Fault monitoring method and system for power equipment in distribution network system
By calculating the importance information and current fluctuation value of power equipment and adjusting the spectral range of infrared thermal imaging monitoring, the problem of real-time dynamic adjustment of detection strategies in the existing technology is solved, and the monitoring accuracy and coverage of the distribution network system are improved. Reduced resource waste.
Patent Information
- Application Number
- CN202410993825.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-24
AI Technical Summary
The existing power equipment fault detection methods for distribution network systems cannot dynamically adjust the detection strategy in real time, resulting in the inability to fine-grained differentiation of the detection process and cannot effectively improve the safety and stability of the distribution network system.
By calculating the importance information and current fluctuation values of power equipment in each management area, determining the importance level value, and calculating the relative weight based on the number of historical abnormalities, adjusting the spectral range of infrared thermal imaging monitoring to finely distinguish the management area. Infrared detection means.
On the basis of ensuring the coverage of bad detection integrity, it has achieved the reduction of resource waste, improved monitoring accuracy and coverage, and dynamically adjusted detection strategies to adapt to the actual situation of each management area.
Smart Images

Figure CN118534257B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of node fault detection, and more specifically, to a fault monitoring method and system for power equipment in a distribution network system. Background Art
[0002] The importance of distribution network system in urban infrastructure is becoming increasingly prominent. However, there is a potential risk of failure of power equipment in the distribution network system, which may lead to power outages, safety accidents and other problems, and have a serious impact on the normal operation of the city and the lives of residents. In view of this problem, how to effectively monitor the status and health of power equipment in the distribution network has become a challenge that needs to be solved urgently. At present, although the bad monitoring of the connection nodes of each power equipment in the distribution network has been achieved with the help of sensors and infrared thermal imaging technology, since the real-time detection of infrared thermal imaging requires the use of special equipment and software to capture, process and display infrared images, these equipment and software are usually expensive. Therefore, in the actual process, the infrared images are usually recorded by regular inspections to detect the bad connections of each device. However, the existing detection methods do not make a fine distinction between the detection process according to the actual situation, and cannot dynamically adjust the detection strategy in real time. Therefore, the safety and stability of the distribution network system still have room for improvement.
[0003] In view of the above problems, the present invention proposes a solution. Summary of the invention
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A method for monitoring faults of power equipment in a distribution network system comprises the following steps:
[0006] Step S1, determining the main connection nodes of the power equipment in each management area;
[0007] Step S2, calculate and obtain the importance information of the main connection nodes; and calculate the average current fluctuation value per unit time by obtaining the current fluctuation value of the main connection nodes in real time, and then comprehensively determine the importance value of each management area according to the importance information of the main connection nodes and the average current fluctuation value per unit time of the main connection nodes;
[0008] Step S3, obtaining the number of abnormal detections per unit time in each management area, and determining the relative weight of each management area by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time, and then calculating the average importance value by taking the weighted average of the relative weight of each management area and the importance value of each management area;
[0009] Step S4, adjusting the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value.
[0010] In a preferred embodiment, step S1 further includes the following steps:
[0011] Step S11, obtaining the number of power devices connected to each connection node and the proportion of front-end devices;
[0012] Step S12, the obtained number of power devices connected to each connection node and the proportion of front-end devices are mapped to the interval [0, 1] by linear normalization;
[0013] Step S13, after normalizing the number of power devices connected to each connection node and the proportion of front-end devices, the importance of each connection node is determined by weighted summation;
[0014] Step S14, determining the main connection nodes according to the importance scores of each connection node.
[0015] In a preferred embodiment, in step S2, the importance information refers to information for determining main connection nodes.
[0016] In a preferred embodiment, in step S2, the importance value of each management area is calculated as follows:
[0017] Step S21, mapping the importance score of each connection node and the average current fluctuation value per unit time to the interval [0, 1] by linear normalization;
[0018] Step S22: Determine the importance value of each management area by weighted summing up the normalized importance scores of each connection node and the average current fluctuation value per unit time.
