Method for tunnel excavation route planning based on tunnel stress data

By constructing geological and tunnel twin models, combining deep learning to predict the expansion status and stress data of expanded rocks, targeted support information is generated, which solves the problem of lack of targeted support measures for expanded rocks in the existing technology, and improves the tunnel construction Stability and safety.

CN118673569BActive Publication Date: 2024-11-08CHINA RAILWAY DEV INVESTMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411141515.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-08
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

The prior art lacks targeted support measures when dealing with expanded rocks, and cannot effectively deal with the impact of expanded rocks on tunnels under different environmental conditions, resulting in lack of targeted and effective support measures.

Method used

By constructing a geological twin model and a tunnel twin model, combining deep learning models, predicting the expansion status and stress data of the expanded rock area, generating targeted support information, and optimizing the tunnel digging route to reduce the impact of expanded rock.

Benefits of technology

Effective support for the expanded rock area is achieved, ensuring that the tunnel can withstand the influence of expanded rock under different environmental conditions, and improving the stability and safety of tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118673569B_ABST
    Figure CN118673569B_ABST
Patent Text Reader

Abstract

A method for formulating a tunnel excavation route based on tunnel stress data relates to the technical field of tunnel construction. A geological twin model of a construction area and several tunnel simulation routes are constructed, and the contact coefficients between each tunnel simulation route and an expansion rock area are respectively obtained to obtain the tunnel excavation route. Expansion rock samples on the tunnel excavation route and their expansion coefficients under different environmental conditions are obtained. An expansion prediction model is constructed according to the corresponding relationship between the environmental conditions and the expansion coefficients. The historical environmental conditions of the expansion rock area are collected to obtain a change diagram of the expansion coefficient of the expansion rock area under the historical environmental conditions, and then a stress data change diagram of the tunnel is obtained. Support information of the tunnel in the expansion rock area is generated and fed back according to the stress data change diagram and the tunnel excavation route. Through the technical solution of the present invention, it can be ensured that the contact surface between the tunnel excavation route and the expansion rock is minimized, and the support measures of the tunnel can always bear the influence of the expansion rock area on the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to a method for formulating a tunnel excavation route based on tunnel stress data. Background Art

[0002] The method of formulating tunnel excavation routes is usually based on a comprehensive analysis of geological conditions, tunnel purposes, construction technology and economic considerations. During tunnel excavation, tunnel stress data is a very important information that can be used to evaluate the stability and safety of tunnel engineering. During tunnel construction, it is inevitable that it will be affected by swelling rock. Swelling rock refers to a type of rock that will expand in volume under certain conditions. Due to the existence of swelling rock, how to support the tunnel has also become a problem that needs to be solved;

[0003] In the prior art, the treatment of expansive rock is mostly carried out under the premise of avoiding its influence as much as possible, but there is a lack of effective countermeasures for situations that cannot be avoided. In addition, in the prior art, the expansive rocks in different regions will have different expansion conditions due to different environmental conditions. The existing technical solutions lack a method for providing support reference for tunnel construction based on the expansion conditions of expansive rocks, so that the support measures set are often not targeted. In view of the shortcomings of the prior art, the present invention provides a tunnel excavation route formulation method based on tunnel stress data. Summary of the invention

[0004] The object of the present invention is to provide a method for formulating a tunnel excavation route based on tunnel stress data.

[0005] The object of the present invention can be achieved by the following technical solution: A method for formulating a tunnel excavation route based on tunnel stress data comprises the following steps:

[0006] Step S1: Collect geological data of the construction area, construct a geological twin model of the construction area based on the collected geological data, and visualize the swelling rock area in the constructed geological twin model;

[0007] Step S2: obtaining tunnel information according to the construction plan, constructing a tunnel twin model according to the obtained tunnel information, constructing several tunnel simulation routes in combination with the geological twin model, respectively obtaining the contact coefficient between each tunnel simulation route and the swelling rock area, and obtaining the tunnel excavation route according to the obtained contact coefficient;

[0008] Step S3: obtaining swelling rock samples on the tunnel excavation route, monitoring the swelling coefficients of the swelling rock samples under different environmental conditions, and constructing a swelling prediction model for the swelling rock area according to the corresponding relationship between the obtained environmental conditions and the swelling coefficients;

[0009] Step S4: Collect historical environmental conditions of the swelling rock area, obtain a diagram of the expansion coefficient change of the swelling rock area under historical environmental conditions based on the swelling prediction model, obtain stress data of the tunnel twin model under different expansion coefficients, and obtain a diagram of the stress data change of the tunnel in combination with the diagram of the expansion coefficient change. Generate and feedback support information of the tunnel in the swelling rock area based on the stress data change diagram and the tunnel excavation route.

