An intelligent injection-production system and method based on multivariable joint control

Through the intelligent injection and production system of multivariate joint control, combined with data acquisition, oil production and water injection analysis modules, the injection and production process of the well is adjusted, which solves the problems of resource waste and univariate control limitations in the existing technology, and improves oil production efficiency and water resources Utilization.

CN118686591BActive Publication Date: 2024-11-05LINGZHI TECH (DAQING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411173149.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-05
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

The existing oilfield injection and production methods have limitations of resource waste and univariate control, and have failed to make full use of water resources, which affects the efficiency of oil production, and it is difficult to fully consider the comprehensive effects of multiple influencing factors.

Method used

An intelligent injection and procurement system based on multivariate joint control is adopted, and the data of oil well output, oil production efficiency and water injection efficiency are obtained through the data acquisition module, oil production analysis module and water injection analysis module, and the system adjustment is carried out to improve resource utilization.

Benefits of technology

Effectively ensure the accuracy and comprehensiveness of oil well production monitoring, improve water resource utilization, and solve the problem of inefficiency of existing injection and production systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118686591B_ABST
    Figure CN118686591B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent injection-production system and method based on multivariable joint control, which relates to the field of petroleum engineering, solves the problem of low efficiency of the existing injection-production system in petroleum production operations, and includes a data acquisition module for obtaining oil well production period evaluation data; an oil production analysis module for performing oil production analysis on a target oil well according to the oil well production period evaluation data, and obtaining a period oil production efficiency value; a water injection analysis module for performing water injection analysis on a target oil well according to the oil well production period evaluation data, and obtaining a period water injection efficiency value; and an injection-production adjustment module for adjusting the injection-production of the target oil well according to the oil well production period evaluation data, the period oil production efficiency value, and the period water injection efficiency value. The present invention adjusts the oil well by obtaining the period oil production efficiency value and the period water injection efficiency value, and can improve the utilization rate of water and electricity resources and achieve injection-production balance under the premise of ensuring oil production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of petroleum engineering and relates to intelligent control technology, in particular to an intelligent injection-production system and method based on multivariable joint control. Background Art

[0002] Intelligent injection and production refers to the process of using intelligent technology to monitor, analyze and control the water injection and oil production process in the oil field to improve production efficiency, reduce costs, and reduce resource waste, thereby realizing the intelligent and automated management of oil field production;

[0003] The existing oilfield injection and production methods have the following defects:

[0004] 1. Some injection and production methods may waste resources, fail to make full use of water resources, and affect oil production efficiency;

[0005] 2. Based on single variable control, only a single parameter or indicator is considered for control, which makes it difficult to fully consider the combined effects of multiple influencing factors.

[0006] To this end, we propose an intelligent injection-production system and method based on multivariable joint control. Summary of the invention

[0007] In view of the deficiencies in the prior art, the present invention aims to provide an intelligent injection-production system and method based on multivariable joint control. The present invention is based on marking individual production monitoring time periods, respectively obtaining the production depth ratio corresponding to each production monitoring time period, obtaining the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval for comparison with the production depth ratio, and obtaining the oil well production time period evaluation data. According to the oil well production time period evaluation data, the monitoring effective lifting height, the first power value, the actual production of mixed liquid in the oil well, and the relative density of the mixed liquid in the oil pipe corresponding to the second type of production monitoring time period are obtained for analysis to obtain the time period oil production efficiency value. According to the oil well production time period evaluation data, the average value of the water injection pump input power, the average value of the water injection pump outlet pressure, the average value of the water injection pump inlet pressure, and the displacement of the water injection pump corresponding to the target oil well are obtained for water injection analysis to obtain the time period water injection efficiency value. The injection-production adjustment module adjusts the injection-production of the target oil well according to the oil well production time period evaluation data, the time period oil production efficiency value, and the time period water injection efficiency value.

