A pile foundation reinforcement structure for increasing load amplitude and implementation method thereof

By setting up a cage, an extrusion frame and a rotating spring in the pile foundation, combined with the limit support of guide piles and prefabricated pile structures, the problem of deformation of pile foundations under pressure is solved, and the load amplitude and structural stability are improved.

CN118686216BActive Publication Date: 2024-12-06ZHEJIANG DAOQILE TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411180139.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-12-06
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

The existing pile foundation is subject to pressure during actual use and cannot remain stable through the reinforced structure with high load, resulting in poor practical application results.

Method used

A pile foundation reinforcement structure that increases the load amplitude is adopted, including the first side supporting foundation pile, the second side supporting foundation pile and the central supporting foundation pile. By setting up a cage and an extrusion frame, the load buffering is used with a rotating spring, and the load buffering is carried out through Guided piles, prefabricated pile structures and interlaced steel plates are provided for limit support to increase the load amplitude.

Benefits of technology

It effectively improves the load amplitude and working strength of the pile foundation, enhances the stability and reinforcement effect of the structure, and adapts to long-term support work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118686216B_ABST
    Figure CN118686216B_ABST
Patent Text Reader

Abstract

The present invention discloses a pile foundation reinforcement structure for increasing the load amplitude and an implementation method thereof, and belongs to the technical field of foundation reinforcement. A pile foundation reinforcement structure for increasing the load amplitude of the present invention comprises a first side support pile, a second side support pile and a center support pile, and also comprises a retaining frame, an extrusion frame is installed above the retaining frame, and a high-pressure rotary spring is installed between the extrusion frame and the retaining frame. The present invention solves the problem that the existing pile foundation is deformed by pressure and cannot be kept stable by a high-load reinforcement structure. The first side support pile and the second side support pile of the present invention are deformed, and the load generated is buffered by the retaining frame and the extrusion frame, and high-pressure limited support is performed by a high-pressure rotary spring to increase the load amplitude of the prefabricated pile structure, and steel plates and wrapped plywood are interspersed to perform limited support at different angles, and the guide piles and prefabricated pile structures are used to further improve the support, thereby effectively improving the reinforcement effect of the pile foundation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation reinforcement, and in particular to a pile foundation reinforcement structure for increasing load amplitude and an implementation method thereof. Background Art

[0002] Precast reinforced concrete driven piles have many advantages such as mature manufacturing technology, fast construction speed, good adaptability to the strata, easy quality assurance, relatively low project costs and high bearing capacity. Therefore, they are widely used in the foundation engineering of railways, highways and building construction projects.

[0003] The Chinese patent with the announcement number CN110130425A discloses a reinforced concrete pile foundation reinforcement structure and a building containing the reinforcement structure, which includes an original concrete cap and an enlarged concrete cap, the original concrete cap and the enlarged concrete cap are connected, the outer peripheral surface of the original concrete cap contacts the inner peripheral surface of the enlarged concrete cap, and also includes a circumferential loading component for increasing the compressive stress applied by the inner peripheral surface of the enlarged concrete cap to the outer peripheral surface of the original concrete cap. The patent is not only simple in structure, but also enables the original concrete cap and the enlarged concrete cap to form a complete pile foundation as a whole, jointly resisting the load transmitted from the upper structure.

[0004] During actual use, the pile foundation of the above patent is deformed by pressure and cannot be kept stable by the high-load reinforcement structure, resulting in poor actual application effect of the pile foundation; therefore, it does not meet the existing needs. We have proposed a pile foundation reinforcement structure that increases the load amplitude and its implementation method. Summary of the invention

[0005] The purpose of the present invention is to provide a pile foundation reinforcement structure for increasing the load amplitude and its implementation method, so as to solve the problem that the pile foundation proposed in the above background technology is deformed by pressure during actual use and cannot be kept stable by the high-load reinforcement structure, thus resulting in poor actual application effect of the pile foundation.

[0006] To achieve the above object, the present invention provides the following technical solution: a pile foundation reinforcement structure for increasing load amplitude, comprising a first side support pile, a second side support pile and a central support pile, wherein the central support pile is arranged between the first side support pile and the second side support pile, and a cap upper structure is arranged above the first side support pile, the second side support pile and the central support pile;

[0007] It also includes a retaining frame, which is used to increase the load amplitude of the first side supporting pile and the second side supporting pile. The retaining frame is installed on one side of the first side supporting pile and the other side of the second side supporting pile. An extrusion frame is installed above the retaining frame, and a rotation spring is installed between the extrusion frame and the retaining frame.

[0008] Preferably, a pile foundation pedestal is arranged above the pedestal upper structure, and the pedestal upper structure and the pile foundation pedestal are fixedly connected by steel bars penetrating therethrough, and steel bars penetrate the pile foundation pedestal and the first side supporting pile, the second side supporting pile and the center supporting pile respectively.

