Railway mission inspection system and method based on geographic location information analysis
By calculating the railway task patrol difficulty index and reasonably allocating patrol personnel, the problem of difficulty in analyzing patrol difficulty in the existing technology is solved, and the patrol efficiency and safety are improved.
Patent Information
- Application Number
- CN202411121986.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-15
AI Technical Summary
The existing technology cannot effectively analyze the difficulty of railway mission inspection, resulting in the inability to reasonably match patrol personnel, reducing patrol efficiency and posing safety risks.
By obtaining railway line data, household data and drone flight area data, the household patrol difficulty index and drone invasion and damage index are calculated, combined with historical patrol data, the railway mission patrol difficulty index is calculated, and the inspectors are carried out according to the task matching index. Task assignment.
It improves the efficiency of railway mission patrols, maintains railway order and transportation safety, and reduces interference to railway operations due to drone flight.
Smart Images

Figure CN118644234B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data analysis, and in particular to a railway task inspection system and method based on geographic location information analysis. Background Art
[0002] Railway mission inspection is an important task to ensure railway safety and protect the lives and property of passengers and railway employees.
[0003] Among them, patrolling residents along the railway is an important part of the railway mission. It can ensure the safety of residents' lives along the railway, prevent and reduce railway safety accidents that may be caused by residents' activities, and maintain the cleanliness and order of the environment around the railway.
[0004] During the railway mission inspection, it is also particularly important to inspect the areas where drones are allowed to fly near the railway, because the railway contact network has a high voltage and a complex electromagnetic environment. Once a drone flies over the railway, it may interfere with the normal operation of the railway and cause safety hazards.
[0005] Therefore, due to the above conditions, the inspection of railway lines has become increasingly complicated. However, the existing technology is unable to analyze the difficulty of the inspection when conducting railway task inspections, and thus is unable to match appropriate personnel to inspection tasks based on the difficulty of the railway task inspections, which in turn leads to low efficiency in railway task inspections and poses certain risks to railway order and the safety and smoothness of railway transportation. Summary of the invention
[0006] In order to overcome the defects and shortcomings of the prior art, the present invention provides a railway task inspection system and method based on geographic location information analysis, which assigns tasks to all task inspectors in railway task inspection points through task matching indexes, improves the efficiency of railway task inspections, maintains railway order, and ensures safe and smooth railway transportation.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] The present invention provides a railway task inspection method based on geographical location information analysis, comprising the following steps:
[0009] S1. Obtain the railway line data, household data along the railway line, and drone flight area data within the area under the railway task inspection point; at the same time, obtain the historical inspection data of all task inspectors within the railway task inspection point;
[0010] S2. Calculating a household inspection difficulty index based on the railway line data and the household data along the railway line;
[0011] S3. Calculating the drone intrusion damage index according to the railway line data and the drone allowed flight area data;
[0012] S4. Calculating a railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and damage index;
[0013] S5. Calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and assign tasks to all task inspectors in the railway task inspection point according to the task matching index.
[0014] As a preferred technical solution, step S2 includes the following specific steps:
[0015] S21, extracting railway line data and household data along the railway line in the area under the responsibility of the railway task inspection point, wherein the railway line data includes all inspection section data in the area under the responsibility of the railway task inspection point divided by the railway task inspection point, and the inspection section data includes the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines in the inspection section, and the household data along the railway line includes the number of permanent residents along the railway line in all inspection sections in the area under the responsibility of the railway task inspection point;
[0016] S22. Substituting the inspection section data and the household data along the railway line into the household inspection difficulty index calculation formula to calculate the household inspection difficulty index of the i-th inspection section; the household inspection difficulty index calculation formula is:
[0017] ;
[0018] In the formula is the inspection difficulty index of residents in the i-th inspection section, is the railway line complexity index of the ith inspection section, Q is the number of inspection sections in the area that the railway task inspection point is responsible for, is the number of permanent residents along the railway line in the i-th inspection section, are the influence coefficient of line complexity and the influence coefficient of permanent population density, respectively, and i is any one from 1 to Q;
[0019] S23. The calculation formula of the railway line complexity index of the i-th inspection section is:
[0020] ;
[0021] In the formula They are respectively the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines in the i-th inspection section.
