A method for designing continuity of large-scale measurement field based on target accuracy
By calculating the distance measurement accuracy of the measurement equipment and the longest measurement line distance, and optimizing the reference point layout, the measurement accuracy problem of large aircraft assembly systems is solved, ensuring the manufacturing accuracy of aircraft products.
Patent Information
- Application Number
- CN202411121696.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-15
AI Technical Summary
For aircraft assembly systems above 10 meters, the prior art cannot accurately evaluate the impact of measuring reference point layout spacing on assembly accuracy, resulting in the inability to meet the manufacturing accuracy requirements of aircraft products.
By calculating the distance measurement accuracy parameters of the measuring equipment, the minimum number of measuring equipment is determined, and the distance measurement is corrected based on the distance between the measuring equipment and the longest measuring line, the continuity distance between the construction reference point is calculated to ensure that the measurement equipment can envelop the tooling structure to the maximum extent. , optimize the reference point layout to meet the tooling measurement accuracy requirements.
It realizes the continuous design of large-size measurement fields, ensures the manufacturing accuracy of aircraft products, provides quantitative evaluation of the impact of reference point layout spacing on accuracy, and meets the accuracy requirements of tooling measurement fields above 10 meters.
Smart Images

Figure CN118643545B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of aircraft assembly technology, and in particular relates to a large-scale measurement field continuity design method based on target accuracy. Background Art
[0002] Aircraft tooling is a tool or structure used to assist in aircraft manufacturing and assembly. According to the Aviation Manufacturing Engineering Manual, the National Military Standard, and the Aviation Industry Standard, the accuracy of the positioning components and positioning holes on the tooling is generally selected according to 1 / 3 to 1 / 5 of the manufacturing accuracy of the aircraft product. When manufacturing each tooling, a measurement field containing multiple measurement reference points and multiple measurement stations must be established.
[0003] The measurement datum points generally include the system building datum points TB points and the expanded datum system ERS points. In the past decade, most of the measurement datum points of the tooling system have only set ERS points, and the optical adjustment method of multi-point coordinates and the least square method are used to fit the coordinate system. In the process of tooling development, the role of ERS actually mainly includes three parts: system building, station transfer, and detection. According to the current classification, for the measurement datum points that affect the length of the point spacing in each coordinate direction of the reference coordinate system, if the arrangement spacing of such points is too large, it will directly affect the accuracy of establishing the reference coordinate system. Most of them are arranged on the tooling structure according to the spacing rules. These points are called system building datum points; and other measurement datum points used to establish the reference coordinate system that are free from the system building datum points and cannot meet the measurement spacing requirements but are within the measurement envelope. Some of them are used to increase the envelope of the reference coordinate system and meet the requirements of the number of reference coordinate system building points. These datum points are called system building expansion points; the minimum number of common datum points that belong to the two measurement stations in the reference coordinate system. The coordinate conversion process from a local measurement station to another adjacent local measurement station is required. These common datum points are between the two stations. The overlapping area arrangement of the two station measurement benchmarks before and after the transfer formed by these common benchmarks will affect the relative accuracy of the station after the transfer and the station before the transfer in the global coordinate system. According to the degree of influence of the common area accuracy, the overlapping area generally accounts for more than 1 / 4 of the measurement stations in a region. These common benchmarks are called transfer common points, and the system expansion points and transfer common points are collectively called expanded system benchmark points; in addition, there are benchmarks built on the tooling structure, especially the tooling foundation, for monitoring the stability of the tooling structure or foundation. These benchmarks are mainly used to mark the deformation of the tooling structure or the settlement of the foundation. Their measurement data can directly reflect the deformation of the tooling structure and the foundation and indirectly reflect the stability of the entire benchmark system. These points are called stable benchmarks; system benchmarks, expansion benchmarks, and stable benchmarks can overlap in the measurement benchmark system, but their actual functions are slightly different.
