A Fault Analysis Method for Three-Phase Intelligent Electric Energy Meter
By obtaining the electricity consumption and the number of people in the room, a household electricity usage habit model is formed, and the data is analyzed to determine the accuracy of the energy meter data and calibrate the energy meter. This solves the problem of being unable to identify leakage and update electricity usage habits in the existing technology, and achieves timely identification. And deal with leakage problems to ensure users’ electricity safety.
Patent Information
- Application Number
- CN202411037840.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-31
AI Technical Summary
The existing three-phase smart energy meter fault analysis method cannot update the user's household electricity consumption habits in a timely manner, cannot accurately judge the accuracy of the energy meter data, and cannot identify leakage conditions, resulting in the user being unable to promptly know the household electricity consumption situation and equipment safety. There are practical limitations.
By obtaining electricity consumption and the number of people in the room, a model of household electricity consumption habits is formed, and the data is analyzed to determine the accuracy of electricity consumption, determine the cause of abnormalities, calibrate the energy meter, cut off abnormal equipment or circuit control switches, and prompt users to replace or repair them.
It realizes real-time monitoring of household electricity consumption, timely identification and treatment of leakage problems, avoids fire risks, and reduces user property losses.
Smart Images

Figure CN118566827B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of smart meter calibration, and in particular to a fault analysis method for a three-phase smart energy meter. Background Art
[0002] The fault analysis method of three-phase smart energy meter is a necessary work to ensure the accuracy of energy measurement. Meter calibration usually includes testing, adjusting and verifying the accuracy of energy meter readings, including laboratory calibration, fee test calibration, system calibration, digital calibration and analog calibration. Regular calibration can ensure that the energy meter accurately measures the user's electricity consumption, which is of great significance to ensuring the safe and stable operation of the power grid and the rights and interests of users.
[0003] In a laboratory environment, the energy meter is calibrated using high-precision standard equipment and related calibration devices. By changing the output voltage and current, the reading of the energy meter is observed and compared with the standard value. The internal components of the energy meter are adjusted to match the reading of the energy meter with the reading of the standard test equipment. In an actual power consumption environment, the accuracy of the energy meter is verified by the actual power load. This is usually done by the staff of the power supply company. They will carry portable calibration equipment to the site for calibration, use the power load on site, change the voltage and current, and observe the count of the energy meter and compare it with the actual consumed energy. The power grid monitoring system performs remote meter calibration. The built-in communication module and software system of the smart energy meter can remotely receive calibration instructions and perform calibration. For some new digital energy meters, calibration can be performed through software programming, such as adjusting the pulse coefficient and frequency coefficient in the meter. This method usually requires professional technicians to perform calibration in strict accordance with the operating manual provided by the manufacturer. The energy meter is calibrated using an analog signal source. This method is suitable for three-phase energy meters, especially when there is no suitable load on site or the actual load test cannot be performed. The metering accuracy of the energy meter can be verified and adjusted through the analog input signal.
[0004] The existing fault analysis method of three-phase smart electricity meters cannot determine and timely update the user's household electricity usage habits, cannot judge whether the data collected by the electricity meter is accurate based on the user's household electricity usage habits and current electricity consumption, and cannot judge whether there is leakage in the equipment or circuit based on the power consumption of the equipment in each phase circuit, so as to calibrate the data collected by the electricity meter. As a result, the user cannot know the household electricity usage and the safety of indoor equipment in a timely manner, and cannot promptly inspect, repair or replace equipment or circuits with leakage. Its practicality has certain limitations. Summary of the invention
[0005] The present invention provides a fault analysis method for a three-phase intelligent electric energy meter, which is used to promote the solution of the problems mentioned in the background technology.
[0006] The present invention provides the following technical solution: a fault analysis method for a three-phase smart electric energy meter, comprising:
[0007] Get target information;
[0008] The target information includes power consumption and number of people indoors;
[0009] According to the number of people in the room, a household electricity usage habit model is formed to determine the user's household electricity usage habits, thereby judging whether the electricity usage collected by the target energy meter is accurate;
[0010] According to the target information and household electricity consumption habit model, through information analysis strategy, analysis data is formed to determine whether the electricity consumption collected by the target electricity meter is accurate, so as to determine the cause of abnormal electricity consumption;
[0011] Based on the analysis data, the abnormality determination strategy is used to form determination data to determine the cause of abnormal power consumption, thereby calibrating the target power meter;
[0012] According to the judgment data, the target electric energy meter is calibrated through the correction strategy.
