A mining drilling machinery control system
By introducing a geological information import and data evaluation module into the mining drilling rig, precise control of drilling operation position and parameters is achieved, solving the problem of insufficient adaptability to geological conditions in existing technologies and improving the stability and safety of the control system.
Patent Information
- Application Number
- CN202411095916.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-12
AI Technical Summary
Existing mining drilling rig control systems struggle to adapt to unforeseen changes in rock hardness and unstable strata when faced with varied geological conditions. This leads to untimely control, increased failure rates and safety hazards. Furthermore, inappropriate timing of changes to tunneling parameters can impact project progress and equipment stability.
The initial geological information and planned drilling path are imported using the drilling environment import module. Combined with the data from the drilling information acquisition module, the drilling operation position and parameter adjustment requirements are assessed through the operation change analysis module. Reference data is stored in the information database, and the operation change execution terminal performs precise control.
It improved the effectiveness and reliability of drilling rig control, reduced the failure rate and accident risk, optimized the drilling process, and ensured the stability and safety of the project schedule.
Smart Images

Figure CN118622241B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of mechanical control, and in particular relates to a mining drilling mechanical control system. Background Art
[0002] Mining drills are widely used in underground mines, open-pit mines, oil and gas drilling, etc. Especially with the rapid development of the mining industry and the continuous improvement of requirements for efficiency, environmental protection and safety, the operating requirements for mining drills are becoming higher and higher. In order to ensure the operating effect of mining drills, it is necessary to control their operating process.
[0003] At present, mining drill machinery control mainly controls the drilling depth, direction, drilling pressure, speed, torque and other operating parameters of the mining drill to ensure the stability of mining.
[0004] Prior art, such as the Chinese invention patent application with application publication number CN116927751A, discloses an automatic control system and method for an engineering drilling rig, including a scanning unit for detecting the ground geological structure and obtaining the average ground hardness K within a preset depth. A detection unit is used to detect the mass m of the drill bit and the depth d of the drill bit entering the ground after impacting the ground in real time. A control unit is used to control the lifting height of the drill bit when it is pulled up from the bottom of the hole on the ground and until the drill bit stops moving according to the average ground hardness K, the mass m of the drill bit and the depth d of entering the ground. In this way, the lifting height of the drill bit can be dynamically adjusted according to the ground hardness in the actual working environment and the penetration amount of the drill bit each time, thereby improving the working efficiency of the drilling rig.
[0005] Another example of the prior art is a rotary drilling rig control system and a rotary drilling rig disclosed in a Chinese invention patent application with application publication number CN104500023B, which includes a control server and a control terminal. The control server includes a display module, a first control module, a first protocol conversion module and a first wireless module. The control terminal includes a sensor group, a second control module, a second protocol conversion module and a second wireless module. The operator can set different control instructions to achieve the formation conditions of control according to the specific working conditions, and ensure that the data transmission has high reliability through the CAN protocol two-way communication, ensure the timeliness and accuracy of the control instructions sent to the controlled device, and reduce safety hazards.
[0006] With regard to the above technical solution, it is obvious that the excavation parameters are currently mainly regulated based on the currently monitored excavation environment, and there are still the following deficiencies: 1. Insufficient scene adaptability: It is currently difficult to adapt to changing geological conditions, especially when encountering unexpected changes in rock hardness or unstable formations. The current control method is based on actual monitoring values, and there is a possibility that the control may not be timely.
[0007] 2. When excavation parameters need to be changed, failure to pay attention to the timing of the change, that is, failure to pay attention to the location of the change point, may cause unstable operation of mechanical equipment and increase the failure rate, thus affecting the overall project progress. In addition, incorrect change timing may require more frequent equipment adjustments and replacements, and may also cause safety problems. Summary of the invention
[0008] In view of this, in order to solve the problems raised in the above background technology, a mining drilling machine control system is now proposed.
[0009] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a mining drilling machinery control system, which includes: a drilling environment import module, which is used to import the geological environment information corresponding to the initial survey of the current mining area, including the survey depth and soil hardness of each survey layer, and at the same time import the planned drilling path of the current mining area, the depth of each drilling position point in the planned drilling path, the spatial volume of the area and the operating parameters.
[0010] The drilling information collection module is used to collect the earthwork increment, actual position coordinates and drilling environment information of the current drilling rig at each cumulative drilling position point.
[0011] The operation change analysis module is used to conduct drilling operation control demand assessment analysis based on the operation parameters of each drilling position point and the recorded earthwork increment and drilling environment information of each cumulative drilling position point, including: S1, record the next drilling position point as the target position point, and conduct drilling operation position control demand assessment. If the assessment result is a demand, confirm the change of the operation position point, otherwise, execute the next step.
[0012] S2. Record the current drilling position as the analysis position, and evaluate the need for drilling operation parameter adjustment. If the evaluation result is a demand, confirm the current change operation information of the analysis position. Otherwise, there is no need to adjust the drilling operation parameters as the analysis result.
