Construction project quality and safety tracking management system based on big data

Through big data technology, real-time monitoring of the storage environment and apparent quality of construction engineering materials, and calculating the quality and safety assessment index, solving the problems of incomplete material quality and safety monitoring in the existing technology and relying on manual inspection, realizing the quality of construction engineering materials Comprehensive assessment and timely response to ensure the safety and quality of building structures.

CN118657446BActive Publication Date: 2024-11-26LIAONING SHUZHE CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411154275.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-26
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

The existing material quality and safety monitoring of construction projects cannot comprehensively monitor the entire construction project process, resulting in insufficient comprehensive and accurate material quality analysis, affecting the overall quality, and relying on manual inspection, lack of real-time and automated means, and being unable to respond to the construction in a timely manner. question.

Method used

Adopt a construction project quality and safety tracking and management system based on big data, including construction project information acquisition module, warehouse material inspection module, construction material inspection module and completed building inspection module, through humidity, temperature, light intensity sensors, intelligent cameras and image recognition technology , monitor the material storage environment and apparent quality in real time, calculate the quality and safety assessment index, and achieve a comprehensive evaluation and analysis of material quality.

Benefits of technology

Ensure that the materials meet quality standards, reduce the risk of structural failure, avoid quality problems caused by improper preservation and construction, improve the overall quality of construction projects, extend the service life of the building and reduce maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118657446B_ABST
    Figure CN118657446B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of construction project quality, and specifically to a construction project quality and safety tracking management system based on big data, comprising: a construction project information acquisition module, a warehouse material detection module, a warehouse material analysis module, a construction material detection module, a completed building detection module, a material quality and safety analysis module, a quality and safety tracking management terminal and a database; by comprehensively analyzing the quality and safety of engineering materials corresponding to the construction project from three aspects of accumulated materials, construction materials and completed materials of the construction project, the engineering quality of the construction project is guaranteed to the greatest extent, material defects and problems in the construction are reduced, thereby extending the service life of the building, reducing the maintenance and repair costs, and improving the sustainable development capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction engineering quality, and in particular to a construction engineering quality safety tracking and management system based on big data. Background Art

[0002] The importance of quality and safety monitoring of construction projects cannot be ignored. It can not only ensure the quality and performance of the project, but also protect the personal safety of participants and users, and reduce accidents and losses. Among them, the monitoring and tracking of the quality of construction materials is particularly important. The quality of construction materials directly affects the structural safety and performance reliability of the building. Poor quality building materials not only easily lead to insufficient strength and poor stability of the building structure, but also increase the risk of structural failure. Therefore, it is necessary to track and manage the quality and safety of construction materials.

[0003] Existing quality and safety monitoring of construction materials often targets specific materials or links and is unable to comprehensively monitor the entire construction process, resulting in incomplete and inaccurate quality and safety analysis results of construction materials, which in turn affects the overall quality of construction materials and reduces the safety of construction material quality.

[0004] Existing material quality and safety monitoring often relies on manual inspections and lacks real-time monitoring and automation. This results in a relatively passive and untimely monitoring process, which makes it impossible to respond to problems in the construction process in a timely manner, and thus unable to promptly rectify material quality and safety issues in construction projects. Summary of the invention

[0005] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a construction project quality and safety tracking and management system based on big data.

[0006] The purpose of the present invention can be achieved through the following technical solutions: A construction project quality and safety tracking management system based on big data, comprising:

[0007] The construction project information acquisition module is used to acquire the basic information of materials corresponding to the construction project, wherein the basic information of materials includes: warehouse reference humidity, warehouse reference temperature, warehouse reference light intensity, specification information of various types of materials, and composition information of various types of materials;

[0008] The warehouse material detection module is used to detect the storage environment of the material warehouse corresponding to the stacked materials in the construction project, and obtain the storage environment parameters of the material warehouse corresponding to the stacked materials in the construction project, and at the same time detect the apparent quality of the material warehouse corresponding to the stacked materials in the construction project, and obtain the apparent quality parameters of the material warehouse corresponding to the stacked materials in the construction project;

[0009] Preferably, the storage environment of the material warehouse corresponding to the stacked materials in the construction project is detected to obtain the storage environment parameters of the material warehouse corresponding to the stacked materials in the construction project. The specific detection method is:

[0010] The storage humidity of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is detected by the humidity sensor, and the storage humidity of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is obtained;

[0011] The storage temperature of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is detected by a temperature sensor, and the storage temperature of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is obtained;

[0012] Evenly distribute the detection points on the piled materials corresponding to the material warehouse in the construction project, obtain the detection points on the piled materials corresponding to the material warehouse in the construction project, and detect the light intensity of each detection point on the piled materials corresponding to the material warehouse in the construction project at each detection time point in the set detection period through a light intensity sensor, and obtain the light intensity of each detection point on the piled materials corresponding to the material warehouse in the construction project at each detection time point in the set detection period;

[0013] The storage environment parameters of the stacked materials in the material warehouse of the construction project are composed of the storage humidity and storage temperature of the stacked materials in the material warehouse of the construction project at each detection time point within the set detection period and the light intensity of each detection point.