[0009] Preferably, a pedestal pressure support plate is provided on one side of the pedestal upper structure, and a connecting steel frame is installed at the rear end of the pedestal pressure support plate. The connecting steel frame is embedded in the outside of the pedestal upper structure and fixedly connected to the pedestal upper structure, and the upper end surface of the pedestal pressure support plate extends outside the foundation and remains level with the foundation surface.

[0010] Preferably, an integrally formed pressure-resistant arc plate is provided below the pedestal pressure support plate, and three reinforcing support plates are installed between the pressure-resistant arc plate and the pedestal pressure support plate. The two ends of the three reinforcing support plates are respectively embedded in the interior of the pedestal pressure support plate and the pressure-resistant arc plate and are fixedly connected to the pedestal pressure support plate and the pressure-resistant arc plate by steel bars.

[0011] Preferably, guide piles are installed at the lower ends of the first side supporting piles and the second side supporting piles, a prefabricated pile structure is installed below the guide piles, a wrapping plywood is installed outside the prefabricated pile structure, the wrapping plywood is embedded in the outside of the prefabricated pile structure and is interlocked with the prefabricated pile structure, and the upper end of the wrapping plywood extends to the inside of the guide pile and is fixedly connected to the guide pile.

[0012] Preferably, the lower ends of the first side supporting pile and the second side supporting pile are both provided with an integrally formed prefabricated pile end, the lower end of the central supporting pile is provided with an integrally formed base end head, a transition connecting pile is installed between the guide pile and the first side supporting pile and the second side supporting pile, an interpenetrating steel plate is penetrated inside the transition connecting pile, the lower end of the interpenetrating steel plate is embedded in the interior of the guide pile and engaged with the guide pile, a balancing side plate is installed at the rear end of the transition connecting pile, the lower end of the balancing side plate extends to the interior of the guide pile and engages with the guide pile, and the balancing side plate is used to balance the position deviation caused by the retaining frame.

[0013] Preferably, the upper ends of the first side supporting pile and the second side supporting pile are both provided with upper connecting plates, and the lower ends of the first side supporting pile and the second side supporting pile are both provided with lower connecting columns, the lower connecting columns are embedded in the outside of the transition connecting piles and are fixedly connected to the transition connecting piles, and the upper connecting plates are embedded in the inside of the pile foundation pedestal and are fixedly connected to the pile foundation pedestals through steel bars.

[0014] Preferably, the first side supporting piles and the second side supporting piles are both provided with first longitudinal steel bars, the first longitudinal steel bars penetrate the guide piles, the transition connecting piles, the precast pile structure and the precast pile ends and are fixedly connected to the guide piles, the transition connecting piles, the precast pile structure and the precast pile ends by concrete, the second longitudinal steel bars penetrate the interior of the balancing side plate, the lower ends of the second longitudinal steel bars extend to the precast pile structure and the precast pile ends and are fixedly connected to the precast pile structure and the precast pile ends by concrete, the first side supporting piles and the pedestal compression support plate are surrounded by first spiral stirrups and second spiral stirrups, the first spiral stirrups are fixedly connected to the first longitudinal steel bars, and the second spiral stirrups are fixedly connected to the first longitudinal steel bars and the second longitudinal steel bars.

[0015] Preferably, a fastening plate is installed at the lower end of the retaining frame, and the fastening plate is respectively connected to the retaining frame and the prefabricated pile structure through fixing bolts, and a card embedding plate is installed at the upper end of the extrusion frame, and the card embedding plate is embedded in the interior of the wrapping splint and fixedly connected to the wrapping splint, and a rotating spring is installed between the extrusion frame and the retaining frame, and the extrusion frame and the retaining frame are rotatably connected through the rotating spring, and a wrapping sealing sleeve is provided at the connection between the extrusion frame and the retaining frame, and the wrapping sealing sleeve is used to seal the rotating spring and the connection.

[0016] A method for implementing a pile foundation reinforcement structure for increasing load amplitude comprises the following steps:

[0017] Step 1: Prefabricate the first side support piles and the second side support piles according to the geological conditions and the required reinforcement depth;

[0018] Step 2: Set up the formwork, inject concrete into the prefabricated steel bars, make guide piles, transition connection piles, prefabricated pile structures, prefabricated pile ends and transition connection piles, penetrate and insert steel plates inside the transition connection piles and prefabricated pile structures, and fix the transition connection piles, prefabricated pile structures and inserted steel plates by wrapping plywood;

[0019] Step 3: Install the card insert plate and the fastening plate, fix the retainer and the extrusion frame on one side of the wrapped plywood and the prefabricated pile structure, and after the fixation is completed, seal the rotation spring and the connection part through the wrapped sealing sleeve, and install the balancing side plate at the rear end of the transition connection pile to maintain the balance of the pile body;

