Airtight pressure testing machine for water pipe
By introducing components such as feeding mechanisms and hydraulic cylinders into the water pipe air-tight pressure tester, the automatic transmission and pressure testing of the water pipes are achieved, which solves the problem of manual operation and improves the efficiency and accuracy of air-tight pressure testing.
Patent Information
- Application Number
- CN202411133886.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-19
AI Technical Summary
When performing air-tight pressure test on the water pipe, existing water pipe air-tight pressure testers need to be put in and taken out manually, which consumes manpower and affects work efficiency.
An air-tight pressure tester for water pipes is designed, using components such as feeding mechanisms and hydraulic cylinders. The water pipes are clamped and limited by moving blocks and air pressure sensors, and automated conveying and pressure test are achieved using conveying belts and electric sliders. PLC controller is used to detect and separate qualified and unqualified water pipes.
The automatic placement and removal of water pipes is realized, manpower is saved, the working efficiency of airtight pressure testing is improved, and the accuracy and efficiency of pressure testing is ensured through the detection function.
Smart Images

Figure CN118670643B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pressure testing machines, in particular to an airtight pressure testing machine for a water pipe. Background Art
[0002] Water pipes are pipes used to transport water or other liquids. They are usually made of metals (such as copper, iron), plastics and other materials. They have certain strength and sealing properties to ensure that the liquid flows smoothly in the pipes and does not leak. After the water pipes are processed, in order to ensure the airtightness of the water pipes, a pressure test machine is needed to perform an airtight pressure test on the water pipes.
[0003] The prior art discloses a pipe pressure testing machine with application number: CN202222535581.1, which includes a pressure testing machine, a cover fixedly connected to the top of the pressure testing machine, a glass fixedly connected to the inner wall of the cover, and a support leg fixedly connected to the bottom of the pressure testing machine.
[0004] However, the above-mentioned pressure test machine has the disadvantage that it is not conducive to the transportation of water pipes when performing airtight pressure test on water pipes, and workers are required to manually put in and take out the water pipes. Manually putting in and taking out the water pipes by workers consumes manpower and affects the work efficiency of airtight pressure test on water pipes.
[0005] For this purpose, we propose an airtight pressure testing machine for water pipes. Summary of the invention
[0006] In view of the above problems and / or the problems existing in the existing airtight pressure testing machine for water pipes, the present invention is proposed.
[0007] Therefore, the object of the present invention is to provide an airtight pressure testing machine for water pipes. By improving the existing airtight pressure testing machine, it can solve the problem that when performing airtight pressure testing on water pipes in the prior art, it is not conducive to the transportation of water pipes, and staff are required to manually put in and take out the water pipes. Manually putting in and taking out the water pipes by staff will consume manpower and affect the work efficiency of the airtight pressure testing on water pipes.
[0008] To solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:
[0009] A water pipe airtight pressure tester comprises a first mounting plate, a feeding mechanism is installed on one side of the upper surface of the first mounting plate, fixed blocks are fixed on the four corners of the upper surface of the first mounting plate, a second mounting plate is fixed between the upper end surfaces of the fixed blocks, a first movable plate is slidably installed on the lower surface of the second mounting plate in a horizontal direction, hydraulic cylinders are fixed on both ends of the upper surface of the first movable plate, an output rod of the hydraulic cylinder faces downward and passes through the upper and lower surfaces at corresponding positions on the first movable plate, and the lower ends of the hydraulic cylinder output rods are located between the lower sides of the second mounting plate and are fixed to the second movable plate A plurality of moving blocks are installed at both ends of the lower surface of the second movable plate for sliding in the horizontal direction, and a sealing gasket is fixed to the lower end of the moving block on the side surface close to the middle of the second mounting plate. An air pressure sensor penetrating the corresponding sealing gasket is installed in the middle of the lower end of the moving block on one end close to the sealing gasket, and a connecting pipe is installed in the middle of the lower end of the moving block at the end away from the air pressure sensor. The connecting pipes penetrate the corresponding moving blocks and the two side surfaces at the corresponding positions on the sealing gasket. A water tank is installed in the middle of the upper surface of the first mounting plate, and the top of the water tank is in an open state, and water is provided in the water tank.