[0014] Preferably, the apparent quality of the materials piled up in the material warehouse in the construction project is detected to obtain the apparent quality parameters of the materials piled up in the material warehouse in the construction project. The specific detection method is:

[0015] The stacked materials corresponding to the material warehouse in the construction project are classified according to the material types, and the stacked materials corresponding to the various types of materials in the material warehouse are obtained, and the packaging bag images of the various types of materials corresponding to the stacked materials in the material warehouse are obtained through the intelligent camera, and the packaging bag images of the various types of materials corresponding to the stacked materials in the material warehouse are obtained;

[0016] The text of the packaging bag images of various types of materials corresponding to each stacked material in the material warehouse is recognized and extracted by image recognition technology to obtain a text set of the packaging bags of various types of materials corresponding to each stacked material in the material warehouse;

[0017] Extract specification keywords from the text set of packaging bags of various types of materials corresponding to various piled materials in the material warehouse, obtain the specification keywords of various types of materials corresponding to various piled materials in the material warehouse, and form the detection specification information of various types of materials corresponding to various piled materials in the material warehouse from the specification keywords of various types of materials corresponding to various piled materials in the material warehouse;

[0018] The apparent images of various types of materials corresponding to each piled material in the material warehouse are collected by intelligent cameras to obtain the apparent images of various types of materials corresponding to each piled material in the material warehouse, and the number of abnormal places of various types of materials corresponding to each piled material in the material warehouse is extracted, and the abnormal areas of various abnormal places of various types of materials corresponding to each piled material in the material warehouse are extracted, and then the abnormal areas are summed to obtain the total abnormal areas of various types of materials corresponding to each piled material in the material warehouse;

[0019] The total abnormal area, number of abnormal places and detection specification information of various types of materials in the material warehouse corresponding to each piled material constitute the apparent quality parameters of the corresponding piled materials in the material warehouse in the construction project.

[0020] The warehouse material analysis module is used to analyze the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project based on the storage environment parameters and apparent quality parameters of the corresponding stacked materials in the material warehouse in the construction project, and obtain the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project;

[0021] Preferably, the quality safety assessment index of the materials stored in the material warehouse in the construction project is analyzed, and the specific analysis method is as follows:

[0022] Extract warehouse reference humidity SD0, warehouse reference temperature WD0, warehouse reference light intensity QD0, and specification information of various types of materials from the basic information of materials corresponding to the construction project. At the same time, extract the storage humidity CS of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period from the storage environment parameters of the corresponding stacked materials in the material warehouse of the construction project. i , Storage temperature CW i And the light intensity CQ of each detection point i j , i is the number of each detection time point, i is a positive integer, i=1,2,...,n, n is the total number of detection time point numbers, j is the number of each detection point, j is a positive integer, j=1,2,...,m, m is the total number of detection point numbers, and the total abnormal area YS corresponding to each type of material in the material warehouse corresponding to the piled material is extracted from the apparent quality parameters of the material warehouse corresponding to the piled material in the construction project f p 、Number of abnormalities YN f p, testing specification information; f is the number of various types of materials, f is a positive integer, f=1,2,...,q, q is the total number of material type numbers, p is the number of each stacking material, p is a positive integer, p=1,2,...,w, w is the total number of stacking material numbers;

[0023] Extract the specification keywords of various types of materials corresponding to various types of stacked materials in the material warehouse from the detection specification information of various types of materials corresponding to various types of materials in the material warehouse, and match the specification keywords of various types of materials corresponding to various types of stacked materials in the material warehouse with the specification information of the corresponding types of materials in the construction project. If a certain specification keyword in the detection specification information of a certain stacked material successfully matches the specification information of the corresponding type of material, then record the specification keyword as the matching keyword, obtain the matching keywords of the stacked material, and then count the number of matching keywords YG of various types of materials corresponding to various types of stacked materials in the material warehouse f p ;

[0024] According to the formula Calculate the storage environment assessment index CF of the material warehouse corresponding to the piled materials in the construction project, e is a natural constant, a1, a2, a3 are the set weight factors, and the value ranges of a1, a2, a3 are all greater than 0 and less than 1;

[0025] Count the number of specification keywords corresponding to each type of material in the material warehouse, recorded as GG f p ;

[0026] According to the formula Calculate the apparent quality evaluation index BG of the corresponding stacked materials in the material warehouse in the construction project, a4, a5, a6 are the set weight factors, and the value ranges of a4, a5, a6 are all greater than 0 and less than 1;

[0027] The quality safety assessment index ZA of the stacked materials in the material warehouse in the construction project is calculated according to the formula ZA=CF×ab+BG×ac, where ab and ac are the set weight factors, and the value ranges of ab and ac are both greater than 0 and less than 1.

[0028] The construction material detection module is used to detect the quality of the construction materials corresponding to the construction site in the construction project, obtain the construction quality parameters of the construction materials corresponding to the construction site in the construction project, and thereby analyze the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project, and obtain the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project;

[0029] Preferably, the quality of the construction materials corresponding to the construction site in the construction project is tested to obtain the construction quality parameters of the construction materials corresponding to the construction site in the construction project. The specific testing method is:

[0030] Classify the construction materials corresponding to the construction site in the construction project according to the material types to obtain the construction materials corresponding to the various types of materials in the construction site in the construction project, and randomly select a number of construction materials from the construction materials corresponding to the various types of materials in the construction site in the construction project as test materials to obtain the test materials corresponding to the various types of materials in the construction site in the construction project;

[0031] Extract the reference analysis methods corresponding to various types of materials from the database, and analyze the types and contents of components in each test material corresponding to various types of materials in the construction site according to the reference analysis methods of the corresponding types of materials, so as to obtain the types of components and contents of each component in each test material corresponding to various types of materials in the construction site;

[0032] The construction quality parameters of the construction materials corresponding to the construction site in the construction project are constituted by the types of components and the contents of each component in each test material corresponding to the various types of materials in the construction site.

