Out-of-phase double-switch open-circuit fault diagnosis method for active clamped three-level rectifier

By analyzing the topological structure and switching state of the active clamp three-phase three-level rectifier, combining the bridge arm output voltage polarity and the port voltage deviation polarity, a bridge arm state reconstruction method for signal injection is constructed, and a midpoint current is used for two The second identification solves the problem of diagnosis of out-of-phase double-tube open circuit faults, and achieves more efficient fault diagnosis and stronger anti-interference.

CN118584280BActive Publication Date: 2024-12-03SOUTHWEST JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410640905.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-12-03
Estimated Expiration
2044-05-22

AI Technical Summary

Technical Problem

The prior art is difficult to effectively diagnose out-of-phase double-tube open circuit faults in active clamp three-level rectifiers. The fault characteristics are complex and the diagnosis is difficult, and the existing methods have not fully solved this problem.

Method used

By analyzing the topological structure and switching state of the active clamp three-phase three-level rectifier, based on the bridge arm output voltage polarity and the port voltage deviation polarity, a bridge arm state reconstruction method for signal injection is constructed, and combined with the midpoint current Secondary identification to realize the diagnosis of open circuit faults of out-of-phase double-tubes.

Benefits of technology

The diagnostic range is expanded, fault characteristics can be described more intuitively, with strong anti-interference, fast diagnosis speed, avoid misdiagnosis, and improve the safety and stability of the active clamp three-level rectifier.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118584280B_ABST
    Figure CN118584280B_ABST
Patent Text Reader

Abstract

The present invention provides a method for diagnosing an out-of-phase double-tube open-circuit fault for an active clamped three-level rectifier, which belongs to the technical field of fault diagnosis of power electronic equipment. The method comprises: analyzing the switch state and working mode of the active clamped three-phase three-level rectifier in combination with its topological structure; analyzing the fault characteristics of a single-phase open-circuit fault based on the polarity of the bridge arm output voltage; analyzing the working range of the three-phase switch tube during the operation of the active clamped three-level rectifier, dividing the phase-locked loop working area, and analyzing the fault characteristics of the single and double-tube switch tubes based on the port voltage deviation polarity; constructing a fault diagnosis strategy based on signal injection-based bridge arm state reconstruction and secondary identification combined with midpoint current; and performing fault diagnosis based on the fault characteristics of the single and double-tube switch tubes using a fault diagnosis strategy. The present invention solves the problems of complex fault characteristics, multiple fault types, and high diagnostic difficulty when an out-of-phase double-tube fault occurs in an active clamped ANPC type rectifier.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of fault diagnosis of power electronic equipment, and in particular relates to a method for diagnosing an out-of-phase double-tube open-circuit fault of an active clamped three-level rectifier. Background Art

[0002] At present, this type of converter is widely used in high-power medium and high voltage application scenarios, such as ultra-high voltage transmission, distributed power generation, industrial motor drive and other fields. However, due to the increase in the number of power devices and the more complex topology, the difficulty of fault diagnosis is further increased.

[0003] Power device faults are usually divided into two types: short circuit faults and open circuit faults. Among them, short circuit faults are the most serious faults that endanger the stable operation of the system. Once a short circuit fault occurs, the power device's tolerance is usually within 10μs. In actual engineering applications, fast fuses are generally added to the power electronic converter circuit, or short circuit signal blocking is added to the switch tube drive circuit. In this way, when a short circuit fault occurs in the switch tube, the short circuit fault can be quickly converted into an open circuit fault for processing. Therefore, the research on short circuit faults is often unified as open circuit faults.

[0004] The fault diagnosis of the open-circuit switch tube is mainly divided into two parts: one is to extract fault feature information, and the other is to make fault judgment based on the feature information. The fault types can be divided into single-phase single-tube, single-phase double-tube, out-of-phase double-tube faults, etc. At present, some scholars have conducted some research on the method of ANPC single-phase fault diagnosis. For example, the document "Fault Diagnosis Strategy and Fault-Tolerant Control of ANPC Inverter Based on Midpoint Current" analyzes the current path under the open-circuit fault of 6 switch tubes per phase of ANPC three-level, and proposes a fault diagnosis method based on midpoint current combined with the relationship between midpoint current and output current under the action of each vector. This method can be used to solve the diagnosis of single-phase single-tube open-circuit faults; the document "Fault Diagnosis of Active Neutral Point Clamped Three-Level Inverter Based on Energy Spectral Entropy and Wavelet Neural Network" uses the upper, middle and lower bridge arm voltages of the ANPC converter as measurement signals, extracts the bridge arm voltage signal characteristics through wavelet energy entropy, and proposes a fault diagnosis method based on energy spectrum entropy and wavelet packet energy neural network. This method can be used to solve the diagnosis of single-phase single-tube and double-tube faults. However, when the faulty switch tubes are located in different bridge arms (out-of-phase double-tube fault), the fault characteristics are more complex, the fault types increase significantly, and the diagnosis difficulty also increases accordingly. At present, there is little research on the diagnosis method of out-of-phase double-tube. Therefore, designing an out-of-phase double-tube open-circuit fault diagnosis method suitable for active clamped three-level rectifier has become an urgent problem to be solved. Summary of the invention

[0005] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method for diagnosing an out-of-phase double-tube open-circuit fault of an active-clamped three-level rectifier, which solves the problems of complex fault characteristics, multiple fault types, and great difficulty in diagnosis when an out-of-phase double-tube fault occurs in an active-clamped ANPC type rectifier.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is: a method for diagnosing an out-of-phase double-tube open circuit fault of an active clamped three-level rectifier, comprising the following steps:

[0007] S1. Combined with the topological structure of the active clamped three-phase three-level rectifier, its switching state and working mode are analyzed;

