, device and fault diagnosis method to solve the problem that the detection of voltage in the power signal may introduce parasitic circuits and bring serious safety hazards, and improve the accuracy of switch fault diagnosis.
[0010] The purpose of the present invention is mainly achieved through the following technical solutions:
[0011] The present invention discloses a method for sampling the power of a GIS isolating switch driving motor, comprising:
[0012] Pre-sampling of instantaneous power supply current and voltage during the full operation of the GIS isolation switch drive motor;
[0013] Detect the phase difference of current and voltage in each AC power supply cycle during the full operation of the drive motor according to the pre-sampled instantaneous current and voltage values;
[0014] Based on the detected phase difference and the current effective value calculated according to the pre-sampled instantaneous current value, a functional formula for the phase difference change caused by the current effective value change is fitted;
[0015] Separately sample the instantaneous current value of the GIS disconnector drive motor, calculate the effective current value of the cycle based on the sampled instantaneous current value, calculate the phase difference between the current and voltage corresponding to the effective current value in combination with the fitting function, and then inversely deduce the instantaneous voltage value corresponding to the sampled instantaneous current value;
[0016] The instantaneous sampling power of the GIS disconnector drive motor is calculated using the sampled instantaneous current value and the reversed instantaneous voltage value.
[0017] Another aspect of the present invention discloses a power sampling device for a drive motor of an isolating switch, comprising:
[0018] Current sampling circuit and processor unit;
[0019] Wherein, the current sampling circuit is connected between the GIS isolating switch driving motor and the processor unit;
[0020] The current sampling circuit is used to sample the instantaneous value of the power supply current during the full operation of the GIS isolation switch drive motor and output it to the processor unit;
[0021] The processor unit has a built-in function formula for the change of the current and voltage phase difference caused by the change of the current effective value; the current effective value of the AC power supply is calculated according to the sampled current instantaneous value, and the current and voltage phase difference corresponding to the current effective value is calculated in combination with the fitting function formula, and then the voltage instantaneous value corresponding to the sampled current instantaneous value is inferred; the instantaneous sampling power of the GIS isolation switch driving motor is calculated using the sampled current instantaneous value and the inferred voltage instantaneous value;
[0022] The fitting parameters of the functional formula are obtained by fitting the effective current value of the GIS disconnector drive motor during the entire operation process obtained by pre-sampling before formal sampling and the corresponding current and voltage phase difference, through data fitting.
[0023] On the other hand, the present invention also discloses a switch fault diagnosis method based on power sampling of an isolating switch driving motor, which is characterized by comprising:
[0024] The GIS isolating switch driving motor power sampling method as described above is used to perform power sampling to avoid the influence of parasitic loops, and obtain the instantaneous power sampling value of the motor;
[0025] A baseline control diagram for stable operation of the motor is established based on instantaneous power sampling values of the motor collected when the equipment is running stably;
[0026] Based on the established baseline control chart, the newly sampled instantaneous power sampling values of the motor monitored in real time are inserted into the baseline control chart to perform early fault and failure diagnosis of the motor performance;
[0027] Among them, when the instantaneous power sampling value inserted into the baseline control chart exceeds the upper and lower control limits of the baseline control chart, it is diagnosed that the GIS disconnector is abnormal or faulty;
[0028] When the instantaneous power sampling value inserted into the baseline control chart shows a continuous upward or downward shift, or periodic change, it is diagnosed that the GIS disconnector has a performance change or a periodic influencing factor, which is an early fault that requires warning.