[0020] Step 4: prefabricate the central support piles, and hammer the central support piles, the first side support piles, and the second side support piles into the foundation soil by pile sinking;

[0021] Step 5: Fix the pile foundation cap on the top of the first side support pile, the second side support pile and the center support pile, fix the pile foundation cap on the foundation surface, and then install the cap upper structure and the cap pressure support plate;

[0022] Step 6: After the compression support plate of the pedestal is subjected to pressure, the first side support piles and the second side support piles are deformed, and the load generated is buffered by the retaining frame and the extrusion frame, and the support is improved in conjunction with the guide piles and prefabricated pile structure, thereby increasing the load amplitude.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] During the prefabrication process of the pile foundation of the present invention, a template is set up, and concrete is injected into prefabricated steel bars to manufacture guide piles, transition connection piles, prefabricated pile structures, prefabricated pile ends and transition connection piles. Steel plates are inserted through the interior of the transition connection piles and the prefabricated pile structures, and the transition connection piles, the prefabricated pile structures and the inserted steel plates are fixed by wrapping plywood. In addition, a plurality of pile structures are penetrated and connected by first longitudinal steel bars, first spiral stirrups, second longitudinal steel bars and second spiral stirrups. The integrated structure makes the position of the prefabricated pile ends more stable. At the same time, the connection is limited and supported by wrapping plywood and inserted steel plates, thereby improving the working strength to adapt to long-term support work.

[0025] The present invention installs a cap bearing support plate on the side of the pile foundation cap, and the stress position of the cap bearing support plate corresponds to the first side support pile or the second side support pile. Therefore, after the cap bearing support plate is subjected to pressure, the first side support pile and the second side support pile are deformed, and the generated load is buffered by the retaining frame and the extrusion frame. High-pressure limited support is performed by a rotating spring to increase the load amplitude of the precast pile structure, and steel plates and wrapping splints are interspersed to perform limited support at different angles. The guide piles and the precast pile structure are used to further improve the support, thereby increasing the load amplitude and effectively improving the reinforcement effect of the pile foundation.

[0026] The present invention sets a pedestal superstructure above the pile foundation pedestal, limits the pile foundation pedestal at the upper end of the foundation, limits and supports the center position of the pile foundation pedestal by a central supporting pile, and then limits and supports the two sides of the pile foundation pedestal by a first side supporting pile and a second side supporting pile, so that the pressure on the upper end of the pedestal compression support plate can be limited by the connecting steel frame and the pressure-resistant arc plate to increase the load amplitude, thereby improving the work quality, stabilizing the structure, and providing all-round protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is an axonometric view of the present invention from the front;

[0028] Figure 2 is an axonometric view of the present invention from the side;

[0029] Figure 3 For the present invention Figure 2 A partial enlarged view of area A in the middle;

[0030] Figure 4It is an axonometric view of the present invention from above;

[0031] Figure 5 An axonometric view of the present invention viewed from above;

[0032] Figure 6 An axonometric view of a first side support pile from the front of the present invention;

[0033] Figure 7 A front view of the steel bar structure of the first side support pile of the present invention;

[0034] Figure 8 This is a top view of the steel bar structure of the first side support pile of the present invention.

[0035] In the figure: 1. pile foundation pedestal; 2. pedestal upper structure; 3. first side support pile; 301. guide pile; 302. wrapped plywood; 303. precast pile structure; 304. precast pile end; 305. transition connection pile; 306. interlaced steel plate; 307. balance side plate; 4. pedestal compression support plate; 401. connecting steel frame; 402. pressure-resistant arc plate; 403. reinforcing support plate; 5. second side support pile; 501. upper connecting plate; 502. lower connecting column; 503. first longitudinal steel bar; 504. first spiral stirrup; 505. second longitudinal steel bar; 506. second spiral stirrup; 6. center support pile; 601. base end; 7. retaining frame; 701. extrusion frame; 702. wrapped sealing sleeve; 703. fastening plate; 704. rotation spring; 705. embedded plate. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] In order to solve the problem that the existing pile foundation is deformed by pressure during actual use and cannot be stabilized by the high-load reinforcement structure, resulting in poor actual application effect of the pile foundation, please refer to Figure 1 - Figure 3 , Figure 6 , this embodiment provides the following technical solutions:

[0038] A pile foundation reinforcement structure for increasing load amplitude, comprising a first side support pile 3, a second side support pile 5 and a central support pile 6, wherein the central support pile 6 is arranged between the first side support pile 3 and the second side support pile 5, and a cap upper structure 2 is arranged above the first side support pile 3, the second side support pile 5 and the central support pile 6;