[0008] S2. Analyze the fault characteristics of a single-phase open circuit fault based on the analysis result of step S1 and the polarity of the bridge arm output voltage;

[0009] S3, analyzing the working range of the three-phase switch tube during the operation of the active clamped three-level rectifier, dividing the phase-locked loop working area, and analyzing the fault characteristics of the single and double switch tubes based on the port voltage deviation polarity according to the analysis results of step S2 and the analysis results of step S1;

[0010] S4. Based on the fault characteristic analysis results of the voltage deviation polarity of the fault ports of single-tube and double-tube switches in each phase-locked loop working area, a fault diagnosis strategy based on signal injection-based bridge arm state reconstruction and secondary identification combined with midpoint current is constructed;

[0011] S5. According to the comprehensive fault characteristics of the single and double switch tubes, the fault diagnosis strategy is used to perform fault diagnosis and complete the diagnosis of the out-of-phase double-tube open circuit fault.

[0012] Furthermore, the expression of the midpoint current in step S4 is as follows:

[0013] i o =-(|S a |i a +|S b |i b +|S c |i c )

[0014] Among them, i o Indicates the midpoint current of the DC side, i a 、i b 、i c All represent three-phase transient current, S a , S b , S c They represent the switching functions of the three-phase bridge arms respectively.

[0015] Furthermore, step S5 includes the following steps:

[0016] S501, selecting a threshold voltage and an identification time, and performing polarity judgment according to the selected threshold voltage and identification time to determine whether a switch tube failure occurs, and whether it is an uncertain state within a phase-locked loop working area;

[0017] S502, if no uncertain state occurs, the fault range is narrowed down to the faulty bridge arm and the active clamp switch tube, and the process proceeds to step S503; if the state is uncertain, a bridge arm state reconstruction pulse signal is applied, and the faulty bridge arm is located through the auxiliary variable midpoint current, and the process proceeds to step S503;

[0018] S503, determining the fault phase, if the active clamp switch of a phase fails, isolating the fault through the redundant zero-level path of the phase, so that the rectifier is in a single-phase fault;

[0019] S504. Based on the single-phase fault, locate the faulty switch tube and complete the diagnosis of the out-of-phase double-tube open circuit fault.

[0020] Furthermore, in step S501, polarity judgment is performed, and the expression is as follows:

[0021]

[0022] Among them, d xy Indicates the corrected port voltage deviation polarity, Δv xy Indicates the port voltage deviation polarity before correction, Δv th represents the threshold voltage, T th Indicates the recognition time.

[0023] Furthermore, the threshold voltage is set based on sampling errors during the operation of the rectifier, dead time, and calculation errors of diagnostic variables caused by signal delays.

[0024] Furthermore, the calculation error of the diagnostic variable caused by the dead time is expressed as follows:

[0025]

[0026] in, represents the calculation error of the diagnostic variable caused by the dead time, U dc Indicates the DC side output voltage, T dd Indicates the dead time, T s Represents the switching cycle.

[0027] Furthermore, the calculation error of the diagnostic variable caused by the signal delay is expressed as follows:

[0028]

[0029] in, represents the calculation error of the diagnostic variable caused by signal delay, U dc Indicates the DC side output voltage, T dl Indicates the voltage signal delay time, T s Represents the switching cycle.

[0030] The beneficial effects of the present invention are:

[0031] (1) The present invention studies the situation where double-tube faults occur in different bridge arms, expands the diagnostic scope, and can cope with more complex fault conditions, which is of great significance for improving the safety and stability of the active clamped three-level rectifier.

[0032] (2) The present invention uses the port voltage deviation polarity as the main fault feature, which can describe the fault feature more intuitively, and has the advantages of strong anti-interference, easy collection and processing, and fast diagnosis speed.

[0033] (3) The present invention sets a suitable threshold as a condition for judging the occurrence of a fault, thereby avoiding the occurrence of misdiagnosis due to errors generated in the sampling and calculation processes, and sets a certain recognition time to deal with the transient peak of the deviation abnormal value that appears for a very short time or the erroneous judgment of polarity that may be caused by other interferences.

[0034] (4) The active-power-clamped (ANPC) three-level topology structure involved in the present invention is an improvement on the diode-clamped three-level structure. Power devices are used instead of clamping diodes. Compared with the traditional structure, it can better solve the problem of excessive difference in loss between devices. At the same time, the bridge arm has more redundant states, which improves the fault-tolerant operation capability of the converter. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 The figure is a flow chart of the method of the present invention.

[0036] Figure 2 It is an active clamped three-level rectifier topology.

[0037] Figure 3 (a) is S a1 Schematic diagram of current path changes during a fault.

[0038] Figure 3 (b) is S a2 Schematic diagram of current path changes during a fault.

[0039] Figure 3 (c) is S a6 Schematic diagram of current path changes during a fault.

[0040] Figure 3(d) is S a3 Schematic diagram of current path changes during a fault.

[0041] Figure 3 (e) is S a4 Schematic diagram of current path changes during a fault.

[0042] Figure 3 (f) is S a5 Schematic diagram of current path changes during a fault.

[0043] Figure 4 (a) is S a1 +S a2 Schematic diagram of current path changes during a fault.

[0044] Figure 4 (b) is S a1 +S a6 Schematic diagram of current path changes during a fault.

[0045] Figure 4 (c) is S a2 +S a6 Schematic diagram of current path changes during a fault.

[0046] Figure 4 (d) is S a3 +S a4 Schematic diagram of current path changes during a fault.

[0047] Figure 4 (e) is S a3 +S a5 Schematic diagram of current path changes during a fault.

[0048] Figure 4 (f) is S a4 +S a5 Schematic diagram of current path changes during a fault.

[0049] Figure 5 This is a schematic diagram of the operating range of each switch tube in the single-phase bridge arm.

