An elevator device suitable for renovation of old residential areas
Through the traveling mechanism of the dual-track crane rail and folding arm combination, combined with the gearbox and compensation gear, the problems of large space occupation, high cost, and poor safety and reliability in the renovation of elevators in old residential areas are solved, and the stability and safety of the elevator device are achieved. sexual enhancement.
Patent Information
- Application Number
- CN202411016035.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-27
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-27
AI Technical Summary
The existing elevator renovation plan for old residential areas has problems such as large space occupation, high cost, poor safety and reliability, and serious sagging of the traction rope, resulting in failure to install normally or low safety factor.
It adopts a traveling mechanism that combines double-track hanging rails, folding arms and booms, combined with gearboxes and compensation gears, and sets elastic clips and shuttle-shaped impact blocks to support the guide rope, reduce the sag of the traction rope, and reduce space occupation through the lifting mechanism.
The elevator device has a small space, high safety and reliability, and low cost. The traction rope has slight sagging and good stability, making it suitable for the renovation of old communities.
Smart Images

Figure CN118545594B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of elevator reconstruction in old residential quarters, and in particular to an elevator device suitable for reconstruction of old residential quarters. Background Art
[0002] There are many old residential communities in my country, which are mainly multi-story structures and mostly inhabited by elderly people. It is very inconvenient for elderly people living in high-rise buildings to travel. With the increasing number of old residential communities and the aging of Chinese society, how to care for the elderly and realize the elevator renovation of old residential communities has become a social problem that needs to be solved urgently.
[0003] Due to the influence of existing building space, economic cost, safety performance and other factors, the existing elevator renovation scheme for old residential areas has certain defects and shortcomings, such as: the vertical lift elevator installed outside the building has the problems of occupying the unit exit space, affecting the lighting of low-rise residents, and high cost; automatic escalators cannot be implemented in the renovation of old residential areas; installing elevator seats on the railings of the stairs has the problems of poor safety and reliability and high cost; although the cost of installing elevator pedals or elevator seats on the walls or ceilings of the stairwell is low, the existing elevators all use single-arm suspension and single-track travel, which not only has poor stability, but also the weight of the entire elevator and the people and goods carried acts on the track with a large pressure, which requires high strength at the connection of the track. The old residential areas have aging problems, which further increases the risk. The above defects and shortcomings directly lead to a large number of old residential areas being unable to carry out normal elevator installation and renovation or having a low safety factor. In addition, the existing suspended rail cantilever elevators are generally pulled by guide ropes, but because the travel mechanism is not convenient to pass through the guide rope support device, the guide rope is not supported, resulting in serious sagging of the guide rope. Therefore, there is a need for an elevator device that is suitable for the renovation of old communities and has a simple structure, is safe and reliable, economical and applicable, and can reduce the sagging of the traction rope. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the existing defects and provide an elevator device suitable for the renovation of old residential areas, which can effectively solve the problems in the background technology.
[0005] In order to achieve the above-mentioned purpose, the present invention discloses an elevator device suitable for the renovation of old residential areas. The technical solution adopted is that it includes a hanging rail, a carrier and a travel mechanism. The hanging rail is hoisted on the installation surface above the travel mechanism. The travel mechanism is on the hanging rail, and the travel mechanism travels along the hanging rail. The travel mechanism is connected to the carrier below. The hanging rail is connected with a guide rope, and the guide rope connects the travel mechanism and the traction motor. The installation surface is also connected with a guide block, and the guide block also includes two hinged elastic cards. The two elastic cards are arranged opposite to each other, and surround the support. The guide rope can support the guide rope and slow down the sagging. A spring is connected between the two elastic cards. A shuttle-shaped impact block is connected to the travel mechanism. The shuttle-shaped impact block is connected to the guide rope and the shuttle-shaped impact block corresponds to the position and size of the docking point of the two elastic cards. The two elastic cards are closed under the action of the spring, and the shuttle-shaped impact block can knock open the elastic card to pass through the guide block. The hanging rail adopts a double-track hanging rail. The traction motor is connected to the reducer and then connected to the rope roller through the gearbox. The gearbox is equipped with a constant speed gear, a speed change gear and a compensation gear. The guide rope is wrapped around the guide rope. On the rope roller, the double-track hanging rail has better stability, the constant speed gear is used for running on the straight track, the speed change gear is used for turning, and the speed is adjusted due to the difference in the travel distance of the two tracks. The compensation gear is used to compensate for the speed after the deflection caused by speed change after long-term operation; the travel mechanism is connected to the carrier through a lifting mechanism, and the lifting mechanism can lift the carrier when idle to reduce space occupancy; the travel mechanism is connected to double rollers through a folding arm and a hanging arm, and the double rollers travel along the hanging rail, the folding arm and the hanging arm are arranged before and after the travel mechanism, and the folding arm and the hanging arm are arranged before and after the travel mechanism. Each boom has two groups, which are arranged on both sides of the traveling mechanism, so that the traveling mechanism has better stability. The folding arm is hinged with a guide wheel, and the hanging rail also includes a traveling track and a guide track. The double rollers are connected to the traveling track, and the guide wheels are opposite to the guide track. The traveling track is used for the double rollers to travel, and the guide track is used to maintain the level of the vehicle when the inclination of the track changes during the travel of the double rollers. It also includes a control device and an operating device, and the control device is electrically connected to the traction motor, the gearbox, the lifting mechanism, and the operating device.