[0010] Furthermore, geological data of the construction area is collected, and a geological twin model of the construction area is constructed based on the collected geological data. The process of visualizing the swelling rock area in the constructed geological twin model includes:

[0011] The geological data of the construction area is collected. The geological data refers to the various information necessary for constructing a digital twin model of the construction area. The geological twin model of the construction area is constructed according to the geological data using digital twin technology. The swelling rock area of ​​the construction area is obtained according to the collected geological data, and the obtained swelling rock area is rendered in a different color from other areas.

[0012] Furthermore, the process of obtaining tunnel information according to the construction plan, constructing a tunnel twin model according to the obtained tunnel information, and constructing several tunnel simulation routes in combination with the geological twin model includes:

[0013] A construction plan for the tunnel is obtained, and tunnel information is obtained according to the construction plan, wherein the tunnel information refers to various information necessary for constructing a digital twin model of the tunnel, and a tunnel twin model of the tunnel is constructed according to the tunnel information using digital twin technology. The constructed tunnel twin model is combined with the geological twin model, and several tunnel simulation routes are constructed in the geological twin model using an exhaustive method, and the tunnel twin models are respectively set on the constructed tunnel simulation routes.

[0014] Furthermore, the contact coefficients between each tunnel simulation route and the swelling rock region are obtained respectively, and the process of obtaining the tunnel excavation route according to the obtained contact coefficients includes:

[0015] The total contact area between each tunnel simulation route and all geological environments and the contact swelling rock area with the swelling rock area are obtained respectively, and the ratio of the contact swelling rock area divided by the total contact area is used as the contact coefficient of each tunnel simulation route. The tunnel simulation route with the smallest contact coefficient is used as the tunnel excavation route.

[0016] Furthermore, the process of obtaining swelling rock samples on the tunnel excavation route, monitoring the swelling coefficients of the swelling rock samples under different environmental conditions, and constructing a swelling prediction model for the swelling rock area according to the corresponding relationship between the obtained environmental conditions and the swelling coefficients includes:

[0017] Swelling rock samples are collected from the swelling rock area on the tunnel excavation route, wherein the environmental conditions refer to various external conditions that can cause the swelling rock samples to swell, and the collection volume of the swelling rock samples is obtained. Different environmental conditions are applied to the swelling rock samples to obtain corresponding swelling volumes, and the ratio of the swelling volume divided by the collection volume is used as the swelling coefficient of the swelling rock samples;

[0018] Different environmental conditions and their corresponding expansion coefficients are included in the same data set, a deep learning model is selected as the initial expansion prediction model, and the data set is used to train and evaluate the initial expansion prediction model to obtain the current expansion prediction model.

[0019] Furthermore, the historical environmental conditions of the swelling rock area are collected, and the process of obtaining the swelling coefficient change diagram of the swelling rock area under the historical environmental conditions according to the swelling prediction model includes:

[0020] The historical environmental conditions of the swelling rock area are collected and an environmental condition change map is constructed. The historical environmental conditions refer to the environmental conditions of the swelling rock area throughout the year. The expansion coefficient of the swelling rock area under different historical environmental conditions is obtained according to the expansion prediction model to construct an expansion coefficient change map.

[0021] Furthermore, the process of obtaining stress data of the tunnel twin model under different expansion coefficients and obtaining a stress data change diagram of the tunnel in combination with the expansion coefficient change diagram includes:

[0022] The stress data on the contact surface between the tunnel excavation route and the expansive rock area are collected, and the corresponding environmental conditions and expansion coefficients are obtained. The stress data and expansion coefficients are input into the geological twin model including the tunnel excavation route. In the geological twin model, the expansion coefficient is adjusted according to the expansion coefficient change diagram to obtain the corresponding stress data, and then the stress data change diagram is constructed.