[0010] As a preferred solution of an airtight pressure testing machine for water pipes described in the present invention, the feeding mechanism includes first connecting plates located at both ends and the middle of one side of the upper surface of the first mounting plate, the first connecting plates are fixedly connected to corresponding positions on the upper surface of the first mounting plate, first fixing plates are fixed at both ends of the upper surface of the first connecting plate, the first connecting plate can fix and limit the first fixing plate, a second connecting plate is fixed between adjacent first connecting plates on one side of the middle of the upper surface of the first mounting plate close to the first connecting plate, second fixing plates are fixed at both ends of the upper surface of the second connecting plate, the upper surface of the first fixing plate is inclined downward toward the second fixing plate, a third fixing plate is fixed at one end of the upper surface of the first fixing plate close to the second fixing plate, and the first fixing plate can fix and limit the third fixing plate The cam is secured to the upper and lower ends of the first and second surfaces of the second fixing plate and the second fixing plate, and the cam is secured to the upper and second surfaces of the second fixing plate.
[0011] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, wherein: a first rotating rod is commonly fixed between the middle part of the first rotating roller located at the upper end of the third fixed plate and between the middle part of the first rotating roller located at the lower end of the third fixed plate, the first rotating rod passes through the two end surfaces of the corresponding middle part of the first rotating roller, the first rotating rod passes through the two side surfaces of the corresponding position on the third fixed plate, the first rotating rod is rotatably connected with the corresponding position on the third fixed plate through a bearing, and the first rotating rod helps to rotate and limit the first rotating roller.
[0012] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, the third fixed plate located at one end is provided with a first rotating motor at the lower end thereof away from the surface of one side of the first conveyor belt corresponding to the first rotating rod, and the third fixed plate can fix and limit the first rotating motor, and the output shaft of the first rotating motor faces the first rotating rod, and the output shaft of the first rotating motor is fixedly installed between one end close to the first rotating rod and the opposite end on the corresponding first rotating rod.
[0013] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, wherein: a second rotating rod is fixed to the middle part of the second rotating roller, the second rotating rod passes through the two end surfaces of the corresponding middle part of the second rotating roller, the two ends of the second rotating rod pass through the two side surfaces of the corresponding positions on the corresponding second fixed plate, the two ends of the outer ring surface of the second rotating rod are rotatably connected with the corresponding positions on the corresponding second fixed plate through bearings, the second rotating rod helps to rotate and limit the second rotating roller, and a connecting rod is commonly fixed between the opposite ends of the second rotating rod on the side away from the first fixed plate.
[0014] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, the second fixed plate located at one end is away from the top of the surface of one side of the second conveyor belt, and a second rotating motor is installed corresponding to the second rotating rod. The output shaft of the second rotating motor faces the second rotating rod, and the end of the output shaft of the second rotating motor close to the second rotating rod is fixedly connected with the opposite end on the corresponding second rotating rod, and the second rotating motor helps to drive the second rotating rod to rotate.
[0015] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, wherein: a connected air intake hose is fixed to the end of the connecting pipe away from the air pressure sensor, and the end of the air intake hose away from the connecting pipe is connected and installed with an external air pump, a second electric slider is installed on the upper surface of the moving block, and a plurality of second guide rails are fixed on the lower surface of the second moving plate at intervals along the horizontal direction corresponding to the second electric slider, the second moving plate can fix and limit the second guide rail, and the second electric sliders are slidably installed along the horizontal direction between the corresponding positions on the corresponding second guide rails.
[0016] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, wherein: first electric sliders are installed at both ends of the upper surface of the first movable plate, first guide rails are fixed at both ends of the lower surface of the second mounting plate corresponding to the first electric sliders, the first electric sliders are slidably installed along the horizontal direction between the corresponding positions on the corresponding first guide rails, the first guide rails help to limit the first electric slider, a PLC controller is installed in the middle of one side of the upper surface of the second mounting plate, the PLC controller is electrically connected to the air pressure sensor, and the second electric sliders are electrically connected to the PLC controller.
[0017] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, wherein: both ends of the second mounting plate are provided with retention holes corresponding to the hydraulic cylinder, the middle part of the upper surface of the first mounting plate is located on the side of the water tank away from the second fixed plate, and the first material receiving frame is fixed to the middle part of the upper surface of the first mounting plate, which is located on the side of the first material receiving frame away from the water tank, and the second material receiving frame is fixed to the middle part of the upper surface of the first mounting plate, which is located on the side of the first material receiving frame away from the water tank, and the first mounting plate can fix and limit the first material receiving frame and the second material receiving frame.
[0018] As a preferred solution of the airtight pressure testing machine for water pipes described in the present invention, the first mounting plate is in a horizontal state, and a plurality of supporting legs are fixed at intervals around the edge portion of the lower surface of the first mounting plate. The supporting legs can support and limit the first mounting plate, which helps to stably use the first mounting plate.