[0022] As a preferred technical solution, step S3 includes the following specific steps:
[0023] S31, extracting railway line data and drone permitted flight area data within the area responsible for the railway mission inspection point, wherein the drone permitted flight area data includes the number of drone permitted flight areas within all inspection sections within the area responsible for the railway mission inspection point, the area of all drone permitted flight areas, and the shortest distance between all drone permitted flight areas and railway lines within the inspection section;
[0024] S32, substituting the railway line data and the drone allowed flight area data into the drone intrusion damage index calculation formula to calculate the drone intrusion damage index of the i-th patrol section; the drone intrusion damage index calculation formula is:
[0025] ;
[0026] In the formula is the UAV intrusion damage index of the i-th patrol section, is the area of the jth drone’s allowed flight area in the i-th patrol section, is the shortest distance between the jth UAV allowed flight area in the i-th inspection section and the railway line in the i-th inspection section, , are the maximum and minimum values of the total area of the allowed flight area for all drones in each of the Q patrol sections calculated, respectively. , are the maximum and minimum values of the sum of the shortest distances between all drone-permitted flight areas in each of the Q inspection sections and the corresponding railway lines in the inspection section, j is any item from 1 to K, K is the number of drone-permitted flight areas in the i-th inspection section, They represent the influence coefficient of UAV inspection area and the influence coefficient of UAV inspection distance respectively.
[0027] As a preferred technical solution, step S4 includes the following specific steps:
[0028] S41, obtaining the calculated resident inspection difficulty index and drone intrusion damage index of the i-th inspection section;
[0029] S42. Substituting the household inspection difficulty index and the drone intrusion and destruction index into the railway task inspection difficulty index calculation formula to calculate the railway task inspection difficulty index of the i-th inspection section, the railway task inspection difficulty index calculation formula is:
[0030] ;
[0031] In the formula represents the railway task inspection difficulty index of the i-th inspection section, They represent the impact coefficient of resident inspection and the impact coefficient of drone inspection respectively.
[0032] As a preferred technical solution, the calculation of the task matching index of all task inspectors in step S5 includes the following specific steps:
[0033] S51, extracting the historical inspection data of all task inspectors in the railway task inspection point and the calculated railway task inspection difficulty index of the i-th inspection section, wherein the historical inspection data includes the historical inspection times of the task inspectors and the duration of each historical inspection, and obtaining the railway task inspection difficulty index corresponding to the inspection section of each historical inspection;
[0034] S52, substituting the historical inspection data and the railway task inspection difficulty index into the task matching index calculation formula to calculate the task matching index, the task matching index calculation formula is:
[0035] ;
[0036] Where P represents the task matching index, H represents the historical inspection times of the task inspector, It represents the railway task inspection difficulty index corresponding to the inspection section of the h-th historical inspection by the task inspector. Indicates the duration of the hth historical inspection of the task inspector, where h is any item from 1 to H.
[0037] As a preferred technical solution, the step S5 allocates tasks to all task inspectors in the railway task inspection point according to the task matching index, including:
[0038] Obtain the task matching indexes of all task inspectors performing railway task inspection in the ith inspection section, preset the task matching standard value of the ith inspection section, compare the task matching indexes of all task inspectors performing railway task inspection in the ith inspection section with the task matching standard value of the ith inspection section, obtain the task matching index with the smallest difference from the task matching standard value of the ith inspection section, and assign the task inspector corresponding to the task matching index with the smallest difference from the task matching standard value of the ith inspection section to the ith inspection section for railway task inspection.
[0039] The present invention also provides a railway task inspection system based on geographical location information analysis, comprising:
[0040] The data acquisition module is used to obtain the railway line data, the household data along the railway line, and the data of the drone allowed flight area within the area responsible for the railway task inspection point; at the same time, it obtains the historical inspection data of all task inspectors in the railway task inspection point;
[0041] A household inspection difficulty index calculation module, used to calculate the household inspection difficulty index based on the railway line data and the household data along the railway line;
[0042] A drone intrusion damage index calculation module, used to calculate the drone intrusion damage index based on the railway line data and the drone allowed flight area data;
[0043] A railway task inspection difficulty index calculation module, used to calculate the railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and damage index;
[0044] A railway task allocation module, used to calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and to allocate tasks to all task inspectors in the railway task inspection point according to the task matching index;
[0045] A control module is used to control the operation of the data acquisition module, the household inspection difficulty index calculation module, the drone intrusion and destruction index calculation module, the railway task inspection difficulty index calculation module and the railway task allocation module.