[0006] As a preferred technical solution of the present invention, the elastic card is hook-shaped, including a hook handle and a hook portion, the hook handle is hinged to the mounting surface, the hook portion forms a semi-enclosed accommodating cavity, the hook portions of the two elastic cards are opposite to each other, so that the two accommodating cavities embrace each other, the guide rope passes through the accommodating cavities of the two opposite elastic cards, and the spring is installed on the hook handle.
[0007] As a preferred technical solution of the present invention, the shuttle-shaped impact block is small at both ends and large in the middle, and is opposite to the accommodating cavity of the elastic card. The diameter of its smaller end is smaller than that of the accommodating cavity, and its largest part is larger than that of the accommodating cavity, thereby ensuring that the wedge-shaped impact can push open the guide block.
[0008] As a preferred technical solution of the present invention, the hanging rail also includes an inner rail and an outer rail, and there are two guide ropes, which correspond to the inner rail and the outer rail respectively; there are two rope rollers, namely a first rope roller and a second rope roller, and the two guide ropes are respectively wound around the two rope rollers.
[0009] As a preferred technical solution of the present invention, the inner shaft of the gearbox is connected with a driving gear, a driven gear, a steering gear, a speed-increasing compensation gear and a speed-reducing compensation gear. A transmission gear is also arranged in the gearbox. The transmission gear is slidably connected with the driving gear, the driven gear, the steering gear, the speed-increasing compensation gear and the speed-reducing compensation gear. The transmission ratio of the transmission gear is the same as that of the driving gear and the driven gear, and the transmission ratio of the transmission gear is different from that of the driven gear and the steering gear. The transmission ratio of the transmission gear to the speed-increasing compensation gear is smaller than that of the transmission gear to the steering gear, and the transmission ratio of the transmission gear to the speed-reducing compensation gear is greater than that of the transmission gear to the steering gear. The driven gear, the steering gear, the speed-increasing compensation gear and the speed-reducing compensation gear are connected through a synchronous transmission structure to realize synchronous rotation. The gearbox also includes an electric push rod, the telescopic end of which is connected with the transmission gear. A deflection detection mechanism is installed on the left and right sides of any one of the traveling mechanism, the lifting mechanism and the carrier, and the deflection detection mechanism and the electric push rod are electrically connected with the control device.
[0010] As a preferred technical solution of the present invention, the second pulley and the sixth pulley are coaxially connected to the driven gear, the first pulley and the fourth pulley are coaxially connected to the steering gear, the third pulley is coaxially connected to the speed increase compensation gear, the fifth pulley is coaxially connected to the speed reduction compensation gear, a first synchronous belt is installed between the first pulley and the second pulley, a second synchronous belt is installed between the third pulley and the fourth pulley, and a third synchronous belt is installed between the fifth pulley and the sixth pulley.
[0011] As a preferred technical solution of the present invention, the deflection detection mechanism also includes a laser transmitter and a laser receiver, which are respectively arranged on two surfaces parallel to and opposite to the traveling track. The laser receiver also includes multiple receiving ports, and the laser receiver corresponds to the position of the receiving ports. The laser transmitter and the laser receiver are both electrically connected to the control device.
[0012] As a preferred technical solution of the present invention, the lifting mechanism also includes a box body, the box body is connected to the folding arm and the boom, and the box body is connected to a scissors-type lifting frame, the scissors-type lifting frame is connected to the carrier, the box body contains a lifting motor, the lifting motor is connected to a double-headed lead screw, the double-headed lead screw is connected to two lead screw nuts with opposite rotation directions, the lead screw nuts are connected to the scissors-type lifting frame, the lifting motor is electrically connected to the control device, the lifting motor controls the rotation of the double-headed lead screw, and can control the two lead screw nuts to move in opposite directions, thereby controlling the folding and unfolding of the scissors-type lifting frame.
[0013] As a preferred technical solution of the present invention, the travel track also includes a travel inclined track and a travel horizontal track, which are connected and transitioned by a travel turning track; the guide track is located below the travel track, and also includes a guide inclined track and a guide middle track, the guide inclined track is parallel to the travel inclined track, the guide middle track is parallel to the travel horizontal track, the guide inclined track and the guide middle track are connected by a transition track, and the curvature and trend of the transition track are the same as those of the travel turning track; thereby maintaining the horizontality of the travel mechanism.
[0014] As a preferred technical solution of the present invention, the folding arm also includes an upper arm and a lower arm, the two ends of the upper arm are respectively hinged to the double rollers and the upper end of the lower arm, the lower end of the lower arm is hinged to the box, the guide wheel also includes an upper wheel and a lower wheel, the upper wheel and the lower wheel are respectively located at the hinges at the two ends of the lower arm and are hinged to the lower arm, and the lower wheel is flush with the hinges of the boom and the box; both ports of the guide rail are connected with buffer rods, the buffer rods are laterally arranged, the lower wheel corresponds to the track of the guide rail, the upper wheel corresponds to the buffer rod, and the axis of the upper wheel is higher than the buffer rod, and the buffer rod can apply resistance to the upper wheel, thereby folding the folding arm.
