A protective device and installation method for temporary shelter of deep-sea islands and reefs

By designing support frames, multi-layer protective roofs and automatic fall-off connection nodes on the temporary shelter of deep-sea islands and reefs, the problems of high wind pressure and radar exposure are solved, and the protection and concealment effect of the shelter is achieved, and the maintenance of the structure is improved. and flexibility.

CN118639594BActive Publication Date: 2024-11-12CSIC INTERNATIONAL ENGINEERING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411087862.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-12
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

The temporary shelter of deep-sea islands and reefs is easily damaged by wind pressure and detected by radar in strong winds, resulting in exposure and damage.

Method used

A protective device is designed, including a support frame, a multi-layer protective roof and an automatic shed connection node. The support frame is composed of ground beams and columns. The protective roof is composed of shielded roof and light membrane roof. The automatic shed connection node is carried out under small wind speed. The first stage falls off, resists the wind pressure, and performs the second stage falls off at high wind speed, driving the light membrane roof panel to disengage the shielding module panel, reducing the damage to the shielding part by the wind pressure.

Benefits of technology

Effectively protect the temporary shielding part from damage to strong wind pressure, plays a role in concealed radar detection, improves the flexibility and maintainability of the structure, and reduces the damage caused by wind pressure to the shielding part and personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118639594B_ABST
    Figure CN118639594B_ABST
Patent Text Reader

Abstract

The present invention relates to a protective device and installation method for a temporary shelter for deep-sea islands and reefs. The device is used to be arranged at the periphery of the temporary shelter, including: a supporting frame, including a ground beam and a column, the ground beam is arranged on the supporting ground at intervals, and the column is installed on the ground beam; a multi-layer protective roof, including a shielding roof and a light membrane roof, the shielding roof includes at least one shielding module plate, the shielding module plate is arranged on the top of multiple columns, and is connected and fixed with multiple columns; the light membrane roof includes at least one light membrane roof panel, and the light membrane roof panel is arranged above the shielding roof; an automatic falling connection node is arranged between the shielding roof and the light membrane roof, one end of which is connected to the shielding roof, and the other end is connected to the light membrane roof, the automatic falling connection node can fall off at the first level under low wind speed, and the automatic falling connection node resists wind pressure by falling off at the first level itself. The present invention can effectively reduce the damage of excessive wind pressure to the temporary shelter and play a role in concealed radar detection, and the rapid installation can achieve the effect of disassembly and use of the structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building structures, in particular to a temporary shelter for deep-sea islands and reefs, and specifically to a protective device and an installation method for the temporary shelter for deep-sea islands and reefs. Background Art

[0002] The temporary shelter of deep-sea islands and reefs is a prefabricated structure used to temporarily resist damage from external explosives and other weapons. Due to the extremely high wind speed on deep-sea islands and reefs, the temporary shelter is easily damaged by wind pressure, bending and shearing deformation under strong winds, and the structure is easily exposed after being detected by radar.

[0003] In order to prevent the temporary shelter from being damaged and exposed, we need to propose a new protective device that can avoid the above-mentioned hazards. Summary of the invention

[0004] In view of the deficiencies in the prior art, the main purpose of the present invention is to provide a protective device and an installation method for temporary shelters on deep-sea islands and reefs, so as to solve one or more problems in the prior art.

[0005] The technical solution of the present invention is as follows:

[0006] A protective device for a temporary shelter of a deep-sea island or reef, the device being arranged at the periphery of the temporary shelter, comprising:

[0007] A supporting frame, comprising ground beams and columns, wherein the ground beams are arranged at intervals on the supporting ground, and the columns are installed on the ground beams to form a supporting structure;

[0008] Multi-layer protective roof, including:

[0009] A shielding roof, comprising at least one shielding module plate, wherein the shielding module plate is arranged on the top of the column and is connected and fixed to a plurality of the columns;

[0010] A light membrane roof, comprising at least one light membrane roof panel, wherein the light membrane roof panel is arranged above the shielding roof;

[0011] An automatic detaching connection node is arranged between the shielding roof and the light membrane roof. One end of the automatic detaching connection node is connected to the shielding roof, and the other end is connected to the light membrane roof. The automatic detaching connection node can undergo a first-stage detachment at a low wind speed to resist wind pressure through the first-stage detachment.

[0012] In some embodiments, there are multiple columns, including four side clamping columns and at least two middle columns, wherein the four side clamping columns are bolted to the two ends of the two ground beams, and the tops of the four side clamping columns are provided with clamping grooves facing the multi-layer protective roof, at least two middle columns are clamped and / or bolted to the middle parts of the two ground beams, and at least two middle columns are provided with installation grooves on the tops facing the multi-layer protective roof.

[0013] In some embodiments, the shielding roof includes two shielding module plates arranged opposite to each other, the outer sides of the two shielding module plates are clamped and fixed by the clamping grooves, and the inner sides of the two shielding module plates are connected by a connecting rod, and connecting balls are provided at both ends of the connecting rod facing the mounting grooves, which are suitable for being inserted into the mounting grooves and spot-welded to the mounting grooves.

[0014] In some embodiments, the lightweight membrane roof includes a plurality of lightweight membrane roof panels, and a plurality of automatic detachable connection nodes are provided. Each of the plurality of lightweight membrane roof panels matches each of the plurality of automatic detachable connection nodes, and one end of each of the automatic detachable connection nodes is connected to each of the lightweight membrane roof panels, and the other end is connected to the shielding module panel.

[0015] In some embodiments, the automatically falling-off connection node comprises:

[0016] The end fixing structures are symmetrically arranged above and below the automatic detachable connection node, each of the end fixing structures comprises a first fixing portion and a second fixing portion, the first fixing portion is arranged on the outside, the second fixing portion is arranged on the inside, and the two are closely arranged in the vertical direction;

[0017] A damping structure is symmetrically arranged on each of the end fixing structures, one end of each of the damping structures is movably connected to the first fixing portion, and the other end passes through the second fixing portion in the vertical direction, and a damping hole is provided at the end of the passing portion in the vertical direction;

[0018] A pulling rope, wherein one end of the pulling rope is connected to one of the end fixing structures, and the other end is connected to another end fixing structure;

[0019] The wind sensing structure is inserted into the two damping holes and is rotatably connected to the two damping holes. The wind sensing structure is provided with a rotating wind knife, which is suitable for rotating at a low wind speed and driving the rotating wind knife to cut multiple pulling ropes to perform the first level of shedding.

