An intelligent management system for the entire life cycle of equipment scrapping
Through the Internet of Things technology, an intelligent management system for the full cycle of equipment scrapping was established, which solved the problem that traditional systems could not deeply analyze equipment data, achieved the accuracy and resource optimization of equipment scrapping, and provided intelligent decision-making support.
Patent Information
- Application Number
- CN202410640556.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional equipment scrap management systems cannot deeply analyze the data of the equipment during the scrapping cycle, resulting in premature scrapping of equipment, wasted resources, lack of intelligent support, low efficiency and error-prone.
Through the Internet of Things technology, an intelligent management system for the full cycle of equipment scrapping is established, including equipment data registration, usage data collection and analysis, maintenance data collection and analysis, equipment health assessment and on-site testing, to calculate the use value, maintenance value and scrap evaluation coefficient, and provide Intelligent decision support.
It improves the efficiency of equipment scrapping, reduces resource waste, enhances the accuracy of equipment scrapping, optimizes resource configuration, and provides intelligent scrapping decision support.
Smart Images

Figure CN118552177B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of full-cycle intelligent management of equipment scrapping, and specifically relates to a full-cycle intelligent management system for equipment scrapping. Background Art
[0002] With the development of science and technology and the acceleration of industrialization, enterprises are facing more and more challenges in equipment scrapping management, including high equipment maintenance costs, untimely scrapping decisions, and waste of resources. Equipment scrapping management is crucial in daily work. Therefore, enterprises have begun to seek more intelligent and efficient equipment scrapping management solutions to improve production efficiency, reduce costs, optimize resource utilization, and better manage the entire scrapping cycle of equipment.
[0003] The traditional equipment scrapping management system has the following problems: First, the traditional equipment scrapping management system simply determines whether the equipment has reached the scrapping standard based on the length of use, and does not collect and process other data of the equipment during the scrapping cycle, resulting in the inability to conduct in-depth analysis of the specific situation of the equipment, and thus unable to correctly predict the failure and scrapping time of the equipment, resulting in the equipment being scrapped prematurely without being fully utilized, causing waste of resources.
[0004] Second, the traditional equipment scrapping management system does not analyze the maintenance status of the equipment, does not count the number of replaced parts and the number of repairs, but simply collects the damage status of the current equipment. It relies on human decision-making and manual operation, lacks sufficient intelligent support, is inefficient and prone to errors.
[0005] Third, when equipment is at risk of being scrapped, the traditional equipment scrapping management system will not conduct on-site operation tests to obtain the actual operation data of the target equipment. This makes it impossible to determine whether the equipment has reached the scrapping standard, resulting in equipment that has not reached the scrapping standard being scrapped. Summary of the invention
[0006] In view of this, the present invention aims to propose an intelligent management system for the entire cycle of equipment scrapping. By analyzing the equipment usage data and maintenance data, the equipment usage value coefficient and the equipment maintenance value coefficient are obtained, and then the equipment health coefficient is evaluated. The equipment health status is evaluated through the equipment health coefficient, and on-site tests are performed to obtain the equipment scrapping assessment coefficient. The equipment scrapping status is obtained through the scrapping assessment coefficient assessment, and an alarm is issued to effectively solve the problems raised in the above-mentioned background technology.
[0007] The purpose of the present invention can be achieved through the following technical solutions: A construction machinery safety operation control system based on Internet of Things technology, comprising the following modules: an equipment data registration module, used to enter the initial information of the target equipment into the database, the initial information including type, specification, use date and life cycle.
[0008] The device usage data collection module is used to collect the usage data of the target device during use.
[0009] The equipment usage data analysis module is used to analyze and process the usage data of the target equipment during use to obtain the use value degree coefficient of the target equipment.
[0010] The equipment maintenance data collection module is used to collect the maintenance data of the target equipment during the maintenance process.
[0011] The equipment maintenance data analysis module is used to analyze and process the maintenance data of the target equipment during the maintenance process to obtain the maintenance value degree coefficient of the target equipment.