[0019] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0020] 1. In the present invention, the moving block can clamp the two ends of the water pipe through the sealing gasket, and the connecting pipe and the air pressure sensor on the moving block help to limit the inner sides of the two ends of the water pipe. When the water pipe is subjected to an airtight pressure test during use, it helps to transport the water pipe, and can conveniently put in and take out the water pipe that needs to be subjected to an airtight pressure test. When putting in and taking out the water pipe that needs to be subjected to an airtight pressure test, it helps to save the manpower required, so as to ensure the work efficiency of the airtight pressure test of the water pipe.
[0021] 2. In the present invention, when the first electric slider moves, it can drive the moving block to move in the horizontal direction through the first moving plate, the hydraulic cylinder, the second moving plate, the second guide rail and the second electric slider. The output rod of the hydraulic cylinder can drive the moving block to move in the vertical direction through the second moving plate, the second guide rail and the second electric slider. The second electric slider can drive the connecting pipes and the air pressure sensor at both ends to move in the horizontal direction through the moving block, so as to clamp and limit the water pipe.
[0022] 3. In the present invention, when the air pressure sensor is turned on, the air pressure in the water pipe can be detected, and the detected air pressure data information can be transmitted to the PLC controller. After the water pipe is moved to the position corresponding to the first material receiving frame, the PLC controller will open the second electric slider corresponding to the air pressure sensor that records the air pressure lower than the preset value during the detection, so that the moving block moves away from the water pipe to cancel the limit on the substandard water pipe, so as to facilitate the separation of the substandard water pipe from the standard water pipe.
[0023] 4. In the present invention, when the first conveyor belt rotates, it can drive the hook block to rotate. When the hook block rotates, it can drive the water pipe in contact with the first conveyor belt to move upward. The first conveyor belt can transport the water pipe to the upper side of the second conveyor belt through the hook block. When the second conveyor belt rotates, it can transport the water pipe on the upper side, and the block can block the water pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of the present invention;
[0025] Figure 2 It is a schematic structural diagram of the first fixing plate of the present invention;
[0026] Figure 3 It is a schematic structural diagram of the first movable plate of the present invention;
[0027] Figure 4 It is a schematic diagram of the structure of the third fixing plate of the present invention;
[0028] Figure 5 It is a schematic structural diagram of a second mounting plate of the present invention;
[0029] Figure 6 for Figure 5 A partial enlarged schematic diagram of the middle A part;
[0030] Figure 7 for Figure 5 A partial enlarged schematic diagram of the middle B part;
[0031] Figure 8 It is a schematic diagram of the structure of the first rotating rod of the present invention;
[0032] Fig. 9 It is a schematic diagram of the block structure of the present invention;
[0033] Fig.10 It is a schematic diagram of the connecting rod structure of the present invention.
[0034] In the figure: 1, first mounting plate; 2, second mounting plate; 3, supporting leg; 4, fixing block; 5, first connecting plate; 6, second connecting plate; 7, first fixing plate; 8, second fixing plate; 9, third fixing plate; 10, first rotating rod; 11, second rotating rod; 12, first rotating motor; 13, second rotating motor; 14, connecting rod; 15, first rotating roller; 16, second rotating roller; 17, first conveying belt; 18, second conveying belt; 19, hook Material block; 20, water storage tank; 21, connecting block; 22, stopper; 23, first material receiving frame; 24, second material receiving frame; 25, first guide rail; 26, second guide rail; 27, first electric slider; 28, second electric slider; 29, first moving plate; 30, second moving plate; 31, hydraulic cylinder; 32, retention hole; 33, moving block; 34, sealing gasket; 35, connecting pipe; 36, air intake hose; 37, air pressure sensor; 38, PLC controller. DETAILED DESCRIPTION
[0035] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0036] The present invention provides an airtight pressure tester for water pipes, which has the advantages of being helpful for conveying water pipes when performing airtight pressure test on water pipes, being able to conveniently put in and take out water pipes that need to perform airtight pressure test, and being helpful for saving manpower required when putting in and taking out water pipes that need to perform airtight pressure test, so as to ensure the working efficiency of airtight pressure test on water pipes;
