A safety control method, device and medium for a storage tank system

Through the combination of weather prediction and storage tank service data, multi-dimensional risk assessment and dynamic control strategy adjustment are carried out, which solves the problem of timeliness and comprehensiveness of safety monitoring of the storage tank system under extreme conditions, and reduces the risk level of the storage tank system.

CN118627913BActive Publication Date: 2024-10-29SHANDONG CHAMBROAD HLDG GRP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411095713.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-29
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

The safety monitoring of existing storage tank systems is insufficient in timeliness and comprehensiveness during extreme weather or geological activities. A single risk evaluation index cannot meet the risk prediction needs under different working conditions and different service years, resulting in missed safety risk assessments and untimely control.

Method used

Determine the probability information of extreme scenarios through meteorological prediction, determine the risk information of the storage tank based on the storage tank service data, conduct a multi-dimensional risk assessment based on multi-source real-time monitoring data and prediction models, and dynamically adjust the control strategy to deal with potential risks.

Benefits of technology

Identify extreme weather or natural disasters in advance, respond quickly and take preventive measures, comprehensively assess storage tank risks, dynamically adjust control strategies, reduce the risk level of the storage tank system, and improve safety control effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118627913B_ABST
    Figure CN118627913B_ABST
Patent Text Reader

Abstract

The embodiments of the present specification disclose a safety control method, device and medium for a storage tank system, which relate to the field of storage tank technology. The method comprises: performing meteorological forecasts on the use area of ​​the storage tank system, determining extreme scenario prediction information corresponding to the use area, and when the extreme scenario probability information is greater than a preset probability threshold, determining corresponding tank risk information based on pre-acquired tank service data and extreme scenario prediction information corresponding to the storage tank system, determining designated multi-source real-time monitoring data in a multi-source real-time monitoring data set based on the tank risk information, and determining corresponding multi-dimensional prediction data based on the designated multi-source real-time monitoring data and a pre-built tank parameter prediction model; performing risk assessment on the storage tank system through the multi-dimensional prediction data, determining the prediction risk index corresponding to the storage tank system, and dynamically adjusting the control strategy of the storage tank system based on the prediction risk index to perform safety control on the storage tank system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present specification relates to the technical field of storage tanks, and in particular to a safety control method, equipment and medium for a storage tank system. Background Art

[0002] The storage tank system is an essential and important infrastructure in the petroleum, chemical and other industries. During the transportation and use of the storage tanks, they are affected by the external environment, various gas and liquid corrosion and stress changes, as well as the operational risks during transportation and use, resulting in many storage tanks having defects such as cracks and corrosion to varying degrees. In addition, in some extreme scenarios, such as extreme weather conditions (such as high temperature, severe cold, strong winds, heavy rain, etc.) or geological activities (such as earthquakes, landslides, etc.), the storage tank system may face additional safety risks. For example, extreme temperature changes may cause the performance of the tank material to deteriorate, and geological activities may cause damage or displacement of the tank structure.

[0003] With the development of Internet of Things technology, real-time data collection of tank sites is carried out through Internet of Things devices to realize remote safety monitoring of tank systems. In the traditional remote safety monitoring process, most of them are matched with real-time data and fixed data thresholds. However, due to the influence of the volume of the tank, the amount of real-time data is large, which generates a long data matching time. In extreme scenarios, the timeliness of its safety warning needs to be improved; in addition, with the increase of service life, the structure of the tank is also constantly changing. Under different working conditions and different service years, the use of a single risk assessment indicator for safety risk judgment can often only reflect the safety status of a certain aspect of the tank, such as the unilateral status of the tank structure and medium, and cannot fully consider the multi-party safety factors of the tank. It is easy to miss the possibility of safety risk, which further leads to the problem of incomplete safety monitoring; in addition, in extreme scenarios, safety control through real-time data lacks prediction of future trends, and real-time data usually only reflects the current or recent situation, and cannot cover all factors that may affect the safety of the tank system, resulting in the system being unable to take preventive measures in advance when extreme weather is about to occur or in the early stage, thereby increasing the risk.

[0004] Therefore, when conducting safety control on the tank system, a real-time data matching method is adopted without considering the potential impact of extreme weather or geological activities on the tank system. A single risk assessment indicator is used, which cannot meet the risk prediction needs under different working conditions and different service years, resulting in the need to improve the timeliness and comprehensiveness of safety monitoring. Summary of the invention

[0005] One or more embodiments of the present specification provide a safety control method, device and medium for a storage tank system, which are used to solve the following technical problems: when performing safety control on a storage tank system, a real-time data matching method is used, without considering the potential impact of extreme weather or geological activities on the storage tank system, and a single risk assessment indicator is used, which cannot meet the risk prediction requirements under different working conditions and different service years, resulting in the need to improve the timeliness and comprehensiveness of safety monitoring.

[0006] One or more embodiments of this specification adopt the following technical solutions:

[0007] One or more embodiments of the present specification provide a safety control method for a storage tank system, the method comprising: performing a meteorological forecast on a use area of ​​the storage tank system, determining extreme scenario prediction information corresponding to the use area, wherein the extreme scenario prediction information comprises extreme scenario probability information and scenario type information; when the extreme scenario probability information is greater than a preset probability threshold, determining corresponding tank risk information based on pre-acquired tank service data corresponding to the storage tank system and the extreme scenario prediction information, wherein the tank risk information comprises at least one tank risk location area and at least one tank risk monitoring element, and the tank risk monitoring element comprises a storage medium element, a tank structure element, and a tank The storage tank service data includes service life and storage medium; according to the storage tank risk information, data is screened in a multi-source real-time monitoring data set to determine the designated multi-source real-time monitoring data corresponding to a plurality of the storage tank risk monitoring elements in the storage tank risk location area, and based on the designated multi-source real-time monitoring data and a pre-built tank parameter prediction model, the multi-dimensional prediction data corresponding to the tank risk location area is determined; through the multi-dimensional prediction data, the storage tank system is risk assessed to determine the predicted risk index corresponding to the storage tank system, so as to dynamically adjust the control strategy of the storage tank system based on the predicted risk index and perform safety control on the tank system.