[0023] Furthermore, the process of generating and feeding back the support information of the tunnel in the swelling rock area according to the stress data variation diagram and the tunnel excavation route includes:

[0024] Support measures are added to the contact surface between the tunnel excavation route and the swelling rock area, and the highest value in the stress data change diagram is used as the stress peak value that the tunnel excavation route is subjected to in the swelling rock area. The bearing capacity of the support measures is set according to the stress peak value and the support information of the tunnel is generated. The support information includes the contact surface between the tunnel excavation route and the swelling rock area and the bearing capacity of the support measures, and the support information is fed back to relevant personnel.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] 1. The present invention collects geological data of the construction area and tunnel information of the tunnel, and then constructs a geological twin model and a tunnel twin model respectively, which can introduce digital twin technology into the field of tunnel construction technology, and provide an intuitive and visual method for tunnel construction that is difficult to observe. By combining the geological twin model and the tunnel twin model, a tunnel simulation route is constructed in the virtual space in advance, and the tunnel simulation route with the least contact is obtained according to the contact coefficient between each simulation route and the swelling rock area, which can ensure that the contact area between the obtained tunnel excavation route and the swelling rock is minimized, and can fundamentally reduce the impact of the swelling rock on the tunnel;

[0027] 2. The present invention collects swelling rock samples on the tunnel excavation route to obtain its swelling coefficient under different environmental conditions, and constructs an swelling prediction model for the swelling rock area according to the corresponding relationship between the environmental conditions and the swelling coefficient. In combination with comprehensive historical environmental conditions, the daily swelling coefficient changes in the swelling rock area can be obtained. At the same time, the stress data of the tunnel is simulated in the digital twin model to obtain the daily changes in the tunnel stress data. On this basis, support measures are added to the contact surface between the tunnel and the swelling rock area to ensure that the tunnel support measures can always bear the impact of the swelling rock area on the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0029] like Figure 1 As shown, the method for formulating a tunnel excavation route based on tunnel stress data includes the following steps:

[0030] Step S1: Collect geological data of the construction area, construct a geological twin model of the construction area based on the collected geological data, and visualize the swelling rock area in the constructed geological twin model;

[0031] Step S2: obtaining tunnel information according to the construction plan, constructing a tunnel twin model according to the obtained tunnel information, constructing several tunnel simulation routes in combination with the geological twin model, respectively obtaining the contact coefficient between each tunnel simulation route and the swelling rock area, and obtaining the tunnel excavation route according to the obtained contact coefficient;

[0032] Step S3: obtaining swelling rock samples on the tunnel excavation route, monitoring the swelling coefficients of the swelling rock samples under different environmental conditions, and constructing a swelling prediction model for the swelling rock area according to the corresponding relationship between the obtained environmental conditions and the swelling coefficients;

[0033] Step S4: Collect historical environmental conditions of the swelling rock area, obtain a diagram of the expansion coefficient change of the swelling rock area under historical environmental conditions based on the swelling prediction model, obtain stress data of the tunnel twin model under different expansion coefficients, and obtain a diagram of the stress data change of the tunnel in combination with the diagram of the expansion coefficient change. Generate and feedback support information of the tunnel in the swelling rock area based on the stress data change diagram and the tunnel excavation route.

[0034] It should be further explained that, in the specific implementation process, the geological data of the construction area is collected, and a geological twin model of the construction area is constructed based on the collected geological data. The process of visualizing the swelling rock area in the constructed geological twin model includes:

[0035] Collect geological data of the tunnel construction area, including but not limited to topographic information, stratigraphic information, rock engineering information, underground hydrological information, mineral resource information, etc. of the construction area, that is, all the information necessary for building a digital twin model of the construction area;

[0036] A digital twin model of the construction area is constructed based on the collected geological data using digital twin technology, and is marked as a geological twin model. The geological twin model is used to simulate the geological conditions of the construction area in a virtual space, and the swelling rock area of ​​the construction area is obtained based on the collected geological data. The swelling rock refers to a type of rock that will expand in volume under certain conditions. The obtained swelling rock area is visualized to distinguish it from other areas, that is, it is rendered in a different color from other areas to facilitate relevant personnel to view its geographical location, coverage area, actual volume and other information.