[0046] An electronic device of the present invention comprises: a processor and a memory, wherein the memory stores a computer program that can be called by the processor, and the processor executes a railway task inspection method based on geographic location information analysis by calling the computer program stored in the memory.
[0047] A computer-readable storage medium of the present invention stores instructions, and when the instructions are executed on a computer, the computer is enabled to execute a railway task inspection method based on geographic location information analysis.
[0048] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0049] The present invention calculates a household inspection difficulty index through railway line data and household data along the railway line; calculates a drone intrusion and destruction index according to railway line data and drone allowed flight area data; calculates a railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and destruction index; calculates a task matching index of all task inspectors according to the railway task inspection difficulty index and historical inspection data, and assigns tasks to all task inspectors in railway task inspection points according to the task matching index, thereby improving railway task inspection efficiency, maintaining railway order, and ensuring safe and smooth railway transportation. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0051] Figure 1 It is a schematic diagram of the overall process of the railway task inspection method based on geographical location information analysis of the present invention;
[0052] Figure 2 It is a structural schematic diagram of the railway mission inspection system based on geographic location information analysis of the present invention. DETAILED DESCRIPTION
[0053] The technical solution of the present invention is described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of the present invention and the specific features in the embodiments are detailed descriptions of the technical solution of the present invention, rather than limitations on the technical solution of the present invention. The embodiments of the present invention and the technical features in the embodiments may be combined with each other unless there is a conflict.
[0054] Example 1
[0055] like Figure 1 As shown, this embodiment provides a railway task inspection method based on geographic location information analysis, which specifically includes the following steps:
[0056] S1. Obtain the railway line data, household data along the railway line, and drone flight area data within the area under the railway task inspection point; at the same time, obtain the historical inspection data of all task inspectors within the railway task inspection point;
[0057] S2. Calculating a household inspection difficulty index based on the railway line data and the household data along the railway line;
[0058] The calculation of the resident inspection difficulty index includes the following specific steps:
[0059] S21. Extract the railway line data and household data along the railway line in the area under the responsibility of the railway task inspection point. The railway line data includes all inspection section data in the area under the responsibility of the railway task inspection point divided by the railway task inspection point. The inspection section data includes the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines in the inspection section. The household data along the railway line includes the number of permanent residents along the railway lines in all inspection sections in the area under the responsibility of the railway task inspection point; wherein the railway main line refers to the line connecting the station and passing through or extending directly into the station. The main line plays a vital role in transportation and is the main channel for train operation. The railway main line can be divided into the section main line and the station main line. The part connecting the station is the section main line, and the part passing through or extending directly into the station is the station main line. The main line is usually directly connected to the section line outside the station without using turnouts. Railway station line refers to the general term for other railway lines within the scope of the railway station except the main line. The railway station line includes the arrival and departure line: used to receive and dispatch passenger cars and freight cars, the shunting line: used for handling the dismantling, assembly and marshaling of freight trains, the pull-out line: used to pull out the vehicle during shunting operations, the loading and unloading line: used for the trucks to stop for cargo loading and unloading operations, the cargo line: used for cargo loading and unloading and storage, and other lines for designated purposes in the station: such as locomotive running lines, vehicle station repair lines, etc. Railway section pipelines refer to lines that are dedicated and managed by sections such as locomotive, vehicle, engineering, electrical, and power supply. They are usually used for specific operations and vehicle management in their respective sections, such as the locomotive preparation line of the locomotive section, and the line used for vehicle maintenance operations in the vehicle section. Railway branch lines refer to dedicated lines that connect to the track in the section or station and lead to units inside and outside the road. The railway branch line directly serves external units such as factories and mines. In this embodiment, the purpose line is a railway special purpose line, which includes a safety line and a refuge line. The safety line is a dead end line set to prevent trains or locomotives and vehicles from entering another train running line, or passing the warning mark to enter the section when entering the station. Its effective length is generally not less than 50 meters, and no downhill slope should be used in the direction of the vehicle. The refuge line is a line set up according to the line conditions to prevent the train that loses control on the steep and long slope from colliding or overturning. The refuge line is generally designed with a large ascending slope to slow down the speed of the out-of-control train. Therefore, according to the differences in the lines in various areas along the railway, it is necessary to fully analyze and calculate the main line, station line, section pipeline, branch line, and special-purpose line in order to more accurately calculate the railway line complexity index.