[0039] It also includes a retaining frame 7, which is used to increase the load amplitude of the first side support pile 3 and the second side support pile 5. The retaining frame 7 is installed on one side of the first side support pile 3 and the other side of the second side support pile 5. An extrusion frame 701 is installed above the retaining frame 7, and a rotation spring 704 is installed between the extrusion frame 701 and the retaining frame 7. The generated load is buffered by the retaining frame 7 and the extrusion frame 701, and high-pressure limit support is performed by the rotation spring 704 to increase the load amplitude of the prefabricated pile structure 303. A fastening plate 703 is installed at the lower end of the retaining frame 7, and the fastening plate 703 is respectively connected to the retaining frame 7 and the prefabricated pile structure 303 through fixing bolts. A card embedded plate 705 is installed at the upper end of the extrusion frame 701, and the card embedded plate 705 is embedded in the interior of the wrapping splint 302 and fixedly connected to the wrapping splint 302, and a rotation spring 704 is installed between the extrusion frame 701 and the retaining frame 7, and the extrusion frame 701 and the retaining frame 7 are rotationally connected through the rotation spring 704, and a wrapping sealing sleeve 702 is provided at the connection between the extrusion frame 701 and the retaining frame 7, and the wrapping sealing sleeve 702 is used to seal the rotation spring 704 and the connection. The wrapping sealing sleeve 702 prevents the rotation spring 704 and the connection from being affected by the lower layer of the foundation, thereby maintaining an effective extrusion support effect and improving the working strength of the side support piles.

[0040] A capping pressure support plate 4 is provided on one side of the capping upper structure 2, and a connecting steel frame 401 is installed at the rear end of the capping pressure support plate 4. The connecting steel frame 401 is embedded in the outside of the capping upper structure 2 and is fixedly connected to the capping upper structure 2, and the upper end surface of the capping pressure support plate 4 extends to the outside of the foundation and keeps level with the foundation surface. The capping pressure support plate 4 is installed on the side of the pile foundation cap 1, and the force-bearing position of the capping pressure support plate 4 corresponds to the first side supporting pile 3 or the second side supporting pile 5, so that after the capping pressure support plate 4 is subjected to pressure, the first side supporting pile 3 and the second side supporting pile 5 are deformed to perform supporting work.

[0041] The lower ends of the first side support pile 3 and the second side support pile 5 are both installed with guide piles 301, and a prefabricated pile structure 303 is installed below the guide pile 301. A wrapping splint 302 is installed outside the prefabricated pile structure 303, and the wrapping splint 302 is embedded in the outside of the prefabricated pile structure 303 and is interlocked with the prefabricated pile structure 303, and the upper end of the wrapping splint 302 extends to the inside of the guide pile 301 and is fixedly connected to the guide pile 301. The lower ends of the first side support pile 3 and the second side support pile 5 are both provided with an integrally formed prefabricated pile end 304, and the lower end of the central support pile 6 is provided with an integrally formed base end head 601. The guide pile 301 is connected to the first side support pile 3 and the second side support pile A transition connection pile 305 is installed between the foundation piles 5, and an interlaced steel plate 306 runs through the interior of the transition connection pile 305. The lower end of the interlaced steel plate 306 is embedded in the interior of the guide pile 301 and engages with the guide pile 301. A balancing side plate 307 is installed at the rear end of the transition connection pile 305. The lower end of the balancing side plate 307 extends to the interior of the guide pile 301 and engages with the guide pile 301. The balancing side plate 307 is used to balance the position deviation caused by the retaining frame 7. The interlaced steel plate 306 and the wrapping splint 302 are limitedly supported at different angles, and cooperate with the guide pile 301 and the prefabricated pile structure 303 to further improve the support, thereby increasing the load amplitude and effectively improving the reinforcement effect of the pile foundation.

[0042] Specifically, a cap bearing plate 4 is installed on the side of the pile foundation cap 1, and the position where the cap bearing plate 4 is subjected to force corresponds to the first side support pile 3 or the second side support pile 5. Therefore, after the cap bearing plate 4 is subjected to pressure, the first side support pile 3 and the second side support pile 5 are deformed, and the generated load is buffered by the retaining frame 7 and the extrusion frame 701. High-pressure limited support is performed by the rotating spring 704 to increase the load amplitude of the precast pile structure 303. The steel plates 306 and the wrapping splints 302 are interspersed to perform limited support at different angles, and the guide piles 301 and the precast pile structure 303 are cooperated to further improve the support, thereby increasing the load amplitude and effectively improving the reinforcement effect of the pile foundation.

[0043] In order to solve the problem that the existing pile foundation has a single reinforcement structure and poor stability of interconnection in actual use, which affects long-term use, please refer to Figure 1 - Figure 3 , Figure 6 - Figure 8 , this embodiment provides the following technical solutions:

[0044] A pile foundation pedestal 1 is arranged above the upper structure 2 of the pedestal. The upper structure 2 of the pedestal and the pile foundation pedestal 1 are fixedly connected by steel bars. Steel bars are passed through the pile foundation pedestal 1 and the first side support pile 3, the second side support pile 5 and the center support pile 6 respectively. The integrated structure makes the position of the prefabricated pile end 304 more stable. At the same time, the connection is limited and supported by wrapping the plywood 302 and inserting the steel plate 306, thereby improving the working strength to adapt to long-term support work.

