A method and system for rapid power regulation of impulse turbine generator set
By comparing the output power and reference power of the water turbine generator set in real time, and using the folding gear and needle control system to quickly adjust the water flow rate, the problem of slow power adjustment speed of the traditional impact turbine generator set is solved, and the rapid and efficient Power regulation enhances the stability of the new power system.
Patent Information
- Application Number
- CN202411144639.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-20
AI Technical Summary
The power regulation speed of traditional impact hydrowheel generator sets is slow and cannot meet the demand for fast peak and frequency regulation in new power systems.
By obtaining the deviation value of the output power of the water turbine generator set in real time and the preset reference power, the folding control system and the needle injection control system jointly adjust the opening degree of the folding gear and needle injection to achieve rapid adjustment of the water flow rate, thereby quickly Adjust power.
The power response speed of the impact hydropower generator set is improved, power fluctuations are suppressed, the stability of the new power system is enhanced, and the requirements of new energy to quickly adjust power.
Smart Images

Figure CN118653953B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy and power generation, and in particular to a method and system for quickly adjusting the power of an impulse turbine generator set. Background Art
[0002] Traditional impulse turbines mainly have two regulating mechanisms, including a needle and a deflector. The needle plays the role of regulating the jet. By adjusting the size of the jet, the needle controls the flow rate of the turbine runner, thereby controlling the output of the hydro-generator. The deflector plays the role of rapid shutdown and rapid cut-in, and is mainly used to control the start and stop of the turbine. However, under this regulation method, since the action time of the needle is usually slow (15~30s), the power regulation speed of the unit will also be slow, which is not conducive to the hydro-generator unit to play the role of rapid peak regulation and frequency regulation in the new power system. Summary of the invention
[0003] The embodiment of the present invention solves the problem that the prior art cannot realize rapid adjustment of the output power of the hydraulic turbine set by providing a method and system for rapid adjustment of the power of the hydraulic turbine set.
[0004] In order to achieve the above object, the technical solution of the embodiment of the present invention is:
[0005] In a first aspect, an embodiment of the present invention provides a method for rapid power regulation of an impulse turbine generator set, comprising: acquiring the output power of the impulse turbine generator set in real time, and comparing it with a preset reference power to determine a first deviation value between the output power and the reference power; based on the first deviation value, determining and controlling the opening of the deflector through a deflector control system; increasing the reference power by a preset margin as the input of a needle control system, and determining the reference opening of the needle according to a functional relationship between the preset reference power and the needle opening; and adjusting the opening of the needle through the needle control system based on the reference opening.
[0006] In some possible implementations, based on the first deviation value, the opening of the diverter is determined and controlled by the diverter control system, including: inputting the first deviation value into the PID controller of the diverter control system, calculating through the PID controller to obtain a control signal of the diverter; transmitting the control signal to the first servo system of the diverter control system, and converting the control signal into the opening of the diverter through the first servo system.
[0007] In some possible implementations, the value of the preset margin is determined according to predicted grid regulation requirements.
[0008] In some possible implementations, the spray needle control system controls the opening of the spray needle through a second servo system.
[0009] In some possible implementations, the opening of the nozzle is adjusted in real time by a nozzle control system based on a reference opening, including: acquiring the opening of the nozzle in real time and comparing it with the reference opening to obtain a second deviation value of the nozzle opening; and adjusting the opening of the nozzle in real time by a second servo system based on the second deviation value.
[0010] In the second aspect, an embodiment of the present invention provides a rapid power regulation system for an impulse turbine generator set for implementing the method of the first aspect, comprising: a power measuring unit for measuring the actual output power of the turbine generator set in real time; a deflector control unit comprising a PID controller and a first servo system; the PID controller is connected to the power measuring unit, for receiving a first deviation value between the actual output power and the reference power, and calculating a control signal for the deflector according to the first deviation value; the first servo system is connected to the PID controller, for receiving and executing a control signal to control the opening of the deflector; a nozzle control unit comprising a second servo system, the second servo system being used to determine a reference opening of the nozzle according to the reference power after increasing a preset margin, and to control the opening of the nozzle based on the reference opening.