[0060] S22. Substituting the inspection section data and the household data along the railway line into the household inspection difficulty index calculation formula to calculate the household inspection difficulty index of the i-th inspection section; the household inspection difficulty index calculation formula is:
[0061] ;
[0062] In the formula is the inspection difficulty index of residents in the i-th inspection section, is the railway line complexity index of the ith inspection section, Q is the number of inspection sections in the area that the railway task inspection point is responsible for, is the number of permanent residents along the railway line in the i-th inspection section, are the influence coefficient of line complexity and the influence coefficient of permanent population density, respectively, which are set by technicians in this field according to actual needs; i is any one from 1 to Q;
[0063] S23. The calculation formula of the railway line complexity index of the i-th inspection section is:
[0064] ;
[0065] In the formula They are respectively the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines in the i-th inspection section.
[0066] S3. Calculating the drone intrusion damage index according to the railway line data and the drone allowed flight area data;
[0067] The area within 500 meters around the railway power line is a no-fly zone for drones. This is because the voltage of the railway contact network is high and the electromagnetic environment is complex, and drone flights may be disturbed, causing safety hazards. At the same time, once a drone collides with a high-speed train or high-voltage line, the consequences will be disastrous. According to the "Interim Regulations on the Management of Unmanned Aerial Vehicle Flight" and other laws and regulations, airspaces above 120 meters in true altitude, air restricted areas, air restricted areas and surrounding airspaces, military aviation ultra-low-altitude flight airspaces, airports and surrounding areas, military restricted areas, important revolutionary memorial sites and other areas are also set as controlled airspaces, and drone flights must be applied for and approved in advance. However, for micro, light, and small unmanned aerial vehicles, the true altitude below 120 meters (except for controlled airspace) is suitable for flying airspace, and they can fly freely without submitting flight activity applications. This brings great risks to the normal operation of the railway. Once a drone flies to the railway, it may interfere with the normal operation of the railway and cause safety hazards. Therefore, when conducting railway task inspections, it is also necessary to calculate the drone intrusion and destruction index to assign appropriate inspectors to the drone-allowed flight areas along the railway for careful inspections. Calculating the drone intrusion damage index includes the following specific steps:
[0068] S31, extracting railway line data and drone permitted flight area data within the area responsible for the railway mission inspection point, wherein the drone permitted flight area data includes the number of drone permitted flight areas within all inspection sections within the area responsible for the railway mission inspection point, the area of all drone permitted flight areas, and the shortest distance between all drone permitted flight areas and railway lines within the inspection section;
[0069] S32, substituting the railway line data and the drone allowed flight area data into the drone intrusion damage index calculation formula to calculate the drone intrusion damage index of the i-th patrol section; the drone intrusion damage index calculation formula is:
[0070] ;
[0071] In the formula is the UAV intrusion damage index of the i-th patrol section, is the area of the jth drone’s allowed flight area in the i-th patrol section, is the shortest distance between the jth UAV allowed flight area in the i-th inspection section and the railway line in the i-th inspection section, , are the maximum and minimum values of the total area of the allowed flight area for all drones in each of the Q patrol sections calculated, respectively. , are the maximum and minimum values of the sum of the shortest distances between all drone-permitted flight areas in each of the Q inspection sections and the corresponding railway lines in the inspection section, j is any item from 1 to K, K is the number of drone-permitted flight areas in the i-th inspection section, They respectively represent the influence coefficient of the UAV inspection area and the influence coefficient of the UAV inspection distance, and are set by technical personnel in this field according to actual needs.
