A new energy vehicle connector based on the Internet of Things

Through the Internet of Things intelligently manage the charging process of new energy vehicle connectors, predict vehicle electricity consumption and optimize charging time, solving the problems of home charging efficiency and cost of new energy vehicle connectors, and reducing grid charging when electricity prices are high Car use cost.

CN118578906BActive Publication Date: 2024-12-06SHENZHEN CHANGJIANG CONNECTOR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411076776.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-12-06
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

New energy vehicle connectors have slow charging power when charging at home, which has a high burden on the power grid and high electricity bills during peak periods, resulting in higher vehicle costs.

Method used

Design a new energy vehicle connector based on the Internet of Things to obtain the vehicle's historical electricity consumption data and current electricity through the controller, predict the target electricity consumption, and intelligent charging management between the Internet of Things and the power grid, allocate charging time and electricity to Optimize charging efficiency and cost.

Benefits of technology

Reduce the use of the power grid to charge during periods of high electricity prices, meet the vehicle's electricity demand, reduce charging costs, and improve charging efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118578906B_ABST
    Figure CN118578906B_ABST
Patent Text Reader

Abstract

The present application provides a new energy vehicle connector based on the Internet of Things, which belongs to the technical field of charging equipment, and includes a controller and at least two charging and discharging management modules. The controller is configured as follows: the controller determines, based on the Internet of Things, first historical power consumption data of a first vehicle currently connected to the first management module, and second historical power consumption data of a second vehicle currently connected to the second management module; the controller obtains, based on the first historical power consumption data and the second historical power consumption data, a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period; the controller obtains a first current power consumption of the first vehicle and a second current power consumption of the second vehicle; the controller allocates the first current power consumption and the second current power consumption based on the first target power consumption and the second target power consumption, so that the first target power consumption is greater than or equal to the first current power consumption, and the second target power consumption is greater than or equal to the second current power consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of charging equipment, and in particular to a new energy vehicle connector based on the Internet of Things. Background Art

[0002] New energy vehicle connector is an important component used to connect various electrical equipment of new energy vehicles. It is a current transmission device that can effectively connect the power supply with electrical equipment to ensure the stability and safety of power supply. New energy vehicle connectors are usually made of metal materials, have good conductivity and corrosion resistance, and can withstand higher voltage and current.

[0003] As the new energy vehicle market continues to expand, the demand for new energy vehicle connectors is also gradually increasing. This is because the number and complexity of electrical equipment in new energy vehicles are higher, and more connectors are needed to meet various connection needs. At the same time, the development of new energy vehicle connectors is also driven by technological innovations, such as wireless charging technology and smart grid technology. The development of these technologies has brought new opportunities and challenges to new energy vehicle connectors.

[0004] In the prior art, a family may own multiple vehicles for regular use, which are generally charged through a connector connected to the power grid at home. The charging power of the home connector (home charger) is slow, and when charging during peak hours, the burden on the power grid is large, and the electricity bill is high, resulting in high vehicle use costs. Summary of the invention

[0005] The embodiment of the present application provides a new energy vehicle connector based on the Internet of Things to improve the above-mentioned problems.

[0006] In order to achieve the above objectives, this application adopts the following technical solutions:

[0007] In the first aspect, the present application proposes a new energy vehicle connector based on the Internet of Things, including a controller and at least two charge and discharge management modules, namely a first management module and a second management module, the first management module is connected to the second management module, and the first management module and the second management module are respectively connected to the power grid, and the controller is configured as:

[0008] The controller obtains, based on the Internet of Things, first historical power usage data of a first vehicle currently connected to the first management module and second historical power usage data of a second vehicle currently connected to the second management module;

[0009] The controller obtains a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period based on the first historical power consumption data and the second historical power consumption data;

[0010] The controller obtains a first current power of the first vehicle and a second current power of the second vehicle;

[0011] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power and the second target power is greater than or equal to the second current power.