[0037] See also Figure 1-10, a water pipe airtight pressure testing machine, comprising a first mounting plate 1, a feeding mechanism is installed on one side of the upper surface of the first mounting plate 1, four corners of the upper surface of the first mounting plate 1 are fixed with fixed blocks 4, a second mounting plate 2 is fixed between the upper end surfaces of the fixed blocks 4, a first movable plate 29 is slidably installed on the lower surface of the second mounting plate 2 in a horizontal direction, hydraulic cylinders 31 are fixed at both ends of the upper surface of the first movable plate 29, an output rod of the hydraulic cylinder 31 faces downward and penetrates the upper and lower surfaces of the corresponding positions on the first movable plate 29, a second movable plate 30 is fixed between the lower ends of the output rods of the hydraulic cylinder 31 and located on the lower side of the second mounting plate 2, a plurality of movable blocks 33 are slidably installed in the horizontal direction at intervals on both ends of the lower surface of the second movable plate 30, a sealing gasket 34 is fixed to the lower end of the surface of one side of the movable block 33 close to the middle of the second mounting plate 2, and a sealing gasket 34 is fixed to the lower end of the surface of one side of the movable block 33 close to the middle of the sealing gasket 34. The parts are all installed with air pressure sensors 37 penetrating the corresponding sealing gaskets 34, and the middle part of the lower end of the moving block 33 away from the end of the air pressure sensor 37 is installed with a connecting pipe 35, and the connecting pipe 35 penetrates the corresponding moving block 33 and the two side surfaces of the corresponding positions on the sealing gasket 34. A water storage tank 20 is installed in the middle of the upper surface of the first mounting plate 1, and the top of the water storage tank 20 is in an open state. There is water in the water storage tank 20. The moving block 33 can clamp the two ends of the water pipe through the sealing gasket 34, and the connecting pipe 35 and the air pressure sensor 37 on the moving block 33 help to limit the inner sides of the two ends of the water pipe. When the water pipe is subjected to an airtight pressure test during use, it helps to transport the water pipe, and can conveniently put in and take out the water pipe that needs to be subjected to an airtight pressure test. It helps to save the manpower required when putting in and taking out the water pipe that needs to be subjected to an airtight pressure test, so as to ensure the work efficiency of the airtight pressure test of the water pipe.
[0038] Among them, the feeding mechanism includes a first connecting plate 5 located at both ends and the middle of one side of the upper surface of the first mounting plate 1, the first connecting plates 5 are fixedly connected to the corresponding positions on the upper surface of the first mounting plate 1, and the first fixing plates 7 are fixed at both ends of the upper surface of the first connecting plate 5, and the first connecting plate 5 can fix and limit the first fixing plate 7, and the second connecting plate 6 is fixed between the adjacent first connecting plates 5 on the middle part of the upper surface of the first mounting plate 1, and the second fixing plates 8 are fixed at both ends of the upper surface of the second connecting plate 6, and the upper surface of the first fixing plate 7 is inclined downward toward the second fixing plate 8, and the third fixing plate 9 is fixed at one end of the upper surface of the first fixing plate 7 close to the second fixing plate 8, and the first fixing plate 7 can fix and limit the third fixing plate 9, and the first rotating roller 15 is rotatably installed between the upper end and the lower end of the opposite surface of the third fixing plate 9 above the same first connecting plate 5, and the first conveying belt 17 is installed between the outer sides of the first rotating roller 15 above the same first connecting plate 5, and the outer sides of the first conveying belt 17 are fixed with a plurality of intervals The hook block 19, the second rotating roller 16 is rotatably installed between the two ends of the top of the opposite surface of the second fixed plate 8 on the same second connecting plate 6, and the second conveying belt 18 is sleeved and installed between the outer sides of the second rotating roller 16 above the same second connecting plate 6. The end of the upper surface of the second fixed plate 8 away from the first fixed plate 7 is fixed with a connecting block 21, and the opposite surfaces of the connecting block 21 above the same second connecting plate 6 are fixed with a stopper 22, and the connecting block 21 can fix and limit the stopper 22. The upper end of the third fixed plate 9 is facing the second fixed plate The fixed plate 8 is in a tilted state; a first rotating rod 10 is fixed between the middle part of the first rotating roller 15 at the upper end of the third fixed plate 9 and between the middle part of the first rotating roller 15 at the lower end of the third fixed plate 9. The first rotating rod 10 passes through the two end surfaces of the corresponding middle part of the first rotating roller 15, and the first rotating rod 10 passes through the two side surfaces of the corresponding position on the third fixed plate 9. The first rotating rod 10 is rotatably connected with the corresponding position on the third fixed plate 9 through a bearing, and the first rotating rod 10 helps to rotate and limit the first rotating roller 15.