[0011] One or more technical solutions provided in the embodiments of the present invention have at least the following technical effects or advantages:
[0012] In the embodiment of the present invention, the output power of the impulse turbine generator set is obtained in real time, and compared with the preset reference power to determine the first deviation value between the output power and the reference power; based on the first deviation value, the opening of the deflector is determined and controlled by the deflector control system; the reference power is increased by a preset margin as the input of the needle control system, and the reference opening of the needle is determined according to the preset functional relationship between the power and the needle opening; based on the reference opening, the needle opening is adjusted by the needle control system. In this way, the flow entering the impulse runner is quickly changed by utilizing the characteristics of the deflector being able to quickly cut in or out of the jet and partially or completely deflect the direction of the jet, while adjusting the opening of the needle to ensure the hydraulic efficiency of the unit, thereby quickly and efficiently adjusting the power of the impulse turbine generator set. In addition, the present invention can effectively improve the power response speed of the impulse turbine generator set, greatly increase the stability of the new power system based on new energy, and meet the requirements of rapid power regulation of new energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present invention, the accompanying drawings required for use in the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0014] Figure 1A schematic flow chart of an embodiment of a method for rapid power regulation of an impulse turbine generator set provided for the implementation of the present invention;
[0015] Figure 2 Schematic diagram of the working process of the deflector in the embodiment of the present invention;
[0016] Figure 3 A control strategy diagram of a method for rapid power regulation of an impulse turbine generator set in an embodiment of the present invention;
[0017] Figure 4 A schematic diagram showing a comparison of power changes in adjusting the output power of a hydropower unit by the method of an embodiment of the present invention and the prior art method;
[0018] Figure 5 The present invention is a schematic diagram of the structure of a rapid power regulation system for an impulse turbine generator set in an embodiment of the present invention. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] In the relevant description of this embodiment, the terms "including, containing, having" and the like are open terms and are generally understood to include but not be limited to; the term "at least one" is generally understood to mean one or more, where "plurality" refers to two or more; the term "at least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items, for example, "at least one of a, b or c", or "at least one of a, b and c", can all represent: a, b, c, ab (i.e., a and b), ac, bc, or abc, where a, b, c can be single or multiple, respectively; the symbol "A / B" is used to describe the selection relationship of associated objects, generally indicating an "or" relationship before and after.
[0021] In the following description of the present embodiment, the terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "an" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0022] Those skilled in the art should understand that in the following description of the embodiments of the present invention, the order of serial numbers does not mean the order of execution, some or all of the steps can be executed in parallel or sequentially, and the execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0023] It will be appreciated by those skilled in the art that the numerical ranges in the embodiments of the present invention are to be understood as each intermediate value between the upper and lower limits of the scope being specifically disclosed. Each smaller range between the intermediate value in any stated value or stated range and any other stated value or intermediate value in the range is also included in the present invention. The upper and lower limits of these smaller ranges may be independently included or excluded in the scope.
[0024] Unless otherwise specified, the technical / scientific terms used herein have the same meanings as those generally understood by those skilled in the art to which the invention belongs. Although the present invention only describes preferred methods and materials, any methods and materials similar or equivalent to those herein may also be used in the implementation or testing of the present invention. All documents mentioned in this specification are incorporated by reference to disclose and describe methods and / or materials related to the documents. In the event of a conflict with any incorporated document, the content of this specification shall prevail.
[0025] In order to illustrate the technical solution of the present invention, specific embodiments are provided below for illustration.
[0026] Traditional impulse turbines mainly have two regulating mechanisms, including a needle and a deflector. The needle plays the role of regulating the jet. By adjusting the size of the jet, the needle controls the flow rate of the turbine runner, thereby controlling the output of the hydro-generator. The deflector plays the role of rapid shutdown and rapid cut-in, and is mainly used to control the start and stop of the turbine. However, under this regulation method, since the action time of the needle is usually slow (15~30s), the power regulation speed of the unit will also be slow, which is not conducive to the hydro-generator unit to play the role of rapid peak regulation and frequency regulation in the new power system.
[0027] In order to build a new power system, new energy sources will be connected to the power grid on a large scale. In the process of absorbing new energy, due to its volatility, randomness and intermittency, it often poses a huge challenge to the stable operation of the power grid. Therefore, the present invention proposes a method for quickly adjusting the power of an impulse turbine generator set using a deflector and a spray needle. By transforming the control logic of the deflector and the spray needle, the role of the deflector is developed, and then a method for simultaneously controlling the power of the unit based on the deflector and the spray needle is designed, which effectively improves the power response speed of the unit, suppresses the power fluctuation problem of the hydropower unit, greatly increases the stability of the new power system based on new energy, and meets the requirements of rapid power regulation of new energy.