[0012] In conjunction with the first aspect, in some embodiments, the controller is configured to:

[0013] The controller obtains electricity price information from the server based on the Internet of Things, and determines the target charging time interval based on the electricity price information;

[0014] The controller determines the current connection status of the first vehicle and the second vehicle with the connector;

[0015] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, the first management module and the second management module are controlled to charge the first vehicle and the second vehicle through the power grid.

[0016] In conjunction with the first aspect, in some embodiments, the controller is configured to:

[0017] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes:

[0018] The controller determines whether the first vehicle and the second vehicle are fully charged within a target charging time interval;

[0019] If the first vehicle is fully charged but the second vehicle is not fully charged, the controller controls the first management module to discharge the first vehicle to the second management module, and the second management module charges the second vehicle.

[0020] If the second vehicle is fully charged but the first vehicle is not fully charged, the controller controls the second management module to discharge the second vehicle to the first management module, and the first management module charges the first vehicle.

[0021] In conjunction with the first aspect, in some embodiments, the controller is configured to:

[0022] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes:

[0023] If the first vehicle and the second vehicle are not fully charged, the controller controls the first management module and the second management module to charge the first vehicle and the second vehicle at rated power within the target charging time interval.

[0024] In conjunction with the first aspect, in some embodiments, the controller is configured to:

[0025] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including:

[0026] Determine the total target power consumption based on the sum of the first target power consumption and the second target power consumption;

[0027] The controller obtains electricity price information from the server based on the Internet of Things, and determines a secondary target charging interval based on the electricity price information, wherein the electricity price corresponding to the secondary target charging interval is only higher than the electricity price corresponding to the target charging time interval;

[0028] The controller controls the first management module and the second management module to charge the first vehicle and the second vehicle simultaneously, so that the total power consumption of the first vehicle and the second vehicle after charging is completed is greater than or equal to the total target power consumption.

[0029] In conjunction with the first aspect, in some embodiments, the controller is configured to:

[0030] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including:

[0031] If the first current power is less than the first target power, the controller controls the first management module to discharge from the second vehicle to the first management module, and the first management module charges the first vehicle until the first current power is equal to the first target power;

[0032] If the second current power is less than the second target power consumption, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle until the second current power is equal to the second target power consumption.

[0033] In the second aspect, the present application proposes a method for using a new energy vehicle connector based on the Internet of Things, which is applicable to a new energy vehicle connector based on the Internet of Things. The connector includes a controller and at least two charge and discharge management modules, namely a first management module and a second management module. The first management module is connected to the second management module, and the first management module and the second management module are respectively connected to the power grid. The method includes:

[0034] The controller obtains, based on the Internet of Things, first historical power usage data of a first vehicle currently connected to the first management module and second historical power usage data of a second vehicle currently connected to the second management module;

[0035] The controller obtains a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period based on the first historical power consumption data and the second historical power consumption data;

[0036] The controller obtains a first current power of the first vehicle and a second current power of the second vehicle;

[0037] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power and the second target power is greater than or equal to the second current power.

[0038] In conjunction with the second aspect, in some embodiments, the method comprises:

[0039] The controller obtains electricity price information from the server based on the Internet of Things, and determines the target charging time interval based on the electricity price information;

[0040] The controller determines the current connection status of the first vehicle and the second vehicle with the connector;

[0041] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, the first management module and the second management module are controlled to charge the first vehicle and the second vehicle through the power grid.

[0042] In conjunction with the second aspect, in some embodiments, the method comprises:

[0043] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes:

[0044] The controller determines whether the first vehicle and the second vehicle are fully charged within a target charging time interval;

[0045] If the first vehicle is fully charged but the second vehicle is not fully charged, the controller controls the first management module to discharge the first vehicle to the second management module, and the second management module charges the second vehicle.

[0046] If the second vehicle is fully charged but the first vehicle is not fully charged, the controller controls the second management module to discharge the second vehicle to the first management module, and the first management module charges the first vehicle.

[0047] In conjunction with the second aspect, in some embodiments, the method comprises:

[0048] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes:

[0049] If the first vehicle and the second vehicle are not fully charged, the controller controls the first management module and the second management module to charge the first vehicle and the second vehicle at rated power within the target charging time interval.

