A double-layer plate structure and construction method for hospital clean room renovation project

Through assembly and welding of steel plate standard sections, a double-layer board structure is formed, and waterproof coating is applied to the steel plate, which solves the problems of complex processes and poor waterproofing effects in the renovation of the hospital's clean room, and achieves simple construction, low cost, short construction period and waterproofing. Good performance.

CN118582007BActive Publication Date: 2025-02-07BEIJING URBAN CONSTR GROUP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410842375.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-02-07
Estimated Expiration
2044-06-27

AI Technical Summary

Technical Problem

In the hospital clean room renovation project, the process of adding a new closed structural panel under the original structure is complicated, and the concrete cannot be applied with waterproof coating after forming, which affects the construction quality and waterproof effect.

Method used

The steel plate standard section is assembled and welded to form a double-layer plate structure. The four sides of the steel plate standard section have an upturned edge, and the bearing plate is connected by a C-shaped piece, and waterproof coating is applied to the steel plate.

Benefits of technology

The construction process is simplified, complex mold support and reinforcement processes are avoided, the waterproof performance of the steel plate is ensured, the cost is reduced and the construction period is shortened.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118582007B_ABST
    Figure CN118582007B_ABST
Patent Text Reader

Abstract

The present invention discloses a double-layer plate structure for a hospital clean room renovation project and a construction method thereof. The structure does not require complex processes such as supporting formwork, planting reinforcement, and drilling holes to construct reinforced concrete plates. Steel plates are used for support, and the steel plates are assembled and welded using standard steel plate sections. Waterproof coatings can be applied inside the structure. Compared with reinforced concrete plates, the structure has better waterproof performance and avoids leakage caused by cracking of concrete materials. Therefore, the present invention has the advantages of simple construction, low cost, short construction period, and good waterproof performance. The standard steel plate sections can be reliably connected to each other through an upward flip plate, and C-shaped parts can be installed through an inward flip edge. This not only achieves a pre-fixing effect during splicing, but can also be pre-fixed with steel bars and combined into one body later. The construction steps are simple and the connection strength is strong.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of underground building construction, and in particular relates to a double-layer plate structure for a hospital clean room renovation project and a construction method thereof. Background Art

[0002] In various types of hospital buildings, especially in clean room renovation projects with cleanliness requirements, it is often encountered that the layout of the drawings after renovation is inconsistent with the layout of the original drawings, and even the medical use function of the renovation area changes. For example, the use function of the rooms without cleanliness requirements such as warehouses and toilets in the original drawing layout is changed to rooms with cleanliness requirements such as wards, operating rooms, ICUs, etc. According to the "General Hospital Building Design Code" GB51039-2014 6.1.2, "water supply and drainage pipes should not pass through the indoor overhead of clean rooms and important medical equipment rooms. If they must pass, leakage prevention measures should be taken." Therefore, the water supply and drainage pipes that meet the specifications in the original drawings no longer meet the specifications in the drawings after renovation due to the change in room use functions. However, the cost of re-changing the pipeline route is high, so a leakage prevention measure is required to deal with it. The conventional practice is to add a layer of structural plate under the original structural plate to form a double-layer plate structure.

[0003] In the existing conventional double-layer slab structure construction system, a new layer of reinforced concrete structural slab is added under the original water supply and drainage pipes to enclose the pipes inside, so that the water supply and drainage pipes are enclosed in the structure to avoid water leakage. However, this method has great limitations. Due to the large dead weight of the reinforced concrete slab, the structural beams on both sides need to be reinforced before construction. In addition, since the original structure has been completed during the renovation project, it is not easy to add a new closed structural slab under the original structure. It is necessary to plant reinforcement, support formwork, open the upper slab hole and then pour concrete. Not only is the process complicated, but because the concrete is formed in one piece, it is impossible to apply waterproof coating on the newly added structural slab later, and the construction quality and waterproof effect cannot be guaranteed. Summary of the invention

[0004] The present invention provides a double-layer plate structure for a hospital clean room renovation project and a construction method thereof, which are used to solve the problem that it is not easy to add a new closed structural plate under the original structure, which requires planting reinforcement, supporting formwork, opening upper plate holes and then pouring concrete. Not only is the process complicated, but also because the concrete is formed in one piece, it is impossible to subsequently apply waterproof coating on the newly added structural plate, and the construction quality and waterproof effect cannot be guaranteed. Technical problems.