[0072] S4. Calculating a railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and damage index;
[0073] Calculating the railway task inspection difficulty index includes the following specific steps:
[0074] S41, obtaining the calculated resident inspection difficulty index and drone intrusion damage index of the i-th inspection section;
[0075] S42. Substituting the household inspection difficulty index and the drone intrusion and destruction index into the railway task inspection difficulty index calculation formula to calculate the railway task inspection difficulty index of the i-th inspection section, the railway task inspection difficulty index calculation formula is:
[0076] ;
[0077] In the formula represents the railway task inspection difficulty index of the i-th inspection section, They respectively represent the resident inspection impact coefficient and the drone inspection impact coefficient, and are set by technical personnel in this field according to actual needs.
[0078] S5. Calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and assign tasks to all task inspectors in the railway task inspection point according to the task matching index.
[0079] Calculating the task matching index of all task inspectors includes the following specific steps:
[0080] S51, extracting the historical inspection data of all task inspectors in the railway task inspection point and the calculated railway task inspection difficulty index of the i-th inspection section, wherein the historical inspection data includes the historical inspection times of the task inspectors and the duration of each historical inspection, and obtaining the railway task inspection difficulty index corresponding to the inspection section of each historical inspection;
[0081] S52, substituting the historical inspection data and the railway task inspection difficulty index into the task matching index calculation formula to calculate the task matching index, the task matching index calculation formula is:
[0082] ;
[0083] Where P represents the task matching index, H represents the historical inspection times of the task inspector, It represents the railway task inspection difficulty index corresponding to the inspection section of the h-th historical inspection by the task inspector. Indicates the duration of the hth historical inspection of the task inspector, where h is any item from 1 to H.
[0084] The task matching index is used to allocate tasks to all task inspectors in the railway task inspection point, including:
[0085] Obtain task matching indexes of all task inspectors performing railway task inspection in the ith inspection section, preset a task matching standard value for the ith inspection section, compare the task matching indexes of all task inspectors performing railway task inspection in the ith inspection section with the task matching standard value for the ith inspection section, obtain the task matching index with the smallest difference from the task matching standard value for the ith inspection section, and assign the task inspector corresponding to the task matching index with the smallest difference from the task matching standard value for the ith inspection section to the ith inspection section for railway task inspection; wherein the task matching standard value for the ith inspection section is set by technical personnel in this field according to the specific circumstances of the inspection section.
[0086] Example 2
[0087] like Figure 2 As shown, this embodiment provides a railway task inspection system based on geographic location information analysis, including:
[0088] The data acquisition module is used to obtain the railway line data, the household data along the railway line, and the data of the drone allowed flight area within the area responsible for the railway task inspection point; at the same time, it obtains the historical inspection data of all task inspectors in the railway task inspection point;
[0089] A household inspection difficulty index calculation module, used to calculate the household inspection difficulty index based on the railway line data and the household data along the railway line;
[0090] A drone intrusion damage index calculation module, used to calculate the drone intrusion damage index based on the railway line data and the drone allowed flight area data;
[0091] A railway task inspection difficulty index calculation module, used to calculate the railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and damage index;
[0092] A railway task allocation module, used to calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and to allocate tasks to all task inspectors in the railway task inspection point according to the task matching index;
[0093] A control module is used to control the operation of the data acquisition module, the household inspection difficulty index calculation module, the drone intrusion and destruction index calculation module, the railway task inspection difficulty index calculation module and the railway task allocation module.