[0029] The beneficial effects of the present invention are as follows:
[0030] The GIS isolating switch drive motor power sampling method and device disclosed in the present invention change the voltage sampling mode. On the one hand, it avoids the parasitic loop problem that may be caused by direct voltage sampling, which may cause the isolating switch to fail to operate normally and bring risks to the site. On the other hand, the voltage phase is reversely deduced by using the pre-determined voltage and current phase difference to accurately determine the impedance of the drive circuit, thereby improving the accuracy of the mechanical state diagnosis of the isolating switch. In addition, when the drive motor power is formally collected, only the current sampling circuit needs to be connected, which simplifies the detection process and reduces the detection cost. Moreover, the control chart used in the switch fault diagnosis method of the present invention for fault diagnosis can achieve high-sensitivity detection of small-range variations, so as to provide early warning of faults; its fault diagnosis through control charts has the advantages of intuitive understanding of data and less calculation; and it has good adaptability and flexibility, and is suitable for various types of monitoring, and is not limited to specific fault modes. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The accompanying drawings are only used for the purpose of illustrating specific embodiments and are not to be considered as limiting the present invention. In the entire drawings, the same reference symbols represent the same components;
[0032] Figure 1 This is a flow chart of a method for sampling the power of a GIS isolating switch driving motor in Embodiment 1 of the present invention;
[0033] Figure 2 A curve diagram of the instantaneous voltage value sampled during an isolating switch operation in the first embodiment of the present invention;
[0034] Figure 3 A curve diagram of the instantaneous value of current sampled during an isolating switch operation in the first embodiment of the present invention;
[0035] Figure 4 A phase relationship diagram of voltage and current during a primary isolating switch operation in the first embodiment of the present invention;
[0036] Figure 5 A fitting curve diagram of the relationship between the initial current effective value and the phase is constructed for the corresponding relationship between the phase difference and the current effective value in the first embodiment of the present invention;
[0037] Figure 6 A diagram showing the phase matching between the inversely derived voltage instantaneous value and the sampled voltage instantaneous value in the first embodiment of the present invention;
[0038] Figure 7 A connection block diagram of a GIS isolating switch drive motor power sampling device in Embodiment 2 of the present invention;
[0039] Figure 8A connection block diagram of another GIS isolating switch drive motor power sampling device in the second embodiment of the present invention;
[0040] Fig. 9 is a schematic diagram of a phase difference detection circuit in Embodiment 2 of the present invention;
[0041] Fig.10 This is a flow chart of the switch fault diagnosis method in Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0042] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of this application and are used to illustrate the principles of the present invention together with the embodiments of the present invention.
[0043] This embodiment discloses a method for sampling the power of a GIS isolating switch driving motor. Figure 1 As shown, including:
[0044] Step S1, pre-sampling the instantaneous values of power supply current and voltage during the full operation of the GIS isolation switch driving motor;
[0045] Step S2, detecting the phase difference of the current and voltage in each AC power supply cycle during the full operation of the drive motor according to the pre-sampled instantaneous current and voltage values;
[0046] Step S3, based on the detected phase difference and the current effective value calculated according to the pre-sampled instantaneous current value, fitting a function formula of the phase difference change caused by the current effective value change;
[0047] Step S4, sampling the instantaneous value of the current of the GIS isolation switch driving motor separately, calculating the effective value of the current in the cycle according to the sampled instantaneous value of the current, calculating the phase difference between the current and the voltage corresponding to the effective value of the current in combination with the fitting function, and then inverting the instantaneous value of the voltage corresponding to the sampled instantaneous value of the current;
[0048] Step S5: Calculate the instantaneous sampling power of the GIS disconnector drive motor using the sampled instantaneous current value and the reversed instantaneous voltage value.
[0049] Specifically, during the installation phase of the GIS disconnector before the pre-sampling in step S1, ensure that the disconnector and its drive motor have been correctly installed and connected, and install a voltage sampling circuit and a current sampling circuit on the drive motor; during pre-sampling, when someone is on duty, pre-sample the instantaneous values of voltage and current through the voltage sampling circuit and the current sampling circuit;
[0050] Among them, the voltage sampling circuit is set to direct sampling mode, which means that the circuit directly measures the voltage across the drive motor without passing through any additional components.
[0051] In the pre-sampling stage, the voltage and current sampling circuits are connected, and the GIS isolation switch drive motor is operated under human supervision to collect the instantaneous values of the power supply current and voltage during the entire operation of the drive motor. On the one hand, in order to accurately measure the phase difference between voltage and current in subsequent operations, the instantaneous current and voltage value data are collected. On the other hand, when someone is on duty, the parasitic circuit fault caused by the direct connection of the voltage sampling circuit to the drive motor is handled in a timely manner.
