IT equipment time-sharing rental business management system

Through the collaborative work of multiple modules of the IT equipment time-share leasing business management system, the problems of insufficient user behavior analysis and unreasonable market demand in the traditional system are solved, and the balance between resource supply and demand, the flexibility of price strategies and equipment energy consumption are achieved. The optimization improves user satisfaction and business efficiency.

CN118628219BActive Publication Date: 2024-10-29SHENZHEN LINGXIONG RENT SERVICE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411096618.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-29
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

The traditional IT equipment rental business management system lacks in-depth user behavior analysis and is difficult to accurately grasp market demand, resulting in unreasonable resource allocation and inability to meet users' personalized needs. The price strategy is fixed and it is difficult to quickly adapt to market changes, resulting in resource shortage or excess, affecting Service quality and user experience limit business development.

Method used

Adopt an IT equipment time-sharing leasing business management system, including user behavior analysis module, market demand forecast module, dynamic pricing module, resource allocation optimization module, energy efficiency management module, danger warning and response module, fault diagnosis and traceability module, process reorganization and optimization The module optimizes resource allocation and management through user behavior insights, demand forecasting, dynamic price adjustment, resource optimization, energy consumption management and fault diagnosis.

Benefits of technology

Through analysis and understanding of customer needs, predict market trends, ensure the balance between resource supply and demand, achieve flexible price adjustments, adapt to market changes, enhance the competitiveness of price strategies, ensure the efficiency and fairness of resource allocation, optimize equipment energy consumption, and reduce operating costs , to meet the diverse needs of users and improve user satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118628219B_ABST
    Figure CN118628219B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of time-sharing leasing, specifically to a time-sharing leasing business management system for IT equipment, the system including a user behavior analysis module, a market demand prediction module, a dynamic pricing module, a resource allocation optimization module, an energy efficiency management module, a danger warning and response module, a fault diagnosis and tracing module, and a process reorganization and optimization module. The present invention, by analyzing and understanding customer needs, and analyzing and predicting market trends, ensures the balance between resource supply and demand, formulates matching promotional activities according to price sensitivity and market demand, realizes flexible adjustment of prices, adapts to market changes, enhances the competitiveness of price strategies, adjusts the allocation of equipment within the available time, ensures the efficiency and fairness of resource allocation, optimizes equipment energy consumption, reduces operating costs, realizes the maximization of resource utilization, meets the diverse needs of users, and at the same time reduces management costs and improves user satisfaction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of time-sharing leasing, and in particular to a management system for IT equipment time-sharing leasing services. Background Art

[0002] The time-sharing leasing technology field focuses on providing leasing services divided by time periods, allowing users to lease equipment or resources for specific time periods according to their needs. The development of this technology field benefits from efficient resource management and scheduling technologies, which maximize resource utilization while meeting the personalized needs of multiple users. In the scenario of IT equipment leasing, it solves the demand for computing resources for short-term projects or temporary demand peaks, providing a cost-effective and flexible solution.

[0003] Among them, the IT equipment time-sharing rental business management system is a system designed to manage IT equipment time-sharing rental business, aiming to optimize the allocation and scheduling of equipment through automated tools and algorithms to achieve efficient use of resources. The purpose of the system is to simplify the rental process, reduce management costs, improve user satisfaction, and ensure maximum equipment utilization. It aims to provide enterprises and individuals with flexible, cost-effective IT resource rental services to meet short-term or project-specific technical needs, while supporting business growth and technological innovation.

[0004] Traditional IT equipment leasing business management systems lack in-depth user behavior analysis, making it difficult to accurately grasp market demand, resulting in irrational resource allocation and failure to meet users' personalized needs. Pricing strategies are relatively fixed and lack flexibility, making it difficult to quickly adapt to market changes, and failing to effectively predict and adjust resource allocation, resulting in resource shortages or surpluses, affecting service quality and user experience, limiting business development and failing to fully meet user service needs. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an IT equipment time-sharing rental business management system.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solution: IT equipment time-sharing leasing business management system, the system comprising:

[0007] The user behavior analysis module classifies and analyzes user behaviors based on user rental history data, identifies user group characteristics, and generates user behavior insight information;

[0008] The market demand forecasting module performs time series analysis on historical IT equipment rental data based on the user behavior insight information, analyzes seasonal changes and trends, and obtains demand forecasting results;

[0009] The dynamic pricing module analyzes the relationship between the demand and price of the IT equipment rental market based on the demand forecast results, uses a decision tree algorithm to dynamically adjust the price, matches the market supply and demand status, and generates a time-based pricing strategy;

[0010] The resource allocation optimization module optimizes the IT equipment resource allocation strategy based on the time-divided pricing strategy and utilizes a linear programming method to dynamically adjust resource allocation and generate a resource optimization plan;

[0011] The energy efficiency management module optimizes the power consumption of IT equipment based on the resource optimization solution and combines the energy consumption data of IT equipment to generate an energy efficiency control strategy;

[0012] The hazard warning and response module identifies potential risks and failures based on the energy efficiency control strategy and combines the IT equipment operation data, formulates warning strategies, and obtains warning and response mechanism information;

[0013] The fault diagnosis and tracing module, based on the early warning and response mechanism information and combined with the IT equipment operation and fault data, infers the potential cause of the fault, traces back the initial fault point, and generates a fault diagnosis result;

[0014] The process reorganization and optimization module identifies the bottlenecks and redundant links in the process based on the fault diagnosis results and the leasing business process information, optimizes the business processing efficiency, and obtains a process optimization plan.