[0012] The equipment data evaluation module is used to evaluate the health coefficient of the target equipment according to the use value degree coefficient of the target equipment and the maintenance value degree coefficient of the target equipment.
[0013] The equipment scrapping assessment module is used to perform on-site operation tests on the target equipment, obtain the operation data of the target equipment, and obtain the scrapping assessment coefficient of the target equipment based on the operation data of the target equipment.
[0014] The early warning module is used to evaluate the scrap status of the target equipment and issue an early warning.
[0015] The database is used to store the total number of times each type of equipment corresponding to each specification is set to be used, the influence weights of various types of parts, and the standard startup time, safe loudness of operating sound, and reference vibration amplitude of each type of equipment corresponding to each specification during operation.
[0016] In an alternative implementation, the usage data of the target device during use includes a total usage duration, a total number of uses, and a duration corresponding to each use.
[0017] In an alternative embodiment, the analysis and processing of the usage data of the target device during use is as follows: extract the total usage time from the usage data of the target device during use, record it as d, extract the life cycle of the target device from the database, and obtain the service life of the target device according to the life cycle of the target device, record it as d0, and analyze the formula Get the influence weight factor α of the total usage time of the target device corresponding to the usage value d , e is a natural constant.
[0018] Extract the total number of times the target device is used from its usage data during use, and record it as c. Extract the total number of times the set usage of each type of device corresponding to each specification from the database. Filter the total number of times the set usage of the target device according to the type and specification of the target device, and record it as c0. Get the total number of times the target device is used, and the corresponding weight factor α of the use value c .
[0019] Extract the duration of each use from the usage data of the target device during use, filter the number of times the usage duration is greater than the set usage duration threshold, record it as the number of overload usage, record it as z, count the duration of each overload usage, record it as f r , r represents the number corresponding to the rth time of equipment overload use, r = 1, 2, ..., z, filter the number of times the use time is less than or equal to the set use time threshold, record it as the normal use number, record it as k, count the time corresponding to each normal use, record it as f s ′, s represents the number corresponding to the normal use of the sth device, s=1,2,...,k, through the formula The use value degree influence weight factor corresponding to the use time of the target device is obtained, f0 represents a preset use time threshold of the target device, and Δf represents a preset deviation threshold corresponding to the use time of the target device.
[0020] In an alternative embodiment, the data analysis and processing of the target device during use also includes: analyzing the formula Obtain the target equipment use value coefficient χ.
[0021] In an alternative embodiment, the maintenance data of the target device during the maintenance process includes the total number of maintenance times, the total number of replaced parts, and the number of various replaced parts corresponding to each maintenance.
[0022] In an alternative embodiment, the maintenance data analysis and processing of the target device during the maintenance process is as follows: extract the total number of maintenance times from the maintenance data of the target device during the maintenance process, record it as m, compare it with the preset total number of allowed maintenance times of the target device, and calculate it by formula The maintenance degree coefficient β1 of the total number of maintenance times of the target equipment is obtained, and m0 is the total number of allowable maintenance times of the preset target equipment.
[0023] The total number of replacement parts is extracted from the maintenance data of the target device during the maintenance process, recorded as g, and compared with the total number of replacement parts allowed for the preset target device. The formula The maintenance degree coefficient β2 of the total number of replacement parts for the target equipment is obtained, and g0 is the total number of standard replacement parts for the preset target equipment.
[0024] Extract the number of various replacement parts corresponding to each maintenance from the maintenance data of the target equipment during the maintenance process, count all the different types of replacement parts for each maintenance, retrieve the influence weights of various types of parts in the target equipment from the database, compare and obtain the influence weights of various replacement parts corresponding to each maintenance, and record them as i represents the number of the i-th maintenance, o represents the number of the o-th replacement part, i=1,2,...,m, o=1,2,...,n, and the number of each replacement part corresponding to each maintenance is recorded as By formula Obtain the maintenance degree coefficient β3 of the target equipment corresponding to the type of replacement parts.