[0008] One or more embodiments of this specification provide a safety control device for a storage tank system, including:

[0009] at least one processor; and,

[0010] a memory communicatively connected to the at least one processor; wherein,

[0011] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the above method.

[0012] One or more embodiments of the present specification provide a non-volatile computer storage medium storing computer executable instructions, wherein the computer executable instructions are configured to execute the above method.

[0013] At least one of the above technical solutions adopted in the embodiments of this specification can achieve the following beneficial effects: through the above technical solution, by conducting meteorological forecasts for the use area, potential extreme weather or natural disaster scenarios can be identified in advance, reducing the impact of emergencies on the tank system; when the extreme scenario probability information is greater than the preset threshold, the risk assessment process is triggered, and the risk location and monitoring elements of the tank are quickly determined based on real-time data and tank service data. The timely response mechanism helps to take effective control measures before or in the early stage of the risk; through a multi-source real-time monitoring data set and a tank parameter prediction model, multiple monitoring elements (such as storage media, tank structure, tank environment) in the tank risk location area are obtained, and a multi-dimensional The predicted data provides a comprehensive and scientific basis for risk assessment. In the risk assessment process, not only the extreme scenario prediction information is taken into account, but also the service life of the tank, storage medium and other data are combined to meet the safety monitoring needs under different working conditions and different service lives, and can more accurately reflect the actual risk status of the tank system. Based on the predicted risk indicators, the system can dynamically adjust the control strategy of the tank system. When the risk status changes, the system can automatically update the control strategy to ensure that the control measures always match the risk status. Through accurate risk assessment and dynamic control strategy adjustment, the risk level of the tank system can be effectively reduced, the safety control effect can be improved, the possibility of accidents can be reduced, and the safe operation of the tank system can be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions in the embodiments of this specification or the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art description. Obviously, the drawings described below are only some embodiments recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. In the drawings:

[0015] Figure 1 A schematic flow chart of a safety control method for a storage tank system provided in an embodiment of this specification;

[0016] Figure 2 A schematic diagram of the structure of a safety control device for a storage tank system provided in an embodiment of this specification. DETAILED DESCRIPTION

[0017] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.

[0018] The embodiments of this specification provide a safety control method for a storage tank system. It should be noted that the execution subject in the embodiments of this specification may be a server or any device with data processing capabilities. Figure 1 A flow chart of a safety control method for a storage tank system provided in an embodiment of this specification is shown as follows: Figure 1 As shown, it mainly includes the following steps:

[0019] Step S101, performing a weather forecast on the use area of ​​the storage tank system to determine extreme scenario forecast information corresponding to the use area.

[0020] The extreme scenario prediction information includes extreme scenario probability information and scenario type information;

[0021] In actual application scenarios, extreme weather will cause great damage to the tank system. When extreme scenarios occur, safety control is less timely. Therefore, it is necessary to conduct weather forecasts in advance and predict extreme scenarios to implement safety control before extreme weather occurs, effectively reducing the degree of damage to the tank system caused by extreme scenarios.

[0022] In one embodiment of the present specification, a meteorological forecast is performed on the use area of ​​the storage tank system to determine the extreme scenario prediction information corresponding to the use area, and the extreme scenario prediction information includes extreme scenario probability information and scenario type information. It should be noted that the extreme scenarios here include extreme high temperature scenarios, extreme low temperature scenarios, extreme high wind scenarios, extreme precipitation scenarios, geological disaster scenarios, and other extreme scenarios that affect the safety of the storage tank system. For example, extremely high or low temperatures cause changes in the properties of the material in the storage tank, increasing the risk of leakage or explosion; extreme high wind scenarios cause damage to the tank structure or material leakage; extreme precipitation scenarios, such as heavy rain and floods, will cause the tank foundation to be unstable or flooded; geological disaster scenarios such as earthquakes and landslides directly affect the stability of the tank.

[0023] When making weather forecasts, first determine the specific geographical location and scope of the tank system, including terrain, landforms, surrounding environment, etc., and collect meteorological data for the past few decades or even longer in the area, including key parameters such as temperature, humidity, wind speed, wind direction, rainfall, and air pressure. The data here can be obtained from local meteorological stations, national meteorological departments, or data providers with authorization. Analyze historical meteorological data using statistical methods and meteorological models to identify meteorological trends and periodic changes in the area. Filter out extreme weather events from historical data, analyze the frequency, intensity, duration of events, and their possible impact on the tank system. Use advanced meteorological models (such as numerical weather forecast models) to collect key meteorological data such as temperature, humidity, wind speed, wind direction, rainfall, etc. in real time to predict meteorological conditions in the future. According to the prediction results of the meteorological model and the analysis of historical data, the probability or possibility of each extreme scenario is given.

[0024] Step S102, when the extreme scenario probability information is greater than a preset probability threshold, the corresponding tank risk information is determined based on the pre-acquired tank service data corresponding to the tank system and the extreme scenario prediction information.

[0025] Among them, the tank risk information includes at least one tank risk location area and at least one tank risk monitoring element, the tank risk monitoring element includes storage medium element, tank structure element and tank environment element, and the tank service data includes service life and storage medium.