[0052] After the isolating switch drives the motor to start, the phase difference between the voltage and current is not fixed, but changes with the magnitude of the current. This means that the phase difference determined by the instantaneous values of current and voltage measured at a single point cannot truly reflect the change process of the current and voltage phase difference during the entire operation of the drive motor.
[0053] Therefore, the pre-sampled instantaneous current and voltage data of the drive motor during the entire operation process is a very important basic data collection task in the subsequent steps.
[0054] Specifically, in step S2, the phase difference detection of the current and voltage of the driving motor during the whole operation process is performed through the XOR gate; the detection process includes:
[0055] 1) Two ADC circuits are used to perform analog-to-digital conversion on the instantaneous current value sampled by the current sampling circuit and the instantaneous voltage value sampled by the voltage sampling circuit respectively;
[0056] 2) Input the instantaneous digital signals of current and voltage after analog-to-digital conversion into the XOR gate for phase difference detection, and output a duty cycle signal that is proportional to the phase difference between current and voltage;
[0057] Specifically, the XOR gate includes an XOR circuit including a first AND gate, a second AND gate and a NOR gate; wherein the first and second AND gates are both two-input AND gates, and the NOR gate is a two-input NOR gate;
[0058] The two input ends of the first AND gate and the NOR gate are respectively connected to the instantaneous digital signals of current and voltage after analog-to-digital conversion; the two input ends of the second AND gate are respectively connected to the output ends of the first AND gate and the NOR gate, and the output end of the second AND gate is a duty cycle signal.
[0059] Specifically, step S3 includes:
[0060] 1) Synchronously receive the instantaneous digital signals of current and voltage after analog-to-digital conversion and the duty cycle signal after phase difference detection;
[0061] 2) Calculate the effective value of the current in the cycle according to the instantaneous value of the sampled current, and convert the phase difference according to the duty cycle signal; use fitting methods including second-order fitting to fit the function of the phase difference change caused by the change of the effective value of the current;
[0062] Specifically, the effective value of current ; For the first The instantaneous sampling value of the current, is the number of instantaneous current sampling values in one cycle;
[0063] Phase Difference ; is the duty cycle;
[0064] Second-order fitting formula:
[0065] ;
[0066] in, is the fitting coefficient.
[0067] Through the fitted formula, the phase difference between the current and the voltage in any power supply cycle during the entire operation of the drive motor can be fitted according to the effective value of the current in the cycle due to the influence of the current amplitude.
[0068] Then, the instantaneous value of the voltage can be inferred based on the phase difference. Therefore, when performing formal power sampling, there is no need to directly connect the voltage sampling circuit to the two ends of the drive motor, which effectively avoids the parasitic loop problem caused by the voltage sampling circuit directly connected to the two ends of the drive motor, which may cause the isolation switch to fail to operate normally and bring risks to the site.
[0069] Step S4 comprises:
[0070] 1) Disconnect the voltage sampling circuit, connect the current sampling circuit separately, and sample the instantaneous value of the current of the GIS isolation switch drive motor separately when no one is on duty;
[0071] 2) Calculate the effective value of the current in the cycle based on the instantaneous value of the sampled current;
[0072] The calculation formula is the same as the current effective value calculation formula in the previous step;
[0073] 3) Substituting the calculated current effective value into the fitting function, calculating the phase difference between the current and the voltage corresponding to the current effective value; the phase difference is the phase difference between the current and the voltage of the period;
[0074] 4) inferring the instantaneous voltage value corresponding to the sampled instantaneous current value based on the known effective voltage value and the phase difference between the current and voltage of the cycle;
[0075] The reverse process is carried out by:
[0076] 1) Calculate the current phase angle at the sampling moment based on the instantaneous value of the sampled current;
[0077] 2) Calculate the phase angle of the voltage at the sampling time based on the phase angle of the current at the sampling time and the phase difference between the current and the voltage;
[0078] 3) Based on the voltage phase angle at the sampling moment and the known voltage effective value, the instantaneous voltage value at the sampling moment corresponding to the voltage phase angle at the sampling moment is deduced.