[0013] The information base is used to store the reference earthwork increment per unit excavation space volume under various soil hardnesses, and store the reference drilling vibration frequency, drilling temperature value and drilling speed of the drilling rig under various soil hardnesses.
[0014] The operation change execution terminal is used to perform corresponding drilling control on the current drilling rig according to the evaluation and analysis results of the drilling operation control requirements.
[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention effectively solves the problem of insufficient adaptability of current scenarios by combining the pre-surveyed drilling environment and the actually monitored drilling environment to assess the need for drilling operation position control and the need for drilling operation parameter control. It can ensure that when the prediction is not accurate enough, the drilling parameters of the drilling rig can be adjusted in time, avoiding the shortcomings of the current control based only on the actual monitoring values, ensuring the effectiveness and reliability of the drilling rig control, and at the same time optimizing the drilling process to the greatest extent and reducing the risk of accidents and costs.
[0016] (2) The present invention effectively solves the problem of not paying attention to the timing of changes when the excavation parameters need to be changed by evaluating the demand for position control of drilling operations, thereby reducing the risk of fluctuations and failure rates in drilling operations, providing a strong guarantee for the overall project progress, and at the same time improving the control of the timing of drilling rig changes, avoiding frequent adjustments and replacements of equipment requirements due to changes at the wrong time, and further reducing the probability of safety problems.
[0017] (3) The present invention analyzes the earthwork increment abnormality, drilling characterization abnormality and drilling soil deviation, and then evaluates the drilling rig operation position control needs from these three indicator dimensions. It can accurately judge the changes in the current geological conditions, expand the coverage of the drilling rig operation position control needs assessment, and thus ensure the reliability and authenticity of the assessment results. At the same time, it also helps to effectively evaluate and control the drilling rig's operation position requirements, thereby improving the efficiency, safety and economy of the subsequent drilling process.
[0018] (4) The present invention achieves long-term tracking of earthwork increments by setting an earthwork increment anomaly assessment compensation factor based on the recorded earthwork increments at each cumulative drilling position point, fully considering the dynamic changes in geology during the drilling process, and thus can help monitor the changes in earthwork during the drilling process in real time, thereby improving the accuracy of earthwork increment anomaly analysis, and further reducing work stagnation or production delays caused by unexpected changes in earthwork increments.
[0019] (5) When the drilling operation parameters need to be regulated, the present invention realizes the refined change of the drilling operation parameters by confirming the change items and the change indicators under the corresponding change items. At the same time, it also ensures the accuracy and consistency of the changes in the drilling rig operation parameters, and can formulate corresponding action plans and control measures more quickly and accurately, thereby improving the scientificity and effectiveness of decision-making, and further ensuring the effectiveness and change effect of the drilling rig operation changes. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0021] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention.
[0022] Figure 2 The present invention is a schematic diagram of the drilling operation parameter control demand assessment and analysis process. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] See also Figure 1 As shown, the present invention provides a mining drilling machinery control system, which includes: a drilling environment import module, a drilling information acquisition module, an operation change analysis module, an information library and an operation change execution terminal.
[0025] In the above, the operation change analysis module is connected with the drilling environment import module, the drilling information collection module, the information library and the operation change execution terminal respectively.
[0026] The drilling environment import module is used to import the geological environment information corresponding to the initial survey of the current mining area, including the survey depth and soil hardness of each survey layer, and at the same time import the planned drilling path of the current mining area, the depth of the area where each drilling position point in the planned drilling path is located, the spatial volume of the area and operation parameters.
[0027] The drilling environment import module is used to import the geological environment information corresponding to the initial survey of the current mining area, including the survey depth and soil hardness of each survey layer, and at the same time import the planned drilling path of the current mining area, the depth of each drilling position point in the planned drilling path, the spatial volume of the area and operation parameters.
[0028] Specifically, the operating parameters include but are not limited to drilling speed, set flow rate of drilling fluid, drilling angle and drilling direction.
[0029] The drilling information collection module is used to collect the earthwork increment, actual position coordinates and drilling environment information of the current drilling rig at each cumulative drilling position point.
[0030] Specifically, the drilling environment information includes but is not limited to monitoring soil hardness and the temperature and vibration frequency of the drilling rig corresponding to each drilling time point.
[0031] See also Figure 2 As shown, the operation change analysis module is used to perform drilling operation control demand assessment analysis based on the operation parameters of each drilling position point and the recorded earthwork increment and drilling environment information of each cumulative drilling position point, including: S1, record the next drilling position point as the target position point, and conduct drilling operation position control demand assessment. If the assessment result is a demand, confirm the change of the operation position point, otherwise, execute the next step.
[0032] The embodiment of the present invention effectively solves the problem of not paying attention to the timing of change when the current excavation parameters need to be changed by evaluating the demand for drilling operation position regulation, reduces the risk of fluctuations and failure rates in drilling operations, and provides strong guarantees for the overall project progress. At the same time, it also improves the control over the timing of drilling rig change, avoids frequent adjustments and replacements of equipment requirements due to changes at the wrong time, and further reduces the probability of safety problems.