[0013] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the forming of the household electricity consumption habit model is specifically as follows:
[0014] Get the initial time point;
[0015] Set the collection duration;
[0016] Calculate the collection time point, collection time point = initial time point - collection duration;
[0017] The collection time point is taken as the starting time point, and the initial time point is taken as the ending time point to form an electricity consumption collection cycle;
[0018] Set the first sub-cycle duration;
[0019] According to the duration of the first sub-cycle, the electricity consumption collection cycle is divided into a first number of first sub-collection cycles, where the first number = collection duration / first sub-cycle duration;
[0020] Set the duration of the second sub-cycle;
[0021] According to the second sub-cycle duration, each first sub-acquisition cycle is divided into a second number of second sub-acquisition cycles, where the second number = first sub-cycle duration / second sub-cycle duration;
[0022] Obtaining the number of people indoors in each second sub-collection cycle within the electricity consumption collection cycle;
[0023] The time periods when the number of people indoors is ≥1 and the time periods when the number of people indoors is <1 are defined as active time periods and unoccupied time periods respectively;
[0024] According to the date corresponding to the second sub-collection period, the activity time periods of all the second sub-collection periods corresponding to the same date are extracted, and the overlapping activity time periods are defined as the habitual activity time periods;
[0025] According to the date corresponding to the second sub-collection period, the customary activity time period corresponding to each date is extracted to form an activity set;
[0026] According to the date corresponding to the second sub-collection period, extract the unmanned time periods of all the second sub-collection periods corresponding to the same date, and define the overlapping unmanned time periods as the customary unmanned time periods;
[0027] According to the date corresponding to the second sub-collection period, the customary unmanned time period corresponding to each date is extracted to form an unmanned set;
[0028] Calculate the change period, change period = second sub-period duration - usual activity period - usual unattended period;
[0029] According to the date corresponding to the second sub-collection period, the change period corresponding to each date is extracted to form a change set.
[0030] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the information analysis strategy is specifically:
[0031] S1. Get the current time point;
[0032] Get the power consumption at the current time point and set it as the current power consumption;
[0033] S2, extracting the date of the second sub-collection period corresponding to the current time point and setting it as the target date;
[0034] Respectively extract the customary activity time period, customary no-person time period and change time period corresponding to the target date in the activity set, no-person set and change set;
[0035] S3. If the current time point is in the usual activity period, then execute the activity power consumption determination strategy;
[0036] Extract the activity power consumption corresponding to the current time point and identify it as the target power consumption;
[0037] If the current power consumption is ≥ the target power consumption × (1 + 60%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed;
[0038] If the current power consumption is less than the target power consumption × (1 + 60%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated;
[0039] S4. If the current time point is in the usual unmanned period, the unmanned power consumption determination strategy is executed;
[0040] Extract the unattended power consumption corresponding to the current time point and identify it as the target power consumption;
[0041] If the current power consumption is ≥ the target power consumption × (1 + 30%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed;
[0042] If the current power consumption is less than the target power consumption × (1 + 30%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated;
[0043] S5. If the current time point is in a changing period, then execute the changing power consumption determination strategy;
[0044] Extract the changed power consumption corresponding to the current time point and identify it as the target power consumption;
[0045] If the current power consumption is ≥ the target power consumption × (1 + 50%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed;
[0046] If the current power consumption is less than the target power consumption × (1 + 50%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated.
[0047] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the active power consumption determination strategy is specifically:
[0048] Get the habitual activity period corresponding to the current time point and set it as the current activity period;
[0049] Get the start time of the current activity period and set it as the activity start time;
[0050] The activity start time is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period;
[0051] Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods;
[0052] Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption;
[0053] If all the determined power consumptions within the power collection cycle are consistent, the determined power consumption will be identified as the active power consumption;
[0054] If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as the active power consumption, where the average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
[0055] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the unmanned power consumption determination strategy is specifically as follows:
[0056] Get the usual unmanned time period corresponding to the current time point, and set it as the current unmanned time period;
[0057] Get the start time of the current unmanned period and set it as the unmanned start time;
[0058] The time point when no one starts is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period;
[0059] Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods;
[0060] Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption;
[0061] If all the determined power consumptions within the power collection period are consistent, the determined power consumption will be considered as unattended power consumption;
[0062] If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as unattended power consumption. The average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
[0063] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the change power consumption determination strategy is specifically:
[0064] Get the change period corresponding to the current time point, and define it as the current change period;
[0065] Get the start time of the current change period and set it as the change start time;
[0066] The starting time point of the change is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period;
[0067] Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods;
[0068] Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption;
[0069] If all the determined power consumptions within the power collection cycle are consistent, the determined power consumptions are identified as variable power consumptions;
[0070] If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as the variable power consumption. The average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
[0071] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the abnormality determination strategy is specifically as follows:
[0072] Obtaining target power consumption of each phase circuit in the three-phase circuit respectively, and setting them as a first target power consumption, a second target power consumption, and a third target power consumption respectively;
[0073] The current power consumption of each phase circuit in the three-phase circuit is obtained respectively, and is defined as a first current power consumption, a second current power consumption, and a third current power consumption;
[0074] If the first current power ≥ the first target power × (1 + 30%), it is determined that the circuit corresponding to the first current power is abnormal, and the circuit is identified as an abnormal circuit;
[0075] If the second current power ≥ the second target power × (1 + 30%), it is determined that the circuit corresponding to the second current power is abnormal, and the circuit is identified as an abnormal circuit;
[0076] If the third current power ≥ the third target power × (1 + 30%), it is determined that the circuit corresponding to the third current power is abnormal, and the circuit is identified as an abnormal circuit;
[0077] executing an abnormal circuit determination strategy for the abnormal circuit;
[0078] If the first current power level is less than the first target power level × (1 + 30%), the second current power level is less than the second target power level × (1 + 30%), and the third current power level is less than the third target power level × (1 + 30%), then it is determined that the target power meter is abnormal.