[0020] In some embodiments, the automatically disconnected connection node further comprises:

[0021] A connecting rod is symmetrically arranged between each of the damping structures and the first fixing part. One end of each of the connecting rods passes through the damping structure and is anchored to the first fixing part. The connecting rod is separated from the first fixing part under high wind speed and performs a second-stage shedding. During the second-stage shedding, at least one of the lightweight membrane roof panels is detached from the shielding module panel.

[0022] In some embodiments, the first fixing portion includes a base and a protrusion, the base is embedded with rubber area blocks on both sides, suitable for anchoring the connecting rod, the middle of the base is provided with a protrusion; the protrusion is provided with a slot on the side facing the damping structure, suitable for placing the damping structure, and / or

[0023] The second fixing portion is a rectangular block, and the rectangular block is provided with a through first mounting hole and a plurality of second mounting holes along a vertical direction. The first mounting hole is suitable for passing through the damping structure, and the plurality of second mounting holes are suitable for passing through a plurality of pulling ropes.

[0024] In some embodiments, each of the damping structures includes a transverse damping plate and a vertical damping strip, wherein the transverse damping plate is arranged between the first fixing portion and the second fixing portion and welded to the second fixing portion, and one end of the vertical damping strip is vertically arranged on the transverse damping plate, and the other end passes through the second fixing portion, and the damping hole is provided at the protruding end.

[0025] In some embodiments, the wind sensing structure comprises:

[0026] A rotating circular shaft is vertically inserted into the two damping holes and is rotationally connected with the two damping holes, and is suitable for rotating in the damping holes at low wind speed;

[0027] There is at least one rotating disc, which is mounted on the rotating shaft and is coaxially arranged with the rotating shaft and is suitable for synchronously rotating with the rotating shaft;

[0028] A plurality of rotating wind knives are circumferentially arranged on the outer circumference of the rotating disc, adapted to rotate synchronously with the rotating disc and cut the plurality of pulling ropes during the rotation process;

[0029] The wind sensing flag comprises a rotating rod and a flag. The rotating rod is arranged transversely on the rotating circular axis. The flag is arranged at one end of the rotating rod away from the rotating circular axis. The flag is suitable for sensing wind force and driving the rotating rod to rotate.

[0030] In some embodiments, each of the pulling ropes comprises:

[0031] Pulling rope body;

[0032] A fixing iron claw is connected to the top of the pulling rope body, and a through hole is opened on the first fixing part above the automatic detaching connection node corresponding to the second mounting hole, and the hole opening at the top of the hole is suitable for passing through the pulling rope body to fix the fixing iron claw;

[0033] A plumb bob is connected to the bottom end of the pulling rope body and is arranged on the first fixing portion below the automatic detaching connection node. A one-way opening is provided corresponding to the second mounting hole, which is suitable for the plumb bob to enter from the outside and restrict the plumb bob from escaping from the one-way opening.

[0034] A method for installing the protective device comprises the following steps:

[0035] S10: placing two ground beams at intervals on the supporting ground, and positioning the two ground beams using positioning beams;

[0036] S20: Two middle columns are symmetrically installed in the middle of the two ground beams;

[0037] S30: assembling a plurality of automatically detachable connection nodes;

[0038] S40: welding one end of the plurality of automatic detaching connection nodes to the shielding module plate, and then welding the other end of the plurality of automatic detaching connection nodes to the plurality of light membrane roof panels;

[0039] S50: transporting the assembled multi-layer protective roof to the tops of the two center columns and connecting and fixing the roof to the two center columns;

[0040] S60: Install four side clamping columns at the ends of the two ground beams, and clamp and fix the clamping grooves at the tops of the side clamping columns to the multi-layer protective roof;

[0041] S70: Remove the positioning beam, push the assembled protection device to the periphery of the temporary shelter, and fix it to the supporting ground with fixing pins.

[0042] The beneficial effects of the present invention compared with the prior art are as follows: the present invention proposes a protective device for temporary shelters on deep-sea islands and reefs, which can protect the temporary shelters from damage caused by strong wind pressure and can also play a role in concealing radar detection. Specifically, it has at least the following practical effects:

[0043] The support frame of the present invention is assembled into a stable support structure by two ground beams and a plurality of columns, which can not only support the multi-layer protective roof, but also realize rapid assembly and disassembly.

[0044] The automatic detachable connection node of the present invention is connected by two end fixing structures, two damping structures, multiple pulling ropes, and a wind sensing structure. Each component has a simple structure and is easy to assemble and disassemble. It is also convenient to maintain and replace damaged components, thereby improving the flexibility and maintainability of the overall structure.

[0045] The present invention performs first-stage shedding under low wind speed through an automatically detachable connection node formed by connecting two end fixing structures, two damping structures, multiple pulling ropes, and a wind sensing structure, which can withstand wind pressure and reduce damage to the temporary shelter caused by wind pressure.

[0046] The present invention performs the first-level shedding at low wind speed through an automatically detaching connection node formed by two end fixing structures, two damping structures, multiple pulling ropes, a wind sensing structure and multiple connecting rods, which can withstand wind pressure and reduce the damage of wind pressure to the temporary shelter; and performs the second-level shedding at high wind speed, driving at least one lightweight membrane roof panel and a shielding module panel to detach, further reducing the damage of wind pressure to the temporary shelter.

[0047] The automatic detaching connection node of the present invention has a two-stage detaching mechanism, which can respond step by step under different wind speed conditions. First, the wind sensing structure cuts off the pulling rope when the wind speed reaches the first speed limit to perform the first stage detachment. Then, when the wind speed further increases to the second speed limit, the connecting rod is separated from the first fixed part, realizing the second stage detachment and driving at least one lightweight membrane roof panel and the shielding module panel to detach.

