A tunnel power cable laying construction equipment

By combining orthotics, hot air softeners and cable supply flatteners in tunnel power cable laying facilities and equipment, the problem of cable laying deformation is solved, efficient straightening correction and stable laying of cables are achieved, and construction efficiency and quality are improved.

CN118554346BActive Publication Date: 2024-11-12WEIHAI WENDENG POWER SUPPLY CO OF STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411025442.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-12
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

During the tunnel power cable laying process, the pre-winding of the cable causes laying deformation, affecting the layout and space utilization, and increasing construction difficulty and cost.

Method used

A tunnel power cable installation equipment was designed, including orthotics, hot air softeners and cable flatteners. The cable shape is corrected through the orthotics, the hot air softeners heat the cable outer skin, and the cable flatteners flatteners to ensure the cable. Straightness and stability during laying.

Benefits of technology

Effectively correct the cable shape, improve laying efficiency, reduce winding deformation, ensure the straightness and uniformity of the cable during laying, and reduce construction costs and difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118554346B_ABST
    Figure CN118554346B_ABST
Patent Text Reader

Abstract

The present invention discloses a tunnel power cable laying construction equipment, which relates to the technical field of cable laying equipment, and includes a chassis, a chassis is fixedly installed on the top of the chassis, and orthotics are installed at both ends of the top of the chassis, and the orthotics are used to press the power cable to correct and straighten the cable. The tunnel power cable laying construction equipment supports the power cable through the bite concave wheel, and compresses the cable in cooperation with the wire pressing wheel. The pulling force during the laying of the power cable and the friction between the cable and the wire pressing wheel and the bite concave wheel are used to rotate the bite concave wheel and the wire pressing wheel to compress and correct the cable, and then the power cable compresses the wire pressing wheel, so that the movable push plate slides in the outer guide cavity shell, and compresses the spring part to deform, and cooperates with the rebound force of the spring part to adjust the distance between the wire pressing wheel and the bite concave wheel, so that the power cable is straightened, and the deformation of the cable caused by winding is weakened, thereby ensuring the subsequent cable laying effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of cable laying equipment, in particular to a tunnel power cable laying construction equipment. Background Art

[0002] Tunnel power cable refers to a power transmission cable specially designed and used in tunnel environment. It is mainly used to provide power supply for lighting, ventilation, monitoring, emergency equipment, traffic signal system, etc. in the tunnel. Due to the special environment of the tunnel, the requirements for cables are relatively high. Its safety, durability and practicality must be fully considered to meet the special requirements in the complex environment of the tunnel. Usually, pulling equipment is used to pull the cable on the winding roller, and the laying of tunnel power cable is realized with the assistance of cable laying equipment.

[0003] When laying cables, the cables may be deformed due to the pre-winding of the cables. The deformed cables tend to occupy a larger installation space, affecting the layout of the cables, thereby reducing space utilization and making it difficult to align the cables straight when they are fixed, increasing the difficulty and cost of the laying process. Summary of the invention

[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: a tunnel power cable laying construction equipment, including a base frame, the base frame provides a stable basic support for the entire equipment, ensuring that the equipment remains stable during operation, a chassis is fixedly installed on the top of the base frame, the chassis is used to accommodate and protect the internal components of the equipment, and plays a role in protection and integration, the top two ends of the base frame are installed with orthotics, the orthotics are used to press the power cable to correct and straighten the cable, so that it maintains a better shape, which is convenient for subsequent laying, and a hot air softener is installed on the inner wall of the chassis, the hot air softener It is used to output hot air to soften the power cable, and the cable sheath is softened by heating the air to facilitate laying and handling. A symmetrically arranged cable flattener is installed on the top of the chassis. The cable flattener is used to guide and flatten the softened power cable to keep the cable flat during transportation to avoid bending or twisting. The orthosis includes a distance adjusting frame for adjusting the distance between components to meet the laying requirements of cables of different specifications. The bottom surface of the distance adjusting frame is connected to the top of the base frame. A wire biting roller is detachably installed on the inner side of the distance adjusting frame. A limited position squeezing member is provided above the wire biting roller. The limiting and squeezing member is detachably mounted on the inner side of the spacing frame, a crimping wheel is mounted on the inner side of the limiting and squeezing member, the wire biting roller and the crimping wheel provide a certain clamping force through contact with the cable to ensure stable transmission of the cable, the crimping wheel is used to apply pressure to the cable to keep the position and shape of the cable stable, an auxiliary adjusting member is mounted on the outer surface of the limiting and squeezing member, the limiting and squeezing member is used to limit the position of the cable to prevent it from deviating from the predetermined laying path, the end of the auxiliary adjusting member away from the crimping wheel is adapted to slide with the outer edge surface of the spacing frame, and the auxiliary adjusting member is used to assist in adjusting the position of the limiting and squeezing member; The wire-biting roller includes a cross bar, which plays a role of connection and support to enhance the integrity of the structure. The two ends of the cross bar are adapted to rotate with the inner side of the distance adjusting frame. The two ends of the cross bar are threadedly connected with a first locking screw. The first locking screw is used to lock and fix the cross bar to prevent it from displacement during operation. The outer edge surface of the first locking screw is adapted to rotate with the inner wall of the distance adjusting frame. A wire-biting concave wheel is fixedly installed on the outer edge surface of the cross bar. The wire-biting concave wheel is used to cooperate with the wire-pressing wheel to better clamp and convey the cable. The wire-biting concave wheel is located directly below the wire-pressing wheel to bite and correct the power cable.