[0015] The present invention has improvements in that the user behavior insight information includes user rental frequency, preferred equipment type, and active time period information; the demand forecasting results specifically include equipment demand in multiple time periods, demand growth trend information, and seasonal demand change information; the time period pricing strategy includes price adjustment plans for differentiated time periods, price sensitivity analysis results, and preferential promotion strategies; the resource optimization plan specifically includes IT equipment allocation priority, maintenance and update plans, and energy allocation strategies; the energy efficiency regulation strategy specifically includes IT equipment operating parameters, energy-saving measures, and performance and energy consumption ratio optimization plans; the early warning and response mechanism information includes abnormal state indicators, risk levels, and emergency response measures; the fault diagnosis results include fault type, fault cause, initial fault point, and maintenance strategy; the process optimization plan specifically includes process bottleneck solutions, operation step simplification plans, and resource allocation plans.

[0016] The present invention is improved in that the market demand forecasting module comprises:

[0017] The demand analysis submodule performs statistical analysis of historical IT equipment rental data based on the user behavior insight information, calculates the rental frequency and total amount of multiple types of equipment in differentiated time periods, and generates historical demand analysis results;

[0018] The trend prediction submodule studies and analyzes the time series data based on the historical demand analysis results, predicts the trend and change of future market demand, and generates trend prediction results;

[0019] The seasonal change analysis submodule analyzes the seasonal components in the data based on the trend forecast results, extracts seasonal fluctuation characteristics, identifies the changing patterns of rental demand in differentiated seasons, predicts future market demand, and generates demand forecast results.

[0020] The present invention is improved and characterized in that: the dynamic pricing module includes:

[0021] The price adjustment scheme submodule analyzes the relationship between market demand and price based on the demand forecast results, establishes a model, analyzes and predicts price schemes, and obtains a basic pricing strategy;

[0022] The sensitivity analysis submodule performs price sensitivity analysis based on the basic pricing strategy, evaluates the impact of differentiated price points on demand, and obtains price sensitivity analysis results;

[0023] The promotion strategy design submodule uses a decision tree algorithm based on the price sensitivity analysis results to formulate promotion time periods and discount strengths, formulates matching promotion activities based on price sensitivity and market demand, and generates a time-based pricing strategy.

[0024] The present invention is improved in that the decision tree algorithm is based on the formula:

[0025] ;

[0026] Calculate the optimal information gain ratio of the node splitting of the decision tree and generate a time-divided pricing strategy, where: is the current dataset, is the attribute used for splitting, By attribute Splitting the dataset The information gain obtained is For the dataset By Attribute Information measure of splitting, is the innovation weight coefficient, For attributes In the dataset The novelty score in is the diversity weight coefficient, For the dataset In Properties Diversity score after splitting, is the stability weight coefficient, For attributes In the dataset Stability score in .

[0027] The present invention is improved in that the resource allocation optimization module comprises:

[0028] The allocation priority determination submodule analyzes resource usage and market leasing demand based on the time-divided pricing strategy, optimizes resource allocation ratios, and generates resource allocation decisions;

[0029] The maintenance and update planning submodule performs maintenance and update strategy planning based on the resource allocation decision, selects maintenance and update time points and strategies that match the current resources and demand conditions, and generates a maintenance and update plan;

[0030] The energy strategy planning submodule optimizes the IT equipment usage strategy based on the maintenance and update plan, uses a linear programming method, adjusts the allocation of equipment within the available time, and generates a resource optimization plan.

[0031] The present invention is improved in that the linear programming method is according to the formula:

[0032] ;

[0033] Maximize the efficiency and cost-effectiveness of computing equipment and obtain resource optimization solutions, where: is the improved objective function, For the The unit time efficiency value of each device, For the The allocation ratio of each device in the available time, For the The reliability factor of a device, For the The operating cost per unit time of each device, is the impact of unused time due to equipment maintenance and update on the total efficiency, is the total number of devices, is the adjustment coefficient.

[0034] The present invention is improved in that the energy efficiency management module comprises:

[0035] The operation parameter optimization submodule analyzes the energy consumption data of the IT equipment based on the resource optimization solution and the energy consumption data of the IT equipment, adjusts the equipment parameters to optimize the energy consumption, and obtains the operation parameter optimization information;

[0036] The energy-saving measures submodule monitors the real-time status of the equipment, collects operating data, automatically adjusts the equipment status, and generates an energy-saving measures execution plan based on the operating parameter optimization information;

[0037] The performance-to-energy ratio analysis submodule analyzes the uncertainty of equipment operation data based on the energy-saving measures execution plan, evaluates the impact of energy-saving measures on performance, optimizes operating parameters, and generates energy efficiency control strategies.

[0038] Compared with the prior art, the advantages and positive effects of the present invention are:

[0039] In the present invention, by analyzing and understanding customer needs and analyzing and predicting market trends, the balance between resource supply and demand is ensured, and matching promotional activities are formulated according to price sensitivity and market demand. Flexible adjustment of prices is achieved to adapt to market changes, thereby enhancing the competitiveness of pricing strategies, adjusting the allocation of equipment within the available time, ensuring the efficiency and fairness of resource allocation, optimizing equipment energy consumption, reducing operating costs, maximizing resource utilization, and meeting the diverse needs of users. At the same time, management costs are reduced and user satisfaction is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 The module diagram of the IT equipment time-sharing leasing business management system proposed by the present invention;

[0041] Figure 2 The system framework diagram of the IT equipment time-sharing leasing business management system proposed by the present invention;

[0042] Figure 3 A schematic diagram of a user behavior analysis module in an IT equipment time-sharing rental business management system proposed by the present invention;