[0015] As a preferred technical solution of the present invention, the installation surface is the top surface of the step ladder or a installation platform connected to the top surface of the step ladder.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: by setting up double tracks and adopting a combination of a suspension arm and a folding arm on the traveling mechanism, the present invention can make the vehicle more stable during travel, and the folding arm can cooperate with the guide track to maintain the level of the traveling mechanism box when the track changes; and the setting of the lifting mechanism can reduce space occupation when idle; the traction motor is connected to the gearbox, and the gearbox is provided with gears corresponding to the straight track and the steering track respectively, and a compensation gear is provided, so that the traveling mechanism box can operate stably during travel and have automatic correction capabilities; by providing a guide block supporting the guide rope and a shuttle-shaped collision block passing through the guide block, the travel mechanism can smoothly pass through the guide block while reducing the sagging of the guide rope. The technical solution occupies a small space, has high safety and reliability, is low in cost, and has slight sagging of the traction rope and good stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the present invention;
[0018] Figure 2 This is the A-direction view of the present invention;
[0019] Figure 3 This is a B-direction view of the present invention;
[0020] Figure 4 It is a C-direction view of the present invention;
[0021] Figure 5 This is a D-direction view of the present invention;
[0022] Figure 6 It is a schematic diagram of the carrier of the present invention when it moves horizontally on the first horizontal track;
[0023] Figure 7 It is a schematic diagram of the carrier of the present invention when it moves horizontally on the first inclined track;
[0024] Figure 8 It is a schematic diagram of the idle state of the vehicle of the present invention;
[0025] Fig. 9 For the present invention Figure 7 EE cross-sectional view;
[0026] Fig.10 For the present invention Figure 7 FF cross-sectional view;
[0027] Fig.11 For the present invention Fig. 9 G-direction view;
[0028] Fig.12 The track structure diagram of the present invention is Figure 1 ;
[0029] Fig.13 The track structure diagram of the present invention is Figure 2 ;
[0030] Fig.14 This is an enlarged structural view of the H part of the present invention;
[0031] Fig.15 This is an enlarged structural view of part I of the present invention;
[0032] Fig.16 This is an enlarged structural view of part J of the present invention;
[0033] Fig.17 The schematic diagram of the structure of the traction motor connected to the gearbox of the present invention is Figure 1 ;
[0034] Fig.18 The schematic diagram of the structure of the traction motor connected to the gearbox of the present invention is Figure 2 ;
[0035] Fig.19 Schematic diagram of the internal structure of the gearbox of the present invention Figure 1 ;
[0036] Fig. 20 Schematic diagram of the internal structure of the gearbox of the present invention Figure 2 ;
[0037] Fig.21 Schematic diagram of the internal structure of the gearbox of the present invention Figure 3 .
[0038] In the figure: 1, fixed operating device; 2, traction lowering motor; 201, reducer; 202, gearbox; 203, first rope roller; 204, second rope roller; 205, electric push rod; 206, driving gear; 2061, driving wheel shaft; 207, transmission gear; 208, driven gear; 2081, driven wheel shaft; 209, steering gear; 2091, steering wheel shaft; 210, speed increase compensation gear; 2101, speed increase wheel shaft; 211, speed reduction compensation gear Wheel; 2111, reduction wheel shaft; 212, first pulley; 213, second pulley; 214, first synchronous belt; 215, third pulley; 216, fourth pulley; 217, second synchronous belt; 218, fifth pulley; 219, sixth pulley; 220, third synchronous belt; 3, guide rope; 4, double roller; 5, inner track; 6, outer track; 7, folding arm; 701, upper arm; 702, lower arm; 8, suspension arm; 9, guide block; 901, elastic card; 9 02, spring; 10, shuttle block; 11, small gear; 12, large gear; 13, double-headed screw; 14, bracket; 15, box; 16, connecting shaft; 17, folding rod; 18, hinge pin; 19, traction and lifting motor; 21, lifting motor; 22, left-hand screw nut; 23, right-hand screw nut; 24, mobile operating device; 26, first photoelectric sensor; 27, pull rod; 28, guide wheel; 2801, upper wheel; 2802, lower wheel; 29, load Tools; 30, travel track; 3001, first inclined track; 3002, first turning track; 3003, first horizontal track; 3004, fourth turning track; 3005, fourth inclined track; 31, guide track; 3101, second inclined track; 3102, second turning track; 3103, second horizontal track; 3104, first buffer rod; 3105, third turning track; 3106, third inclined track; 3107, second buffer rod. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example 1
[0040] like Figures 1 to 21 As shown, the present invention discloses an elevator device suitable for the renovation of old residential areas, and the technical solution adopted is that it includes a hanging rail, and the hanging rail is in the form of a combination of an inner rail 5 and an outer rail 6, such as Figure 1As shown, the hanging rail is laid along the top surface of the step ladder from the top surface of the first floor, fixed to the bottom surface of the step ladder by expansion bolts, laid along the inclination of the step ladder, and turned at the turning platform of the step ladder, as shown in FIG. Figure 3 When reaching the top floor, the hanging rail is hung on the ceiling above the top floor step ladder by the pull rod 27. Also includes a control device, the control device adopts a PLC controller.