[0025] In an alternative embodiment, the maintenance data analysis and processing of the target device during the maintenance process further includes: analyzing the formula Obtain the target equipment maintenance value coefficient η.
[0026] In an alternative implementation, the health factor of the target device is analyzed as follows: The health coefficient λ1 of the target device is obtained, and Δγ represents the deviation threshold of the health coefficient of the preset target device.
[0027] When the health coefficient of the target device is greater than or equal to the preset standard health coefficient, it means that the target device has no risk of being scrapped. When the health coefficient of the target device is less than the preset standard health coefficient, it means that the target device has a risk of being scrapped. At this time, the equipment scrapping assessment module is started.
[0028] In an alternative implementation, the scrap assessment coefficient of the target device is analyzed as follows: the target device is subjected to an on-site operation test to obtain operating data of the target device during operation, the operating data including power-on time, operating sound loudness, and vibration amplitude.
[0029] The standard startup time, safe operating sound loudness, and reference vibration amplitude of each type and specification of equipment during operation are extracted from the database. According to the type and specification of the target equipment, the standard startup time, safe operating sound loudness, and reference vibration amplitude of the target equipment during operation are obtained and recorded as j0, p0, and q0, respectively.
[0030] By analyzing the formula The scrapping assessment coefficient θ of the target device is obtained, j represents the power-on time extracted from the operating data of the target device during operation, p represents the operating sound loudness of the target device extracted from the sound sensor during operation of the target device, and q represents the vibration amplitude of the target device extracted from the operating data of the target device during operation.
[0031] In an alternative embodiment, the scrapping assessment coefficient analysis of the target device also includes: comparing the scrapping assessment coefficient of the target device with a preset scrapping assessment reference coefficient of the target device; when the scrapping assessment coefficient of the target device is greater than or equal to the preset scrapping assessment reference coefficient of the target device, the target device reaches the scrapping standard and issues an alarm.
[0032] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention obtains the use value coefficient of the target equipment by analyzing and processing the usage data of the target equipment during use, simplifies the complex evaluation method, effectively improves the scrapping efficiency of the target equipment during use, and collects and analyzes the total usage time, total number of uses and corresponding duration of each use of the equipment during the scrapping cycle. Through precise data analysis, the service life of the equipment can be more accurately evaluated, thereby formulating a more reasonable scrapping plan, which helps to optimize resource allocation and improve economic benefits.
[0033] 2. The present invention obtains the maintenance value coefficient of the target equipment by analyzing and processing the maintenance data of the target equipment during the maintenance process, thereby improving the accuracy of equipment scrapping and greatly reducing the scrapping of equipment that does not meet the scrapping standards. At the same time, through multi-faceted analysis of the maintenance data during the maintenance process, the scrapping situation of the equipment can be better understood and grasped, providing enterprises with intelligent scrapping decision support.
[0034] 3. The present invention obtains the health coefficient of the target equipment by analyzing the use value degree coefficient and the maintenance value degree coefficient of the target equipment. The health status of the target equipment can be obtained through the health coefficient of the target equipment, which makes it clearer whether the target equipment has the risk of being scrapped, greatly increasing the accuracy of equipment scrapping.
[0035] 4. The present invention obtains the actual operation data of the target device and obtains the scrapping assessment coefficient of the target device by performing an on-site operation test on the target device when the target device has a risk of being scrapped. The scrapping assessment coefficient can be used to better determine whether the target device meets the scrapping standard, thereby avoiding waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0037] Figure 1 It is a schematic diagram of the connection of various modules of the system of the present invention. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] The present invention proposes an intelligent management system for the entire equipment scrapping cycle, comprising an equipment data registration module, an equipment usage data collection module, an equipment usage data analysis module, an equipment maintenance data collection module, an equipment maintenance data analysis module, an equipment data evaluation module, an equipment scrapping evaluation module, an early warning module and a database.