[0028] Based on this, an embodiment of the present invention provides a method and system for rapid power regulation of an impulse turbine generator set, which solves the problem that the prior art cannot achieve rapid regulation of the output power of the turbine set.
[0029] Figure 1 A schematic diagram of an embodiment of a method for rapid power regulation of an impulse turbine generator set provided by the present invention is shown in FIG. Figure 1 As shown, the above-mentioned method for rapid power regulation of impulse turbine generator set may include:
[0030] S101, obtaining the output power of the impulse turbine generator set in real time, and comparing it with a preset reference power to determine a first deviation value between the output power and the reference power;
[0031] Among them, the Pelton turbine generator is a hydroelectric power generation equipment that efficiently converts kinetic energy of water into electrical energy. It is particularly suitable for hydropower resources with high head and small flow. It uses a special water guide mechanism to guide high-speed water flow to directly impact the runner bucket, drive the runner to rotate, and then drive the generator to generate electricity. Because of its unique design, it can maintain high efficiency in a wide load range.
[0032] In some embodiments, the output power of the impulse turbine generator can be calculated by installing sensors on the generator to directly measure parameters such as current and voltage. For example, when obtaining the output power by direct measurement, a sensor capable of measuring the output power, such as a current sensor, a voltage sensor or a power sensor, can be installed at an appropriate position of the generator set. These sensors can capture the electrical parameters of the generator set in real time, thereby reflecting its output power. Alternatively, the data output by the sensor can be read in real time through a data acquisition system (such as a PLC, DCS or a dedicated data acquisition unit), and necessary processing such as filtering and denoising can be performed to ensure the accuracy and reliability of the data. The processed data is the real-time output power of the generator set. In addition, the turbine output power formula can also be used to estimate the head, flow rate and efficiency, and verified and optimized through real-time monitoring and data analysis of a modern hydropower station monitoring system.
[0033] In some embodiments, the reference power can determine a reasonable reference power based on the operating requirements of the hydropower station or hydropower generation system, the grid dispatching requirements, and the actual situation of water resources. In actual application, a preset reference power value can be set in the control system or monitoring software. This value can be fixed or dynamically adjusted according to certain rules (such as load forecasting, water flow, etc.). The output power obtained in real time by the above method is compared with the preset reference power, and the difference between the two is calculated to obtain the first deviation value.
[0034] S102, determining and controlling the opening of the deflector through the deflector control system based on the first deviation value;
[0035] Among them, the deflector, as a key component in hydropower equipment, is mainly used in impulse turbines to control the direction and speed of water flow, thereby achieving precise regulation of the operating state of the turbine. The deflector is usually installed at the nozzle outlet as a diversion device, which is intended to affect the operation of the turbine by adjusting the direction and flow of water flow.
[0036] In an embodiment of the present invention, the first deviation value is determined based on the output power and the reference power, the opening value of the deflector is calculated by the deflector control system, and then the deflector opening is adjusted according to the calculated opening value, so that the output power can meet the reference power requirement as much as possible.
[0037] In some embodiments, the above step S102 may include:
[0038] S1021, inputting the first deviation value into a PID controller of a deflector control system, and performing calculations through the PID controller to obtain a control signal of the deflector;
[0039] S1022, transmitting the control signal to the first servo system of the deflector control system, and converting the control signal into the deflector opening through the first servo system.
[0040] Among them, a PID (proportional-integral-differential) controller is a widely used feedback controller. In the embodiment of the present invention, the PID controller can generate a control signal by calculating the proportion, integral and differential terms of the first deviation value.
[0041] Specifically, the proportional term can directly reflect the size of the deviation. The larger the deviation, the greater the change in the control signal, so as to quickly respond to the deviation. The integral term can integrate the deviation to eliminate the steady-state error that may exist in the system. The integral term helps to gradually reduce the deviation over a long period of time. The differential term can predict the trend of the deviation change and make corrections in advance to reduce the overshoot and oscillation of the system. Through the calculation of the PID controller, a deflector control signal suitable for the current operating conditions (that is, the output power meets the reference power) can be generated.