[0037] It should be further explained that, in the specific implementation process, the process of obtaining tunnel information according to the construction plan, constructing a tunnel twin model according to the obtained tunnel information, and constructing several tunnel simulation routes in combination with the geological twin model includes:

[0038] Obtaining a construction plan for the tunnel, and obtaining tunnel information of the tunnel according to the obtained construction plan, wherein the tunnel information is used to represent various design standards of the tunnel during the construction process, including but not limited to materials, cross-sectional shapes, dimensions, support structures, drainage systems, etc., that is, all information necessary for constructing a digital twin model of the tunnel;

[0039] Digital twin technology is used to construct a digital twin model of the tunnel based on the obtained tunnel information, and it is marked as a tunnel twin model. The tunnel twin model is used to simulate the physical form of the tunnel. The constructed tunnel twin model is combined with the geological twin model, and several tunnel simulation routes are constructed in the geological twin model by exhaustive method. The tunnel twin models are respectively set on the constructed tunnel simulation routes. The tunnel simulation routes are used to provide a reference for relevant personnel when formulating tunnel routes.

[0040] It should be further explained that, in the specific implementation process, the contact coefficients between each tunnel simulation route and the swelling rock area are obtained respectively, and the process of obtaining the tunnel excavation route according to the obtained contact coefficients includes:

[0041] Taking any tunnel simulation route as an example, in the constructed geological twin model, the tunnel simulation route passes through it. In the embodiment of the present invention, it is intended to obtain the most suitable tunnel simulation route according to the contact situation between the tunnel simulation route and the swelling rock area, so the tunnel simulation route is regarded as necessarily in contact with the swelling rock area;

[0042] The total area where the outer surface of the tunnel simulation route is in contact with all geological environments is obtained, which is recorded as the total contact area. The area where the outer surface of the tunnel simulation route is in contact with the swelling rock area is obtained, which is recorded as the contact swelling rock area. The ratio obtained by dividing the contact swelling rock area by the total contact area is used as the contact coefficient of the tunnel simulation route. The contact coefficient is used to reflect the proportion of the area of ​​the tunnel simulation route in contact with swelling rocks to the area of ​​the tunnel simulation route in contact with all geological environments. The same method is adopted to obtain the contact coefficient of each tunnel simulation route. The tunnel simulation route with the smallest contact coefficient is used as the tunnel excavation route of the construction plan, and construction is carried out in the construction area according to the geographical location corresponding to the tunnel simulation route.

[0043] It should be further explained that, in the specific implementation process, the swelling rock samples on the tunnel excavation route are obtained, the swelling coefficients of the swelling rock samples under different environmental conditions are monitored, and the swelling prediction model of the swelling rock area is constructed according to the corresponding relationship between the obtained environmental conditions and the swelling coefficients. The process includes:

[0044] The swelling rocks in the swelling rock area on the tunnel excavation route are collected and recorded as swelling rock samples. Since the swelling rock will expand in volume under certain environmental conditions, a certain volume of swelling rock can be processed by adopting a control variable method to obtain its volume change, thereby reflecting the expansion of the swelling rock in the swelling rock area with the change of environmental conditions;

[0045] The environmental conditions are used to describe the various external conditions of the swelling rock in the construction area, including temperature, humidity, pH, pressure, vibration frequency, etc., that is, all external conditions that can cause it to expand. The initial volume of the swelling rock sample collected is recorded as the collection volume. Without changing other factors, different environmental conditions are applied to the swelling rock sample, and its volume under different environmental conditions is recorded, that is, the swelling volume. The ratio obtained by dividing the swelling volume by the collection volume is used as the expansion coefficient of the swelling rock sample.

[0046] Different environmental conditions and their corresponding expansion coefficients are included in the same data set, and the data set is divided into a training set and a test set. A deep learning model is selected as the initial expansion prediction model, and the initial expansion prediction model is trained using the training set. The trained expansion prediction model is obtained by learning the correspondence between the environmental conditions and the expansion coefficients. The trained expansion prediction model is evaluated using the test set, and the trained expansion prediction model is tuned according to the evaluation results to obtain a tuned expansion prediction model. The most recently tuned expansion prediction model is used as the latest expansion prediction model, and the expansion prediction model is used to output the expansion coefficient of the expansive rock under the input environmental conditions according to the environmental conditions.