[0094] In this embodiment, the household inspection difficulty index calculation module is used to calculate the household inspection difficulty index according to the railway line data and the household data along the railway line. The specific steps of calculating the household inspection difficulty index include:
[0095] Extract railway line data and household data along the railway line within the area under the responsibility of the railway task inspection point, the railway line data includes all inspection section data within the area under the responsibility of the railway task inspection point divided by the railway task inspection point, the inspection section data includes the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines within the inspection section, and the household data along the railway line includes the number of permanent residents along the railway line in all inspection sections within the area under the responsibility of the railway task inspection point;
[0096] Substitute the inspection section data and the household data along the railway line into the household inspection difficulty index calculation formula to calculate the household inspection difficulty index of the i-th inspection section; the household inspection difficulty index calculation formula is:
[0097] ;
[0098] In the formula is the inspection difficulty index of residents in the i-th inspection section, is the railway line complexity index of the ith inspection section, Q is the number of inspection sections in the area that the railway task inspection point is responsible for, is the number of permanent residents along the railway line in the i-th inspection section, are the influence coefficient of line complexity and the influence coefficient of permanent population density, respectively, and i is any one from 1 to Q;
[0099] The calculation formula of the railway line complexity index of the i-th inspection section is:
[0100] ;
[0101] In the formula They are respectively the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines in the i-th inspection section.
[0102] In this embodiment, the drone intrusion damage index calculation module is used to calculate the drone intrusion damage index according to the railway line data and the drone allowed flight area data. The specific steps of calculating the drone intrusion damage index include:
[0103] Extracting railway line data and drone permitted flight area data within the area under the responsibility of the railway mission inspection point, wherein the drone permitted flight area data includes the number of drone permitted flight areas within all inspection sections within the area under the responsibility of the railway mission inspection point, the area of all drone permitted flight areas, and the shortest distance between all drone permitted flight areas and railway lines within the inspection section;
[0104] Substitute the railway line data and the drone allowed flight area data into the drone intrusion damage index calculation formula to calculate the drone intrusion damage index of the i-th patrol section; the drone intrusion damage index calculation formula is:
[0105] ;
[0106] In the formula is the UAV intrusion damage index of the i-th patrol section, is the area of the jth drone’s allowed flight area in the i-th patrol section, is the shortest distance between the jth UAV allowed flight area in the i-th inspection section and the railway line in the i-th inspection section, , are the maximum and minimum values of the total area of the allowed flight area for all drones in each of the Q patrol sections calculated, respectively. , are the maximum and minimum values of the sum of the shortest distances between all drone-permitted flight areas in each of the Q inspection sections and the corresponding railway lines in the inspection section, j is any item from 1 to K, K is the number of drone-permitted flight areas in the i-th inspection section, They represent the influence coefficient of UAV inspection area and the influence coefficient of UAV inspection distance respectively.
[0107] In this embodiment, the railway task inspection difficulty index calculation module is used to calculate the railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion damage index. The specific steps of calculating the railway task inspection difficulty index include:
[0108] Obtain the calculated resident inspection difficulty index and drone intrusion damage index of the i-th inspection section;
[0109] Substitute the household inspection difficulty index and the drone intrusion and destruction index into the railway task inspection difficulty index calculation formula to calculate the railway task inspection difficulty index of the i-th inspection section. The railway task inspection difficulty index calculation formula is:
[0110] ;
[0111] In the formula It represents the railway task inspection difficulty index of the ith inspection section, and represents the impact coefficient of residents’ inspection and the impact coefficient of drone inspection respectively.
[0112] In this embodiment, the railway task allocation module is used to calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and to allocate tasks to all task inspectors in the railway task inspection point according to the task matching index. Calculating the task matching index includes the following specific steps:
[0113] Extract the historical inspection data of all task inspectors in the railway task inspection point and the calculated railway task inspection difficulty index of the i-th inspection section, wherein the historical inspection data includes the historical inspection times of the task inspectors and the duration of each historical inspection, and obtain the railway task inspection difficulty index corresponding to the inspection section of each historical inspection;
[0114] Substituting the historical inspection data and the railway task inspection difficulty index into the task matching index calculation formula to calculate the task matching index, the task matching index calculation formula is:
[0115] ;
[0116] Where P represents the task matching index, H represents the historical inspection times of the task inspector, It represents the railway task inspection difficulty index corresponding to the inspection section of the h-th historical inspection by the task inspector. Indicates the duration of the hth historical inspection of the task inspector, where h is any item from 1 to H.