[0033] Specifically, the drilling operation position control demand assessment is performed, including: S11, comparing the depth of each drilling position point with the survey depth of each survey layer, and confirming the reference soil hardness and reference earthwork increment of each drilling position point.
[0034] S12, extract the reference earthwork increment of each cumulative drilling position point, and set the earthwork increment abnormal assessment compensation factor, recorded as .
[0035] S13, record the reference earthwork increment and recorded earthwork increment of the analysis location as and , calculate the abnormality of the earthwork increment of the current drilling rig , , It is the pre-set allowable earthwork increment difference.
[0036] S14, extracting the temperature and vibration frequency of the drilling rig corresponding to each drilling time point from the drilling environment information, analyzing the abnormality of the drilling characterization corresponding to the current drilling rig, and recording it as .
[0037] S15. Extract the reference soil hardness of the analysis location and the soil hardness of the target location, and record them as and , count the current drilling rig corresponding to the soil deviation, recorded as ;
[0038] It should be added that the specific calculation formula for the current drilling rig corresponding to the soil deviation is as follows: , The soil hardness difference is used to set the reference.
[0039] In a specific embodiment, The specific value of is obtained by extracting it from the drilling rig operating parameter assessment technical table.
[0040] S16, if , and If an item is greater than 0, demand is taken as the evaluation result; otherwise, no demand is taken as the evaluation result.
[0041] The embodiment of the present invention analyzes the earthwork increment abnormality, drilling characterization abnormality and drilling soil deviation, and then evaluates the drilling rig operation position control needs from these three indicator dimensions, which can accurately judge the changes in the current geological conditions, expand the coverage of the drilling rig operation position control needs assessment, and thus ensure the reliability and authenticity of the assessment results. At the same time, it also helps to effectively evaluate and control the drilling rig's operation position requirements, thereby improving the efficiency, safety and economy of the subsequent drilling process.
[0042] Furthermore, the step S11 of confirming the reference soil hardness and the reference earthwork increment of each drilling position point includes: if the depth of the area where a drilling position point is located is less than or equal to the survey depth of a survey layer and the depth of the area where the drilling position point is located is greater than the survey depth of the survey layer to the previous survey layer, the survey layer is used as the survey layer to which the drilling position point belongs, so as to obtain the survey layer to which each drilling position point belongs.
[0043] The soil hardness of the survey layer corresponding to each drilling position point is used as the reference soil hardness of each drilling position point.
[0044] The reference earthwork increment of the unit excavation space volume under the soil hardness corresponding to each drilling position point is extracted from the information database as the reference unit earthwork increment of each drilling position point, and the product is calculated with the spatial volume of the interval where each drilling position point is located, and the calculation result is used as the reference earthwork increment of each drilling position point.
[0045] Furthermore, the setting of the earthwork increment abnormality assessment compensation factor in step S12 includes: subtracting the reference earthwork increment and the recorded earthwork increment of each cumulative drilling position point to obtain the earthwork increment difference.
[0046] The accumulated drilling position points with earthwork increment difference greater than 0 are recorded as abnormal position points. The number of abnormal position points is counted and compared with the accumulated number of drilling position points. The ratio is recorded as the abnormal position number ratio, which is recorded as .
[0047] The accumulated drilling position is used as the horizontal coordinate and the earthwork increment difference is used as the vertical coordinate to construct the earthwork increment change curve, and the slope of the curve is extracted and recorded as .
[0048] Based on the and , the compensation factor for abnormal assessment of earthwork increment is obtained by calculating the Sigmoid function.
[0049] It should be added that before calculating the earthwork increment anomaly assessment supplement factor through the Sigmoid function, it also includes and Normalization is performed, where and The specific process of normalization includes: 1) The difference is compared with the preset ratio of the number of abnormal positions allowed, and the difference is compared with the preset ratio of the number of normal positions allowed, and the ratio is used as the value. The normalized result is recorded as .
[0050] Understandably, the preset ratio of the number of permitted normal positions can be set with reference to the abnormal warning ratio, wherein the abnormal warning ratio can be obtained by extracting from the drilling technical rule table of the drilling rig, and illustratively, the preset ratio of the number of permitted normal positions can be specifically set to 0.5. The drilling technical rule table of the drilling rig is the drilling instructions of the drilling rig, which is provided by the manufacturer of the drilling rig.
[0051] 2) The difference is subtracted from the preset allowable earthwork increment difference change rate, and the difference is compared with the preset allowable earthwork increment difference change rate, and the ratio is used as The normalized result is recorded as .
[0052] It is understandable that when there is no change in the earthwork increment difference, it indicates that the earthwork increment change is stable at this time, which further indicates that the drilling is normal at this time. Therefore, 0 is selected as the boundary value of the allowable earthwork increment difference change rate. Specifically, the pre-set allowable earthwork increment difference change rate can be 0.1.