[0048] The graded response mechanism of the present invention can play a role in venting wind, effectively reducing the damage to the temporary shelter caused by excessive wind pressure, thereby effectively avoiding damage to the temporary shelter and personnel inside the temporary shelter due to excessive pressure between the temporary shelter and the lightweight membrane roof.

[0049] It should be understood that the implementation of any embodiment of the present invention does not mean that multiple or all of the above-mentioned beneficial effects must be possessed or achieved at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0051] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment in size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.

[0052] Figure 1 It is a schematic diagram of the overall structure of a protective device for temporary shelters of deep-sea islands and reefs according to some embodiments of the present invention;

[0053] Figure 2 It is a schematic diagram of the overall structure of the support frame of some embodiments of the present invention;

[0054] Figure 3 Schematic diagram of the overall structure of a multi-layer protective roof according to some embodiments of the present invention;

[0055] Figure 4 A schematic diagram of connecting a shielded roof and a lightweight membrane roof through an automatic falling-off connection node in some embodiments of the present invention;

[0056] Figure 5 A schematic diagram of the overall structure of an automatic detachable connection node according to some embodiments of the present invention;

[0057] Figure 6 It is a schematic diagram of the end fixing structure of some embodiments of the present invention;

[0058] Figure 7 Schematic diagram of the damping structure of some embodiments of the present invention;

[0059] Figure 8 A schematic diagram of a wind sensing structure of some embodiments of the present invention;

[0060] Fig. 9 Schematic diagram of pulling ropes according to some embodiments of the present invention.

[0061] Markings in the figure:

[0062] 1-support frame; 1a-ground beam; 1a1-positioning hole; 1a2-plug-in slot 1; 1b-side clamping column; 1b1-clamping slot; 1c-center column; 1c1-installation slot; 1d-positioning beam; 2-multi-layer protective roof; 2a-shielded roof; 2a1-shielded module board; 2b-light membrane roof; 2b1-light membrane roof panel; 2c-automatic detachment connection node; 2c1-end fixing structure; 2c11-first fixing part; 2c111-base; 2c112-bump; 2c113-rubber area block; 2c114-groove; 2c115-one-way opening; 2c12-second fixing part; 2c121-first installation hole; 2c122-second Mounting hole; 2c2-damping structure; 2c21-damping hole; 2c22-lateral damping plate; 2c23-vertical damping strip; 2c3-pulling rope; 2c31-pulling rope body; 2c32-fixing iron claw; 2c33-plumb bob; 2c4-wind sensing structure; 2c41-rotating circular axis; 2c42-rotating circular disk; 2c43-rotating wind knife; 2c44-wind sensing flag; 2c441-rotating rod; 2c442-flag; 2c5-connecting rod; 3-connecting plate one; 301-pin hole; 4-fixing pin; 5-connecting plate two; 6-bolt; 7-connecting plate three; 8-connecting rod; 801-connecting ball; 9-connecting plate four; 10-support plate.

[0063] The same or corresponding symbols in the drawings indicate the same or corresponding parts. DETAILED DESCRIPTION

[0064] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clearly understood, the embodiments of the present invention are further described in detail below in conjunction with the embodiments and drawings. Here, the illustrative embodiments of the present invention and their description are used to explain the present invention, but are not intended to limit the present invention.

[0065] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0066] It should be understood that the terms "include / comprise", "consist of..." or any other variations are intended to cover non-exclusive inclusion, so that a product, device, process or method that includes a series of elements includes not only those elements, but also may include other elements not explicitly listed when necessary, or also includes elements inherent to such product, device, process or method. In the absence of more restrictions, the elements defined by the sentence "include / comprise...", "consist of..." do not exclude the presence of other identical elements in the product, device, process or method that includes the elements.

[0067] It is also necessary to understand that terms such as "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside" and "outside" to indicate directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device, component or structure must have a specific direction, be constructed or operate in a specific direction, and should not be understood as a limitation on the present invention.

[0068] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0069] The implementation of the present invention is described in detail below in conjunction with preferred embodiments.

[0070] The present invention proposes a protective device for a temporary shelter on a deep-sea island or reef. The protective device is used to be arranged on the periphery of the temporary shelter, which can effectively reduce the damage to the temporary shelter caused by excessive wind pressure and play a role in concealing radar detection.

[0071] like Figures 1 to 9 As shown, the protection device includes a support frame 1 and a multi-layer protective roof 2. The support frame 1 includes two ground beams 1a and a plurality of columns, the two ground beams 1a are arranged on the supporting ground at a predetermined distance, and the plurality of columns are symmetrically installed on the two ground beams 1a to form a stable support structure, which is mainly used to support the multi-layer protective roof 2.

[0072] It is easy to understand that the predetermined distance here generally refers to the width of the temporary shielding part or a distance slightly larger than the width of the temporary shielding part, mainly to facilitate the arrangement of the two ground beams 1a on both sides of the temporary shielding part.

[0073] The multi-layer protective roof 2 includes a shielding roof 2a, a lightweight membrane roof 2b and a plurality of automatically detachable connection nodes 2c, wherein the shielding roof 2a includes at least one shielding module panel 2a1, which is arranged on the top of a plurality of columns and is connected and fixed to the plurality of columns; the lightweight membrane roof 2b includes a plurality of lightweight membrane roof panels 2b1, which are docked and arranged above the shielding roof 2a and are connected to the shielding roof 2a via a plurality of automatically detachable connection nodes 2c.

[0074] A plurality of automatic detachable connection nodes 2c are arranged between the shielding roof 2a and the light membrane roof 2b, and one end of each of the plurality of automatic detachable connection nodes 2c is connected and fixed to the shielding roof 2a, and the other end is connected and fixed to the light membrane roof 2b. The automatic detachable connection nodes 2c can be first-stage detached at low wind speeds, that is, when the wind speed on the island reaches the first speed limit, at least part of the automatic detachable connection nodes 2c themselves are first-stage detached, and the automatic detachable connection nodes resist wind pressure by first-stage detachment themselves to protect the temporary shelter.