[0039] The third fixed plate 9 at one end is located away from the first conveyor belt 17. The lower end of the surface is installed with a first rotating motor 12 corresponding to the first rotating rod 10. The third fixed plate 9 can fix and limit the first rotating motor 12. The output shaft of the first rotating motor 12 faces the first rotating rod 10. The end of the output shaft of the first rotating motor 12 close to the first rotating rod 10 is fixedly installed with the opposite end on the corresponding first rotating rod 10; the middle of the second rotating roller 16 is fixed with a second rotating rod 11, and the second rotating rod 11 passes through the two end surfaces of the middle of the corresponding second rotating roller 16. The two ends of the second rotating rod 11 pass through the two side surfaces of the corresponding position on the corresponding second fixed plate 8. The two ends of the outer ring surface of the second rotating rod 11 are rotatably connected with the corresponding position on the corresponding second fixed plate 8 through bearings. The second rotating rod 11 helps to rotate and limit the second rotating roller 16. A connecting rod 14 is fixed between the opposite ends of the second rotating rod 11 on the side away from the first fixed plate 7.
[0040] The second fixed plate 8 located at one end is located at the top of the surface of one side away from the second conveyor belt 18, and a second rotating motor 13 is installed corresponding to the second rotating rod 11. The output shaft of the second rotating motor 13 faces the second rotating rod 11, and the end of the output shaft of the second rotating motor 13 close to the second rotating rod 11 is fixedly connected to the opposite end on the corresponding second rotating rod 11, and the second rotating motor 13 helps to drive the second rotating rod 11 to rotate; a connected air intake hose 36 is fixed to the end of the connecting pipe 35 away from the air pressure sensor 37, and the end of the air intake hose 36 away from the connecting pipe 35 is connected and installed with an external air pump, and a second electric slider 28 is installed on the upper surface of the moving block 33, and a plurality of second guide rails 26 are fixed on the lower surface of the second moving plate 30 corresponding to the second electric slider 28 at intervals in the horizontal direction. The second moving plate 30 can fix and limit the second guide rail 26, and the second electric sliders 28 are slidably installed between the corresponding positions on the corresponding second guide rails 26 in the horizontal direction.
[0041] The first electric slider 27 is installed at both ends of the upper surface of the first movable plate 29, and the first guide rails 25 are fixed at both ends of the lower surface of the second mounting plate 2 corresponding to the first electric slider 27. The first electric slider 27 is slidably installed along the horizontal direction between the corresponding positions on the corresponding first guide rails 25. The first guide rails 25 help to limit the first electric slider 27. A PLC controller 38 is installed in the middle of one side of the upper surface of the second mounting plate 2. The PLC controller 38 is electrically connected to the air pressure sensor 37, and the second electric slider 28 is electrically connected to the PLC controller 38; both ends of the second mounting plate 2 correspond to the liquid The pressure cylinder 31 is provided with a retaining hole 32, and a first material receiving frame 23 is fixed to the middle part of the upper surface of the first mounting plate 1, which is located on the side of the water tank 20 away from the second fixed plate 8. A second material receiving frame 24 is fixed to the middle part of the upper surface of the first mounting plate 1, which is located on the side of the first material receiving frame 23 away from the water tank 20. The first mounting plate 1 can fix and limit the first material receiving frame 23 and the second material receiving frame 24; the first mounting plate 1 is in a horizontal state, and a plurality of supporting legs 3 are fixed at intervals around the edge of the lower surface of the first mounting plate 1. The supporting legs 3 can support and limit the first mounting plate 1, which helps to stably use the first mounting plate 1.
[0042] The working principle of the present invention is as follows: during use, the supporting legs 3 are stably placed at the position where they need to be used, the supporting legs 3 can support and limit the first mounting plate 1 and the various components assembled on the first mounting plate 1, so as to facilitate the stable use of the first mounting plate 1 and the various components assembled on the first mounting plate 1, the first mounting plate 1 can support and limit the fixing block 4, so as to facilitate the stable use of the fixing block 4, the fixing block 4 can support and limit the second mounting plate 2 and the various components assembled on the second mounting plate 2, so as to facilitate the stable use of the second mounting plate 2 and the various components assembled on the second mounting plate 2.
