An automatic testing device and method for bottled liquefied petroleum gas pressure regulators
By designing automated bottled liquefied petroleum gas pressure regulator testing equipment and using conveyor units and robots to achieve automated production and testing data binding, the problem of non-automated testing equipment in the existing technology has been solved, production efficiency and testing efficiency have been improved, and ensured This ensures quality traceability and elimination of non-conforming products.
Patent Information
- Application Number
- CN202411048573.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The existing bottled liquefied petroleum gas regulator testing equipment lacks automation, resulting in low production efficiency, high labor costs, unbound testing data, and the possibility of substandard products being mixed into qualified products, posing the risk of errors.
An automatic inspection equipment including a conveyor unit, a robot and a variety of inspection machines is designed. The conveyor unit realizes automatic conveyance and inspection of the voltage regulator. The robot carries out transportation and scans the code for recording. All inspection data is bound to the product barcode to realize Automated production and quality traceability.
It improves production efficiency, reduces labor costs, ensures no leakage of the inspection process, realizes automatic rejection of unqualified products, improves inspection efficiency, and reduces manual labor intensity and consumable consumption.
Smart Images

Figure CN118577516B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pressure regulator detection, in particular to automatic detection equipment and a detection method for a bottled liquefied petroleum gas pressure regulator. Background Art
[0002] In recent years, gas safety accidents have occurred frequently, and gas safety has been highly valued by relevant departments. Therefore, the demand for bottled liquefied petroleum gas pressure regulator products has increased dramatically. The pressure regulator is suitable for bottled liquefied petroleum gas, and mainly has an automatic pressure regulation function. Some products have an automatic shutdown function for underpressure, overpressure, and overcurrent, that is, it can automatically cut off the gas when the pipeline leaks or falls off to avoid safety accidents. After the cause of the fault is found and the fault is eliminated, the pressure regulator button can be pulled up to restore the gas supply and continue to ensure the safety of gas use. At present, the pressure regulator manufacturers either make the self-closing valve performance testing equipment themselves or buy it from other companies. The styles and standards of the equipment are varied, and the equipment is not suitable for automated production. Generally, the test data cannot be bound to the product. At the same time, the detection is all manual operation, which is not only labor-intensive and increases production costs, but also the qualified and unqualified tests are manually distinguished, which has the risk of errors. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the existing defects and provide an automatic detection device and a detection method for bottled liquefied petroleum gas pressure regulators, which can realize automated production, improve production efficiency, reduce labor costs, and ensure that no detection process is missed. All detection data are bound to the product barcode, and unqualified products are automatically rejected, which realizes quality traceability and ensures that unqualified products will not be mixed with qualified products. At the same time, the detection efficiency is high, which can effectively solve the problems in the background technology.
[0004] To achieve the above-mentioned object, the present invention provides the following technical solutions: an automatic detection device and detection method for a bottled liquefied petroleum gas pressure regulator, comprising a conveying unit;
[0005] Conveying unit: A loading unit is provided on the right side of its front side, a symmetrically distributed high-pressure airtightness testing machine is placed on the left side of the front side of the conveying unit, a symmetrically distributed low-pressure airtightness testing machine is placed on the left end of the conveying unit, a symmetrically distributed high-pressure function testing machine is placed on the left side of the rear side of the conveying unit, and a symmetrically distributed low-pressure function testing machine is placed on the right side of the rear side of the conveying unit. Robots are placed between the two high-pressure airtightness testing machines, between the two low-pressure airtightness testing machines, between the two high-pressure function testing machines, and between the two low-pressure function testing machines. The input end of the robot is electrically connected to the output end of the external controller to realize automated production, improve production efficiency, reduce labor costs, and ensure that no inspection process is missed. All inspection data are bound to the product barcode, and unqualified products are automatically eliminated, which realizes quality traceability and ensures that unqualified products will not be mixed with qualified products. At the same time, the inspection efficiency is high.
[0006] Furthermore, the conveying unit includes a support frame, a rear conveyor, a front conveyor and a tooling pallet. The support frame is located in the middle of the loading unit, the high-pressure airtightness testing machine, the low-pressure airtightness testing machine, the high-pressure function testing machine and the low-pressure function testing machine. The rear side of the upper surface of the support frame is provided with a rear conveyor, and the front side of the upper surface of the support frame is provided with a front conveyor. Evenly distributed tooling pallets are placed on the upper surfaces of the front conveyor and the rear conveyor. The input ends of the rear conveyor and the front conveyor are electrically connected to the output end of the external controller to convey the voltage regulator.
[0007] Furthermore, the conveying unit also includes a material blocking rack, and there are four material blocking racks. Two material blocking racks are provided at the upper ends of the rear conveyor and the front conveyor to block the tooling pallets that are placed upside down.
[0008] Furthermore, the conveying unit also includes a barcode scanning gun, which is symmetrically installed in the middle of the upper surface of the support frame. The output end of the barcode scanning gun is electrically connected to the input end of the external controller to scan and record the voltage regulator.
[0009] Furthermore, the upper surfaces of the high-pressure air tightness testing machine, the low-pressure air tightness testing machine, the high-pressure function testing machine and the low-pressure function testing machine are all provided with evenly distributed large cylinders, the telescopic ends of the large cylinders are all provided with button lifting cylinders, and the telescopic ends of the button lifting cylinders are all provided with button clamping cylinders, which facilitate the control of the voltage regulator.
[0010] A method for detecting a bottled liquefied petroleum gas pressure regulator comprises the following steps:
[0011] S1: The loading unit places the voltage regulator on the tooling tray on the front conveyor. The front conveyor drives the voltage regulator to move to the left, and the rear conveyor drives the voltage regulator to move to the right.