[0033] Preferably, the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project is analyzed to obtain the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project. The specific analysis method is:

[0034] Extract the types of components and the contents of each component in each test material corresponding to each type of material in the construction site from the construction quality parameters of the construction materials corresponding to the construction site in the construction project;

[0035] Extracting the component information of various types of materials corresponding to the construction project from the basic information of materials corresponding to the construction project, and extracting the reference component types and reference contents of each component type corresponding to various types of materials in the construction project from the component information of various types of materials corresponding to the construction project;

[0036] Match the component types in each test material corresponding to each type of material in the construction site with the reference component types corresponding to the corresponding type of material. If a component type successfully matches the reference component type corresponding to the corresponding type of material, the component type is recorded as the matching component type. Otherwise, the component type is recorded as the abnormal component type. Then, the number of matching component types in each test material corresponding to each type of material in the construction site is obtained by counting PP. f v and the number of abnormal component types YC f v ; f is the number of various types of materials, f is a positive integer, f=1,2,...,q, q is the total number of material types, v is the number of each test material, v is a positive integer, v=1,2,...,x, x is the total number of test material numbers;

[0037] Extract the content of each matching component type in each test material from the content of each type of material in the construction site corresponding to each type of test material. f vk And the content of each abnormal component type YH f vg ; k is the number of each matching component type, k is a positive integer, k=1,2,...,s, s is the total number of matching component type numbers, g is the number of each abnormal component type, g is a positive integer, g=1,2,...,h, h is the total number of abnormal component type numbers;

[0038] Based on the reference content of each type of material corresponding to each component type in the construction project, obtain the reference content of each type of material corresponding to each matching component type CH f k ;

[0039] According to the formula The construction quality safety assessment index SA of the construction materials corresponding to the construction site in the construction project is calculated, b1, b2, b3, and b4 are set weight factors, and the value ranges of b1, b2, b3, and b4 are all greater than 0 and less than 1.

[0040] The completed building detection module is used to detect the quality of the completed materials corresponding to the completed buildings in the construction project, obtain the completed quality parameters of the completed materials corresponding to the completed buildings in the construction project, and analyze the completed quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project, and obtain the completed quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project;

[0041] Preferably, the quality of the finished materials corresponding to the finished buildings in the construction project is tested to obtain the finished quality parameters of the finished materials corresponding to the finished buildings in the construction project. The specific testing method is:

[0042] Classify each completed building in the construction project according to the type of material, and obtain the sub-buildings corresponding to each type of material of the completed building in the construction project;

[0043] Extracting quality inspection methods for various types of materials from the database, and inspecting sub-buildings corresponding to various types of materials of the completed buildings in the construction project according to the quality inspection methods for the corresponding types of materials, and obtaining quality analysis values ​​corresponding to various types of materials of the completed buildings in the construction project;

[0044] The apparent images of each completed building in the construction project are collected by a high-definition camera to obtain the apparent images corresponding to each completed building in the construction project;

[0045] Identify the defects corresponding to the appearance of each completed building from the appearance images corresponding to each completed building in the construction project, count the number of defects corresponding to the appearance of each completed building, and obtain the defect area corresponding to each defect of each completed building, and then sum them up to obtain the defect area corresponding to each completed building;

[0046] The completion quality parameters of the finished materials corresponding to the finished buildings in the construction project are composed of the number of apparent defects and the defect area of ​​each finished building in the construction project and the quality analysis values ​​of various types of materials corresponding to the finished buildings.

[0047] Preferably, the completion quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project is analyzed to obtain the completion quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project. The specific analysis method is:

[0048] Extract the number of defects WN corresponding to the surface of each completed building in the construction project from the finished quality parameters of the completed materials corresponding to the completed buildings in the construction project d , defect area QS d And the quality analysis value FX of various types of materials corresponding to the completed building f ; d is the number of each completed building, d is a positive integer, d=1,2,...,y, y is the total number of completed building numbers;

[0049] Extract the reference mass analysis value of each type of material from the database, denoted as CZ f ;

[0050] According to the formula The completion quality safety assessment index WA of the completed materials corresponding to the completed buildings in the construction project is calculated, c1, c2, c3 are the set influencing factors, ca, cb are the set weight factors, and the value ranges of c1, c2, c3, ca, and cb are all greater than 0 and less than 1.

[0051] The material quality and safety analysis module is used to obtain the engineering material quality assessment coefficient corresponding to the construction project based on the quality and safety assessment index of the accumulated materials in the material warehouse in the construction project, the construction quality and safety assessment index of the construction materials in the construction site, and the completion quality and safety assessment index of the completed materials in the completed building, and then analyze the quality and safety level of the engineering materials corresponding to the construction project based on this, and obtain the quality and safety level of the engineering materials corresponding to the construction project;

[0052] Preferably, the engineering material quality assessment coefficient GCZ corresponding to the construction project is calculated according to the formula GCZ=ZA×bn+SA×bm+WA××bp, bn, bm, bp are set weight factors, and the value ranges of bn, bm, bp are all greater than 0 and less than 1.

[0053] Preferably, the quality safety level of engineering materials corresponding to the construction project is analyzed to obtain the quality safety level of engineering materials corresponding to the construction project. The specific analysis method is:

[0054] The engineering material quality assessment coefficient corresponding to the construction project is matched with the engineering material quality assessment coefficient threshold corresponding to each set engineering material quality safety level to obtain the engineering material quality safety level corresponding to the construction project.

[0055] The quality and safety tracking management terminal is used to track and manage the quality of engineering materials corresponding to the construction project based on the quality and safety level of the engineering materials corresponding to the construction project;

[0056] The database is used to store reference analysis methods corresponding to various types of materials, store quality inspection methods for various types of materials, and store reference quality analysis values ​​for various types of materials.

[0057] Beneficial effects of the present invention:

[0058] The present invention conducts targeted monitoring of the storage environment and apparent quality of the corresponding stacked materials in the material warehouse in the construction project, which not only ensures that the used materials meet the corresponding quality standard requirements, but also ensures that the source of the construction project materials is relatively reliable, thereby ensuring the safety of the building structure from the root.

[0059] The present invention analyzes the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project, thereby ensuring to a large extent the good condition of the construction project materials before use and avoiding the occurrence of material safety and quality problems caused by improper storage.

[0060] The present invention ensures full utilization and reasonable allocation of materials to a great extent by detecting and analyzing the quality of construction materials corresponding to the construction site in the construction project, avoiding the problems of insufficient strength and poor stability of the building structure due to improper proportioning and improper processing, thereby reducing the risk of structural failure.