[0026] The tank system is a complex system. For the tank body, its volume is large. In order to ensure precise data collection, a large number of multi-type sensors are generally arranged in the tank system to provide a comprehensive data source for the intelligent monitoring of the tank. However, in high-probability extreme scenarios, it is necessary to timely control the safety of the tank system. The huge amount of data brings a large amount of data processing, which reduces the efficiency of data processing, and thus the timeliness of safety control needs to be improved. In response to the above technical problems, when the extreme scenario probability information is greater than the preset probability threshold, the different impacts on the tank system are determined in combination with different extreme scenarios and service status to determine the tank risk information. The preset probability threshold here can be determined according to the needs of safety control and empirical data. The smaller the probability threshold is set, the more refined the safety control and the stronger the prevention ability. The larger the probability threshold is set, the higher the accuracy of safety control. The tank risk information includes at least one tank risk location area and at least one tank risk monitoring element. The tank risk monitoring element includes storage medium element, tank structure element and tank environment element. The tank service data includes service life and storage medium. Through extreme scenario prediction information, it is possible to predict possible extreme weather or natural disasters in advance, so as to take preventive measures in advance; combining tank service data and extreme scenario prediction information, it is possible to accurately identify risk location areas in the tank system that may be affected by extreme scenarios, providing precise targets for risk management; tank risk monitoring elements include storage medium elements, tank structure elements and tank environment elements. A comprehensive assessment of these elements helps to fully understand the risk status of the tank system; based on different risk locations and risk elements, differentiated risk management strategies can be formulated to improve the pertinence and effectiveness of risk management. Before extreme scenarios occur, emergency plans can be formulated and improved in advance based on prediction information and risk information to ensure that they can be responded to quickly and orderly when extreme scenarios occur.

[0027] In one embodiment of the present specification, based on the pre-acquired storage tank service data corresponding to the storage tank system and the extreme scenario prediction information, the corresponding storage tank risk information is determined, specifically including the following steps:

[0028] First, the scene type information and scene level information in the extreme scene prediction information are obtained. The scene type information is used to describe the type of extreme scene, and the scene level information is used to indicate the level of the extreme scene, such as extreme windy weather, which is level two. According to the scene type information in the extreme scene prediction information, at least one environmental dimension corresponding to the extreme scene is determined. For example, when the extreme scene type information is extreme precipitation, the corresponding environmental dimension is soil moisture, that is, the environmental dimension directly affected by the extreme scene. And through the scene level information, the dimension increment corresponding to each environmental dimension is set. Meteorological empirical data can be used here. The dimension increment refers to the increment of environmental data generated for the environmental dimension under the extreme scene corresponding to the level.

[0029] Secondly, the initial tank virtual model corresponding to the tank system is obtained, which can be obtained from design documents, CAD drawings or historical data. The model contains basic information such as the tank's geometry, material properties, and structural design. Based on the service life and storage medium in the tank service data, the initial tank virtual model is modified to determine the current tank virtual model corresponding to the tank system. The initial virtual model is modified according to the service life of the tank and the characteristics of the storage medium (such as corrosiveness, temperature sensitivity, pressure requirements, etc.). This includes considering the effects of factors such as material aging, corrosion thinning, and structural fatigue on the strength and integrity of the tank. By adjusting the relevant parameters in the model (such as material strength, wall thickness, stress distribution, etc.), the virtual model is closer to the actual service status.

[0030] Analyze the environmental dimensions in extreme scenarios, such as extreme temperature, humidity, wind speed, pressure, etc., and their possible impact on the tank system. Determine a dimension increment for each environmental dimension, which represents the amount of change in the extreme scenario relative to the normal service conditions. Apply the dimension increment of each environmental dimension to the current tank virtual model, and adjust the parameters of the model to simulate the service process in extreme scenarios. This includes adjusting parameters such as temperature field, stress field, flow field, etc. to reflect the impact of extreme environment on the tank structure, medium state and surrounding environment. Through the dimension increment corresponding to each environmental dimension, set the parameters of the current tank virtual model to simulate the service process of the tank in the extreme scenario. By analyzing the various environmental dimensions in extreme scenarios in detail and their impact on the tank system, we can have a more comprehensive understanding of the performance and risk status of the tank under extreme conditions. The simulation based on actual environmental parameters can more accurately assess the risk level of the tank; applying the dimension increment under extreme environmental conditions to the tank virtual model can make the model closer to the actual service scenario, and the adaptable model can more accurately simulate the service process of the tank in different environments.

[0031] Through the simulation process, the multi-dimensional simulation parameters under the extreme scenario are determined. The multi-dimensional simulation parameters correspond to multiple data dimensions, including the tank structure dimension, the medium dimension, and the tank environment dimension. For example, the tank structure dimension may include a tank thickness distribution data set, a tank stress distribution data set, etc. The medium dimension may include medium temperature data, medium pressure data, medium concentration data, etc. The tank environment dimension may include tank internal pressure data, fixed humidity data, tank internal temperature data, etc. The corresponding tank risk information is determined through the multi-dimensional simulation parameters under the extreme scenario.

[0032] In one embodiment of the present specification, the corresponding tank risk information is determined by the multi-dimensional simulation parameters in the extreme scenario, specifically including: according to the data dimension corresponding to each multi-dimensional simulation parameter, the multi-dimensional simulation parameters are classified, and the simulation parameter data set corresponding to each data dimension is determined. It should be noted that the simulation parameter data set includes data of multiple location points of the same type that can be used for data comparison and data calculation. When each data dimension corresponds to multiple data types, it is classified according to the data type. For example, if the medium dimension includes medium temperature data and medium pressure data, all medium temperature data are divided into a data set, and the medium pressure data is divided into a data set. The following data dimensions are explained by taking each data dimension as an example that only one data type is included. Based on the data dimension, the safety assessment threshold corresponding to each data dimension is determined. The safety assessment threshold here can be determined based on empirical data, and is used to indicate the corresponding threshold when there is no safety risk, such as a medium pressure threshold, a tank stress threshold, etc. It should be noted that for the same type of data, the reason why there are multiple data is the number of settings of the acquisition device. For example, the acquisition positions corresponding to the temperature data in the multiple tanks are different, indicating that the corresponding tank position data are different.