[0042] The first servo system is an automated system that can accurately control the position, speed or acceleration of mechanical parts. After receiving the control signal, the first servo system can convert it into mechanical motion instructions, which can be directly related to the opening adjustment of the baffle. The first servo system accurately adjusts the opening of the baffle through its internal motor, transmission mechanism and feedback mechanism to achieve the position or angle specified by the control signal. During the adjustment process, the first servo system can also continuously monitor the actual opening of the baffle and compare it with the expected opening. If there is a difference, the first servo system can further adjust its output to ensure precise control of the baffle opening. For details, please refer to Figure 2 As shown, Figure 2 The schematic diagram of the working process of the deflector in the embodiment of the present invention, wherein the deflector opening calculation value Y PID Can be included in the control signal, Y is the deflector opening, is the deflector opening deviation.
[0043] The first servo system can use an electro-hydraulic converter to achieve precise control of the opening of the diverter. First, the control electrical signal from the PID controller is received, and this signal is received by the electro-hydraulic converter and converted into an oil pressure signal. The converted oil pressure signal is then directed to the main distribution valve. As a key component of oil pressure regulation, the main distribution valve performs necessary distribution and adjustment of the oil pressure signal. Subsequently, the precisely regulated oil pressure signal is transmitted to the diverter relay through the pressure oil pipeline. As an actuator, the diverter relay directly responds to the change of the oil pressure signal, converts the oil pressure energy into mechanical energy through its internal mechanical structure, and then drives the rod transmission device to move.
[0044] Specifically, when the power of the hydro-turbine unit is higher than the reference power of the power grid, the output of the hydro-turbine generator unit needs to be reduced. At this time, the calculated value of the opening of the diverter decreases, and the difference between its value and the feedback value of the diverter servo is a negative value. After being converted into an oil pressure signal by the electro-hydraulic converter, it is sent to the main distribution valve, and the piston of the main distribution valve moves up, so that the pressure oil is connected to the closing chamber of the servo, and the servo moves in the closing direction, reducing the water volume of the hydro-turbine generator unit, so that the speed of the unit decreases, and the power of the unit tends to and is equal to the power of the power grid, and the diverter opening is equal to the calculated opening of the diverter, and then enters a stable state. When the power of the unit is lower than the power of the power grid, the action process is opposite to the above, and the output of the unit needs to be increased. At this time, the calculated value of the opening of the diverter increases, and the difference between its value and the feedback value of the diverter servo is a positive value. The opening of the diverter servo increases, increasing the flow rushing into the hydro-turbine generator unit, and the speed of the unit increases, so that the power of the unit automatically tracks the power demand of the power grid in a timely manner.
[0045] In the embodiment of the present invention, the series of power transmission and conversion processes of the first servo system finally realize the effective control of the opening of the baffle, ensuring that the entire system can flexibly and accurately adjust the position or angle of the baffle according to preset instructions or real-time needs to meet different working scenarios and performance requirements. In addition, through the coordinated work of the PID controller and the first servo system, the baffle control system can quickly and accurately adjust the opening of the baffle based on the first deviation value monitored in real time, thereby realizing precise control of the operating state of the turbine and improving the operating efficiency and stability of the turbine.
[0046] S103, increasing the reference power by a preset margin as the input of the nozzle control system, and determining the reference opening of the nozzle according to a functional relationship between the preset reference power and the nozzle opening;
[0047] Among them, margin, also known as safety margin or redundancy, refers to the additional capacity or resources reserved during system design or operation to cope with factors such as uncertainty, load fluctuations, system aging or failure. In power systems, especially in the field of turbine control, the setting of margin is crucial to ensure the stable operation of the system and improve the reliability and responsiveness of the system.
[0048] In some embodiments, the reference factors for the specific value of the preset margin may include multiple aspects, such as system load characteristics, system reliability requirements and / or external environmental factors. Among them, the system load characteristics can analyze the operation of the system under different load conditions, determine the fluctuation range and change trend of the load, and set the appropriate margin based on this. The system reliability requirements can determine the minimum required margin level according to the specific requirements of the system for reliability. The higher the reliability requirements, the larger the required margin is usually. External environmental factors such as changes in water source flow, water temperature changes, grid voltage fluctuations and other external factors may also have an impact on the system, and it is necessary to set the corresponding margin according to the actual situation to deal with these uncertainties.