[0005] Preferably, the distance adjusting frame includes a vertical frame, which provides a vertical supporting structure to enhance the stability and structural strength of the equipment. The bottom surface of the vertical frame is fixed to the top of the base frame. The vertical frame is symmetrically arranged about the center line of the cross bar. A through hole is opened on the outer surface of the vertical frame. The through hole is used to realize the connection and installation of the biting roller and the limiting pushing member, and plays a role of auxiliary fixation. There are a plurality of through holes and they are evenly spaced. The outer edge surface of the first locking screw rotates in coordination with the inner wall of the through hole, and the two ends of the cross bar rotate with the inner surface of the vertical frame.

[0006] Preferably, the position limiting pushing member includes a connecting rod, which is used to connect different components. One end of the connecting rod is adapted to slide with the inner surface of the stand. A second locking screw is threadedly connected to the inner wall of the side of the connecting rod close to the stand. The second locking screw is similar to the first locking screw and plays a role in locking and fixing the connecting rod. The outer edge surface of the second locking screw is adapted to rotate with the inner wall of the through hole. The end of the connecting rod away from the stand is fixedly connected to an outer guide cavity shell, and a movable push plate is adapted to slide on the inner wall of the bottom surface of the outer guide cavity shell. The outer guide cavity shell provides a guiding space for the movable push plate to move, and the movable push plate is used to move in the outer guide cavity shell to realize the position adjustment of the wire pressing wheel. The inner side of the movable push plate is adapted to rotate with the outer surface of the wire pressing wheel. The top of the inner cavity of the outer guide cavity shell is fixedly connected with a spring member, and the spring member provides an elastic restoring force for limiting the moving position of the movable push plate. The bottom surface of the spring member is fixedly connected with a sliding plate, and the bottom surface of the sliding plate is fixed to the top of the movable push plate, and the outer edge surface of the sliding plate is adapted to slide with the inner edge surface of the outer guide cavity shell.

[0007] Preferably, a sliding groove is opened on the outer edge surface of the outer guide cavity shell, and a limiting slider is fixedly connected to the outer surface of the sliding plate. The outer edge surface of the limiting slider slides in coordination with the inner wall of the sliding groove, and the limiting slider and the sliding groove cooperate to limit the sliding plate and the movable push plate.

[0008] Preferably, the auxiliary adjusting part includes a sliding connecting plate, which is connected to and realizes the sliding movement of the outer guide cavity shell, one end of the sliding connecting plate is fixed to a side surface of the outer guide cavity shell close to the connecting rod, and the sliding connecting plate is located below the second locking screw, and the inner wall of the sliding connecting plate at one end away from the outer guide cavity shell is adapted to slide with the outer edge surface of the vertical frame, an installation groove is provided on the inner wall of the sliding connecting plate, and a roller is adaptively rotatable on the inner wall of the installation groove, and the outer edge surface of the roller is adapted to slide with the outer edge surface of the vertical frame, and the roller reduces friction, thereby facilitating the movement and adjustment of the limiting pushing part.

[0009] Preferably, the cable delivery leveler comprises a casing, the bottom surface of the casing is fixed to the top of the chassis, a cover plate is detachably installed on the top of the inner wall of the casing, the casing and the cover plate serve to protect the internal mechanical and electrical components, a wire pressing conveyor belt is adaptively rotatable on the inner wall of the casing, a servo motor is fixedly installed on the bottom surface of the casing, the servo motor is used to provide power output, the servo motor is arranged inside the chassis, and the output shaft of the servo motor extends to the inside of the casing and rotates adaptively with the inner wall of the casing, a roller is fixedly connected to the end of the output shaft of the servo motor, a plurality of auxiliary rollers with equal intervals are arranged on one side of the roller, the outer edge surface of the auxiliary roller rotates adaptively with the inner wall of the casing, the auxiliary roller is connected to the roller by a transmission belt for synchronous rotation, the roller is rotatably connected to the inner wall of the casing, the outer edge surface of the roller rotates adaptively with the inner edge surface of the wire pressing conveyor belt, and the wire pressing conveyor belt applies pressure to the cable by contacting with the cable to ensure stable transportation of the cable.