[0050] In conjunction with the second aspect, in some embodiments, the method comprises:

[0051] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including:

[0052] Determine the total target power consumption based on the sum of the first target power consumption and the second target power consumption;

[0053] The controller obtains electricity price information from the server based on the Internet of Things, and determines a secondary target charging interval based on the electricity price information, wherein the electricity price corresponding to the secondary target charging interval is only higher than the electricity price corresponding to the target charging time interval;

[0054] The controller controls the first management module and the second management module to charge the first vehicle and the second vehicle simultaneously, so that the total power consumption of the first vehicle and the second vehicle after charging is completed is greater than or equal to the total target power consumption.

[0055] In conjunction with the second aspect, in some embodiments, the method comprises:

[0056] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including:

[0057] If the first current power is less than the first target power, the controller controls the first management module to discharge from the second vehicle to the first management module, and the first management module charges the first vehicle until the first current power is equal to the first target power;

[0058] If the second current power is less than the second target power consumption, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle until the second current power is equal to the second target power consumption.

[0059] A third aspect of an embodiment of the present invention provides an electronic device, the electronic device comprising:

[0060] At least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method proposed in the first aspect of the embodiment of the present invention.

[0061] A fourth aspect of an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method provided in the first aspect of the embodiment of the present invention.

[0062] In summary, the above method and device have the following technical effects:

[0063] A new energy vehicle connector based on the Internet of Things proposed in an embodiment of the present application is provided with a first management module and a second management module that are interconnected and independently connected to the power grid. The vehicle information connected at this time is obtained through the Internet of Things, and the power required for the next usage cycle is predicted through the vehicle information. Then, the power between different vehicles is distributed through the first management module and the second management module, so that the vehicle usage needs can be met without using the power grid for charging during the time period with higher electricity prices. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 This is a flow chart of a method for using a new energy vehicle connector based on the Internet of Things proposed in an embodiment of the present application. DETAILED DESCRIPTION

[0065] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0066] The embodiment of the present application proposes a method for using a new energy vehicle connector based on the Internet of Things, which is applicable to a new energy vehicle connector based on the Internet of Things, the connector includes a controller and at least two charging and discharging management modules, namely a first management module and a second management module, the first management module is connected to the second management module, and the first management module and the second management module are connected to the power grid respectively. In some other embodiments, according to different needs and environments, a third management module and a fourth management module may also be included... The specific number is not limited in this application. In this application, two charging modules are taken as an example.

[0067] See also Figure 1 , the method of use includes the following steps:

[0068] S101: The controller obtains first historical power usage data of a first vehicle currently connected to a first management module and second historical power usage data of a second vehicle currently connected to a second management module based on the Internet of Things.

[0069] It can be understood that the controller can obtain the detailed power consumption records of the first vehicle that is currently closely connected to the first management module in the past period of time by using the advanced connection capabilities of the Internet of Things. This includes all power consumption of the vehicle, such as energy consumption data in various aspects such as starting, driving, and air conditioning use. At the same time, the controller can also obtain the detailed power consumption of the second vehicle currently connected to the second management module in the past period of time. Similarly, this covers the power consumption of the vehicle in all aspects. In this way, the controller can fully understand and grasp the power consumption history data of the two vehicles, and provide data support for subsequent energy management. In some other embodiments, the historical power consumption data of other vehicles such as the third vehicle connected to the third management module can also be obtained in the same way.

[0070] S102: The controller obtains a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period based on the first historical power consumption data and the second historical power consumption data.

[0071] It is understandable that the controller will calculate the first target power consumption required by the first vehicle and the second target power consumption required by the second vehicle within the forecast period based on the first historical power consumption data and the second historical power consumption data collected previously. In this process, the controller will analyze the historical power consumption data in detail to more accurately predict future power demand. In other embodiments, the target power consumption of more vehicles can also be obtained in the same way.

[0072] S103: The controller obtains a first current power level of the first vehicle and a second current power level of the second vehicle.