[0040] The above-mentioned equipment usage data acquisition module is connected to the equipment usage data analysis module, the equipment maintenance data acquisition module is connected to the equipment maintenance data analysis module, the equipment data evaluation module is connected to the equipment usage data analysis module and the equipment maintenance data analysis module respectively, the equipment data evaluation module is connected to the equipment scrapping evaluation module, the equipment scrapping evaluation module is connected to the early warning module, and the database is connected to the equipment data registration module, the equipment usage data analysis module, the equipment maintenance data analysis module and the equipment scrapping evaluation module respectively.
[0041] For the connection relationship between modules, see Figure 1 .
[0042] The equipment data registration module is used to enter the initial information of the target equipment into the database, and the initial information includes type, specification, use date and life cycle.
[0043] The device usage data collection module is used to collect usage data of the target device during use.
[0044] The usage data of the target device during use includes the total usage time, the total number of times of use and the duration of each use.
[0045] It should be noted that the method of collecting the usage data of the target device during use is as follows: the total usage time of the target device can be obtained by subtracting the current date of the target device from the usage date. The total number of times the target device is used and the corresponding duration of each use can be obtained by calling the control terminal background of the target device.
[0046] The device usage data analysis module is used to analyze and process the usage data of the target device during use to obtain the use value degree coefficient of the target device.
[0047] The usage data of the target device during use is analyzed and processed as follows: the total usage time is extracted from the usage data of the target device during use, which is recorded as d, and the service life of the target device is obtained according to the life cycle of the target device, which is recorded as d0. Get the influence weight factor α of the total usage time of the target device corresponding to the usage value d , e is a natural constant.
[0048] Extract the total number of times the target device is used from its usage data during use, and record it as c. Extract the total number of times the set usage of each type of device corresponding to each specification from the database. Filter the total number of times the set usage of the target device according to the type and specification of the target device, and record it as c0. Get the total number of times the target device is used, and the corresponding weight factor α of the use value c .
[0049] Extract the duration of each use from the usage data of the target device during use, filter the number of times the usage duration is greater than the set usage duration threshold, record it as the number of overload usage, record it as z, count the duration of each overload usage, record it as f r , r represents the number corresponding to the rth time of equipment overload use, r = 1, 2, ..., z, filter the number of times the use time is less than or equal to the set use time threshold, record it as the normal use number, record it as k, count the time corresponding to each normal use, record it as f s ′, s represents the number corresponding to the normal use of the sth device, s=1,2,...,k, through the formula The use value degree influence weight factor corresponding to the use time of the target device is obtained, f0 represents a preset use time threshold of the target device, and Δf represents a preset deviation threshold corresponding to the use time of the target device.
[0050] The specific implementation of obtaining the use value coefficient of the target equipment is as follows: Obtain the target equipment use value coefficient χ.
[0051] It should be supplemented that the present invention obtains the use value coefficient of the target equipment by analyzing and processing the usage data of the target equipment during use, simplifies the complex evaluation method, effectively improves the scrapping efficiency of the target equipment during use, and collects and analyzes the total usage time, total number of uses and corresponding duration of each use of the equipment during the scrapping cycle. Through precise data analysis, the service life of the equipment can be more accurately evaluated, so as to formulate a more reasonable scrapping plan, which helps to optimize resource allocation and improve economic benefits.
[0052] The equipment maintenance data collection module is used to collect maintenance data of the target equipment during the maintenance process.
[0053] The maintenance data of the target equipment during the maintenance process includes the total number of maintenance times, the total number of replaced parts, and the number of various replaced parts corresponding to each maintenance.
[0054] It should be noted that the maintenance data collection method of the target device during the maintenance process is as follows: retrieve all maintenance logs from the control terminal background of the target device, count the number of all maintenance logs, and record them as the total number of maintenance times of the target device. Obtain the number of various replacement parts corresponding to each maintenance from the maintenance log. Sum up the number of various replacement parts corresponding to each maintenance to obtain the total number of replacement parts of the target device.