[0010] Preferably, connecting grooves are provided on the outer edge surface of the wire-pressing conveyor belt, and the connecting grooves are evenly spaced on the outer edge surface of the wire-pressing conveyor belt. A pressure block is fixedly installed on the inner wall of the connecting groove, and the pressure block increases the pressure on the cable to enhance its correction effect.

[0011] Preferably, the hot air softener includes an air guide box, which is fixedly mounted on the outer surface of the chassis. The air guide box includes an outer box, an air guide fan, an air guide duct, a dust filter, etc., but is not limited to this. The air guide box is used to guide the flow of air. A hot air outlet duct is installed at the output end of the air guide box. The hot air outlet duct is used to transport air and provide air heating space. The hot air outlet duct is installed in the top inner wall of the chassis. An electric heating element is installed in the middle of the inner cavity of the hot air outlet duct. The electric heating element is used to generate heat and heat the air. The wiring terminal of the electric heating element is electrically connected to an external heating device.

[0012] Preferably, the hot air outlet duct includes an external fixed tube, which is fixedly installed on the top inner wall of the chassis, and the output end of the air guide box extends to the inside of the external fixed tube and is fixed to the inner wall of the external fixed tube. A hot air discharge groove is provided on the top of the external fixed tube, and the hot air discharge groove is used to discharge hot air to achieve heating of the cable. A number of external fixed tubes are provided, which are evenly spaced.

[0013] Preferably, an air storage arc tube is arranged below the electric heating element, and the air storage arc tube is used for storing and gathering air to improve the utilization efficiency of air, the two ends of the air storage arc tube are fixed to the inner edge surface of the external fixed tube, and symmetrical air outlet grooves are opened on the inner arc surface of the air storage arc tube, and the air outlet grooves are the outlets of air, so that the air can act on the electric heating element and enhance the air heating effect, the output end of the air guide box extends to the interior of the air storage arc tube, and a baffle is arranged above the electric heating element, and the baffle is used for blocking the flow of air to control the air outlet effect of hot air, and a plurality of baffles are provided, and fixing rods are fixedly penetrated on the inner walls of the plurality of baffles, and the fixing rods are used for fixing and supporting the baffles to ensure the stability of the structure, and the two ends of the fixing rods are fixed to the inner wall of the external fixed tube, and the plurality of baffles are distributed at intervals, and the baffles are located below the hot air discharge groove.

[0014] The present invention provides a tunnel power cable laying construction equipment, which has the following beneficial effects:

[0015] 1. The tunnel power cable laying construction equipment uses a brace to straighten the laid power cable, and automatically adjusts the correction interval according to the bending state of the cable. It then cooperates with a hot air softener to heat the transported cable to soften the power cable and cooperates with a cable flattener to assist in flattening and correcting the power cable, thereby ensuring the straightness of the tunnel power cable during laying construction and improving the efficiency of power cable laying construction.

[0016] 2. The power cable laying construction equipment in the tunnel supports the power cable through the bite concave wheel and extrude the cable with the help of the crimping wheel. The pulling force during the laying of the power cable and the friction between the cable and the crimping wheel and the bite concave wheel are used to rotate the bite concave wheel and the crimping wheel to extrude and correct the cable. The crimping wheel is squeezed by the power cable to make the movable push plate slide in the outer guide cavity shell and compress the spring part to deform. With the rebound force of the spring part, the distance between the crimping wheel and the bite concave wheel is adjusted to adapt to the correction requirements of the power cable, so as to straighten the power cable and weaken the deformation of the cable caused by winding, thereby ensuring the subsequent cable laying effect.

[0017] 3. The tunnel power cable laying construction equipment limits the movable push plate and the wire pressing wheel by connecting the sliding connecting plate with the outer guide cavity shell to ensure that the wire pressing wheel cooperates with the wire biting concave wheel to press and correct the cable, and cooperates with the contact between the roller and the vertical frame to reduce the friction of the wire pressing wheel during adjustment to ensure the convenience of adjustment.

[0018] 4. The power cable laying construction equipment in the tunnel guides the outside air into the air storage arc tube through the air guide box to store the air, and then blows the air to the electric heating element to heat the air with the help of the air outlet slot. The hot air is blocked by the baffle and the fixed rod to increase the temporary storage time of the air in the external fixed tube to ensure the temperature increase effect. The hot air is then blown to the power cable through the hot air discharge slot to soften the power cable material. The cable is flattened by the cable flattener, and the cable is straightened by the auxiliary orthosis to facilitate the restoration of the cable shape and ensure the straightness and uniformity of the cable during the laying process.