[0079] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the abnormal circuit determination strategy is specifically as follows:
[0080] Obtain all electrical equipment under abnormal circuits to form a judgment device;
[0081] The power of each determination device is obtained respectively and determined as the device power;
[0082] The initial time point of the day corresponding to the current time point is taken as the starting time point, and the current time point is taken as the ending time point to form a determination period;
[0083] The usage time of each determination device in the determination period is obtained respectively, and is determined as the current usage time;
[0084] Calculate the current power consumption of each determined device respectively, current power consumption of the device = device power × current usage time;
[0085] The usage time of each determination device in the determination period in each target sub-collection cycle is respectively obtained, and is determined as the determination usage time;
[0086] If all determined usage durations within the electricity consumption collection cycle are consistent, the determined usage duration is identified as the target usage duration;
[0087] If the determined usage time in the electricity collection cycle is inconsistent, the average usage time is calculated and the average usage time is determined as the target usage time, and the average usage time = the sum of all determined usage time in the electricity collection cycle / the first number;
[0088] Calculate the target device power consumption of each determination device respectively, target device power consumption = device power × target usage time;
[0089] The device whose current device power consumption ≥ target device power consumption × (1 + 30%) is identified as an abnormal device;
[0090] If there is an abnormal device in the abnormal circuit, it is determined that the abnormal device is faulty;
[0091] If there is no abnormal device in the abnormal circuit, it is determined that the abnormal circuit has a fault.
[0092] As an optional solution of the fault analysis method of the three-phase smart energy meter of the present invention, the correction strategy is specifically:
[0093] If the target electric energy meter is abnormal, the target electric energy consumption corresponding to the current time point is obtained;
[0094] Calculate the power difference, power difference = target power consumption - current power consumption;
[0095] The current time point is taken as the starting time point until the target electric energy meter is replaced, forming a correction period;
[0096] The power consumption collected by the target power meter during the calibration period is adjusted to the power consumption minus the power difference;
[0097] Prompt the user to replace the target electric energy meter;
[0098] If the abnormal device has a fault, cut off the control switch corresponding to the abnormal device;
[0099] Prompt users to check and replace abnormal equipment;
[0100] If there is a fault in the abnormal circuit, the control switch corresponding to the abnormal circuit is cut off;
[0101] Prompt the user to check and repair abnormal circuits.
[0102] The present invention has the following beneficial effects:
[0103] 1. The fault analysis method of the three-phase smart energy meter obtains the number of people indoors every day during the electricity collection cycle in real time, determines the time periods when there are people at home and when there are no people at home, and thus determines the user's electricity usage habits. According to the current electricity consumption of the day collected at the current time point, the current electricity consumption is compared with the target electricity consumption determined during the electricity collection cycle. Different judgment conditions are formed according to different time periods. If the current electricity consumption exceeds the judgment conditions, it means that the current electricity consumption is abnormal, and the cause of the abnormal electricity consumption needs to be further determined, so that users can know the household electricity consumption and the safety of various indoor equipment in a timely manner, so as to timely check, repair and replace the equipment or circuit with leakage, avoid serious situations such as fire caused by leakage, and reduce user property losses.