[0004] The expansion system datum point, stable datum point and construction system datum point are the main work contents of the continuity design of large-scale tooling measurement field. At home and abroad, most of the datum point spacings including the three continuity design contents of expansion system datum point, stable datum point and construction system datum point are arranged according to the requirements of "less than 300mm will not increase the system accuracy, more than 800mm will reduce the system accuracy, and the maximum size shall not exceed 1400mm". However, for large-scale assembly systems, the spacing of 300 to 1400mm is arranged regularly, and the datum points are too many and too dense, which seriously affects the function of the tooling. Therefore, in actual development, the datum point spacing of large-scale assembly systems ranges from 2m to 5m, and in some scenarios, the datum point spacing is even greater than 10m.
[0005] After long-term measurement practice, for tooling measurement sites below 10m, no matter how the establishment reference points, expansion reference points, and stable reference points are set, the envelopes formed by them have little effect on the accuracy of the measured object. However, for tooling measurement sites above 10m, the different envelopes formed by the setting of the measurement reference points have an impact on the accuracy of the measured object, and may even exceed the assembly accuracy requirements. There is no standard rule for the setting of relevant establishment reference points, expansion reference points, and stable reference points. For various tooling measurement sites, especially those above 10 meters, their impact on the accuracy of the measured object cannot be quantitatively evaluated, and cannot be directly reflected in the arrangement spacing of the measurement reference points, so it is impossible to accurately infer their impact on the final assembly accuracy of aircraft products. Summary of the invention
[0006] In order to solve the above technical problems, this application provides a large-scale measurement field continuity design method based on target accuracy, which mainly includes:
[0007] Step S1, calculating the first distance measurement under the required accuracy of the tooling according to the distance measurement accuracy parameter of the measuring equipment;
[0008] Step S2, determining the minimum number of measuring devices according to the first distance measurement, and correcting it to obtain the first number of measuring devices;
[0009] Step S3, correcting the first distance measurement according to the ratio of the minimum number of measuring devices to the first number of measuring devices to obtain a second distance measurement;
[0010] Step S4, evenly distributing the measuring devices in the measuring field according to the number of the first measuring devices, so that the measuring devices can cover the measuring points of each tooling structure to the maximum extent;
[0011] Step S5, correcting the first number of measuring devices based on the distance between the measuring device and the longest measuring line to obtain the second number of measuring devices;
[0012] Step S6, correcting the second distance measurement according to the ratio of the number of the first measuring devices to the number of the second measuring devices to obtain a third distance measurement;
[0013] Step S7, calculating the first continuous spacing of the system reference points on the longest measurement line according to the third distance measurement and the tooling required accuracy, and calculating the second continuous spacing of the system reference points on the longest measurement line according to the third distance measurement and its corresponding actual distance measurement accuracy;
[0014] Step S8, calculating the first continuity interval and the second continuity interval according to the longest measurement line to obtain a third continuity interval, and completing the layout of the system building reference points on the longest measurement line according to the third continuity interval.
[0015] Preferably, step S2 further comprises:
[0016] Step S21, calculating the minimum number of measuring devices along the longest measuring line of the tooling measuring field according to the first distance measurement;
[0017] Step S22, correcting the minimum number of measuring devices based on a given transfer error;
[0018] Step S23: round up the corrected minimum number of measuring devices to obtain the first number of measuring devices.
[0019] Preferably, in step S22, the correction coefficient ρ2=(σ1+σ) / σ, wherein σ1 is the transfer error and σ is the required accuracy of the tooling.
[0020] Preferably, step S5 further comprises:
[0021] Step S51, determining the vertical distance between the measuring device and the longest measuring line according to the position of the measuring device actually arranged;
[0022] Step S52, calculating a deviation correction coefficient according to the vertical distance and the second distance measurement;
[0023] Step S53: correct the first number of measuring devices according to the deviation correction coefficient, and round it up to form the second number of measuring devices.