[0061] The present invention detects and analyzes the quality of finished materials corresponding to finished buildings in the construction project, which can not only intuitively reflect the overall quality of the finished building and ensure a good appearance effect, but also can avoid the situation of cutting corners during the construction process of the construction project to a certain extent.

[0062] The present invention comprehensively analyzes the quality and safety of engineering materials corresponding to the construction project from three aspects: the stacking materials, construction materials, and finished materials of the construction project, thereby ensuring the engineering quality of the construction project to the greatest extent, reducing material defects and problems in construction, thereby extending the service life of the building, reducing maintenance and repair costs, and improving sustainable development capabilities. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] The present invention will be further described below in conjunction with the accompanying drawings.

[0064] Figure 1 It is a schematic diagram of system module connection of the present invention. DETAILED DESCRIPTION

[0065] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0066] See also Figure 1 As shown, the present invention is a construction project quality and safety tracking and management system based on big data, including: a construction project information acquisition module, a warehouse material detection module, a warehouse material analysis module, a construction material detection module, a completed building detection module, a material quality and safety analysis module, a quality and safety tracking management terminal and a database.

[0067] The construction project information acquisition module is used to acquire the basic information of materials corresponding to the construction project, wherein the basic information of materials includes: warehouse reference humidity, warehouse reference temperature, warehouse reference light intensity, specification information of various types of materials, and composition information of various types of materials;

[0068] It should be noted that the specification information includes but is not limited to: brand, model, industry standard. The component information of various types of materials is the reference component types and reference content of each component type in various types of materials.

[0069] The warehouse material detection module is used to detect the storage environment of the material warehouse corresponding to the stacked materials in the construction project, and obtain the storage environment parameters of the material warehouse corresponding to the stacked materials in the construction project. The specific detection process is as follows:

[0070] The storage humidity of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is detected by the humidity sensor, and the storage humidity of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is obtained;

[0071] The storage temperature of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is detected by a temperature sensor, and the storage temperature of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is obtained;

[0072] Evenly distribute the detection points on the piled materials corresponding to the material warehouse in the construction project, obtain the detection points on the piled materials corresponding to the material warehouse in the construction project, and detect the light intensity of each detection point on the piled materials corresponding to the material warehouse in the construction project at each detection time point in the set detection period through a light intensity sensor, and obtain the light intensity of each detection point on the piled materials corresponding to the material warehouse in the construction project at each detection time point in the set detection period;

[0073] The storage environment parameters of the stacked materials in the material warehouse of the construction project are composed of the storage humidity and storage temperature of the stacked materials in the material warehouse of the construction project at each detection time point within the set detection period and the light intensity of each detection point.

[0074] The apparent quality of the materials piled up in the material warehouse in the construction project is tested to obtain the apparent quality parameters of the materials piled up in the material warehouse in the construction project. The specific testing process is as follows:

[0075] The stacked materials corresponding to the material warehouse in the construction project are classified according to the material types, and the stacked materials corresponding to the various types of materials in the material warehouse are obtained, and the packaging bag images of the various types of materials corresponding to the stacked materials in the material warehouse are obtained through the intelligent camera, and the packaging bag images of the various types of materials corresponding to the stacked materials in the material warehouse are obtained;

[0076] The text of the packaging bag images of various types of materials corresponding to each stacked material in the material warehouse is recognized and extracted by image recognition technology to obtain a text set of the packaging bags of various types of materials corresponding to each stacked material in the material warehouse;

[0077] Extract specification keywords from the text set of packaging bags of various types of materials corresponding to various piled materials in the material warehouse, obtain the specification keywords of various types of materials corresponding to various piled materials in the material warehouse, and form the detection specification information of various types of materials corresponding to various piled materials in the material warehouse from the specification keywords of various types of materials corresponding to various piled materials in the material warehouse;

[0078] It should be noted that the specification keyword refers to the specification information of the stacking material, including but not limited to: brand, model, and industry standard.

[0079] The apparent images of various types of materials corresponding to each piled material in the material warehouse are collected by intelligent cameras to obtain the apparent images of various types of materials corresponding to each piled material in the material warehouse, and the number of abnormal places of various types of materials corresponding to each piled material in the material warehouse is extracted, and the abnormal areas of various abnormal places of various types of materials corresponding to each piled material in the material warehouse are extracted, and then the abnormal areas are summed to obtain the total abnormal areas of various types of materials corresponding to each piled material in the material warehouse;

[0080] It should be noted that abnormalities include but are not limited to breakage, cracks, and dents.

[0081] The total abnormal area, number of abnormal places and detection specification information of various types of materials in the material warehouse corresponding to each piled material constitute the apparent quality parameters of the corresponding piled materials in the material warehouse in the construction project.

[0082] The warehouse material analysis module is used to analyze the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project based on the storage environment parameters and apparent quality parameters of the corresponding stacked materials in the material warehouse in the construction project, and obtain the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project. The specific analysis process is as follows:

[0083] Extract warehouse reference humidity SD0, warehouse reference temperature WD0, warehouse reference light intensity QD0, and specification information of various types of materials from the basic information of materials corresponding to the construction project. At the same time, extract the storage humidity CS of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period from the storage environment parameters of the corresponding stacked materials in the material warehouse of the construction project. i 、Storage temperature CW i And the light intensity CQ of each detection point i j , i is the number of each detection time point, i is a positive integer, i=1,2,...,n, n is the total number of detection time point numbers, j is the number of each detection point, j is a positive integer, j=1,2,...,m, m is the total number of detection point numbers, and the total abnormal area YS corresponding to each type of material in the material warehouse corresponding to the piled material is extracted from the apparent quality parameters of the material warehouse corresponding to the piled material in the construction project f p 、Number of abnormalities YN f p , testing specification information; f is the number of various types of materials, f is a positive integer, f=1,2,...,q, q is the total number of material type numbers, p is the number of each stacking material, p is a positive integer, p=1,2,...,w, w is the total number of stacking material numbers;