[0079] Preferably, the instantaneous value of the reverse voltage ;
[0080] in, The effective value of voltage is related to the type of AC power supply being sampled. If the AC power supply is used, the effective value of voltage is 220V. The effective value of voltage of AC power supply after power supply voltage conversion can be obtained through voltage conversion rules. is the power supply frequency, for The voltage phase angle at the time; is the voltage amplitude adjustment parameter, which is obtained based on the measurement and back-calculation comparison results.
[0081] Specifically, in step S5, the instantaneous value of the sampled current is used And the reverse voltage instantaneous value Calculate the instantaneous sampling power of the GIS disconnector drive motor .
[0082] In this embodiment, the scheme is verified based on the measured data.
[0083] like Figure 2 As shown in FIG. 1 , it is a curve of the instantaneous voltage value sampled during an isolating switch operation; in the figure, the horizontal axis is time, and the vertical axis is voltage (V);
[0084] like Figure 3 As shown in the figure, it is the instantaneous value curve of the current sampled during the operation of the isolating switch; the horizontal axis is time, and the vertical axis is current (A);
[0085] After phase difference detection, we get Figure 4 The phase relationship between voltage and current during the operation of a primary isolating switch is shown in the figure. It can be seen from the figure that the phase difference is not fixed, and the phase difference changes with the change of the current size. Figure 4 In the figure, the horizontal axis is the number of cycles, and the vertical axis is the duty cycle of the logic level output;
[0086] like Figure 5 As shown, the corresponding relationship between the phase difference and the effective value of the current constructs a fitting curve of the relationship between the initial current effective value and the phase;
[0087] The obtained fitting formula is .
[0088] Figure 5 In the figure, the horizontal axis is the RMS current (A), and the vertical axis is the duty cycle D (Duty cycle); the phase difference .
[0089] This embodiment also verifies the phase match between the inversely derived voltage instantaneous value and the sampled voltage instantaneous value. Figure 6 As shown in the figure, the curve in the lower half is the inverse voltage data, and the curve in the upper half is the actual sampled voltage data. It can be seen from the figure that the two curves overlap well in phase, and the amplitude is adjusted by adjusting the voltage amplitude adjustment parameter. The two curves can be made to coincide with each other. In order to satisfy the phase observation effect in this figure, the final result of the two curves coinciding with each other is not adopted.
[0090] In summary, the GIS isolating switch drive motor power sampling method disclosed in the present invention changes the voltage sampling mode. On the one hand, it avoids the parasitic loop problem that may be caused by direct voltage sampling, which may cause the isolating switch to fail to operate normally and bring risks to the site. On the other hand, the voltage phase is reversely deduced by using the pre-determined voltage and current phase difference to accurately determine the impedance of the drive circuit, thereby improving the accuracy of the mechanical state diagnosis of the isolating switch. In addition, when the drive motor power is formally collected, only the current sampling circuit needs to be connected, which simplifies the detection process and reduces the detection cost.
[0091] Embodiment 2
[0092] This embodiment discloses a GIS isolating switch drive motor power sampling device, such as Figure 7 As shown, it includes: a current sampling circuit and a processor unit;
[0093] Wherein, the current sampling circuit is connected between the GIS isolating switch driving motor and the processor unit;
[0094] The current sampling circuit is used to sample the instantaneous value of the power supply current during the full operation of the GIS isolation switch drive motor and output it to the processor unit;
[0095] The processor unit has a built-in function formula for the change of the current and voltage phase difference caused by the change of the current effective value; the current effective value of the AC power supply is calculated according to the sampled current instantaneous value, and the current and voltage phase difference corresponding to the current effective value is calculated in combination with the fitting function formula, and then the voltage instantaneous value corresponding to the sampled current instantaneous value is inferred; the instantaneous sampling power of the GIS isolation switch driving motor is calculated using the sampled current instantaneous value and the inferred voltage instantaneous value;
[0096] The fitting parameters of the functional formula are obtained by fitting the effective current value of the GIS disconnector drive motor during the entire operation process obtained by pre-sampling before formal sampling and the corresponding current and voltage phase difference, through data fitting.