[0053] It should also be added that the specific calculation formula for calculating the earthwork increment anomaly assessment supplement factor through the Sigmoid function is: , is a natural constant.
[0054] The embodiment of the present invention achieves long-term tracking of earthwork increments by setting an earthwork increment anomaly assessment compensation factor based on the recorded earthwork increments at each cumulative drilling position point, fully considers the dynamic changes in geology during the drilling process, and can help monitor the changes in earthwork during the drilling process in real time, thereby improving the accuracy of earthwork increment anomaly analysis, and can further reduce work stagnation or production delays caused by unexpected earthwork increment changes.
[0055] Furthermore, the analysis of the abnormality of the drilling characterization corresponding to the current drilling rig in step S14 includes: locating the drilling vibration frequency and drilling temperature value of the drilling rig referenced under the reference soil hardness corresponding to the analysis position point from the information database, which are recorded as and .
[0056] Based on the temperature and vibration frequency of the drilling rig corresponding to each drilling time point, the temperature sequence and vibration sequence of the analysis location point are constructed.
[0057] Traverse the temperature sequence and filter out the highest temperature , and filter out The drilling time point is recorded as the abnormal time point, the number of abnormal time points is counted, and the ratio of the number of abnormal time points to the number of drilling time points is recorded as the abnormal temperature ratio. .
[0058] Traverse the vibration sequence and select the highest vibration frequency , and follow The confirmation method is similar to confirming the abnormal vibration ratio. .
[0059] Statistics of the abnormality of drilling characteristics corresponding to the current drilling rig , , and They are the abnormal temperature ratio and abnormal vibration ratio for setting reference respectively.
[0060] It should be added that the statistical formula of the drilling characterization anomaly corresponding to the current drilling rig is set with reference to the variant of the ReLU function. The variant of the ReLU function is set because it is necessary to ensure that the two parameters of temperature and vibration are not affected by the positive and negative values of each other during the analysis process, that is, to prevent the numerical interference caused by the inconsistent signs of the drilling vibration characterization anomaly and the drilling temperature characterization anomaly, thereby ensuring the authenticity and representativeness of the final result of the drilling characterization anomaly corresponding to the current drilling rig.
[0061] It is also necessary to add that Indicates the abnormality of drilling temperature. It represents the drilling vibration characterization abnormality. The drilling temperature characterization abnormality and the drilling vibration characterization abnormality are respectively subtracted by 1 because the abnormal critical values of the drilling temperature characterization abnormality and the drilling vibration characterization abnormality are both 1. It is necessary to subtract the critical value to better reflect the abnormal situation of the drilling characterization corresponding to the current drilling rig, thereby ensuring the accuracy of the calculation of the drilling characterization abnormality corresponding to the current drilling rig and the reference of the evaluation results of the operation position control demand.
[0062] In a specific embodiment, and The specific value of can be extracted from the operating technical specification table of the drilling rig. For example, The value can be 0.35. The value can be 0.3.
[0063] Specifically, confirming the change operation position point includes: U1, intercepting the planned drilling path located before the analysis position point from the planned drilling path, recording it as the reference planned path, and at the same time constructing the actual drilling path based on the actual position coordinates of each accumulated drilling position point, setting the drilling path deviation degree .
[0064] Furthermore, in step U1, the drilling path deviation is set, including: U11, comparing the actual drilling path with the reference planned path to obtain the overlapped path length, and recording the ratio of the overlapped path length to the length of the reference planned path as the overlapped path ratio .
[0065] U12. The non-overlapping path segments corresponding to the actual drilling path and the reference planned path are recorded as deviation segments. The number of deviation segments is counted and compared with the cumulative number of drilling position points. The ratio is recorded as the deviation position ratio. .
[0066] U13, extract the maximum distance between each deviation segment and the reference planned path as the reference deviation distance, calculate the mean of the reference deviation distance of each deviation segment, and obtain the average deviation distance, recorded as .
[0067] U14, Statistical drilling path deviation , , To set the allowable deviation distance of the reference.
[0068] It should be added that the path deviation The statistical formula of is derived from the deformation setting of the Sigmoid function because, in a specific embodiment, compared with the setting of the weight, the path deviation involves a wider range of values. By using the deformation of the Sigmoid function, the stability and efficiency of the numerical calculation process can be guaranteed. And in a specific embodiment, The specific value of can be extracted from the drilling rig drilling technical rules table.
[0069] U2, statistical position change trend , , are the weights of the set earthwork increment anomaly, drilling characterization anomaly, soil deviation and drilling path deviation, respectively. ,and , , , and They are the reference earthwork increment anomaly, drilling characterization anomaly, drilling soil deviation and drilling path deviation.
