A rapid test method for extremely low dew point in a wind tunnel based on the chilled mirror test principle

Through the rapid test method of extremely low dew point in wind tunnel based on the principle of chilled mirror testing, combined with the chilled mirror dew point meter and auxiliary system, the complexity of extremely low dew point measurement in wind tunnel is solved, and the temperature of -100℃~20℃ is achieved. Fast and accurate measurement and real-time response within the range, suitable for complex working conditions in wind tunnels.

CN118670675BActive Publication Date: 2024-10-29CHINA AERODYNAMIC RES & DEV CENT EQUIP DESIGN & TESTING TECH INST
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411164935.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-10-29
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

The rapid and accurate measurement of extremely low dew point in wind tunnels is an unsolved technical problem in the world, especially under complex working conditions. The existing extremely low chilled mirror dew point meter is difficult to apply, and there is no domestically based chilled mirror test principle. Actual test case.

Method used

A wind tunnel ultra-low dew point rapid test method based on the chilled mirror testing principle is designed, including a chilled mirror dew point meter and an auxiliary system. The dew point measurement is achieved through the steps of initial isolation, purging, purification, heating, and flow adjustment of the system. , and transmit data through PLC for real-time control and display.

Benefits of technology

It achieves dew point testing in the range of -100°C to 20°C, has fast response time, can track wind tunnel dew point changes in real time, has good applicability, and meets the needs of extremely low dew point testing under complex wind tunnel working conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118670675B_ABST
    Figure CN118670675B_ABST
Patent Text Reader

Abstract

The present invention provides a method for rapid testing of extremely low dew points in a wind tunnel based on the principle of a chilled mirror test. The dew point test system of the scheme is installed near the opening of the dew point test position of the wind tunnel section, and the signal is connected to the switch configured in each section nearby. The dew point test system mainly includes a chilled mirror dew point meter and an auxiliary system. The chilled mirror dew point meter is mainly responsible for completing the dew point test; the auxiliary system mainly includes a bypass purge test system (purifier, etc.), a pipeline electric heating system (thermal resistor, heating belt, temperature controller, etc.), a bypass flow system, a sampling system (pipeline, valve, etc.) and a control system, etc., which are responsible for completing system pipeline purge and on-site detection, pipeline heating and water removal, large-flow rapid water removal, gas sampling, control and other functions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind tunnel dew point measurement, in particular to a wind tunnel extremely low dew point rapid testing method based on a cold mirror testing principle. Background Art

[0002] Dew point is an important indicator reflecting the micro-water content in the gas. Dew point temperature refers to the temperature corresponding to when the water vapor partial pressure (i.e., absolute water content) remains unchanged and the wet air reaches saturation. Generally, it is called dew point above zero degrees and frost point below zero degrees. The rapid and accurate measurement of extremely low dew point in wind tunnels is a technical problem that has not yet been solved in the field of humidity in the world. It not only needs to reach the extremely low dew point range (-100°C), but also needs to ensure fast test response tracking under extremely low dew point. At present, although there is research and development of the main equipment of extremely low cold mirror dew point meter, it is generally used in test conditions such as clean medium and stable pressure and temperature, which is different from the actual test in the wind tunnel. The working conditions in the wind tunnel are complex, the pressure and temperature of the test medium vary widely, the gas cleanliness is not ideal, and the sampling gas path is long, so the test is difficult. At present, there is no actual test case for extremely low dew point in wind tunnels based on the principle of cold mirror test in China. Summary of the invention

[0003] The purpose of the present invention is to solve the technical problem of extremely low dew point testing and fast response speed requirement in actual wind tunnel testing, and to provide a wind tunnel extremely low dew point rapid testing method based on the chilled mirror testing principle.

[0004] The dew point test system is installed near the opening of the dew point test position in the wind tunnel section, and the signal is connected to the switch configured in each section. The dew point test system mainly includes a cold mirror dew point meter and auxiliary systems. The cold mirror dew point meter is mainly responsible for completing the dew point test; the auxiliary system mainly includes a bypass purge test system (purifier, etc.), a pipeline electric heating system (thermal resistor, heating belt, temperature controller, etc.), a bypass flow system, a sampling pipeline (pipeline, valve, etc.) and a control system, etc., which are responsible for completing the system pipeline purge and on-site detection, pipeline heating and water removal, large flow rapid water removal, gas sampling, control and other functions.