[0041] like Figures 2 to 5 As shown, a traction descending motor 2 and a traction ascending motor 19 are respectively installed at both ends of the track. The two motors and the connected reducer 201 and gearbox 202 are the same. The upper shaft of the gearbox 202 is connected to the first rope roller 203 and the second rope roller 204. A guide rope 3 is set on the inner side of the inner track 5 and the outer track 6. The two ends of the guide rope 3 are connected to the rope rollers connected to the traction descending motor 2 and the traction ascending motor 19. In order to reduce the sagging of the guide rope 3, a guide block 9 is installed on the bottom surface of the step ladder above the guide rope 3, as shown in FIG. Fig.10 As shown, the guide block 9 also includes two elastic cards 901. The elastic cards 901 are hook-shaped structures, including a vertical hook handle and a bent hook portion. After the two elastic cards 901 are arranged oppositely, the hook portions surround a diamond-shaped accommodating cavity, and the guide rope 3 passes through the diamond-shaped accommodating cavity. The hook handle is hinged at the bottom surface of the step ladder and the turning platform, and a spring 902 is arranged between the two relatively arranged hook handles. Under the action of the spring 902, the two elastic cards 901 are kept together. The traction descending motor 2 and the traction ascending motor 19 are both servo motors, and are both electrically connected to the PLC controller.
[0042] The carrier 29 of the elevator is a seat, such as Figure 6 , Figure 7 As shown, the upper part of the carrier 29 is connected to the box 15 through a scissor-type lifting frame, and transverse grooves are opened on both sides of the carrier 29 and the vertical surfaces of both sides of the box 15. The scissor-type lifting frame is a scissor-type hinged folding rod 17, and there are multiple folding rods 17, which are hinged by hinge pins 18. The ends of the two lowest folding rods 17 are slidably connected in the transverse grooves on the top of the carrier 29, and the ends of the two highest folding rods 17 are connected to the connecting shaft 16, and the connecting shaft 16 is slidably connected in the transverse grooves of the box 15. A driving mechanism for driving the scissor-type lifting frame to fold and unfold is set in the box 15, as shown in FIG. Figures 9 to 11As shown, the driving mechanism includes a lifting motor 21 and a double-ended lead screw 13, the double-ended lead screw 13 is connected to a bracket 14, the bracket 14 is mounted on the inner bottom surface of a box 15, the output end of the lifting motor 21 is connected to a pinion 11, the double-ended lead screw 13 is connected to a large gear 12, the pinion 11 is meshed with the large gear 12, the two threaded sections of the double-ended lead screw 13 are respectively meshed with a left-handed lead screw nut 22 and a right-handed lead screw nut 23, and the ends of the two folding rods 17 at the upper end of the scissor-type lifting frame pass through the transverse groove of the box 15 and are respectively connected to the left-handed lead screw nut 22 and the right-handed lead screw nut 23. The lifting motor 21 adopts a servo motor and is electrically connected to a PLC controller.
[0043] like Fig.10 As shown, a shuttle-shaped impact block 10 is installed on the top surface of the box body 15. The main body of the shuttle-shaped impact block 10 is a shuttle-shaped structure with small ends and a large middle part. It corresponds to the accommodating cavity of the guide block 9 and is coaxially connected to the guide rope 3. The lower part of the main body is connected to the top surface of the box body 15 through a connecting rod. The small end of the shuttle-shaped impact block 10 is smaller than the accommodating cavity, so that it can drill into the accommodating cavity. The middle diameter is larger than the accommodating cavity, so that the accommodating cavity can be stretched open to allow the shuttle-shaped impact block 10 and the connecting rod to pass through the guide block 9. When passing through, the two elastic clips 901 rotate to both sides, and the spring 902 is stretched. After the largest part of the shuttle-shaped impact block 10 passes, the elastic clip 901 gradually closes under the action of the spring 902.
[0044] like Figure 6 , Figure 7 As shown, the double rollers 4 are connected to the top of the box 15 through the folding arm 7 and the hanging arm 8. Figure 6 , Figure 7 Taking the perspective as an example, the folding arm 7 and the suspension arm 8 are both hinged to the box body 15 and are arranged on the left and right sides of the front and rear vertical sides of the box body 15. There are two groups of folding arms 7 and suspension arms 8, which are arranged on the front and rear sides of the box body 15. Fig.12 , Fig.14 As shown, the upper arm 701 is connected to the double rollers 4, and the hinge shafts at both ends of the lower arm 702 are respectively connected to the upper wheel 2801 and the lower wheel 2802 of the guide wheel 28. Fig.12 , Fig.13 , Fig.15 , Fig.16As shown, the inner track 5 and the outer track 6 both include a travel track 30 and a guide track 31, the guide track 31 is located below the travel track 30, the travel track 30 includes a first horizontal track 3003, the first horizontal track 3003 is a U-shaped track, and its two ends are connected to the first inclined track 3001 and the fourth inclined track 3005 through the first turning track 3002 and the fourth turning track 3004 respectively, the first inclined track 3001 and the fourth inclined track 3005 are installed under the inclined step ladder, the first horizontal track 3003 is installed under the turning platform of the step ladder, and the first turning track 3002 is used to connect the first inclined track 3001 and the first inclined track 3005. The fourth turning track 3004 is a transition track connecting the fourth inclined track 3005 and the first horizontal track 3003. In this embodiment, the turning track adopts an arc track; since the box body 15 is respectively provided with a folding arm 7 and a hanging arm 8 at the front and rear, the folding arm 7 and the hanging arm 8 will be hung on the first inclined track 3001 and the first horizontal track 3003 before and after passing the first turning track 3002. At this time, the height difference between the upper end of the folding arm 7 and the upper end of the hanging arm 8 will change. The guide track 31 is used to maintain the lower end of the folding arm 7 and the lower end of the hanging arm 8 on the same horizontal line, thereby maintaining the level of the box body 15. Fig.13 , Fig.15 , Fig.16 As shown, the guide track 31 also includes a second horizontal track 3103, the second horizontal track 3103 is located below the first horizontal track 3003, and the two ends of the second horizontal track 3103 are connected to the second inclined track 3101 and the