[0008] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: The specific working process of each module of an intelligent injection-production system based on multivariable joint control is as follows:

[0009] Data acquisition module: used to mark the mining monitoring period, obtain the production depth ratio corresponding to each mining monitoring period, obtain the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval and compare them with the production depth ratio to obtain the oil well production period evaluation data;

[0010] Oil production analysis module: used to obtain the monitoring effective lifting height, the first power value, the actual production volume of the mixed liquid in the oil well, and the relative density of the mixed liquid in the oil pipe corresponding to the second type of production monitoring period according to the oil well production period evaluation data, and obtain the period oil production efficiency value;

[0011] Water injection analysis module: used to obtain the average value of water injection pump input power, average value of water injection pump outlet pressure, average value of water injection pump inlet pressure and displacement of water injection pump corresponding to the target oil well according to the oil production period evaluation data of the oil well, and perform water injection analysis to obtain the water injection efficiency value of the period;

[0012] Injection-production adjustment module: The injection-production adjustment module adjusts the injection-production of the target oil well according to the oil production period evaluation data, period oil production efficiency value and period water injection efficiency value.

[0013] Furthermore, the process of the data acquisition module acquiring the oil well production period evaluation data is as follows:

[0014] During the production process of the target oil well, a plurality of different production monitoring periods are selected and marked as the first to kth production monitoring periods respectively;

[0015] Performing production analysis on a target oil well in a first oil well production period to obtain a first production depth ratio;

[0016] The production depth ratios corresponding to the second to k-th mining monitoring periods are respectively obtained to obtain the second to k-th production depth ratios;

[0017] Obtain the upper limit of the yield depth ratio benchmark interval and the lower limit of the yield depth ratio benchmark interval;

[0018] The first to kth production depth ratios are respectively compared with the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval to obtain the oil well production period evaluation data.

[0019] Furthermore, the process of the data acquisition module acquiring the first yield-to-depth ratio is specifically as follows:

[0020] Marking the start time of the period corresponding to the first oil well production period as the first production mark time, and marking the end time of the period corresponding to the first oil well production period as the second production mark time;

[0021] Obtain the cumulative oil production of the target oil well corresponding to the first production mark time to obtain the first oil production, obtain the cumulative oil production of the target oil well corresponding to the second production mark time to obtain the second oil production, calculate the difference between the first oil production and the second oil production, and take the absolute value of the obtained difference to obtain the cumulative oil production of the target oil well in the first production mark time period, and name it the first cumulative oil production;

[0022] Obtaining the oil production depth value corresponding to the first production mark time of the target oil well to obtain the first oil production depth value, obtaining the oil production depth value corresponding to the second production mark time of the target oil well to obtain the second oil production depth value, calculating the average value of the first oil production depth value and the second oil production depth value, obtaining the average oil production depth value of the target oil well in the first production mark time period, and naming it as the first oil average production depth;

[0023] Obtain the water injection depth value corresponding to the first production mark time of the target oil well to obtain the first water injection depth value, obtain the water injection depth value corresponding to the second production mark time of the target oil well to obtain the second water injection depth value, calculate the average value of the first water injection depth value and the second water injection depth value, obtain the average water injection depth value of the target oil well in the first production mark time period, and name it as the first average water injection depth;

[0024] The first cumulative oil production, the first average oil production depth and the first average water injection depth are calculated to obtain the production depth ratio corresponding to the target oil well in the first oil well production period, and it is named the first production depth ratio.

[0025] Furthermore, the process of the data acquisition module acquiring the upper limit of the yield depth ratio reference interval and the lower limit of the yield depth ratio reference interval is as follows:

[0026] In the oil field where the target oil well is located, several oil wells of the same type as the target oil well and in normal working conditions are selected, and they are named first to jth characteristic oil wells respectively;

[0027] Respectively obtain the production depth ratios corresponding to the first to j-th characteristic oil wells in the first oil well production period, and obtain the first to j-th characteristic production depth ratios;

[0028] Arrange the first to jth characteristic yield-depth ratios in descending order according to their numerical values, take the first-ranked characteristic yield-depth ratio as the upper limit of the yield-depth ratio benchmark interval, and take the j-ranked characteristic yield-depth ratio as the lower limit of the yield-depth ratio benchmark interval.

[0029] Furthermore, the data acquisition module compares the first to kth yield depth ratios with the upper limit of the yield depth ratio benchmark interval and the lower limit of the yield depth ratio benchmark interval, as follows:

[0030] When the production depth ratio is between the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval, the corresponding mining monitoring period is divided into the first type of mining monitoring period;

[0031] When the production depth ratio is not between the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval, the corresponding mining monitoring period is divided into the second type of mining monitoring period.