[0050] Figure 6 Schematic diagram of the working range distribution of the switch tube in the six working areas.

[0051] Figure 7 This is the equivalent circuit diagram of the rectifier AC side.

[0052] Figure 8 is the actual output voltage taking into account the dead time.

[0053] Fig. 9 is the actual output voltage taking the delay into account.

[0054] Fig.10It is a flow chart of the comprehensive diagnosis method for single-tube and double-tube faults. DETAILED DESCRIPTION

[0055] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.

[0056] Example

[0057] like Figure 1 As shown, the present invention provides a method for diagnosing an out-of-phase double-tube open-circuit fault of an active clamped three-level rectifier, and the implementation method thereof is as follows:

[0058] S1. Combined with the topological structure of the active clamped three-phase three-level rectifier, its switching state and working mode are analyzed;

[0059] S2. Analyze the fault characteristics of a single-phase open circuit fault based on the analysis result of step S1 and the polarity of the bridge arm output voltage;

[0060] S3, analyzing the working range of the three-phase switch tube during the operation of the active clamped three-level rectifier, dividing the phase-locked loop working area, and analyzing the fault characteristics of the single and double switch tubes based on the port voltage deviation polarity according to the analysis results of step S2 and the analysis results of step S1;

[0061] S4. Based on the fault characteristic analysis results of the voltage deviation polarity of the fault ports of single-tube and double-tube switches in each phase-locked loop working area, a fault diagnosis strategy based on signal injection-based bridge arm state reconstruction and secondary identification combined with midpoint current is constructed;

[0062] S5. According to the comprehensive fault characteristics of the single and double switch tubes, the fault diagnosis strategy is used to perform fault diagnosis and complete the diagnosis of the out-of-phase double tube open circuit fault. The implementation method is as follows:

[0063] S501, selecting a threshold voltage and an identification time, and performing polarity judgment according to the selected threshold voltage and identification time to determine whether a switch tube failure occurs, and whether it is an uncertain state within a phase-locked loop working area;

[0064] S502, if no uncertain state occurs, the fault range is narrowed down to the faulty bridge arm and the active clamp switch tube, and the process proceeds to step S503; if the state is uncertain, a bridge arm state reconstruction pulse signal is applied, and the faulty bridge arm is located through the auxiliary variable midpoint current, and the process proceeds to step S503;

[0065] S503, determining the fault phase, if the active clamp switch of a phase fails, isolating the fault through the redundant zero-level path of the phase, so that the rectifier is in a single-phase fault;

[0066] S504. Based on the single-phase fault, locate the faulty switch tube and complete the diagnosis of the out-of-phase double-tube open circuit fault.

[0067] In this embodiment, Figure 2 As shown, Figure 2 Active clamp three-level rectifier topology, L represents the filter inductor connecting the AC power supply and the rectifier, R represents the equivalent resistance of the filter inductor, S x1 To S x6 (x=a,b,c) are the 6 switch tubes of each phase bridge arm, a,b,c are three phases, C1 and C2 are DC side capacitors, which can stabilize the DC side voltage and store energy. dc Indicates the DC side voltage. Ideally, the capacitor voltages of C1 and C2 are both equal to 0.5U dc The fault diagnosis method mentioned in the present invention is based on the analysis of the topological structure.

[0068] In this embodiment, the present invention provides a method for diagnosing an out-of-phase double-tube open-circuit fault of an active clamped three-level rectifier, which is: combining the topological structure of the ANPC three-phase three-level rectifier, analyzing its switch state and working mode; taking the a-phase bridge arm of the three-phase three-level ANPC as an example, based on the bridge arm output voltage polarity, analyzing the fault characteristics when a single-phase open-circuit fault (single tube, double tube) occurs; analyzing the working range of the three-phase switch tube during the operation of the ANPC rectifier, dividing the working area, and based on the port voltage deviation polarity, studying the fault characteristics of the single-tube and double-tube comprehensive (including out-of-phase double tube) of the switch tube; based on the analysis results of the port voltage deviation polarity of the single-tube and double-tube faults in each working area, designing a bridge arm state reconstruction based on signal injection and combining the midpoint current for secondary identification Fault diagnosis strategy; based on the port voltage deviation polarity analysis and bridge arm state reconstruction identification method, studying the single-tube and double-tube comprehensive fault diagnosis.

[0069] In this embodiment, the specific content of analyzing the working mode of the ANPC three-level rectifier is:

[0070] ANPC three-level rectifier output 0.5U per phase dc , 0, -0.5U dc The three voltage levels are represented by [P], [O], and [N] respectively. The effective switch state table is shown in Table 1. Table 1 is the effective switch state table of ANPC.

[0071] Table 1

[0072]

[0073] In this embodiment, it can be seen from Table 1 that there are two current flow modes for each phase output [O] level of the ANPC three-level rectifier. Mode 1 is through the S of the upper half bridge arm. x2 and S x5 Flow, corresponding to the switch states of [OU1] and [OU2]; Mode 2 is through the S of the lower half bridge arm x3 and S x6 Flow, corresponding to the switch states [OL1] and [OL2]. According to the current flow mode, [OU1] and [OU2] are both defined as [OU] state, and [OL1] and [OL2] are both defined as [OL] state. During the operation of the ANPC rectifier, level jumps are generally not allowed, that is, the working process of the bridge arm is Table 2 shows the working mode and output voltage of each phase when it is working normally under different current directions. xi (x=a,b,c;i=1,2,3,4,5,6) represents the switch tube S xi The anti-parallel diode, L x (x=a, b, c) represents the filter inductance connecting the AC power supply and the rectifier. The current flowing from the AC side to the DC side is defined as positive, and vice versa as negative. Table 2 is the working mode table of the three-phase ANPC rectifier.