[0075] The shielding roof 2a of the present invention is mainly used to shield the signal of radar or other detection structures, and plays the role of concealing the detection of radar or other detection structures. The light membrane roof 2b can be separated from the shielding roof 2a by means of the automatic detachment connection node 2c when the wind reaches a certain wind speed, and can protect the temporary shelter from damage by excessive wind pressure. How to separate from the shielding roof 2a by means of the automatic detachment connection node 2c will be described in detail below.

[0076] In some embodiments, see Figure 2 The support frame 1 further includes a positioning beam 1d, which is suitable for being connected between the two ground beams 1a in the transverse direction when the protection device is installed, and is removed when the protection device is in normal use. The positioning beam 1d of the present invention is used to locate the distance between the two ground beams 1a according to the width of different temporary shielding parts, so that the protection device can be applied to temporary shielding parts of different sizes.

[0077] In one specific embodiment, see Figure 1 , Figure 2 A positioning hole 1a1 is provided inwardly at the middle position of the two ground beams 1a, and both ends of the positioning beam 1d are suitable for being inserted into the two positioning holes 1a1 of the two ground beams 1a and being plugged and fixed with the two ground beams 1a.

[0078] In some embodiments, see Figure 1 , Figure 2 A connecting plate 3 is provided at both ends of the bottom of the two ground beams 1a, and at least one pin hole 301 is provided on the connecting plate 3, which is suitable for fixing the two ground beams 1a by inserting the fixing pin 4 through the pin hole 301 to support the ground when the two ground beams 1a move to both sides of the bottom of the temporary shelter.

[0079] Preferably, the connecting plate 1 3 is a rectangular steel plate. The rectangular steel plate is welded to the outer edges of the bottom ends of the two ground beams 1a. Two pin holes 301 are arranged in parallel on the rectangular steel plate, and each end of the two ground beams 1a is suitable for two fixing pins 4 to be inserted and fixed.

[0080] In some embodiments, see Figure 1 , Figure 2 The columns include four side clamping columns 1b and two middle columns 1c, wherein the four side clamping columns 1b are arranged at both ends of the two ground beams 1a, the bottoms of the four side clamping columns 1b are bolted and fixed to the ground beams 1a, the tops of the four side clamping columns 1b are provided with clamping grooves 1b1 facing the multi-layer protective roof 2, which are suitable for clamping and fixing the outer periphery of the shielding roof 2a, and the two middle columns 1c are arranged in the middle of the two ground beams 1a, the bottoms of the two middle columns 1c are clamped and / or bolted and fixed to the ground beams 1a, and the tops of the two middle columns 1c are provided with installation grooves 1c1 facing the multi-layer protective roof 2, which are suitable for fixing the middle part of the shielding roof 2a.

[0081] In some embodiments, a connecting plate 25 is provided at the bottom of each side clamping column 1b, and the connecting plate 25 is symmetrically arranged on the front and rear sides of the side clamping column 1b. At least one bolt hole (not shown in the figure) is provided on the connecting plate 25, and the end of the ground beam 1a is correspondingly provided with the same hole, which is suitable for being connected and fixed to the ground beam 1a by bolts 6 passing through the corresponding bolt holes when the side clamping column 1b is arranged above the end of the ground beam 1a.

[0082] In some embodiments, the connecting plate 2 5 is arranged at a certain distance above the bottom edge of the side clamping column 1b, that is, the bottom of the side clamping column 1b extends out of the connecting plate 2 5, and the end of the ground beam 1a is provided with a plug-in slot 1a2, and the extended part is suitable for inserting into the plug-in slot 1a2 and then being bolted and fixed to the ground beam 1a through the connecting plate 2 5. The side clamping column 1b of the present invention is a rectangular bar, and the plug-in slot 1a2 is a strip groove. The side clamping column 1b of the present invention and the ground beam 1a are connected by bolts first, which can prevent the side clamping column 1b from rotating back and forth, and ensure that the side clamping column 1b and the ground beam 1a are more firmly connected.

[0083] The second connecting plate 5 in the present invention is also a rectangular steel plate, which is welded to the front and rear sides of the bottom of the side clamping column 1b.

[0084] In some embodiments, a connecting plate 3 7 is provided at the bottom of each middle column 1c. The connecting plate 3 7 is arranged directly below the bottom of each middle column 1c and is welded and fixed to the middle column 1c. The size of the connecting plate 3 7 is larger than the size of the bottom of the middle column 1c, that is, the connecting plate 3 7 extends outward along the bottom of the middle column 1c, and the extended part is provided with bolt holes. The same holes are correspondingly provided above the ground beam 1a, which is suitable for being fixed to the ground beam 1a by bolts 6 passing through the corresponding bolt holes when the middle column 1c is arranged above the middle part of the ground beam 1a.

[0085] In some embodiments, each center column 1c is arranged at a position corresponding to the positioning hole 1a1 of each ground beam 1a. It should be understood that the positioning hole 1a1 here is a hole that penetrates the cross section of the ground beam 1a. A vertical plug-in board (not shown in the figure) is connected below the connection plate 3 7. Telescopic heads are provided on the front and rear sides of the vertical plug-in board corresponding to the positioning holes 1a1, similar to spring buckles. A vertical plug-in slot 2 (not shown in the figure) is provided above the ground beam 1a corresponding to the vertical plug-in board. When the vertical plug-in board is inserted into the vertical plug-in slot 2, the telescopic head extends to the positioning hole 1a1 for clamping and fixing.

[0086] The center column 1c of the present invention can be directly fixed to the ground beam 1a by bolt connection, or by clamping, or by bolting and plugging. The present invention does not limit the specific fixing method, which is determined by the specific load bearing size and stability of the center column 1c in actual installation.