[0005] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a double-layer plate structure for a hospital clean room renovation project, comprising a water pipe, a floor, a side wall and a partition plate mounting beam, the water pipe is L-shaped, the water pipe passes through the floor vertically, and the water pipe passes through the side wall horizontally and vertically, the partition plate mounting beam is located on the side of the water pipe away from the side wall, and a plurality of steel plate standard sections are installed between the side wall and the partition plate mounting beam, the length direction of the steel plate standard section is arranged parallel to the horizontal section direction of the water pipe, and the two ends of the steel plate standard section are respectively fixed to the side wall and the partition plate mounting beam by L steel, and the four sides of the steel plate standard section have upward turning edges, and a plurality of steel plate standard sections are welded in sequence through the turning plates on both sides to form a bearing plate, the L steel comprises a vertical edge and a horizontal edge, and the two ends of the steel plate standard section in the length direction are respectively placed on the horizontal edge and connected to the horizontal edge The vertical edges are respectively fixed to the side walls and the partition plate mounting beams by side chemical bolts. The vertical edges installed on the side walls are provided with perforations corresponding to the water pipes. The bottom ends of the standard sections of the steel plates and the horizontal edges are coated with a 1.5 mm thick JS waterproof coating layer. The outer sides of the standard sections of the steel plates at both ends are respectively welded and connected with side steel plates. The bottom ends of the side steel plates are flush with the bottom ends of the standard sections of the steel plates. The tops of the side steel plates extend to the bottom of the floor slabs and have hanging plates bent toward the horizontal outside. The hanging plates are fixed to the floor slabs by top chemical bolts. The tops of the flanges have inward-turned flanges that are horizontal and facing inward. Adjacent inward-turned flanges are connected by a number of C-shaped parts. The middle part of the C-shaped part is located at the top of the inward-turned flanges. The two ends of the C-shaped part are folded through the ends of the inward-turned flanges to fit the upper-turned flanges.

[0006] Preferably, a collar is fixed on the outside of the C-shaped member, and when the C-shaped member is folded to cover the inward-turned flange, the collar turns to be along the vertical direction, and the perforation of the collar is along the horizontal direction. Transverse steel bars are passed through the collar, and longitudinal steel bars and vertical bars are tied to the transverse steel bars. The vertical bars are supported on the plate of the standard section of the steel plate, and grouting material is poured in the standard section of the steel plate, and the top of the grouting material is flush with the top of the inward-turned flange.

[0007] Preferably, the waterproof coating layer is turned up 40 mm on the outer side of the L-steel on the partition plate mounting beam, and the waterproof coating layer is turned up and down 40 mm on the side wall.

[0008] Preferably, the spacing between the side chemical bolts is 300 mm, and the spacing between the top chemical bolts is 300 mm.

[0009] Preferably, the width of the hanging plate is 80 mm, and the top chemical bolt is an M12 chemical bolt.

[0010] Preferably, a waterproof sealant is provided at the joint between the L steel and the water pipe.

[0011] A double-layer plate structure for hospital clean room renovation project, comprising the following steps:

[0012] Step 1: Review the drawings, draw detailed drawings, design the layout of the standard section of the steel plate, and set the L steel opening according to the location of the water supply pipe;

[0013] Step 2: Make a standard section of steel plate. Bend the four sides of the standard section upward by 40mm. Assemble the standard section according to the required size of the newly added plate and install the C-shaped piece. During installation, bend the C-shaped piece and clamp it on the side flange to ensure the initial connection. Then weld the interface of the standard section of steel plate.