[0043] The first fixed plate 7 is aligned with the lower part of the external pipe making and unloading equipment, so that the water pipe discharged from the external pipe making and unloading equipment will fall to the top of the first fixed plate 7. After the water pipe falls to the top of the first fixed plate 7, it will move along the inclined surface of the top of the first fixed plate 7 toward the first conveyor belt 17, and further open the first rotating motor 12 on the third fixed plate 9. The third fixed plate 9 can fix and limit the first rotating motor 12, which is convenient for the stable use of the first rotating motor 12. When the first rotating motor 12 is opened, the output shaft of the first rotating motor 12 can drive the first rotating rod 10 along the third rotating motor 12. The first rotating roller 15 is driven by the third fixed plate 9 to rotate. When the first rotating rod 10 rotates, it can drive the first rotating roller 15 to rotate. The third fixed plate 9 can limit the first rotating roller 15 through the first rotating rod 10, which is helpful to stably rotate the first rotating roller 15. When the first rotating roller 15 rotates, it can drive the first conveying belt 17 to rotate. When the first conveying belt 17 rotates, it can drive the hooking block 19 to rotate. When the hooking block 19 rotates, it can drive the water pipe fitted with the first conveying belt 17 to move upward. The first conveying belt 17 can transport the water pipe to the upper side of the second conveying belt 18 through the hooking block 19.
[0044] The second rotating motor 13 on the second fixed plate 8 is opened, and the second fixed plate 8 can fix and limit the second rotating motor 13, so as to stably use the second rotating motor 13. When the second rotating motor 13 is opened, the output shaft of the second rotating motor 13 can drive the second rotating rod 11 at the corresponding end to rotate. When the second rotating rod 11 rotates, the second rotating rod 11 at the other end can be driven to rotate through the connecting rod 14. When the second rotating rod 11 rotates, the second rotating roller 16 can be driven to rotate. The second fixed plate 8 can limit the second rotating roller 16 through the second rotating rod 11, which is helpful to stably rotate the second rotating roller 16. When the second rotating roller 16 rotates, the second conveying belt 18 can be driven to rotate. When the second conveying belt 18 rotates, the water pipe on the upper side can be conveyed, so that the second conveying belt 18 drives the water pipe on the upper side to move toward the stopper 22. The stopper 22 can block the water pipe. The second fixed plate 8 can fix and limit the stopper 22 through the connecting block 21, so as to stably use the stopper 22.
[0045] The first electric slider 27 on the first guide rail 25 is opened, so that the first electric slider 27 moves toward the stopper 22 in the horizontal direction. When the first electric slider 27 moves, it can drive the moving block 33 to move in the horizontal direction through the first moving plate 29, the hydraulic cylinder 31, the second moving plate 30, the second guide rail 26 and the second electric slider 28. After the moving block 33 is moved to the two ends of the corresponding water pipe that needs to be transported, the hydraulic cylinder 31 is opened. When the hydraulic cylinder 31 is opened, the output rod of the hydraulic cylinder 31 can drive the second moving plate 30 to move downward. When the second moving plate 30 moves downward, the moving block 33 can be driven to move downward through the second guide rail 26 and the second electric slider 28. When the moving block 33 is used downward, it can drive the corresponding connecting pipe 35, the air intake hose 36 and the air pressure sensor 37 to move downward, and the end of the air intake hose 36 away from the connecting pipe 35 is connected and installed with the external air pump.
[0046] After the air pressure sensor 37 and the connecting pipe 35 are moved to correspond to the ends of the water pipe respectively, the second electric slider 28 is opened. When the second electric slider 28 is opened, the second electric slider 28 can drive the connecting pipes 35 and the air pressure sensors 37 at both ends to move toward the water pipe respectively through the moving block 33, so that the connecting pipes 35 and the air pressure sensors 37 are moved to the inner sides of the corresponding ends of the water pipe respectively, and the moving block 33 can clamp the two ends of the water pipe through the sealing gasket 34. The connecting pipes 35 and the air pressure sensors 37 on the moving block 33 help to limit the inner sides of the two ends of the water pipe. The moving block 33 can seal the two ends of the water pipe through the sealing gasket 34, and further, the water pipe clamped by the moving block 33 is moved upward by the hydraulic cylinder 31, and the water pipe is moved to correspond to the water tank 20 by the first electric slider 27, and water is poured into the water tank 20, and further, the moving block 33 and the water pipe clamped and limited by it are moved downward into the water in the water tank 20 by the hydraulic cylinder 31.