[0087] In some embodiments, see Figure 3 The shielding roof 2a includes two shielding module boards 2a1, which are arranged opposite to each other. The outer sides of the two shielding module boards 2a1 are fixed by the clamping grooves 1b1 on the side clamping columns 1b, and the inner sides of the two shielding module boards 2a1 are connected by a connecting rod 8. For example, the upper surface of the connecting rod 8 is welded with a plurality of connecting plates 99 along its length direction, and the two sides of the connecting plates 99 are respectively welded and fixed to the surfaces of the two shielding module boards 2a1. The two ends of the connecting rod 8 are provided with connecting balls 801, which are suitable for being inserted into the installation groove 1c1 of the middle column 1c and being fixed by spot welding to the inner cross section of the installation groove.

[0088] The spot welding connection between the connecting ball 801 and the inner section of the installation groove can prevent the connecting ball 801 from being directly inserted into the installation groove 1c1 and rotating in the vertical section and up and down directions under the action of wind, thereby preventing the roof membrane structure from being blown away prematurely and failing to achieve the subsequent pressure relief effect.

[0089] In some embodiments, each shielding module plate 2a1 is made of a plurality of shielding module units welded to a steel frame. The shielding module unit here can be made of a steel plate with a layer of absorbing material applied on its surface. The absorbing material is a composite functional material that converts electromagnetic wave energy into other forms of energy such as heat energy through a specific physical mechanism, thereby achieving the effect of shielding radar or other detection structure signals. Of course, the shielding module unit can also be other plates with the function of shielding radar or shielding other detection structure signals. The specific material is not limited by the present invention, and it is sufficient to ensure that the structure can achieve the shielding function.

[0090] In some embodiments, the light membrane roof 2b is formed by connecting four light membrane roof panels 2b1. Each light membrane roof panel 2b1 is made of a protective film coated on the outer surface of a steel frame. The protective film is made of ETFE membrane structural material, and the ETFE membrane material has an elongation rate of 420%-440%, allowing for large elastic deformation, and a light transmission spectrum similar to that of glass. At the same time, this material has good thermal insulation performance.

[0091] In some embodiments, see Figure 4 Each of the multiple automatic detachable connection nodes 2c matches each lightweight membrane roof panel 2b1, and one end of each automatic detachable connection node 2c is connected to each lightweight membrane roof panel 2b1, and the other end is connected to the shielding module panel 2a1.

[0092] Since the multiple lightweight membrane roof panels 2b1 are only butt-jointed and there is no connection between adjacent panels, when the present invention sets each of the multiple automatic detachment connection nodes 2c in a one-to-one correspondence with each of the multiple lightweight membrane roof panels 2b1, it is convenient for each lightweight membrane roof panel 2b1 to fall off along with each automatic detachment connection node 2c without being affected by the falling off of adjacent lightweight membrane roof panels 2b1. The lightweight membrane roof panels 2b1 fall off in blocks, which is beneficial to improving the ability of the multiple lightweight membrane roof panels 2b1 to resist wind pressure.

[0093] Continue to see Figure 4 A support plate 10 is provided at the top and bottom of each automatic detachable connection node 2c. One end of the support plate 10 provided at the top of each automatic detachable connection node 2c is welded and fixed to the top of the automatic detachable connection node 2c, and the other end is welded and fixed to the light membrane roofing panel 2b1. One end of the support plate 10 provided at the bottom of each automatic detachable connection node 2c is welded and fixed to the bottom of the automatic detachable connection node 2c, and the other end is welded and fixed to the shielding module panel 2a1.

[0094] The support plate 10 of the present invention is a cross-shaped plate, which is formed by cross-welding two rectangular plates.

[0095] In some embodiments, each automatic detachable connection node 2c includes two end fixing structures 2c1, two damping structures 2c2, a plurality of pulling ropes 2c3 and a wind sensing structure 2c4.

[0096] The two end fixing structures 2c1 are symmetrically arranged above and below the automatic detachable connection node 2c, and each end fixing structure 2c1 includes a first fixing portion 2c11 and a second fixing portion 2c12. The first fixing portion 2c11 of each end fixing structure 2c1 is arranged on the outside, and the second fixing portion 2c12 is arranged on the inside, and the first fixing portion 2c11 and the second fixing portion 2c12 of each end fixing structure 2c1 are tightly arranged in the vertical direction.

[0097] The two damping structures 2c2 are symmetrically arranged between the first fixing part 2c11 and the second fixing part 2c12 of the two end fixing structures 2c1, and a part of each damping structure 2c2 is fixedly connected to the second fixing part 2c12 of one of the end fixing structures 2c1, a part is movably connected to the first fixing part 2c11 of one of the end fixing structures 2c1, and a part passes through the second fixing part 2c12 of one of the end fixing structures 2c1 in the vertical direction, and a damping hole 2c21 is provided at the end of the passed part in the vertical direction.

[0098] One end of the plurality of pulling ropes 2c3 is connected to one of the end fixing structures 2c1, and the other end is connected to the other end fixing structure 2c1.

[0099] The wind sensing structure 2c4 is arranged between the two damping structures 2c2 and is correspondingly inserted into the two damping holes 2c21. The wind sensing structure 2c4 is provided with a rotating wind knife 2c43, which is suitable for rotating and driving the rotating wind knife 2c43 to cut multiple pulling ropes 2c3 when the wind speed reaches the first speed limit, and perform the first level of shedding.

[0100] The components of the automatic detachable connection node of the present invention are simple in structure, easy to assemble and disassemble, and convenient to maintain and replace damaged components. This design improves the flexibility and maintainability of the overall structure.

[0101] The invention uses an automatic detachable connection node 2c formed by two end fixing structures 2c1, two damping structures 2c2, multiple pulling ropes 2c3, and a wind sensing structure 2c4. When the wind speed reaches a first speed limit, the pulling ropes 2c3 are cut off to perform the first level of detachment, which can withstand wind pressure, play a role in venting wind, and reduce the damage of wind pressure to the temporary shelter.

[0102] In some embodiments, see Figures 5 to 9Each automatically detachable connection node 2c also includes a connecting rod 2c5, which is symmetrically arranged between each damping structure 2c2 and the first fixed part 2c11. One end of a plurality of connecting rods 2c5 passes through the damping structure 2c2 and is anchored to the first fixed part 2c11, and is suitable for separating from the first fixed part 2c11 when the wind speed reaches the second speed limit, and performing a second-level detachment. The second-level detachment drives at least one lightweight membrane roof panel 2b1 and the shielding module panel 2a1 to detach.