[0104] 2. The fault analysis method of the three-phase smart energy meter obtains the current power consumption of each phase circuit in the three-phase circuit respectively, and obtains the target power consumption of each phase circuit within the power consumption collection cycle respectively, and compares the current power consumption of each phase circuit with the target power consumption one by one. If the current power consumption exceeds the judgment condition, it means that the current power consumption is abnormal, and it is necessary to further determine the cause of the abnormal power consumption. If the current power consumption does not exceed the judgment condition, it means that the energy meter has inaccurate data collection due to aging, then the data of the target energy meter is calibrated in time, and the user is notified in time to check and repair the abnormal circuit or energy meter, so that the user can know the household power consumption and the safety of indoor equipment in time, so as to check, repair and replace the equipment or circuit with leakage in time, avoid serious situations such as fire caused by leakage, and reduce the property loss of users.
[0105] 3. The fault analysis method of the three-phase smart energy meter obtains the current power consumption of the equipment in each phase of the three-phase circuit respectively, and obtains the target power consumption of the equipment in each phase during the power collection period respectively, and compares the current power consumption of each device with the target power consumption one by one. If the current power consumption exceeds the judgment condition, it means that the current power consumption is abnormal. If the current power consumption does not exceed the judgment condition, it means that there is no leakage in the equipment, that is, there is leakage in the phase circuit. The data of the target energy meter is calibrated in time, and the user is notified in time to check and repair the abnormal equipment or abnormal circuit, so that the user can know the household power consumption and the safety of indoor equipment in time, so as to check, repair and replace the equipment or circuit with leakage in time, avoid serious situations such as fire caused by leakage, and reduce the property loss of users. BRIEF DESCRIPTION OF THE DRAWINGS
[0106] Figure 1 The present invention is a flowchart of a fault analysis method for a three-phase smart electric energy meter. DETAILED DESCRIPTION
[0107] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0108] Embodiment 1, a fault analysis method for a three-phase smart energy meter, referring to Figure 1 ,include:
[0109] Get target information;
[0110] The target information includes power consumption and number of people indoors;
[0111] According to the number of people in the room, a household electricity usage habit model is formed to determine the user's household electricity usage habits, thereby judging whether the electricity usage collected by the target energy meter is accurate;
[0112] According to the target information and household electricity consumption habit model, through information analysis strategy, analysis data is formed to determine whether the electricity consumption collected by the target electricity meter is accurate, so as to determine the cause of abnormal electricity consumption;
[0113] Based on the analysis data, the abnormality determination strategy is used to form determination data to determine the cause of abnormal power consumption, thereby calibrating the target power meter;
[0114] According to the judgment data, the target electric energy meter is calibrated through the correction strategy.
[0115] Through the above method, the user's household electricity usage habits are determined and updated in time. According to the user's household electricity usage habits and current electricity consumption, it is judged whether the data collected by the electric energy meter is accurate. According to the power consumption of the equipment in each phase circuit, it is judged whether there is leakage in the equipment or circuit, so as to calibrate the data collected by the electric energy meter, so that the user can know the household electricity usage and the safety of various indoor equipment in time, so as to timely check, repair and replace the equipment or circuit with leakage, avoid serious situations such as fire caused by leakage, and reduce the property loss of the user.
[0116] Embodiment 2: This embodiment is an improvement made on the basis of embodiment 1. The fault analysis method of the three-phase smart energy meter, the formation of the household electricity usage habit model, is specifically:
[0117] Get the initial time point, which is 0 o'clock on the day corresponding to the current time point;
[0118] Set the collection time, which is fourteen days, that is;
[0119] Calculate the collection time point, collection time point = initial time point - collection duration;
[0120] The collection time point is taken as the starting time point, and the initial time point is taken as the ending time point to form an electricity consumption collection cycle;
[0121] Setting the duration of the first sub-cycle, wherein the duration of the first sub-cycle is seven days;
[0122] According to the first sub-cycle duration, the electricity consumption collection cycle is divided into a first number of first sub-collection cycles, where the first number = collection duration ÷ first sub-cycle duration, that is, the electricity consumption collection cycle has two first sub-collection cycles in total;
[0123] Set the duration of the second sub-cycle, which is one day;