[0074] Table 2

[0075]

[0076]

[0077] In this embodiment, based on the bridge arm output voltage deviation polarity, the specific process of analyzing the single-phase open circuit fault characteristics is as follows:

[0078] First, define the desired bridge arm output voltage as The actual bridge arm output voltage is Bridge arm output voltage deviation The voltages of the DC side support capacitors are U c1 , U c2 .

[0079] Next, taking the rectifier a bridge arm as an example, based on the bridge arm output voltage deviation polarity, the fault characteristics of the typical cases of single-phase single-tube fault and double-tube fault are analyzed respectively:

[0080] (1) For the case of single-phase single-tube fault, taking bridge arm A phase as an example, it can be seen from Table 2 that the switch tube S a1 , S a2 , S a6 Both of them are in the working mode when the current is negative, and the switch tube S a3 , S a4 , Sa5 Both of them participate in the working mode when the current is forward.

[0081] when i a <0(i a represents the current of phase A of the bridge arm), S a1 The current path changes after the fault as follows Figure 3 (a) only affects the current path of working mode V. At this time, S a2 , S a6 are both in the on state, and the current will flow through D a5 —S a2 , S a6 —D a3 The two paths continue to flow, the bridge arm operation state changes from [P] to [O], and the bridge arm output voltage changes from U c1 becomes 0, the output voltage deviation is U c1 .

[0082] S a2 The current path changes after the fault as follows Figure 3 As shown in (b), the output of working modes V and VI will be affected by S a2 When phase a is in working mode V, S a2 Under fault conditions, the current flows through S a6 —D a3 The path continues to flow, the operating state changes from [P] to [OL], and the output voltage of the bridge arm changes from U c1 becomes 0, the output voltage deviation is U c1 ; In working mode VI, the current can only pass through the lower bridge arm diode D a3 , D a4 The continuous current is carried out, the operating state changes from [OU] to [N], and the output voltage of the bridge arm changes from 0 to -U c2 , then the output voltage deviation is U c2 .

[0083] S a6 The current path changes after the fault as follows Figure 3 (c) As shown, the current of working mode VII flows through D a3 —D a4 Continue current, the operating state changes from [OL] to [N], and the bridge arm output voltage changes from 0 to -U c2 , then the output voltage deviation is U c2 .

[0084] when i a >0, S a3 , S a4 , S a5 The changes of the current path and the operating state of the bridge arm due to the open circuit fault are as follows: Figure 3As shown in (d) to (f), the upper bridge arm is symmetrical with the lower bridge arm, S a3 The fault causes the operating state to be [N]→[OU], [OL]→[P], and the output voltage deviation is -U c2 , -U c1 ; S a4 When a fault occurs, the bridge arm output changes from [N] to [OL], and the output voltage deviation is -U c2 ; S a5 The fault causes the operating state to [OU] → [P], and the output voltage deviation is -U c1 .

[0085] (2) For the single-phase double-tube fault, we also take the bridge arm a phase as an example for analysis. The existing fault conditions include S a1 +S a2 Fault, S a1 +S a3 Fault, S a1 +S a4 Fault, S a1 +S a5 Fault, S a1 +S a6 Fault, S a2 +S a3 Fault, S a2 +S a4 Fault, S a2 +S a5 Fault, S a2 +S a6 Fault, S a3 +S a4 Fault, S a3 +S a5 Fault, S a3 +S a6 Fault, S a4 +S a5 Fault, S a4 +S a6 Failure and S a5 +S a6 Fault.

[0086] For S a1 +S a3 Failure, when i a <0, S a3 The fault will not cause the normal working state of the circuit to change abnormally. a1 Open circuit fault affects the switch state; when i a >0, S a1 The fault will not cause the normal working state of the circuit to change abnormally. a3 The open circuit fault affects the switch state. Therefore, S a1 and Sa3 At the same time, the fault affects the normal operation of the bridge arm in the negative half cycle and the positive half cycle respectively, and the impact interval is almost half a cycle. Similarly, in the listed fault conditions occurring in the same bridge arm, S a1 +S a4 Fault, S a1 +S a5 Fault, S a2 +S a3 Fault, S a2 +S a4 Fault, S a2 +S a5 Fault, S a3 +S a6 Fault, S a4 +S a6 Fault, S a5 +S a6 The faults are all caused by the two switching tubes working in different current directions. This situation can be treated as a single-tube fault occurring at different times. Therefore, the following mainly analyzes the single-phase double-tube fault that affects the output of the bridge arm in the same current direction.

[0087] Figure 4 (a) is S a1 +S a2 The current flow path changes under open circuit fault. a <0, if the output state of the A-phase bridge arm is normally controlled to be [P], then S a1 +S a2 After an open circuit fault occurs, the current cannot flow from the upper half bridge arm and can only flow through S a6 —S a3 The anti-parallel diode continues to flow, the state [P] changes to [OL], and the voltage deviation is U c1 ; Normal control A phase bridge arm output state is [OU], S a1 +S a2 The open circuit fault causes the current to flow through S a3 and S a4 The anti-parallel diode is connected to the bridge arm for freewheeling. The actual output state of the bridge arm is [N], and the voltage deviation is U c2 . when i a >0, due to S a1 , S a2 It only participates in the commutation between [OU]-[P]-[OU] of the bridge arm, during which the current mainly flows through S a1 , S a2 The anti-parallel diode, S a1 +S a2 An open circuit fault will not cause the bridge arm output to deviate from the normal value. a1 +S a2 The impact of open circuit fault on rectifier output and Sa2 Same as open circuit fault.