third inclined track 3106 through the second turning track 3102 and the third turning track 3105 respectively, so as to Fig.13 The second inclined track 3101 is inclined from the lower left to the upper right, and the third inclined track 3106 is inclined from the lower right to the upper left. In order to keep the lower end of the folding arm 7 and the lower end of the boom 8 on the same horizontal line, the horizontal distance between the junction point X of the second inclined track 3101 and the second turning track 3102 and the junction point W of the first inclined track 3001 and the first turning track 3002 is recorded as , the horizontal distance between the axis of the lower wheel 2802 and the axis of the hinge shaft at the lower end of the boom 8 is recorded as , the horizontal distance between the junction point Z of the second horizontal track 3103 and the third turning track 3105 and the junction point Y of the first horizontal track 3003 and the fourth turning track 3004 is recorded as , need to maintain , , The first steering track 3002, the second steering track 3102, the third steering track 3105 and the fourth steering track 3004 are equal in radius and central angle. In order to enable the lower wheel 2802 to enter the guide track 31, the second inclined track 3101 and the third inclined track 3106 can be tangent to the lower part of the lower wheel 2802 when the lower wheel 2802 arrives, and the ends of the second inclined track 3101 and the third inclined track 3106 are rounded. In order to enable the folding arm 7 to be folded smoothly and pass in both directions, a first transverse buffer rod 3104 and a second transverse buffer rod 3107 are respectively arranged above the ends of the second inclined track 3101 and the third inclined track 3106, and the two are opposite to the lower part of the upper wheel 2801. When the upper wheel 2801 arrives, it can satisfy the upper wheel 2801 passing through the buffer rod while applying a transverse thrust to the upper wheel 2801, thereby folding the folding arm 7.
[0045] The guide rope 3 is driven to move by the traction descending motor 2 or the traction ascending motor 19. Figure 1 As shown, the traction descending motor 2 is located on the top surface of the first layer, and the traction ascending motor 19 is located on the top surface of the top layer. The lifting mechanism is pulled by the guide rope 3 to move the carrier 29 along the inner track 5 and the outer track 6. Since the double rollers 4 have different travel distances on the inner track 5 and the outer track 6 when turning 180 degrees at the turning platform, the first rope roller 203 and the second rope roller 204 are respectively provided to correspond to the guide ropes 3 of the two tracks. The traction descending motor 2 is connected to the same structure as the traction ascending motor 19. Taking the traction descending motor 2 as an example, as shown in FIG. Figures 17 to 21As shown, the output end of the traction lowering motor 2 is connected to the reducer 201 and then connected to the second rope roller 204 through the driving wheel shaft 2061. The first rope roller 203 is connected to the driven wheel shaft 2081. The driving wheel shaft 2061 and the driven wheel shaft 2081 are both inserted into the gearbox 202. In the gearbox 202, the driving wheel shaft 2061 is keyed to the driving gear 206, and the driving gear 206 is a long gear. The driven wheel shaft 2081 is keyed to the driven gear 208. The gearbox 202 is slidably connected with the transmission gear 207. The electric push rod 205 is vertically installed outside the gearbox 202. The telescopic end of the electric push rod 205 is connected to the transmission gear 207. The transmission gear 207 is meshed and slidably connected with the driving gear 206 and the driven gear 208. The transmission gear 207 is slidably connected with the driving gear 206 and the driven gear 208. The wheels 208 are driven at a constant speed. Considering that when turning on the first horizontal track 3003, the pulling speed of the inner track 5 connected to the first rope roller 203 on the guide rope 3 needs to be lower than the pulling speed of the outer track 6 connected to the second rope roller 204 on the guide rope 3, a steering gear 209 is also connected to the gearbox 202 through a steering wheel shaft 2091. The diameter of the steering gear 209 is larger than that of the driven gear 208, and the transmission gear 207 is meshed with the steering gear 209 and slidably connected. The key connection on the steering wheel shaft 2091 is The first pulley 212 is connected to the second pulley 213 on the driven wheel shaft 2081, and the first synchronous belt 214 is set between the first pulley 212 and the second pulley 213; considering that the deviation may occur after long-term operation, the speed-increasing compensation gear 210 and the speed-reducing compensation gear 211 are connected in the gearbox 202 through the speed-increasing wheel shaft 2101 and the speed-reducing wheel shaft 2111, wherein the diameter of the speed-increasing compensation gear 210 is smaller than the steering gear 209 but larger than the driven gear 208, and the diameter of the speed-reducing compensation gear 211 is The speed increasing compensating gear 210 and the speed decreasing compensating gear 211 are both meshed with the transmission gear 207 and are slidably connected. The driven gear 208, the steering gear 209, the speed increasing compensating gear 210 and the speed decreasing compensating gear 211 are staggered. When the transmission gear 207 is moved by the electric push rod 205, it always keeps meshing with the driving gear 206, but keeps meshing with at most one of the driven gear 208, the steering gear 209, the speed increasing compensating gear 210 and the speed decreasing compensating gear 211. The fourth pulley 216 is also keyed to the steering wheel shaft 2091, the third pulley 215 is keyed to the speed increasing wheel shaft 2101, a second synchronous belt 217 is installed between the third pulley 215 and the fourth pulley 216, the fifth pulley 218 is keyed to the reduction wheel shaft 2111, the sixth pulley 219 is keyed to the driven wheel shaft 2081, and a third synchronous belt 220 is installed between the fifth pulley 218 and the sixth pulley 219.A laser transmitter and a laser receiver are respectively installed on the two inner opposite surfaces of the box 15 connecting the two booms 8. The laser receiver also includes three receiving ports, namely a normal port and a faster port and a slower port located on both sides of the normal port. The laser receiver corresponds to the position of the receiving port. In order to obtain the gear switching time, a first photoelectric sensor 26 is installed at both ends of the semicircular track of the first horizontal track 3003. The laser transmitter, the laser receiver, the electric push rod 205, and the first photoelectric sensor 26 are all electrically connected to the PLC controller.