[0070] It should be added that the weights of earthwork increment anomaly, drilling characterization anomaly, soil deviation and path deviation are set according to the impact of the need for position change. In a specific embodiment, if the soil deviation is high, it indicates that the geology of the current location point and the target location point is very different, which directly leads to the need to change the location of the operation in advance. Therefore, the weight of the soil deviation is set to the maximum. If the earthwork increment is significantly different from the expected value, it may indicate that the geological conditions are inconsistent with the prediction or there is a construction error. At this time, it also indirectly reflects the need to change the location of the operation in advance to reduce the direct difference between the drilling effect and the actual expectation. The drilling data can provide a continuous record of the stratum. The anomaly may indicate an unexpected hard rock layer or cavity, which also indirectly requires the location of the operation to be changed in advance. Therefore, the weight of the earthwork increment anomaly is set to be the same as the weight of the drilling characterization anomaly. At the same time, the drilling path deviation affects the accurate execution of the construction path and the accuracy of the final result. When the path deviation is large, the operation may require more adjustments and verifications. Therefore, the drilling path deviation has the least impact on the need for position change. For example, , , and The possible values are 0.2, 0.2, 0.5 and 0.1 respectively.
[0071] It should be added that the statistical formula of the position change tendency is set with reference to the linear regression function. And in a specific embodiment, , , and It is set according to the critical values of earthwork increment abnormality, drilling characterization abnormality, drilling soil deviation and drilling path deviation. For example, , , The critical values of these three are 0, and they can be set with 0 as the boundary, that is, , , Both can be set to 0.1. The critical value of is 0.5, which can be used as The specific value of .
[0072] U3. The change advance ratio is matched and compared with the reference position change tendency interval corresponding to each preset change advance ratio to obtain a matched change advance ratio.
[0073] It should be added that the reference position change trend interval corresponding to each change advance ratio is extracted from the drilling rig drilling technical rule table.
[0074] U4. The distance between the analysis position point and the target position point is recorded as the planned change distance, and the product of the planned change distance and the matched change advance ratio is recorded as the advance change distance .
[0075] U5. Locate the point in front of the target position from the planned drilling path. The drilling position point at is recorded as the change operation position point.
[0076] In a specific embodiment, the earthwork increment refers to the volume of soil or rock excavated during the drilling process, which is an important indicator of drilling efficiency and geological conditions. When the earthwork increment is abnormal, that is, exceeds expectations or does not match previous drilling data, this may indicate that the geological conditions have changed or there is a problem with the drilling system. Therefore, whether the drilling rig needs to adjust the drilling parameters in advance or delay is directly related to the abnormal earthwork increment.
[0077] In another specific embodiment, when there is a large deviation between the geological layer to be drilled and the current geological layer, drilling parameters such as drilling speed need to be adjusted in advance or delayed. At the same time, when the temperature, vibration and other mechanical performance indicators of the drilling rig change significantly, it indicates that the geological layer at this time has a large deviation from the pre-surveyed geological layer. At this time, the drilling parameters also need to be adjusted in advance or delayed to ensure the effectiveness and stability of the adjustment. Therefore, the drilling path, soil hardness, earthwork increment, temperature and vibration of the drilling rig are selected to evaluate the adjustment requirements of the drilling operation parameters corresponding to the operating position.
[0078] S2. Record the current drilling position as the analysis position, and evaluate the need for drilling operation parameter adjustment. If the evaluation result is a demand, confirm the current change operation information of the analysis position. Otherwise, there is no need to adjust the drilling operation parameters as the analysis result.
[0079] Specifically, the drilling operation parameter control demand assessment is performed, including: N1, based on the temperature and vibration frequency of the drilling rig corresponding to the analysis location point at each drilling time point, the drilling environment abnormality of the location point is statistically analyzed, recorded as .
[0080] It should be added that the statistical formula for analyzing the abnormality of the drilling environment at the location point is as follows: .
[0081] N2. Extract the monitoring soil hardness from the drilling environment information of the analysis location point, based on the reference soil hardness of the analysis location point, according to The statistical method is similar to the statistical analysis of the drilling soil prediction difference at the location point. .
[0082] N3. Statistical drilling operation parameter change requirements , , is the floor symbol, and They are the reference drilling environment anomaly and soil prediction difference respectively.
[0083] It should be added that the statistical formula for the demand for change of drilling operation parameters is set with reference to the exponential regression function. Its purpose is to ensure that the calculation result is a non-negative number, thereby reducing the value range and improving the judgment efficiency. At the same time, it also reduces the interference between the values of drilling environment anomaly, soil prediction difference and drilling path deviation. Different from the statistics of position change trend, when the overall position change trend reaches a certain value, it can indicate a change in position demand. When any of the drilling environment anomaly, soil prediction difference and drilling path deviation is greater than 0, the operation parameters need to be changed. The setting is different from the operation change position assessment method in order to provide a data basis for the confirmation of subsequent operation parameter values, save subsequent calculations, and thus improve the efficiency of confirmation of changed operation parameters.
[0084] In a specific embodiment, and The specific value of , , The specific value setting principle is the same and will not be repeated here.