[0032] Furthermore, the process of the oil production analysis module obtaining the oil production efficiency value of the time period is as follows:

[0033] Obtaining evaluation data based on oil well production time period;

[0034] When the production monitoring period is the second type of production monitoring period, the process of obtaining the efficiency of the machine production well system corresponding to the target oil well;

[0035] The details are as follows:

[0036] Obtain the input power of the motor of the dragging pumping system corresponding to the target oil well to obtain a first power value;

[0037] A unit mass of solid-liquid mixture in the target oil well is randomly sampled to obtain a sample solid-liquid mixture, the sample solid-liquid mixture is decomposed, and the content of the solid-liquid mixture is obtained to obtain the sample mixed liquid production amount, which is named as the actual mixed liquid production amount of the oil well;

[0038] Obtaining the effective lifting height corresponding to the target oil well and the machine-produced well system during the second type of production monitoring period, and obtaining the monitored effective lifting height;

[0039] The effective lifting height, the first power value, the actual mixed liquid production of the oil well, and the relative density of the mixed liquid in the oil pipe are monitored to obtain the actual effective power of the pumping wellhead corresponding to the second type of production monitoring period of the target oil well, and it is named as the period oil production efficiency value;

[0040] The actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period is calculated, and the specific formula configuration is as follows:

[0041] ;

[0042] Among them, Scg is the actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period, Hj is the monitoring effective lifting height, and Yhy is the actual mixed liquid production of the oil well. is the relative density of the mixed liquid in the oil pipe, g is the gravity constant, is the first power value.

[0043] Furthermore, the process of the oil production analysis module acquiring the monitoring effective lifting height is as follows:

[0044] Obtaining the dynamic liquid level depth corresponding to the target oil well during the second type of production monitoring period;

[0045] Obtaining the wellhead oil pressure corresponding to the target oil well during the second type of production monitoring period;

[0046] Obtaining the wellhead casing pressure corresponding to the target oil well during the second type of production monitoring period;

[0047] The liquid extraction pipeline of the dragging pumping system extending into the oil well is obtained as the oil well liquid extraction pipeline, the relative density of the mixed liquid corresponding to the oil well liquid extraction pipeline is obtained, and the relative density of the mixed liquid in the oil pipe is obtained;

[0048] The dynamic liquid level depth, wellhead oil pressure, wellhead casing pressure and relative density of the mixed liquid in the tubing are calculated to obtain the effective lifting height for monitoring;

[0049] The effective lifting height of the monitoring is calculated as follows:

[0050] ;

[0051] Among them, Hj is the effective lifting height of monitoring, Hd is the dynamic liquid surface depth, is the wellhead oil pressure, is the wellhead casing pressure, is the relative density of the mixed liquid in the oil pipe.

[0052] Furthermore, the process of obtaining the time period water injection efficiency value by the water injection analysis module is as follows:

[0053] Obtaining evaluation data based on oil well production time period;

[0054] When the mining monitoring period is the second type mining monitoring period, n water injection monitoring time points are marked respectively and named as the first to nth water injection monitoring time points respectively;

[0055] The real-time power values ​​of the water injection pump corresponding to the first to the nth water injection monitoring time points are obtained through the electric meter to obtain multiple water injection pump input power values, and the average of the multiple water injection pump input power values ​​is calculated to obtain the average value of the water injection pump input power;

[0056] Obtain outlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtain multiple outlet pressure values ​​of the water injection pump, average the multiple outlet pressure values ​​of the water injection pump, and obtain an average outlet pressure of the water injection pump;

[0057] Obtain the inlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtain multiple inlet pressure values ​​of the water injection pump, average the multiple inlet pressure values ​​of the water injection pump, and obtain the average inlet pressure of the water injection pump;

[0058] Obtain the cumulative drainage volume input into the target oil well by the water injection pump during the production monitoring period to obtain the water injection pump displacement;

[0059] The average value of water injection pump input power, average value of water injection pump outlet pressure, average value of water injection pump inlet pressure and water injection pump displacement are calculated to obtain the water injection efficiency value for the period;

[0060] The water injection efficiency value of the time period is calculated, and the specific formula configuration is as follows:

[0061] ;

[0062] Among them, Sxl is the water injection efficiency value of the time period, Pbj is the average inlet pressure of the water injection pump, Pbc is the average outlet pressure of the water injection pump, Zsp is the displacement of the water injection pump, and Wsr is the average input power of the water injection pump.