[0103] It is easy to understand that the inner side here refers to the side of the damping structure 2c2 facing the middle of the automatic detachment connection node 2c, and the outer side refers to the side of the shielding roof 2a and the lightweight membrane roof 2b facing the outside of the automatic detachment connection node 2c.

[0104] The automatic shedding connection node of this embodiment has a two-level shedding mechanism, which can respond step by step under different wind speed conditions. First, the wind sensing structure cuts off the pulling rope when the wind speed reaches the first speed limit to perform the first level of shedding. Then, when the wind speed further increases to the second speed limit, the connecting rod separates from the first fixed part to achieve the second level of shedding and drive at least one lightweight membrane roof panel 2b1 and the shielding module panel to fall off. This hierarchical response mechanism can play a role in venting wind, effectively reducing the damage to the temporary shelter caused by excessive wind pressure, thereby effectively avoiding damage to the temporary shelter and personnel in the temporary shelter due to excessive pressure between the temporary shelter and the lightweight membrane roof.

[0105] Gradual shedding is also beneficial for timely pressure relief when the wind speed is relatively low, and complete shedding occurs when the wind speed is relatively high, thus avoiding the problem of wasting materials by direct shedding when only one level of shedding occurs. It can also relieve pressure in a timely manner while ensuring that materials are not wasted.

[0106] See also Figure 6 The first fixing part 2c11 includes a base 2c111 and a protrusion 2c112, wherein rubber area blocks 2c113 are embedded on both sides of the base 2c111, suitable for anchoring the connecting rod 2c5, a protrusion 2c112 is provided in the middle of the base 2c111, and a groove 2c114 is provided on the side of the protrusion 2c112 facing the damping structure 2c2, suitable for placing the damping structure 2c2.

[0107] Continue to see Figure 6 The second fixing portion 2c12 is a rectangular block, which is provided with a through first mounting hole 2c121 and a plurality of second mounting holes 2c122 in the vertical direction. The first mounting hole 2c121 is suitable for passing through the damping structure 2c2, and the plurality of second mounting holes 2c122 are suitable for passing through a plurality of pulling ropes 2c3.

[0108] See also Figure 7Each damping structure 2c2 includes a transverse damping plate 2c22 and a vertical damping strip 2c23, wherein the transverse damping plate 2c22 is arranged between the first fixing portion 2c11 and the second fixing portion 2c12 of each end fixing structure 2c1, and the surface of the transverse damping plate 2c22 is welded to the second fixing portion 2c12, and one end of the vertical damping strip 2c23 is vertically arranged on the transverse damping plate 2c22, and the other end passes through the second fixing portion 2c12, such as the first mounting hole 2c121, and the protruding end is provided with a damping hole 2c21.

[0109] See also Figure 8 The wind sensing structure 2c4 includes a rotating shaft 2c41, a rotating disc 2c42, a plurality of rotating wind knives 2c43 and a wind sensing flag 2c44, wherein the rotating shaft 2c41 is vertically inserted into the two damping holes 2c21 and is rotatably connected with the two damping holes 2c21, and is suitable for being driven by the wind sensing flag 2c44 to rotate in the damping holes 2c21 when the wind speed reaches the first speed limit; the rotating disc 2c42 is provided with at least one, which is installed on the rotating shaft 2c41 and is coaxially arranged with the rotating shaft 2c41, and is suitable for rotating synchronously with the rotating shaft 2c41 The plurality of rotating wind knives 2c43 are circumferentially arranged on the outer periphery of the rotating disk 2c42, and are suitable for rotating synchronously with the rotating disk 2c42, and cutting the plurality of pulling ropes 2c3 during the rotation process; the wind force sensing flag 2c44 comprises a rotating rod 2c441 and a flag 2c442, the rotating rod 2c441 is transversely arranged on the rotating circular shaft 2c41, and the flag 2c442 is arranged at one end of the rotating rod 2c441 away from the rotating circular shaft 2c41, and is suitable for sensing wind force, and driving the rotating rod 2c441 to rotate, and the rotating rod 2c441 drives the rotating circular shaft 2c41 to rotate. In the present invention, the flag 2c442 can greatly increase the force bearing area of ​​the rotating rod 2c441, and better sense the wind force.

[0110] It is easy to understand that the rotation connection between the rotating circular shaft 2c41 and the damping hole 2c21 is similar to the connection between the rotating shaft and the support rod of an outdoor wind turbine in the prior art, or the connection of other similar components.

[0111] In a specific implementation, when wind occurs, the wind sensing flag 2c44 is first acted upon, and then the rotating shaft 2c41 is driven to rotate, and then the rotating disc 2c42 and multiple rotating wind knives 2c43 are driven to start rotating. Multiple rotating wind knives 2c43 are thrown outward under the action of centrifugal force. When the wind speed reaches a first speed limit value, such as 22m / s, multiple pulling ropes 2c3 are cut off, and the first level of shedding occurs. When the wind speed reaches a second speed limit value, such as above 32m / s, the connecting rod 2c5 at the upper or lower end becomes loose and eventually falls off. At this time, the second level of shedding occurs, i.e., complete shedding occurs.

[0112] See also Fig. 9Each pulling rope 2c3 includes a pulling rope body 2c31, a fixing iron claw 2c32 and a plumb bob 2c33. The fixing iron claw 2c32 is connected to the top of the pulling rope body 2c31, and a through hole is provided on the first fixing part 2c11 disposed above the automatic detaching connection node 2c corresponding to the second mounting hole 2c122. The hole on the top of the first fixing part 2c11 is suitable for passing through the pulling rope body 2c31 to clamp the fixing iron claw 2c32. The plumb bob 2c33 is connected to the bottom end of the pulling rope body 2c31, and a one-way opening 2c115 is provided on the first fixing portion 2c11 below the automatic detaching connection node 2c corresponding to the second mounting hole 2c122. The one-way opening 2c115 is, for example, provided on the protrusion 2c112. The one-way opening 2c115 can only be opened downward but not upward. Therefore, the plumb bob 2c33 is not easy to fall out from the top after entering from the outside, and is used to fix the plumb bob 2c33 in the one-way opening 2c115.