[0055] Furthermore, each maintenance log corresponding to the target device is entered into the control terminal background.
[0056] The equipment maintenance data analysis module is used to analyze and process the maintenance data of the target equipment during the maintenance process to obtain the maintenance value degree coefficient of the target equipment.
[0057] The maintenance data of the target equipment during the maintenance process is analyzed and processed as follows: the total number of maintenance times is extracted from the maintenance data of the target equipment during the maintenance process, recorded as m, and compared with the preset total number of allowed maintenance times of the target equipment, and the total number of maintenance times is calculated by the formula The maintenance degree coefficient β1 of the total number of maintenance times of the target equipment is obtained, and m0 is the total number of allowable maintenance times of the preset target equipment.
[0058] The total number of replacement parts is extracted from the maintenance data of the target device during the maintenance process, recorded as g, and compared with the total number of replacement parts allowed for the preset target device. The formula The maintenance degree coefficient β2 of the total number of replacement parts for the target equipment is obtained, and g0 is the total number of standard replacement parts for the preset target equipment.
[0059] Extract the number of various replacement parts corresponding to each maintenance from the maintenance data of the target equipment during the maintenance process, count all the different types of replacement parts for each maintenance, retrieve the influence weights of various types of parts in the target equipment from the database, compare and obtain the influence weights of various replacement parts corresponding to each maintenance, and record them as i represents the number of the i-th maintenance, o represents the number of the o-th replacement part, i=1,2,...,m, o=1,2,...,n, and the number of each replacement part corresponding to each maintenance is recorded as By formula Obtain the maintenance degree coefficient β3 of the target equipment corresponding to the type of replacement parts.
[0060] The specific implementation of obtaining the target equipment maintenance value coefficient is as follows: Obtain the target equipment maintenance value coefficient η.
[0061] It should be supplemented that the present invention obtains the maintenance value coefficient of the target equipment by analyzing and processing the maintenance data of the target equipment during the maintenance process, thereby improving the accuracy of equipment scrapping and greatly reducing the scrapping of equipment that does not meet the scrapping standards. At the same time, through multi-faceted analysis of the maintenance data during the maintenance process, the scrapping situation of the equipment can be better understood and grasped, providing enterprises with intelligent scrapping decision support.
[0062] The equipment data evaluation module is used to evaluate the health coefficient of the target equipment according to the use value degree coefficient of the target equipment and the maintenance value degree coefficient of the target equipment.
[0063] The health factor analysis of the target device is as follows: The health coefficient λ1 of the target device is obtained, and Δγ represents the deviation threshold of the health coefficient of the preset target device.
[0064] When the health coefficient of the target device is greater than or equal to the preset standard health coefficient, it means that the target device has no risk of being scrapped. When the health coefficient of the target device is less than the preset standard health coefficient, it means that the target device has a risk of being scrapped. At this time, the equipment scrapping assessment module is started.
[0065] It should be noted that the present invention obtains the health coefficient of the target equipment by analyzing the use value degree coefficient and the maintenance value degree coefficient of the target equipment. The health status of the target equipment can be obtained through the health coefficient of the target equipment, which makes it clearer whether the target equipment has the risk of being scrapped, thereby greatly increasing the accuracy of equipment scrapping.
[0066] The equipment scrapping assessment module is used to perform an on-site operation test on the target equipment, obtain the operation data of the target equipment, and obtain the scrapping assessment coefficient of the target equipment according to the operation data of the target equipment.
[0067] The scrap assessment coefficient analysis of the target equipment is as follows: the target equipment is subjected to an on-site operation test to obtain the operating data of the target equipment during operation, and the operating data includes the power-on time, operating sound loudness and vibration amplitude.
[0068] The standard startup time, safe operating sound loudness, and reference vibration amplitude of each type and specification of equipment during operation are extracted from the database. According to the type and specification of the target equipment, the standard startup time, safe operating sound loudness, and reference vibration amplitude of the target equipment during operation are obtained and recorded as j0, p0, and q0, respectively.