[0005] This solution is achieved through the following technical measures:

[0006] A wind tunnel extremely low dew point rapid testing method based on the chilled mirror testing principle comprises the following steps:

[0007] Step 1: When the system is initially used, all valves are closed to isolate the system from the gas in the cave and the outside atmosphere, and the system is in protection mode;

[0008] Step 2: Open the diaphragm valve of the dew point test system to drive the main gas supply valve of the gas circuit and the main gas supply valve of the purge gas circuit;

[0009] Step 3: Turn on the sampling pipeline electrical companion system (16) and set the heating temperature to 40°C;

[0010] Step 4: Start the bypass flow system (13) to automatically adjust the flow;

[0011] Step 5: Open the manual valve II (7) at the purge inlet and the pneumatic diaphragm valve VI (9) at the bypass discharge outlet, and close all other diaphragm valves. The purge gas passes through the bypass dew point meter (8) on the purge gas line and then is discharged out of the pipeline.

[0012] Step 6: When the bypass dew point meter (8) detects that the dew point of the gas flowing through is lower than -50°C, close the pneumatic diaphragm valve VI (9) at the bypass discharge outlet;

[0013] Step 7: Open the pneumatic diaphragm valve IV (10) at the front end of the purifier (11), the manual valve I (3) at the front end of the pressure sensor (4), and the pneumatic diaphragm valve I (5) at the rear end, and the gas enters the purifier (11) and the sampling pipeline (1). The sampling pipeline (1) is cleaned and dried by purging for about 2 to 6 hours. The system is in the purge mode at this time.

[0014] Step 8. Close the pneumatic diaphragm valve I (5) at the rear end of the pressure sensor (4), open the pneumatic diaphragm valve V (12) on the purge gas path at the front end of the cold mirror dew point meter (15), and allow the gas to directly enter the cold mirror dew point meter (15). The dew point of the initial purge gas source after drying reaches ≤-90°C, and the system is in self-check mode I.

[0015] Step 9: Close the pneumatic diaphragm valve V (12) on the purge gas path at the front end of the cold mirror dew point meter (15), open the pneumatic diaphragm valve III (18) on the sampling gas path (1), and allow the gas to enter the dew point meter (15) after passing through the one-way valve (19). The dew point of the initial purge gas source after drying reaches ≤-90°C, and the system is in self-check mode II.

[0016] Step 10: Close the pneumatic diaphragm valve IV (10) at the front end of the purifier (11), open the pneumatic diaphragm valve I (5) at the rear end of the pressure sensor (4), and switch the system to the dew point measurement mode. The gas enters the chilled mirror dew point meter (15) from the sampling gas line (1) through the pneumatic diaphragm valve III (18) and the bypass flow system (13);

[0017] Step 11: Using the value of the pressure sensor (4) as a basis for judgment, when the pressure is higher than 100 kPa, start the dew point measurement; when the pressure is lower than 95 kPa, close each diaphragm valve and stop the dew point measurement;

[0018] Step 12: The dew point test data is transmitted to the external control system through the PLC (17). At the same time, the dew point and related data are transmitted to the measurement computer in real time to realize various control functions of the dew point test system and the collection, display and storage of the dew point;

[0019] Step 13: Repeat steps 11 to 12 to continuously test the wind tunnel dew point.

[0020] As a preferred embodiment of this solution: in step 1, when the chilled mirror dew point meter is not working, the chilled mirror surface and pipeline are sealed and protected to keep them dry.

[0021] As a preferred embodiment of this scheme: in step 2, the driving gas pressure of the diaphragm valve is 4 kPa, the gas supply pressure of the purge gas circuit is greater than 3 kPa, and the dew point of the purge gas source is lower than -60°C.

[0022] As a preferred embodiment of this solution: in step three, the pipeline electrical tracking system heats the pipe wall to accelerate the release rate of moisture adsorbed by the inner wall material of the pipeline and improve the response speed of the dew point test.

[0023] As the preferred embodiment of this scheme: In step 4, in order to speed up the dehumidification and dewatering speed of the inner wall of the sampling pipeline and improve the dynamic test response time, the air flow rate of the sampling pipeline is increased, while at the same time, the flow rate through the dew point equipment measurement chamber is avoided to be too large, causing the dew layer on the cold mirror surface to be blown away, and part of the gas is released through the bypass flow system.

[0024] As a preferred embodiment of this scheme: in step five, when the purge gas line is initially used, the incoming flow dew point is generally high. To prevent contamination of the purifier, the incoming flow dew point is detected in real time. When the dew point is lower than -50°C, it is allowed to enter the purifier.

[0025] As the preferred embodiment of this scheme: In step seven, in order to improve the response speed and test accuracy, the sampling pipeline is made of EP-grade low-temperature resistant stainless steel pipe with an outer diameter of 1 / 4 inch, and VCR connectors are used at the joints; various valves on the gas line fully consider the sealing and moisture adsorption characteristics; a filter needs to be installed at the inlet of the sampling pipeline to filter out dust.