[0012] S2: The robot in the middle of the two high-pressure airtightness testing machines moves the delivered voltage regulator to the high-pressure airtightness testing machine for high-pressure airtightness testing. After the testing is completed, the robot moves the qualified voltage regulator to the tooling tray;
[0013] S3: The robot in the middle of the two low-pressure airtightness testing machines moves the delivered voltage regulator to the low-pressure airtightness testing machine for low-pressure airtightness testing. After the testing is completed, the robot moves the qualified voltage regulator to the tooling tray;
[0014] S4: The robot in the middle of the two high-voltage function test machines moves the delivered voltage regulator to the high-voltage function test machine to perform high-voltage function test. After the test is completed, the robot moves the qualified voltage regulator to the tooling tray;
[0015] S5: The robot in the middle of the two low-voltage function testing machines moves the conveyed voltage regulator to the low-voltage function testing machine for low-voltage function testing. After the testing is completed, the robot moves the regulator to the buffer conveyor belt line on the right.
[0016] Furthermore, the high pressure airtightness testing machine includes the following steps during testing:
[0017] S201: The tooling on the high-pressure air tightness testing machine clamps the pressure regulator to be tested, opens the test valve, and connects the pressure regulator to be tested with the gas outlet end of the test valve;
[0018] S202: Open the charging valve, and the external compressed air enters the interior of the gas tank one through the pressure reducing valve one. The pressure sensor one detects the pressure inside the system. When the pressure is greater than 1.76Mpa, the pressure is stabilized for 5S;
[0019] S203: Close the inflation valve, stabilize the pressure for 5 seconds, and then close the detection valve 1;
[0020] S204: Balance for 20 seconds, and use a differential pressure sensor to detect the pressure difference between the standard product and the pressure regulator to be tested, and record the differential pressure value P1;
[0021] S205: Detect for 10 seconds and record the differential pressure value P2;
[0022] S206: Open the detection valve and exhaust valve 1 at the same time, and the gas inside the system is discharged to the outside through the muffler;
[0023] S207: Open the tooling and convert the leakage amount through P2-P1.
[0024] Furthermore, the low-pressure airtightness detection machine includes the following steps during detection:
[0025] S301: Open the detection valve 2 and the detection valve 3 at the same time to connect the two sides of the differential pressure sensor 2;
[0026] S302: The tooling on the low-pressure airtightness testing machine clamps the pressure regulator to be tested, and the pressure regulator to be tested is connected to the second detection valve and the second differential pressure sensor through the sponge;
[0027] S303: Open the first intake valve and the second exhaust valve, and the external compressed air enters the second gas tank through the second pressure reducing valve, and then enters the gas circuit system. The second pressure sensor detects the system pressure to ensure that the pressure value is greater than 15.2Kpa;
[0028] S304: close the air intake valve 1 and adjust the throttle valve to reduce the pressure to 15±0.1 kPa;
[0029] S305: Close the second and third detection valves simultaneously;
[0030] S306: Close the second exhaust valve, balance for 5 seconds, and use the second differential pressure sensor to detect the pressure difference between the standard product and the pressure regulator to be tested, and record the differential pressure value P3;
[0031] S307: Detect for 10 seconds and record the differential pressure value P4;
[0032] S308: Open the tooling and calculate the leakage value of the voltage regulator through P4-P3.
[0033] Furthermore, the high voltage function tester comprises the following steps during testing:
[0034] S401: The tooling on the high-pressure function tester clamps the voltage regulator to be tested, and the voltage regulator to be tested is connected in series between the pressure sensor 3 and the pressure sensor 4. The air inlet valve 2 is opened, and the external compressed air enters the interior of the gas tank 3 through the ball valve and the pressure reducing valve 3, and then enters the interior of the voltage regulator to be tested through the air inlet valve 2. The pressure sensor 3 detects the pressure value inside the system, and the button lifting cylinder pulls up the button of the voltage regulator through the button lifting claw cylinder;
[0035] S402: The regulating valve first opens a small opening and then closes;
[0036] S403: The pressure sensor 4 detects the outlet pressure, and observes the change of the outlet pressure P5 after 5 seconds. If P5 is stable ≤ 4Kpa, proceed to the next step. If P5 is unstable, continue to observe the final stable pressure within 5 minutes. If it is still unstable after 5 minutes, it is judged as unqualified;
[0037] S404: Flow sensor 1 detects the flow rate, adjusts regulating valve 1 to make the flow rate reach 10% of the rated flow rate, and uses pressure sensor 4 to measure the outlet pressure = P6. If P6≤3.3kpa, it is qualified, otherwise it is unqualified;
[0038] S405: Continue to adjust the regulating valve 1 to increase the outlet opening. If the pressure regulator can be closed, it is qualified. Otherwise, it is unqualified. Use the flow sensor 1 to collect the flow value Q1 during the overflow.
[0039] S406: After the pressure regulator is closed, close the regulating valve 1, and observe the pressure change of the pressure sensor 4 after 5 seconds. If the pressure increase is less than 400 Pa within 5 seconds, it is judged that the closing leakage is less than 200 ml / h, which is qualified, otherwise it is unqualified;
[0040] S407: Close the second air inlet valve and release the pressure regulator.
[0041] Furthermore, the low voltage function detection machine includes the following steps during detection:
[0042] S501: After the tooling on the low-pressure function test machine clamps the voltage regulator, the air inlet valve 3 is opened, and the external compressed air enters the interior of the gas tank 4 through the pressure reducing valve 4, and the gas inside the gas tank 4 enters the voltage regulator to be tested through the air inlet valve 3 and the electrical proportional valve, and the pressure sensor 5 detects the air inlet pressure, and the button lifting cylinder pulls up the button of the voltage regulator through the button clamping cylinder;
[0043] S502: Regulate the regulating valve 2, and the flow sensor 2 detects the flow to make the flow reach 100% of the rated flow. The pressure sensor 6 measures the outlet pressure P7. If P7 ≥ 2.3 kpa, it is qualified, otherwise it is unqualified;
[0044] S503: Continue to adjust valve 2, flow sensor 2 records flow rate Q2 when the pressure regulator is cut off, Q2 ≥ 110% of the rated flow rate is qualified, otherwise it is unqualified;
[0045] S504: After the pressure regulator is closed, close the regulating valve 2, and observe the pressure change of the pressure sensor 6 after 5 seconds. If the pressure increase is less than 400 Pa within 5 seconds, it is judged that the closing leakage is less than 200 ml / h, which is qualified, otherwise it is unqualified;
[0046] S505: Close the air inlet valve 3 and release the pressure regulator.