[0033] In one embodiment of the present specification, according to each simulation parameter data set and the corresponding safety assessment threshold, the difference between each simulation parameter data and the safety assessment threshold is calculated, and the difference is converted into the pixel value of the position point. According to the storage tank position data corresponding to each simulation parameter data, the parameter distribution heat map data under each data dimension is generated. The parameter distribution heat map includes multiple pixel feature points, and the pixel value of the pixel feature point is positively correlated with the excess range higher than the safety assessment threshold. For example, the darker the position, the higher the safety risk of the current parameter at this position. Relying on the three-dimensional distribution map of the storage tank system, the parameter distribution heat map under each data dimension is formed, and the predicted risk of each data type in the storage tank system can be intuitively displayed. The heat map directly reflects the degree of deviation of the parameter value of each position point from the safety threshold through the depth of color, so that managers can quickly identify which areas are expected to exceed the safety range and which areas have higher risks. The intuitive visualization method is easier to understand and analyze than simple numbers or tables. Through heat maps, we can quickly locate areas that require special attention and action, so that targeted response measures can be formulated, reducing the time cost of analyzing large amounts of data one by one and improving decision-making efficiency.

[0034] Calculate the pixel value of the parameter distribution heat map data under each data dimension to generate the average pixel value corresponding to each parameter distribution heat map data, where the average pixel value represents the average situation of the predicted risk generated for each data dimension in the current predicted extreme scenario. Determine the designated data dimension through the average pixel value corresponding to each parameter distribution heat map data to determine the at least one tank risk monitoring element, and determine the reference weight allocation information corresponding to each tank risk monitoring element according to the average pixel value, wherein the designated data dimension is the data dimension corresponding to at least one designated parameter distribution heat map data higher than the preset pixel threshold, where the preset pixel threshold can be determined based on empirical data. When setting the reference weight allocation information, first calculate the sum of the average pixel values ​​of all data dimensions, and then determine the ratio between the average pixel value corresponding to each data dimension and the sum as the reference weight allocation information corresponding to each data dimension. According to the designated parameter distribution heat map data corresponding to each designated data dimension, pixel feature points with a value higher than the average pixel value are marked to determine a plurality of risk pixel feature points; based on the tank location data corresponding to the plurality of risk pixel feature points, a continuous area consisting of at least two risk pixel feature points is determined as at least one tank risk location area.

[0035] By marking pixel feature points with higher than average pixel values, pixel feature points with higher risks in each data dimension, namely risk pixel feature points, can be accurately identified and directly associated with specific tank locations, making risk monitoring more accurate; by calculating the ratio between the average pixel value corresponding to each data dimension and the sum, the reference weight allocation information is determined, ensuring the scientificity and rationality of resource allocation. High-risk data dimensions will receive higher weights, thereby guiding more monitoring resources to lean towards them and improving monitoring efficiency; the setting of preset pixel thresholds allows flexible adjustment based on empirical data to adapt to risk monitoring needs in different scenarios. When new data or experience indicates that the risk threshold of certain parameters needs to be adjusted, the preset pixel thresholds can be modified accordingly to ensure the effectiveness and accuracy of the monitoring strategy; by determining a continuous area composed of at least two risk pixel feature points as a tank risk location area, potential risk areas can be quickly identified and corresponding risk response mechanisms can be triggered.

[0036] Step S103, based on the tank risk information, data is screened in the multi-source real-time monitoring data set to determine the specified multi-source real-time monitoring data corresponding to multiple tank risk monitoring elements in the tank risk location area, and based on the specified multi-source real-time monitoring data and a pre-built tank parameter prediction model, the multi-dimensional prediction data corresponding to the tank risk location area is determined.

[0037] In one embodiment of the present specification, the tank risk information has clearly pointed out the risk location area and related risk monitoring elements, which provides a clear target for data screening. According to the tank risk information, data screening is performed in the multi-source real-time monitoring data set to determine the specified multi-source real-time monitoring data corresponding to multiple tank risk monitoring elements in the tank risk location area. By screening the multi-source real-time monitoring data set, the real-time monitoring data corresponding to these risk monitoring elements can be quickly located to ensure the accuracy and pertinence of the data; the multi-source real-time monitoring data set usually contains a large amount of data, and in extreme scenarios, there are high requirements for the timeliness of data processing, so only focus on specific data related to the risk. Through data screening, data that is not related to the risk can be excluded, reducing the burden of data processing and analysis, and effectively ensuring the timeliness of the safety control process and the efficiency of safety monitoring.

[0038] In one embodiment of the present specification, based on the specified multi-source real-time monitoring data and the pre-built tank parameter prediction model, the multi-dimensional prediction data corresponding to the tank risk location area is determined, specifically including:

[0039] First, obtain the historical monitoring data sequence corresponding to the specified multi-source real-time monitoring data; according to the collection time in the historical monitoring data sequence, perform data screening, and sort multiple specified historical monitoring data according to the collection time to determine the latest historical monitoring data sequence within the specified time period. It should be noted that the specified time period here can be set according to demand, for example, each type of historical data can be analyzed for time changes to determine the corresponding specified time period. Through the latest historical monitoring data sequence, determine the data change type corresponding to each specified multi-source real-time monitoring data, wherein the data change type includes a regular change type and an irregular change type, and the regular change type includes a data growth type and a data decay type. It should be noted that the data growth type here indicates that the data increases monotonically over time, on the contrary, the data decay type indicates that the data decreases monotonically over time. If it does not meet the above two change rules, it is determined to be an irregular change type. According to the data change type and the latest historical monitoring data sequence, the initial parameter prediction model is trained to determine the tank parameter prediction model. Based on the tank parameter prediction model, the data dimension corresponding to the specified multi-source real-time monitoring data is predicted, and the corresponding predicted data under the data dimension is determined to determine the multi-dimensional predicted data.