[0047] It should be further explained that, in the specific implementation process, the historical environmental conditions of the swelling rock area are collected, and the process of obtaining the swelling coefficient change diagram of the swelling rock area under the historical environmental conditions according to the swelling prediction model includes:

[0048] The historical environmental conditions of the swelling rock area are collected, and the historical environmental conditions are used to represent the environmental conditions of the swelling rock area throughout the year and their changes over time. An environmental condition change graph is constructed based on the historical environmental conditions obtained, with the horizontal axis being the time point and the vertical axis being the environmental conditions. The expansion coefficient of the swelling rock area under different historical environmental conditions is obtained based on the constructed expansion prediction model, and a corresponding expansion coefficient change graph is constructed with the horizontal axis being the time point and the vertical axis being the expansion coefficient. The constructed expansion coefficient change graph is used to reflect the expansion coefficient of the swelling rock area at different times throughout the year.

[0049] It should be further explained that, in the specific implementation process, the process of obtaining the stress data of the tunnel twin model under different expansion coefficients and obtaining the stress data change diagram of the tunnel in combination with the expansion coefficient change diagram includes:

[0050] The stress data on the contact surface between the tunnel excavation route and the expansive rock area are collected, and the environmental conditions and the corresponding expansion coefficients at this time are obtained. The obtained stress data and expansion coefficient are input into the geological twin model including the tunnel excavation route. The expansion coefficient of the expansive rock area is adjusted in the geological twin model to obtain the stress data corresponding to different expansion coefficients. Combined with the above-mentioned expansion coefficient change graph, the expansion coefficient is adjusted according to the expansion coefficient change graph in the geological twin model to obtain the corresponding stress data. According to the obtained stress data, a stress data change graph with the horizontal axis as the time point and the vertical axis as the stress data is constructed.

[0051] It should be further explained that, in the specific implementation process, the process of generating and feeding back the support information of the tunnel in the swelling rock area according to the stress data change diagram and the tunnel excavation route includes:

[0052] Obtain the contact surface between the tunnel excavation route and the swelling rock area. Since the swelling rock will change with the environment, it is necessary to ensure that the contact surface can still work normally when the swelling rock changes. In the construction process, it is necessary to add support measures to the contact surface;

[0053] According to the constructed stress data change diagram, the stress peak value to which the tunnel excavation route is subjected in the expansive rock area is obtained, that is, the highest value in the stress data change diagram. The bearing capacity of the support measures is obtained according to the obtained stress peak value, wherein the bearing capacity that the support measures can provide must be greater than several times the stress peak value. On this basis, the support information of the tunnel is generated, and the support information includes the contact surface between the tunnel excavation route and the expansive rock area and the bearing capacity that the support measures need to provide. The generated support information is fed back to relevant personnel for reference.

[0054] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A method for formulating a tunnel excavation route based on tunnel stress data, characterized in that: The following steps are involved: Step S1: Collect geological data of the construction area, construct a geological twin model of the construction area based on the collected geological data, and visualize the swelling rock area in the constructed geological twin model; Step S2: obtaining tunnel information according to the construction plan, constructing a tunnel twin model according to the obtained tunnel information, constructing several tunnel simulation routes in combination with the geological twin model, respectively obtaining the contact coefficient between each tunnel simulation route and the swelling rock area, and obtaining the tunnel excavation route according to the obtained contact coefficient; Step S3: obtaining swelling rock samples on the tunnel excavation route, monitoring the swelling coefficients of the swelling rock samples under different environmental conditions, and constructing a swelling prediction model for the swelling rock area according to the corresponding relationship between the obtained environmental conditions and the swelling coefficients; Step S4: collecting historical environmental conditions of the swelling rock area, obtaining a swelling coefficient change diagram of the swelling rock area under historical environmental conditions according to the swelling prediction model, obtaining stress data of the tunnel twin model under different swelling coefficients, combining the swelling coefficient change diagram to obtain a stress data change diagram of the tunnel, and generating support information of the tunnel in the swelling rock area according to the stress data change diagram and the tunnel excavation route and providing feedback; The contact coefficients between each tunnel simulation route and the swelling rock area are obtained respectively, and the process of obtaining the tunnel excavation route according to the obtained contact coefficients includes: The total contact area between each tunnel simulation route and all geological environments and the contact swelling rock area with the swelling rock area are obtained respectively, and the ratio of the contact swelling rock area divided by the total contact area is used as the contact coefficient of each tunnel simulation route. The tunnel simulation route with the smallest contact coefficient is used as the tunnel excavation route.