[0047] Compared with the prior art, the invention has the following beneficial effects: the automatic detection device and detection method for bottled liquefied petroleum gas pressure regulator have the following advantages:
[0048] 1. The front conveyor and the rear conveyor transport the tooling pallet. The robot grabs the voltage regulator to be inspected from the tooling pallet, and then places the voltage regulator to be inspected on the high-pressure air tightness tester for high-pressure air tightness test. The voltage regulator is then tested by the low-pressure air tightness tester, the high-pressure function tester, and the low-pressure function tester. The qualified voltage regulator is transported by the robot on the far right to the buffer conveyor belt line on the right, realizing automated production, improving production efficiency, reducing labor costs, and ensuring that no inspection process is missed.
[0049] 2. The robot grabs the voltage regulator to be inspected from the tooling tray, and at the same time uses the barcode scanner to scan and record the barcode on the voltage regulator to be inspected. If there are unqualified products, the robot will first remove the unqualified products to a distant unqualified product removal box. All inspection data is bound to the product barcode, and unqualified products are automatically removed, which realizes quality traceability and ensures that unqualified products will not be mixed with qualified products.
[0050] 3. The loading unit is a manual loading unit. The developed testing bench is suitable for both manual production and automated production. In the initial stage, the company can purchase the testing bench for manual production. After the company's products are stable and orders are increased, it can invest in automatic loading and unloading parts. The step-by-step investment can reduce the investment pressure on the company.
[0051] 4. One device combines the detection function at 1.29Mpa, and one device combines the detection function at 30Kpa. The two devices can cover the functional detection of the voltage regulator. When used manually, it reduces labor intensity, improves efficiency, and reduces the consumption of consumables such as sealing gaskets. When used automatically, it reduces the loading and unloading times of the robot by half, greatly reducing the material turnover cost and the cost of equipment such as robots.
[0052] 5. During the inspection process, multiple inspection items require multiple lifting of the lifting button, and then the lifting button lifting cylinder is used to pull up the lifting button of the voltage regulator through the lifting button clamping cylinder, avoiding the problem of manual failure to lift the lifting button in time and causing the inspection to be interrupted, thereby improving the inspection efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a schematic diagram of the structure of the present invention;
[0054] Figure 2 This is an enlarged structural schematic diagram of location A of the present invention;
[0055] Figure 3 This is a schematic diagram of the enlarged structure of B of the present invention;
[0056] Figure 4 This is a schematic diagram of the enlarged structure of position C of the present invention;
[0057] Figure 5 It is a structural schematic diagram of the high-pressure airtightness testing machine of the present invention;
[0058] Figure 6 It is a structural schematic diagram of a large cylinder of the present invention;
[0059] Figure 7 It is a schematic diagram of the top view of the structure of the conveying unit of the present invention;
[0060] Figure 8 This is a gas circuit principle diagram of the high-pressure airtightness detection machine of the present invention;
[0061] Fig. 9 This is a gas circuit principle diagram of the low-pressure airtightness detection machine of the present invention;
[0062] Fig.10 This is a gas circuit schematic diagram of the high-pressure function detection machine of the present invention;
[0063] Fig.11 This is a gas circuit schematic diagram of the low-pressure function detection machine of the present invention;
[0064] Fig.12 Flow chart of the detection method of the present invention.
[0065] In the figure: 1 conveying unit, 101 support frame, 102 rear conveyor, 103 front conveyor, 104 tooling tray, 105 material blocking rack, 106 code scanning gun, 2 feeding unit, 3 high pressure air tightness tester, 301 muffler, 302 pressure reducing valve 1, 303 gas tank 1, 304 charging valve, 305 detection valve 1, 306 exhaust valve 1, 307 differential pressure sensor 1, 308 pressure sensor 1, 4 low pressure air tightness tester, 401 throttle valve, 402 pressure reducing valve 2, 403 gas tank 2, 404 intake valve 1, 405 detection valve 2, 406 differential pressure sensor 2, 407 sponge, 408 pressure Sensor 2, 409 detection valve 3, 410 exhaust valve 2, 5 high pressure function tester, 501 regulating valve 1, 502 ball valve, 503 pressure reducing valve 3, 504 gas tank 3, 505 intake valve 2, 506 pressure sensor 3, 507 pressure sensor 4, 508 flow sensor 1, 6 low pressure function tester, 601 regulating valve 2, 602 pressure reducing valve 4, 603 gas tank 4, 604 intake valve 3, 605 electric proportional valve, 606 pressure sensor 5, 607 pressure sensor 6, 608 flow sensor 2, 7 robot, 8 large cylinder, 9 button lifting cylinder, 10 button gripper cylinder. DETAILED DESCRIPTION
[0066] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0067] See also Figure 1-12 ,This embodiment provides a technical solution: an automatic detection device for a bottled liquefied petroleum gas pressure regulator, comprising a conveying unit 1;
[0068] Conveying unit 1: A loading unit 2 is provided on the right side of its front side, and the loading unit 2 is a manual loading unit. A symmetrically distributed high-pressure airtightness tester 3 is placed on the left side of the front side of the conveying unit 1, and a symmetrically distributed low-pressure airtightness tester 4 is placed on the left end of the conveying unit 1. A symmetrically distributed high-pressure function tester 5 is placed on the left side of the rear side of the conveying unit 1, and a symmetrically distributed low-pressure function tester 6 is placed on the right side of the rear side of the conveying unit 1. A robot 7 is placed between the two high-pressure airtightness testers 3, between the two low-pressure airtightness testers 4, between the two high-pressure function testers 5, and between the two low-pressure function testers 6. The input end of the robot 7 is electrically connected to the output end of the external controller. The conveying unit 1 includes a support frame 101 and a rear conveyor 102. , front conveyor 103 and tooling pallet 104, the support frame 101 is located in the middle of the loading unit 2, the high-pressure airtightness