[0026] As the preferred embodiment of this solution: Step eight is mainly used for the performance test of the chilled mirror dew point meter itself, to detect whether the chilled mirror dew point meter can test the dew point value below -90°C.

[0027] As the preferred embodiment of this scheme: Step nine is mainly used to measure the performance test of pipelines and chilled mirror dew point meters, to detect whether the chilled mirror dew point meter can test the dew point value below -90°C when a partial sampling pipeline is included.

[0028] As a preferred embodiment of this solution: in step eleven, the stop and start thresholds are set to different values ​​in order to prevent the diaphragm valve from repeatedly starting and stopping in a short period of time when the gas pressure in the cave fluctuates, thereby affecting the service life of the diaphragm valve for a long time.

[0029] The beneficial effects of this scheme can be known from the description of the above scheme, because the beneficial effects of this scheme are:

[0030] 1. Wide test range: -100℃~20℃, meeting the requirements of extremely low dew point test range of wind tunnel;

[0031] 2. Fast response time: can track the changes of wind tunnel dew point in real time;

[0032] 3. Good applicability: It adopts multiple working modes to realize system purge, self-check, measurement, etc., meeting the needs of extremely low dew point testing under complex working conditions in wind tunnels.

[0033] It can be seen that compared with the prior art, the present invention has substantial characteristics and progress, and the beneficial effects of its implementation are also obvious. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 Schematic diagram of the gas path structure of an embodiment of the present invention.

[0035] In the figure, 1. sampling pipeline, 2. filter, 3. manual valve I, 4. pressure sensor, 5. pneumatic diaphragm valve I, 6. heating belt, 7. manual valve II, 8. bypass dew point meter, 9. pneumatic diaphragm valve VI, 10. pneumatic diaphragm valve IV, 11. purifier, 12. pneumatic diaphragm valve V, 13. bypass flow system, 14. pneumatic diaphragm valve II, 15. chilled mirror dew point meter, 16. pipeline electric heating system, 17. PLC controller, 18. pneumatic diaphragm valve III, 19. check valve. DETAILED DESCRIPTION

[0036] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.

[0037] Any feature disclosed in this specification (including any additional claims, abstract and drawings), unless otherwise stated, may be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

[0038] like Figure 1 As shown, the specific test method of the gas path structure includes the following steps:

[0039] Step 1: When the system is initially used, all valves are closed to isolate the system from the gas in the cave and the outside atmosphere, and the system is in protection mode;

[0040] Step 2: Open the diaphragm valve of the dew point test system to drive the main gas supply valve of the gas circuit and the main gas supply valve of the purge gas circuit;

[0041] Step 3: Turn on the sampling pipeline electrical companion system (16) and set the heating temperature to 40°C;

[0042] Step 4: Start the bypass flow system (13) to automatically adjust the flow;

[0043] Step 5: Open the manual valve II (7) at the purge inlet and the pneumatic diaphragm valve VI (9) at the bypass discharge outlet, and close all other diaphragm valves. The purge gas passes through the bypass dew point meter (8) on the purge gas line and then is discharged out of the pipeline.

[0044] Step 6: When the bypass dew point meter (8) detects that the dew point of the gas flowing through is lower than -50°C, close the pneumatic diaphragm valve VI (9) at the bypass discharge outlet;

[0045] Step 7: Open the pneumatic diaphragm valve IV (10) at the front end of the purifier (11), the manual valve I (3) at the front end of the pressure sensor (4), and the pneumatic diaphragm valve I (5) at the rear end, and the gas enters the purifier (11) and the sampling pipeline (1). The sampling pipeline (1) is cleaned and dried by purging for about 2 to 6 hours. The system is in the purge mode at this time.

[0046] Step 8. Close the pneumatic diaphragm valve I (5) at the rear end of the pressure sensor (4), open the pneumatic diaphragm valve V (12) on the purge gas path at the front end of the cold mirror dew point meter (15), and allow the gas to directly enter the cold mirror dew point meter (15). The dew point of the initial purge gas source after drying reaches ≤-90°C, and the system is in self-check mode I.

[0047] Step 9: Close the pneumatic diaphragm valve V (12) on the purge gas path at the front end of the cold mirror dew point meter (15), open the pneumatic diaphragm valve III (18) on the sampling gas path (1), and allow the gas to enter the dew point meter (15) after passing through the one-way valve (19). The dew point of the initial purge gas source after drying reaches ≤-90°C, and the system is in self-check mode II.