2. The method for determining a tunnel excavation route based on tunnel stress data according to claim 1, characterized in that: The geological data of the construction area is collected, and a geological twin model of the construction area is constructed based on the collected geological data. The process of visualizing the swelling rock area in the constructed geological twin model includes: The geological data of the construction area is collected, and the digital twin technology is used to build a geological twin model of the construction area based on the geological data. The swelling rock area of ​​the construction area is obtained based on the collected geological data, and the obtained swelling rock area is rendered in a different color from other areas.

3. The method for determining a tunnel excavation route based on tunnel stress data according to claim 2, characterized in that: The process of obtaining tunnel information according to the construction plan, building a tunnel twin model based on the obtained tunnel information, and building several tunnel simulation routes in combination with the geological twin model includes: A construction plan for the tunnel is obtained, and tunnel information is obtained according to the construction plan, wherein the tunnel information refers to various information necessary for constructing a digital twin model of the tunnel, and a tunnel twin model of the tunnel is constructed according to the tunnel information using digital twin technology. The constructed tunnel twin model is combined with the geological twin model, and several tunnel simulation routes are constructed in the geological twin model using an exhaustive method, and the tunnel twin models are respectively set on the constructed tunnel simulation routes.

4. The method for determining a tunnel excavation route based on tunnel stress data according to claim 3, characterized in that: The process of obtaining swelling rock samples on the tunnel excavation route, monitoring the swelling coefficient of the swelling rock samples under different environmental conditions, and constructing a swelling prediction model for the swelling rock area according to the corresponding relationship between the obtained environmental conditions and the swelling coefficient includes: Swelling rock samples are collected from the swelling rock area on the tunnel excavation route, wherein the environmental conditions refer to various external conditions that can cause the swelling rock samples to swell, and the collection volume of the swelling rock samples is obtained. Different environmental conditions are applied to the swelling rock samples to obtain corresponding swelling volumes, and the ratio of the swelling volume divided by the collection volume is used as the swelling coefficient of the swelling rock samples; Different environmental conditions and their corresponding expansion coefficients are included in the same data set, a deep learning model is selected as the initial expansion prediction model, and the data set is used to train and evaluate the initial expansion prediction model to obtain the current expansion prediction model.

5. The method for determining a tunnel excavation route based on tunnel stress data according to claim 4, characterized in that: The process of collecting the historical environmental conditions of the swelling rock area and obtaining the expansion coefficient change diagram of the swelling rock area under the historical environmental conditions according to the swelling prediction model includes: The historical environmental conditions of the swelling rock area are collected and an environmental condition change map is constructed. The expansion coefficient of the swelling rock area under different historical environmental conditions is obtained according to the expansion prediction model to construct an expansion coefficient change map.

6. The method for determining a tunnel excavation route based on tunnel stress data according to claim 5, characterized in that: The process of obtaining the stress data of the tunnel twin model under different expansion coefficients and obtaining the tunnel stress data change diagram in combination with the expansion coefficient change diagram includes: The stress data on the contact surface between the tunnel excavation route and the expansive rock area are collected, and the corresponding environmental conditions and expansion coefficients are obtained. The stress data and expansion coefficients are input into the geological twin model including the tunnel excavation route. In the geological twin model, the expansion coefficient is adjusted according to the expansion coefficient change diagram to obtain the corresponding stress data, and then the stress data change diagram is constructed.

7. The method for determining a tunnel excavation route based on tunnel stress data according to claim 6, characterized in that: The process of generating and feeding back the support information of the tunnel in the swelling rock area based on the stress data variation diagram and the tunnel excavation route includes: Support measures are added to the contact surface between the tunnel excavation route and the swelling rock area, and the highest value in the stress data change diagram is used as the stress peak value that the tunnel excavation route is subjected to in the swelling rock area. The bearing capacity of the support measures is set according to the stress peak value and the support information of the tunnel is generated. The support information includes the contact surface between the tunnel excavation route and the swelling rock area and the bearing capacity of the support measures, and the support information is fed back to relevant personnel.