[0045] The first side support pile 3 and the second side support pile 5 are both provided with a first longitudinal steel bar 503, which penetrates through the guide pile 301, the transition connection pile 305, the precast pile structure 303 and the precast pile end 304 and is fixedly connected to the guide pile 301, the transition connection pile 305, the precast pile structure 303 and the precast pile end 304 through concrete, and the balance side plate 307 is penetrated by a second longitudinal steel bar 505, the lower end of the second longitudinal steel bar 505 extends to the precast pile structure 303 and the precast pile end 304 and is fixedly connected to the precast pile structure 303 and the precast pile end 304 through concrete, and penetrates and intersperses the steel plate 306 inside the transition connection pile 305 and the precast pile structure 303, so as to provide a plurality of side support piles 307 with a plurality of longitudinal steel bars 505, and the balance side plate 307 is provided ... High working strength to adapt to long-term support work, the first side support pile 3 and the pedestal compression support plate 4 are surrounded by the first spiral hoop 504 and the second spiral hoop 506, the first spiral hoop 504 is fixedly connected to the first longitudinal steel bar 503, the second spiral hoop 506 is fixedly connected to the first longitudinal steel bar 503 and the second longitudinal steel bar 505, the wrapping plywood 302 is used to fix the transition connection pile 305, the prefabricated pile structure 303 and the interspersed steel plate 306, and the first longitudinal steel bar 503, the first spiral hoop 504, the second longitudinal steel bar 505 and the second spiral hoop 506 are used to penetrate and connect multiple pile structures, and the integrated structure makes the position of the prefabricated pile end 304 more stable.

[0046] Specifically, during the prefabrication process of the pile foundation, a template is set up, and concrete is injected into the prefabricated steel bars to make guide piles 301, transition connection piles 305, prefabricated pile structures 303, prefabricated pile ends 304 and transition connection piles 305. Steel plates 306 are inserted through the interior of the transition connection piles 305 and the prefabricated pile structures 303, and the transition connection piles 305, the prefabricated pile structures 303 and the inserted steel plates 306 are fixed by wrapping the plywood 302. In addition, a plurality of pile structures are penetrated and connected by the first longitudinal steel bar 503, the first spiral hoop 504, the second longitudinal steel bar 505 and the second spiral hoop 506. The integrated structure makes the position of the prefabricated pile end 304 more stable. At the same time, the connection is limited and supported by the wrapping plywood 302 and the inserted steel plates 306, thereby improving the working strength to adapt to long-term support work.

[0047] In order to solve the problem that the existing pile foundation is subjected to different pressure angles during actual use, which affects the position stability of the bottom pile structure and leads to poor long-term working effect, please refer to Figure 1 - Figure 5 , this embodiment provides the following technical solutions:

[0048] An integrally formed pressure-resistant arc plate 402 is arranged below the pressure support plate 4 of the pedestal, and three reinforcing support plates 403 are installed between the pressure-resistant arc plate 402 and the pressure support plate 4 of the pedestal. The two ends of the three reinforcing support plates 403 are respectively embedded in the interior of the pressure support plate 4 of the pedestal and the pressure-resistant arc plate 402, and are fixedly connected to the pressure support plate 4 of the pedestal and the pressure-resistant arc plate 402 by steel bars. The two sides of the pile foundation pedestal 1 are limitedly supported by the first side supporting piles 3 and the second side supporting piles 5, so that the pressure on the upper end of the pressure support plate 4 of the pedestal can be limited by the connecting steel frame 401 and the pressure-resistant arc plate 402 to increase the load amplitude, thereby improving the work quality, stabilizing the structure, and providing all-round protection.

[0049] A capping platform superstructure 2 is arranged above the pile foundation capping platform 1, the pile foundation capping platform 1 is limited at the upper end of the foundation, and the central position of the pile foundation capping platform 1 is limited and supported by the central supporting pile 6, and the upper ends of the first side supporting pile 3 and the second side supporting pile 5 are provided with upper connecting plates 501, and the lower ends of the first side supporting pile 3 and the second side supporting pile 5 are provided with lower connecting columns 502, the lower connecting columns 502 are embedded in the outside of the transition connecting pile 305 and are fixedly connected to the transition connecting pile 305, the upper connecting plate 501 is embedded in the inside of the pile foundation capping platform 1 and is fixedly connected to the pile foundation capping platform 1 by steel bars, the positions of the first side supporting pile 3 and the second side supporting pile 5 are kept stable by the upper connecting plate 501 and the lower connecting column 502, and the connectivity between the transition connecting pile 305 and the pile foundation capping platform 1 is improved.