[0069] By analyzing the formula The scrapping assessment coefficient θ of the target device is obtained, j represents the power-on time extracted from the operating data of the target device during operation, p represents the operating sound loudness of the target device extracted from the sound sensor during operation of the target device, and q represents the vibration amplitude of the target device extracted from the operating data of the target device during operation.
[0070] It should be noted that the operation data collection method of the target device during operation is as follows: the power-on time of the target device during operation is retrieved through the control terminal background. The sound waves generated by the target device are received through the sound sensor, and the sound waves are converted into a waveform graph using an oscilloscope to obtain the different amplitudes in the entire waveform graph, and the average value is taken and then converted into the operating sound loudness. The vibration amplitude of all target devices is extracted through the control terminal background, and the maximum vibration amplitude is taken as the vibration amplitude of the target device.
[0071] It should be supplemented that the present invention obtains the actual operation data of the target device by performing an on-site operation test on the target device when the target device has a risk of being scrapped, and obtains the scrap assessment coefficient of the target device. The scrap assessment coefficient can be used to better determine whether the target device meets the scrap standard, thereby avoiding waste of resources.
[0072] The early warning module is used to evaluate the scrapping status of the target equipment and issue an early warning.
[0073] The early warning module compares the scrapping assessment coefficient of the target device with the preset scrapping assessment reference coefficient of the target device. When the scrapping assessment coefficient of the target device is greater than or equal to the preset scrapping assessment reference coefficient of the target device, the target device reaches the scrapping standard and issues an alarm.
[0074] The database is used to store the total number of times each type of equipment corresponding to each specification is set to be used, the influence weights of various types of parts, and the standard startup time, safe loudness of operating sound, and reference vibration amplitude of each type of equipment corresponding to each specification during operation.
[0075] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. An intelligent management system for the entire life cycle of equipment scrapping, characterized in that , the system includes: The equipment data registration module is used to enter the initial information of the target equipment into the database, including type, specification, use date and life cycle; The device usage data collection module is used to collect the usage data of the target device during use; The equipment usage data analysis module is used to analyze and process the usage data of the target equipment during use to obtain the use value degree coefficient of the target equipment; Equipment maintenance data collection module, used to collect maintenance data of target equipment during maintenance; The equipment maintenance data analysis module is used to analyze and process the maintenance data of the target equipment during the maintenance process to obtain the maintenance value degree coefficient of the target equipment; An equipment data evaluation module, used to evaluate the health factor of the target equipment according to the use value degree coefficient of the target equipment and the maintenance value degree coefficient of the target equipment; An equipment scrapping assessment module is used to perform on-site operation tests on target equipment, obtain operation data of the target equipment, and obtain a scrapping assessment coefficient of the target equipment based on the operation data of the target equipment; The early warning module is used to evaluate whether the target equipment has reached the scrap standard and issue an early warning; The database is used to store the total number of times each type of equipment of each specification is set to be used, the influence weight of each type of parts, and the standard startup time, safe loudness of the operating sound, and reference vibration amplitude of each type of equipment of each specification during operation; The usage data of the target device during use includes the total usage time, the total number of times of use and the duration corresponding to each use; The analysis and processing of the usage data of the target device during use is as follows: Extract the total usage time from the usage data of the target device during use and record it as , extract the life cycle of the target device from the database, and calculate the service life of the target device according to the life cycle of the target device, which is recorded as , by analyzing the formula Get the weight factor of the total usage time of the target device corresponding to the degree of use value , is a natural constant; Extract the total number of times used from the usage data of the target device during use and record it as , extract the total number of times each type of device corresponding to each specification is used from the database, and filter the total number of times the target device is used according to its type and specification, which is recorded as , by analyzing the formula Get the weight factor of the total number of times the target device is used corresponding to the degree of use value ; Extract the duration of each use from the usage data of