[0024] Preferably, step S7 further comprises:
[0025] The first continuity spacing C1 is calculated according to the following formula:
[0026] C1=2.5*σ*L4;
[0027] The second continuity spacing C2 is calculated according to the following formula:
[0028] C2=40*(σ-σ2)+0.8;
[0029] Wherein, σ is the required accuracy of the tooling, and σ2 is the actual ranging accuracy corresponding to the third ranging L4.
[0030] Preferably, it further includes boundary limitation on the second continuous spacing C2:
[0031] When C2 < 0.3m, modify C2 to 0.3m; when the length L of the longest ranging line < 5m and C2 > 0.8m, modify C2 to 0.8m; when 5m ≤ L < 10m and C2 > 1.4m, modify C2 to 1.4m; when L ≥ 10m and C2 > 5m, modify C2 to 5m.
[0032] Preferably, step S8 further includes:
[0033] When L ≤ 10m, the third continuous spacing C3 is set as: C3 ≤ min(C1, C2);
[0034] When 10 < L ≤ 20m, the third continuous spacing C3 is set as: C3 ≤ (c1 + c2) / 2;
[0035] When L > 20m, the third continuous spacing C3 is set as: C3 ≤ max(C1, C2).
[0036] Preferably, after step S8, it further includes:
[0037] Step S9. Determine the layout spacing C4 of the extended system reference points according to the third continuous spacing C3 and the longest measurement line L: C4 ≤ min(2 * C3, L / 5);
[0038] Step S10. Determine the layout spacing C5 of the stable reference points according to the longest measurement line L: C5 ≤ min(5m, L / 3).
[0039] This application can meet the tooling measurement accuracy requirements and ensure the manufacturing accuracy of aircraft products. Brief Description of the Drawings
[0040] Figure 1 It is a layout diagram of each measurement point of a preferred embodiment of the large - size measurement field continuity design method based on the target accuracy of this application.
[0041] Wherein, 1 - tooling structure; 2 - system - building reference point; 3 - extended system reference point; 4 - stable reference point; 5 - measurement point; 6 - bottom plane; 7 - measurement station. Detailed Embodiment
[0042] In order to make the purpose, technical scheme and advantages of the implementation of this application clearer, the technical scheme in the implementation of this application will be described in more detail in combination with the drawings in the implementation of this application. In the drawings, the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The described implementation is a part of the implementation of this application, not all of the implementations. The implementation described below with reference to the drawings is exemplary and is intended to be used to explain this application, and cannot be understood as a limitation on this application. Based on the implementation in this application, all other implementations obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application. The implementation of this application is described in detail below in combination with the drawings.
[0043] The present application provides a method for designing the continuity of a large-scale measurement field based on target accuracy. The main purpose is to design the spacing between the measurement reference points of the continuous arrangement of the large-scale measurement field so that various types of measurement reference points can meet the tooling measurement accuracy requirements and ultimately ensure the manufacturing accuracy of aircraft products.
[0044] First reference Figure 1 , the tooling structure 1 and the measuring station 7 are set above the bottom plane 6; the system reference point 2, the expansion system reference point 3, and the stable reference point 4 are subdivided from the traditional measurement field ERS reference points according to their functions. Since their layout characteristics are similar, they are also used as part of the continuity design work. These reference points are arranged on the surface or bottom plane 6 of the tooling structure 1. Among them, the system reference point 2 is a reference point for compensating the stability of the measurement field establishment system with the smallest impact on the measurement accuracy within a certain spacing. According to domestic and foreign laser measurement scenarios, the conventional arrangement spacing is 0.3m~1.4m, and there are cases of large-size measurement spacing of 0.8m~10m. Figure 1 The China Construction System Reference Points 2 include 15 points in one horizontal row and 6 points in each of four vertical columns. The extended system reference points 3 are mainly used to increase the envelope of the reference coordinate system and meet the number of reference coordinate system reference points, and are transfer points used to improve the transfer accuracy. Figure 1 The middle and expanded system benchmark points 3 are determined according to the minimum number of system establishment points, which are no less than 7 measuring points in each of the 4 measuring stations, the minimum number of transfer station common points and the minimum range of related transfer station requirements. On the basis of the system establishment benchmark points 2, 2 to 4 expanded system benchmark points 3 are added to each station; the stable benchmark points 4 are measurement benchmark points for monitoring the stability of the tooling structure or foundation. The spacing between them is determined according to the deflection deformation calculation of the tooling structure or foundation and the required accuracy of the measurement field system. The stable benchmark points 4 are generally arranged on the upper surface of the foundation. According to the layout rules, their structures are evenly arranged in 2 rows and 11 columns from top to bottom; the system establishment benchmark points 2, the expanded system benchmark points 3 and the stable benchmark points 4 can overlap in some positions.