[0084] Extract the specification keywords of various types of materials corresponding to various types of stacked materials in the material warehouse from the detection specification information of various types of materials corresponding to various types of materials in the material warehouse, and match the specification keywords of various types of materials corresponding to various types of stacked materials in the material warehouse with the specification information of the corresponding types of materials in the construction project. If a certain specification keyword in the detection specification information of a certain stacked material successfully matches the specification information of the corresponding type of material, then record the specification keyword as the matching keyword, obtain the matching keywords of the stacked material, and then count the number of matching keywords YG of various types of materials corresponding to various types of stacked materials in the material warehouse fp ;

[0085] According to the formula Calculate the storage environment assessment index CF of the material warehouse corresponding to the piled materials in the construction project, e is a natural constant, a1, a2, a3 are the set weight factors, and the value ranges of a1, a2, a3 are all greater than 0 and less than 1;

[0086] It should be noted that the number of matching keywords, the total abnormal area, and the number of abnormal locations of various types of materials corresponding to each stacked material in the material warehouse are normalized and then substituted into the storage environment assessment index of the stacked materials in the material warehouse in the construction project for calculation. In the subsequent calculations of the documents submitted by the present invention, the numerical values ​​are all processed accordingly.

[0087] Count the number of specification keywords corresponding to each type of material in the material warehouse, recorded as GG f p ;

[0088] According to the formula Calculate the apparent quality evaluation index BG of the corresponding stacked materials in the material warehouse in the construction project, a4, a5, a6 are the set weight factors, and the value ranges of a4, a5, a6 are all greater than 0 and less than 1;

[0089] The quality safety assessment index ZA of the stacked materials in the material warehouse in the construction project is calculated according to the formula ZA=CF×ab+BG×ac, where ab and ac are the set weight factors, and the value ranges of ab and ac are both greater than 0 and less than 1.

[0090] The construction material detection module is used to detect the quality of the construction materials corresponding to the construction site in the construction project, and obtain the construction quality parameters of the construction materials corresponding to the construction site in the construction project. The specific detection steps are:

[0091] Classify the construction materials corresponding to the construction site in the construction project according to the material types to obtain the construction materials corresponding to the various types of materials in the construction site in the construction project, and randomly select a number of construction materials from the construction materials corresponding to the various types of materials in the construction site in the construction project as test materials to obtain the test materials corresponding to the various types of materials in the construction site in the construction project;

[0092] Extract the reference analysis methods corresponding to various types of materials from the database, and analyze the types and contents of components in each test material corresponding to various types of materials in the construction site according to the reference analysis methods of the corresponding types of materials, so as to obtain the types of components and contents of each component in each test material corresponding to various types of materials in the construction site;

[0093] It should be noted that the reference analysis methods corresponding to various types of materials include but are not limited to: chemical analysis, spectral analysis, and thermal analysis.

[0094] The construction quality parameters of the construction materials corresponding to the construction site in the construction project are constituted by the types of components and the contents of each component in each test material corresponding to the various types of materials in the construction site.

[0095] The construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project is analyzed to obtain the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project. The specific analysis process is as follows:

[0096] Extract the types of components and the contents of each component in each test material corresponding to each type of material in the construction site from the construction quality parameters of the construction materials corresponding to the construction site in the construction project;

[0097] Extracting the component information of various types of materials corresponding to the construction project from the basic information of materials corresponding to the construction project, and extracting the reference component types and reference contents of each component type corresponding to various types of materials in the construction project from the component information of various types of materials corresponding to the construction project;

[0098] Match the component types in each test material corresponding to each type of material in the construction site with the reference component types corresponding to the corresponding type of material. If a component type successfully matches the reference component type corresponding to the corresponding type of material, the component type is recorded as the matching component type. Otherwise, the component type is recorded as the abnormal component type. Then, the number of matching component types in each test material corresponding to each type of material in the construction site is obtained by counting PP. f v and the number of abnormal component types YC f v ; f is the number of various types of materials, f is a positive integer, f=1,2,...,q, q is the total number of material types, v is the number of each test material, v is a positive integer, v=1,2,...,x, x is the total number of test material numbers;

[0099] Extract the content of each matching component type in each test material from the content of each type of material in the construction site corresponding to each type of test material. f vk And the content of each abnormal component type YH f vg ; k is the number of each matching component type, k is a positive integer, k=1,2,...,s, s is the total number of matching component type numbers, g is the number of each abnormal component type, g is a positive integer, g=1,2,...,h, h is the total number of abnormal component type numbers;

[0100] Based on the reference content of each type of material corresponding to each component type in the construction project, obtain the reference content of each type of material corresponding to each matching component type CH f k ;

[0101] According to the formula The construction quality safety assessment index SA of the construction materials corresponding to the construction site in the construction project is calculated, b1, b2, b3, and b4 are set weight factors, and the value ranges of b1, b2, b3, and b4 are all greater than 0 and less than 1.

[0102] The completed building detection module is used to detect the quality of the completed materials corresponding to the completed buildings in the construction project, and obtain the completed quality parameters of the completed materials corresponding to the completed buildings in the construction project. The specific detection method is:

[0103] Classify each completed building in the construction project according to the type of material, and obtain the sub-buildings corresponding to each type of material of the completed building in the construction project;

[0104] Extracting quality inspection methods for various types of materials from the database, and inspecting sub-buildings corresponding to various types of materials of the completed buildings in the construction project according to the quality inspection methods for the corresponding types of materials, and obtaining quality analysis values ​​corresponding to various types of materials of the completed buildings in the construction project;

[0105] It should be noted that the quality inspection methods for various types of materials are as follows: For example, ultrasonic thickness gauges can be used to measure the thickness of concrete structures, and permeability tests can evaluate the compactness of concrete. The thickness and compactness of concrete are collectively referred to as the quality analysis value of concrete.