[0019] 5. The power cable laying construction equipment in the tunnel uses the servo motor and the wire pressing conveyor belt to guide the cable, and cooperates with the pressure block to squeeze the softened material of the power cable and the orthosis to ensure the high-quality laying requirements of the power cable, thereby effectively improving the laying efficiency of the cable. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The present invention is a schematic diagram of the external structure of a tunnel power cable laying construction equipment.

[0021] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention.

[0022] Figure 3 Schematic diagram of the three-dimensional structure of the orthosis of the present invention.

[0023] Figure 4 It is a three-dimensional structural schematic diagram of the position-limiting pushing member and the auxiliary adjusting member of the present invention.

[0024] Figure 5 It is a schematic diagram of the partial cross-sectional structure of the position limiting pushing member and the auxiliary adjusting member of the present invention.

[0025] Figure 6 It is a partial structural schematic diagram of the present invention.

[0026] Figure 7 It is a schematic diagram of the three-dimensional structure of the cable feeding and leveling device of the present invention.

[0027] Figure 8 It is a schematic diagram of the exploded structure of the cable feeding leveler of the present invention.

[0028] Fig. 9 It is a schematic diagram of the three-dimensional structure of the hot air softener of the present invention.

[0029] Fig.10 It is a schematic diagram of the cross-sectional structure of the hot air outlet duct of the present invention.

[0030] Fig.11 It is a schematic diagram of the cross-sectional structure of the hot air outlet duct of the present invention.

[0031] In the figure: 1, chassis; 2, chassis; 3, orthosis; 31, distance adjustment frame; 311, stand; 312, through hole; 32, thread-biting roller; 321, cross bar; 322, thread-biting concave wheel; 323, first locking screw; 33, pressing wheel; 34, limit extrusion member; 341, second locking screw; 342, connecting rod; 343, outer guide cavity shell; 344, movable push plate; 345, slide groove; 346, spring member; 347, sliding plate; 348, limit slider; 3 5. Auxiliary adjustment part; 351. Sliding connecting plate; 352. Mounting groove; 353. Roller; 4. Cable feeding leveler; 41. Casing; 42. Cover plate; 43. Servo motor; 44. Wire pressing conveyor belt; 45. Pressing block; 46. Roller; 5. Hot air softener; 51. Air guide box; 52. Hot air outlet pipe; 521. External fixed pipe; 522. Hot air discharge groove; 53. Electric heating element; 54. Air storage arc tube; 55. Air outlet groove; 56. Baffle; 57. Fixing rod. DETAILED DESCRIPTION

[0032] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

[0033] The first embodiment, as Figures 1 to 3As shown, the present invention provides a technical solution: a tunnel power cable laying construction equipment, including a base frame 1, a chassis 2 is fixedly installed on the top of the base frame 1, orthotics 3 are installed at both ends of the top of the base frame 1, the orthotics 3 are used to press the power cable to correct and straighten the cable, a hot air softener 5 is installed on the inner wall of the chassis 2, the hot air softener 5 is used to output hot air to soften the power cable, and a symmetrically arranged cable delivery and flattening device 4 is installed on the top of the chassis 2, the cable delivery and flattening device 4 is used to guide and flatten the softened power cable, and pass through the orthotics 3 is used to correct the laid power cable, and the correction interval is adjusted according to the bending state of the cable, and then the hot air softener 5 is used to heat the transported cable to soften the power cable and cooperate with the cable leveler 4 to assist in leveling and correcting the power cable, so as to ensure the straightness of the tunnel power cable during the laying construction and improve the laying efficiency of the power cable; wherein, the orthotic device 3 includes a spacing frame 31, the bottom surface of the spacing frame 31 is connected to the top of the base frame 1, and the inner side of the spacing frame 31 is detachably installed with a bite roller 3 2. A limited pushing member 34 is arranged above the bite roller 32. The limited pushing member 34 is detachably mounted on the inner side of the spacing frame 31. A crimping wheel 33 is mounted on the inner side of the limited pushing member 34. An auxiliary adjusting member 35 is mounted on the outer side of the limited pushing member 34. The end of the auxiliary adjusting member 35 away from the crimping wheel 33 slides in accordance with the outer edge of the spacing frame 31. The crimping wheel 33 and the bite roller 32 are used to press the orthopedic power cable, and the setting of the limited pushing member 34 is used to adjust the orthopedic interval of the power cable. The bite roller 32 It includes a cross bar 321, both ends of which are adapted to rotate with the inner side of the distance adjusting frame 31, both ends of the cross bar 321 are threadedly connected with a first locking screw 323, the outer edge surface of the first locking screw 323 is adapted to rotate with the inner wall of the distance adjusting frame 31, and a wire biting concave wheel 322 is fixedly installed on the outer edge surface of the cross bar 321, and the wire biting concave wheel 322 is located directly below the wire pressing wheel 33 to bite and correct the power cable, and the correction operation of the power cable is realized by biting the cable with the wire pressing wheel 33 and the wire biting concave wheel 322.