[0047] The external air pump is turned on, and the external air pump can deliver air to the water pipe for pressurization through the air intake hose 36 and the connecting pipe 35. The air pressure sensor 37 is further turned on. When the air pressure sensor 37 is turned on, the air pressure in the water pipe can be detected, and the detected air pressure data information is transmitted to the PLC controller 38. After the water pipe is placed in the water in the water storage tank 20, if there is an air leak on the water pipe, the position of the air leak on the water pipe can be observed. The PLC controller 38 can record the air pressure in the corresponding water pipe detected by each air pressure sensor 37. After the airtight pressure test of the water pipe is completed, the moving block 33 and the water pipe are moved upward by the hydraulic cylinder 31. Move, and move the moving block 33 and the water pipe toward the first receiving frame 23 through the first electric slider 27. After the water pipe is moved to the position corresponding to the first receiving frame 23, the PLC controller 38 will open the second electric slider 28 corresponding to the air pressure sensor 37 which is lower than the preset air pressure value recorded during the detection, so that the moving block 33 moves away from the water pipe, so that the moving block 33 corresponding to the air pressure sensor 37 which is lower than the preset air pressure value cancels the limit on the water pipe that fails the airtight pressure test, so as to facilitate the water pipe that fails the airtight pressure test to fall into the first receiving frame 23. The first receiving frame 23 helps to collect the water pipe that fails the airtight pressure test.
[0048] The water pipe that has passed the airtight pressure test is further moved to the corresponding second receiving frame 24 through the first electric slider 27, and the second electric slider 28 corresponding to the water pipe that has passed the airtight pressure test is opened, so that the second electric slider 28 drives the moving block 33 to move in the direction away from the water pipe, so as to cancel the limit on the water pipe that has passed the airtight pressure test, so that the water pipe that has passed the airtight pressure test falls into the second receiving frame 24, and the water pipe that has passed the airtight pressure test is collected through the second receiving frame 24.
[0049] During use, when the water pipes are subjected to airtight pressure testing, it is helpful to transport the water pipes, and the water pipes that need to be subjected to airtight pressure testing can be conveniently placed in and taken out, which helps save the manpower required when placing in and taking out the water pipes that need to be subjected to airtight pressure testing, so as to ensure the work efficiency of the airtight pressure testing of the water pipes.
[0050] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced by equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A water pipe airtight pressure tester, comprising a first mounting plate (1), characterized in that: A feeding mechanism is installed on one side of the upper surface of the first mounting plate (1); fixed blocks (4) are fixed at four corners of the upper surface of the first mounting plate (1); a second mounting plate (2) is fixed between the upper end surfaces of the fixed blocks (4); a first movable plate (29) is slidably installed on the lower surface of the second mounting plate (2) in a horizontal direction; hydraulic cylinders (31) are fixed at both ends of the upper surface of the first movable plate (29); an output rod of the hydraulic cylinder (31) faces downward and penetrates the upper and lower surfaces at corresponding positions on the first movable plate (29); a second movable plate (30) is fixed between the lower ends of the output rods of the hydraulic cylinders (31) and are located on the lower side of the second mounting plate (2); and both ends of the lower surface of the second movable plate (30) are spaced apart along the horizontal direction. A plurality of moving blocks (33) are installed to slide in the direction of rotation, and a sealing pad (34) is fixed to the lower end of the surface of one side of the moving block (33) close to the middle of the second mounting plate (2). A pressure sensor (37) penetrating the corresponding sealing pad (34) is installed in the middle of the lower end of the surface of one side of the moving block (33) close to the sealing pad (34). A connecting pipe (35) is installed in the middle of the lower end of the moving block (33) at the end away from the pressure sensor (37). The connecting pipe (35) penetrates the two side surfaces of the corresponding position on the corresponding moving block (33) and the sealing pad (34). A water storage tank (20) is installed in the middle of the upper surface of the first mounting plate (1). The top of the water storage tank (20) is in an open state, and water is provided in the water storage tank (20); The feeding mechanism comprises first connecting plates (5) located at both ends and the middle of one side of the upper surface of the first mounting plate (1), the first connecting plates (5) are fixedly connected to corresponding positions on the upper surface of the first mounting plate (1), first fixing plates (7) are fixed to both ends of the upper surface of the first connecting plate (5), second connecting plates (6) are fixed between adjacent first connecting plates (5) on one side of the middle of the upper surface of the first mounting plate (1) close to the first connecting plate (5), second fixing plates (8) are fixed to both ends of the upper surface of the second connecting plate (6), the upper surface of the first fixing plate (7) is inclined downward toward the second fixing plate (8), a third fixing plate (9) is fixed to one end of the upper surface of the first fixing plate (7) close to the second fixing plate (8), and the upper end and the lower end of the opposite surface of the third fixing plate (9) above the same first connecting plate (5) are fixed. A first rotating roller (15) is mounted for common rotation; a first conveying belt (17) is mounted on the outer sides of the first rotating roller (15) above the same first connecting plate (5); a plurality of hooking blocks (19) are fixed at intervals on the outer sides of the first conveying belt (17); a second rotating roller (16) is mounted for common rotation between the two ends of the top of the opposite surface of the second fixed plate (8) on the same second connecting plate (6); a second conveying belt (18) is mounted on the outer sides of the second rotating roller (16) above the same second connecting plate (6); a connecting block (21) is fixed on the end of the upper surface of the second fixed plate (8) away from the first fixed plate (7); a stopper (22) is fixed on the opposite surfaces of the connecting block (21) above the same second connecting plate (6); and the upper end of the third fixed plate (9) is inclined toward the second fixed plate (8).