[0124] According to the second sub-cycle duration, each first sub-collection cycle is divided into a second number of second sub-collection cycles, where the second number = first sub-cycle duration ÷ second sub-cycle duration, i.e., each first sub-collection cycle has seven second sub-collection cycles, i.e., the power consumption collection cycle has a total of fourteen second sub-collection cycles;
[0125] Obtaining the number of people indoors in each second sub-collection cycle within the electricity consumption collection cycle;
[0126] The time periods when the number of people indoors is ≥1 and the time periods when the number of people indoors is <1 are defined as active time periods and unoccupied time periods respectively;
[0127] According to the date corresponding to the second sub-collection cycle, the activity time periods of all the second sub-collection cycles corresponding to the same date are extracted, and the overlapping activity time periods are defined as the habitual activity time periods. For example, the activity time periods of two Mondays are 0:00-8:00 and 18:00-23:59 and 0:00-7:40 and 18:20-23:59 respectively, and the activity time periods of two Saturdays are 0:00-11:30 and 20:00-23:59 and 0:00--23:59 respectively. Then the habitual activity time periods of Monday are 0:00-7:40 and 18:20-23:59, and the habitual activity time periods of Saturday are 0:00-11:30 and 20:00-23:59;
[0128] According to the date corresponding to the second sub-collection period, the habitual activity time period corresponding to each date is extracted to form an activity set, and the activity set is the habitual activity time period of each day from Monday to Sunday;
[0129] According to the date corresponding to the second sub-collection cycle, extract the unmanned time periods of all the second sub-collection cycles corresponding to the same date, and define the overlapping unmanned time periods as the habitual unmanned time periods. For example, if the activity time periods on two Mondays are 8:00-18:00 and 7:40-18:20 respectively, and the activity time periods on two Saturdays are 11:30-20:00 and no data respectively, then the habitual unmanned time period on Monday is 8:00-18:00, and the habitual unmanned time period on Saturday is no data;
[0130] According to the date corresponding to the second sub-collection period, the customary unmanned time period corresponding to each date is extracted to form an unmanned set, where the unmanned set is the customary unmanned time period of each day from Monday to Sunday;
[0131] Calculate the change period, change period = second sub-period duration - customary activity period - customary unattended period. For example, the customary unattended period on Monday is 8:00-18:00, and the customary activity period is 0:00-7:40 and 18:20-23:59, then the change period on Monday is 7:40-8:00 and 18:00-18:20;
[0132] According to the date corresponding to the second sub-collection cycle, the change period corresponding to each date is extracted to form a change set, and the change set is the change period of each day from Monday to Sunday.
[0133] Embodiment 3: This embodiment is an improvement made on the basis of Embodiment 2. In this embodiment, the information analysis strategy is specifically as follows:
[0134] S1. Get the current time point;
[0135] Get the power consumption at the current time point and set it as the current power consumption;
[0136] S2, extracting the date of the second sub-collection period corresponding to the current time point and setting it as the target date;
[0137] Respectively extract the customary activity time period, customary no-person time period and change time period corresponding to the target date in the activity set, no-person set and change set;
[0138] S3. If the current time point is in the habitual activity period, the activity power consumption determination strategy is executed, that is, at this time, there is someone at home, and the power consumption may change with the change of the number of electrical devices used by the user;
[0139] Extract the activity power consumption corresponding to the current time point and identify it as the target power consumption;
[0140] If the current power consumption is ≥ the target power consumption × (1 + 60%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed;
[0141] If the current power consumption is less than the target power consumption × (1 + 60%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated;
[0142] S4. If the current time point is in the usual unmanned period, the unmanned power consumption determination strategy is executed, that is, when no one is at home at this time, the power consumption is basically maintained within a constant range;
[0143] Extract the unattended power consumption corresponding to the current time point and identify it as the target power consumption;
[0144] If the current power consumption is ≥ the target power consumption × (1 + 30%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed;
[0145] If the current power consumption is less than the target power consumption × (1 + 30%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated;
[0146] S5. If the current time point is in a changing period, the changing power consumption determination strategy is executed, that is, at this time, it is uncertain whether there is anyone at home, and the power consumption may change with the change in the number of power-consuming devices used by the user;
[0147] Extract the changed power consumption corresponding to the current time point and identify it as the target power consumption;
[0148] If the current power consumption is ≥ the target power consumption × (1 + 50%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed;
[0149] If the current power consumption is less than the target power consumption × (1 + 50%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated.