[0034] During work, the staff passes the cable through the orthosis 3, connects it to the pulling device, uses the pulling device to pull out the cable on the winding roller, and then uses the wire pressing wheel 33 and the wire biting concave wheel 322 to correct the laid power cable, and uses the limiting pushing member 34 to self-adjust the correction interval according to the bending state of the cable, and then uses the hot air softener 5 to heat the transported cable to soften the power cable and cooperate with the cable feeding flattener 4 to assist in flattening and correcting the power cable, and then the corrected power cable is laid.

[0035] The second embodiment is based on the first embodiment. Figures 2 to 5As shown, the spacing frame 31 includes a stand 311, the bottom surface of the stand 311 is fixed to the top of the base frame 1, the stand 311 is symmetrically arranged about the center line of the cross bar 321, and a through hole 312 is opened on the outer surface of the stand 311. The through holes 312 are arranged in a plurality of equal intervals. The outer edge surface of the first locking screw 323 is adapted to rotate with the inner wall of the through hole 312, and the two ends of the cross bar 321 rotate with the inner surface of the stand 311. The power cable is supported by the bite concave wheel 322 and the cable is squeezed by the wire pressing wheel 33. The pulling force during the laying of the power cable and the cable, the wire pressing wheel 33 and the bite concave wheel 322 are used. The friction between the concave wheels 322 causes the bite concave wheel 322 and the crimping wheel 33 to rotate to squeeze and correct the cable. The first locking screw 323 is rotated to separate it from the cross bar 321, and the position of the cross bar 321 on the stand 311 can be adjusted. The first locking screw 323 is then inserted into the through hole 312 to lock the cross bar 321. The limiting extrusion member 34 includes a connecting rod 342, one end of which is adapted to slide with the inner surface of the stand 311, and the second locking screw 341 is threadedly connected to the inner wall of the side of the connecting rod 342 close to the stand 311. The outer edge surface of the second locking screw 341 The surface is adapted to rotate with the inner wall of the through hole 312, the end of the connecting rod 342 away from the stand 311 is fixedly connected to the outer guide cavity shell 343, and a movable push plate 344 is adaptively slid on the inner wall of the bottom surface of the outer guide cavity shell 343, and the inner side of the movable push plate 344 is adapted to rotate with the outer surface of the wire pressing wheel 33, and the top of the inner cavity of the outer guide cavity shell 343 is fixedly connected with a spring member 346, and the bottom surface of the spring member 346 is fixedly connected with a sliding plate 347, the bottom surface of the sliding plate 347 is fixed to the top of the movable push plate 344, and the outer edge surface of the sliding plate 347 is adapted to slide with the inner edge surface of the outer guide cavity shell 343, and the outer guide A slide groove 345 is provided on the outer edge surface of the cavity shell 343, and a limit slider 348 is fixedly connected to the outer surface of the sliding plate 347. The outer edge surface of the limit slider 348 slides in accordance with the inner wall of the slide groove 345, and the movable push plate 344 slides in the outer guide cavity shell 343 in accordance with the squeezing of the wire pressing wheel 33 by the power cable, and the spring member 346 is compressed and deformed, and the distance between the wire pressing wheel 33 and the wire biting concave wheel 322 is adjusted in accordance with the rebound force of the spring member 346 to adapt to the correction requirements of the power cable, so as to straighten the power cable and weaken the deformation of the cable caused by winding, thereby ensuring the subsequent cable laying effect;The auxiliary adjustment member 35 includes a sliding connecting plate 351, one end of which is fixed to a side surface of the outer guide cavity shell 343 close to the connecting rod 342, and the sliding connecting plate 351 is located below the second locking screw 341, and the inner wall of the sliding connecting plate 351 at one end away from the outer guide cavity shell 343 slides in a manner that matches and fits the outer edge surface of the stand 311. A mounting groove 352 is provided on the inner wall of the sliding connecting plate 351, and a roller 353 is adaptively rotated on the inner wall of the mounting groove 352, and the outer edge surface of the roller 353 slides in a manner that matches and fits the outer edge surface of the stand 311. Through the connection between the sliding connecting plate 351 and the outer guide cavity shell 343, the movable push plate 344 and the wire pressing wheel 33 are limited to ensure that the wire pressing wheel 33 cooperates with the wire biting concave wheel 322 to have a tight compression and correction effect on the cable, and cooperates with the contact between the roller 353 and the stand 311 to reduce the friction of the wire pressing wheel 33 during adjustment to ensure the convenience of adjustment. ;

[0036] The clamping wheel 33 is used to push the cable into the locking cam 344 and the locking cam 346, and the locking cam 346 is used to push the cable into the locking cam 344.