[0043] Figure 4 A schematic diagram of a market demand forecasting module in an IT equipment time-sharing leasing business management system proposed by the present invention;

[0044] Figure 5 A schematic diagram of a dynamic pricing module in an IT equipment time-sharing leasing business management system proposed by the present invention;

[0045] Figure 6 A schematic diagram of a resource allocation optimization module in an IT equipment time-sharing leasing business management system proposed by the present invention;

[0046] Figure 7 A schematic diagram of an energy efficiency management module in an IT equipment time-sharing rental business management system proposed by the present invention;

[0047] Figure 8 A schematic diagram of a danger warning and response module in a time-sharing leasing business management system for IT equipment proposed by the present invention;

[0048] Fig. 9 The present invention proposes a schematic diagram of a fault diagnosis and tracing module in an IT equipment time-sharing leasing business management system;

[0049] Fig.10 The present invention proposes a schematic diagram of a process reorganization and optimization module in an IT equipment time-sharing leasing business management system. DETAILED DESCRIPTION

[0050] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0051] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0052] Example: See Figure 1 ,The present invention provides a technical solution: IT equipment time-sharing leasing business management system, the system includes a user behavior analysis module, a market demand prediction module, a dynamic pricing module, a resource allocation optimization module, an energy efficiency management module, a danger warning and response module, a fault diagnosis and tracing module, and a process reorganization and optimization module;

[0053] The user behavior analysis module classifies user behaviors based on user rental history data, analyzes user rental preferences and behavior patterns, identifies differentiated user group characteristics, and generates user behavior insight information;

[0054] The market demand forecasting module conducts time series analysis on historical IT equipment rental data based on user behavior insights, predicts future market demand, analyzes seasonal changes and trends in historical data, and generates demand forecast results;

[0055] The dynamic pricing module is based on demand forecast results. It analyzes the relationship between market demand and price of IT equipment rental in different time periods, including the rental demand and corresponding pricing in each time period, and dynamically adjusts prices to match the market supply and demand status. For example, for periods with expected high demand, prices are increased to avoid excessive resource consumption, and for periods with low demand, prices are lowered to attract more rentals. This aims to maximize profits while meeting market demand and generate time-based pricing strategies.

[0056] The resource allocation optimization module optimizes the IT equipment resource allocation strategy based on the time-based pricing strategy. By analyzing the IT equipment resource usage and market leasing demand, it dynamically adjusts resource allocation and generates a resource optimization plan.

[0057] The energy efficiency management module is based on resource optimization solutions and combines the energy consumption data of IT equipment to analyze and optimize the energy consumption patterns of IT equipment. It combines the Internet of Things technology to monitor the status of equipment, adjust operating parameters, optimize the power consumption of IT equipment, analyze the uncertainty of data, and generate energy efficiency control strategies.

[0058] The hazard warning and response module is based on energy efficiency control strategies and combines IT equipment operation data to detect abnormal points in the data, identify potential risks and failures, analyze the severity and possibility of risks, and formulate response measures and warning strategies to generate warning and response mechanism information;

[0059] The fault diagnosis and tracing module classifies and diagnoses fault types based on early warning and response mechanism information, combined with IT equipment operation and fault data. It analyzes the conditions and environment in which the fault occurs, infers the potential cause of the fault, traces back to the initial fault point, and generates fault diagnosis results.

[0060] The process reorganization and optimization module analyzes the concurrency, synchronization and resource sharing in the process based on the fault diagnosis results and the leasing business process information, identifies the bottlenecks and redundant links in the process, simulates the execution effect of differentiated optimization plans, selects plans to reorganize the process, optimizes business processing efficiency, and generates process optimization plans.

[0061] User behavior insight information includes user rental frequency, preferred equipment type, and active time period information. Demand forecasting results include equipment demand in multiple time periods, demand growth trend information, and seasonal demand change information. Time-based pricing strategies include price adjustment plans for differentiated time periods, price sensitivity analysis results, and preferential promotion strategies. Resource optimization plans include IT equipment allocation priorities, maintenance and update plans, and energy allocation strategies. Energy efficiency regulation strategies include IT equipment operating parameters, energy-saving measures, and performance and energy consumption ratio optimization plans. Early warning and response mechanism information includes abnormal status indicators, risk levels, and emergency response measures. Fault diagnosis results include fault type, fault cause, initial fault point, and maintenance strategy. Process optimization plans include process bottleneck solutions, operation step simplification plans, and resource allocation plans.

[0062] See also Figure 2 and Figure 3 ,The user behavior analysis module includes a behavior pattern analysis submodule, a preference identification submodule, and a user segmentation submodule;

[0063] The behavior pattern analysis submodule processes the data based on the user's rental history data, identifies differentiated user behavior patterns, groups users according to their rental behaviors, and generates the specific process of the user's basic behavior pattern as follows;

[0064] The behavior pattern analysis submodule extracts the user's rental history data from the database based on the user's rental history data, including rental date, duration, device type and other information. The data is cleaned, including removing incomplete records and standardizing the time format, calculating the number of rentals and total rental duration for each user, and based on this, calculating the average rental duration and rental frequency for each user. The data is used as a feature and a clustering algorithm is used to group users. For example, if the average rental duration and frequency of a user group exceeds the set threshold, it is classified as a "frequent rental user." The calculation formula is "new user classification = current user classification + classification adjustment factor * (target user classification - current user classification)", where the classification adjustment factor is driven by user behavior data, and the target user classification is set based on the user behavior pattern to generate the user's basic behavior pattern.