[0040] According to the data change type and the latest historical monitoring data sequence, the initial parameter prediction model is trained to determine the tank parameter prediction model, which specifically includes: the initial parameter prediction model predicts by performing single-step prediction one by one to obtain the historical monitoring data at each moment in the latest historical monitoring data sequence and the historical prediction information corresponding to each moment, wherein the historical prediction information includes a historical prediction value and a historical reference prediction range; the prediction offset data is determined through the historical monitoring data and the historical prediction value at a specified moment, so as to determine the initial prediction data corresponding to the specified moment based on the prediction offset data and the historical monitoring data; according to the initial prediction data, the historical reference prediction range is corrected to determine the specified prediction range corresponding to the next moment of the specified moment; the prediction data corresponding to the next moment is determined through the specified prediction range and the data change type, so as to perform iterative prediction and determine the tank parameter prediction model.

[0041] In one embodiment of the present specification, based on the tank parameter prediction model, the data dimension corresponding to the specified multi-source real-time monitoring data is predicted, and the corresponding prediction data under the data dimension is determined to determine the multi-dimensional prediction data. The prediction offset data is determined by the difference between the prediction parameters at the current moment and the real-time monitoring data at the current moment at the previous moment, and the prediction offset data is added on the basis of the real-time monitoring data corresponding to the current moment to obtain the initial prediction data corresponding to the next moment of the current moment. The historical reference prediction range generated at the previous moment of the current moment is corrected by the initial prediction data, and the historical reference prediction range includes the historical prediction maximum threshold and the historical prediction minimum threshold. The corrected correction prediction maximum value is calculated as follows: first, the difference between the historical prediction maximum threshold and the initial prediction data is calculated, and the difference is corrected by the preset error index, and the sum between the corrected data and the initial prediction data is determined as the corrected prediction maximum value; similarly, the difference between the historical prediction minimum threshold and the initial prediction data is calculated, and the difference is corrected by the preset error index, and the sum between the corrected data and the initial prediction data is determined as the corrected prediction minimum value. Then, the revised predicted maximum value and the revised predicted minimum value are revised for the second time according to the real-time monitoring data. If the real-time monitoring data is greater than the revised predicted maximum value, the real-time monitoring data is set to the current predicted maximum threshold; if the real-time monitoring data is less than the revised predicted minimum value, the real-time monitoring data is set to the current predicted minimum threshold. Determine the predicted value at the next moment according to the data change type, the current predicted minimum threshold, and the current predicted maximum threshold in the specified time period before the current moment. When the data change type is an irregular change type, take the average of the current predicted minimum threshold and the current predicted maximum threshold to determine the predicted value at the next moment. When the data change type is a data growth type, take the current predicted maximum threshold to determine the predicted value at the next moment. When the data change type is a data decay type, take the current predicted minimum threshold to determine the predicted value at the next moment.

[0042] By obtaining the historical monitoring data and historical prediction information (including historical prediction values ​​and historical reference prediction ranges) at each moment, we can have a more comprehensive understanding of the changing trends and laws of the tank parameters; by calculating the prediction offset data and adjusting the initial prediction data accordingly, we can gradually approach the actual parameter changes, thereby improving the prediction accuracy; the combined use of historical monitoring data and historical prediction information enables the prediction model to continuously learn and adapt to the actual changes in tank parameters; through iterative prediction, the model can gradually optimize its own prediction logic and parameter settings to better adapt to the tank parameter prediction needs under different environments and conditions; the correction of the historical reference prediction range and the determination of the specified prediction range provide a reliable range reference for the prediction results, which helps to have a clearer understanding of the reliability and accuracy of the prediction results when using the prediction model; the iterative prediction method enables the prediction model to predict and update in real time based on the latest monitoring data.

[0043] Step S104, through multi-dimensional prediction data, the risk assessment of the tank system is carried out to determine the prediction risk index corresponding to the tank system, so as to dynamically adjust the control strategy of the tank system based on the prediction risk index and perform safety control on the tank system.

[0044] In one embodiment of the present specification, the multi-dimensional prediction data is used to conduct a risk assessment on the storage tank system and determine the prediction risk index corresponding to the storage tank system, which specifically includes: first, classifying the data according to the data dimensions corresponding to the multi-dimensional prediction data, determining the multiple prediction data corresponding to each data dimension, and determining the tank location data corresponding to each prediction data; determining the single risk index value corresponding to each prediction data according to the multiple prediction data corresponding to each data dimension and the safety threshold value corresponding to the pre-set data dimension. It should be noted that the safety threshold value here can be set to the same value as the safety assessment threshold value in the previous step. According to the difference between each prediction data and the corresponding safety threshold value, the single risk index value corresponding to each prediction data is determined, and the ratio of the difference between each prediction data and the corresponding safety threshold value can also be determined as a single risk index value by the difference between the difference between each prediction data and the corresponding safety threshold value.

[0045] Obtain a plurality of preset tank risk types to determine a multi-dimensional weight allocation matrix corresponding to each tank risk type, wherein the multi-dimensional weight allocation matrix is ​​used to represent the risk monitoring factor weights corresponding to each tank risk type and the multiple location risk weights corresponding to each risk monitoring factor. It should be noted that the multi-dimensional weight allocation matrix here can be combined with a variety of methods such as multi-type tank risk simulation, expert database, and empirical data to set the risk monitoring factor weights of each risk monitoring factor corresponding to each tank risk type and the multi-location risk weights of multiple tank locations corresponding to each risk monitoring factor. For example, the following Table 1 is an example of a multi-dimensional weight allocation matrix corresponding to a certain tank risk type in a tabular form provided in an embodiment of this specification:

[0046]

[0047] Since different risk monitoring elements may have different collection areas, and different types of collection data may have different data locations, different elements may have different data locations, and different elements at the same location may have different weights. For example, in the case of leakage risk, the weight parameters corresponding to the pressure data at a certain point on the inner wall of the tank and the stress data at this point are different. In addition, the number of locations with weight parameters under different elements may also be different. For example, there are 3 locations with weights corresponding to pressure data, and other locations are not important in fire risk and can be set to 0. Similarly, in fire risk, there may be 8 locations with weight parameters corresponding to medium temperature data.