[0019] In a preferred embodiment, in step S3, the ratio of the number of abnormality detections per unit time in each management area to the total number of abnormality detections per unit time is calculated, and is set as the relative weight of each management area. The average importance value is then calculated based on the weighted average of the relative weight of each management area and the importance value of each management area.
[0020] In a preferred embodiment, in step S4, the specific steps of adjusting the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value are as follows:
[0021] Step S41, calculating the ratio of the importance value of each management area to the average importance value, and marking it as k;
[0022] Step S42, calculating and obtaining the average spectral range of infrared thermal imaging monitoring according to historical data, and marking it as μ, and calculating and obtaining the standard deviation of the spectral range of infrared thermal imaging monitoring, and marking it as σ;
[0023] Step S43, according to the ratio of the importance value of each management area to the average importance value, combined with the average spectral range of infrared thermal imaging monitoring and the standard deviation of the spectral range of infrared thermal imaging monitoring, calculate the spectral range corresponding to each management area:
[0024] The upper limit of the spectral range can be calculated as follows: upper limit = μ + (k × σ);
[0025] The calculation formula for the lower limit of the spectral range can be: lower limit = μ-(k×σ).
[0026] The fault monitoring system of the power equipment in the distribution network system includes a data monitoring module, a node evaluation module, a management area module, an infrared confirmation module and a historical database, and signal connections between the modules;
[0027] The data monitoring module is used to obtain the number of power devices connected to each connection node and the proportion of front-end devices, and send the obtained information to the node evaluation module; it is also used to obtain the current fluctuation value of the main connection node, calculate the average current fluctuation value per unit time and the number of abnormal detections per unit time, and send the current fluctuation value of the main connection node to the management area module;
[0028] The node evaluation module is used to determine the main connection nodes of the power equipment in each management area according to the number of power equipment connected to each connection node and the proportion of front-end equipment;
[0029] The management area module is used to comprehensively determine the importance value of each management area based on the importance information of the main connection node and the average current fluctuation value of the main connection node per unit time; and determine the relative weight of each management area by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time, and then calculate the average importance value based on the relative weight of each management area and the weighted average of the importance value of each management area;
[0030] The infrared confirmation module is used to adjust the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value;
[0031] The historical database is used to store the data generated by the operation of each module in the fault monitoring system of the power equipment of the distribution network system
[0032] Technical effects and advantages of the present invention:
[0033] The present invention first determines the importance value of each management area according to the importance of the device connection node and the node current deviation in each management area, and then determines the relative weight of each management area according to the number of historical abnormalities in each management area and obtains the average importance value by weighted average. Then, the spectral range of infrared thermal imaging monitoring is adjusted according to the ratio of the actual importance value of each management area to the average importance value, so as to better refine the infrared detection means of each management area, and can minimize resource waste on the basis of ensuring the integrity coverage of poor detection.
[0034] The present invention adjusts the spectral range of infrared thermal imaging monitoring according to the ratio of the actual importance value of each management area to the average importance value. If the actual importance value of a management area is higher than the average importance value, it can be considered to expand the spectral range of the management area to improve the monitoring accuracy and coverage of the management area. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0036] Figure 1 It is a flow chart of the fault monitoring method of the power equipment of the distribution network system in the present invention;
[0037] Figure 2 It is a schematic diagram of a fault monitoring system for power equipment in a distribution network system in the present invention. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] The present invention first determines the importance value of each management area based on the importance of the device connection nodes in each management area and the node current deviation through comprehensive calculation, then determines the relative weight of each management area based on the number of historical abnormalities in each management area and obtains the average importance value by weighted average, and then adjusts the spectral range of infrared thermal imaging monitoring according to the ratio of the actual importance value of each management area to the average importance value, so as to better refine the infrared detection means of each management area, and can minimize resource waste on the basis of ensuring the integrity coverage of poor detection.