[0088] Figure 4 (b) is S a1 +S a6 The current flow path changes under open circuit fault. a <0, S a1 Open circuit fault makes the current unable to flow through S in the normal [P] state. a1 , S a2 Circulation, plus S a6 Fault, the current can only flow through S a2 —S a5 The anti-parallel diode, the bridge arm state is [P]-[OU], the voltage deviation is U c1 ; S a6 The open circuit fault causes the bridge arm state to change from [OL] to [N], and the voltage deviation is U c2 .

[0089] Figure 4 (c) is S a2 +S a6 The current flow path changes under open circuit fault. a <0, if the normal control bridge arm is in the [P] state, S a2 The fault makes the A bridge arm unable to connect to the DC bus, and due to S a6 Also fault, current can only flow through S a3 and S a4 The anti-parallel diode is connected to the circuit for freewheeling, and the operating state [P] changes to [N], and the voltage deviation is U c1 +U c2 ; If the bridge arm is in the normal control state Switching, in the [OL] state, negative current can still only pass through S a3 and S a4 The anti-parallel diode is freewheeling, the [OL] state is replaced by the [N] state, and the voltage deviation is U c2 .

[0090] Figure 4 (d)~(f) are S a3 +S a4 Fault, S a3 +S a5 Fault, S a4 +S a5 The current flow path changes during a fault, where S a3 +S a4 Fault and S a3 The open circuit fault is the same, and the voltage deviation is -U c2 、-U c1 ; S a3 +Sa5 The voltage deviations after the fault are -U c1 -U c2 , -U c1 ; S a4 +S a5 The voltage deviations after the fault are -U c2 , -U c1 .

[0091] The symmetry of the three-phase bridge arm can be used to obtain the single-tube and double-tube open-circuit faults of the other two-phase bridge arms. In summary, the output voltage deviation polarity of the bridge arm with single-phase fault (single-tube and double-tube) can be obtained in Table 3. Table 3 is a table of the output voltage deviation polarity of the bridge arm with single-phase fault.

[0092] Table 3

[0093]

[0094] In this embodiment, it can be found from Table 3 that the switch group S x1 , S x2 , S x6 The voltage deviation caused by the fault is greater than zero, and the switch group S x3 , S x4 , S x5 The voltage deviation caused by the fault is less than zero. Therefore, in the subsequent analysis of the port voltage deviation polarity, the switch group S x1 , S x2 , S x6 The fault condition within the voltage deviation polarity Δv xo >0, switch group S x3 , S x4 , S x5 The fault condition within the voltage deviation polarity Δv xo <0 is used as the basis for analysis.

[0095] In this embodiment, the specific process of dividing the working area and analyzing the characteristics of the open circuit fault of the switch tube is as follows:

[0096] like Figure 5 As shown, Figure 5 is the working range of the single-phase switch tube, where the clamp switch tube S x5 , S x6 The remaining four switch tubes S x1 and S x2 , S x3 and S x4The length and position of the working interval depend on the phase difference δ between the rectifier current I and the equivalent modulation voltage V. δ includes the phase difference θ between the AC voltage E and the rectifier equivalent modulation voltage V and the power factor angle φ (the phase difference between the AC voltage E and the rectifier current I), which is proportional to the rectifier current amplitude I m It is related to the ratio of the modulation index m.

[0097] The impact of each switch failure on the rectifier in the fundamental wave cycle has a certain range, and the present invention divides these ranges into working areas. According to the direction of the three-phase current, the fundamental wave cycle can be divided into 6 areas, which are respectively recorded as R1, R2, R3, R4, R5, and R6. The working range distribution of the 18 switches of the ANPC three-level rectifier in the 6 areas is as follows: Figure 6 Taking R1 as an example, in this working area, within the time range of the phase difference δ, during normal operation, phase A switches back and forth between zero level and negative level, and the bridge arm state switching process is [N]→[OL]→[N]. a >0, so S a3 , S a4 The anti-parallel diode provides a current flow path for the bridge arm to output negative level and zero level; within the time range of π-δ, the equivalent modulation voltage of phase A begins to be greater than zero. During normal operation, phase A switches between zero level and positive level, and the bridge arm state switching process is [OU]→[P]→[OU], i a >0, so only S is needed in the power switch tube a5 It provides a current flow path for the bridge arm to output zero level, and the current flows through the anti-parallel diode when the output is positive level. The same is true for phase B and C. b <0,i c >0, the state of the bridge arm of phase B is switched to [N]→[OL]→[N], and that of phase C is [OU]→[P]→[OU]. The output of phase B at the N level and phase C at the P level are both provided with flow paths by anti-parallel diodes. Therefore, only S is required in the switch tubes of phase B and phase C, respectively. b6 , S c5 Provide a critical path for the normal output of zero level of the bridge arm. In each working area, only one phase needs an active clamp switch tube plus two inner and outer switch tubes to provide a current flow path for the normal output of the bridge arm, while the other two phases are S x5 or S x6 Work within this range.

[0098] From step S2, we know that the bridge arm output node voltage deviation Δv xo It is a variation within the phase and can only reveal the fault characteristics when a single-phase open-circuit fault occurs. However, in order to analyze the situation of an out-of-phase double-tube open-circuit fault, it is necessary to explore the relationship between phases. Therefore, the bridge arm output node voltage deviation Δv xoTransform to analyze the terminal voltage deviation Δv between phases xy (x=a,b,c;y=a,b,c). The expected port voltage under normal control is v xy * , the actual output port voltage is v xy ,but:

[0099]

[0100] Among them, v xo * and v yo * Denotes the desired bridge arm output voltage between any two phases, Δv xo and Δv yo Represents the output voltage deviation of any two-phase bridge arm.