[0050] Specifically, a pedestal superstructure 2 is arranged above the pile foundation pedestal 1, the pile foundation pedestal 1 is limited at the upper end of the foundation, the center position of the pile foundation pedestal 1 is limited and supported by the central support pile 6, and then the two sides of the pile foundation pedestal 1 are limited and supported by the first side support pile 3 and the second side support pile 5, so that the pressure on the upper end of the pedestal compression support plate 4 can be limited by the connecting steel frame 401 and the pressure-resistant arc plate 402 to increase the load amplitude, thereby improving the work quality, stabilizing the structure, and performing multi-directional protection under different compression angles.

[0051] See also Figure 1 - Figure 8 , a method for implementing a pile foundation reinforcement structure for increasing load amplitude, comprising the following steps:

[0052] Step 1: prefabricate the first side support pile 3 and the second side support pile 5 according to the geological conditions and the required reinforcement depth;

[0053] Step 2: Set up the formwork, inject concrete into the prefabricated steel bars, make guide piles 301, transition connection piles 305, prefabricated pile structures 303, prefabricated pile ends 304 and transition connection piles 305, penetrate and insert steel plates 306 inside the transition connection piles 305 and the prefabricated pile structures 303, and fix the transition connection piles 305, the prefabricated pile structures 303 and the inserted steel plates 306 by wrapping the plywood 302, penetrate and connect multiple pile structures by the first longitudinal steel bar 503, the first spiral hoop 504, the second longitudinal steel bar 505 and the second spiral hoop 506, the integrated structure makes the position of the prefabricated pile end 304 more stable, and at the same time, the connection is limited and supported by the wrapping plywood 302 and the inserted steel plates 306, thereby improving the working strength to adapt to long-term support work;

[0054] Step 3: Install the card embedding plate 705 and the fastening plate 703, fix the retaining frame 7 and the extrusion frame 701 on one side of the wrapped splint 302 and the prefabricated pile structure 303, and after the fixation is completed, seal the rotary spring 704 and the connection part by wrapping the sealing sleeve 702, and install the balancing side plate 307 at the rear end of the transition connection pile 305 to maintain the balance of the pile body, buffer the generated load by the retaining frame 7 and the extrusion frame 701, and perform high-pressure limit support by the rotary spring 704 to increase the load amplitude of the prefabricated pile structure 303, insert the steel plate 306 and the wrapped splint 302 to perform limit support at different angles, and cooperate with the guide pile 301 and the prefabricated pile structure 303 to further improve the support, thereby increasing the load amplitude and effectively improving the reinforcement effect of the pile foundation;

[0055] Step 4: prefabricate the central support pile 6, and drive the central support pile 6, the first side support pile 3, and the second side support pile 5 into the foundation soil by pile sinking, so as to limit and support the center position of the pile foundation cap 1 by the central support pile 6;

[0056] Step 5: Fix the pile foundation cap 1 on the top of the first side support pile 3, the second side support pile 5 and the center support pile 6. After the pile foundation cap 1 is fixed on the foundation surface, install the cap superstructure 2 and the cap pressure support plate 4, and keep the position of the first side support pile 3 and the second side support pile 5 stable through the upper connecting plate 501 and the lower connecting column 502, so as to improve the connectivity between the transition connecting pile 305 and the pile foundation cap 1;

[0057] Step six: After the pressure support plate 4 of the pedestal is subjected to pressure, the first side supporting pile 3 and the second side supporting pile 5 are deformed, and the generated load is buffered by the retaining frame 7 and the extrusion frame 701, and the guide pile 301 and the prefabricated pile structure 303 are used to improve the support, thereby increasing the load amplitude. The pressure on the upper end of the pressure support plate 4 of the pedestal can be limited by the connecting steel frame 401 and the pressure-resistant arc plate 402 to increase the load amplitude, thereby improving the work quality, stabilizing the structure, and performing multi-directional protection under different pressure angles.