[0097] Furthermore, the GIS isolating switch driving motor power sampling device, such as Figure 8 As shown, it also includes a voltage sampling circuit, a phase difference detection circuit and a gating control unit; wherein,
[0098] The gating control unit is connected between the GIS isolating switch driving motor and the voltage sampling circuit, and is connected to the processor unit and controlled by the processor unit; the phase difference detection circuit is connected to the voltage sampling circuit and the current sampling circuit respectively;
[0099] During pre-sampling, the gating control unit selects the circuit connection between the isolating switch driving motor and the voltage sampling circuit; the voltage sampling circuit and the current sampling circuit work simultaneously, sampling the instantaneous values of the power supply voltage and current during the entire operation of the GIS isolating switch driving motor, and outputting them to the phase difference detection circuit;
[0100] The phase difference detection circuit detects the phase difference of the current and voltage of each AC power supply cycle during the full operation of the drive motor according to the instantaneous values of the input current and voltage;
[0101] The processor unit fits a function of the phase difference change caused by the current effective value change according to the detected phase difference and the current effective value calculated according to the pre-sampled current instantaneous value, and stores the fitting parameters in the function.
[0102] like Fig. 9 As shown, the phase difference detection circuit includes a first ADC circuit, a second ADC circuit and an XOR circuit; wherein,
[0103] The first ADC circuit is used to perform digital-to-analog conversion on the instantaneous value of the current sampled by the current sampling circuit to obtain an instantaneous digital signal of the current;
[0104] The second ADC circuit is used to perform digital-to-analog conversion on the instantaneous voltage value sampled by the voltage sampling circuit to obtain an instantaneous voltage digital signal;
[0105] Two inputs of the XOR circuit are connected to the first and second ADC circuits respectively, and the output end is connected to the processor unit;
[0106] The XOR circuit includes a first AND gate, a second AND gate and a NOR gate; wherein the first and second AND gates are both two-input AND gates, and the NOR gate is a two-input NOR gate.
[0107] The two input ends of the first AND gate and the NOR gate are respectively connected to the output ends of the first and second ADC circuits; the two input ends of the second AND gate are respectively connected to the output ends of the first AND gate and the NOR gate, and the output end of the second AND gate is connected to the processor unit.
[0108] The XOR circuit detects the phase difference between the instantaneous digital signals of current and voltage, and outputs a duty cycle signal that is proportional to the phase difference between current and voltage;
[0109] Furthermore, the processor unit synchronously obtains the pre-sampled instantaneous current digital signal and the duty cycle signal after phase difference detection; calculates the effective value of the current in the cycle according to the sampled instantaneous current value, and converts the phase difference according to the duty cycle signal; and uses a fitting method including a second-order fitting to fit the function formula of the phase difference change caused by the change of the effective value of the current;
[0110] Specifically, the effective value of current ; For the first The instantaneous sampling value of the current, is the number of instantaneous current sampling values in one cycle;
[0111] Phase Difference ; is the duty cycle;
[0112] Second-order fitting formula:
[0113] ;
[0114] in, is the fitting coefficient.
[0115] When formal sampling is performed, the voltage sampling circuit is disconnected by the strobe control unit, so that the connection between the isolating switch drive motor and the voltage sampling circuit is disconnected, and only the instantaneous value of the power supply current is collected through the connected current sampling circuit and output to the processor unit;
[0116] For converting the sampled analog instantaneous value of the power supply current into the instantaneous digital signal of the current, the first ADC circuit in the phase difference detection circuit can be used, or the ADC module provided by the processor unit can be used.