[0117] The task matching index is used to allocate tasks to all task inspectors in the railway task inspection point, including:
[0118] Obtain task matching indexes of all task inspectors performing railway task inspection in the ith inspection section, preset a task matching standard value for the ith inspection section, compare the task matching indexes of all task inspectors performing railway task inspection in the ith inspection section with the task matching standard value for the ith inspection section, obtain the task matching index with the smallest difference from the task matching standard value for the ith inspection section, and assign the task inspector corresponding to the task matching index with the smallest difference from the task matching standard value for the ith inspection section to the ith inspection section for railway task inspection; wherein the task matching standard value for the ith inspection section is set by technical personnel in this field according to the specific circumstances of the inspection section.
[0119] The above-mentioned parameters and steps for each unit module to implement corresponding functions in the railway mission inspection system based on geographic location information analysis of the present invention can refer to the parameters and steps in the embodiment of the railway mission inspection method based on geographic location information analysis above, and will not be repeated here.
[0120] Example 3
[0121] A computer-readable storage medium according to an embodiment of the present invention stores a computer program thereon, and when the computer program is executed by a processor, the above-mentioned railway task inspection method based on geographic location information analysis is implemented. It should be noted that all computer programs of the railway task inspection method based on geographic location information analysis are implemented using C language, wherein the data acquisition module, the household inspection difficulty index calculation module, the drone intrusion and damage index calculation module, the railway task inspection difficulty index calculation module, the railway task allocation module and the control module are all controlled by a remote server.
[0122] Example 4
[0123] This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;
[0124] When the computer program runs on a computer device, the computer device executes the above-mentioned railway task inspection method based on geographic location information analysis.
[0125] For example, the computer readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
Claims
1. A railway task inspection method based on geographic location information analysis, characterized in that: The steps include: S1. Obtain the railway line data, household data along the railway line, and drone flight area data within the area under the railway task inspection point; at the same time, obtain the historical inspection data of all task inspectors within the railway task inspection point; S2. Calculating a household inspection difficulty index based on the railway line data and the household data along the railway line; S3. Calculating the drone intrusion damage index according to the railway line data and the drone allowed flight area data; S4. Calculating a railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and damage index; S5. Calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and assign tasks to all task inspectors in the railway task inspection point according to the task matching index; The step S2 comprises the following specific steps: S21, extracting railway line data and household data along the railway line in the area under the responsibility of the railway task inspection point, wherein the railway line data includes all inspection section data in the area under the responsibility of the railway task inspection point divided by the railway task inspection point, and the inspection section data includes the number of railway main lines, station lines, section pipelines, branch lines, and purpose lines in the inspection section, and the household data along the railway line includes the number of permanent residents along the railway line in all inspection sections in the area under the responsibility of the railway task inspection point; S22. Substituting the inspection section data and the household data along the railway line into the household inspection difficulty index calculation formula to calculate the household inspection difficulty index of the i-th inspection section; the household inspection difficulty index calculation formula is: ; In the formula is the inspection difficulty index of residents in the i-th inspection section, is the railway line complexity index of the ith inspection section, Q is the number of inspection sections in the area that the railway task inspection point is responsible for, is the number of permanent residents along the railway line in the i-th inspection section, are the influence coefficient of line complexity and the influence coefficient of permanent population density, respectively, and i is any one from 1 to Q; S23. The calculation formula of the railway line complexity index of the i-th inspection section is: ; In the formula are the number of railway main lines, station lines, section lines, branch lines, and purpose lines in the i-th inspection section; The step S3 comprises the following specific steps: S31, extracting railway line data and drone permitted flight area data within the area responsible for the railway mission inspection point, wherein the drone permitted flight area data includes the number of drone permitted flight areas within all inspection sections within the area responsible for the railway mission inspection point, the area of all drone permitted flight areas, and the shortest distance between all drone permitted flight areas and railway lines within the inspection section; S32, substituting the railway line data and the drone allowed flight area data into the drone intrusion damage index calculation formula to calculate the drone intrusion damage index of the i-th patrol section; the drone intrusion damage index calculation formula is: ; In the formula is the UAV intrusion damage index of the i-th patrol