[0065] The preference identification submodule is based on the basic user behavior patterns, analyzes the rental frequency, average rental duration and preferred device types of the differentiated behavior pattern user groups for various devices, identifies the preference differences between differentiated user patterns, and generates the specific process of user preference analysis results as follows;

[0066] The preference identification submodule analyzes the device rental behavior of each user group based on the basic user behavior patterns. The number of rentals and average rental duration of each user group on different device types are counted, and statistical methods are applied to analyze the data. For example, for the analysis of device type preference, "preference score = number of rentals * average rental duration" can be calculated to determine the degree of preference of each user group for different device types. It can also identify which device types are more popular among specific user groups and generate user preference analysis results.

[0067] The user segmentation submodule is based on the user preference analysis results and defines user groups based on user group behavior patterns and equipment preferences, including "short-term high-frequency rental users" and "long-term professional equipment rental users". The specific process of generating user behavior insight information is as follows;

[0068] The user segmentation submodule refines user groups based on the results of user preference analysis. For example, users can be divided into "short-term high-frequency rental users" and "long-term professional equipment rental users". The grouping is based on the user's rental behavior and equipment preference. Using the data analysis results, the user segmentation score = (short-term rental frequency * short-term average rental duration) + (long-term rental frequency * long-term average rental duration) can be used to determine which segment group the user should belong to. This can more accurately understand and predict the user's rental behavior patterns and equipment preferences, generate user behavior insights, and provide support for decision-making.

[0069] See also Figure 2 and Figure 4 ,The market demand forecasting module includes a demand analysis submodule, a trend forecasting submodule, and a seasonal change analysis submodule;

[0070] The demand analysis submodule conducts statistical analysis of historical IT equipment rental data based on user behavior insights, calculates the rental frequency and total amount of multiple types of equipment in differentiated time periods, and generates the specific process of historical demand analysis results as follows;

[0071] The demand analysis submodule classifies and counts the historical rental data of IT equipment based on user behavior insights, including rental records of different equipment types and different time periods, and extracts data including rental start time, end time, equipment type, quantity, etc. from the database. Data is grouped by defining time periods such as "monthly" and "quarterly", and the frequency and total amount of equipment rentals in each group are calculated by the calculation methods of "rental frequency statistics = summary of rental times in each time period" and "rental total statistics = summary of the number of rental equipment in each time period". Statistical data is used to identify historical trends in equipment demand, generate historical demand analysis results, and provide basic data for subsequent forecasts.

[0072] The trend forecasting submodule studies and analyzes time series data based on historical demand analysis results to predict future market demand trends and changes. The specific process of generating trend forecasting results is as follows:

[0073] The trend forecast submodule is based on the historical demand analysis results and uses time series analysis methods to predict future market demand trends. It collects the equipment demand at each time point in the historical data, smoothes the data to eliminate the impact of noise, and uses moving average and exponential smoothing techniques to calculate the demand forecast at future time points. The calculation formula is "smoothed demand forecast = current demand + smoothing factor × (target demand - current demand)", where the smoothing factor is determined according to the change range of historical data to generate trend forecast results.

[0074] The seasonal change analysis submodule analyzes the seasonal components in the data based on the trend forecast results, extracts seasonal fluctuation characteristics, identifies the changing patterns of rental demand in different seasons, and predicts future market demand. The specific process of generating demand forecast results is as follows;

[0075] The seasonal change analysis submodule analyzes the seasonal components in the data based on the trend forecast results to determine the impact of different seasons on rental demand, and uses Fourier transform to extract seasonal fluctuation characteristics from time series data. The average demand for each season is calculated and compared with the annual demand change, where "seasonal impact value = seasonal average demand - annual average demand", identifies the changing pattern of rental demand in different seasons, predicts the seasonal fluctuation of future market demand, and generates demand forecast results.

[0076] See also Figure 2 and Figure 5 ,The dynamic pricing module includes the price adjustment scheme submodule, the sensitivity analysis submodule, and the promotion strategy design submodule;

[0077] The price adjustment plan submodule analyzes the relationship between market demand and price based on the demand forecast results, builds models, analyzes and predicts price plans, and obtains the specific process of the basic pricing strategy:

[0078] The price adjustment plan submodule collects and organizes data on the relationship between market demand and price based on the demand forecast results. This includes the summary of historical price data and demand data for the corresponding period. Through data analysis, a model of the relationship between price and demand is constructed, and historical data is analyzed using regression analysis methods to form a basic response model of price to demand. The relationship between price and demand is set to "base price = current price + adjustment factor × (forecasted demand - current demand)", where the adjustment factor is determined based on historical price elasticity data, analyzes and predicts demand changes at different price points, and generates a basic pricing strategy.

[0079] The sensitivity analysis submodule conducts price sensitivity analysis based on the basic pricing strategy to evaluate the impact of differentiated price points on demand. The specific process of obtaining the price sensitivity analysis results is as follows:

[0080] The sensitivity analysis submodule uses price sensitivity analysis to evaluate the specific impact of different price points on demand based on the basic pricing strategy. By setting different price change scenarios and recording the corresponding changes in demand, the sensitivity of price changes to demand is calculated through "demand change rate = (demand after change - original demand) / original demand", the demand changes at each price point are measured, the most effective price point is evaluated and determined, and the price sensitivity analysis results are generated.