[0063] Furthermore, the process of the injection-production adjustment module adjusting the injection-production of the target oil well is as follows:

[0064] Obtaining the period evaluation data of the oil production of the oil well, and obtaining the period oil production efficiency value and the period water injection efficiency value corresponding to the second type of mining monitoring period according to the period evaluation data of the oil production of the oil well;

[0065] Obtaining a time period oil production efficiency threshold and a time period water injection efficiency threshold;

[0066] In the second type of production monitoring period, if the oil production efficiency value of the period is less than the oil production efficiency threshold of the period, the wellhead oil pressure of the injection and production system is adjusted upward, and the wellhead casing pressure is adjusted downward;

[0067] If the water injection efficiency value of the second type of mining monitoring period is less than the water injection efficiency threshold, the inlet pressure of the water injection pump of the injection-production system is adjusted upward and the outlet pressure of the water injection pump is adjusted downward.

[0068] An intelligent injection-production method based on multivariable joint control includes the following specific steps:

[0069] Step K1: Obtaining the oil production period evaluation data of the oil well;

[0070] Step K2: Performing oil production analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the oil production efficiency value of the period;

[0071] Step K3: Perform water injection analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the period water injection efficiency value;

[0072] Step K4: adjusting the injection and production of the target oil well according to the period evaluation data of the oil production of the oil well, the period oil production efficiency value and the period water injection efficiency value.

[0073] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0074] 1. The present invention analyzes oilfield production by acquiring cumulative oil production, average oil production depth and average water injection depth, and analyzes water injection and oil production for oil wells with periodic abnormal production, which can effectively ensure the accuracy and comprehensiveness of oil well production monitoring;

[0075] 2. The present invention adjusts the oil well by obtaining the oil production efficiency value and the water injection efficiency value of each period, which can improve the utilization rate of water resources while ensuring the oil production efficiency, and solves the problem of low efficiency of the existing injection and production system in oil production operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0077] Figure 1 is the overall system block diagram of the present invention;

[0078] Figure 2 It is a diagram of the implementation steps of the present invention. DETAILED DESCRIPTION

[0079] The technical scheme of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0080] Embodiment 1

[0081] See also Figure 1 The present invention provides a technical solution: an intelligent injection-production system based on multivariable joint control, comprising a data acquisition module, an oil production analysis module, a water injection analysis module, an injection-production adjustment module and a server, wherein the data acquisition module, the oil production analysis module, the water injection analysis module and the injection-production adjustment module are respectively connected to the server, and the server respectively adjusts the data acquisition module, the oil production analysis module, the water injection analysis module and the injection-production adjustment module;

[0082] The data acquisition module obtains the period evaluation data of oil well production;

[0083] During the production process of the target oil well, a plurality of different production monitoring periods are selected and marked as the first to kth production monitoring periods respectively;

[0084] It should be noted here that:

[0085] In this application, k is the quantity value corresponding to the marked mining monitoring period, and k is an integer greater than 0;

[0086] Performing production analysis on the target oil well in the first oil well production period to obtain a production depth ratio corresponding to the first oil well production period;

[0087] The details are as follows:

[0088] Marking the start time of the period corresponding to the first oil well production period as the first production mark time, and marking the end time of the period corresponding to the first oil well production period as the second production mark time;

[0089] Obtain the cumulative oil production of the target oil well corresponding to the first production mark time to obtain the first oil production, obtain the cumulative oil production of the target oil well corresponding to the second production mark time to obtain the second oil production, calculate the difference between the first oil production and the second oil production, and take the absolute value of the obtained difference to obtain the cumulative oil production of the target oil well in the first production mark time period, and name it the first cumulative oil production;