section, is the area of the jth drone’s allowed flight area in the i-th patrol section, is the shortest distance between the jth UAV allowed flight area in the i-th inspection section and the railway line in the i-th inspection section, , are the maximum and minimum values of the total area of the allowed flight area for all drones in each of the Q patrol sections calculated, respectively. , are the maximum and minimum values of the sum of the shortest distances between all drone-permitted flight areas in each of the Q inspection sections and the corresponding railway lines in the inspection section, j is any item from 1 to K, K is the number of drone-permitted flight areas in the i-th inspection section, They represent the influence coefficient of the UAV inspection area and the influence coefficient of the UAV inspection distance respectively; The step S4 comprises the following specific steps: S41, obtaining the calculated resident inspection difficulty index and drone intrusion damage index of the i-th inspection section; S42. Substituting the household inspection difficulty index and the drone intrusion and destruction index into the railway task inspection difficulty index calculation formula to calculate the railway task inspection difficulty index of the i-th inspection section, the railway task inspection difficulty index calculation formula is: ; In the formula represents the railway task inspection difficulty index of the i-th inspection section, They represent the impact coefficient of residents’ inspection and the impact coefficient of drone inspection respectively; Calculating the task matching index of all task inspectors in step S5 includes the following specific steps: S51, extracting the historical inspection data of all task inspectors in the railway task inspection point and the calculated railway task inspection difficulty index of the i-th inspection section, wherein the historical inspection data includes the historical inspection times of the task inspectors and the duration of each historical inspection, and obtaining the railway task inspection difficulty index corresponding to the inspection section of each historical inspection; S52, substituting the historical inspection data and the railway task inspection difficulty index into the task matching index calculation formula to calculate the task matching index, the task matching index calculation formula is: ; Where P represents the task matching index, H represents the historical inspection times of the task inspector, It represents the railway task inspection difficulty index corresponding to the inspection section of the h-th historical inspection by the task inspector. Indicates the duration of the hth historical inspection of the task inspector, where h is any one of 1 to H; The step S5 of allocating tasks to all task inspectors in the railway task inspection point according to the task matching index includes: Obtain the task matching indexes of all task inspectors performing railway task inspection in the ith inspection section, preset the task matching standard value of the ith inspection section, compare the task matching indexes of all task inspectors performing railway task inspection in the ith inspection section with the task matching standard value of the ith inspection section, obtain the task matching index with the smallest difference from the task matching standard value of the ith inspection section, and assign the task inspector corresponding to the task matching index with the smallest difference from the task matching standard value of the ith inspection section to the ith inspection section for railway task inspection.
2. A railway task inspection system based on geographic location information analysis, which is implemented based on the railway task inspection method based on geographic location information analysis described in claim 1, and is characterized in that: The system comprises: The data acquisition module is used to obtain the railway line data, the household data along the railway line, and the data of the drone allowed flight area within the area responsible for the railway task inspection point; at the same time, it obtains the historical inspection data of all task inspectors in the railway task inspection point; A household inspection difficulty index calculation module, used to calculate the household inspection difficulty index based on the railway line data and the household data along the railway line; A drone intrusion damage index calculation module, used to calculate the drone intrusion damage index based on the railway line data and the drone allowed flight area data; A railway task inspection difficulty index calculation module, used to calculate the railway task inspection difficulty index according to the household inspection difficulty index and the drone intrusion and damage index; A railway task allocation module, used to calculate the task matching index of all task inspectors according to the railway task inspection difficulty index and the historical inspection data, and to allocate tasks to all task inspectors in the railway task inspection point according to the task matching index; A control module is used to control the operation of the data acquisition module, the household inspection difficulty index calculation module, the drone intrusion and destruction index calculation module, the railway task inspection difficulty index calculation module and the railway task allocation module.
3. An electronic device, comprising: A processor and a memory, wherein the memory stores a computer program that can be called by the processor; and characterized in that the processor executes the railway task inspection method based on geographic location information analysis as described in claim 1 by calling the computer program stored in the memory.
4. A computer-readable storage medium, characterized in that: Instructions are stored, and when the instructions are executed on a computer, the computer is caused to execute the railway task inspection method based on geographic location information analysis as claimed in claim 1.
Citation Information
Patent Citations
Railway line inspection method
CN105551108A
Method and system for mobilizing unmanned aerial vehicle in inspection area
CN107703971A