[0014] Step 3: Fix the galvanized L steel to the edge of the structural beam with M16 chemical anchor bolts, set waterproof sealant at the joints between the L steel and the water pipe, overlap the assembled steel plate standard section as a whole on the angle steel, and weld the joints;

[0015] Step 4: Apply a layer of 1.5mm thick JS waterproof coating on the bottom of the assembled steel plate standard section, and turn it up 40mm on the outer side of the L steel on the partition plate installation beam, and turn the waterproof coating layer up and down 40mm on the side wall;

[0016] Step 5: Arrange transverse reinforcement in the collar on the C-shaped member, with a spacing between the transverse reinforcement and the upper flap to facilitate insertion into the collar, support the vertical reinforcement and longitudinal reinforcement, and tie the vertical reinforcement, transverse reinforcement and longitudinal reinforcement;

[0017] Step 6: pour the grouting material until the top of the grouting material is flush with the top of the inward flange;

[0018] Step 7: Install the side steel plate. Fix the side steel plate under the upper floor slab with the top chemical bolts, weld the side steel plate to the L steel, perform secondary waterproofing, and apply a coating layer at the junction of the side steel plate and the standard section of the steel plate;

[0019] Step 8. Paint the exposed metal of steel plates, side steel plates, galvanized angle steels and bolts with anti-rust paint.

[0020] The beneficial effects of the present invention are embodied in the following aspects: 1. It does not require complex processes such as supporting formwork, planting reinforcement, and drilling holes to construct reinforced concrete slabs. It uses steel plates for support, and the steel plates are assembled and welded using standard steel plate sections, and the inside can be painted with waterproof coating. Compared with reinforced concrete slabs, it has better waterproof performance and avoids leakage caused by cracking of concrete materials. Therefore, the present application has the advantages of simple construction, low cost, short construction period, and good waterproof performance; 2. The standard steel plate sections can be reliably connected to each other through the upward flip plate, and the C-shaped parts can be installed through the inward flip edge, which not only plays the effect of pre-fixing during splicing, but can also be pre-fixed with the steel bars and combined into one later. The construction steps are simple, the connection strength is strong, and it has a very good construction effect.

[0021] Other features and advantages of the present invention will be set forth in the following description, and in part will become apparent from the description, or may be understood by practicing the present invention; the main purpose and other advantages of the present invention may be realized and obtained through the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a schematic side view of the structure of an embodiment of the present invention;

[0023] Figure 2 yes Figure 1 Schematic diagram of AA in the middle;

[0024] Figure 3 yes Figure 2 Enlarged view of point A in the middle;

[0025] Figure 4 yes Figure 2 Enlarged view of point B

[0026] Figure 5 It is a plan view of a water pipe passing through an L-steel according to an embodiment of the present invention.

[0027] Figure numerals: 1. water pipe; 2. floor slab; 3. side wall; 4. partition plate mounting beam; 5. steel plate standard section; 6. L-steel; 7. upper flange; 8. vertical edge; 9. horizontal edge; 10. side chemical bolt; 11. waterproof coating layer; 12. side steel plate; 13. hanging plate; 14. top chemical bolt; 15. inner flange; 16. C-shaped part; 17. ring; 18. transverse steel bar; 19. longitudinal steel bar; 20. vertical reinforcement; 21. grouting material. DETAILED DESCRIPTION

[0028] The technical solution of the present invention is described in detail below through examples. The following examples are merely exemplary and can only be used to explain and illustrate the technical solution of the present invention, but cannot be interpreted as limiting the technical solution of the present invention.