[0048] Based on the single risk indicator value corresponding to each of the predicted data and the multi-dimensional weight allocation matrix, multiple tank risk comprehensive parameters corresponding to the tank system are determined, specifically including: generating multiple indicator dimensions corresponding to the single risk indicator through the single risk indicator value corresponding to each of the predicted data, wherein the indicator dimension includes the designated tank location information and designated monitoring element information corresponding to the single risk indicator; according to the multiple indicator dimensions, weight matching is performed in the multi-dimensional weight allocation matrix corresponding to each of the tank risk types to determine the designated location risk weight information and designated monitoring element weight information corresponding to each of the single risk indicators. Since the multi-dimensional predicted data corresponds to the tank risk location area, multiple location risk weight information belonging to this location area can be filtered in the multi-dimensional weight allocation matrix according to the tank risk location area, thereby narrowing the search scope of the location risk weight information. Based on the risk weight information of the designated location and the single risk index value, determine the comprehensive risk index value corresponding to each risk monitoring element; multiply the risk weight information of the designated location and the single risk index value corresponding to the designated location to obtain the single risk index correction value corresponding to each location, add and average the single risk index correction values ​​corresponding to all locations corresponding to each risk monitoring element, and determine the comprehensive risk index value corresponding to each risk monitoring element. Determine the comprehensive risk parameter of the tank risk type corresponding to each tank risk type by specifying the monitoring element weight information and the comprehensive risk index value corresponding to each risk monitoring element. Multiply the designated monitoring element weight information and the comprehensive risk index value corresponding to each risk monitoring element to obtain the comprehensive risk index correction value, and average the comprehensive risk index correction values ​​corresponding to multiple risk monitoring elements to obtain the comprehensive risk parameter of the tank risk type corresponding to each tank risk type.

[0049] In one embodiment of the present specification, according to the same calculation rules, the upper and lower limits of the risk parameters corresponding to each tank risk are calculated in advance to determine the risk parameter matching range corresponding to each tank risk type, where the risk parameter matching range is the theoretical risk parameter matching range. The tank risk comprehensive parameter corresponding to each tank risk type calculated by the tank system is matched with the risk parameter matching range corresponding to the preset multiple tank risk types to determine the predicted risk index corresponding to the tank system, wherein the predicted risk index includes at least one predicted risk type, the predicted risk probability corresponding to each predicted risk type, and the predicted risk level corresponding to each predicted risk type. When matching, the calculated tank risk comprehensive parameter belonging to the same tank risk type is compared with the theoretical risk parameter matching range corresponding to the risk type obtained in advance to determine whether the calculated tank risk comprehensive parameter falls into the theoretical risk parameter matching range. If it falls into, it means that this risk type exists. And according to the position of the calculated tank risk comprehensive parameter in the theoretical risk parameter matching range, the predicted risk probability is determined. The closer to the upper limit of the theoretical risk matching parameter matching range, the greater the probability. In addition, the predicted risk level corresponding to each predicted risk type is related to the risk type.

[0050] In one embodiment of the present specification, based on the predicted risk index, the control strategy of the storage tank system is dynamically adjusted to perform safety control on the storage tank system, specifically including: determining the predicted risk probability corresponding to each predicted risk type of at least one predicted risk type of the predicted risk index and the predicted risk level corresponding to each predicted risk type, wherein the predicted risk type includes any one or more of the abnormal risk of the tank structure and the abnormal risk of the tank medium; sorting the at least one predicted risk type according to the predicted risk probability corresponding to each predicted risk type, generating a predicted risk sequence, and determining the control order of the control strategy based on the predicted risk sequence. By sorting the predicted risk types according to their corresponding predicted risk probabilities, a clear predicted risk sequence can be generated, which reflects the urgency and importance of different risk types, and provides a scientific basis for formulating control strategies. The control order determined based on this sequence can ensure that high-risk and high-urgency risk types are handled first, thereby improving the efficiency and effectiveness of safety control.

[0051] In one embodiment of the present specification, a control strategy library is pre-constructed, which includes countermeasures and control strategies for different risk types and risk levels. The control strategy library should cover multiple aspects such as physical isolation, safety monitoring, emergency response, and process parameter adjustment. According to the predicted risk level corresponding to each predicted risk type, the corresponding safety control strategy is matched in the pre-constructed control strategy library; according to the predicted risk level corresponding to each risk type in the predicted risk sequence, the corresponding safety control strategy is matched in the control strategy library to ensure that the matched control strategy is targeted and effective, and can accurately control the specific risk type. Each predicted risk type corresponds to a certain predicted risk level, and these levels have corresponding safety control strategies in the pre-constructed control strategy library. Through precise matching, it can be ensured that the most appropriate and effective control measures are provided for each risk type. Targeted control strategies can better deal with risks and reduce the possibility of accidents.

[0052] Dynamic adjustments are made according to the control sequence and the safety control strategy to achieve safety control of the tank system. The operating environment and conditions of the tank system may change, resulting in changes in risk types and risk levels. Through real-time monitoring and prediction, these changes can be discovered in a timely manner, and the control sequence and safety control strategy can be dynamically adjusted according to the new prediction results, so that safety control can always adapt to the actual situation of the system and remain efficient and effective. The safety control method based on the predicted risk sequence and control strategy library can achieve comprehensive, accurate and dynamic control of the tank system. By optimizing the control sequence, accurately matching the control strategy and realizing dynamic adjustment, the safety control level of the tank system can be significantly improved, the risk of accidents can be reduced, and production safety can be guaranteed.