[0117] The processor unit calculates the effective value of the current of the AC power supply according to the sampled instantaneous value of the current, calculates the phase difference between the current and voltage corresponding to the effective value of the current in combination with the stored fitting function, and then reversely deduce the instantaneous value of the voltage corresponding to the sampled instantaneous value of the current; and calculates the instantaneous sampling power of the GIS isolation switch driving motor using the sampled instantaneous value of the current and the reversed instantaneous value of the voltage.
[0118] The more specific technical details and beneficial effects of this embodiment are the same as those described in Embodiment 1. Please refer to them for details and will not be described in detail here.
[0119] Embodiment 3
[0120] This embodiment discloses a switch fault diagnosis method based on isolating switch drive motor power sampling, such as Fig.10 As shown, including:
[0121] Step 1: adopt the GIS isolating switch driving motor power sampling method as described in Example 1 to perform power sampling to avoid the influence of parasitic loops, and obtain the instantaneous power sampling value of the driving motor;
[0122] Step 2: establishing a baseline control diagram for stable operation of the drive motor based on the instantaneous power sampling value of the drive motor collected when the device is running stably;
[0123] Step 3: Based on the established baseline control chart, the newly sampled instantaneous power sampling value of the drive motor monitored in real time is inserted into the baseline control chart to perform early fault and fault diagnosis of the drive motor performance;
[0124] Among them, when the instantaneous power sampling value inserted into the baseline control chart exceeds the upper and lower control limits of the baseline control chart, it is diagnosed that the GIS disconnector is abnormal or faulty;
[0125] When the instantaneous power sampling value inserted into the baseline control chart shows a continuous upward or downward shift, or periodic change, it is diagnosed that the GIS disconnector has a performance change or a periodic influencing factor, which is an early fault that requires warning.
[0126] Specifically, the baseline control chart established in step 2 includes:
[0127] 1) Calculate the center line;
[0128] The center line is the average value of the process data for:
[0129] ;
[0130] in, For the The power value of each sample, is the sample size.
[0131] 2) Calculate the standard deviation (SD)
[0132] Standard deviation, a measure of the dispersion of power data for:
[0133] ;
[0134] in, is the average power of the sample.
[0135] 3) Calculate the upper and lower control limits (UCL & LCL)
[0136] Based on the center line and standard deviation, calculate the upper control limit (UCL) and lower control limit (LCL):
[0137] Upper control limit ;
[0138] lower control limit ;
[0139] Here, the rules for the upper and lower control limits are such that approximately 99.73% of the data should fall between these two control limits.
[0140] 4) Draw a control chart based on the center line and the set upper and lower control limits.
[0141] In step three, each new power measurement is plotted on a control chart for continuous monitoring of the GIS disconnector performance.
[0142] Among them, when the instantaneous power sampling value inserted into the baseline control chart exceeds the upper and lower control limits of the baseline control chart, it is diagnosed that the GIS disconnector is abnormal or faulty;
[0143] When the instantaneous power sampling value inserted into the baseline control chart shows a continuous upward or downward shift, or periodic change, it is diagnosed that the GIS disconnector has a performance change or a periodic influencing factor, which is an early fault that requires warning.
[0144] Furthermore, other statistical rules can be applied, such as more than seven consecutive points on the same side of the center line, or a certain number of points near the control limit, to discover other symptoms of GIS disconnectors that require early intervention.
[0145] When a potential problem is detected, the maintenance team or operations staff is immediately notified for inspection or intervention.
[0146] Preferably, the parameters of the center line or control limit of the control chart can be adjusted according to the specific usage of the GIS disconnector to reflect new operating conditions or process improvements, so that existing faults and early warning faults can be discovered more accurately and timely.
[0147] In summary, the switch fault diagnosis method of the embodiment of the present invention has the same effect as embodiments one and two, and adopts a control chart for fault diagnosis, which can achieve high-sensitivity detection of small-range variations, so as to provide early warning of faults; its fault diagnosis through control charts has the advantages of intuitive understanding of data and less calculation; and has good adaptability and flexibility, and is suitable for various types of monitoring, and is not limited to specific fault modes.