[0058] Working principle: Prefabricate the first side support pile 3 and the second side support pile 5 according to the geological conditions and the required reinforcement depth, set the template, inject concrete into the prefabricated steel bars, make the guide pile 301, the transition connection pile 305, the prefabricated pile structure 303, the prefabricated pile end 304 and the transition connection pile 305, penetrate the steel plate 306 inside the transition connection pile 305 and the prefabricated pile structure 303, and fix the transition connection pile 305, the prefabricated pile structure 303 and the interlaced steel plate 306 by wrapping the plywood 302, penetrate the multiple pile structures through the first longitudinal steel bar 503, the first spiral hoop 504, the second longitudinal steel bar 505 and the second spiral hoop 506 The through connection and the integrated structure make the position of the prefabricated pile end 304 more stable. At the same time, the connection is limited and supported by the wrapped splint 302 and the inserted steel plate 306, thereby improving the working strength to adapt to long-term support work. The card embedding plate 705 and the fastening plate 703 are installed, and the retaining frame 7 and the extrusion frame 701 are fixed to one side of the wrapped splint 302 and the prefabricated pile structure 303. After the fixation is completed, the rotating spring 704 and the connection part are sealed by the wrapped sealing sleeve 702, and the balancing side plate 307 is installed at the rear end of the transition connection pile 305 to maintain the balance of the pile body. The load generated is buffered by the retaining frame 7 and the extrusion frame 701, and the rotating spring 7 04 Perform high-pressure limited support to increase the load amplitude of the precast pile structure 303, insert steel plates 306 and wrapped plywood 302 to perform limited support at different angles, and cooperate with guide piles 301 and precast pile structures 303 to further improve the support performance, prefabricate central support piles 6, hammer the central support piles 6, the first side support piles 3 and the second side support piles 5 into the foundation soil through pile sinking operations, limit and support the center position of the pile foundation pedestal 1 through the central support piles 6, fix the pile foundation pedestal 1 on the top of the first side support piles 3, the second side support piles 5 and the central support piles 6, and after the pile foundation pedestal 1 is fixed on the foundation surface, install the pedestal upper structure 2 and the pedestal pressure support plate 4, the positions of the first side support pile 3 and the second side support pile 5 are kept stable through the upper connecting plate 501 and the lower connecting column 502, and the connectivity between the transition connecting pile 305 and the pile foundation pedestal 1 is improved. After the pedestal pressure support plate 4 is subjected to pressure, the first side support pile 3 and the second side support pile 5 are deformed, and the load generated is buffered by the retaining frame 7 and the extrusion frame 701, and the supporting performance is improved in conjunction with the guide pile 301 and the prefabricated pile structure 303, thereby increasing the load amplitude. The pressure on the upper end of the pedestal pressure support plate 4 can be limited by the connecting steel frame 401 and the pressure-resistant arc plate 402 to increase the load amplitude, thereby improving the work quality.

[0059] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0060] While the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the invention.

Claims

1. A pile foundation reinforcement structure for increasing load amplitude, comprising a first side support pile (3), a second side support pile (5) and a central support pile (6), characterized in that: The central support pile (6) is arranged between the first side support pile (3) and the second side support pile (5), and a capping platform upper structure (2) is arranged above the first side support pile (3), the second side support pile (5) and the central support pile (6); It also comprises a retaining frame (7), the retaining frame (7) being used for increasing the load amplitude of the first side supporting pile (3) and the second side supporting pile (5), being installed on one side of the first side supporting pile (3) and the other side of the second side supporting pile (5), an extrusion frame (701) being installed above the retaining frame (7), and a rotation spring (704) being installed between the extrusion frame (701) and the retaining frame (7); A guide pile (301) is installed at the lower end of each of the first side support pile (3) and the second side support pile (5); a prefabricated pile structure (303) is installed below the guide pile (301); a wrapping splint (302) is installed outside the prefabricated pile structure (303); the wrapping splint (302) is embedded in the outside of the prefabricated pile structure (303) and is engaged with the prefabricated pile structure (303); and the upper end of the wrapping splint (302) extends to the inside of the guide pile (301) and is fixedly connected to the guide pile (301); The lower ends of the first side support pile (3) and the second side support pile (5) are both provided with an integrally formed prefabricated pile end (304); the lower end of the central support pile (6) is provided with an integrally formed base end head (601); a transition connection pile (305) is installed between the guide pile (301) and the first side support pile (3) and the second side support pile (5); a through steel plate (306) is inserted into the interior of the transition connection pile (305); the lower end of the through steel plate (306) is embedded in the interior of the guide pile (301) and is engaged with the guide pile (301); a balancing side plate (307) is installed at the rear end of the transition connection pile (305); the lower end of the balancing side plate (307) extends to the interior of the guide pile (301) and is engaged with the guide pile (301); and the balancing side plate (307) is used to balance the position deviation generated by the retaining frame (7); A fastening plate (703) is installed at the lower end of the retaining frame (7), and the fastening plate (703) is respectively connected to the retaining frame (7) and the prefabricated pile structure (303) by fixing bolts; a card insert plate (705) is installed at the upper end of the extrusion frame (701), and the card insert plate (705) is embedded in the interior of the wrapping clamp plate (302) and is fixedly connected to the wrapping clamp plate (302); a rotation spring (704) is installed between the extrusion frame (701) and the retaining frame (7); the extrusion frame (701) and the retaining frame (7) are rotationally connected by the rotation spring (704); and a wrapping sealing sleeve (702) is provided at the connection between the extrusion frame (701) and the retaining frame (7), and the wrapping sealing sleeve (702) is used to seal the rotation spring (704) and the connection.