[0053] Through the above technical solution, by conducting meteorological forecasts for the use area, potential extreme weather or natural disaster scenarios can be identified in advance, reducing the impact of emergencies on the tank system; when the probability information of extreme scenarios is greater than the preset threshold, the risk assessment process is triggered, and the risk location and monitoring elements of the tank are quickly determined based on real-time data and tank service data. The timely response mechanism helps to take effective control measures before or in the early stages of the risk; through multi-source real-time monitoring data sets and tank parameter prediction models, multiple monitoring elements (such as storage media, tank structure, tank environment) in the risk location area of ​​the tank are obtained, and multi-dimensional prediction data is generated accordingly, providing a comprehensive risk assessment. , scientific basis; in the risk assessment process, not only the extreme scenario prediction information is taken into account, but also the service life of the tank, storage medium and other data are combined to meet the safety monitoring needs under different working conditions and different service lives, and can more accurately reflect the actual risk status of the tank system; based on the predicted risk indicators, the system can dynamically adjust the control strategy of the tank system; when the risk status changes, the system can automatically update the control strategy to ensure that the control measures always match the risk status; through accurate risk assessment and dynamic control strategy adjustment, the risk level of the tank system can be effectively reduced, the safety control effect can be improved, the possibility of accidents can be reduced, and the safe operation of the tank system can be guaranteed.

[0054] The present specification also provides a safety control device for a storage tank system, such as Figure 2 As shown, the device includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the above method.

[0055] The embodiments of the present specification also provide a non-volatile computer storage medium storing computer executable instructions, wherein the computer executable instructions are configured to execute the above method.

[0056] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0057] The devices and media provided in the embodiments of this specification correspond one-to-one to the methods. Therefore, the devices and media also have similar beneficial technical effects as the corresponding methods. Since the beneficial technical effects of the methods have been described in detail above, the beneficial technical effects of the devices and media will not be repeated here.

[0058] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0059] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. A safety control method for a storage tank system, It is characterized in that The method comprises: Performing meteorological forecasts on the use area of ​​the storage tank system to determine extreme scenario forecast information corresponding to the use area, wherein the extreme scenario forecast information includes extreme scenario probability information and scenario type information; When the extreme scenario probability information is greater than a preset probability threshold, the corresponding tank risk information is determined based on the pre-acquired tank service data corresponding to the tank system and the extreme scenario prediction information, wherein the tank risk information includes at least one tank risk location area and at least one tank risk monitoring element, the tank risk monitoring element includes a storage medium element, a tank structure element, and a tank environment element, and the tank service data includes service years and storage medium; According to the tank risk information, data is screened in a multi-source real-time monitoring data set to determine the designated multi-source real-time monitoring data corresponding to the plurality of tank risk monitoring elements in the tank risk location area, and based on the designated multi-source real-time monitoring data and a pre-built tank parameter prediction model, the multi-dimensional prediction data corresponding to the tank risk location area is determined; Through the multi-dimensional prediction data, the risk of the storage tank system is evaluated, and the prediction risk index corresponding to the storage tank system is determined, so as to dynamically adjust the control strategy of the storage tank system based on the prediction risk index to perform safety control on the storage tank system; Based on the pre-acquired storage tank service data corresponding to the storage tank system and the extreme scenario prediction information, the corresponding storage tank risk information is determined, specifically including: Obtaining scene type information and scene level information in the extreme scene prediction information; Determine at least one environmental dimension corresponding to the extreme scene according to the scene type information in the extreme scene prediction information, and set a dimension increment corresponding to each of the environmental dimensions according to the scene level information; Acquire an initial tank virtual model corresponding to the tank system, and based on the service years in the tank service data and the storage medium, modify the initial tank virtual model to determine a current tank virtual model corresponding to the tank system; By means of the dimension increment corresponding to each of the environmental dimensions, the parameters of the current tank virtual model are set to simulate the tank service process under the extreme scenario, and the multi-dimensional simulation parameters under the extreme scenario are determined, wherein the multi-dimensional simulation parameters correspond to a plurality of data dimensions, and the data dimensions include a tank structure dimension, a medium dimension, and a tank environment dimension; Determine the corresponding tank risk information through multi-dimensional simulation parameters under the extreme scenario; Through the multi-dimensional simulation parameters under the extreme scenario, the corresponding tank risk information is determined, including: Classifying the multi-dimensional simulation parameters according to the data dimension corresponding to each of the multi-dimensional simulation parameters, and determining a simulation parameter data set corresponding to each of the data dimensions; Based on the data dimensions, determining a security assessment threshold corresponding to each of the data dimensions; According to each of the simulation parameter data sets and the corresponding safety assessment threshold, and according to the storage tank location data corresponding to each of the simulation parameter data, parameter distribution heat map data under each of the data dimensions is generated, wherein the parameter distribution heat map includes a plurality of pixel feature points, and the pixel values ​​of the pixel feature points are positively correlated with the excess range exceeding the safety assessment threshold; Calculate the pixel value of the parameter distribution heat map data under each of the data dimensions to generate an average pixel value corresponding to each of the parameter distribution heat map data; Determine the designated data dimension by the average pixel value corresponding to each of the parameter distribution thermogram data to determine the at least one tank risk monitoring element, and determine the reference weight distribution information corresponding to each of the tank risk monitoring elements according to the average pixel value, wherein the designated data dimension is the data dimension corresponding to at least one designated parameter distribution thermogram data above a preset pixel threshold; According to the specified parameter distribution heat map data corresponding to each of the specified data dimensions, pixel feature points with a value higher than the average pixel value are marked to determine a plurality of risk pixel feature points; Based on the storage tank location data corresponding to the plurality of risk pixel feature points, a continuous area formed by at least two risk pixel feature points is determined as at least one storage tank risk location area; Based on the specified multi-source real-time monitoring data and the pre-built tank parameter prediction model, the multi-dimensional prediction data corresponding to the tank risk location area is determined, specifically including: Obtaining a historical monitoring data sequence corresponding to the specified multi-source real-time monitoring data; According to the collection time in the historical monitoring data sequence, data is screened, and multiple specified historical monitoring data are sorted according to the collection time to determine the latest historical monitoring data sequence within a specified time period; Determine the data change type corresponding to each of the specified multi-source real-time monitoring data through the latest historical monitoring data sequence, wherein the data change type includes a regular change type and an irregular change type, and the regular change type includes a data growth type and a data decay type; According to the data change type and the latest historical monitoring data sequence, the initial parameter prediction model is trained to determine the tank parameter prediction model; Based on the tank parameter prediction model, the data dimensions corresponding to the designated multi-source real-time monitoring data are predicted, and the corresponding prediction data under the data dimensions are determined to determine the multi-dimensional prediction data.