tester 3, the low-pressure airtightness tester 4, the high-pressure function tester 5 and the low-pressure function tester 6, the rear side of the upper surface of the support frame 101 is provided with a rear conveyor 102, the front side of the upper surface of the support frame 101 is provided with a front conveyor 103, and the upper surfaces of the front conveyor 103 and the rear conveyor 102 are both placed with evenly distributed tooling pallets 104, the left and right ends of the support frame 101 are provided with tooling pallet line changing and rotating mechanisms, which facilitate the transfer of tooling pallets 104 on the front conveyor 103 and the rear conveyor 102. Two profiling grooves are provided on the tooling pallet 104, and the voltage regulator cannot be put in if it is placed upside down. The tooling of the tooling pallet 104 is rectangular It is designed that the tooling pallet 104 cannot be put into the conveyor for transportation after being rotated 90°. The support frame 101 is provided with a tooling pallet stopping mechanism and corresponds to the positions of the high-pressure airtightness tester 3, the low-pressure airtightness tester 4, the high-pressure function tester 5 and the low-pressure function tester 6. The tooling pallet stopping mechanism positions the tooling pallet 104. The input ends of the rear conveyor 102 and the front conveyor 103 are electrically connected to the output end of the external controller. The conveying unit 1 also includes a material stopping rack 105. There are four material stopping racks 105. Two material stopping racks 105 are provided at the upper ends of the rear conveyor 102 and the front conveyor 103. The shapes of the front and rear ends of the material stopping rack 105 are different. When the tooling pallet 104 is rotated 180°, the material stopping rack 105 will stop the tooling pallet 104 and the adjustment The pressure regulator is blocked, and the conveying unit 1 also includes a barcode scanning gun 106, which is symmetrically installed in the middle of the upper surface of the support frame 101. The output end of the barcode scanning gun 106 is electrically connected to the input end of the external controller. While grabbing, the barcode scanning gun 106 scans and records the barcode on the voltage regulator to be inspected. The upper surfaces of the high-pressure airtightness detection machine 3, the low-pressure airtightness detection machine 4, the high-pressure function detection machine 5 and the low-pressure function detection machine 6 are all provided with uniformly distributed large cylinders 8, and the telescopic ends of the large cylinders 8 are provided with button lifting cylinders 9, and the telescopic ends of the button lifting cylinders 9 are provided with button clamping claw cylinders 10. The large cylinders 8 are convenient for driving the button lifting cylinders 9 and the button clamping claw cylinders 10 to move up and down, and the button clamping claw cylinders 10 can clamp the button of the voltage regulator.The button lifting cylinder 9 drives the button to move up and down through the button clamping cylinder 10.
[0069] A method for detecting a bottled liquefied petroleum gas pressure regulator comprises the following steps:
[0070] S1: The loading unit 2 places the voltage regulator on the tooling pallet 104 on the front conveyor 103, the front conveyor 103 drives the voltage regulator to move to the left, and the rear conveyor 102 drives the voltage regulator to move to the right. The tooling pallet line change and rotation mechanisms at the left and right ends of the support frame 101 facilitate the transfer of the tooling pallet 104 between the front conveyor 103 and the rear conveyor 102, thereby achieving a good flow effect on the tooling pallet 104;
[0071] S2: The robot 7 in the middle of the two high-pressure airtightness testers 3 moves the delivered voltage regulator to the high-pressure airtightness tester 3 to perform high-pressure airtightness test. After the test is completed, the robot 7 moves the qualified voltage regulator to the tooling tray 104. The high-pressure airtightness tester 3 includes the following steps when testing:
[0072] S201: The tooling on the high-pressure airtightness testing machine 3 clamps the pressure regulator to be tested, opens the testing valve 305, and the pressure regulator to be tested is connected to the gas outlet end of the testing valve 305;
[0073] S202: Open the charging valve 304, and the external compressed air enters the interior of the gas tank 303 through the pressure reducing valve 302. The pressure reducing valve 302 reduces the pressure of the external compressed air to 1.76Mpa. The gas tank 303 temporarily stores the reduced-pressure air. The pressure sensor 308 detects the pressure inside the system. When the pressure is greater than 1.76Mpa, the pressure is stabilized for 5S.
[0074] S203: close the charging valve 304, stabilize the pressure for 5 seconds and then close the detection valve 305;
[0075] S204: Balance for 20 seconds, the differential pressure sensor 307 detects the pressure difference between the standard product and the pressure regulator to be tested, and records the differential pressure value P1;
[0076] S205: Detect for 10 seconds and record the differential pressure value P2;
[0077] S206: Open the detection valve 305 and the exhaust valve 306 at the same time, and the gas inside the system is discharged to the outside through the muffler 301;
[0078] S207: Open the tooling and convert P2-P1 into leakage amount;
[0079] S3: The robot 7 in the middle of the two low-pressure airtightness testing machines 4 moves the conveyed voltage regulator to the low-pressure airtightness testing machine 4 to perform low-pressure airtightness testing. After the testing is completed, the robot 7 moves the qualified voltage regulator to the tooling tray 104. The low-pressure airtightness testing machine 4 includes the following steps during testing:
[0080] S301: Open the second detection valve 405 and the third detection valve 409 at the same time to connect the two sides of the differential pressure sensor 2 406;
[0081] S302: The tooling on the low-pressure airtightness testing machine 4 clamps the pressure regulator to be tested, and the pressure regulator to be tested is connected to the second detection valve 405 and the second differential pressure sensor 406 through the sponge 407;
[0082] S303: Open the inlet valve 1 404 and the exhaust valve 2 410, and the external compressed air enters the gas tank 2 403 through the pressure reducing valve 2 402. The pressure reducing valve 2 402 reduces the system pressure to 15Kpa. The gas tank 2 403 buffers the gas and then enters the gas path system. The pressure sensor 2 408 detects the system pressure to ensure that the pressure value is greater than 15.2Kpa.