[0040] Embodiment 1: A method for monitoring faults of power equipment in a distribution network system, such as Figure 1 As shown, the specific steps include:
[0041] Step S1, determining the main connection nodes of the power equipment in each management area;
[0042] Step S2, calculate and obtain the importance information of the main connection nodes; and calculate the average current fluctuation value per unit time by obtaining the current fluctuation value of the main connection nodes in real time, and then comprehensively determine the importance value of each management area according to the importance information of the main connection nodes and the average current fluctuation value per unit time of the main connection nodes;
[0043] It should be noted that the current fluctuation values described in this application do not exceed the preset warning values, and the management area described in this application refers to the regional divisions where the distribution network equipment is located, which will not be elaborated here.
[0044] Step S3, obtaining the number of abnormal detections per unit time in each management area, and determining the relative weight of each management area by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time, and then calculating the average importance value by taking the weighted average of the relative weight of each management area and the importance value of each management area;
[0045] It should be noted that the number of anomaly detections refers to the number of times a connection node has an adverse condition.
[0046] Step S4, according to the ratio of the importance value of each management area to the average importance value, the spectral range of infrared thermal imaging monitoring is adjusted, so as to better refine the infrared detection means for distinguishing each management area.
[0047] It should be noted that the unit time can be set according to actual needs. For example, in this embodiment, the interval time of infrared detection can be set as the unit time, so as to perform refined analysis on each management area.
[0048] Furthermore, in step S1, there are multiple ways to determine the main connection node of the power equipment in each management area, such as directly determining it based on the number of power equipment connected to the connection node. When the number of power equipment connected to the connection node exceeds a set value, the connection node is determined as the main connection node.
[0049] In an optional example, this embodiment comprehensively determines whether each connection node is a main connection node by the number of power devices connected to each connection node in each management area and the proportion of front-end devices. Specifically:
[0050] Step S11, obtaining the number of power devices connected to each connection node and the proportion of front-end devices;
[0051] Step S12: The obtained number of power devices connected to each connection node and the proportion of front-end devices are mapped to the interval [0, 1] by linear normalization, and the formula is: In the formula, is the normalized value.
[0052] It should be noted that the normalization formula given in this embodiment is a general formula, and does not involve the process of normalizing the number of power devices connected to each connection node of this application and the proportion of front-end equipment to be consistent with the general formula, so it will not be repeated here.
[0053] Step S13, after normalizing the number of power devices connected to each connection node and the proportion of front-end devices, mark the number of power devices connected to each connection node as Q (i), and record the proportion of front-end devices of each connection node as P (i), i represents the sequence number of each connection node, and then determine the importance of each connection node by weighted summation. Specifically, the importance score calculation formula of each main connection node and key component can be: I (i) = Q (i) + P (i). In the formula, I (i) is the importance score of each connection node;
[0054] It should be noted that the proportion of front-end equipment refers to the proportion of equipment at the front end of system operation among the power equipment connected to the connection node. The larger the value, the greater the impact of the corresponding connection node failure on the system operation, so the importance of the connection node will also be higher.
[0055] It should be noted that the importance score of each connection node in this embodiment is based on the number of power devices connected to each connection node and the proportion of front-end equipment, and the weighted sum of the two is taken to determine the overall importance. The weights of the two can be designed according to actual conditions. The calculation formula of this embodiment only takes the case where the weights of the two are the same as an example, which will not be elaborated here.
[0056] Step S14, determining the main connection node according to the importance score of each connection node. Specifically, comparing the importance score of each connection node with the importance threshold. If it is greater than the importance threshold, the connection node is determined as the main connection node.
[0057] It should be noted that the importance threshold can be set according to actual conditions. For example, in this embodiment, the number of power equipment can be set to 3, the proportion of front-end equipment can be set to 0.5, and the importance score obtained by normalizing the two and entering them into the above importance score calculation formula is set as the importance threshold.