[0106] The apparent images of each completed building in the construction project are collected by a high-definition camera to obtain the apparent images corresponding to each completed building in the construction project;

[0107] Identify the defects corresponding to the appearance of each completed building from the appearance images corresponding to each completed building in the construction project, count the number of defects corresponding to the appearance of each completed building, and obtain the defect area corresponding to each defect of each completed building, and then sum them up to obtain the defect area corresponding to each completed building;

[0108] It should be noted that defects include but are not limited to: apparent damage to the building and apparent cracks in the building.

[0109] The completion quality parameters of the finished materials corresponding to the finished buildings in the construction project are composed of the number of apparent defects and the defect area of ​​each finished building in the construction project and the quality analysis values ​​of various types of materials corresponding to the finished buildings.

[0110] The completion quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project is analyzed to obtain the completion quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project. The specific analysis method is as follows:

[0111] Extract the number of defects WN corresponding to the surface of each completed building in the construction project from the finished quality parameters of the completed materials corresponding to the completed buildings in the construction project d , defect area QS d And the quality analysis value FX of various types of materials corresponding to the completed building f ; d is the number of each completed building, d is a positive integer, d=1,2,...,y, y is the total number of completed building numbers;

[0112] Extract the reference mass analysis value of each type of material from the database, denoted as CZ f ;

[0113] According to the formula The completion quality safety assessment index WA of the completed materials corresponding to the completed buildings in the construction project is calculated, c1, c2, c3 are the set influencing factors, ca, cb are the set weight factors, and the value ranges of c1, c2, c3, ca, and cb are all greater than 0 and less than 1.

[0114] The material quality and safety analysis module is used to obtain the engineering material quality assessment coefficient corresponding to the construction project based on the quality and safety assessment index of the stacked materials in the material warehouse in the construction project, the construction quality and safety assessment index of the construction materials in the construction site, and the completion quality and safety assessment index of the completed materials in the completed building. The analysis formula is: According to the formula GCZ=ZA×bn+SA×bm+WA××bp, the engineering material quality assessment coefficient GCZ corresponding to the construction project is calculated, bn, bm, and bp are the set weight factors, and the value ranges of bn, bm, and bp are all greater than 0 and less than 1.

[0115] Based on this, the quality and safety level of engineering materials corresponding to the construction project is analyzed to obtain the quality and safety level of engineering materials corresponding to the construction project. The analysis method is: match the engineering material quality assessment coefficient corresponding to the construction project with the engineering material quality assessment coefficient threshold corresponding to each set engineering material quality and safety level to obtain the quality and safety level of engineering materials corresponding to the construction project.

[0116] The quality and safety tracking management terminal is used to track and manage the quality of engineering materials corresponding to the construction project based on the quality and safety level of the engineering materials corresponding to the construction project;

[0117] In a specific embodiment, the quality of the engineering materials corresponding to the construction project is tracked and managed accordingly based on the quality safety level of the engineering materials corresponding to the construction project, and the specific method is:

[0118] If the quality and safety grade of the engineering materials corresponding to the construction project is Grade C, it means that the quality and safety of the engineering materials corresponding to the construction project are extremely poor and need to be rectified immediately. Obtain the list and contact information of the person in charge of the supervision of the engineering materials corresponding to the construction project and the relevant staff, implement rectification and punishment plans, suspend the construction work of the construction project, and issue a notice of criticism.

[0119] If the quality and safety grade of the engineering materials corresponding to the construction project is B, it means that the quality and safety of the engineering materials corresponding to the construction project meet the standards. The list and contact information of the person in charge of supervising the engineering materials corresponding to the construction project and related staff are obtained, and they are encouraged to maintain safety and regulatory requirements when constructing the construction project.

[0120] If the quality and safety grade of the engineering materials corresponding to the construction project is Class A, it means that the quality and safety of the engineering materials corresponding to the construction project are excellent. The list and contact information of the person in charge of supervising the engineering materials corresponding to the construction project and relevant staff will be obtained, and they will be rewarded and encouraged, and praised at the same time.

[0121] The database is used to store reference analysis methods corresponding to various types of materials, store quality inspection methods for various types of materials, and store reference quality analysis values ​​for various types of materials.

[0122] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined in the documents submitted for the present invention, they should all fall within the protection scope of the present invention.