[0101] The port voltage deviation between phase A and phase B, phase A and phase C, and phase B and phase C is as follows:

[0102]

[0103] Where Δv ab , Δv bc and Δv ca They represent the port output voltage deviation of the AB phase, the port output voltage deviation of the AC phase, and the port output voltage deviation of the AC phase, Δv ao , Δv bo and Δv co They respectively represent the output voltage deviation of the A-phase bridge arm, the output voltage deviation of the B-phase bridge arm and the output voltage deviation of the C-phase bridge arm.

[0104] To simplify the analysis, we assume that U c1 =U c2 =U dc / 2, taking the working area R1 as an example, the polarity of the port voltage deviation when a single-tube or double-tube open-circuit fault occurs is analyzed.

[0105] Depend on Figure 6 It can be seen that in the working area R1, the A phase bridge arm switch tube S a3 , S a4 , S a5 Working, B phase bridge arm switch tube S b6 Working, C phase bridge arm switch tube S c5 Next, we analyze the possible switch failures in the working area R1:

[0106] (1) For the open circuit fault of the switch tube in the same phase, there are single-tube and double-tube faults in phase A at the same time. At this time, phase B (switch tube S b6 ) and C phase (switching tube S c5) works normally, and the output voltage of the bridge arm has no deviation, that is, Δv bo =Δv co =0, when S a3 , S a4 , S a5 A single tube failure or S a3 +S a4 , S a3 +S a5 , S a4 +S a5 When a double-tube fault occurs, it can be seen from Table 3 that the output voltage deviation of bridge arm A is Δv ao <0, so the port voltage deviation polarity is Δv ab <0, Δv bc =0,Δv ca >0. For phase B or phase C, since there is only one switch tube (S b6 or S c5 ) works in this working area, that is, there is only a single tube fault, B phase S b6 When a fault occurs, Δv ao =0,Δv bo >0,Δv co =0, the port voltage deviation polarity is Δv ab <0,Δv bc >0,Δv ca =0; Similarly, we can get C phase S c5 When the fault occurs, the port voltage deviation polarities are Δv ab =0,Δv bc >0,Δv ca <0.

[0107] (2) When the switch tube open circuit fault occurs in different phases, there are three situations: phase A + phase B, phase A + phase C, and phase B + phase C. For the double tube fault of phase A + phase B, there is S a3 +S b6 , S a4 +S b6 , S a5 +S b6 Three cases, and all three cases satisfy the bridge arm output voltage deviation polarity Δv ao <0, Δv bo >0, Δv co =0, the port voltage deviation polarity is Δv ab <0, Δv bc >0,Δv ca >0; for double-tube faults in phase B and phase C, there is S a3 +S c5 , S a4 +S c5 , Sa5 +S c5 Three cases, and all three cases satisfy the bridge arm output voltage deviation polarity Δv ao <0, Δv bo =0, Δv co <0, the port voltage deviation polarity is Δv ab <0,Δv bc >0,Δv ca =0; only S exists in phase B + phase C b6 +S c5 A double-tube fault occurs, and the output voltage of the bridge arm has a polarity deviation of Δv ao =0, Δv bo >0, Δv co <0, the port voltage deviation polarity is Δv ab <0,Δv bc >0,Δv ca <0.

[0108] Similarly, the port voltage deviation polarity can be obtained when a single-tube or double-tube fault occurs in the working area R2 to R6, and the analysis results are shown in Tables 4 to 9. Table 4 is a table of port voltage deviation polarity for single-tube or double-tube faults in the working area R1, Table 5 is a table of port voltage deviation polarity for single-tube or double-tube faults in the working area R2, Table 6 is a table of port voltage deviation polarity for single-tube or double-tube faults in the working area R3, Table 7 is a table of port voltage deviation polarity for single-tube or double-tube faults in the working area R4, Table 8 is a table of port voltage deviation polarity for single-tube or double-tube faults in the working area R5, and Table 9 is a table of port voltage deviation polarity for single-tube or double-tube faults in the working area R6.

[0109] Table 4

[0110]

[0111]

[0112] Table 5

[0113]

[0114]

[0115] Table 6

[0116]

[0117] Table 7

[0118]

[0119] Table 8

[0120]

[0121]

[0122] Table 9

[0123]

[0124]

[0125] In this embodiment, the specific implementation process of the fault diagnosis strategy of step S4 based on the bridge arm state reconstruction of the signal injection and the secondary identification in combination with the midpoint current is as follows:

[0126] From the analysis results of Tables 4 to 9 in step S3, it can be seen that there is a situation in all six working areas where the voltage deviation of a single-phase fault and the other two-phase faults may overlap each other and the fault phase cannot be accurately identified. For example, in the R1 working area, when Δv ab <0,Δv bc >0,Δv ca = 0, it is not possible to accurately identify whether there is only a B-phase fault or an A-phase + C-phase fault. Therefore, in order to further quickly distinguish the bridge arms where the faulty switches with similar characteristics are located, the present invention studies a bridge arm state reconstruction based on signal injection and a secondary identification method combined with the midpoint current to lock the fault phase:

[0127] First, we need to introduce the concept of midpoint current:

[0128] The relationship between the midpoint current of the ANPC three-level rectifier and the three-phase switch state and the three-phase current can be expressed as:

[0129] i o =-(|S a |i a +|S b |i b +|S c |i c )

[0130] In the formula, i o Indicates the midpoint current of the DC side, i a 、i b 、i c is the three-phase transient current, S a , S b , S c They represent the three-phase bridge arm switching functions, S a , S b , S c The value is determined by the switch state. The [P] state value is 1, the [OU] and [OL] state values ​​are 0, and the [N] state value is -1. When the rectifier is operating normally, the three-phase current is balanced and satisfies i a +i b+i c = 0. For example, the switch state PPP corresponds to the midpoint current i o =0; switch state LPP, corresponding to the midpoint current i o =i a ; Switching state PLP, corresponding to the midpoint current i o =i b ; Switching state PPL, corresponding to the midpoint current i o =i c .