[0083] S304: close the air inlet valve 404 and adjust the throttle valve 401 to reduce the pressure to 15±0.1 kPa;
[0084] S305: Close the second detection valve 405 and the third detection valve 409 at the same time;
[0085] S306: Close the exhaust valve 410, balance for 5 seconds, and use the differential pressure sensor 406 to detect the pressure difference between the standard product and the pressure regulator to be tested, and record the differential pressure value P3;
[0086] S307: Detect for 10 seconds and record the differential pressure value P4;
[0087] S308: Open the tooling and calculate the leakage value of the voltage regulator through P4-P3;
[0088] S4: The robot 7 in the middle of the two high-voltage function testers 5 moves the delivered voltage regulator to the high-voltage function tester 5 to perform a high-voltage function test. After the test is completed, the robot 7 moves the qualified voltage regulator to the tooling tray 104. The high-voltage function tester 5 includes the following steps when testing:
[0089] S401: The tooling on the high-pressure function tester 5 clamps the voltage regulator to be tested, and the voltage regulator to be tested is connected in series between the pressure sensor 3 506 and the pressure sensor 4 507. The air inlet valve 2 505 is opened, and the external compressed air enters the interior of the gas tank 3 504 through the ball valve 502 and the pressure reducing valve 3 503. The pressure reducing valve 3 503 reduces the system pressure to 1.29Mpa, and then enters the interior of the voltage regulator to be tested through the air inlet valve 2 505. The pressure sensor 3 506 detects the pressure value inside the system, and the button lifting cylinder 9 pulls up the button of the voltage regulator through the button lifting claw cylinder 10;
[0090] S402: The regulating valve 501 first opens a small opening and then closes;
[0091] S403: The pressure sensor 507 detects the outlet pressure, and observes the change of the outlet pressure P5 after 5 seconds. If P5 is stable ≤ 4Kpa, proceed to the next step. If P5 is unstable, continue to observe the final stable pressure within 5 minutes. If it is still unstable after 5 minutes, it is judged as unqualified;
[0092] S404: The flow sensor 508 detects the flow rate, adjusts the regulating valve 501, and makes the flow rate reach 10% of the rated flow rate. The pressure sensor 507 is used to measure the outlet pressure = P6. If P6 ≤ 3.3 kpa, it is qualified, otherwise it is unqualified.
[0093] S405: Continue to adjust the regulating valve 501 to increase the outlet opening. If the pressure regulator can be closed, it is qualified. Otherwise, it is unqualified. Use the flow sensor 508 to collect the flow value Q1 during the overflow.
[0094] S406: After the pressure regulator is closed, close the regulating valve 501, and observe the pressure change of the pressure sensor 4 507 after 5s. If the pressure increase is less than 400pa within 5s, it is judged that the closing leakage is less than 200ml / h, which is qualified, otherwise it is unqualified;
[0095] S407: close the second air inlet valve 505, and release the pressure regulator;
[0096] S5: The robot 7 in the middle of the two low-voltage function testers 6 moves the conveyed voltage regulator to the low-voltage function tester 6 for low-voltage function test. After the test, the robot 7 moves the conveyed voltage regulator to the buffer conveyor belt line on the right. The low-voltage function tester 6 includes the following steps when testing:
[0097] S501: After the tooling on the low-pressure function tester 6 clamps the voltage regulator, the air inlet valve three 604 is opened, and the external compressed air enters the interior of the gas tank four 603 through the pressure reducing valve four 602. The pressure reducing valve four 602 reduces the system gas pressure to 0.2Mpa, and the gas inside the gas tank four 603 enters the voltage regulator to be tested through the air inlet valve three 604 and the electrical proportional valve 605. The electrical proportional valve 605 regulates the pressure, and the pressure sensor five 606 detects the air inlet pressure. The button lifting cylinder 9 pulls up the button of the voltage regulator through the button clamping cylinder 10;
[0098] S502: Regulate the regulating valve 601, the flow sensor 608 detects the flow rate, so that the flow rate reaches 100% of the rated flow rate, and the pressure sensor 607 measures the outlet pressure P7, P7 ≥ 2.3 kpa is qualified, otherwise it is unqualified;
[0099] S503: Continue to adjust the valve 2 601, the flow sensor 2 608 records the flow Q2 when the pressure regulator is cut off, Q2 ≥ 110% of the rated flow is qualified, otherwise it is unqualified;
[0100] S504: After the pressure regulator is closed, close the regulating valve 2 601, and observe the pressure change of the pressure sensor 6 607 after 5 seconds. If the pressure increase is less than 400pa within 5 seconds, it is judged that the closing leakage is less than 200ml / h, which is qualified, otherwise it is unqualified;
[0101] S505: Close the air inlet valve 3 604, and the tooling releases the pressure regulator.