Claims

1. Construction project quality and safety tracking management system based on big data, characterized by: include: The construction project information acquisition module is used to acquire the basic information of materials corresponding to the construction project, wherein the basic information of materials includes: warehouse reference humidity, warehouse reference temperature, warehouse reference light intensity, specification information of various types of materials, and composition information of various types of materials; The warehouse material detection module is used to detect the storage environment of the material warehouse corresponding to the stacked materials in the construction project, and obtain the storage environment parameters of the material warehouse corresponding to the stacked materials in the construction project, and at the same time detect the apparent quality of the material warehouse corresponding to the stacked materials in the construction project, and obtain the apparent quality parameters of the material warehouse corresponding to the stacked materials in the construction project; The warehouse material analysis module is used to analyze the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project based on the storage environment parameters and apparent quality parameters of the corresponding stacked materials in the material warehouse in the construction project, and obtain the quality safety assessment index of the corresponding stacked materials in the material warehouse in the construction project: Extract warehouse reference humidity SD0, warehouse reference temperature WD0, warehouse reference light intensity QD0, and specification information of various types of materials from the basic information of materials corresponding to the construction project. At the same time, extract the storage humidity CS of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period from the storage environment parameters of the corresponding stacked materials in the material warehouse of the construction project. i 、Storage temperature CW i And the light intensity CQ of each detection point i j , i is the number of each detection time point, i is a positive integer, i=1,2,...,n, n is the total number of detection time point numbers, j is the number of each detection point, j is a positive integer, j=1,2,...,m, m is the total number of detection point numbers, and the total abnormal area YS corresponding to each type of material in the material warehouse corresponding to the piled material is extracted from the apparent quality parameters of the material warehouse corresponding to the piled material in the construction project f p 、Number of abnormalities YN f p , testing specification information; f is the number of various types of materials, f is a positive integer, f=1,2,...,q, q is the total number of material type numbers, p is the number of each stacking material, p is a positive integer, p=1,2,...,w, w is the total number of stacking material numbers; Extract the specification keywords of various types of materials corresponding to various types of stacked materials in the material warehouse from the detection specification information of various types of materials corresponding to various types of materials in the material warehouse, and match the specification keywords of various types of materials corresponding to various types of stacked materials in the material warehouse with the specification information of the corresponding types of materials in the construction project. If a certain specification keyword in the detection specification information of a certain stacked material successfully matches the specification information of the corresponding type of material, then record the specification keyword as the matching keyword, obtain the matching keywords of the stacked material, and then count the number of matching keywords YG of various types of materials corresponding to various types of stacked materials in the material warehouse f p ; According to the formula Calculate the storage environment assessment index CF of the material warehouse corresponding to the piled materials in the construction project, e is a natural constant, a1, a2, a3 are the set weight factors, and the value ranges of a1, a2, a3 are all greater than 0 and less than 1; Count the number of specification keywords corresponding to each type of material in the material warehouse, recorded as GG f p ; According to the formula Calculate the apparent quality evaluation index BG of the corresponding stacked materials in the material warehouse in the construction project, a4, a5, a6 are the set weight factors, and the value ranges of a4, a5, a6 are all greater than 0 and less than 1; The quality safety assessment index ZA of the material warehouse corresponding to the piled materials in the construction project is calculated according to the formula ZA=CF×ab+BG×ac, where ab and ac are the set weight factors, and the value ranges of ab and ac are both greater than 0 and less than 1; The construction material detection module is used to detect the quality of the construction materials corresponding to the construction site in the construction project, obtain the construction quality parameters of the construction materials corresponding to the construction site in the construction project, and analyze the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project, and obtain the construction quality safety assessment index of the construction materials corresponding to the construction site in the construction project: Extract the types of components and the contents of each component in each test material corresponding to each type of material in the construction site from the construction quality parameters of the construction materials corresponding to the construction site in the construction project; Extracting the component information of various types of materials corresponding to the construction project from the basic information of materials corresponding to the construction project, and extracting the reference component types and reference contents of each component type corresponding to various types of materials in the construction project from the component information of various types of materials corresponding to the construction project; Match the component types in each test material corresponding to each type of material in the construction site with the reference component types corresponding to the corresponding type of material. If a component type successfully matches the reference component type corresponding to the corresponding type of material, the component type is recorded as the matching component type. Otherwise, the component type is recorded as the abnormal component type. Then, the number of matching component types in each test material corresponding to each type of material in the construction site is obtained by counting PP. f v and the number of abnormal component types YC f v ; f is the number of various types of materials, f is a positive integer, f=1,2,...,q, q is the total number of material types, v is the number of each test material, v is a positive integer, v=1,2,...,x, x is the total number of test material numbers; Extract the content of each matching component type in each test material from the content of each type of material in the construction site corresponding to each type of test material. f vk And the content of each abnormal component type YH f vg ; k is the number of each matching component type, k is a positive integer, k=1,2,...,s, s is the total number of matching component type numbers, g is the number of each abnormal component type, g is a positive integer, g=1,2,...,h, h is the total number of abnormal component type numbers; Based on the reference content of each type of material corresponding to each component type in the construction project, obtain the reference content of each type of material corresponding to each matching component type CH f k ; According to the formula Calculate the construction quality safety assessment index SA of the construction materials corresponding to the construction site in the construction project, b1, b2, b3, b4 are the set weight factors, and the value ranges of b1, b2, b3, b4 are all greater than 0 and less than 1; The completed building detection module is used to detect the quality of the completed materials corresponding to the completed buildings in the construction project, obtain the completed quality parameters of the completed materials corresponding to the completed buildings in the construction project, and analyze the completed quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project to obtain the completed quality safety assessment index of the completed materials corresponding to the completed buildings in the construction project: Extract the number of defects WN corresponding to the surface of each completed building in the construction project from the finished quality parameters of the completed materials corresponding to the completed buildings in the construction project d , defect area QS d And the quality analysis value FX of various types of materials corresponding to the completed building f ; d is the number of each completed building, d is a positive integer, d=1,2,...,y, y is the total number of completed building numbers; Extract the reference mass analysis value of each type of material from the database, denoted as CZ f ; According to the formula Calculate the completion quality safety assessment index WA of the completed materials corresponding to the completed buildings in the construction project, c1, c2, c3 are the set influencing factors, ca, cb are the set weight factors, and the value ranges of c1, c2, c3, ca, and cb are all greater than 0 and less than 1; The material quality and safety analysis module is used to obtain the engineering material quality assessment coefficient corresponding to the construction project based on the quality and safety assessment index of the material warehouse corresponding to the piled materials in the construction project, the construction quality and safety assessment index of the construction materials corresponding to the construction site, and the completion quality and safety assessment index of the completed materials corresponding to the completed building: The engineering material quality assessment coefficient GCZ corresponding to the construction project is calculated according to the formula GCZ=ZA×bn+SA×bm+WA××bp, where bn, bm, and bp are the set weight factors, and the value ranges of bn, bm, and bp are all greater than 0 and less than 1; Based on this, the quality and safety level of engineering materials corresponding to the construction project is analyzed to obtain the quality and safety level of engineering materials corresponding to the construction project; The quality and safety tracking management terminal is used to track and manage the quality of engineering materials corresponding to the construction project based on the quality and safety level of the engineering materials corresponding to the construction project; The database is used to store reference analysis methods corresponding to various types of materials, store quality inspection methods for various types of materials, and store reference quality analysis values ​​for various types of materials.