[0048] Step 10: Close the pneumatic diaphragm valve IV (10) at the front end of the purifier (11), open the pneumatic diaphragm valve I (5) at the rear end of the pressure sensor (4), and switch the system to the dew point measurement mode. The gas enters the chilled mirror dew point meter (15) from the sampling gas line (1) through the pneumatic diaphragm valve III (18) and the bypass flow system (13);

[0049] Step 11: Using the value of the pressure sensor (4) as a basis for judgment, when the pressure is higher than 100 kPa, start the dew point measurement; when the pressure is lower than 95 kPa, close each diaphragm valve and stop the dew point measurement;

[0050] Step 12: The dew point test data is transmitted to the external control system through the PLC (17). At the same time, the dew point and related data are transmitted to the measurement computer in real time to realize various control functions of the dew point test system and the collection, display and storage of the dew point;

[0051] Step 13: Repeat steps 11 to 12 to continuously test the wind tunnel dew point.

[0052] In step 1, when the chilled mirror dew point meter is not working, the chilled mirror surface and pipeline are sealed and protected to keep them dry.

[0053] In step 2, the diaphragm valve driving gas pressure is 4 kPa, the gas supply pressure of the purge gas line is greater than 3 kPa, and the dew point of the purge gas source is lower than -60°C.

[0054] In step three, the pipeline electrical tracing system heats the pipe wall to accelerate the release rate of moisture adsorbed by the inner wall material of the pipeline and improve the response speed of the dew point test.

[0055] In step 4, in order to speed up the dehumidification and dewatering of the inner wall of the sampling pipeline and improve the dynamic test response time, the air flow rate of the sampling pipeline is increased. At the same time, the flow rate through the dew point equipment measurement chamber is prevented from being too large, causing the dew layer on the cold mirror surface to be blown off. Part of the gas is released through the bypass flow system.

[0056] In step 5, when the purge gas line is initially used, the incoming flow dew point is generally high. To prevent contamination of the purifier, the incoming flow dew point is detected in real time. Only when the dew point is lower than -50°C is the incoming flow allowed to enter the purifier.

[0057] In step 7, the sampling pipeline that has not been used for a long time and is exposed to the outside is mainly cleaned and dried to avoid affecting the test response speed. In order to improve the response speed and test accuracy, the sampling pipeline is an EP-grade low-temperature resistant stainless steel pipe with an outer diameter of 1 / 4 inch, and a VCR joint is used at the connection; various valves on the gas line fully consider the sealing and moisture adsorption characteristics; a filter needs to be installed at the inlet of the sampling pipeline to filter dust, etc.

[0058] The step eight is mainly used to test the performance of the chilled mirror dew point meter itself, and to detect whether the chilled mirror dew point meter can test the dew point value below -90°C.

[0059] The step nine is mainly used to measure the performance test of the pipeline and the chilled mirror dew point meter, and to detect whether the chilled mirror dew point meter can test the dew point value below -90°C when a part of the sampling pipeline is included.

[0060] In the step eleven, the stop and start thresholds are set to different values ​​in order to prevent the diaphragm valve from repeatedly starting and stopping in a short period of time when the gas pressure in the cave fluctuates, thereby affecting the service life of the diaphragm valve for a long time.

[0061] The present invention is not limited to the above-mentioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.