[0037] The third embodiment is based on the first and second embodiments. Figures 6 to 11As shown, the cable feeding leveler 4 includes an organic shell 41, the bottom surface of the shell 41 is fixed to the top of the chassis 2, a cover plate 42 is detachably installed on the top of the inner wall of the shell 41, a wire pressing conveyor belt 44 is adaptively rotatable on the inner wall of the shell 41, a servo motor 43 is fixedly installed on the bottom surface of the shell 41, the servo motor 43 is arranged inside the chassis 2, and the output shaft of the servo motor 43 extends to the inside of the shell 41 and rotates adaptively with the inner wall of the shell 41, a roller 46 is fixedly connected to the end of the output shaft of the servo motor 43, the roller 46 is rotatably connected to the inner wall of the shell 41, the outer edge surface of the roller 46 is adaptively rotated with the inner edge surface of the wire pressing conveyor belt 44, a plurality of equally spaced auxiliary rollers are arranged on one side of the roller 46, the outer edge surface of the auxiliary roller is adaptively rotated with the inner wall of the shell 41, the auxiliary roller is connected to the roller 46 through a transmission belt to rotate synchronously, and the outer edge surface of the wire pressing conveyor belt 44 A connecting groove is provided, and the connecting grooves are evenly spaced and distributed on the outer edge surface of the crimping conveyor belt 44. A pressing block 45 is fixedly installed on the inner wall of the connecting groove. The output shaft of the servo motor 43 drives the roller 46 to rotate, and cooperates with the roller 46 and the crimping conveyor belt 44 to guide the cable for transportation, and uses the pressing block 45 to extrude the power cable, and cooperates with the orthosis 3 to ensure the high-quality laying requirements of the power cable; the hot air softener 5 includes an air guide box 51, which is fixedly installed on the outer surface of the chassis 2. The air guide box 51 includes an outer box, an air guide fan, an air guide pipe, a dust filter, etc., but is not limited to this. A hot air outlet pipe 52 is installed at the output end of the air guide box 51, and the hot air outlet pipe 52 is installed in the top inner wall of the chassis 2. An electric heating element 53 is installed in the middle of the inner cavity of the hot air outlet pipe 52. The air is guided into the hot air outlet pipe 52 through the air guide box 51, and the air is heated by the electric heating element 53;The hot air outlet duct 52 includes an external fixed tube 521, which is fixedly installed on the top inner wall of the chassis 2. The output end of the air guide box 51 extends to the inside of the external fixed tube 521 and is fixed to the inner wall of the external fixed tube 521. A hot air discharge slot 522 is provided on the top of the external fixed tube 521. The external fixed tube 521 is provided with a plurality of equally spaced distributions. An air storage arc tube 54 is provided below the electric heating element 53. Both ends of the air storage arc tube 54 are fixed to the inner edge surface of the external fixed tube 521. A symmetrically arranged air outlet slot 55 is provided on the inner arc surface of the air storage arc tube 54. The outside air is guided into the air storage arc tube 54 through the air guide box 51 to be accumulated, and then the air is blown to the electric heating element 53 to heat the air with the air outlet slot 55. The output end of the air guide box 51 extends to the inside of the air storage arc tube 54. A baffle 56 is provided above the electric heating element 53. The baffle 56 is provided with a plurality of baffles. A fixed rod 57 is fixedly provided on the inner wall of the flow plate 56. The baffle plate 56 and the fixed rod 57 cooperate to block the hot air, so as to increase the temporary storage time of the air in the external fixed tube 521 and ensure the temperature raising effect. The two ends of the fixed rod 57 are fixed to the inner wall of the external fixed tube 521. A plurality of baffle plates 56 are arranged at intervals. The baffle plates 56 are located below the hot air discharge slot 522. The hot air discharge slot 522 is then used to blow the hot air to the power cable to soften the power cable material. The cable is flattened in cooperation with the cable delivery flattener 4, and the orthosis 3 is assisted to realize the straightening of the cable, which is convenient for the recovery of the cable shape and ensures the straightness and uniformity of the cable during the laying process. The servo motor 43 and the wire pressing conveyor belt 44 cooperate to guide the cable, and the power cable after the material is squeezed by the pressing block 45, and cooperates with the orthosis 3 to ensure the high-quality laying requirements of the power cable, thereby effectively improving the laying efficiency of the cable. ;

[0038] During operation, the outside air is guided into the air storage arc tube 54 through the air guide box 51 to store the air, and the air is blown to the electric heating element 53 to heat the air in cooperation with the air outlet slot 55. The hot air is blocked by the baffle 56 and the fixing rod 57 to increase the temporary storage time of the air in the external fixed tube 521. The hot air is blown to the power cable by the hot air discharge slot 522 to soften the power cable material. The output shaft of the servo motor 43 drives the roller 46 to rotate, and the roller 46 and the wire pressing conveyor belt 44 are cooperated to guide the cable. The power cable after the material is squeezed and softened is cooperated with the pressing block 45, and the cable is fully corrected in cooperation with the orthosis 3.