[0058] In step S2, the importance information refers to the information for determining the main connection nodes, for example, it can be the number of power devices connected to the connection nodes. In this embodiment, it is the importance score. The calculation method of the importance value of each management area is as follows:
[0059] Step S21, mapping the importance score of each connection node and the average current fluctuation value per unit time to the interval [0, 1] by linear normalization;
[0060] Step S22, mark the normalized average current fluctuation value per unit time of each connection node as O(i), and determine the importance of each connection node by weighted summation. Specifically, the importance score calculation formula of each main connection node and key component can be: E(i)=O(i)+I(i). In the formula, E(i) is the importance value of each connection node;
[0061] It should be noted that the weight setting method corresponding to the importance score of each connection node and the average current fluctuation value per unit time is consistent with the weight setting method corresponding to the number of power equipment connected to each connection node and the proportion of front-end equipment, which will not be repeated here.
[0062] In step S3, the relative weight of each management area is determined by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time. Then, the average importance value is calculated by weighted average of the relative weight of each management area and the importance value of each management area. This can further use historical abnormal factors to more accurately evaluate the average importance of the entire total area, avoiding the direct average summation that is prone to analytical deviations in the importance of each area due to additional short-term influences.
[0063] In step S4, the specific steps of adjusting the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value are as follows:
[0064] Step S41, calculating the ratio of the importance value of each management area to the average importance value, and marking it as k;
[0065] Step S42, calculating and obtaining the average spectral range of infrared thermal imaging monitoring according to historical data, and marking it as the standard spectral average value, represented by the symbol μ, and calculating and obtaining the standard deviation of the spectral range of infrared thermal imaging monitoring, represented by σ;
[0066] Step S43, calculating the spectral range corresponding to each management area according to the ratio of the importance value of each management area to the average importance value, combined with the average spectral range monitored by infrared thermal imaging and the standard deviation of the spectral range monitored by infrared thermal imaging.
[0067] Specifically, the upper limit calculation formula of the spectral range can be: upper limit = μ + (k × σ);
[0068] The formula for calculating the lower limit of the spectral range can be: lower limit = μ-(k×σ);
[0069] It should be noted that, as shown in the above formula, when the ratio of the importance value of each management area to the average importance value is larger, it means that the importance of each management area is greater, and the spectral range of infrared thermal imaging monitoring becomes larger accordingly. On the contrary, when the ratio of the importance value of each management area to the average importance value is smaller, it means that the importance of each management area is smaller, and the spectral range of infrared thermal imaging monitoring becomes smaller accordingly. Therefore, the spectral range of infrared thermal imaging monitoring can be adjusted dynamically and accurately according to the ratio of the actual importance value of each management area to the average importance value. If the actual importance value of a management area is higher than the average importance value, it can be considered to expand the spectral range of the management area to improve its monitoring accuracy and coverage.
[0070] Embodiment 2: Embodiment 1 mainly introduces the fault monitoring method of the power equipment of the distribution network system of the present invention. This embodiment mainly introduces the fault monitoring system of the power equipment of the distribution network system, which is used to implement the method described in Embodiment 1.
[0071] Specifically, Figure 2 As shown, it includes a data monitoring module, a node evaluation module, a management area module, an infrared confirmation module and a historical database, and the modules are connected by signals.
[0072] The data monitoring module is used to obtain the number of power devices connected to each connection node and the proportion of front-end devices, and send the obtained information to the node evaluation module; it is also used to obtain the current fluctuation value of the main connection node, calculate the average current fluctuation value per unit time and the number of abnormal detections per unit time, and send the current fluctuation value of the main connection node to the management area module;
[0073] The node evaluation module is used to determine the main connection nodes of the power equipment in each management area according to the number of power equipment connected to each connection node and the proportion of front-end equipment;
[0074] The management area module is used to comprehensively determine the importance value of each management area based on the importance information of the main connection node and the average current fluctuation value of the main connection node per unit time; and determine the relative weight of each management area by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time, and then calculate the average importance value based on the relative weight of each management area and the weighted average of the importance value of each management area;
[0075] The infrared confirmation module is used to adjust the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value;
[0076] The historical database is used to store the data generated by the operation of each module in the fault monitoring system of the power equipment in the distribution network system.