[0081] The promotion strategy design submodule uses the decision tree algorithm based on the price sensitivity analysis results to formulate promotion time periods and discount strengths, formulates matching promotion activities based on price sensitivity and market demand, and generates the specific process of time-divided pricing strategies as follows;

[0082] The promotion strategy design submodule formulates promotion strategies based on the results of price sensitivity analysis and uses the decision tree method. According to price sensitivity and demand forecasts, it defines the promotion needs under different market environments. Based on the decision tree analysis, it determines the optimal combination of promotion period and discount intensity, formulates promotion activities that match market demand and price sensitivity, and generates time-based pricing strategies.

[0083] Decision tree algorithm, according to the formula:

[0084] ;

[0085] Calculate the optimal information gain ratio of the node splitting of the decision tree and generate a time-divided pricing strategy, where: is the current dataset, is the attribute used for splitting, By attribute Splitting the dataset The information gain obtained is For the dataset By Attribute Information measure of splitting, is the innovation weight coefficient, For attributes In the dataset The novelty score in is the diversity weight coefficient, For the dataset In Properties Diversity score after splitting, is the stability weight coefficient, For attributes In the dataset Stability score in .

[0086] The specific implementation process of the improved formula is as follows:

[0087] Collecting and preparing datasets , including product price, sales volume, and promotional activities, to evaluate each attribute Information gain and split information measure , then, calculate the novelty score of each attribute , based on the frequency of occurrence of the attribute in the dataset and the uniqueness of its relationship with the target variable, determine the diversity score of the dataset after each attribute split , evaluate the stability score of the attribute based on the difference and uniqueness between subsets , based on the consistency and prediction accuracy of the attributes in different time periods, by determining the weight coefficient , and The coefficient value can be determined by regression analysis of historical data to ensure the overall performance of the model is optimized. By adjusting the weight coefficient, novelty, diversity and stability can be balanced. The information gain ratio is optimized according to the improved formula. , selects the best splitting attributes for each node, generating a promotion strategy that is highly adaptable and responsive to market changes.

[0088] See also Figure 2 and Figure 6 ,The resource allocation optimization module includes the allocation priority ,determination submodule, the maintenance and update planning submodule, and the energy ,strategy planning submodule;

[0089] The allocation priority decision submodule analyzes resource usage and market leasing demand based on the time-based pricing strategy, optimizes resource allocation ratios, and generates the specific process of resource allocation decisions:

[0090] The allocation priority decision submodule collects and analyzes the current resource usage and market rental demand based on the time-based pricing strategy. Through statistical analysis of equipment utilization in different time periods, combined with the market rental demand trend, resource allocation optimization is performed through "resource allocation ratio = current resource utilization + adjustment factor × (target market demand - current market demand)", where the adjustment factor is adjusted based on past market responsiveness, optimizes the utilization of various resources in different time periods, ensures maximum resource utilization, and generates resource allocation decisions.

[0091] The maintenance and update planning submodule performs maintenance and update strategy planning based on resource allocation decisions, selects maintenance and update time points and strategies that match current resources and demand conditions, and generates the specific process of maintenance and update plans as follows;

[0092] The maintenance and update planning submodule selects the best maintenance and update time point based on resource allocation decisions, taking into account the current resource usage and changes in market demand. For example, the definition of "maintenance and update time point = current time + delay factor × (resource utilization - safety threshold)", where the delay factor is adjusted according to the equipment maintenance cycle and usage intensity, and the safety threshold refers to the minimum safety standard for equipment operation. Maintenance and updates are performed during the off-peak period of resource usage to reduce the impact on operations and generate a maintenance and update plan.

[0093] The energy strategy planning submodule uses linear programming methods to optimize IT equipment usage strategies based on maintenance and update plans, adjust equipment allocation within available time, and generate resource optimization solutions.

[0094] The energy strategy planning submodule uses linear programming methods to optimize the use strategy of IT equipment based on the maintenance and update plan. It evaluates the energy efficiency and usage requirements of all equipment and determines the optimal allocation plan for equipment within the available time. It optimizes the energy consumption of equipment, takes into account cost-effectiveness, and generates resource optimization plans.

[0095] Linear programming method, according to the formula:

[0096] ;

[0097] Maximize the efficiency and cost-effectiveness of computing equipment and obtain resource optimization solutions, where: is the improved objective function, For the The unit time efficiency value of each device, For the The allocation ratio of each device in the available time, For the The reliability factor of a device, For the The operating cost per unit time of each device, is the impact of unused time due to equipment maintenance and update on the total efficiency, is the total number of devices, is an adjustment factor used to balance the effects of efficiency and unused time.

[0098] The specific implementation process of the improved formula is as follows:

[0099] Analyze the performance and energy consumption of each IT device and evaluate the efficiency per unit time of each IT device , determine the available time and required running quantity of each device, and calculate the allocation ratio , introducing the reliability coefficient of the equipment , reflecting the low failure rate and high availability of the equipment, and calculating the operating cost of each device , including energy consumption, maintenance costs, etc., and the impact of unused time due to equipment maintenance or updates on the overall efficiency , to take into account the negative impact on efficiency when equipment is unavailable, by determining the adjustment factor The value of the coefficient can be determined through historical data analysis and cost-benefit trade-offs. It is used to balance the impact of efficiency and equipment non-use time. The improved linear programming is implemented using the linprog function in the SciPy library to obtain a resource optimization plan that comprehensively considers utilization efficiency, cost, and equipment reliability. It aims to achieve optimal energy use while ensuring that equipment maintenance and updates are not affected.