[0085] In another specific embodiment, the three factors of drilling environment abnormality, soil prediction difference and drilling path deviation will significantly affect the adjustment of drilling operation parameters. The drilling environment abnormality and soil prediction difference usually require immediate adjustment of drilling parameters to adapt to unpredictable geological conditions. The drilling path deviation is more related to the use of the guidance system and the correction of trajectory planning. When any of these factors is established, the drilling operation parameters need to be changed. Therefore, the weights of drilling environment abnormality, soil prediction difference and drilling path deviation are not set here.
[0086] N4, if , the demand will be taken as the evaluation result, otherwise there will be no need to adjust the drilling operation parameters as the evaluation result.
[0087] In yet another specific embodiment, the current change operation information of the analysis position point is confirmed, including: F1, confirming the change items, including the drilling position and the drilling speed.
[0088] F2. If the change item is drilling positioning, the planned drilling position coordinates of the analysis position point are extracted from the planned drilling path. Based on the actual position coordinates of the analysis position point and the planned drilling position coordinates, the change drilling angle and change direction are calculated through the trajectory planning algorithm, and used as the change indicator for the change item being drilling positioning.
[0089] It should be added that the trajectory planning algorithm is a relatively mature algorithm currently available, and its specific planning process will not be described here.
[0090] F3. If the change item is drilling speed, extract the drilling speed of the drill rig reference under the monitoring soil hardness corresponding to the analysis location point from the information database. .
[0091] F4. Extract drilling speed from the operating parameters of the analysis location , confirm the change category and the change value of the change category, and use it as the change indicator under the drilling speed as the change item.
[0092] F5. If the change items are drilling speed and drilling positioning, the change indicators of drilling positioning and drilling speed will be used as the change indicators under this change item.
[0093] F6. Use the change item and the change indicators under the change item as the current change operation information.
[0094] In the embodiment of the present invention, when the drilling operation parameters need to be regulated, the drilling operation parameters are refined by confirming the change items and the change indicators under the corresponding change items, while also ensuring the accuracy and consistency of the changes in the drilling rig operation parameters, and can more quickly and accurately formulate corresponding action plans and regulatory measures, thereby improving the scientificity and effectiveness of decision-making, and further ensuring the effectiveness and change effect of the drilling rig operation changes.
[0095] Furthermore, the changes confirmed in step F1 include: , , and As conditions 1, 2, 3 and 4, To set the early warning drilling path deviation.
[0096] If any one of conditions 1, 2 and 3 is met, the drilling speed is used as the change item. If only condition 4 is met, the drilling positioning is used as the change item. If condition 4 is met and any one of conditions 1, 2 and 3 is also met, the drilling speed and drilling positioning are used as the change items.
[0097] It should be added that when It indicates that the temperature or vibration is abnormal. The item directly related to temperature and vibration is the drilling speed. This indicates that the geological deviation is large at this time, and the item directly related to the geology is the drilling speed. , indicating that there is a deviation in the path at this time. When the deviation is small, it can be adjusted by reducing the drilling speed. Therefore, if any one of conditions 1, 2 and 3 is met, the drilling speed is used as the change item, and when When the path deviation is large, it means that the drilling direction needs to be adjusted, that is, the drilling positioning is used as a change operation item.
[0098] In a specific embodiment, The specific value can be 0.7.
[0099] Furthermore, the confirmation of the change category and the change value of the change category in step F4 includes: F41, if , the change category is taken as the drilling speed, otherwise, the change category is taken as the drilling speed and drilling fluid flow rate.
[0100] F42, when the change category is drilling speed, calculate the change drilling speed , , To set the required change in drilling operation parameters for reference, As the change value of drilling speed.
[0101] It should be added that The critical value of is 0. It is set with 0 as the boundary. Specifically, can take the value 1, and Represents the change correction factor, which is set by referring to the Sigmoid function to ensure that the adjustment ratio is between 0 and 1.
[0102] F43, when the change category is drilling speed and drilling fluid flow rate, As the change value of drilling speed.
[0103] F44. Extract the set flow rate of drilling fluid from the operating parameters of the analysis location point , calculate the change flow rate of drilling fluid , , is the reference flow rate of the drilling fluid. As the change value of drilling fluid flow rate.
[0104] It should be added that It is the reference speed to ensure that the drill can drill into the formation. When the speed is adjusted, it means that the temperature or vibration frequency at that time exceeds the preset value. Slowing down the drilling speed can reduce friction and heat generation, which helps to reduce the temperature. At the same time, slowing down the drilling speed can reduce the impact of the drill bit on the rock and avoid the resonance frequency, thereby reducing vibration. In this case, when The drilling speed can be adjusted to the drilling speed referenced by the drilling rig To ensure drilling, , indicating that the drilling speed referenced by the drilling rig is too high and a higher speed is required for drilling. At this time, the flow characteristics of the drilling fluid can be adjusted to alleviate the temperature and vibration abnormalities and increase the drilling speed to the drilling speed referenced by the drilling rig.
[0105] In a specific embodiment, the reference flow rate of the drilling fluid is An upper limit value of the flow rate is set for the drilling fluid, which is extracted from the drilling rig drilling technical rule table.