[0077] It should be noted that the above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0078] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0079] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0080] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0081] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for monitoring faults of power equipment in a distribution network system, characterized in that: The method comprises the following steps: Step S1, determining the main connection nodes of the power equipment in each management area; Step S2, calculate and obtain the importance information of the main connection nodes; and calculate the average current fluctuation value per unit time by obtaining the current fluctuation value of the main connection nodes in real time, and then comprehensively determine the importance value of each management area according to the importance information of the main connection nodes and the average current fluctuation value per unit time of the main connection nodes; Step S3, obtaining the number of abnormal detections per unit time in each management area, and determining the relative weight of each management area by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time, and then calculating the average importance value by taking the weighted average of the relative weight of each management area and the importance value of each management area; Step S4, adjusting the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value; In step S1, the following steps are also included: Step S11, obtaining the number of power devices connected to each connection node and the proportion of front-end devices; Step S12, the obtained number of power devices connected to each connection node and the proportion of front-end devices are mapped to the interval [0, 1] by linear normalization; Step S13, after normalizing the number of power devices connected to each connection node and the proportion of front-end devices, the importance of each connection node is determined by weighted summation; Step S14, determining the main connection nodes according to the importance scores of each connection node; In step S2, the importance information refers to information for determining the main connection nodes; In step S2, the importance value of each management area is calculated as follows: Step S21, mapping the importance score of each connection node and the average current fluctuation value per unit time to the interval [0, 1] by linear normalization; Step S22: Determine the importance value of each management area by weighted summing up the normalized importance scores of each connection node and the average current fluctuation value per unit time.
2. The method for fault monitoring of power equipment in a distribution network system according to claim 1, characterized in that: In step S3, the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time is calculated and set as the relative weight of each management area. Then, the average importance value is calculated by weighted average of the relative weight of each management area and the importance value of each management area.
3. The method for fault monitoring of power equipment in a distribution network system according to claim 1, characterized in that: In step S4, the specific steps of adjusting the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value are as follows: Step S41, calculating the ratio of the importance value of each management area to the average importance value, and marking it as k; Step S42, calculating and obtaining the average spectral range of infrared thermal imaging monitoring according to historical data, and marking it as μ, and calculating and obtaining the standard deviation of the spectral range of infrared thermal imaging monitoring, and marking it as σ; Step S43, according to the ratio of the importance value of each management area to the average importance value, combined with the average spectral range of infrared thermal imaging monitoring and the standard deviation of the spectral range of infrared thermal imaging monitoring, calculate the spectral range corresponding to each management area: The upper limit of the spectral range is calculated as follows: upper limit = μ + (k × σ); The formula for calculating the lower limit of the spectral range is: lower limit = μ-(k×σ).
4. A fault monitoring system for power equipment in a distribution network system, used to implement the fault monitoring method for power equipment in a distribution network system according to any one of claims 1 to 3, characterized in that: It includes data monitoring module, node evaluation module, management area module, infrared confirmation module and historical database, and signal connection between each module; The data monitoring module is used to obtain the number of power devices connected to each connection node and the proportion of front-end devices, and send the obtained information to the node evaluation module; it is also used to obtain the current fluctuation value of the main connection node, calculate the average current fluctuation value per unit time and the number of abnormal detections per unit time, and send the current fluctuation value of the main connection node to the management area module; The node evaluation module is used to determine the main connection nodes of the power equipment in each management area according to the number of power equipment connected to each connection node and the proportion of front-end equipment; The management area module is used to comprehensively determine the importance value of each management area based on the importance information of the main connection node and the average current fluctuation value of the main connection node per unit time; The relative weight of each management area is determined by the ratio of the number of abnormal detections per unit time in each management area to the total number of abnormal detections per unit time, and then the average importance value is calculated by weighted average of the relative weight of each management area and the importance value of each management area; The infrared confirmation module is used to adjust the spectral range of infrared thermal imaging monitoring according to the ratio of the importance value of each management area to the average importance value; The historical database is used to store the data generated by the operation of each module in the fault monitoring system of the power equipment in the distribution network system.