[0150] The activity power consumption determination strategy is specifically as follows:
[0151] Get the habitual activity period corresponding to the current time point and set it as the current activity period;
[0152] Get the start time of the current activity period and set it as the activity start time;
[0153] The activity start time is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period;
[0154] Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods;
[0155] Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption;
[0156] If all the determined power consumptions within the power collection cycle are consistent, the determined power consumption will be identified as the active power consumption;
[0157] If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as the active power consumption, where the average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
[0158] The strategy for determining whether no one is using electricity is as follows:
[0159] Get the usual unmanned time period corresponding to the current time point, and set it as the current unmanned time period;
[0160] Get the start time of the current unmanned period and set it as the unmanned start time;
[0161] The time point when no one starts is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period;
[0162] Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods;
[0163] Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption;
[0164] If all the determined power consumptions within the power collection period are consistent, the determined power consumption will be considered as unattended power consumption;
[0165] If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as unattended power consumption. The average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
[0166] The change power consumption determination strategy is specifically as follows:
[0167] Get the change period corresponding to the current time point, and define it as the current change period;
[0168] Get the start time of the current change period and set it as the change start time;
[0169] The starting time point of the change is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period;
[0170] Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods;
[0171] Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption;
[0172] If all the determined power consumptions within the power collection cycle are consistent, the determined power consumptions are identified as variable power consumptions;
[0173] If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as the variable power consumption. The average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
[0174] Embodiment 4: This embodiment is an improvement made on the basis of Embodiment 3. In this embodiment, the abnormality determination strategy is specifically as follows:
[0175] Obtaining target power consumption of each phase circuit in the three-phase circuit respectively, and setting them as a first target power consumption, a second target power consumption, and a third target power consumption respectively;
[0176] The current power consumption of each phase circuit in the three-phase circuit is obtained respectively, and is defined as a first current power consumption, a second current power consumption, and a third current power consumption;
[0177] If the first current power ≥ the first target power × (1 + 30%), it is determined that the circuit corresponding to the first current power is abnormal, and the circuit is identified as an abnormal circuit;
[0178] If the second current power ≥ the second target power × (1 + 30%), it is determined that the circuit corresponding to the second current power is abnormal, and the circuit is identified as an abnormal circuit;
[0179] If the third current power ≥ the third target power × (1 + 30%), it is determined that the circuit corresponding to the third current power is abnormal, and the circuit is identified as an abnormal circuit;
[0180] executing an abnormal circuit determination strategy for the abnormal circuit;
[0181] If the first current power level is less than the first target power level × (1 + 30%), the second current power level is less than the second target power level × (1 + 30%), and the third current power level is less than the third target power level × (1 + 30%), then it is determined that the target power meter is abnormal.
[0182] The abnormal circuit determination strategy is specifically as follows:
[0183] Obtain all electrical equipment under abnormal circuits to form a judgment device;
[0184] The power of each determination device is obtained respectively and determined as the device power;
[0185] The initial time point of the day corresponding to the current time point is taken as the starting time point, and the current time point is taken as the ending time point to form a determination period;
[0186] The usage time of each determination device in the determination period is obtained respectively, and is determined as the current usage time;
[0187] Calculate the current power consumption of each determined device respectively, current power consumption of the device = device power × current usage time;
[0188] Obtaining the usage time of each determination device in the determination period in each target sub-collection cycle respectively, and setting it as the determination usage time;
[0189] If all determined usage durations within the electricity consumption collection cycle are consistent, the determined usage duration is identified as the target usage duration;
[0190] If the determined usage time in the electricity collection cycle is inconsistent, the average usage time is calculated and the average usage time is determined as the target usage time, and the average usage time = the sum of all determined usage time in the electricity collection cycle / the first number;
[0191] Calculate the target device power consumption of each determination device respectively, target device power consumption = device power × target usage time;
[0192] The device whose current device power consumption ≥ target device power consumption × (1 + 30%) is identified as an abnormal device;
[0193] If there is an abnormal device in the abnormal circuit, it is determined that the abnormal device is faulty, that is, the abnormal device has leakage, which will lead to increased power consumption;
[0194] If there is no abnormal device in the abnormal circuit, it is determined that the abnormal circuit has a fault, that is, there is a leakage in the abnormal circuit, and the leakage will cause an increase in power consumption.
[0195] This embodiment also provides that the correction strategy is specifically:
[0196] If the target electric energy meter is abnormal, the target electric energy consumption corresponding to the current time point is obtained;
[0197] Calculate the power difference, power difference = target power consumption - current power consumption;
[0198] The current time point is taken as the starting time point until the target electric energy meter is replaced, forming a correction period;
[0199] The power consumption collected by the target power meter during the calibration period is adjusted to the power consumption minus the power difference;
[0200] Prompt the user to replace the target electric energy meter;
[0201] If the abnormal device has a fault, cut off the control switch corresponding to the abnormal device;
[0202] Prompt users to check and replace abnormal equipment;
[0203] If there is a fault in the abnormal circuit, the control switch corresponding to the abnormal circuit is cut off;
[0204] Prompt the user to check and repair abnormal circuits.
[0205] In this embodiment, the user's household electricity usage habits are determined and updated in a timely manner. Based on the user's household electricity usage habits and current electricity usage, whether the data collected by the electric energy meter is accurate is judged. Based on the power usage of the equipment in each phase circuit, whether there is leakage in the equipment or circuit is judged, thereby calibrating the data collected by the electric energy meter, so that the user can know the household electricity usage and the safety of various indoor equipment in a timely manner, and thus promptly check, repair and replace the equipment or circuit with leakage, so as to avoid serious situations such as fire caused by leakage, and reduce the user's property loss.