the target device during use, filter the number of times when the usage duration is greater than the set usage duration threshold, and record it as the number of overload usages, and record it as , count the duration of each overload usage and record it as , Indicates The secondary device overload uses the corresponding number, , filter the number of times the usage time is less than or equal to the set usage time threshold, record it as the normal usage number, and record it as , count the duration of each normal use and record it as , Indicates The corresponding number of the secondary device is normally used. , through the formula Get the weight factor of the use value corresponding to the use time of the target device, Indicates the preset target device usage time threshold. Indicates the deviation threshold corresponding to the preset target device usage time; The data analysis and processing of the target device during use also includes: By analyzing the formula Get the target equipment use value coefficient ; The maintenance data of the target equipment during the maintenance process includes the total number of maintenance times, the total number of replaced parts, and the number of various replaced parts corresponding to each maintenance; The maintenance data analysis and processing of the target equipment during the maintenance process is as follows: The total number of maintenance times is extracted from the maintenance data of the target equipment during the maintenance process and recorded as , compare it with the preset total number of allowed maintenance times of the target equipment, and calculate it by the formula Get the maintenance degree coefficient of the total number of maintenance times of the target equipment , The total number of maintenance times allowed for the preset target equipment; The total number of replaced parts is extracted from the maintenance data of the target equipment during the maintenance process and recorded as , compare it with the total number of allowed replacement parts of the preset target equipment, and calculate it by formula Get the maintenance degree coefficient of the total number of replacement parts for the target equipment , The total quantity of standard replacement parts for the pre-set target equipment; Extract the number of various replacement parts corresponding to each maintenance from the maintenance data of the target equipment during the maintenance process, count all the different types of replacement parts for each maintenance, retrieve the influence weights of various types of parts in the target equipment from the database, compare and obtain the influence weights of various replacement parts corresponding to each maintenance, and record them as , Indicates The number of the repair, Indicates The number of the replacement part, , , the number of various replacement parts corresponding to each maintenance is recorded as , through the formula Get the maintenance degree coefficient of the target equipment corresponding to the type of replacement parts ; The maintenance data analysis and processing of the target equipment during the maintenance process also includes: By analyzing the formula Get the target equipment maintenance value coefficient ; The health factor analysis of the target device is as follows: By analyzing the formula Get the health factor of the target device , Indicates the deviation threshold of the health factor of the preset target device; When the health coefficient of the target device is greater than or equal to the preset standard health coefficient, it means that the target device has no risk of being scrapped. When the health coefficient of the target device is less than the preset standard health coefficient, it means that the target device has a risk of being scrapped. At this time, the equipment scrapping assessment module is started.
2. According to claim 1, the intelligent management system for the whole cycle of equipment scrapping is characterized by: The scrap evaluation coefficient of the target equipment is analyzed as follows: The target device is subjected to an on-site operation test to obtain the operation data of the target device during operation, the operation data including the boot time, the operation sound volume and the vibration amplitude; The standard boot time, safe operating sound volume, and reference vibration amplitude of each type of equipment corresponding to each specification in the operation process are extracted from the database. According to the type and specification of the target equipment, the standard boot time, safe operating sound volume, and reference vibration amplitude of the target equipment in the operation process are obtained and recorded as , and ; By analyzing the formula Get the target equipment scrapping assessment coefficient , It is represented by the boot time extracted from the running data of the target device during operation. It is represented by the operating sound volume of the target device extracted from the sound sensor during the operation of the target device. It is expressed as the vibration amplitude of the target device extracted from the operation data of the target device during operation.
3. According to claim 2, the intelligent management system for the whole cycle of equipment scrapping is characterized by: The early warning analysis of the target device is as follows: The scrapping assessment coefficient of the target device is compared with a preset scrapping assessment reference coefficient of the target device. When the scrapping assessment coefficient of the target device is greater than or equal to the preset scrapping assessment reference coefficient of the target device, the target device reaches the scrapping standard and issues an alarm.