[0029] Combination Figure 1-5A double-layer plate structure for a hospital clean room renovation project includes a water pipe 1, a floor 2, a side wall 3 and a partition plate mounting beam 4. The water pipe 1 is L-shaped. The water pipe 1 passes through the floor 2 vertically and the side wall 3 horizontally. The partition plate mounting beam 4 is located on the side of the water pipe 1 away from the side wall 3. A plurality of steel plate standard sections 5 are installed between the side wall 3 and the partition plate mounting beam 4. The length direction of the steel plate standard section 5 is parallel to the horizontal section direction of the water pipe 1. Both ends of the steel plate standard section 5 are respectively fixed to the side wall 3 and the partition plate mounting beam 4 by L steel 6. The four sides of the steel plate standard section 5 have upward turning edges 7. A plurality of steel plate standard sections 5 are sequentially welded through the turning plates on both sides to form a bearing plate. The L steel 6 includes a vertical edge 8 and transverse edge 9, the two ends of the steel plate standard section 5 in the length direction are respectively placed on the transverse edge 9 and welded at the joints with the transverse edge 9, the vertical edge 8 is respectively fixed to the side wall 3 and the partition plate mounting beam 4 by side chemical bolts 10, and the vertical edge 8 installed on the side wall 3 is provided with a perforation corresponding to the water pipe 1, the bottom ends of the steel plate standard section 5 and the transverse edge 9 are coated with a 1.5mm thick JS waterproof coating layer 11, and the outer sides of the steel plate standard sections 5 at both ends are respectively welded with side steel plates 12, and the bottom ends of the side steel plates 12 are flush with the bottom ends of the steel plate standard sections 5, and the top of the side steel plates 12 extends to the bottom of the floor slab 2 and has a hanging plate 13 bent toward the horizontal outside, and the hanging plate 13 is fixed to the floor slab 2 by top chemical bolts 14.

[0030] The top of the flange has an inward-turned flange 15 which is horizontal and faces inward. Adjacent inward-turned flanges 15 are connected by a number of C-shaped parts 16. The middle part of the C-shaped part 16 is located at the top of the inward-turned flange 15. The two ends of the C-shaped part 16 are folded through the ends of the inward-turned flange 15 to fit the upper flange 7. A ring 17 is fixed to the outside of the C-shaped part 16. When the C-shaped part 16 is folded to cover the inward-turned flange 15, the ring 17 turns to be vertical. The perforation of the ring 17 is in the horizontal direction. A transverse steel bar 18 is passed through the ring 17. A longitudinal steel bar 19 and a vertical rib 20 are tied to the transverse steel bar 18. The vertical rib 20 is supported on the plate of the standard section 5 of the steel plate. Grouting material 21 is poured in the standard section 5 of the steel plate. The top of the grouting material 21 is flush with the top of the inward-turned flange 15.

[0031] The waterproof coating layer 11 is turned up 40mm on the outer side of the L steel 6 on the partition board mounting beam 4, and the waterproof coating layer 11 is turned up and down 40mm on the side wall 3. The interval between the side chemical bolts 10 is 300mm, and the interval between the top chemical bolts 14 is 300mm.

[0032] The width of the hanging plate 13 is 80 mm, and the top chemical bolt 14 is an M12 chemical bolt. A waterproof sealant is provided at the joint between the L steel 6 and the water pipe 1.

[0033] A double-layer plate structure for hospital clean room renovation project, comprising the following steps:

[0034] Step 1: Review the drawings, draw detailed drawings, design the layout of the standard section 5 of the steel plate, and set the L steel 6 opening according to the position of the water supply pipe 1;

[0035] Step 2: Make a standard section 5 of steel plate. Bend the four sides of the standard section upward by 40 mm. Assemble the standard section according to the required size of the newly added plate and install the C-shaped piece 16. During installation, bend the C-shaped piece 16 and clamp it on the side flange to ensure the initial connection. Then weld the interface of the standard section 5 of steel plate.

[0036] Step 3: Fix the galvanized L steel 6 to the edge of the structural beam with M16 chemical anchor bolts, set waterproof sealant at the joint between the L steel 6 and the water pipe 1, overlap the assembled steel plate standard section 5 as a whole on the angle steel, and weld the joint;

[0037] Step 4: Apply a layer of 1.5mm thick JS waterproof coating on the bottom of the assembled steel plate standard section 5, and turn up 40mm on the outer side of the L steel 6 on the partition plate mounting beam 4, and turn up and down the waterproof coating layer 11 on the side wall 3 by 40mm;