Claims
1. A fault analysis method for a three-phase smart electric energy meter, characterized in that: include: Get target information; The target information includes power consumption and number of people indoors; According to the number of people in the room, a household electricity usage habit model is formed to determine the user's household electricity usage habits, thereby judging whether the electricity usage collected by the target energy meter is accurate; According to the target information and household electricity consumption habit model, through information analysis strategy, analysis data is formed to determine whether the electricity consumption collected by the target electricity meter is accurate, so as to determine the cause of abnormal electricity consumption; Based on the analysis data, the abnormality determination strategy is used to form determination data to determine the cause of abnormal power consumption, thereby calibrating the target power meter; According to the judgment data, the target electric energy meter is calibrated through a correction strategy; The forming of the household electricity usage habit model is specifically as follows: Get the initial time point; Set the collection duration; Calculate the collection time point, collection time point = initial time point - collection duration; The collection time point is taken as the starting time point, and the initial time point is taken as the ending time point to form an electricity consumption collection cycle; Set the first sub-cycle duration; According to the duration of the first sub-cycle, the electricity consumption collection cycle is divided into a first number of first sub-collection cycles, where the first number = collection duration / first sub-cycle duration; Set the duration of the second sub-cycle; According to the second sub-cycle duration, each first sub-acquisition cycle is divided into a second number of second sub-acquisition cycles, where the second number = first sub-cycle duration / second sub-cycle duration; Obtaining the number of people indoors in each second sub-collection cycle within the electricity consumption collection cycle; The time periods when the number of people indoors is ≥1 and the time periods when the number of people indoors is <1 are defined as active time periods and unoccupied time periods respectively; According to the date corresponding to the second sub-collection period, the activity time periods of all the second sub-collection periods corresponding to the same date are extracted, and the overlapping activity time periods are defined as the habitual activity time periods; According to the date corresponding to the second sub-collection period, the customary activity time period corresponding to each date is extracted to form an activity set; According to the date corresponding to the second sub-collection period, extract the unmanned time periods of all the second sub-collection periods corresponding to the same date, and define the overlapping unmanned time periods as the customary unmanned time periods; According to the date corresponding to the second sub-collection period, the customary unmanned time period corresponding to each date is extracted to form an unmanned set; Calculate the change period, change period = second sub-period duration - usual activity period - usual unattended period; According to the date corresponding to the second sub-collection period, extract the change period corresponding to each date to form a change set; The information analysis strategy is specifically as follows: S1. Get the current time point; Get the power consumption at the current time point and set it as the current power consumption; S2, extracting the date of the second sub-collection period corresponding to the current time point and setting it as the target date; Respectively extract the customary activity time period, customary no-person time period and change time period corresponding to the target date in the activity set, no-person set and change set; S3. If the current time point is in the usual activity period, then execute the activity power consumption determination strategy; Extract the activity power consumption corresponding to the current time point and identify it as the target power consumption; If the current power consumption is ≥ the target power consumption × (1 + 60%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed; If the current power consumption is less than the target power consumption × (1 + 60%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated; S4. If the current time point is in the usual unmanned period, the unmanned power consumption determination strategy is executed; Extract the unattended power consumption corresponding to the current time point and identify it as the target power consumption; If the current power consumption is ≥ the target power consumption × (1 + 30%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed; If the current power consumption is less than the target power consumption × (1 + 30%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated; S5. If the current time point is in a changing period, then execute the changing power consumption determination strategy; Extract the changed power consumption corresponding to the current time point and identify it as the target power consumption; If the current power consumption is ≥ the target power consumption × (1 + 50%), the current power consumption is determined to be abnormal, the current power consumption is identified as abnormal power consumption, and the abnormal determination strategy is executed; If the current power consumption is less than the target power consumption × (1 + 50%), it is determined that the current power consumption is normal, and steps S1 to S5 are repeated; The abnormality determination strategy is specifically as follows: Obtaining target power consumption of each phase circuit in the three-phase circuit respectively, and setting them as a first target power consumption, a second target power consumption, and a third target power consumption respectively; The current power consumption of each phase circuit in the three-phase circuit is obtained respectively, and is defined as a first current power consumption, a second current power consumption, and a third current power consumption; If the first current power ≥ the first target power × (1 + 30%), it is determined that the circuit corresponding to the first current power is abnormal, and the circuit is identified as an abnormal circuit; If the second current power ≥ the second target power × (1 + 30%), it is determined that the circuit corresponding to the second current power is abnormal, and the circuit is identified as an abnormal circuit; If the third current power ≥ the third target power × (1 + 30%), it is determined that the circuit corresponding to the third current power