[0106] The embodiments of the present invention effectively solve the problem of insufficient adaptability of current scenarios by combining the pre-surveyed drilling environment and the actually monitored drilling environment to assess the need for drilling operation position control and the need for drilling operation parameter control. It can ensure that when the prediction is not accurate enough, the drilling parameters of the drilling rig can be adjusted in time, avoiding the shortcomings of the current control based only on the actual monitoring values, ensuring the effectiveness and reliability of the drilling rig control, and at the same time can optimize the drilling process to the greatest extent and reduce the risk of accidents and costs.
[0107] The information database is used to store the reference earthwork increment per unit excavation space volume under various soil hardnesses, and store the reference drilling vibration frequency, drilling temperature value and drilling speed of the drilling rig under various soil hardnesses.
[0108] The operation change execution terminal is used to perform corresponding drilling control on the current drilling rig according to the drilling operation regulation demand assessment and analysis results.
[0109] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A mining drilling machine control system, characterized in that: The system includes: The drilling environment import module is used to import the geological environment information corresponding to the initial survey of the current mining area, including the survey depth and soil hardness of each survey layer, and import the planned drilling path of the current mining area, the depth of each drilling position point in the planned drilling path, the spatial volume of the area and the operation parameters; The drilling information collection module is used to collect the earthwork increment, actual position coordinates and drilling environment information of the current drilling rig at each cumulative drilling position point; The operation change analysis module is used to evaluate and analyze the drilling operation control requirements based on the operation parameters of each drilling position point and the recorded earthwork increment and drilling environment information of each cumulative drilling position point, including: S1. Record the next drilling position point as the target position point, and evaluate the drilling operation position control demand. If the evaluation result is the demand, confirm to change the operation position point, otherwise, execute the next step; S2. Record the current drilling position as the analysis position, and evaluate the drilling operation parameter adjustment demand. If the evaluation result is a demand, confirm the current change operation information of the analysis position. Otherwise, there is no need to adjust the drilling operation parameters as the analysis result. An information database for storing reference earthwork increments per unit excavation space volume under various soil hardnesses, and storing reference drilling vibration frequencies, drilling temperature values, and drilling speeds of drilling rigs under various soil hardnesses; The operation change execution terminal is used to perform corresponding drilling control on the current drilling rig according to the evaluation and analysis results of the drilling operation control requirements; The drilling operation position control demand assessment includes: Compare the depth of each drilling position with the survey depth of each survey layer to confirm the reference soil hardness and reference earthwork increment of each drilling position; Extract the reference earthwork increment of each cumulative drilling position point and set the earthwork increment abnormal evaluation compensation factor, which is recorded as ; The reference earthwork increment and recorded earthwork increment of the analysis location are recorded as and , calculate the abnormality of the earthwork increment of the current drilling rig , , It is the pre-set allowable earthwork increment difference; The temperature and vibration frequency of the drilling rig corresponding to each drilling time point are extracted from the drilling environment information, and the abnormality of the drilling characterization corresponding to the current drilling rig is analyzed and recorded as ; The reference soil hardness of the analysis location and the soil hardness of the target location are extracted and recorded as and , count the current drilling rig corresponding to the soil deviation, recorded as ; like , and If there is an item greater than 0, demand is taken as the evaluation result, otherwise no demand is taken as the evaluation result; The drilling operation parameter regulation demand assessment includes: Based on the temperature and vibration frequency of the drilling rig corresponding to the analysis location point at each drilling time point, the drilling environment abnormality of the location point is statistically analyzed and recorded as ; The monitoring soil hardness is extracted from the drilling environment information of the analysis location point, and the reference soil hardness of the analysis location point is calculated according to The statistical method is similar to the statistical analysis of the drilling soil prediction difference at the location point. ; Statistics on the need to change drilling operation parameters , , is the floor symbol, and They are the drilling environment anomaly and soil prediction difference of the set reference respectively; like , the demand will be taken as the evaluation result, otherwise there will be no need to adjust the drilling operation parameters as the evaluation result.
2. A mining drilling machine control system according to claim 1, characterized in that: The method of setting the compensation factor for abnormal assessment of earthwork increment includes: Subtract the reference earthwork increment from the recorded earthwork increment at each cumulative drilling position point to obtain the earthwork increment difference; The accumulated drilling position points with earthwork increment difference greater than 0 are recorded as abnormal position points. The number of abnormal position points is counted and compared with the accumulated number of drilling position points. The ratio is recorded as the abnormal position number ratio, which is recorded as ; The accumulated drilling position is used as the horizontal coordinate and the earthwork increment difference is used as the vertical coordinate to construct the earthwork increment change curve, and the slope of the curve is extracted and recorded as ; Based on the and , the compensation factor for abnormal assessment of earthwork increment is obtained by calculating the Sigmoid function.