[0038] Step 5: Arrange transverse reinforcement 18 in the collar 17 on the C-shaped member 16, with a spacing between the transverse reinforcement 18 and the upper flap so that the collar 17 can be inserted, support the vertical reinforcement 20 and the longitudinal reinforcement 19, and tie the vertical reinforcement 20, the transverse reinforcement 18 and the longitudinal reinforcement 19;

[0039] Step 6: pour the grouting material 21 until the top of the grouting material 21 is flush with the top of the inward flange 15;

[0040] Step 7: Install the side steel plate 12, fix the side steel plate 12 under the upper floor slab 2 through the top chemical bolts 14, and weld the side steel plate 12 to the L steel 6, perform secondary waterproofing, and apply a coating layer 11 at the junction of the side steel plate 12 and the steel plate standard section 5;

[0041] Step 8: Apply anti-rust paint to the exposed metal of the steel plate, side steel plate 12, galvanized angle steel, and bolts.

[0042] The beneficial effects of the present invention are embodied in the following aspects: 1. No complicated processes such as supporting formwork, planting reinforcement, and drilling holes are required to construct reinforced concrete slabs. Steel plates are used for support, and the steel plates are assembled and welded using standard steel plate sections 5, and the inside can be painted with waterproof coating. Compared with reinforced concrete slabs, the steel plates have better waterproof performance and avoid leakage caused by cracking of concrete materials. Therefore, the present application has the advantages of simple construction, low cost, short construction period, and good waterproof performance; 2. The standard steel plate sections 5 can be reliably connected to each other through the upward flip plate, and the C-shaped parts 16 can be installed through the inward flip edge 15, which not only plays the effect of pre-fixing during splicing, but can also be pre-fixed with the steel bars and combined into one later. The construction steps are simple, the connection strength is strong, and it has a very good construction effect.

[0043] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field can think of within the technical scope disclosed in the present invention should be covered within the protection scope of the present invention.