[0045] The purpose of the present application is to determine the spacing requirements between adjacent establishment reference points 2, the spacing between adjacent expansion reference points 3, and the spacing requirements between adjacent stable reference points 4, so as to arrange these reference points in the measurement field.
[0046] This application provides a large-scale measurement field continuity design method based on target accuracy, such as Figure 1 As shown, it mainly includes:
[0047] Step S1, calculating a first distance measurement under the required accuracy of the tooling according to the distance measurement accuracy parameter of the measuring device.
[0048] In this step, the ranging accuracy parameters include the ranging constant and the ranging coefficient. The ranging accuracy formula is usually expressed as: ranging accuracy = ranging constant + ranging coefficient * ranging. Taking a certain type of laser tracker as an example, its ranging constant is 15μm, and the ranging coefficient is 6μm. Substitute the tooling requirement accuracy σ=0.1mm as the ranging accuracy into the ranging accuracy formula, that is, 0.1mm=100μm=15μm+6μm*L1, and calculate the first ranging L1=14.16m of the measuring equipment in the station.
[0049] In this embodiment, the measurement range of each measuring device is represented by a circle. Figure 1 In the figure, the four circles represent the measurement ranges of the four measuring devices, and the center point of each circle is the measurement station 7 of the corresponding measuring device. The distance measurement usually refers to the size of the longest distance measurement line that the measuring device can cover. The distance measurement calculated in step S1 is not Figure 1 The final distance measurement is a maximum distance measurement, so the first distance measurement L1 is used here for representation, and it will be continuously corrected in subsequent steps.
[0050] Step S2: determine the minimum number of measuring devices according to the first distance measurement, and correct it to obtain the first number of measuring devices.
[0051] It can be understood that with the distance measurement of each measuring device, the number of measuring devices can be calculated according to the total required measurement size. In this embodiment, the total required measurement size can be represented by L, which is obtained by measuring the longest measurement line. The longest measurement line refers to the longest connecting line formed by the combination of the tooling structure model and the bottom plane model, and the connecting line extends along each coordinate axis parallel to the global coordinate system, and then the longest connecting line is projected on the bottom plane, such as Figure 1 As shown, the connection is Figure 1 The horizontal line segment in the middle of the middle rectangular frame, in this example, L=30m. This application needs to set up a measuring station 7 so that it can cover the measuring points 5 of all tooling structures 1 and can cover the longest measuring line L. This step is used to determine the number of measuring devices that meet the above-mentioned measurement requirement of covering the longest measuring line according to the ranging parameters of each measuring device.
[0052] In some optional implementations, step S2 further includes:
[0053] Step S21, calculating the minimum number of measuring devices along the longest measuring line of the tooling measuring field according to the first distance measurement. This step calculates the minimum number of measuring devices n by the following formula:
[0054] n=ρ1*L / L1; when σ≥0.1mm, ρ1≥1.1, when σ<0.1mm, ρ1≥1.2, in this embodiment, σ=0.1mm, therefore, ρ1 can be taken as 1.1. Substituting into the formula, we get n=2.53.