[0073] The controller first obtains the current power of the first vehicle, that is, the remaining power of the first vehicle. This power is a direct reflection of the electric energy consumed by the first vehicle during operation. It can be used to determine the remaining mileage of the first vehicle or whether it needs to be charged in time. Subsequently, the controller will also obtain the current power of the second vehicle, that is, the remaining power of the second vehicle. This power can also reflect the remaining mileage or charging demand of the second vehicle. By obtaining these two power levels, the controller can understand the power status of the two vehicles in real time, so as to make corresponding control decisions. In some other embodiments, the current power of the third vehicle and the fourth vehicle can also be obtained so that the controller can obtain the total power of all vehicles currently connected.

[0074] S104: The controller obtains electricity price information from the server based on the Internet of Things, and determines the target charging time interval based on the electricity price information.

[0075] It is understandable that by utilizing the Internet of Things technology, real-time electricity price information can be obtained from a remote server. As an implementation method, algorithms and data analysis can be used to deeply process and analyze the obtained electricity price data to ensure that the trend and law of electricity price fluctuations can be accurately grasped. Based on this accurate electricity price information, the controller can intelligently calculate and determine the most economical charging time interval. This time interval is to help users achieve the most cost-optimized charging plan by comprehensively considering the high and low electricity prices and charging needs, thereby achieving the purpose of saving electricity bills and improving charging efficiency.

[0076] S105: The controller determines the current connection status of the first vehicle and the second vehicle with the connector.

[0077] It is understandable that in this embodiment, the controller will verify and evaluate in detail whether the first vehicle and the second vehicle are currently connected to the connector. In some embodiments, the controller will also monitor the stability of the connection to ensure that the connector can withstand various stresses during the operation of the vehicle and ensure that the connection will not become loose or have other problems. In addition, the controller will also track the status of the connector in real time so that when the connector is abnormal, an alarm will be issued in time and corresponding measures will be taken.

[0078] S106: If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, the first management module and the second management module are controlled to charge the first vehicle and the second vehicle through the power grid.

[0079] It can be understood that in this embodiment, if the first vehicle and the second vehicle mentioned are connected to the power grid system through the connector within a predetermined charging time range, then within this charging time window, the first management module and the second management module will be instructed to use the energy transmission function of the power grid to supply power to the first vehicle and the second vehicle to meet their charging needs.

[0080] In some implementations, during the charging process, since it is uncertain whether the vehicle can be fully charged within the charging interval, in this embodiment, the controller also needs to determine whether the first vehicle and the second vehicle are fully charged within the target charging time interval.

[0081] In this embodiment, if the first vehicle is fully charged and the second vehicle is not fully charged, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle. If the second vehicle is fully charged and the first vehicle is not fully charged, the controller controls the second management module to discharge from the second vehicle to the first management module, and the first management module charges the first vehicle. It can be understood that since the first management module and the second management module are subject to power restrictions when connected to the civil power grid, they can only be charged at the rated maximum power, such as the standard 7kw, 14kw, etc. In the case that a vehicle is already fully charged, in this embodiment, since the first management module and the second management module are connected, the redundant charging power of the fully charged vehicle can be used to charge another vehicle using the connection between them, that is, at this time, the two management modules can still charge at the maximum rated power, and charge as much as possible between the time intervals when the electricity price is relatively cheap. How to distribute electric energy has been disclosed in the relevant technology and is not limited here.

[0082] In some other embodiments, it may be the case that the first vehicle and the second vehicle are not fully charged within the target charging interval. Therefore, if the first vehicle and the second vehicle are not fully charged, the controller controls the first management module and the second management module to charge the first vehicle and the second vehicle at the rated full load power within the target charging time interval.

[0083] At this time, the controller can obtain electricity price information from the server based on the Internet of Things, and determine the secondary target charging interval based on the electricity price information, wherein the electricity price corresponding to the secondary target charging interval is only higher than the electricity price corresponding to the target charging time interval. Of course, in this embodiment, two electricity price intervals are taken as an example, and in actual use, multiple intervals from low to high can also be used.