[0100] See also Figure 2 and Figure 7 ,The energy efficiency management module includes the operation parameter optimization submodule, the ,energy saving measures submodule, and the performance energy consumption ratio analysis submodule;

[0101] The operation parameter optimization submodule is based on the resource optimization solution, combined with the energy consumption data of IT equipment, analyzes the energy consumption data of IT equipment, adjusts the equipment parameters to optimize energy consumption, and obtains the specific process of operation parameter optimization information as follows;

[0102] The operating parameter optimization submodule collects energy consumption data of various IT devices based on the resource optimization solution, including information such as the equipment's operating time and power consumption. Analyze the data to identify high-energy-consuming devices and their operating parameters. For high-energy-consuming devices, adjust key parameters such as temperature settings and power usage to reduce energy consumption. For example, a server still maintains high energy consumption under low load, and is optimized by adjusting "device operation mode = standard mode + energy saving factor × (current energy consumption - target energy consumption)". The energy saving factor is calculated based on the equipment characteristics and historical energy consumption data, optimizes the equipment's operating parameters, reduces unnecessary energy consumption, and obtains operating parameter optimization information.

[0103] The specific process of the energy-saving measures submodule based on the operation parameter optimization information, monitoring the real-time status of the equipment, collecting operation data, automatically adjusting the equipment status, and generating the energy-saving measures execution plan is as follows;

[0104] The energy-saving measures submodule monitors the device status in real time and automatically adjusts the device to perform energy-saving measures based on the operating parameter optimization information. This includes using sensors and monitoring software to collect real-time operating data of the device, such as current, voltage, and temperature. The device status is automatically adjusted to ensure optimal energy efficiency. For example, if the current is greater than the preset current threshold, the voltage setting is reduced. This helps ensure that the device operates under optimal energy consumption conditions and generates an energy-saving measures execution plan.

[0105] The specific process of the performance-to-energy ratio analysis submodule based on the energy-saving measures execution plan, analyzing the uncertainty of equipment operation data, evaluating the impact of energy-saving measures on performance, optimizing operating parameters, and generating energy efficiency control strategies is as follows;

[0106] The performance-to-energy ratio analysis submodule evaluates the relationship between equipment performance and energy consumption after the implementation of energy-saving measures based on the energy-saving measures execution plan. It includes statistical analysis of equipment operation data, especially performance data after the implementation of energy-saving measures. Evaluate the actual impact of energy-saving measures on equipment performance and adjust operating parameters as needed to achieve the best performance-to-energy ratio. Through "performance-to-energy ratio = performance output / energy consumption", analyze and adjust equipment parameters, optimize performance-to-energy ratio, ensure that the equipment does not sacrifice the required performance level while saving energy, generate energy efficiency control strategies, balance performance and energy consumption, and ensure equipment operation efficiency.

[0107] See also Figure 2 and Figure 8 ,The hazard warning and response module includes ,abnormal monitoring submodule, risk level assessment submodule, and response measure design submodule;

[0108] The abnormal monitoring submodule performs abnormal point detection based on the energy efficiency control strategy and IT equipment operation data, identifies abnormal points in the multidimensional data set, and detects data points that deviate from the normal mode by analyzing the energy consumption mode and operation parameters of the equipment. The specific process of generating abnormal point detection results is as follows;

[0109] The anomaly monitoring submodule uses the operating data of IT equipment to detect anomalies based on the energy efficiency control strategy, and collects the energy consumption data and operating parameters of the equipment, such as power consumption, temperature, and operating time. Through statistical analysis methods, the distribution of data points is identified in the multidimensional data set and compared with the normal operating mode. The anomaly detection rule is set as follows: if the current energy consumption exceeds twice the standard deviation of the average energy consumption, it is marked as an anomaly. It helps to identify data points that deviate significantly from the normal energy consumption pattern, and can detect possible equipment failures or inefficiencies in a timely manner, generating anomaly detection results.

[0110] The risk level assessment submodule evaluates the severity and likelihood of potential risks based on the abnormal point detection results by analyzing the equipment status, historical fault data and current abnormal indicators. The specific process of generating risk level assessment results is as follows:

[0111] The risk level assessment submodule analyzes the current status of the equipment, historical fault data, and abnormal indicators based on the abnormal point detection results. The risk assessment model is used to consider the historical frequency of equipment failures and the severity of abnormal data to assess the severity and likelihood of potential risks. The formula "risk level = abnormal severity × fault frequency" is used, where the abnormal severity is determined based on energy consumption deviation and performance degradation, and the fault frequency is calculated based on historical fault records. It helps determine the risk level that the equipment may face and generates risk level assessment results.

[0112] The response measures design submodule formulates response measures and early warning strategies based on the risk level assessment results, designs early warning levels and corresponding response measures according to the risk level, including adjusting operating parameters, and generating early warning and response mechanism information. The specific process is as follows;

[0113] The response measures design submodule is based on the risk level assessment results. According to different risk levels, it formulates corresponding early warning strategies and response measures, such as equipment shutdown for maintenance, parameter adjustment or operation mode change. For example, if the risk level is high, a shutdown warning will be sent immediately and emergency maintenance will be arranged. If the risk level is medium, the equipment operating parameters will be adjusted to reduce the possibility of risk. The measures are designed to reduce the impact of equipment failures, maintain the stability and safety of operation, and generate early warning and response mechanism information.