[0055] Step S22, based on the given transfer station error, correct the minimum number of measuring devices. In some optional implementations, in step S22, the correction coefficient ρ2=(σ1+σ) / σ, where σ1 is the transfer station error, and σ is the required tooling accuracy, for example, the aforementioned given σ=0.1mm, the transfer station error σ1 in this step is the initial given, for example, σ1=0.02mm. Thus, the correction coefficient ρ2=1.2 is obtained, and then the minimum number of measuring devices is corrected, and the corrected minimum number of measuring devices n1=ρ2*n =1.2*2.53=2.79.
[0056] Step S23: round up the corrected minimum number of measuring devices to obtain the first number of measuring devices.
[0057] In this step, the number of the first measuring devices n2=roundup(n1)=roundup(2.79)=3; wherein roundup is a round-up function.
[0058] Step S3: correct the first distance measurement according to the ratio of the minimum number of measuring stations to the number of the first measuring devices to obtain a second distance measurement.
[0059] It can be understood that since the number of the first measuring devices in step S2 changes relative to the minimum number of measuring devices, the first distance measurement will inevitably change. That is, based on the situation that the longest measuring line remains unchanged, the more measuring devices there are, the smaller the maximum distance measurement size can be. In this step, the first distance measurement L1 is corrected according to the ratio relationship from n=2.33 to n2=3, and finally the rounded second distance measurement L2=L1*n / n2=14.16*2.33 / 3=11m is obtained.
[0060] Step S4: Distribute the measuring devices evenly in the measuring field according to the first number of measuring devices, so that the measuring devices can cover the measuring points of each tooling structure to the maximum extent.
[0061] In this step, the coordinate axes close to the global coordinate system of the measurement system are used to envelop the tooling structure measurement point 5 to the maximum extent, and the measurement points are evenly distributed within the range of L=30m of the longest measurement line according to n2=3; that is, three measurement devices are arranged according to the actual situation.
[0062] Step S5: Correct the first number of measuring devices based on the distance between the measuring device and the longest measuring line to obtain the second number of measuring devices.
[0063] In this step, since the measuring devices arranged in step S4 are not necessarily completely located on the longest measuring line, they may be a certain distance away from the longest measuring line. As a result, the number of first measuring devices determined in step S2 cannot make all measuring devices completely cover the longest measuring line. Therefore, this step requires correction of the first measuring devices.
[0064] In some optional implementations, step S5 further includes:
[0065] Step S51: Determine the vertical distance between the measuring device and the longest measuring line according to the position of the measuring device actually arranged; Figure 1 , assuming that the vertical distance L3 is 4m.
[0066] Step S52, calculating a deviation correction coefficient according to the vertical distance and the second distance measurement; in this step, the deviation correction coefficient ρ2=2*[L3 2 +(L2 / 2) 2 ] 1 / 2 / L2, substituting the parameters into the deviation correction coefficient ρ2=1.23.
[0067] Step S53: Correct the first number of measuring devices according to the deviation correction coefficient, and round up to form the second number of measuring devices. In this step, the second number of devices n3 = roundup(ρ2*n2), and the second number of devices n3 = 4 can be obtained by substituting the parameters.
[0068] It can be seen that step S5 corrects the number of measuring devices from 3 to 4, such as Figure 1 As shown, the four circles represent the measurement coverage of the four measurement devices respectively.
[0069] Step S6: Correct the second distance measurement according to the ratio of the number of the first measuring devices to the number of the second measuring devices to obtain a third distance measurement.
[0070] The principle of this step is the same as that of step S3. The number of measuring devices has changed, and the maximum distance can be further reduced. In this step, the second distance L2 is corrected according to the ratio change from n2=3 to n3=4, and finally the third distance L4=L2*n2 / n3=11*3 / 4=8.25m is obtained after rounding.
[0071] Step S7, calculating the first continuous spacing of the system reference points on the longest measurement line according to the third distance measurement and the tooling required accuracy, and calculating the second continuous spacing of the system reference points on the longest measurement line according to the third distance measurement and its corresponding actual distance measurement accuracy.
[0072] In this step, after calculating the third distance measurement, it is necessary to lay out the system reference points on the longest measurement line. Step S7 is used to calculate the spacing of the system reference points that are continuously laid out.