3. A mining drilling machine control system according to claim 1, characterized in that: The analysis of the abnormality of the drilling performance corresponding to the current drilling rig includes: The drilling vibration frequency and drilling temperature values of the drilling rig referenced under the reference soil hardness are located from the information database and recorded as and ; Based on the temperature and vibration frequency of the drilling rig at each drilling time point, the temperature sequence and vibration sequence of the analysis location point are constructed; Traverse the temperature sequence and filter out the highest temperature , and filter out The drilling time point is recorded as the abnormal time point, the number of abnormal time points is counted, and the ratio of the number of abnormal time points to the number of drilling time points is recorded as the abnormal temperature ratio. ; Traverse the vibration sequence and select the highest vibration frequency , and follow The confirmation method is similar to confirming the abnormal vibration ratio. ; Statistics of the abnormality of drilling characteristics corresponding to the current drilling rig , , and They are the abnormal temperature ratio and abnormal vibration ratio of the reference, is a natural constant.
4. A mining drilling machine control system according to claim 3, characterized in that: The step of confirming the change of the operation position point includes: The planned drilling path before the analysis position point is selected from the planned drilling path and recorded as the reference planned path. At the same time, the actual drilling path is constructed based on the actual position coordinates of each accumulated drilling position point, and the drilling path deviation is set. ; Statistical position change trend , , are the weights of the set earthwork increment anomaly, drilling characterization anomaly, soil deviation and drilling path deviation, respectively. ,and , , , and They are the set reference earthwork increment anomaly, drilling representation anomaly, drilling soil deviation and drilling path deviation respectively; Will Matching and comparing with the reference position change trend intervals corresponding to the preset change advance ratios to obtain a matched change advance ratio; The distance between the analysis position point and the target position point is recorded as the planned change distance, and the product of the planned change distance and the matched change advance ratio is recorded as the advance change distance ; From the planned drilling path, locate the point that is a distance before the target position. The drilling position point at is recorded as the change operation position point.
5. A mining drilling machine control system according to claim 4, characterized in that: The setting of the drilling path deviation includes: Compare the actual drilling path with the reference planned path to obtain the length of the overlapping path. The ratio of the length of the overlapping path to the length of the reference planned path is recorded as the overlapping path ratio. ; The non-overlapping path segments corresponding to the actual drilling path and the reference planned path are recorded as deviation segments. The number of deviation segments is counted and compared with the cumulative number of drilling position points. The ratio is recorded as the deviation position ratio. ; The maximum distance between each deviation segment and the reference planned path is extracted as the reference deviation distance. The reference deviation distance of each deviation segment is averaged to obtain the average deviation distance, which is recorded as ; Statistical drilling path deviation , , To set the allowable deviation distance of the reference.
6. A mining drilling machine control system according to claim 1, characterized in that: The current change operation information of the confirmation analysis location point includes: Confirm changes, including drilling positioning and drilling speed; If the change item is drilling positioning, the planned drilling position coordinates of the analysis position point are extracted from the planned drilling path, and based on the actual position coordinates of the analysis position point and the planned drilling position coordinates, the change drilling angle and change direction are calculated through the trajectory planning algorithm, and used as the change indicator of the change item being drilling positioning; If the change item is drilling speed, extract the drilling speed of the drill rig reference under the monitoring soil hardness corresponding to the analysis location point from the information database ; Extracting the penetration rate from the operating parameters at the analysis location , confirm the change category and the change value of the change category, and use it as the change indicator under the drilling speed; If the change item is drilling speed and drilling positioning, the change indicators of drilling positioning and drilling speed shall be used as the change indicators under this change item; The change item and the change indicator under the change item are used as the current change operation information.
7. A mining drilling machine control system according to claim 6, characterized in that: The confirmed change items include: Will , , and As conditions 1, 2, 3 and 4, To set the early warning drilling path deviation; If any one of conditions 1, 2 and 3 is met, the drilling speed is used as the change item. If only condition 4 is met, the drilling positioning is used as the change item. If condition 4 is met and any one of conditions 1, 2 and 3 is also met, the drilling speed and drilling positioning are used as the change items.
8. A mining drilling machine control system according to claim 6, characterized in that: The confirmation of the changed category and the changed value of the changed category includes: like , the change category is taken as the drilling speed, otherwise, the change category is taken as the drilling speed and drilling fluid flow rate; When the change category is drilling speed, calculate the change drilling speed , , To set the required change in drilling operation parameters for reference, As the change value of drilling speed; When changing the category to drilling speed and drilling fluid flow rate, As the change value of drilling speed; Extract the set flow rate of drilling fluid from the operating parameters at the analysis location , calculate the change flow rate of drilling fluid , , is the reference flow rate of the drilling fluid. As the change value of drilling fluid flow rate.
Citation Information
Patent Citations
Rotary Drilling Rig Control System and Rotary Drilling Rig
CN104500023B
Automatic control system and method for engineering driller
CN116927751A
Intelligent drill jumbo
CN107575161A
Coal mine underground drilling construction equipment system and construction parameter optimization method thereof
CN113756711A
Method and system for online monitoring and optimization of mining and mineral processing operations
IN201821040541A