2. A safety control method for a storage tank system according to claim 1, It is characterized in that According to the data change type and the latest historical monitoring data sequence, the initial parameter prediction model is trained to determine the tank parameter prediction model, specifically including: Obtain the historical monitoring data at each moment in the latest historical monitoring data sequence and the historical prediction information corresponding to each moment, wherein the historical prediction information includes a historical prediction value and a historical reference prediction range; Determine the prediction offset data by using the historical monitoring data and the historical prediction value at the specified time, so as to determine the initial prediction data corresponding to the specified time based on the prediction offset data and the historical monitoring data; According to the initial prediction data, the historical reference prediction range is corrected to determine the specified prediction range corresponding to the next moment of the specified moment; The prediction data corresponding to the next moment is determined by the specified prediction range and the data change type, so as to perform iterative prediction and determine the tank parameter prediction model.

3. A safety control method for a storage tank system according to claim 1, It is characterized in that Through the multi-dimensional prediction data, the risk assessment of the storage tank system is performed to determine the prediction risk index corresponding to the storage tank system, specifically including: According to the data dimensions corresponding to the multi-dimensional prediction data, data classification is performed to determine a plurality of prediction data corresponding to each of the data dimensions, and storage tank location data corresponding to each of the prediction data is determined; Determine a single risk indicator value corresponding to each of the predicted data according to the multiple predicted data corresponding to each of the data dimensions and a preset safety threshold corresponding to the data dimension; Acquire a plurality of preset tank risk types to determine a multi-dimensional weight allocation matrix corresponding to each of the tank risk types, wherein the multi-dimensional weight allocation matrix is ​​used to represent the risk monitoring factor weight corresponding to each of the tank risk types and the plurality of location risk weights corresponding to each of the risk monitoring factors; Determine a plurality of storage tank risk comprehensive parameters corresponding to the storage tank system based on a single risk index value corresponding to each of the predicted data and the multi-dimensional weight allocation matrix; The predicted risk index corresponding to the tank system is determined by matching the multiple comprehensive tank risk parameters with the preset risk parameter matching ranges corresponding to the multiple tank risk types, wherein the predicted risk index includes at least one predicted risk type, a predicted risk probability corresponding to each predicted risk type, and a predicted risk level corresponding to each predicted risk type.

4. A safety control method for a storage tank system according to claim 3, It is characterized in that Based on the single risk index value corresponding to each of the predicted data and the multi-dimensional weight distribution matrix, a plurality of comprehensive tank risk parameters corresponding to the tank system are determined, specifically including: Generate multiple indicator dimensions corresponding to the single risk indicator through the single risk indicator value corresponding to each of the predicted data, wherein the indicator dimensions include the designated storage tank location information and the designated monitoring element information corresponding to the single risk indicator; According to the multiple indicator dimensions, weight matching is performed in the multi-dimensional weight allocation matrix corresponding to each of the tank risk types to determine the designated location risk weight information and the designated monitoring element weight information corresponding to each of the single risk indicators; Determine the comprehensive risk index value corresponding to each of the risk monitoring elements based on the risk weight information of the designated location and the single risk index value; The comprehensive risk parameter of the storage tank corresponding to each of the storage tank risk types is determined through the designated monitoring element weight information and the comprehensive risk index value corresponding to each of the risk monitoring elements.

5. A safety control method for a storage tank system according to claim 3, It is characterized in that Based on the predicted risk index, dynamically adjust the control strategy of the storage tank system to perform safety control on the storage tank system, specifically including: Determine at least one predicted risk type of the predicted risk indicator, a predicted risk probability corresponding to each predicted risk type, and a predicted risk level corresponding to each predicted risk type, wherein the predicted risk type includes any one or more of a storage tank structure abnormality risk and a storage tank medium abnormality risk; Sorting the at least one predicted risk type according to the predicted risk probability corresponding to each predicted risk type to generate a predicted risk sequence, and determining a control order of the control strategy based on the predicted risk sequence; Matching a corresponding safety control strategy in a pre-built control strategy library according to the predicted risk level corresponding to each predicted risk type; Dynamic adjustment is performed according to the control sequence and the safety control strategy to achieve safety control of the storage tank system.

6. A safety control device for a tank system, It is characterized in that The device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the method according to any one of claims 1 to 5.

7. A non-volatile computer storage medium storing computer executable instructions, It is characterized in that The computer executable instructions are configured to execute the method according to any one of claims 1 to 5.

Citation Information

Patent Citations

  • Storage tank lightning stroke accident risk analysis method, system and storage medium

    CN108629493A

  • Storage tank area major hazard source risk assessment and early warning method based on data driving

    CN117634884A

  • Intelligent Fire Prediction System

    KR102175292B1

  • System for making risk reduction protocol in oil and gas industry tanks

    WO2022248932A1

  • KR20200092800A