[0039] The following is a detailed description of the working principle of the tunnel power cable laying construction equipment.

[0040] When in use, the staff passes the cable through the orthosis 3, connects it to the pulling device, uses the pulling device to pull out the cable on the winding roller, and then uses the pressing wheel 33 and the bite concave wheel 322 to correct the laid power cable, and uses the bite concave wheel 322 to support the power cable and cooperate with the pressing wheel 33 to squeeze the cable, and uses the pulling force when the power cable is laid and the friction between the cable and the pressing wheel 33 and the bite concave wheel 322 to make the bite concave wheel 322 and the pressing wheel 33 rotate to squeeze and correct the cable, and cooperate with the power cable to squeeze the pressing wheel 33 to make the movable push plate 344 slide in the outer guide cavity shell 343, compressing the spring member 346 to deform, and cooperate with the rebound force of the spring member 346 to adjust the distance between the pressing wheel 33 and the bite concave wheel 322 to adapt To meet the needs of power cable correction, the power cable is straightened out to weaken the deformation of the cable caused by winding, and then the outside air is guided into the air storage arc tube 54 through the air guide box 51 to store the air, and the air outlet slot 55 is used to blow the air to the electric heating element 53 to heat the air, and the baffle 56 and the fixing rod 57 are used to block the hot air to increase the temporary storage time of the air in the external fixed tube 521, and then the hot air is blown to the power cable by the hot air discharge slot 522 to soften the power cable material, and the output shaft of the servo motor 43 drives the roller 46 to rotate, and the roller 46 and the wire pressing conveyor belt 44 are used to guide the cable, and the power cable after the softened material is squeezed by the pressing block 45 is used to flatten and correct the power cable, and then the corrected power cable can be laid.

[0041] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.

Claims

1. A tunnel power cable laying construction equipment, It is characterized in that The invention comprises a base frame (1), a chassis (2) is fixedly mounted on the top of the base frame (1), orthotics (3) are mounted on both ends of the top of the base frame (1), the orthotics (3) are used to compress the power cable to straighten the cable, a hot air softener (5) is mounted on the inner wall of the chassis (2), the hot air softener (5) is used to output hot air to soften the power cable, a symmetrically arranged cable feeder and leveler (4) is mounted on the top of the chassis (2), the cable feeder and leveler (4) is used to guide and level the softened power cable; wherein the orthotics (3) comprises a spacing frame (31), the bottom surface of the spacing frame (31) is connected to the top of the base frame (1), a bite roller (32) is detachably mounted on the inner side of the spacing frame (31), and the A limit push piece (34) is arranged above the thread-biting roller (32), the limit push piece (34) is detachably mounted on the inner side of the distance-adjusting frame (31), a line pressing wheel (33) is mounted on the inner side of the limit push piece (34), an auxiliary adjustment piece (35) is mounted on the outer side surface of the limit push piece (34), and the end of the auxiliary adjustment piece (35) away from the line pressing wheel (33) is adapted to slide with the outer edge surface of the distance-adjusting frame (31); the thread-biting roller (32) comprises a cross bar (321), the two ends of the cross bar (321) are adapted to rotate with the inner side of the distance-adjusting frame (31), the two ends of the cross bar (321) are threadedly connected with a first locking screw (323), the outer edge surface of the first locking screw (323) is adapted to slide with the outer edge surface of the distance-adjusting frame (31), and the thread-biting roller (32) comprises a cross bar (321), the two ends of the cross bar (321) are adapted to rotate with the inner side of the distance-adjusting frame (31), the two ends of the cross bar (321) are threadedly connected with a first locking screw (323), and the outer edge surface of the first locking screw (323) is adapted to slide with the outer edge surface of the distance-adjusting frame (31). 1) is adapted to rotate with the inner wall of the cross bar (321), a thread-biting concave wheel (322) is fixedly mounted on the outer edge surface of the cross bar (321), the thread-biting concave wheel (322) is located directly below the wire-pressing wheel (33) so as to bite and correct the power cable, the spacing frame (31) comprises a stand (311), the bottom surface of the stand (311) is fixed to the top of the base frame (1), the stand (311) is symmetrically arranged about the center line of the cross bar (321), a through hole (312) is opened on the outer surface of the stand (311), a plurality of through holes (312) are arranged and are evenly spaced, the outer edge surface of the first locking screw (323) is adapted to rotate with the inner wall of the through hole (312), the two ends of the cross bar (321) are connected to the stand ( The limiting pushing member (34) includes a connecting rod (342), one end of which is adapted to slide with the inner surface of the stand (311), a second locking screw (341) is threadedly connected to the inner wall of the side surface of the connecting rod (342) close to the stand (311), the outer edge surface of the second locking screw (341) is adapted to rotate with the inner wall of the through hole (312), the end of the connecting rod (342) away from the stand (311) is fixedly connected to an outer guide cavity shell (343), a movable push plate (344) is adapted to slide on the inner wall of the bottom surface of the outer guide cavity shell (343), the inner side of the movable push plate (344) is adapted to rotate with the outer surface of the wire pressing wheel (33),The top of the inner cavity of the outer guide cavity shell (343) is fixedly connected with a spring member (346), the bottom surface of the spring member (346) is fixedly connected with a sliding plate (347), the bottom surface of the sliding plate (347) is fixed to the top of the movable push plate (344), and the outer edge surface of the sliding plate (347) is adapted to slide with the inner edge surface of the outer guide cavity shell (343), a sliding groove (345) is provided on the outer edge surface of the outer guide cavity shell (343), a limiting slider (348) is fixedly connected to the outer surface of the sliding plate (347), the outer edge surface of the limiting slider (348) is adapted to slide with the inner wall of the sliding groove (345), and the auxiliary adjustment The component (35) includes a sliding connecting plate (351), one end of which is fixed to a side surface of the outer guide cavity shell (343) close to the connecting rod (342), and the sliding connecting plate (351) is located below the second locking screw (341). The inner wall of the sliding connecting plate (351) away from the outer guide cavity shell (343) is adapted to slide with the outer edge surface of the stand (311). A mounting groove (352) is provided on the inner wall of the sliding connecting plate (351), and a roller (353) is adapted to rotate on the inner wall of the mounting groove (352), and the outer edge surface of the roller (353) is adapted to slide with the outer edge surface of the stand (311).