[0148] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A method for sampling the power of a GIS isolating switch driving motor, characterized in that: include: Pre-sampling of instantaneous power supply current and voltage during the full operation of the GIS isolation switch drive motor; Detect the phase difference of current and voltage in each AC power supply cycle during the full operation of the drive motor according to the pre-sampled instantaneous current and voltage values; Based on the detected phase difference and the current effective value calculated according to the pre-sampled instantaneous current value, a functional formula for the phase difference change caused by the current effective value change is fitted; Separately sample the instantaneous current value of the GIS disconnector drive motor, calculate the effective current value of the cycle based on the sampled instantaneous current value, calculate the phase difference between the current and voltage corresponding to the effective current value in combination with the fitting function, and then inversely deduce the instantaneous voltage value corresponding to the sampled instantaneous current value; The instantaneous sampling power of the GIS disconnector drive motor is calculated using the sampled instantaneous current value and the reversed instantaneous voltage value. The phase difference detection of the current and voltage of the driving motor during the whole operation process is performed through the XOR gate; The testing process includes: 1) Two ADC circuits are used to perform analog-to-digital conversion on the instantaneous current value sampled by the current sampling circuit and the instantaneous voltage value sampled by the voltage sampling circuit respectively; 2) Input the instantaneous digital signals of current and voltage after analog-to-digital conversion into the XOR gate for phase difference detection, and output a duty cycle signal that is proportional to the phase difference between current and voltage; The fitting process of the function of the phase difference change caused by the change of the current effective value includes: 1) Synchronously receive the instantaneous digital signals of current and voltage after analog-to-digital conversion and the duty cycle signal after phase difference detection; 2) Calculate the effective value of the current in the cycle according to the instantaneous value of the sampled current, and convert the phase difference according to the duty cycle signal; use fitting methods including second-order fitting to fit the function of the phase difference change caused by the change of the effective value of the current; Current RMS ; For the first The instantaneous sampling value of the current, is the number of instantaneous current sampling values in one cycle; Phase Difference ; is the duty cycle; Second-order fitting formula: ; in, is the fitting coefficient; The process of inverse calculation of voltage instantaneous value includes: 1) Disconnect the voltage sampling circuit, connect the current sampling circuit separately, and sample the instantaneous value of the current of the GIS isolation switch drive motor separately when no one is on duty; 2) Calculate the effective value of the current in the cycle based on the instantaneous value of the sampled current; 3) Substituting the calculated current effective value into the fitting function, calculating the phase difference between the current and the voltage corresponding to the current effective value; the phase difference is the phase difference between the current and the voltage of the period; 4) Inversely derive the instantaneous voltage value corresponding to the sampled instantaneous current value based on the known effective voltage value and the phase difference between the current and voltage in the cycle.
2. The GIS isolating switch driving motor power sampling method according to claim 1 is characterized in that: During the installation phase of the GIS disconnector before pre-sampling, ensure that the disconnector and its drive motor have been correctly installed and connected, and install the voltage sampling circuit and current sampling circuit on the drive motor; during pre-sampling, when someone is on duty, pre-sample the instantaneous values of voltage and current through the voltage sampling circuit and current sampling circuit.
3. A GIS isolating switch drive motor power sampling device for implementing the GIS isolating switch drive motor power sampling method as described in any one of claims 1 to 2, characterized in that: include: Current sampling circuit and processor unit; Wherein, the current sampling circuit is connected between the GIS isolating switch driving motor and the processor unit; The current sampling circuit is used to sample the instantaneous value of the power supply current during the full operation of the GIS isolation switch drive motor and output it to the processor unit; The processor unit has a built-in function formula for the change of the current and voltage phase difference caused by the change of the current effective value; the current effective value of the AC power supply is calculated according to the sampled current instantaneous value, and the current and voltage phase difference corresponding to the current effective value is calculated in combination with the fitting function formula, and then the voltage instantaneous value corresponding to the sampled current instantaneous value is inferred; the instantaneous sampling power of the GIS isolation switch driving motor is calculated using the sampled current instantaneous value and the inferred voltage instantaneous value; The fitting parameters of the functional formula are obtained by fitting the effective current value of the GIS disconnector drive motor during the entire operation process obtained by pre-sampling before formal sampling and the corresponding current and voltage phase difference, through data fitting.