[0114] See also Figure 2 and Fig. 9 ,The fault diagnosis and tracing module includes the fault classification submodule, the cause analysis submodule, and the maintenance suggestion formulation submodule;

[0115] The fault classification submodule is based on the early warning and response mechanism information, combined with IT equipment operation and fault data, and classified according to the nature and manifestation of the fault event. The fault types include software faults, hardware faults and network problems. The specific process of generating the fault type classification results is as follows;

[0116] The fault classification submodule collects the operation and fault data of IT equipment based on the early warning and response mechanism information. The data includes the timestamp, fault code, impact range and device type of the equipment fault. Use data cleaning technology to remove duplicate or irrelevant data records to ensure the accuracy of analysis. Through the logistic regression model, classification is performed based on the characteristics and performance of the fault event. The model parameters include the device type, the environmental conditions in which the fault occurred, and the use history of the equipment. The classification algorithm is applied to each fault event to classify the fault into software fault, hardware fault and network problem, and generate the fault type classification result;

[0117] The cause analysis submodule is based on the fault type classification results. By analyzing the equipment status, operating conditions, and historical fault records, it infers the potential cause of the fault and generates the specific process of the fault cause analysis results as follows:

[0118] The cause analysis submodule integrates the equipment status data, user operating conditions and historical fault records of the equipment to analyze the cause of the fault based on the fault type classification results. The decision tree analysis method is used to evaluate the possible causes of the fault from multiple dimensions. For example, by analyzing the equipment status data, including the temperature, voltage and other parameters of the equipment, and comparing them with historical data, abnormal parameters are found, and combined with the user's operating conditions, such as operating time and operating frequency, operating errors or improper usage habits are identified. The decision criteria for each node clearly point out the influencing factors, and by calculating the branch weights, the cause of the fault is determined, and the fault cause analysis results are generated;

[0119] The maintenance suggestion formulation submodule formulates maintenance strategies and preventive measures based on the fault cause analysis results, combined with the equipment operating status and maintenance history, integrates the IT equipment manufacturer's maintenance manuals and practical operations, and formulates maintenance timing and methods, including regular inspection plans, component replacement plans, and operating parameter adjustment information. The specific process of generating fault diagnosis results is as follows;

[0120] The maintenance recommendation formulation submodule formulates specific maintenance strategies and preventive measures based on the results of the fault cause analysis, combined with the current operating status and maintenance history of the equipment, analyzes the maintenance history of the equipment, including past maintenance time, maintenance results and replaced parts, and evaluates the effectiveness of each maintenance activity. Determine the best maintenance time and method based on the maintenance manual provided by the equipment manufacturer and actual operating experience. For example, according to the type and frequency of equipment failures, set a regular inspection plan and adjust the inspection cycle and content. In the component replacement plan, predict the life of key components based on the equipment's operating load and failure data, and plan the replacement time in advance. Operation parameter adjustment includes the optimization of equipment operating parameters, such as temperature setting, voltage adjustment, etc., to reduce the possibility of failures and generate fault diagnosis results.

[0121] See also Figure 2 and Fig.10 ,The process reorganization and optimization module includes the bottleneck ,resolution strategy submodule, the step simplification scheme submodule, and the resource reallocation submodule;

[0122] The bottleneck resolution strategy submodule identifies the concurrency, synchronization and resource sharing of the process based on the fault diagnosis results and the leasing business process information, and identifies the bottleneck links in the process, including tasks with long processing time and steps with resource contention. The specific process of generating bottleneck identification results is as follows;

[0123] The bottleneck resolution strategy submodule identifies bottlenecks by analyzing the processing time and resource usage in the business process based on the fault diagnosis results. By calculating the "processing time index = current step completion time / total process average completion time", if the processing time index is significantly higher than 1, the step is identified as a potential bottleneck. Resource contention can be quantified by "resource contention rate = maximum number of tasks requesting a resource at the same time / total available units of the resource", which helps identify steps in the process with long processing time and fierce resource competition, and generates bottleneck identification results.

[0124] The step simplification scheme submodule analyzes the redundant links and inefficient steps in the business process based on the bottleneck identification results, merges similar functional steps, eliminates repeated approval processes, optimizes the task allocation logic, and generates the specific process of step simplification and optimization schemes:

[0125] The step simplification program submodule analyzes and simplifies redundant and inefficient steps based on the bottleneck identification results. By calculating "redundancy rate = number of repeated steps / total number of steps". If the redundancy rate is high, it means that there are redundant and repeated activities in the process, and simplification should be considered. The effect of simplifying steps is evaluated by "efficiency improvement ratio = process time before optimization / process time after optimization". It helps to confirm the effectiveness of optimization measures, ensure that the process efficiency can be significantly improved after implementation, and generate step simplification and optimization plans.

[0126] The resource reallocation submodule analyzes the current resource configuration and usage status based on the step simplification and optimization plan, adjusts the resource allocation strategy based on the availability of resources and the priority of leasing business needs, optimizes business processing capabilities, and generates the specific process of the process optimization plan as follows;

[0127] The resource reallocation submodule adjusts the resource allocation strategy based on the step simplification and optimization scheme. By calculating "resource utilization = actual usage time / available time", the efficiency of the use of various resources is evaluated. Using "priority adjustment factor = business demand priority / current resource allocation priority", resource allocation is adjusted to ensure that high-priority businesses receive the necessary resource support, optimize business processing capabilities, and generate process optimization plans.