[0102] The working principle of the automatic detection equipment and detection method for bottled liquefied petroleum gas pressure regulator provided by the present invention is as follows: the front conveyor 103 and the rear conveyor 102 are two common double-speed chain conveyors, which are composed of a motor drive unit, a double-speed chain, a frame, and a driven unit. The material blocking frame 105 prevents tooling pallets with incorrect directions from flowing into the detection position. The height and angle of the barcode scanning gun 106 are adjustable. The support frame 101 is provided with evenly distributed photoelectric sensors to detect the position of the tooling pallet 104 and the position of the self-closing valve. The support frame 101 is provided with a tooling pallet blocking mechanism and corresponds to the positions of the high-pressure airtightness detection machine 3, the low-pressure airtightness detection machine 4, the high-pressure function detection machine 5 and the low-pressure function detection machine 6. The pallet stopping mechanism positions the tooling pallet 104, and the tooling pallet stopping mechanism can be raised and lowered. When it is raised, it can stop the tooling pallet 104, which is convenient for the robot 7 to carry the voltage regulator. There are two profiling grooves on the tooling pallet 104, and the voltage regulator cannot be put in if it is placed upside down. The tooling of the tooling pallet 104 is designed to be rectangular. The tooling pallet 104 cannot be put on the conveyor for transportation after it is rotated 90°. The shapes of the front and rear ends of the material blocking rack 105 are different. When the tooling pallet 104 is rotated 180°, the material blocking rack 105 will block the tooling pallet 104 and the voltage regulator. The combination of the three error-proofing and fool-proofing measures ensures that the position and posture of the self-closing valve to be inspected are when it is transported to the inspection position with the tooling pallet 104. Correct, to avoid collision between the robot 7 and the machine when picking up and placing. The tooling tray line changing and rotating mechanisms at the left and right ends of the support frame 101 facilitate the transfer of the tooling tray 104 between the front conveyor 103 and the rear conveyor 102, thereby achieving a good flow effect on the tooling tray 104. The robot 7 grabs the voltage regulator to be inspected from the tooling tray 104, and at the same time, the barcode scanning gun 106 scans and records the barcode on the voltage regulator to be inspected, and then places the voltage regulator to be inspected on the high-pressure airtightness testing machine 3 for high-pressure airtightness testing. After the test is completed, if there are unqualified products, the robot 7 first removes the unqualified products to the unqualified product rejection box at a distance, and puts the qualified products back to the tooling tray 104. Similarly, the voltage regulator is passed through the low-pressure The airtightness tester 4, the high-pressure function tester 5 and the low-pressure function tester 6 are tested, and then the qualified pressure regulator is carried by the robot 7 on the far right to the buffer conveyor belt line on the right. When the high-pressure airtightness tester 3 is working, the tooling on the high-pressure airtightness tester 3 clamps the pressure regulator to be tested, opens the test valve 305, and the pressure regulator to be tested is connected to the air outlet end of the test valve 305. The charging valve 304 is opened, and the external compressed air enters the interior of the gas tank 303 through the pressure reducing valve 302. The pressure reducing valve 302 reduces the pressure of the external compressed air to 1.76Mpa. The gas tank 303 temporarily stores the depressurized air. The pressure sensor 308 detects the pressure inside the system. If the pressure is greater than 1.After reaching 76Mpa, stabilize the pressure for 5S, close the charging valve 304, and after stabilizing the pressure for 5S, close the detection valve 305, balance for 20S, use the differential pressure sensor 307 to detect the pressure difference between the standard product and the pressure regulator to be tested, record the differential pressure value P1, detect for 10S, record the differential pressure value P2, and open the detection valve 305 and the exhaust valve 306 at the same time. The gas inside the system is discharged to the outside through the muffler 301, open the tooling, and convert it into leakage through P2-P1 to complete the high-pressure sealing test. When testing with the low-pressure airtightness tester 4, open the detection valve 2 405 and the detection valve 3 409 at the same time, connect the two sides of the differential pressure sensor 2 406, and clamp the pressure regulator to be tested with the tooling on the low-pressure airtightness tester 4. The pressure regulator to be tested is connected to the detection valve 2 405 and the differential pressure sensor 2 406 through the sponge 407. The air inlet valve 1 404 and the exhaust valve 2 410 are opened. The external compressed air enters the gas tank 2 403 through the pressure reducing valve 2 402. The pressure reducing valve 2 402 reduces the system pressure to 15Kpa. The gas tank 2 403 buffers the gas and then enters the gas system. The pressure sensor 2 408 detects the system pressure to ensure that the pressure value is greater than 15.2Kpa. The air inlet valve 1 404 is closed, and the pressure value is reduced to 15±0.1kpa by adjusting the throttle valve 401. At the same time, the detection valve 2 405 and the detection valve 3 409 are closed, and the exhaust valve 2 410 is closed. Balance for 5s, and the differential pressure Sensor 2 406 detects the pressure difference between the standard product and the pressure regulator to be tested, records the differential pressure value P3, tests for 10 seconds, records the differential pressure value P4, opens the tooling, calculates the leakage value of the pressure regulator through P4-P3, and completes the low-pressure sealing test. When the high-pressure function tester 5 is tested, the tooling on the high-pressure function tester 5 clamps the pressure regulator to be tested, and the pressure regulator to be tested is connected in series between the pressure sensor 3 506 and the pressure sensor 4 507. The air inlet valve 2 505 is opened, and the external compressed air enters the interior of the gas tank 3 504 through the ball valve 502 and the pressure reducing valve 3 503. The pressure reducing valve 3 503 reduces the system pressure to 1.29Mpa, and then enters the pressure regulator to be tested through the air inlet valve 2 505. Internally, pressure sensor 3 506 detects the pressure value inside the system, the button lifting cylinder 9 pulls up the button of the pressure regulator through the button clamping cylinder 10, the regulating valve 1 501 opens a small opening first and then closes, the sensor 4 507 detects the outlet pressure, observes the change of the outlet pressure P1 after 5s, if P1 is stable ≤4Kpa, proceed to the next step, if P1 is unstable, continue to observe the final stable pressure within 5min, if it is still unstable after 5min, it is judged as unqualified, the flow sensor 1 508 detects the flow, adjusts the regulating valve 1 501, so that the flow reaches 10% of the rated flow, and uses the pressure sensor 4 507 to measure the outlet pressure = P6, P6 ≤ 3.3kpa is qualified, otherwise it is unqualified. Continue to adjust the regulating valve 501 to increase the outlet opening. If the pressure regulator can be closed, it is qualified, otherwise it is unqualified. Use the flow sensor 508 to collect the flow value Q1 during the overflow. After the pressure regulator is closed, close the regulating valve 501. After 5s, observe the pressure change of the pressure sensor 4 507. The pressure increase within 5s is less than 400pa. It is judged that the closed leakage is less than 200m l / h, it is judged as qualified, otherwise it is unqualified, the air inlet valve two 505 is closed, the tooling loosens the pressure regulator, and then the high-pressure function test is completed. When the low-pressure function test machine 6 is tested, the tooling on the low-pressure function test machine 6 clamps the pressure regulator, and then the air inlet valve three 604 is opened. The external compressed air enters the interior of the gas tank four 603 through the pressure reducing valve four 602. The pressure reducing valve four 602 reduces the system gas pressure to 0.2Mpa, and the gas inside the gas tank four 603 enters the pressure regulator to be tested through the air inlet valve three 604 and the electrical proportional valve 605. The pressure sensor five 606 detects the intake pressure, and the button lifting cylinder 9 pulls up the button of the pressure regulator through the button clamping cylinder 10 to adjust the regulating valve two 601. Sensor 2 608 detects the flow rate, so that the flow rate reaches 100% of the rated flow rate. Pressure sensor 6 607 measures the outlet pressure P7. If P7 ≥ 2.3 kpa, it is qualified. Otherwise, it is unqualified. Continue to adjust valve 2 601. Flow sensor 2 608 records the flow rate Q2 when the pressure regulator is cut off. If Q2 ≥ 110% of the rated flow rate, it is qualified. Otherwise, it is unqualified. After the pressure regulator is closed, close the regulating valve 2 601. After 5 seconds, observe the pressure change of pressure sensor 6 607. If the pressure increase within 5 seconds is less than 400 pa, it is judged that the closing leakage is less than 200 ml / h, which is qualified. Otherwise, it is unqualified. Close the intake valve 3 604, loosen the pressure regulator, and then complete the low-pressure function test. .