[0049] In an embodiment of the present invention, the value of the preset margin in the above step 103 can be determined according to the predicted grid regulation demand. By predicting the grid regulation demand, a suitable margin value is set for compensation. For example, if the power deviation is large in a short time scale, a larger margin level is reserved; if the power deviation is small in a short time scale, the margin value can also be set to be smaller, so that the power fluctuation caused by renewable energy generation can be flexibly compensated. In an embodiment of the present invention, generally increasing the margin by about 10% can well cope with the power fluctuation problem and ensure the stability of the system. Then, this margin value is added to the original reference power to obtain the adjusted reference power. The adjusted reference power is used as the input signal of the needle control system. The needle control system adjusts the opening of the needle according to this input signal to control the flow rate of the fluid and the output power of the system. A functional relationship between power and needle opening is usually pre-set inside the needle control system. By substituting this adjusted reference power into this functional relationship, the corresponding needle reference opening can be calculated. Then, the control system adjusts the actual opening of the needle according to this reference opening to achieve the expected power output.
[0050] It should be noted that the functional relationship can be determined by experimental data fitting, theoretical analysis or simulation. These methods usually establish an accurate mathematical model between power output and nozzle opening based on the physical characteristics and operating rules of the system to guide the actual control process. For example, the functional relationship can be expressed by the following formula (1):
[0051] (1)
[0052] in, is the reference opening of the deflector, is the adjusted reference power, , is the reference power, A is the preset margin value, It is a relational function, and its specific value can be determined based on the needs in the actual application process.
[0053] S104, adjusting the opening of the spray needle through the spray needle control system based on the reference opening.
[0054] In some embodiments, the needle control system controls the opening of the needle via a second servo system.
[0055] The second servo system may have the same structure as the first servo system, and may control and adjust the opening of the spray needle according to the deviation between the actual opening of the spray needle and the reference opening, so as to satisfy the reference opening as much as possible.
[0056] In some embodiments, the above step S104 may include:
[0057] S1041, acquiring the opening of the spray needle in real time and comparing it with the reference opening to obtain a second deviation value of the spray needle opening;
[0058] S1042, based on the second deviation value, adjusting the opening of the spray needle in real time through the second servo system.
[0059] Specifically, in some embodiments, the nozzle control system can obtain the current nozzle opening information in real time. For example, this can be achieved by sensors (such as position sensors, angle sensors, etc.) installed on the nozzle mechanism. These sensors can accurately measure the actual position or opening of the nozzle, and convert this information into electrical signals or other forms of signals for processing by the control system. Then, the nozzle opening obtained in real time can be compared with the above-mentioned reference opening. By comparing the actual opening with the reference opening, the second deviation value of the nozzle opening can be calculated.
[0060] After obtaining the second deviation value of the nozzle opening, the nozzle opening can be adjusted according to the deviation value. The second servo system is an automatic control system that can accurately control the position, speed and acceleration of mechanical movement. It can drive the actuator (such as motor, hydraulic cylinder, etc.) according to the input signal (such as the deviation value) to achieve precise position control. Driven by the second servo system, the actuator of the nozzle will adjust the nozzle opening according to the size and direction of the deviation value. For example, if the actual opening is less than the reference opening, the actuator will drive the nozzle to move in the direction of increase; conversely, if the actual opening is greater than the reference opening, the actuator will drive the nozzle to move in the direction of decrease. In this way, the system can adjust the nozzle opening in real time so that it always remains in the desired position, thereby ensuring the stable operation of the turbine and efficient power generation.
[0061] In the embodiment of the present invention, the output power of the impulse turbine generator set is obtained in real time and compared with the preset reference power to determine the first deviation value between the output power and the reference power; based on the first deviation value, the opening of the deflector is determined and controlled by the deflector control system; the reference power is increased by a preset margin as the input of the needle control system, and the reference opening of the needle is determined according to the preset functional relationship between the power and the needle opening; based on the reference opening, the needle control system adjusts the opening of the needle. In this way, the deflector can quickly cut in or out of the jet and partially or completely deflect the direction of the jet, so as to quickly change the flow entering the impulse runner, and at the same time adjust the opening of the needle to ensure the hydraulic efficiency of the unit, thereby quickly and efficiently adjusting the power of the impulse turbine generator set. In addition, the present invention can effectively improve the power response speed of the impulse turbine generator set, greatly increase the stability of the new power system based on new energy, and meet the requirements of rapid power regulation of new energy.