[0128] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. IT equipment time-sharing leasing business management system, It is characterized in that The system comprises: The user behavior analysis module classifies and analyzes user behaviors based on user rental history data, identifies user group characteristics, and generates user behavior insight information; The market demand forecasting module performs time series analysis on historical IT equipment rental data based on the user behavior insight information, analyzes seasonal changes and trends, and obtains demand forecasting results; The dynamic pricing module analyzes the relationship between the demand and price of the IT equipment rental market based on the demand forecast results, uses a decision tree algorithm to dynamically adjust the price, matches the market supply and demand status, and generates a time-based pricing strategy; The resource allocation optimization module optimizes the IT equipment resource allocation strategy based on the time-divided pricing strategy and utilizes a linear programming method to dynamically adjust resource allocation and generate a resource optimization plan; The energy efficiency management module optimizes the power consumption of IT equipment based on the resource optimization solution and combines the energy consumption data of IT equipment to generate an energy efficiency control strategy; The hazard warning and response module identifies potential risks and failures based on the energy efficiency control strategy and combines the IT equipment operation data, formulates warning strategies, and obtains warning and response mechanism information; The fault diagnosis and tracing module, based on the early warning and response mechanism information and combined with the IT equipment operation and fault data, infers the potential cause of the fault, traces back the initial fault point, and generates a fault diagnosis result; The process reorganization and optimization module identifies the bottlenecks and redundant links in the process based on the fault diagnosis results and the leasing business process information, optimizes the business processing efficiency, and obtains a process optimization plan; The dynamic pricing module includes: The price adjustment scheme submodule analyzes the relationship between market demand and price based on the demand forecast results, establishes a model, analyzes and predicts price schemes, and obtains a basic pricing strategy; The sensitivity analysis submodule performs price sensitivity analysis based on the basic pricing strategy, evaluates the impact of differentiated price points on demand, and obtains price sensitivity analysis results; The promotion strategy design submodule uses a decision tree algorithm based on the price sensitivity analysis results to formulate promotion time periods and discount strengths, formulates matching promotion activities according to price sensitivity and market demand, and generates a time-based pricing strategy; The decision tree algorithm is based on the formula: ; Calculate the optimal information gain ratio of the node splitting of the decision tree and generate a time-divided pricing strategy, where: is the current dataset, is the attribute used for splitting, By attribute Splitting the dataset The information gain obtained is For the dataset By Attribute Information measure of splitting, is the innovation weight coefficient, For attributes In the dataset The novelty score in is the diversity weight coefficient, For the dataset In Properties Diversity score after splitting, is the stability weight coefficient, For attributes In the dataset Stability score in ; The resource allocation optimization module includes: The allocation priority determination submodule analyzes resource usage and market leasing demand based on the time-divided pricing strategy, optimizes resource allocation ratios, and generates resource allocation decisions; The maintenance and update planning submodule performs maintenance and update strategy planning based on the resource allocation decision, selects maintenance and update time points and strategies that match the current resources and demand conditions, and generates a maintenance and update plan; The energy strategy planning submodule optimizes the IT equipment usage strategy based on the maintenance and update plan, uses a linear programming method, adjusts the allocation of equipment within the available time, and generates a resource optimization plan; The linear programming method is according to the formula: ; Maximize the efficiency and cost-effectiveness of computing equipment and obtain resource optimization solutions, where: is the improved objective function, For the The unit time efficiency value of each device, For the The allocation ratio of each device in the available time, For the The reliability factor of a device, For the The operating cost per unit time of each device, is the impact of unused time due to equipment maintenance and update on the total efficiency, is the total number of devices, is the adjustment coefficient.

2. The IT equipment time-sharing leasing business management system according to claim 1, Features: The user behavior insight information includes user rental frequency, preferred equipment type, and active time period information; the demand forecasting results specifically include equipment demand in multiple time periods, demand growth trend information, and seasonal demand change information; the time period pricing strategy includes price adjustment plans for differentiated time periods, price sensitivity analysis results, and preferential promotion strategies; the resource optimization plan specifically includes IT equipment allocation priority, maintenance and update plans, and energy allocation strategies; the energy efficiency regulation strategy specifically includes IT equipment operating parameters, energy-saving measures, and performance and energy consumption ratio optimization plans; the early warning and response mechanism information includes abnormal status indicators, risk levels, and emergency response measures; the fault diagnosis results include fault type, fault cause, initial fault point, and maintenance strategy; the process optimization plan specifically includes process bottleneck solutions, operation step simplification plans, and resource allocation plans.

3. The IT equipment time-sharing leasing business management system according to claim 1, It is characterized in that The market demand forecasting module comprises: The demand analysis submodule performs statistical analysis of historical IT equipment rental data based on the user behavior insight information, calculates the rental frequency and total amount of multiple types of equipment in differentiated time periods, and generates historical demand analysis results; The trend prediction submodule studies and analyzes the time series data based on the historical demand analysis results, predicts the trend and change of future market demand, and generates trend prediction results; The seasonal change analysis submodule analyzes the seasonal components in the data based on the trend forecast results, extracts seasonal fluctuation characteristics, identifies the changing patterns of rental demand in differentiated seasons, predicts future market demand, and generates demand forecast results.

4. The IT equipment time-sharing leasing business management system according to claim 1, It is characterized in that The energy efficiency management module includes: The operation parameter optimization submodule analyzes the energy consumption data of the IT equipment based on the resource optimization solution and the energy consumption data of the IT equipment, adjusts the equipment parameters to optimize the energy consumption, and obtains the operation parameter optimization information; The energy-saving measures submodule monitors the real-time status of the equipment, collects operating data, automatically adjusts the equipment status, and generates an energy-saving measures execution plan based on the operating parameter optimization information; The performance-to-energy ratio analysis submodule analyzes the uncertainty of equipment operation data based on the energy-saving measures execution plan, evaluates the impact of energy-saving measures on performance, optimizes operating parameters, and generates energy efficiency control strategies.

Citation Information

Patent Citations

  • Enterprise energy regulation and operation data management system based on cloud computing

    CN118446466A

  • IT equipment time-sharing leasing solution system

    CN118469681A