[0046] In order to keep the guide rope 3 before and after the shuttle-shaped impact block 10 parallel to the shuttle-shaped impact block 10 as much as possible at the turning point of the first horizontal track 3003, the density of the guide block 9 set at the arc track is greater than the density of the guide block 9 set at the straight track.
[0047] For the convenience of operation, a fixed operating device 1 is set on the wall of each floor, and a mobile operating device 24 is set on the carrier 29. The fixed operating device 1 is directly electrically connected to the PLC controller. A bus bar is laid on the inner side of the inner track 5, including a live wire, a neutral wire, and a signal wire. The bus bar is electrically connected to the PLC controller. Carbon brushes are connected to the double rollers 4 connected to the boom 8, and the carbon brushes are electrically connected to the lifting motor 21 and the mobile operating device 24.
[0048] In order to ensure safety during operation, a second photoelectric sensor is installed outside the entrance door, and an emergency stop button is set on the mobile operating device 24. A speaker is set in the box 15, and the speaker is slidably connected to the carbon brush. The photoelectric sensor is electrically connected to the PLC controller. When the second photoelectric sensor detects that the door is open, the elevator will be paused and wait for the resident to pass through and continue to run the elevator after closing the door. The emergency button is used to stop the operation in an emergency. A weight sensor is installed on the carrier 29 to detect the passenger's riding status. The weight sensor is electrically connected to the carbon brush.
[0049] Working principle of the present invention:
[0050] When a passenger wants to take the elevator, he operates the fixed operating device 1 to call the elevator. The PLC controller controls the traction down motor 2 and the traction up motor 19 to work by calling the location of the fixed operating device 1 of the elevator. For example, a passenger calls the elevator on the 1st floor to go to the 2nd floor, and the elevator is on the 1st floor at this time:
[0051] The PLC controller controls the operation of the lifting motor 21, which is driven by the small gear 11 and the large gear 12 to drive the double-headed screw 13 to rotate, so that the left-handed screw nut 22 and the right-handed screw nut 23 move toward each other, and the folding rod 17 gradually moves and rotates to lower the carrier 29. After the passenger sits on the carrier 29, he operates the mobile operating device 24 to select the floor to go to, that is, the 2nd floor. The PLC controller controls the lifting motor 21 to raise the carrier 29 to a set height to ensure that the passenger's feet will not hit the stairs. Then, the lifting motor 19 is pulled to reel in the guide rope 3, and the descending motor 2 is pulled to release the guide rope 3, so that the guide rope 3 moves upward as a whole, pulling the shuttle-shaped collision block 10 to move upward, and the shuttle-shaped collision block 10 drives the box 15 to cause the double rollers 4, the lifting mechanism, and the carrier 29 to move upward as a whole.
[0052] When the double rollers 4 of the folding arm 7 reach the intersection of the first inclined track 3001 and the first turning track 3002, i.e., point W, the lower wheel 2802 of the guide wheel 28 enters the second inclined track 3101, and the upper wheel 2801 is connected to the first buffer rod 3104, and the double rollers 4 continue to move. At this time, the double rollers 4 of the folding arm 7 enter the first turning track 3002, and the vertical distance between the double rollers 4 and the box body 15 is reduced. When the upper wheel 2801 passes the first buffer rod 3104, the folding arm 7 begins to fold due to the deceleration of the first buffer rod 3104, and the lower wheel 2802 of the guide wheel 28 enters the second inclined track 3101. 802 moves along the second inclined track 3101, and the second inclined track 3101 supports the lower wheel 2802 while maintaining the level of the box 15. When the double rollers 4 of the boom 8 reach point W, the lower wheel 2802 reaches the junction of the second inclined track 3101 and the second turning track 3102, that is, point X. As the double rollers 4 of the boom 8 enter the first horizontal track 3003 along the first turning track 3002, the lower wheel 2802 also enters the second horizontal track 3103 along the second turning track 3102. During this process, the folding arm 7 is gradually and completely folded.