[0062] The method proposed in the present invention is described in detail below with reference to a specific embodiment.
[0063] Figure 3 : is a control strategy diagram of a method for rapid power regulation of an impulse turbine generator set in an embodiment of the present invention, wherein P is the unit power, P ref is the reference power, Represents the power deviation, Y ref is the reference opening of the spray needle, is the adjusted reference power, , where A can be 10%. Represents the opening deviation, Q Z represents the flow rate diverted by the deflector, Q S represents the needle ejection flow rate, Q C Represents the flow rate entering the impact wheel.
[0064] See also Figure 3 As shown, the present invention transforms the control logic of the deflector and the spray needle of the impulse turbine generator set, including a deflector control system and a spray needle control system. By adjusting the deflector angle and the spray needle opening at the same time to control the flow entering the turbine runner, the purpose of quickly and efficiently adjusting the power of the impulse turbine generator set is achieved. For the deflector control system, the deflector control system mainly forms a control signal by using the PID (proportional-integral-differential) control method through the difference between the reference power and the unit power, and the servo system converts the control electrical signal into the deflector opening. The deflector control system mainly relies on adjusting the deflector opening to quickly change the size of the deflected flow, thereby quickly controlling the unit output.
[0065] At the same time, for the needle control system, the needle control system obtains the adjusted reference power by increasing the reference power by a preset margin, obtains the needle reference opening through the relationship between the opening and the power, and then converts the difference with the real-time opening of the needle into the needle opening through the servo system, thereby adjusting the flow rate ejected by the needle, which can reduce flow loss and ensure hydraulic efficiency; among them, the deflector control system realizes the rapidity of power regulation, and the needle control system ensures the high efficiency of power regulation. The deflector control system adjusts the size of the deflected flow according to the power deviation, and the needle control system adjusts the size of the flow ejected by the needle according to the opening deviation. The two are superimposed to jointly control the size of the flow entering the impulse wheel, thereby quickly and efficiently adjusting the power of the impulse turbine generator set to ensure the stability and safety of the power system.
[0066] The above linkage between the nozzle and the deflector can ensure hydraulic efficiency and improve the power response capability of the impulse turbine generator set. By using the deflector and nozzle to quickly adjust the power of the unit, the stability of the new power system based on new energy is greatly increased, meeting the requirements of rapid power adjustment of new energy.
[0067] For example, Figure 4 Schematic diagram showing the power variation comparison of the output power regulation of a hydropower unit by the method of the embodiment of the present invention and the existing method. Figure 4 As shown, the power change of the impulse turbine generator set in the prior art is relatively slow, and it takes t2 seconds for the power to drop from P2 to P1. After applying the control method designed by the present invention, the output power change of the impulse turbine generator set is significantly accelerated, and it only takes t1 seconds to drop from P2 to P1. Therefore, the application of the impulse turbine generator set power rapid adjustment method proposed by the present invention can quickly and efficiently adjust the power of the impulse turbine generator set, effectively improve the power response speed of the unit, suppress the power fluctuation problem of the hydropower unit, greatly increase the stability of the new power system based on new energy, and meet the requirements of rapid power adjustment of new energy.
[0068] in, Figure 4 The specific power value changes are shown in the following Table 1:
[0069] Table 1:
[0070]
[0071] Table 1 shows the change of output power value of impulse turbine generator set under two control strategies with time (t, in seconds). Among them, y1 represents the change of output power value after applying the control strategy of the embodiment of the present invention, and y2 represents the change of output power value when the prior art is used for control. It can be clearly seen from Table 1 that, with the control strategy of the present invention, the output power has been reduced to 0 after 7.07 seconds; in contrast, when the prior art is used, the output power does not drop to 0 until 20 seconds later.
[0072] In Table 1, after 7.07 seconds, the output power has dropped to 0 using the method of the embodiment of the present invention, while it does not drop to 0 until 20 seconds later using the prior art.