[0103] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for detecting a bottled liquefied petroleum gas pressure regulator, comprising an automatic detection device for a bottled liquefied petroleum gas pressure regulator and a method for detecting a bottled liquefied petroleum gas pressure regulator; The automatic detection device for bottled liquefied petroleum gas pressure regulator comprises a conveying unit (1); The conveying unit (1) is provided with a loading unit (2) on the right side of the front side thereof; a symmetrically distributed high-pressure airtightness tester (3) is placed on the left side of the front side of the conveying unit (1); a symmetrically distributed low-pressure airtightness tester (4) is placed on the left end of the conveying unit (1); a symmetrically distributed high-pressure function tester (5) is placed on the left side of the rear side of the conveying unit (1); a symmetrically distributed low-pressure function tester (6) is placed on the right side of the rear side of the conveying unit (1); a robot (7) is placed between the two high-pressure airtightness testers (3), between the two low-pressure airtightness testers (4), between the two high-pressure function testers (5) and between the two low-pressure function testers (6); the input end of the robot (7) is electrically connected to the output end of the external controller; The conveying unit (1) comprises a support frame (101), a rear conveyor (102), a front conveyor (103) and a tooling pallet (104); the support frame (101) is located in the middle of a loading unit (2), a high-pressure airtightness tester (3), a low-pressure airtightness tester (4), a high-pressure function tester (5) and a low-pressure function tester (6); a rear conveyor (102) is provided on the rear side of the upper surface of the support frame (101); a front conveyor (103) is provided on the front side of the upper surface of the support frame (101); tooling pallets (104) are evenly distributed on the upper surfaces of the front conveyor (103) and the rear conveyor (102); input ends of the rear conveyor (102) and the front conveyor (103) are electrically connected to the output end of an external controller; Features: The testing method of bottled liquefied petroleum gas pressure regulator includes the following steps: S1: The loading unit (2) places the voltage regulator on the tooling tray (104) on the front conveyor (103), the front conveyor (103) drives the voltage regulator to move to the left, and the rear conveyor (102) drives the voltage regulator to move to the right; S2: The robot (7) in the middle of the two high-pressure airtightness testing machines (3) moves the delivered voltage regulator to the high-pressure airtightness testing machine (3) to perform a high-pressure airtightness test. After the test is completed, the robot (7) moves the qualified voltage regulator to the tooling tray (104); S3: The robot (7) in the middle of the two low-pressure airtightness testing machines (4) moves the delivered voltage regulator to the low-pressure airtightness testing machine (4) to perform a low-pressure airtightness test. After the test is completed, the robot (7) moves the qualified voltage regulator to the tooling tray (104); S4: The robot (7) in the middle of the two high-voltage function testing machines (5) moves the delivered voltage regulator to the high-voltage function testing machine (5) to perform a high-voltage function test. After the test is completed, the robot (7) moves the qualified voltage regulator to the tooling tray (104); S5: The robot (7) in the middle of the two low-voltage function testers (6) moves the conveyed voltage regulator to the low-voltage function tester (6) to perform a low-voltage function test, and after the test is completed, moves it to the buffer conveyor belt line on the right; The high voltage function testing machine (5) comprises the following steps during testing: S401: The tooling on the high-pressure function tester (5) clamps the voltage regulator to be tested, and the voltage regulator to be tested is connected in series between the pressure sensor three (506) and the pressure sensor four (507). The air inlet valve two (505) is opened, and the external compressed air enters the interior of the gas tank three (504) through the ball valve (502) and the pressure reducing valve three (503), and then enters the interior of the voltage regulator to be tested through the air inlet valve two (505). The pressure sensor three (506) detects the pressure value inside the system, and the button lifting cylinder (9) pulls up the button of the voltage regulator through the button lifting claw cylinder (10); S402: The regulating valve 1 (501) is first opened a little and then closed; S403: The pressure sensor 4 (507) detects the outlet pressure, and observes the change of the outlet pressure P5 after 5 seconds. If P5 is stable ≤ 4Kpa, proceed to the next step. If P5 is unstable, continue to observe the final stable pressure within 5 minutes. If it is still unstable after 5 minutes, it is judged as unqualified. S404: Flow sensor 1 (508) detects the flow rate, adjusts regulating valve 1 (501) to make the flow rate reach 10% of the rated flow rate, and uses pressure sensor 4 (507) to measure the outlet pressure = P6. If P6≤3.3kpa, it is qualified, otherwise it is unqualified; S405: Continue to adjust the regulating valve 1 (501) to increase the outlet opening. If the pressure regulator can be closed, it is qualified. Otherwise, it is unqualified. Use the flow sensor 1 (508) to collect the flow value Q1 during the flow. S406: After the pressure regulator is closed, close the regulating valve 1 (501), and observe the pressure change of the pressure sensor 4 (507) after 5 seconds. If the pressure increase is less than 400 Pa within 5 seconds, it is judged that the closing leakage is less than 200 ml / h, and it is judged to be qualified, otherwise it is unqualified; S407: Close the second air inlet valve (505), and release the pressure regulator; The low-voltage function detection machine (6) comprises the following steps during detection: S501: After the tooling on the low-pressure function