[0053] When the PLC controller detects the first double roller 4, i.e., the double roller 4 of the folding arm 7, through the first photoelectric sensor 26, the PLC controller detects the signal reception of the laser receiver. If the standard position laser receiver receives the laser signal, the electric push rod 205 is controlled to be shortened, so that the transmission gear 207 switches from being meshed with the driving gear 206 and the driven gear 208 to being meshed with the driving gear 206 and the steering gear 209. The steering gear 209 drives the steering wheel shaft 2091 to rotate, and the steering wheel shaft 2091 drives the first pulley 212 to rotate, which is driven by the first synchronous belt 214 and the driven wheel shaft 2081 to rotate through the second pulley 213, so that the first rope roller 203 rotates at a slower speed than the second rope roller 204, even if the double roller 4 on the inner track 5 travels at a slower speed than the double roller 4 on the outer track 6; if the fast port receives the laser signal, the electric push rod 205 is controlled to be shortened, so that the transmission gear 207 switches from being meshed with the driving gear 206 and the driven gear 208. The first rope roller 203 is driven to rotate at a speed slower than that of the steering gear 209. Similarly, if the slow port receives a laser signal, the electric push rod 205 is controlled to shorten, so that the transmission gear 207 is meshed with the driving gear 206 and the driven gear 208. The gear 206 is switched to mesh with the driving gear 206 and the speed-increasing compensation gear 210. The speed-increasing compensation gear 210 is driven through the speed-increasing wheel shaft 2101, the third pulley 215, the second synchronous belt 217, the fourth pulley 216, the steering wheel shaft 2091, the first pulley 212, the first synchronous belt 214, the second pulley 213, and the driven wheel shaft 2081 to drive the first rope roller 203 to rotate at a speed faster than the steering gear 209 but slower than the driven gear 208, so as to perform speed compensation.
[0054] When the first photoelectric sensor 26 at the other end of the semicircular track detects the second double roller 4, i.e., the double roller 4 of the boom 8, the PLC controller controls the electric push rod 205 to reset, so that the transmission gear 207 is meshed with the driving gear 206 and the driven gear 208 again, and the first rope roller 203 and the second rope roller 204 are restored to rotate at the same speed.
[0055] When the double rollers 4 of the folding arm 7 reach the intersection of the first horizontal track 3003 and the fourth turning track 3004, i.e., point Y, the lower wheel 2802 of the guide wheel 28 continues to move along the second horizontal track 3103, and the double rollers 4 continue to move. At this time, the double rollers 4 of the folding arm 7 enter the fourth turning track 3004, and the vertical distance between the double rollers 4 and the box 15 increases, so that the folding arm 7 begins to unfold. While the second horizontal track 3103 supports the lower wheel 2802, it maintains the level of the box 15. When the double rollers 4 of the boom 8 reach point Y, the lower wheel 2802 reaches the junction of the second horizontal track 3103 and the third turning track 3105, i.e., point Z. As the double rollers 4 of the boom 8 enter the fourth inclined track 3005 along the fourth turning track 3004, the lower wheel 2802 also enters the third inclined track 3106 along the third turning track 3105. During this process, the folding arm 7 gradually unfolds completely.
[0056] The traveling mechanism drives the carrier 29 to continue to move upward, repeating the above process until it reaches the semicircular track on the second floor. After reaching the semicircular track, the traction lowering motor 2 and the traction raising motor 19 stop running, the lifting mechanism lowers the carrier 29, and the passengers leave the carrier 29. After the PLC controller detects that the carrier 29 is empty for 10 seconds through the weight sensor, if someone calls the elevator, it will go to the call point and continue to run. If no one calls, the lifting mechanism will raise the carrier 29 to the highest point and transport the elevator to the turning platform between the two floors to make as much space as possible in the corridor.
[0057] During operation, music is played through the speaker to remind residents that the elevator is running. When passing through the entrance door, if the second photoelectric sensor detects that the resident has opened the door, the elevator will be suspended and resumed after the resident closes the entrance door. If passengers find any sudden abnormal situation during operation, they can press the emergency stop button to stop the operation.
[0058] The circuits and mechanical connections involved in the present invention are conventional means used by those skilled in the art, and technical inspiration can be obtained through a limited number of experiments, which are common knowledge.
[0059] Components not described in detail herein are prior art.
[0060] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An elevator device suitable for renovation of old residential areas, comprising a hanging rail, a carrier (29) and a travel mechanism, wherein the hanging rail is hoisted on a mounting surface above the travel mechanism, the travel mechanism is on the hanging rail, and the travel mechanism travels along the hanging rail, the travel mechanism is connected to the carrier (29) below, the hanging rail is connected to a guide rope (3), and the guide rope (3) connects the travel mechanism and a traction motor, characterized in that: The mounting surface is also connected to a guide block (9), the guide block (9) further comprising two hinged elastic clips (901), the two elastic clips (901) being arranged opposite to each other, embracing and supporting the guide rope (3), a spring (902) being connected between the two elastic clips (901), a shuttle-shaped collision block (10) being connected to the guide rope (3), and the shuttle-shaped collision block (10) and the two elastic clips (901) having corresponding positions and matching sizes at their joints; the hanging rail adopts a double-track hanging rail, the traction motor is connected to the reducer (201) and then connected to the rope roller via a gearbox (202), the gearbox (202) being equipped with a constant speed gear, a speed change gear and a compensation gear, and the guide rope (3) is wound around the rope roller; the traveling mechanism The mechanism is connected to the carrier (29) through a lifting mechanism; the travel mechanism is connected to a double roller (4) through a folding arm (7) and a suspension arm (8); the double roller (4) travels along the suspension rail; the folding arm (7) and the suspension arm (8) are arranged in front and behind the travel mechanism; the folding arm (7) and the suspension arm (8) each have two groups, which are arranged on both sides of the travel mechanism; a guide wheel (28) is provided at the hinge of the folding arm (7); the suspension rail also includes a travel track (30) and a guide track (31); the double roller (4) is connected to the travel track (30), and the guide wheel (28) is opposite to the guide track (31); and the control device and the operating device are also included; the control device is electrically connected to the traction motor, the gearbox (202), the lifting mechanism, and the operating device; The elastic card (901) is hook-shaped and comprises a hook handle and a hook portion, the hook handle is hinged to the mounting surface, the hook portion forms a semi-enclosed accommodating cavity, the hook portions of the two elastic cards (901) are opposite to each other, the guide rope (3) passes through the accommodating cavities of the two opposite elastic cards (901), and the spring (902) is mounted on the hook handle; The shuttle-shaped collision block (10) is small at both ends and large in the middle, and is opposite to the accommodating cavity of the elastic card (901), with the diameter of its smaller end being smaller than that of the accommodating cavity and its largest part being larger than that of the accommodating cavity; The hanging rail further comprises an inner rail (5) and an outer rail (6); the guide ropes (3) are two and correspond to the inner rail (5) and the outer rail (6) respectively; the rope rollers are two, namely a first rope roller (203) and a second rope roller (204); the two guide ropes (3) are respectively wound around the two rope rollers; The lifting mechanism further comprises a box (15), the box (15) being connected to the folding arm (7) and the boom (8), and the box (15) being connected to a scissor-type lifting frame, the scissor-type lifting frame being connected to the carrier (29), a lifting motor (21) being arranged in the box (15), the lifting motor (21) being connected to a double-headed lead screw (13), the double-headed lead screw (13) being connected to two lead screw nuts with opposite rotation directions, the lead screw nuts being connected to the scissor-type lifting frame, and the lifting motor (21) being electrically connected to the control device; The travel track (30) further comprises a travel inclined track and a travel horizontal track, and the two are connected and transitioned by a travel turning track; the guide track (31) is located below the travel track (30), and further comprises a guide inclined track and a guide middle track, the guide inclined track is parallel to the travel inclined track, the guide middle track is parallel to the travel horizontal track, the guide inclined track and the guide middle track are connected by a transition track, and the curvature and trend of the transition track are the same as those of the travel turning track; The folding arm (7) further comprises an upper arm (701) and a lower arm (702), the two ends of the upper arm (701) being respectively hinged to the double rollers (4) and the upper end of the lower arm (702), and the lower end of the lower arm (702) being hinged to the box body (15); the guide wheel (28) further comprises an upper wheel (2801) and a lower wheel (2802), the upper wheel (2801) and the lower wheel (2802) being respectively located at the hinged ends of the lower arm (702) and hinged to the lower arm (702); the two ends of the guide track (31) are both connected to a buffer rod, the buffer rod is arranged transversely, the lower wheel (2802) corresponds to the track of the guide track (31), the upper wheel (2801) corresponds to the buffer rod, and the axis of the upper wheel (2801) is higher than the buffer rod.
2. The elevator device suitable for renovation of old residential areas according to claim 1 is characterized in that: The gearbox (202) is internally connected to a driving gear (206), a driven gear (208), a steering gear (209), an increasing speed compensating gear (210), and a decreasing speed compensating gear (211). A transmission gear (207) is also provided in the gearbox (202). The transmission gear (207) is slidably connected to the driving gear (206), the driven gear (208), the steering gear (209), the increasing speed compensating gear (210), and the decreasing speed compensating gear (211). The transmission gear (207) has the same transmission ratio as the driving gear (206) and the driven gear (208). The transmission gear (207) has a different transmission ratio from the driven gear (208) and the steering gear (209). The transmission ratio of the compensation gear (210) is smaller than the transmission ratio between the compensation gear (210) and the steering gear (209); the transmission ratio between the transmission gear (207) and the deceleration compensation gear (211) is larger than the transmission ratio between the transmission gear (207) and the steering gear (209); the driven gear (208), the steering gear (209), the speed increasing compensation gear (210), and the deceleration compensation gear (211) are connected via a synchronous transmission structure to achieve synchronous rotation; the gearbox (202) further comprises an electric push rod (205); the telescopic end of the electric push rod (205) is connected to the transmission gear (207); a deflection detection mechanism is installed on the left and right sides of any one of the travel mechanism, the lifting mechanism, and the carrier (29); the deflection detection mechanism and the electric push rod (205) are electrically connected to the control device.
3. The elevator device suitable for renovation of old residential areas according to claim 2 is characterized in that: The driven gear (208) is coaxially connected to a second pulley (213) and a sixth pulley (219); the steering gear (209) is coaxially connected to a first pulley (212) and a fourth pulley (216); the speed-increasing compensation gear (210) is coaxially connected to a third pulley (215); the speed-increasing compensation gear (211) is coaxially connected to a fifth pulley (218); a first synchronous belt (214) is sleeved between the first pulley (212) and the second pulley (213); a second synchronous belt (217) is sleeved between the third pulley (215) and the fourth pulley (216); and a third synchronous belt (220) is sleeved between the fifth pulley (218) and the sixth pulley (219).
4. The elevator device suitable for renovation of old residential areas according to claim 2 is characterized in that: The deflection detection mechanism further comprises a laser transmitter and a laser receiver, which are respectively arranged on two surfaces parallel to and opposite to the travel track (30); the laser receiver further comprises a plurality of receiving ports, the laser receivers correspond to the positions of the receiving ports, and the laser transmitter and the laser receiver are both electrically connected to the control device.