2. A pile foundation reinforcement structure for increasing load amplitude according to claim 1, characterized in that: A pile foundation pedestal (1) is arranged below the pedestal upper structure (2), and the pedestal upper structure (2) and the pile foundation pedestal (1) are fixedly connected by steel bars penetrating therethrough, and steel bars are respectively penetrated between the pile foundation pedestal (1) and the first side support pile (3), the second side support pile (5) and the center support pile (6), and a pedestal pressure support plate (4) is arranged on one side of the pedestal upper structure (2), and a connecting steel frame (401) is installed at the rear end of the pedestal pressure support plate (4), and the connecting steel frame (401) is embedded outside the pedestal upper structure (2) and fixedly connected to the pedestal upper structure (2), and the upper end surface of the pedestal pressure support plate (4) extends outside the foundation and is kept level with the foundation surface.

3. A pile foundation reinforcement structure for increasing load amplitude according to claim 2, characterized in that: An integrally formed pressure-resistant curved plate (402) is provided below the pedestal pressure support plate (4), and three reinforcing support plates (403) are installed between the pressure-resistant curved plate (402) and the pedestal pressure support plate (4), with two ends of the three reinforcing support plates (403) respectively embedded in the interior of the pedestal pressure support plate (4) and the pressure-resistant curved plate (402) and fixedly connected to the pedestal pressure support plate (4) and the pressure-resistant curved plate (402) by steel bars.

4. The pile foundation reinforcement structure for increasing load amplitude according to claim 2, characterized in that: An upper connection plate (501) is provided at the upper end of each of the first side support pile (3) and the second side support pile (5), and a lower connection column (502) is provided at the lower end of each of the first side support pile (3) and the second side support pile (5), wherein the lower connection column (502) is embedded in the exterior of the transition connection pile (305) and is fixedly connected to the transition connection pile (305), and the upper connection plate (501) is embedded in the interior of the pile foundation cap (1) and is fixedly connected to the pile foundation cap (1) via steel bars.

5. A pile foundation reinforcement structure for increasing load amplitude according to claim 4, characterized in that: The first side support pile (3) and the second side support pile (5) are both provided with a first longitudinal steel bar (503) therein; the first longitudinal steel bar (503) penetrates the guide pile (301), the transition connection pile (305), the precast pile structure (303) and the precast pile end (304) and is fixedly connected to the guide pile (301), the transition connection pile (305), the precast pile structure (303) and the precast pile end (304) by concrete; the balance side plate (307) is penetrated by a second longitudinal steel bar (505); the second longitudinal steel bar The lower end of (505) extends to the precast pile structure (303) and the precast pile end (304) and is fixedly connected to the precast pile structure (303) and the precast pile end (304) through concrete; the first side support pile (3) and the cap compression support plate (4) are surrounded by a first spiral stirrup (504) and a second spiral stirrup (506); the first spiral stirrup (504) is fixedly connected to the first longitudinal steel bar (503); and the second spiral stirrup (506) is fixedly connected to the first longitudinal steel bar (503) and the second longitudinal steel bar (505).

6. A method for implementing a pile foundation reinforcement structure for increasing load amplitude according to claim 5, characterized in that: The steps include: Step 1: prefabricate a first side support foundation pile (3) and a second side support foundation pile (5) according to geological conditions and the required reinforcement depth; Step 2: Setting a formwork, injecting prefabricated steel bars into concrete, manufacturing guide piles (301), prefabricated pile structures (303), prefabricated pile ends (304), and transition connection piles (305), inserting steel plates (306) through the interior of the transition connection piles (305) and the prefabricated pile structures (303), and fixing the transition connection piles (305), the prefabricated pile structures (303), and the inserting steel plates (306) by wrapping plywood (302); Step 3: Install the card insert plate (705) and the fastening plate (703), fix the retaining frame (7) and the extrusion frame (701) on one side of the wrapped clamp plate (302) and the prefabricated pile structure (303), and after the fixing is completed, seal the rotation spring (704) and the connection part by wrapping the sealing sleeve (702), and install the balancing side plate (307) at the rear end of the transition connection pile (305) to maintain the balance of the pile body; Step 4: prefabricate the central support pile (6), and hammer the central support pile (6), the first side support pile (3) and the second side support pile (5) into the foundation soil through pile sinking operation; Step 5: Fix the pile foundation cap (1) on the top of the first side support pile (3), the second side support pile (5) and the center support pile (6), and after fixing the pile foundation cap (1) on the foundation surface, install the cap upper structure (2) and the cap pressure support plate (4); Step 6: After the pressure bearing support plate (4) of the cap is subjected to pressure, the first side support pile (3) and the second side support pile (5) are deformed, and the generated load is buffered by the retaining frame (7) and the extrusion frame (701), and the support is improved in cooperation with the guide pile (301) and the prefabricated pile structure (303), thereby increasing the load amplitude.