is abnormal, and the circuit is identified as an abnormal circuit; executing an abnormal circuit determination strategy for the abnormal circuit; If the first current power < the first target power × (1 + 30%), the second current power < the second target power × (1 + 30%), and the third current power < the third target power × (1 + 30%), then it is determined that the target power meter is abnormal; The abnormal circuit determination strategy is specifically as follows: Obtain all electrical equipment under abnormal circuits to form a judgment device; The power of each determination device is obtained respectively and determined as the device power; The initial time point of the day corresponding to the current time point is taken as the starting time point, and the current time point is taken as the ending time point to form a determination period; The usage time of each determination device in the determination period is obtained respectively, and is determined as the current usage time; Calculate the current power consumption of each determined device respectively, current power consumption of the device = device power × current usage time; Obtaining the usage time of each determination device in the determination period in each target sub-collection cycle respectively, and setting it as the determination usage time; If all determined usage durations within the electricity consumption collection cycle are consistent, the determined usage duration is identified as the target usage duration; If the determined usage time in the electricity collection cycle is inconsistent, the average usage time is calculated and the average usage time is determined as the target usage time, and the average usage time = the sum of all determined usage time in the electricity collection cycle / the first number; Calculate the target device power consumption of each determination device respectively, target device power consumption = device power × target usage time; The device whose current device power consumption ≥ target device power consumption × (1 + 30%) is identified as an abnormal device; If there is an abnormal device in the abnormal circuit, it is determined that the abnormal device is faulty; If there is no abnormal device in the abnormal circuit, it is determined that the abnormal circuit has a fault.
2. The fault analysis method of the three-phase smart energy meter according to claim 1 is characterized in that: The activity power consumption determination strategy is specifically as follows: Get the habitual activity period corresponding to the current time point and set it as the current activity period; Get the start time of the current activity period and set it as the activity start time; The activity start time is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period; Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods; Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption; If all the determined power consumptions within the power collection cycle are consistent, the determined power consumption will be identified as the active power consumption; If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as the active power consumption, where the average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
3. The fault analysis method of the three-phase smart energy meter according to claim 1 is characterized in that: The strategy for determining that no one is using electricity is specifically as follows: Get the usual unmanned time period corresponding to the current time point, and set it as the current unmanned time period; Get the start time of the current unmanned period and set it as the unmanned start time; The time point when no one starts is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period; Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods; Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption; If all the determined power consumptions within the power collection period are consistent, the determined power consumption will be considered as unattended power consumption; If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as unattended power consumption. The average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
4. The fault analysis method of the three-phase smart energy meter according to claim 1 is characterized in that: The change power consumption determination strategy is specifically as follows: Get the change period corresponding to the current time point, and define it as the current change period; Get the start time of the current change period and set it as the change start time; The starting time point of the change is taken as the starting time point, and the current time point is taken as the ending time point to form a determination time period; Obtain all second sub-collection periods corresponding to the target date within the electricity consumption collection period, and define them as target sub-collection periods; Obtain the power consumption in the determination time period within each target sub-collection cycle, and define it as the determination power consumption; If all the determined power consumptions within the power collection cycle are consistent, the determined power consumptions are identified as variable power consumptions; If the determined power consumption within the power collection period is inconsistent, the average power consumption is calculated and the average power consumption is identified as the variable power consumption. The average power consumption = the sum of all determined power consumption within the power collection period / the first quantity.
5. The fault analysis method of the three-phase smart electric energy meter according to claim 1 is characterized in that: The correction strategy is specifically as follows: If the target electric energy meter is abnormal, the target electric energy consumption corresponding to the current time point is obtained; Calculate the power difference, power difference = target power consumption - current power consumption; The current time point is taken as the starting time point until the target electric energy meter is replaced, forming a correction period; The power consumption collected by the target power meter during the calibration period is adjusted to the power consumption minus the power difference; Prompt the user to replace the target electric energy meter; If the abnormal device has a fault, cut off the control switch corresponding to the abnormal device; Prompt users to check and replace abnormal equipment; If there is a fault in the abnormal circuit, the control switch corresponding to the abnormal circuit is cut off; Prompt the user to check and repair abnormal circuits.
Citation Information
Patent Citations
Intelligent electric energy meter fault early warning method and device
CN112698261A
Intelligent electric energy meter evaluation method
CN117273337A