[0084] In the above steps, the total target power consumption, that is, the power required to be used later, can be determined by the sum of the first target power consumption and the second target power consumption. The controller controls the first management module and the second management module to charge the first vehicle and the second vehicle at the same time, so that the total power of the first vehicle and the second vehicle after charging is completed is greater than or equal to the total target power consumption. In this way, electricity charges can be saved to the maximum extent and the use cost can be reduced.

[0085] S107: The controller allocates the first current power consumption and the second current power consumption based on the first target power consumption and the second target power consumption, so that the first target power consumption is greater than or equal to the first current power consumption, and the second target power consumption is greater than or equal to the second current power consumption.

[0086] Specifically, if the first current power is less than the first target power consumption, the controller controls the first management module to discharge from the second vehicle to the first management module, and the first management module charges the first vehicle until the first current power is equal to the first target power consumption. If the second current power is less than the second target power consumption, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle until the second current power is equal to the second target power consumption. In some other embodiments, power can also be distributed among multiple vehicles. In this way, while meeting the usage needs, the electricity charges in the time period with lower prices can be used to the maximum extent, saving usage costs.

[0087] The embodiment of the present application proposes a method for using a new energy vehicle connector based on the Internet of Things. A first management module and a second management module are provided which are interconnected and independently connected to the power grid. The information of the vehicle connected at this time is obtained through the Internet of Things, and the power required for the next usage cycle is predicted through the vehicle information. Then, the power between different vehicles is distributed through the first management module and the second management module. This can achieve that during time periods with higher electricity prices, the vehicle usage needs can be met without using the power grid for charging.

[0088] Based on the same inventive concept, the embodiment of the present application also proposes a new energy vehicle connector based on the Internet of Things, characterized in that it includes a controller and at least two charge and discharge management modules, namely a first management module and a second management module, the first management module is connected to the second management module, and the first management module and the second management module are respectively connected to the power grid, and the controller is configured as:

[0089] The controller obtains, based on the Internet of Things, first historical power usage data of a first vehicle currently connected to the first management module and second historical power usage data of a second vehicle currently connected to the second management module;

[0090] The controller obtains a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period based on the first historical power consumption data and the second historical power consumption data;

[0091] The controller obtains a first current power of the first vehicle and a second current power of the second vehicle;

[0092] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power and the second target power is greater than or equal to the second current power.

[0093] In some embodiments, the controller is configured to:

[0094] The controller obtains electricity price information from the server based on the Internet of Things, and determines the target charging time interval based on the electricity price information;

[0095] The controller determines the current connection status of the first vehicle and the second vehicle with the connector;

[0096] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, the first management module and the second management module are controlled to charge the first vehicle and the second vehicle through the power grid.

[0097] In some embodiments, the controller is configured to:

[0098] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes:

[0099] The controller determines whether the first vehicle and the second vehicle are fully charged within a target charging time interval;

[0100] If the first vehicle is fully charged but the second vehicle is not fully charged, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle;

[0101] If the second vehicle is fully charged but the first vehicle is not fully charged, the controller controls the second management module to discharge the second vehicle to the first management module, and the first management module charges the first vehicle.

[0102] In some embodiments, the controller is configured to:

[0103] If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then during the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes:

[0104] If the first vehicle and the second vehicle are not fully charged, the controller controls the first management module and the second management module to charge the first vehicle and the second vehicle at rated power within the target charging time interval.

[0105] In some embodiments, the controller is configured to:

[0106] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including:

[0107] Determine the total target power consumption based on the sum of the first target power consumption and the second target power consumption;

[0108] The controller obtains electricity price information from the server based on the Internet of Things, and determines a secondary target charging interval based on the electricity price information, wherein the electricity price corresponding to the secondary target charging interval is only higher than the electricity price corresponding to the target charging time interval;

[0109] The controller controls the first management module and the second management module to charge the first vehicle and the second vehicle simultaneously, so that the total power consumption of the first vehicle and the second vehicle after charging is completed is greater than or equal to the total target power consumption.