2. A tunnel power cable laying construction equipment according to claim 1, Features: The cable feeder and leveler (4) comprises a casing (41), the bottom surface of the casing (41) being fixed to the top of the case (2), a cover plate (42) being detachably mounted on the top of the inner wall of the casing (41), a wire pressing conveyor belt (44) being rotatably adapted on the inner wall of the casing (41), a servo motor (43) being fixedly mounted on the bottom surface of the casing (41), the servo motor (43) being arranged inside the case (2), and an output shaft of the servo motor (43) extending into the casing (41) and being rotatably adapted with the inner wall of the casing (41), a roller (46) being fixedly connected to the end of the output shaft of the servo motor (43), the roller (46) being rotatably connected to the inner wall of the casing (41), and an outer edge surface of the roller (46) being rotatably adapted with an inner edge surface of the wire pressing conveyor belt (44).

3. A tunnel power cable laying construction equipment according to claim 2, Features: The outer edge surface of the wire pressing conveyor belt (44) is provided with connection grooves, the connection grooves are distributed at equal intervals on the outer edge surface of the wire pressing conveyor belt (44), and a pressing block (45) is fixedly mounted on the inner wall of the connection groove.

4. The tunnel power cable laying construction equipment according to claim 1, Features: The hot air softener (5) comprises an air guide box (51), the air guide box (51) being fixedly mounted on the outer surface of the chassis (2), a hot air outlet pipe (52) being mounted at the output end of the air guide box (51), the hot air outlet pipe (52) being mounted in the top inner wall of the chassis (2), and an electric heating element (53) being mounted in the middle of the inner cavity of the hot air outlet pipe (52).

5. A tunnel power cable laying construction equipment according to claim 4, Features: The hot air outlet pipe (52) comprises an external fixed pipe (521), the external fixed pipe (521) being fixedly mounted on the top inner wall of the chassis (2), the output end of the air guide box (51) extending into the interior of the external fixed pipe (521) and being fixed to the inner wall of the external fixed pipe (521), the top of the external fixed pipe (521) being provided with a hot air discharge groove (522), and a plurality of the external fixed pipes (521) being arranged and distributed at equal intervals.

6. A tunnel power cable laying construction equipment according to claim 5, Features: An air storage arc tube (54) is arranged below the electric heating element (53), and the two ends of the air storage arc tube (54) are fixed to the inner edge surface of the external fixed tube (521). The inner arc surface of the air storage arc tube (54) is provided with symmetrically arranged air outlet grooves (55). The output end of the air guide box (51) extends to the interior of the air storage arc tube (54). A baffle plate (56) is arranged above the electric heating element (53). A plurality of baffle plates (56) are provided. A fixing rod (57) is fixedly penetrated on the inner wall of the plurality of baffle plates (56), and the two ends of the fixing rod (57) are fixed to the inner wall of the external fixed tube (521). The plurality of baffle plates (56) are distributed at intervals, and the baffle plates (56) are located below the hot air discharge groove (522).