[0131] In the working area R1, the deviation polarity combination Δv is detected. ab <0,Δv bc >0,Δv ca = 0 as an uncertain state, then let F d1 = 1, and a state signal [PLP] is forced to be injected into phases A, B, and C. Figure 6 It can be seen that there are i in this workspace a >0,i b <0,i c >0, the state of phase A is forced to change to [P]. Combined with the working mode in Table 2, it can be seen that phase A has only S a1 , S a2 The anti-parallel diode D a1 , D a2 Provides an effective flow path for current. The same is true for phase C, while phase B only has S b6 , S b3 The anti-parallel diode D b3 Provide an effective flow path so that only S b6 It will affect the operation status of the entire ANPC rectifier. At the same time, during the injection of the state signal [PLP], the change of the midpoint current is observed: Normally in the [PLP] state, i o =i b If the conditions are met, it can be confirmed that this deviation polarity combination is caused by the A phase + C phase fault. Otherwise, the fault phase is only the B phase. Therefore, the bridge arm where the faulty switch tube is located can be accurately determined. The fault injection signal is a pulse that lasts for two sampling cycles. The state remains unchanged during the period. The midpoint current is used for observation. Two sampling cycles are sufficient to complete the subsequent identification. Fault injection does not deteriorate the system performance. Similarly, the identification method of other working areas can be obtained. Table 10 lists the bridge arm state reconstruction signal and identification rules injected when the uncertain state is detected in each working area, where F X =1 (x=a, b, c) indicates the indication signal of the fault phase. Table 10 shows the secondary identification rule of the fault phase based on the reconstruction of the bridge arm state.

[0132] Table 10

[0133]

[0134]

[0135] The "?" and the following ":" in the above table together form a conditional operator. When the condition before the "?" is true, the content before the ":" is executed, otherwise the content after the ":" is executed.

[0136] In this embodiment, the specific process of step S5 for comprehensive fault diagnosis of single tube and double tube is as follows: after obtaining the port voltage deviation in step S3, it is necessary to further judge the deviation polarity:

[0137]

[0138] Among them, d xy Indicates the corrected port voltage deviation polarity, Δv xy Indicates the port voltage deviation polarity before correction, Δv th represents the threshold voltage, T th Indicates the recognition time.

[0139] Here Δv th is the threshold voltage. Ideally, the voltage deviation value approaches 0 during normal operation of the circuit. However, the diagnostic variable is affected by errors in the sampling and calculation process, which will cause the deviation value to be not 0 even when no fault occurs. Therefore, in order to avoid the occurrence of misdiagnosis, a suitable threshold value needs to be set as the condition for judging the occurrence of a fault. The setting of the threshold value is mainly based on the sampling error during the operation of the rectifier and the calculation error caused by factors such as dead time and signal delay. The threshold range is set by accumulating each error value, thereby eliminating the influence of the error on the diagnostic result.

[0140] During rectifier operation, a dead time is required to prevent direct conduction of the bridge arm. The effect of dead time on the calculation of diagnostic variables is as follows: Figure 8 As shown, the effect of dead time is opposite when the current is positive or negative. Since the current direction is not easy to determine when the load is light or changes quickly, in order to simplify the diagnosis process, the maximum error caused by dead time is selected when calculating the threshold. The maximum calculation error of the diagnostic variable caused by dead time is:

[0141]

[0142] in, represents the calculation error of the diagnostic variable caused by the dead time, U dc Indicates the DC side output voltage, T dd Indicates the dead time, T s Represents the switching cycle.

[0143] The delay between voltage signals will also directly cause Calculation errors occur in the evaluation of Fig. 9 shown. Fig. 9 In the example, the signal delay includes the bridge arm output voltage v caused by hardware circuits such as the switch tube. xo Similarly, the maximum error value caused by the delay time is used to calculate the threshold. Therefore, the maximum calculation error of the diagnostic variable caused by the delay time is:

[0144]

[0145] in, represents the calculation error of the diagnostic variable caused by signal delay, U dc Indicates the DC side output voltage, T dl Indicates the delay time between voltage signals, T s Represents the switching cycle.

[0146] The threshold setting should be sensitive enough to respond quickly to abnormal values ​​caused by open circuit faults. However, when the deviation abnormal value appears as a transient peak with a very short time or is subject to other interference, it may cause incorrect polarity judgment. In order to avoid misdiagnosis as much as possible, a certain recognition time T needs to be set. th , if the voltage deviation exceeds the threshold and within the identification time T th If the internal deviation polarity remains unchanged, the deviation polarity d can be determined. xy . Identification time T th It cannot be too large, otherwise it will slow down the diagnosis.

[0147] From Table 4 to Table 9, it can be seen that there are two situations in which the switch tube failure occurs in the same working area:

[0148] a. Single-phase single-tube or double-tube open circuit fault: This situation can be dealt with using existing research results on single-phase fault diagnosis.

[0149] b. Two-phase double-tube open circuit fault: For example, in the working area R1, the A phase + B phase double-tube fault includes S a3 +S b6 , S a4 +S b6 , S a5 +S b6 , A phase + C phase double tube fault includes S a3 +S c5 , S a4 +S c5 , S a5 +S c5These two types of faults are the combination of the clamping switch tubes of the other two phases and the single tube fault of phase A. The fault phase identification strategy designed by the present invention can not only distinguish the bridge arm where the faulty switch tube is located, but also identify the clamping switch tubes S of phases B and C in the working area R1. b6 , S c5 Whether it is a fault, when the two switch tubes are detected to be faulty, since the clamp switch tube only participates in the zero-level output and the B-phase and C-phase can still achieve the normal zero-level output of the bridge arm through another zero-level redundant path, therefore, when the A-phase + B-phase double-tube fault or the A-phase + C-phase double-tube fault is identified, the B-phase S b6 Switch tube or C phase S c5 Fault, and immediately start the fault-tolerant state of phase B or phase C, so that another zero-level redundant path is turned on, thereby isolating the fault of phase B or phase C, so that the out-of-phase double-tube fault can be converted into a single-phase single-tube fault diagnosis state. There is also a phase B + phase C fault in the working area R1. This type of double-tube fault is a combination of two-phase clamped switch tubes, and it can be seen from Tables 4 to 9 that this type of fault has a unique polarity feature in each working area, so it can be located only by identifying the voltage deviation polarity. Similarly, the same method can be used to locate the switch tubes of the same fault in the remaining working areas.