[0073] In some optional implementations, step S7 further includes:
[0074] The first continuity spacing C1 is calculated according to the following formula:
[0075] C1=2.5*σ*L3; Substituting the parameters into the calculation, we get C1=2.5*0.1*8.25=2.06m.
[0076] The second continuity spacing C2 is calculated according to the following formula:
[0077] C2=40*(σ-σ2)+0.8;
[0078] Among them, σ is the required accuracy of the tooling, and σ2 is the actual distance measurement accuracy corresponding to the third distance measurement L4. The calculation formula of σ2 is the distance measurement accuracy formula, which has been described in step S1: distance measurement accuracy = distance measurement constant + distance measurement coefficient * distance measurement. After substituting the third distance measurement L4, σ2=15μm+6μm* L4=15μm+6μm*8.25=0.0645mm. Then substitute it into the formula of the second continuity spacing C2 to obtain C2=40*(0.1-0.0645)+0.8=2.22m.
[0079] In some optional embodiments, the second continuity interval C2 is further defined by a boundary:
[0080] When C2<0.3m, change C2 to 0.3m; when the longest ranging line length L<5m and C2>0.8m, change C2 to 0.8m; when 5m≤L<10m and C2>1.4m, change C2 to 1.4m; when L≥10m and C2>5m, change C2 to 5m.
[0081] In this embodiment, since the longest distance measurement line length L=30 and C2=2.22m, no boundary value limiting condition is involved, and finally C2 is still 2.22m.
[0082] Step S8, calculating the first continuity interval and the second continuity interval according to the longest measurement line to obtain a third continuity interval, and completing the layout of the system building reference points on the longest measurement line according to the third continuity interval.
[0083] In some alternative embodiments, step S8 further includes:
[0084] When L ≤ 10 m, the third continuity spacing C3 is set to: C3 ≤ min(C1, C2);
[0085] When 10 < L ≤ 20 m, the third continuity spacing C3 is set to: C3 ≤ (C1 + C2) / 2;
[0086] When L > 20 m, the third continuity spacing C3 is set to: C3 ≤ max(C1, C2).
[0087] In this embodiment, since L = 30 m > 20 m, then C3 ≤ max(C1, C2) = max(2.06, 2.22) = 2.22 m, that is Figure 1 in, the spacing between the coordinate system establishment reference points 2 on the longest measurement line cannot exceed 2.22 m.
[0088] In some alternative embodiments, after step S8, it further includes:
[0089] Step S9. Determine the layout spacing C4 of the extended coordinate system reference points according to the third continuity spacing C3 and the longest measurement line L: C4 ≤ min(2 * C3, L / 5); in this example, C4 ≤ min(2 * 2.22, 30 / 5) = 4.44 m.
[0090] Step S10. Determine the layout spacing C5 of the stable reference points according to the longest measurement line L: C5 ≤ min(5 m, L / 3); in this example, C5 ≤ min(5, 30 / 3) = 5 m.
[0091] According to the above calculations, the upper limit thresholds for the continuity design in the 30 m tooling measurement field embodiment in this embodiment can be obtained. The layout spacing of the coordinate system establishment reference points C3 ≤ 2.22 m, the layout spacing of the extended coordinate system reference points C4 ≤ 4.44 m, and the layout spacing of the stable reference points C5 ≤ 5 m. During the actual layout of the coordinate system establishment reference points, extended coordinate system reference points, and stable reference points, the layout spacing is downward compatible according to the specific structure of the tooling and the limit values.
[0092] The above is only the specific embodiment of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by those skilled in the art within the technical scope disclosed in the present application should be covered by the protection scope of the present application. Therefore, the protection scope of the present application should be subject to the protection scope of the claims.