[0113] The purpose of setting the fixing iron claws 2c32 and the plumb bob 2c33 at both ends of the pulling rope 2c3 of the present invention is to facilitate the pulling rope body 2c31 to pass through the second mounting hole 2c122 under the action of gravity and to facilitate the fixing of the two ends of the pulling rope 2c3.

[0114] In some embodiments, the fixing claw 2c32 of the present invention is cross-shaped.

[0115] In some embodiments, the one-way opening 2c115 includes a hole and a one-way barrier plate. The hole is used to place the plumb bob 2c33. The one-way barrier plate is arranged at the mouth of the hole. The one-way barrier plate can only be opened toward the inside of the hole and cannot be opened toward the outside of the hole. It is used to fix the plumb bob 2c33 in the hole.

[0116] The present invention also provides a method for installing the above protection device, comprising the following steps:

[0117] S10: placing two ground beams 1a at intervals on the supporting ground, and accurately positioning the two ground beams 1a by positioning beams 1d;

[0118] S20: Two middle columns 1c are symmetrically installed in the middle of the two ground beams 1a;

[0119] S30: Assembling a plurality of automatically detachable connection nodes 2c;

[0120] S40: welding one end of the plurality of automatic detachable connection nodes 2c to the shielding module board 2a1, and then welding the other end of the plurality of automatic detachable connection nodes 2c to the plurality of light membrane roof panels 2b1;

[0121] S50: transporting the assembled multi-layer protective roof 2 to the top of the two middle columns 1c by a scissor hydraulic lift, and connecting and fixing the two middle columns 1c;

[0122] S60: Install four side clamping columns 1b at the ends of the two ground beams 1a, and clamp and fix the tops of the side clamping columns 1b to the multi-layer protective roof 2;

[0123] S70: Remove the positioning beam 1d, push the assembled protection device forward to the periphery of the temporary shelter, and fix it to the supporting ground with the fixing pins 4.

[0124] In S30 of the present invention, the steps of assembling each automatic detachable connection node 2c are:

[0125] (1) Install the lower half structure of the automatic detachable connection node 2c;

[0126] First, place the transverse damping plate 2c22 of one of the damping structures 2c2 in the groove 2c114 on the top surface of the first fixing part 2c11 of the end fixing structure 2c1 arranged below the automatic detachment connection node 2c, place the second fixing part 2c12 on the first fixing part 2c11 to cover the transverse damping plate 2c22, and at the same time, pass the vertical damping strip 2c23 of the damping structure 2c2 through the first mounting hole 2c121 of the second fixing part 2c12, and weld the contact surface between the second fixing part 2c12 and the transverse damping plate 2c22. At this time, the second fixing part 2c12 and the damping structure 2c2 are connected as a whole.

[0127] Then the bottom of the wind force sensing structure 2c4 is screwed into the damping hole 2c21 on the vertical damping strip 2c23.

[0128] Finally, a portion of the connecting rod 2c5 is inserted through the transverse damping plate 2c22 of one of the damping structures 2c2 into the rubber area block 2c113 on the top surface of the first fixing portion 2c11 of the end fixing structure 2c1 arranged below the automatic detaching connection node 2c, thereby completing the installation of the lower half of the automatic detaching connection node 2c;

[0129] (2) Install the upper half structure of the automatic detachable connection node 2c;

[0130] The upper half structure of the automatic detachable connection node 2c is symmetrically arranged with the lower half structure, and the upper half structure can be installed according to the installation method of the lower half structure, which will not be elaborated in the present invention.

[0131] (3) The plumb bob 2c33 of the pulling rope 2c3 is passed through the first fixing portion 2c11 and the second fixing portion 2c12 of the end fixing structure 2c1 of the upper half of the automatic detachable connecting node 2c and the second fixing portion 2c12 of the end fixing structure 2c1 of the lower half of the automatic detachable connecting node 2c, and falls into the one-way opening 2c115 on the first fixing portion 2c11 of the end fixing structure 2c1 of the lower half of the automatic detachable connecting node 2c. Since the one-way opening 2c115 can only be opened downward but not upward, the plumb bob 2c33 is fixed in the one-way opening 2c115, the pulling rope 2c3 is pulled upward, and the fixing iron claw 2c32 of the pulling rope 2c3 is fixed to the hole on the first fixing portion 2c11 of the end fixing structure 2c1 of the upper half of the automatic detachable connecting node 2c. The entire device is installed.

[0132] In S50 of the present invention, the connection between the multi-layer protective roof 2 and the two center columns 1c is specifically to spot-weld and fix the connection balls 801 at both ends of the connection rod 8 to the inner cross-section of the installation groove at the top of the two center columns 1c.

[0133] The method can realize the rapid installation of the components of the protection device, and achieve the effect of ready-to-use for the protection device.

[0134] It is easy for those skilled in the art to understand that, under the premise of no conflict, the above-mentioned preferred solutions can be freely combined and superimposed.