2. The construction project quality and safety tracking management system based on big data according to claim 1 is characterized in that: The storage environment of the material warehouse corresponding to the stacked materials in the construction project is detected to obtain the storage environment parameters of the material warehouse corresponding to the stacked materials in the construction project. The specific detection method is: The storage humidity of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is detected by the humidity sensor, and the storage humidity of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is obtained; The storage temperature of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is detected by a temperature sensor, and the storage temperature of the corresponding stacked materials in the material warehouse of the construction project at each detection time point within the set detection period is obtained; Evenly distribute the detection points on the piled materials corresponding to the material warehouse in the construction project, obtain the detection points on the piled materials corresponding to the material warehouse in the construction project, and detect the light intensity of each detection point on the piled materials corresponding to the material warehouse in the construction project at each detection time point in the set detection period through a light intensity sensor, and obtain the light intensity of each detection point on the piled materials corresponding to the material warehouse in the construction project at each detection time point in the set detection period; The storage environment parameters of the stacked materials in the material warehouse of the construction project are composed of the storage humidity and storage temperature of the stacked materials in the material warehouse of the construction project at each detection time point within the set detection period and the light intensity of each detection point.

3. The construction project quality and safety tracking management system based on big data according to claim 1 is characterized in that: The apparent quality of the materials piled up in the material warehouse in the construction project is detected to obtain the apparent quality parameters of the materials piled up in the material warehouse in the construction project. The specific detection method is: The stacked materials corresponding to the material warehouse in the construction project are classified according to the material types, and the stacked materials corresponding to the various types of materials in the material warehouse are obtained, and the packaging bag images of the various types of materials corresponding to the stacked materials in the material warehouse are obtained through the intelligent camera, and the packaging bag images of the various types of materials corresponding to the stacked materials in the material warehouse are obtained; The text of the packaging bag images of various types of materials corresponding to each stacked material in the material warehouse is recognized and extracted by image recognition technology to obtain a text set of the packaging bags of various types of materials corresponding to each stacked material in the material warehouse; Extract specification keywords from the text set of packaging bags of various types of materials corresponding to various piled materials in the material warehouse, obtain the specification keywords of various types of materials corresponding to various piled materials in the material warehouse, and form the detection specification information of various types of materials corresponding to various piled materials in the material warehouse from the specification keywords of various types of materials corresponding to various piled materials in the material warehouse; The apparent images of various types of materials corresponding to each piled material in the material warehouse are collected by intelligent cameras to obtain the apparent images of various types of materials corresponding to each piled material in the material warehouse, and the number of abnormal places of various types of materials corresponding to each piled material in the material warehouse is extracted, and the abnormal areas of various abnormal places of various types of materials corresponding to each piled material in the material warehouse are extracted, and then the abnormal areas are summed to obtain the total abnormal areas of various types of materials corresponding to each piled material in the material warehouse; The total abnormal area, number of abnormal places and detection specification information of various types of materials in the material warehouse corresponding to each piled material constitute the apparent quality parameters of the corresponding piled materials in the material warehouse in the construction project.

4. The construction project quality and safety tracking management system based on big data according to claim 1 is characterized in that: The quality of the construction materials corresponding to the construction site in the construction project is detected to obtain the construction quality parameters of the construction materials corresponding to the construction site in the construction project. The specific detection method is: Classify the construction materials corresponding to the construction site in the construction project according to the material types to obtain the construction materials corresponding to the various types of materials in the construction site in the construction project, and randomly select a number of construction materials from the construction materials corresponding to the various types of materials in the construction site in the construction project as test materials to obtain the test materials corresponding to the various types of materials in the construction site in the construction project; Extract the reference analysis methods corresponding to various types of materials from the database, and analyze the types and contents of components in each test material corresponding to various types of materials in the construction site according to the reference analysis methods of the corresponding types of materials, so as to obtain the types of components and contents of each component in each test material corresponding to various types of materials in the construction site; The construction quality parameters of the construction materials corresponding to the construction site in the construction project are constituted by the types of components and the contents of each component in each test material corresponding to the various types of materials in the construction site.

5. The construction project quality and safety tracking management system based on big data according to claim 1 is characterized in that: The quality of the finished materials corresponding to the finished buildings in the construction project is tested to obtain the finished quality parameters of the finished materials corresponding to the finished buildings in the construction project. The specific testing method is: Classify each completed building in the construction project according to the type of material, and obtain the sub-buildings corresponding to each type of material of the completed building in the construction project; Extracting quality inspection methods for various types of materials from the database, and inspecting sub-buildings corresponding to various types of materials of the completed buildings in the construction project according to the quality inspection methods for the corresponding types of materials, and obtaining quality analysis values ​​corresponding to various types of materials of the completed buildings in the construction project; The apparent images of each completed building in the construction project are collected by a high-definition camera to obtain the apparent images corresponding to each completed building in the construction project; Identify the defects corresponding to the appearance of each completed building from the appearance images corresponding to each completed building in the construction project, count the number of defects corresponding to the appearance of each completed building, and obtain the defect area corresponding to each defect of each completed building, and then sum them up to obtain the defect area corresponding to each completed building; The completion quality parameters of the finished materials corresponding to the finished buildings in the construction project are composed of the number of apparent defects and the defect area of ​​each finished building in the construction project and the quality analysis values ​​of various types of materials corresponding to the finished buildings.

6. The construction project quality and safety tracking management system based on big data according to claim 1 is characterized in that: The quality safety level of engineering materials corresponding to the construction project is analyzed to obtain the quality safety level of engineering materials corresponding to the construction project. The specific analysis method is as follows: The engineering material quality assessment coefficient corresponding to the construction project is matched with the engineering material quality assessment coefficient threshold corresponding to each set engineering material quality safety level to obtain the engineering material quality safety level corresponding to the construction project.