4. The GIS isolating switch drive motor power sampling device according to claim 3 is characterized in that: It also includes a voltage sampling circuit, a phase difference detection circuit and a gating control unit; wherein, The gating control unit is connected between the GIS isolating switch driving motor and the voltage sampling circuit, and is connected to the processor unit and controlled by the processor unit; the phase difference detection circuit is connected to the voltage sampling circuit and the current sampling circuit respectively; During pre-sampling, the gating control unit selects the circuit connection between the isolating switch driving motor and the voltage sampling circuit; the voltage sampling circuit and the current sampling circuit work simultaneously, sampling the instantaneous values of the power supply voltage and current during the entire operation of the GIS isolating switch driving motor, and outputting them to the phase difference detection circuit; The phase difference detection circuit detects the phase difference of the current and voltage in each AC power supply cycle during the whole operation of the motor according to the instantaneous values of the input current and voltage; The processor unit fits a function of the phase difference change caused by the current effective value change according to the detected phase difference and the current effective value calculated according to the pre-sampled current instantaneous value, and stores the fitting parameters in the function.
5. The GIS isolating switch drive motor power sampling device according to claim 4 is characterized in that: The phase difference detection circuit includes a first ADC circuit, a second ADC circuit and an XOR circuit; wherein, The first ADC circuit is used for performing digital-to-analog conversion on the instantaneous value of the current sampled by the current sampling circuit; The second ADC circuit is used for performing digital-to-analog conversion on the instantaneous value of the voltage sampled by the voltage sampling circuit; Two inputs of the XOR circuit are connected to the first and second ADC circuits respectively, and the output end is connected to the processor unit; The XOR circuit includes a first AND gate, a second AND gate and a NOR gate; wherein the first and second AND gates are both two-input AND gates, and the NOR gate is a two-input NOR gate; The two input ends of the first AND gate and the NOR gate are respectively connected to the output ends of the first and second ADC circuits; the two input ends of the second AND gate are respectively connected to the output ends of the first AND gate and the NOR gate, and the output end of the second AND gate is connected to the processor unit.
6. A switch fault diagnosis method based on isolating switch drive motor power sampling, characterized in that: include: The GIS isolating switch driving motor power sampling method as described in any one of claims 1 to 2 is used to perform power sampling to avoid the influence of parasitic circuits, and obtain an instantaneous power sampling value of the motor; A baseline control diagram for stable operation of the motor is established based on instantaneous power sampling values of the motor collected when the equipment is running stably; Based on the established baseline control chart, the newly sampled instantaneous power sampling values of the motor monitored in real time are inserted into the baseline control chart to perform early fault and failure diagnosis of the motor performance; Among them, when the instantaneous power sampling value inserted into the baseline control chart exceeds the upper and lower control limits of the baseline control chart, it is diagnosed that the GIS disconnector is abnormal or faulty; When the instantaneous power sampling value inserted into the baseline control chart shows a continuous upward or downward shift, or periodic change, it is diagnosed that the GIS disconnector has a performance change or a periodic influencing factor, which is an early fault that requires warning.
7. The switch fault diagnosis method based on isolating switch drive motor power sampling according to claim 6 is characterized in that: Establish a baseline control chart, including: 1) Calculate the center line; The center line is the average value of the process data for: ; in, For the The power value of each sample, is the sample size; 2) Calculate the standard deviation ; Standard deviation, a measure of the dispersion of power data for: ; in, is the average power of the sample; 3) Calculate the upper and lower control limits set; Upper control limit ; Sub-restrictions ; 4) Draw a control chart based on the center line and the set upper and lower control limits.