Claims

1. A wind tunnel extremely low dew point rapid test method based on the chilled mirror test principle, characterized by: The following steps are included: Step 1: When the system is initially used, all valves are closed to isolate the system from the gas in the cave and the outside atmosphere, and the system is in protection mode; Step 2: Open the diaphragm valve of the dew point test system to drive the main gas supply valve of the gas circuit and the main gas supply valve of the purge gas circuit; Step 3: Turn on the sampling pipeline electrical companion system (16) and set the heating temperature to 40°C; Step 4: Start the bypass flow system (13) to automatically adjust the flow; Step 5: Open the manual valve II (7) at the purge inlet and the pneumatic diaphragm valve VI (9) at the bypass discharge outlet, and close all other diaphragm valves. The purge gas passes through the bypass dew point meter (8) on the purge gas line and then is discharged out of the pipeline. Step 6: When the bypass dew point meter (8) detects that the dew point of the gas flowing through is lower than -50°C, close the pneumatic diaphragm valve VI (9) at the bypass discharge outlet; Step 7: Open the pneumatic diaphragm valve IV (10) at the front end of the purifier (11), the manual valve I (3) at the front end of the pressure sensor (4), and the pneumatic diaphragm valve I (5) at the rear end, and the gas enters the purifier (11) and the sampling pipeline (1). The sampling pipeline (1) is cleaned and dried by purging for 2 to 6 hours. The system is in the purge mode at this time. Step 8. Close the pneumatic diaphragm valve I (5) at the rear end of the pressure sensor (4), open the pneumatic diaphragm valve V (12) on the purge gas path at the front end of the cold mirror dew point meter (15), and allow the gas to directly enter the cold mirror dew point meter (15). The dew point of the initial purge gas source after drying reaches ≤-90°C, and the system is in self-check mode I. Step 9: Close the pneumatic diaphragm valve V (12) on the purge gas path at the front end of the cold mirror dew point meter (15), open the pneumatic diaphragm valve III (18) on the sampling gas path (1), and allow the gas to enter the dew point meter (15) after passing through the one-way valve (19). The dew point of the initial purge gas source after drying reaches ≤-90°C, and the system is in self-check mode II. Step 10: Close the pneumatic diaphragm valve IV (10) at the front end of the purifier (11), open the pneumatic diaphragm valve I (5) at the rear end of the pressure sensor (4), and switch the system to the dew point measurement mode. The gas enters the chilled mirror dew point meter (15) from the sampling gas line (1) through the pneumatic diaphragm valve III (18) and the bypass flow system (13); Step 11: Using the value of the pressure sensor (4) as a basis for judgment, when the pressure is higher than 100 kPa, start the dew point measurement; when the pressure is lower than 95 kPa, close each diaphragm valve and stop the dew point measurement; Step 12: The dew point test data is transmitted to the external control system through the PLC (17). At the same time, the dew point and related data are transmitted to the measurement computer in real time to realize various control functions of the dew point test system and the collection, display and storage functions of the dew point; Step 13: Repeat steps 11 to 12 to continuously test the wind tunnel dew point.

2. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror test principle according to claim 1, characterized in that: In the step 1, when the chilled mirror dew point meter is not working, the chilled mirror surface and pipeline are sealed and protected to keep them dry.

3. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: In the step 2, the driving gas pressure of the diaphragm valve is 4 kPa, the gas supply pressure of the purge gas circuit is greater than 3 kPa, and the dew point of the purge gas source is lower than -60°C.

4. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror test principle according to claim 1, characterized in that: In the step three, the pipeline electrical tracking system heats the pipe wall to accelerate the release rate of moisture adsorbed by the inner wall material of the pipeline and improve the response speed of the dew point test.

5. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: In step 4, in order to speed up the dehumidification and dewatering of the inner wall of the sampling pipeline and improve the dynamic test response time, the air flow rate of the sampling pipeline is increased. At the same time, to avoid excessive flow through the measurement chamber of the dew point equipment, which causes the dew layer on the cold mirror surface to be blown off, part of the gas is released through the bypass flow system.

6. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: In step 5, when the purge gas line is initially used, in order to prevent contamination of the purifier, the dew point of the incoming flow is detected in real time, and only when the dew point is lower than -50°C is the gas allowed to enter the purifier.

7. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: In step seven, in order to improve the response speed and test accuracy, the sampling pipeline is an EP-grade low-temperature resistant stainless steel pipe with an outer diameter of 1 / 4 inch, and a VCR connector is used at the connection; various valves on the gas line fully consider the sealing and moisture adsorption characteristics; a filter needs to be installed at the inlet of the sampling pipeline to filter dust.

8. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: The step eight is mainly used to test the performance of the chilled mirror dew point meter itself, and to detect whether the chilled mirror dew point meter can test the dew point value below -90°C.

9. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: The step nine is mainly used to measure the performance test of the pipeline and the chilled mirror dew point meter, and to detect whether the chilled mirror dew point meter can test the dew point value below -90°C when a partial sampling pipeline is included.

10. The method for rapid testing of extremely low dew point in a wind tunnel based on the chilled mirror testing principle according to claim 1, characterized in that: In the step eleven, the stop and start thresholds are set to different values ​​in order to prevent the diaphragm valve from repeatedly starting and stopping in a short period of time when the gas pressure in the cave fluctuates, thereby affecting the service life of the diaphragm valve for a long time.

Citation Information

Patent Citations

  • Gas path system for quickly measuring extremely low dew point by using cold mirror method

    CN110672662A

  • Optical path system for dew point measurement test of low-temperature wind tunnel test section

    CN115326349A

  • In-situ online measurement system for high-dynamic dew point of low-temperature wind tunnel test section

    CN115655639A

  • Method for measuring average dew point of continuous wind tunnel based on drying system

    CN116297678A

  • Maintenance platform for dew point measurement of low-temperature wind tunnel test section and use method

    CN117147091A