[0073] In the embodiment of the present invention, the output power of the impulse turbine generator set is obtained in real time and compared with the preset reference power to determine the first deviation value between the output power and the reference power; based on the first deviation value, the opening of the deflector is determined and controlled by the deflector control system; the reference power is increased by a preset margin as the input of the needle control system, and the reference opening of the needle is determined according to the preset functional relationship between the power and the needle opening; based on the reference opening, the needle control system adjusts the opening of the needle. In this way, the deflector can quickly cut in or out of the jet and partially or completely deflect the direction of the jet, so as to quickly change the flow entering the impulse runner, and at the same time adjust the opening of the needle to ensure the hydraulic efficiency of the unit, thereby quickly and efficiently adjusting the power of the impulse turbine generator set. In addition, the present invention can completely avoid the generation of water hammer, effectively improve the power response speed of the impulse turbine generator set, suppress the power fluctuation problem of the hydroelectric unit, greatly increase the stability of the new power system based on new energy, and meet the requirements of rapid power regulation of new energy.
[0074] Based on the same inventive concept, an embodiment of the present invention further provides a rapid power regulation system for an impulse turbine generator set, which is used to implement the rapid power regulation method for an impulse turbine generator set. Figure 5 FIG. 1 is a schematic diagram of a power rapid regulation system for an impulse turbine generator set according to an embodiment of the present invention. Figure 5 As shown, the impulse turbine generator set power rapid regulation system 500 may include: a power measurement unit 501, used to measure the actual output power of the turbine generator set in real time; a deflector control unit 502, including a PID controller and a first servo system; the PID controller is connected to the power measurement unit, and is used to receive a first deviation value between the actual output power and the reference power, and calculate the control signal of the deflector according to the first deviation value; the first servo system is connected to the PID controller, and is used to receive and execute the control signal to realize the control of the deflector opening; a nozzle control unit 503, including a second servo system, the second servo system is used to determine the reference opening of the nozzle according to the reference power after increasing the preset margin, and control the opening of the nozzle based on the reference opening.
[0075] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other. Each embodiment focuses on the differences from other embodiments.
[0076] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the present invention.
Claims
1. A method for quickly adjusting the power of an impulse turbine generator set, characterized in that: include: Acquire the output power of the impulse turbine generator set in real time, and compare it with a preset reference power to determine a first deviation value between the output power and the reference power; Based on the first deviation value, determining and controlling the opening of the deflector through a deflector control system; The reference power is increased by a preset margin and used as an input of a needle control system, and a reference opening of the needle is determined according to a functional relationship between the preset reference power and the needle opening; Based on the reference opening, the opening of the injection needle is adjusted by the injection needle control system.
2. The method according to claim 1, characterized in that The method of determining and controlling the opening of the deflector by a deflector control system based on the first deviation value includes: Inputting the first deviation value into a PID controller of the deflector control system, and performing calculations through the PID controller to obtain a control signal of the deflector; The control signal is transmitted to the first servo system of the deflector control system, and the control signal is converted into the deflector opening by the first servo system.
3. The method according to claim 1, characterized in that The value of the preset margin is determined according to the predicted regulation demand of the power grid.
4. The method according to claim 3, characterized in that The spray needle control system controls the opening of the spray needle through a second servo system.
5. The method according to claim 4, characterized in that The step of adjusting the opening of the spray needle by the spray needle control system based on the reference opening includes: Acquire the opening of the spray needle in real time and compare it with the reference opening to obtain a second deviation value of the spray needle opening; Based on the second deviation value, the opening of the spray needle is adjusted in real time by the second servo system.
6. A rapid power regulation system for an impulse turbine generator set for implementing the method according to any one of claims 1 to 5, characterized in that: include: Power measurement unit, used to measure the actual output power of the hydro-generator set in real time; A deflector control unit, comprising a PID controller and a first servo system; The PID controller is connected to the power measurement unit to receive a first deviation value between the actual output power and the reference power, and calculate a control signal of the deflector according to the first deviation value; the first servo system is connected to the PID controller to receive and execute the control signal to realize the control of the deflector opening; The nozzle control unit includes a second servo system, wherein the second servo system is used to determine a reference opening of the nozzle according to the reference power after increasing a preset margin, and control the opening of the nozzle based on the reference opening.
Citation Information
Patent Citations
Impact turbine spray and flow control device and method thereof
CN103016245A
No-load regulation parameter optimization method for impact type hydro-generator speed regulator
CN111488690A
Coordinated control system and method for deflector and spray needle of hydroelectric system unit
CN117536767A
Method, apparatus, and system for frequency modulation in power grid
JP2019115249A
Power capture system and method
US20110316276A1