[0110] In some embodiments, the controller is configured to:

[0111] The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including:

[0112] If the first current power is less than the first target power, the controller controls the first management module to discharge from the second vehicle to the first management module, and the first management module charges the first vehicle until the first current power is equal to the first target power;

[0113] If the second current power is less than the second target power consumption, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle until the second current power is equal to the second target power consumption.

[0114] A new energy vehicle connector based on the Internet of Things proposed in an embodiment of the present application is provided with a first management module and a second management module that are interconnected and independently connected to the power grid. The vehicle information connected at this time is obtained through the Internet of Things, and the power required for the next usage cycle is predicted through the vehicle information. Then, the power between different vehicles is distributed through the first management module and the second management module, so that the vehicle usage needs can be met without using the power grid for charging during the time period with higher electricity prices.

[0115] Based on the same inventive concept, an embodiment of the present application further proposes an electronic device, the electronic device comprising:

[0116] At least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for using the new energy vehicle connector based on the Internet of Things according to an embodiment of the present application.

[0117] An electronic device proposed in an embodiment of the present application is provided with a first management module and a second management module that are interconnected and independently connected to a power grid. The first management module and the second management module obtain information of vehicles connected at the moment through the Internet of Things, and predict the amount of electricity required for the next usage cycle through the vehicle information. Then, the electricity between different vehicles is distributed through the first management module and the second management module. This can achieve the goal of meeting the vehicle's usage needs even during periods of higher electricity prices without using the power grid for charging.

[0118] In addition, to achieve the above-mentioned purpose, an embodiment of the present application also proposes a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, a method for using the new energy vehicle connector based on the Internet of Things in an embodiment of the present application is implemented.

[0119] The following is a detailed introduction to the various components of electronic equipment:

[0120] The processor is the control center of the electronic device, which can be a processor or a general term for multiple processing elements. For example, the processor is one or more central processing units (CPUs), or an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present invention, such as one or more microprocessors (digital signal processors, DSPs), or one or more field programmable gate arrays (FPGAs).

[0121] Optionally, the processor can perform various functions of the electronic device by running or executing a software program stored in the memory, and calling data stored in the memory.

[0122] The memory is used to store the software program for executing the solution of the present invention, and the execution is controlled by the processor. The specific implementation method can refer to the above method embodiment and will not be repeated here.

[0123] Optionally, the memory may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory may be integrated with the processor, or may exist independently and be coupled to the processor through an interface circuit of the electronic device, which is not specifically limited in the embodiments of the present invention.

[0124] A transceiver is used to communicate with a network device or a terminal device.

[0125] Optionally, the transceiver may include a receiver and a transmitter, wherein the receiver is used to implement a receiving function, and the transmitter is used to implement a sending function.

[0126] Optionally, the transceiver may be integrated with the processor, or may exist independently and be coupled to the processor via an interface circuit of the router, which is not specifically limited in the embodiment of the present invention.

[0127] In addition, the technical effects of the electronic device can refer to the technical effects of the data transmission method in the above method embodiment, which will not be repeated here.

[0128] It should be understood that the processor in the embodiment of the present invention may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0129] It should also be understood that the memory in the embodiments of the present invention may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of random access memory (RAM) are available, such as static RAM (SRAM), dynamic random access memory (DRAM), synchronous DRAM (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link DRAM (SLDRAM), and direct rambus RAM (DR RAM).

[0130] The above embodiments can be implemented in whole or in part by software, hardware (such as circuits), firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. Computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (such as infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0131] It should be understood that the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding.

[0132] In the present invention, "at least one" means one or more, and "plurality" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single items or plural items. For example, at least one of a, b, or c can mean: a, b, c, ab, ac, bc, or abc, where a, b, and c can be single or multiple.