Claims

1. A double-layer plate structure for hospital clean room renovation project, characterized by: The utility model comprises a water pipe (1), a floor slab (2), a side wall (3) and a partition plate mounting beam (4), wherein the water pipe (1) is L-shaped, the water pipe (1) vertically passes through the floor slab (2), the water pipe (1) horizontally and vertically passes through the side wall (3), the partition plate mounting beam (4) is located on the side of the water pipe (1) away from the side wall (3), a plurality of steel plate standard sections (5) are installed between the side wall (3) and the partition plate mounting beam (4), the length direction of the steel plate standard section (5) is arranged parallel to the horizontal section direction of the water pipe (1), the two ends of the steel plate standard section (5) are respectively fixed to the side wall (3) and the partition plate mounting beam (4) by L steel (6), and the steel plate standard section (5) is provided on the side wall (3) and the partition plate mounting beam (4). 5) has upwardly turned flanges (7) on the four sides, and a plurality of steel plate standard sections (5) are welded in sequence through the flaps on both sides to form a bearing plate, the L steel (6) includes a vertical edge (8) and a horizontal edge (9), the two ends of the steel plate standard section (5) in the length direction are respectively placed on the horizontal edge (9) and welded at the joints with the horizontal edge (9), the vertical edge (8) is respectively fixed to the side wall (3) and the partition plate mounting beam (4) by side chemical bolts (10), and a perforation corresponding to the water pipe (1) is opened on the vertical edge (8) installed on the side wall (3), and the bottom ends of the steel plate standard section (5) and the horizontal edge (9) are painted with a 1.5 mm thick JS waterproof coating layer (11), and the two ends are The outer sides of the standard steel plate sections (5) are respectively welded with side steel plates (12), the bottom ends of the side steel plates (12) are flush with the bottom ends of the standard steel plate sections (5), the tops of the side steel plates (12) extend to the bottom of the floor slab (2) and have hanging plates (13) bent toward the horizontal outside, the hanging plates (13) are fixed to the floor slab (2) by top chemical bolts (14), the tops of the upper turning flanges (7) have inner turning flanges (15) along the horizontal direction and facing the inside, adjacent inner turning flanges (15) are connected by a plurality of C-shaped pieces (16), the middle of the C-shaped pieces (16) are located at the tops of the inner turning flanges (15), and the C-shaped pieces (16) are fixed to the floor slab (2) by top chemical bolts (14). ) are folded at both ends of the inward-turned flange (15) to fit the upper-turned flange (7); a collar (17) is fixed on the outer side of the C-shaped member (16); when the C-shaped member (16) is folded to cover the inward-turned flange (15), the collar (17) turns to be in the vertical direction; the perforation of the collar (17) is in the horizontal direction; a transverse steel bar (18) is passed through the collar (17); longitudinal steel bars (19) and vertical bars (20) are tied to the transverse steel bars (18); the vertical bars (20) are supported on the plate of the steel plate standard section (5); a grouting material (21) is poured in the steel plate standard section (5); and the top of the grouting material (21) is flush with the top of the inward-turned flange (15); Step 1: Review the drawings, draw detailed drawings, carry out layout design of the standard section of the steel plate (5), and set the L steel (6) opening according to the position of the water supply pipe (1); Step 2: Make a standard section of steel plate (5), bend the four sides of the standard section upward by 40 mm, assemble the standard section according to the required size of the newly added plate, and install the C-shaped piece (16). During installation, bend the C-shaped piece (16) and clamp it on the side flange to ensure the initial connection, and then weld the interface of the standard section of steel plate (5); Step 3: Fix the galvanized L steel (6) to the edge of the structural beam using M16 chemical anchor bolts, apply waterproof sealant at the joint between the L steel (6) and the water pipe (1), overlap the assembled steel plate standard section (5) as a whole on the angle steel, and weld the joint; Step 4: Apply a layer of 1.5 mm thick JS waterproof coating on the entire bottom of the assembled steel plate standard section (5), and turn up 40 mm on the outer side of the L steel (6) on the partition plate mounting beam (4), and turn up and down the waterproof coating layer (11) on the side wall (3) by 40 mm; Step 5: Arrange transverse reinforcement (18) in the collar (17) on the C-shaped member (16), with the transverse reinforcement (18) spaced apart from the upper flap so as to be inserted into the collar (17), support the vertical reinforcement (20) and the longitudinal reinforcement (19), and tie the vertical reinforcement (20), the transverse reinforcement (18) and the longitudinal reinforcement (19); Step 6: pouring the grouting material (21) until the top of the grouting material (21) is flush with the top of the inward flange (15); Step 7: Install the side steel plate (12), fix the side steel plate (12) under the upper floor plate (2) through the top chemical bolts (14), weld the side steel plate (12) and the L steel (6), perform secondary waterproofing, and apply a coating layer (11) at the junction of the side steel plate (12) and the steel plate standard section (5); Step 8: Apply anti-rust paint to the exposed metal of the steel plate, side steel plate (12), galvanized angle steel and bolts.

2. The double-layer plate structure for hospital clean room renovation project according to claim 1 is characterized by: The waterproof coating layer (11) is turned up 40 mm on the outer side of the L steel (6) on the partition plate mounting beam (4), and the waterproof coating layer (11) is turned up and down 40 mm on the side wall (3).

3. The double-layer plate structure for hospital clean room renovation project according to claim 2 is characterized by: The spacing of the side chemical bolts (10) is 300 mm, and the spacing of the top chemical bolts (14) is 300 mm.

4. The double-layer plate structure for hospital clean room renovation project according to claim 3 is characterized by: The width of the hanging plate (13) is 80 mm, and the top chemical bolt (14) is an M12 chemical bolt.

5. The double-layer plate structure for hospital clean room renovation project according to claim 4 is characterized by: A waterproof sealant is provided at the joint between the L steel (6) and the water pipe (1).

Citation Information

Patent Citations

  • Construction method and device of reinforced concrete double-layer plates

    CN109113245A

  • Formwork-erecting-free steel bar keel steel plate and concrete laminated slab and implementation method thereof

    CN114059700A

  • Sealing structure and outdoor cabinet

    CN220247955U