[0135] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A protective device for temporary shelters on deep-sea islands and reefs, characterized in that: The device is used to be arranged on the periphery of a temporary shelter, and includes: A supporting frame, comprising ground beams and columns, wherein the ground beams are arranged at intervals on the supporting ground, and the columns are installed on the ground beams to form a supporting structure; Multi-layer protective roof, including: A shielding roof, comprising at least one shielding module plate, wherein the shielding module plate is arranged on the top of the column and is connected and fixed to a plurality of the columns; A light membrane roof, comprising at least one light membrane roof panel, wherein the light membrane roof panel is arranged above the shielding roof; An automatic detaching connection node is arranged between the shielding roof and the light membrane roof, one end of the automatic detaching connection node is connected to the shielding roof, and the other end is connected to the light membrane roof. The automatic detaching connection node can detach at the first level under low wind speed to resist wind pressure through the first level detachment; the automatic detaching connection node includes: The end fixing structures are symmetrically arranged above and below the automatic detachable connection node, each of the end fixing structures comprises a first fixing portion and a second fixing portion, the first fixing portion is arranged on the outside, the second fixing portion is arranged on the inside, and the two are closely arranged in the vertical direction; A damping structure is symmetrically arranged on each of the end fixing structures, one end of each of the damping structures is movably connected to the first fixing portion, and the other end passes through the second fixing portion in the vertical direction, and a damping hole is provided at the end of the passing portion in the vertical direction; A pulling rope, wherein one end of the pulling rope is connected to one of the end fixing structures, and the other end is connected to another end fixing structure; The wind sensing structure is inserted into the two damping holes and is rotatably connected to the two damping holes. The wind sensing structure is provided with a rotating wind knife, which is suitable for rotating at a low wind speed and driving the rotating wind knife to cut multiple pulling ropes to perform the first level of shedding.

2. The protection device according to claim 1, characterized in that: There are multiple columns, including four side clamping columns and at least two middle columns, wherein the four side clamping columns are bolted to the two end portions of the two ground beams, and the tops of the four side clamping columns are provided with clamping grooves facing the multi-layer protective roof, and at least two middle columns are clamped and / or bolted to the middle portions of the two ground beams, and the tops of at least two middle columns are provided with installation grooves facing the multi-layer protective roof.

3. The protection device according to claim 2, characterized in that: The shielding roof includes two shielding module plates arranged opposite to each other, the outer sides of the two shielding module plates are fixed by the clamping grooves, and the inner sides of the two shielding module plates are connected by a connecting rod, and connecting balls are provided at both ends of the connecting rod facing the mounting grooves, which are suitable for being inserted into the mounting grooves and spot-welded to the mounting grooves.

4. The protection device according to claim 1, characterized in that: The lightweight membrane roof comprises a plurality of lightweight membrane roof panels, and a plurality of automatic detachable connection nodes are provided. Each of the plurality of lightweight membrane roof panels matches each of the plurality of automatic detachable connection nodes, and one end of each of the automatic detachable connection nodes is connected to each of the lightweight membrane roof panels, and the other end is connected to the shielding module panel.

5. The protection device according to claim 1, characterized in that: The automatic drop-out connection node also includes: A connecting rod is symmetrically arranged between each of the damping structures and the first fixing part. One end of each of the connecting rods passes through the damping structure and is anchored to the first fixing part. The connecting rod is separated from the first fixing part under high wind speed and performs a second-stage shedding. During the second-stage shedding, at least one of the lightweight membrane roof panels is detached from the shielding module panel.

6. The protection device according to claim 5, characterized in that: The first fixing part includes a base and a protrusion. Rubber area blocks are embedded on both sides of the base, suitable for anchoring the connecting rod. A protrusion is provided in the middle of the base; a groove is provided on the side of the protrusion facing the damping structure, suitable for placing the damping structure.

7. The protection device according to claim 5, characterized in that: The second fixing portion is a rectangular block, and the rectangular block is provided with a through first mounting hole and a plurality of second mounting holes along a vertical direction. The first mounting hole is suitable for passing through the damping structure, and the plurality of second mounting holes are suitable for passing through a plurality of pulling ropes.

8. The protection device according to claim 1, characterized in that: Each of the damping structures includes a transverse damping plate and a vertical damping strip, wherein the transverse damping plate is arranged between the first fixing part and the second fixing part and is welded to the second fixing part, and one end of the vertical damping strip is vertically arranged on the transverse damping plate, and the other end passes through the second fixing part, and the protruding end is provided with the damping hole.

9. The protection device according to claim 1, characterized in that: The wind sensing structure comprises: A rotating circular shaft is vertically inserted into the two damping holes and is rotationally connected with the two damping holes, and is suitable for rotating in the damping holes at low wind speed; There is at least one rotating disc, which is mounted on the rotating shaft and is coaxially arranged with the rotating shaft and is suitable for synchronously rotating with the rotating shaft; A plurality of rotating wind knives are circumferentially arranged on the outer circumference of the rotating disc, adapted to rotate synchronously with the rotating disc and cut the plurality of pulling ropes during the rotation process; The wind sensing flag comprises a rotating rod and a flag. The rotating rod is arranged transversely on the rotating circular axis. The flag is arranged at one end of the rotating rod away from the rotating circular axis. The flag is suitable for sensing wind force and driving the rotating rod to rotate.

10. The protection device according to claim 7, characterized in that: Each of the pulling ropes comprises: Pulling rope body; A fixing iron claw is connected to the top of the pulling rope body, and a through hole is opened on the first fixing part above the automatic detaching connection node corresponding to the second mounting hole, and the hole opening at the top of the hole is suitable for passing through the pulling rope body to fix the fixing iron claw; A plumb bob is connected to the bottom end of the pulling rope body and is arranged on the first fixing portion below the automatic detaching connection node. A one-way opening is provided corresponding to the second mounting hole, which is suitable for the plumb bob to enter from the outside and restrict the plumb bob from escaping from the one-way opening.

11. A method for installing a protection device according to claim 2 or 3, comprising the following steps: S10: placing two ground beams at intervals on the supporting ground, and positioning the two ground beams using positioning beams; S20: Two middle columns are symmetrically installed in the middle of the two ground beams; S30: assembling a plurality of automatically detachable connection nodes; S40: welding one end of the plurality of automatic detaching connection nodes to the shielding module plate, and then welding the other end of the plurality of automatic detaching connection nodes to the plurality of light membrane roof panels; S50: transporting the assembled multi-layer protective roof to the tops of the two center columns and connecting and fixing the roof to the two center columns; S60: Install four side clamping columns at the ends of the two ground beams, and clamp and fix the clamping grooves at the tops of the side clamping columns to the multi-layer protective roof; S70: Remove the positioning beam, push the assembled protection device to the periphery of the temporary shelter, and fix it to the supporting ground with fixing pins.