[0133] It should be understood that in various embodiments of the present invention, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0134] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

Claims

1. A new energy vehicle connector based on the Internet of Things, characterized in that: The system comprises a controller and at least two charge and discharge management modules, namely a first management module and a second management module, wherein the first management module is connected to the second management module, and the first management module and the second management module are respectively connected to a power grid, and the controller is configured as follows: The controller acquires first historical power usage data of a first vehicle currently connected to the first management module and second historical power usage data of a second vehicle currently connected to the second management module based on the Internet of Things; The controller acquires, based on the first historical power consumption data and the second historical power consumption data, a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period; The controller obtains a first current power of the first vehicle and a second current power of the second vehicle; The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power; The controller obtains electricity price information from a server based on the Internet of Things, and determines a target charging time interval based on the electricity price information; The controller determines the current connection status of the first vehicle and the second vehicle with the connector; If the first vehicle and the second vehicle are both connected to the connector during the target charging time interval, then, during the target charging time interval, the first management module and the second management module are controlled to charge the first vehicle and the second vehicle through the power grid; The controller determines whether the first vehicle and the second vehicle are fully charged within the target charging time interval; If the first vehicle is fully charged but the second vehicle is not fully charged, the controller controls the first management module to discharge the charge from the first vehicle to the second management module, and the second management module charges the second vehicle; If the second vehicle has been fully charged but the first vehicle has not been fully charged, the controller controls the second management module to discharge the charge from the second vehicle to the first management module, and the first management module charges the first vehicle.

2. A new energy vehicle connector based on the Internet of Things according to claim 1, characterized in that: The controller is configured to: If the first vehicle and the second vehicle are both connected to the connector in the target charging time interval, then in the target charging time interval, controlling the first management module and the second management module to charge the first vehicle and the second vehicle through the power grid includes: If the first vehicle and the second vehicle are not fully charged, the controller controls the first management module and the second management module to charge the first vehicle and the second vehicle at rated power within the target charging time interval.

3. A new energy vehicle connector based on the Internet of Things according to claim 2, characterized in that: The controller is configured to: The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including: Determine a total target power consumption based on the sum of the first target power consumption and the second target power consumption; The controller obtains the electricity price information from the server based on the Internet of Things, and determines a secondary target charging interval based on the electricity price information, wherein the electricity price corresponding to the secondary target charging interval is only higher than the electricity price corresponding to the target charging time interval; The controller controls the first management module and the second management module to charge the first vehicle and the second vehicle simultaneously, so that the total power consumption of the first vehicle and the second vehicle after charging is greater than or equal to the total target power consumption.

4. The new energy vehicle connector based on the Internet of Things according to claim 3 is characterized in that: The controller is configured to: The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power, and the second target power is greater than or equal to the second current power, including: If the first current power is less than the first target power, the controller controls the first management module to discharge from the second vehicle to the first management module, and the first management module charges the first vehicle until the first current power is equal to the first target power; If the second current power is less than the second target power consumption, the controller controls the first management module to discharge from the first vehicle to the second management module, and the second management module charges the second vehicle until the second current power is equal to the second target power consumption.

5. A method for using a new energy vehicle connector based on the Internet of Things, characterized in that: A connector for new energy vehicles based on the Internet of Things according to any one of claims 1 to 4, the connector comprising a controller and at least two charge and discharge management modules, namely a first management module and a second management module, the first management module is connected to the second management module, and the first management module and the second management module are respectively connected to the power grid, the method comprising: The controller acquires first historical power usage data of a first vehicle currently connected to the first management module and second historical power usage data of a second vehicle currently connected to the second management module based on the Internet of Things; The controller acquires, based on the first historical power consumption data and the second historical power consumption data, a first target power consumption of the first vehicle and a second target power consumption of the second vehicle within a prediction period; The controller obtains a first current power of the first vehicle and a second current power of the second vehicle; The controller allocates the first current power and the second current power based on the first target power and the second target power so that the first target power is greater than or equal to the first current power and the second target power is greater than or equal to the second current power.

6. An electronic device, characterized in that: The electronic device comprises: at least one processor; And, a memory communicatively connected to at least one of the processors; wherein the memory stores instructions executable by at least one of the processors, and the instructions are executed by at least one of the processors so that at least one of the processors can execute the method as set forth in claim 5.

7. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the program is executed by a processor, the method as set forth in claim 5 is implemented.