[0150] For double-tube open-circuit faults occurring in different working areas, the time interval between their occurrences is much longer than the diagnosis time, so they can be equivalently regarded as single-phase single-tube open-circuit faults occurring at different times.

[0151] like Fig.10 As shown, the diagnostic approach is divided into three stages:

[0152] a. Determine the working area according to the phase-locked loop, obtain the port voltage deviation polarity through calculation, and make a polarity judgment according to the selected threshold voltage and recognition time to determine whether a switch failure occurs, and further determine whether it is an uncertain state within the working area according to the polarity;

[0153] b. If no uncertain state occurs, the fault scope is narrowed to the faulty bridge arm and the clamping switch tube; if it is an uncertain state, the bridge arm state reconstruction pulse signal is applied, and the faulty bridge arm is located through the auxiliary variable midpoint current. After the faulty phase is determined, if the clamping switch tube of a certain phase fails, the fault is isolated through the redundant zero-level path of the phase, so that the rectifier is in a single-phase fault.

[0154] c. Locate the faulty switch tube using the existing single-phase fault diagnosis method.

Claims

1. A method for diagnosing an out-of-phase double-switch open-circuit fault of an active clamped three-level rectifier, characterized in that: The following steps are involved: S1. Combined with the topological structure of the active clamped three-phase three-level rectifier, its switching state and working mode are analyzed; S2. Analyze the fault characteristics of a single-phase open circuit fault based on the analysis result of step S1 and the polarity of the bridge arm output voltage; S3, analyzing the working range of the three-phase switch tube during the operation of the active clamped three-level rectifier, dividing the phase-locked loop working area, and analyzing the fault characteristics of the single and double switch tubes based on the port voltage deviation polarity according to the analysis results of step S2 and the analysis results of step S1; S4. Based on the fault characteristic analysis results of the voltage deviation polarity of the fault ports of single-tube and double-tube switches in each phase-locked loop working area, a fault diagnosis strategy based on signal injection-based bridge arm state reconstruction and secondary identification combined with midpoint current is constructed; S5. According to the comprehensive fault characteristics of the single and double switch tubes, the fault diagnosis strategy is used to perform fault diagnosis and complete the diagnosis of the out-of-phase double-tube open circuit fault; The step S5 comprises the following steps: S501, selecting a threshold voltage and an identification time, and performing polarity judgment according to the selected threshold voltage and identification time to determine whether a switch tube failure occurs, and whether it is an uncertain state within a phase-locked loop working area; S502, if no uncertain state occurs, the fault range is narrowed down to the faulty bridge arm and the active clamp switch tube, and the process proceeds to step S503; if the state is uncertain, a bridge arm state reconstruction pulse signal is applied, and the faulty bridge arm is located through the auxiliary variable midpoint current, and the process proceeds to step S503; S503, determining the fault phase, if the active clamp switch of a phase fails, isolating the fault through the redundant zero-level path of the phase, so that the rectifier is in a single-phase fault; S504, based on the single-phase fault, locate the faulty switch tube, and complete the diagnosis of the out-of-phase double-tube open circuit fault; The threshold voltage is set based on sampling errors during rectifier operation, dead time, and calculation errors of diagnostic variables caused by signal delays.

2. The out-of-phase double-switch open circuit fault diagnosis method for an active clamped three-level rectifier according to claim 1, characterized in that: The expression of the midpoint current in step S4 is as follows: in, i o Indicates the midpoint current of the DC side, i a , i b 、i c Represent the transient current of phase a, phase b and phase c respectively, S a , S b , S c Respectively represent the switching functions of the a-phase bridge arm, the b-phase bridge arm and the c-phase bridge arm, | S x |(x=a,b,c) means S x The absolute value of (x=a,b,c), S a , S b , S c The value is determined by the switch state. The [P] state value is 1, the [OU] and [OL] state values ​​are 0, and the [N] state value is -1.

3. The out-of-phase double-switch open circuit fault diagnosis method for an active clamped three-level rectifier according to claim 1, characterized in that: The polarity judgment is performed in step S501, and the expression is as follows: in, Indicates the corrected port voltage deviation polarity, Indicates the port voltage deviation polarity before correction, Indicates the threshold voltage. Only when The signal lasts longer than T th When the polarity judgment is triggered, T th Indicates the recognition time.

4. The out-of-phase double-switch open circuit fault diagnosis method for an active clamped three-level rectifier according to claim 1, characterized in that: The expression for the calculation error of the diagnostic variable caused by the dead time is as follows: in, represents the calculation error of the diagnostic variable caused by the dead time, Indicates the DC side output voltage, Indicates the dead time, Represents the switching cycle.

5. The out-of-phase double-switch open circuit fault diagnosis method for an active clamped three-level rectifier according to claim 4, characterized in that: The calculation error of the diagnostic variable caused by the signal delay is expressed as follows: in, represents the calculation error of the diagnostic variable caused by the signal delay, Indicates the DC side output voltage, Indicates the delay time between voltage signals, Represents the switching cycle.