Claims
1. A method for designing continuity of large-scale measurement field based on target accuracy, characterized in that: include: Step S1, calculating the first distance measurement under the required accuracy of the tooling according to the distance measurement accuracy parameter of the measuring equipment; Step S2, determining the minimum number of measuring devices according to the first distance measurement, and correcting it to obtain the first number of measuring devices; Step S3, correcting the first distance measurement according to the ratio of the minimum number of measuring devices to the first number of measuring devices to obtain a second distance measurement; Step S4, evenly distributing the measuring devices in the measuring field according to the number of the first measuring devices, so that the measuring devices can cover the measuring points of each tooling structure to the maximum extent; Step S5, correcting the first number of measuring devices based on the distance between the measuring device and the longest measuring line to obtain the second number of measuring devices; Step S6, correcting the second distance measurement according to the ratio of the number of the first measuring devices to the number of the second measuring devices to obtain a third distance measurement; Step S7, calculating the first continuous spacing of the system reference points on the longest measurement line according to the third distance measurement and the tooling required accuracy, and calculating the second continuous spacing of the system reference points on the longest measurement line according to the third distance measurement and its corresponding actual distance measurement accuracy; Step S8, calculating the first continuity interval and the second continuity interval according to the longest measurement line to obtain a third continuity interval, and completing the layout of the system building reference points on the longest measurement line according to the third continuity interval.
2. The large-scale measurement field continuity design method based on target accuracy as claimed in claim 1 is characterized in that: Step S2 further comprises: Step S21, calculating the minimum number of measuring devices along the longest measuring line of the tooling measuring field according to the first distance measurement; Step S22, correcting the minimum number of measuring devices based on a given transfer error; Step S23: round up the corrected minimum number of measuring devices to obtain the first number of measuring devices.
3. The large-scale measurement field continuity design method based on target accuracy as claimed in claim 2 is characterized in that: In step S22, the correction coefficient ρ2=(σ1+σ) / σ, where σ1 is the transfer error and σ is the required accuracy of the tooling.
4. The large-scale measurement field continuity design method based on target accuracy according to claim 1 is characterized in that: Step S5 further comprises: Step S51, determining the vertical distance between the measuring device and the longest measuring line according to the position of the measuring device actually arranged; Step S52, calculating a deviation correction coefficient according to the vertical distance and the second distance measurement; Step S53: correct the first number of measuring devices according to the deviation correction coefficient, and round it up to form the second number of measuring devices.
5. The large-scale measurement field continuity design method based on target accuracy according to claim 1 is characterized in that: Step S7 further comprises: The first continuity spacing C1 is calculated according to the following formula: C1=2.5*σ*L4; The second continuity spacing C2 is calculated according to the following formula: C2=40*(σ-σ2)+0.8; Among them, σ is the required accuracy of the tooling, and σ2 is the actual ranging accuracy corresponding to the third ranging L4.
6. The large-scale measurement field continuity design method based on target accuracy according to claim 5 is characterized in that: Further comprising defining a boundary for the second continuity spacing C2: When C2<0.3m, change C2 to 0.3m; when the longest ranging line length L<5m and C2>0.8m, change C2 to 0.8m; when 5m≤L<10m and C2>1.4m, change C2 to 1.4m; when L≥10m and C2>5m, change C2 to 5m.
7. The large-scale measurement field continuity design method based on target accuracy as claimed in claim 5 is characterized in that: Step S8 further comprises: When L≤10m, the third continuity interval C3 is set to: C3≤min(C1, C2); When 10 < L ≤ 20 m, the third continuity spacing C3 is set to: C3 ≤ (c1 + c2) / 2; When L > 20 m, the third continuity spacing C3 is set to: C3 ≤ max(C1, C2).
8. The large-scale measurement field continuity design method based on target accuracy according to claim 1 is characterized in that: After step S8, it further includes: Step S9. Determine the layout spacing C4 of the expansion system reference points according to the third continuity spacing C3 and the longest measurement line L: C4 ≤ min(2 * C3, L / 5); Step S10. Determine the layout spacing C5 of the stable reference points according to the longest measurement line L: C5 ≤ min(5 m, L / 3).