2. The airtight pressure testing machine for water pipes according to claim 1, characterized in that: A first rotating rod (10) is fixed between the middle part of the first rotating roller (15) at the upper end of the third fixed plate (9) and between the middle part of the first rotating roller (15) at the lower end of the third fixed plate (9). The first rotating rod (10) penetrates the two end surfaces of the middle part of the corresponding first rotating roller (15). The first rotating rod (10) penetrates the two side surfaces of the corresponding position on the third fixed plate (9). The first rotating rod (10) is rotatably connected to the corresponding position on the third fixed plate (9) through a bearing.
3. The airtight pressure testing machine for water pipes according to claim 2, characterized in that: A first rotating motor (12) is mounted on a lower end of a surface of the third fixed plate (9) at one end away from the first conveyor belt (17) and corresponding to the first rotating rod (10). The output shaft of the first rotating motor (12) faces the first rotating rod (10), and an end of the output shaft of the first rotating motor (12) close to the first rotating rod (10) is fixedly mounted to an opposite end on the corresponding first rotating rod (10).
4. The airtight pressure testing machine for water pipes according to claim 3, characterized in that: A second rotating rod (11) is fixed to the middle of each of the second rotating rollers (16); the second rotating rod (11) penetrates the two end surfaces of the middle of each of the second rotating rollers (16); both ends of the second rotating rod (11) penetrate the two side surfaces of the corresponding positions on the corresponding second fixed plate (8); both ends of the outer ring surface of the second rotating rod (11) are rotatably connected to the corresponding positions on the corresponding second fixed plate (8) through bearings; and a connecting rod (14) is commonly fixed between the opposite ends of the second rotating rod (11) on the side away from the first fixed plate (7).
5. The airtight pressure testing machine for water pipes according to claim 4, characterized in that: A second rotating motor (13) is mounted on an end of the second fixed plate (8) at one end, which is away from the top of the surface of the second conveyor belt (18), corresponding to the second rotating rod (11); an output shaft of the second rotating motor (13) faces the second rotating rod (11); and an end of the output shaft of the second rotating motor (13) close to the second rotating rod (11) is fixedly connected to an opposite end on the corresponding second rotating rod (11).
6. The airtight pressure testing machine for water pipes according to claim 5, characterized in that: An air intake hose (36) is fixed to one end of the connecting pipe (35) away from the air pressure sensor (37); an end of the air intake hose (36) away from the connecting pipe (35) is connected to an external air pump; a second electric slider (28) is installed on the upper surface of the moving block (33); a plurality of second guide rails (26) are fixed to the lower surface of the second moving plate (30) at intervals in the horizontal direction corresponding to the second electric slider (28); and the second electric sliders (28) are slidably installed in the horizontal direction between corresponding positions on the corresponding second guide rails (26).
7. The airtight pressure testing machine for water pipes according to claim 6, characterized in that: First electric sliders (27) are mounted on both ends of the upper surface of the first movable plate (29); first guide rails (25) are fixed to both ends of the lower surface of the second mounting plate (2) corresponding to the first electric sliders (27); the first electric sliders (27) are mounted to slide along the horizontal direction between corresponding positions on the first guide rails (25); a PLC controller (38) is mounted in the middle of one side of the upper surface of the second mounting plate (2); the PLC controller (38) is electrically connected to the air pressure sensor (37); and the second electric sliders (28) are electrically connected to the PLC controller (38).
8. The airtight pressure testing machine for water pipes according to claim 7, characterized in that: Both ends of the second mounting plate (2) are provided with retention holes (32) corresponding to the hydraulic cylinder (31); a first material receiving frame (23) is fixed to a middle portion of the upper surface of the first mounting plate (1) located on a side of the water storage tank (20) away from the second fixing plate (8); and a second material receiving frame (24) is fixed to a middle portion of the upper surface of the first mounting plate (1) located on a side of the first material receiving frame (23) away from the water storage tank (20).
9. The airtight pressure testing machine for water pipes according to claim 8, characterized in that: The first mounting plate (1) is in a horizontal state, and a plurality of supporting legs (3) are fixed at intervals around the edge of the lower surface of the first mounting plate (1).