tester (6) clamps the voltage regulator, the air inlet valve three (604) is opened, and the external compressed air enters the interior of the gas tank four (603) through the pressure reducing valve four (602), and the gas inside the gas tank four (603) enters the voltage regulator to be tested through the air inlet valve three (604) and the electrical proportional valve (605), and the pressure sensor five (606) detects the air inlet pressure, and the button lifting cylinder (9) pulls up the button of the voltage regulator through the button clamping claw cylinder (10); S502: Regulate the regulating valve 2 (601), the flow sensor 2 (608) detects the flow rate to make the flow rate reach 100% of the rated flow rate, and the pressure sensor 6 (607) measures the outlet pressure P7, and P7 ≥ 2.3 kpa is qualified, otherwise it is unqualified; S503: Continue to adjust the valve 2 (601), the flow sensor 2 (608) records the flow rate Q2 when the pressure regulator is cut off, Q2 ≥ 110% of the rated flow rate is qualified, otherwise it is unqualified; S504: After the pressure regulator is closed, close the regulating valve 2 (601), and observe the pressure change of the pressure sensor 6 (607) after 5 seconds. If the pressure increase is less than 400 Pa within 5 seconds, it is judged that the closing leakage is less than 200 ml / h, which is qualified, otherwise it is unqualified; S505: Close the air inlet valve 3 (604), and the tooling releases the pressure regulator.
2. The method for detecting a bottled liquefied petroleum gas pressure regulator according to claim 1, characterized in that: The high-pressure airtightness testing machine (3) comprises the following steps during testing: S201: The tooling on the high-pressure airtightness testing machine (3) clamps the pressure regulator to be tested, opens the testing valve (305), and connects the pressure regulator to be tested with the gas outlet end of the testing valve (305); S202: Open the charging valve (304), and the external compressed air enters the interior of the gas tank (303) through the pressure reducing valve (302). The pressure sensor (308) detects the pressure inside the system. When the pressure is greater than 1.76Mpa, the pressure is stabilized for 5S; S203: Close the inflation valve (304), stabilize the pressure for 5 seconds, and then close the detection valve 1 (305); S204: Balance for 20 seconds, the differential pressure sensor 1 (307) detects the pressure difference between the standard product and the pressure regulator to be tested, and records the differential pressure value P1; S205: Detect for 10 seconds and record the differential pressure value P2; S206: Open the detection valve (305) and the exhaust valve 1 (306) at the same time, and the gas inside the system is discharged to the outside through the muffler (301); S207: Open the tooling and convert the leakage amount through P2-P1.
3. The method for detecting a bottled liquefied petroleum gas pressure regulator according to claim 1, characterized in that: The low-pressure airtightness detection machine (4) comprises the following steps during detection: S301: Open the second detection valve (405) and the third detection valve (409) at the same time to connect the two sides of the differential pressure sensor 2 (406); S302: The tooling on the low-pressure airtightness testing machine (4) clamps the pressure regulator to be tested, and the pressure regulator to be tested is connected to the second detection valve (405) and the second differential pressure sensor (406) through the sponge (407); S303: Open the air inlet valve 1 (404) and the air exhaust valve 2 (410), and the external compressed air enters the air tank 2 (403) through the pressure reducing valve 2 (402), and then enters the air circuit system. The pressure sensor 2 (408) detects the system pressure to ensure that the pressure value is greater than 15.2Kpa; S304: close the air inlet valve 1 (404), and adjust the throttle valve (401) to reduce the pressure to 15±0.1 kPa; S305: Close the second detection valve (405) and the third detection valve (409) at the same time; S306: Close the second exhaust valve (410), balance for 5 seconds, and use the second differential pressure sensor (406) to detect the pressure difference between the standard product and the pressure regulator to be tested, and record the differential pressure value P3; S307: Detect for 10 seconds and record the differential pressure value P4; S308: Open the tooling and calculate the leakage value of the voltage regulator through P4-P3.
4. The method for detecting a bottled liquefied petroleum gas pressure regulator according to claim 1, characterized in that: The conveying unit (1) further comprises a material stopping rack (105), and there are four material stopping racks (105). Two material stopping racks (105) are arranged at the upper ends of the rear conveyor (102) and the front conveyor (103).
5. The method for detecting a bottled liquefied petroleum gas pressure regulator according to claim 1, characterized in that: The conveying unit (1) further comprises a barcode scanning gun (106), wherein the barcode scanning gun (106) is symmetrically mounted on the middle part of the upper surface of the support frame (101), and the output end of the barcode scanning gun (106) is electrically connected to the input end of the external controller.
6. The method for detecting a bottled liquefied petroleum gas pressure regulator according to claim 1, characterized in that: The upper surfaces of the high-pressure airtightness tester (3), the low-pressure airtightness tester (4), the high-pressure function tester (5) and the low-pressure function tester (6) are all provided with evenly distributed large cylinders (8), the telescopic ends of the large cylinders (8) are all provided with button lifting cylinders (9), and the telescopic ends of the button lifting cylinders (9) are all provided with button clamping claw cylinders (10).
Citation Information
Patent Citations
Automatic detection equipment and detection method for self-closing valve
CN116296358A
Self-closing valve testing device
CN218239313U
A voltage regulator detection tool
CN220960494U