[0090] Obtaining the oil production depth value corresponding to the first production mark time of the target oil well to obtain the first oil production depth value, obtaining the oil production depth value corresponding to the second production mark time of the target oil well to obtain the second oil production depth value, calculating the average value of the first oil production depth value and the second oil production depth value, obtaining the average oil production depth value of the target oil well in the first production mark time period, and naming it as the first oil average production depth;

[0091] Obtain the water injection depth value corresponding to the first production mark time of the target oil well to obtain the first water injection depth value, obtain the water injection depth value corresponding to the second production mark time of the target oil well to obtain the second water injection depth value, calculate the average value of the first water injection depth value and the second water injection depth value, obtain the average water injection depth value of the target oil well in the first production mark time period, and name it as the first average water injection depth;

[0092] The first cumulative oil production, the first average oil production depth and the first average water injection depth are calculated to obtain a production depth ratio corresponding to the target oil well in the first oil well production period, and the ratio is named as the first production depth ratio;

[0093] The production depth ratio of the target oil well in the first oil well production period is calculated, and the specific formula configuration is as follows:

[0094] ;

[0095] Among them, Csb1 is the production depth ratio corresponding to the target oil well in the first oil well production period, Ly11 is the first cumulative oil production, Ks1 is the first average oil production depth, and Zs1 is the first average water injection depth;

[0096] Repeat the above process of obtaining the first production depth ratio, and obtain the production depth ratios corresponding to the second to k-th mining monitoring periods respectively, to obtain the second to k-th production depth ratios;

[0097] In the oil field where the target oil well is located, several oil wells of the same type as the target oil well and in normal working conditions are selected, and they are named first to jth characteristic oil wells respectively;

[0098] Respectively obtain the production depth ratios corresponding to the first to j-th characteristic oil wells in the first oil well production period, and obtain the first to j-th characteristic production depth ratios;

[0099] Arrange the first to jth characteristic yield-depth ratios in descending order according to their numerical values, take the first characteristic yield-depth ratio as the upper limit of the yield-depth ratio benchmark interval, and take the jth characteristic yield-depth ratio as the lower limit of the yield-depth ratio benchmark interval;

[0100] Compare the first to kth production depth ratios with the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval respectively to obtain the oil production period evaluation data of the oil well;

[0101] The details are as follows:

[0102] When the production depth ratio is between the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval, the corresponding mining monitoring period is divided into the first type of mining monitoring period;

[0103] When the production depth ratio is not between the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval, the corresponding mining monitoring period is divided into the second type of mining monitoring period;

[0104] It should be noted here that:

[0105] The first type of mining monitoring period involved here includes interval boundary values;

[0106] The data acquisition module acquires the evaluation data of the oil production period of the oil well and transmits it to the oil production analysis module;

[0107] The oil production analysis module performs oil production analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the oil production efficiency value of the period;

[0108] Obtaining evaluation data based on oil well production time period;

[0109] When the production monitoring period is the second type of production monitoring period, the efficiency of the machine production well system corresponding to the target oil well is obtained;

[0110] The details are as follows:

[0111] Obtain the input power of the motor of the dragging pumping system corresponding to the target oil well to obtain a first power value;

[0112] A unit mass of solid-liquid mixture in the target oil well is randomly sampled to obtain a sample solid-liquid mixture, the sample solid-liquid mixture is decomposed, and the content of the solid-liquid mixture is obtained to obtain the sample mixed liquid production amount, which is named as the actual mixed liquid production amount of the oil well;

[0113] The effective lifting height corresponding to the target oil well and the machine-produced well system in the second type of production monitoring period is obtained to obtain the monitored effective lifting height; specifically as follows:

[0114] Obtaining the dynamic liquid level depth corresponding to the target oil well during the second type of production monitoring period;

[0115] Obtaining the wellhead oil pressure corresponding to the target oil well during the second type of production monitoring period;

[0116] Obtaining the wellhead casing pressure corresponding to the target oil well during the second type of production monitoring period;

[0117] The liquid extraction pipeline of the dragging pumping system extending into the oil well is obtained as the oil well liquid extraction pipeline, the relative density of the mixed liquid corresponding to the oil well liquid extraction pipeline is obtained, and the relative density of the mixed liquid in the oil pipe is obtained;

[0118] The dynamic liquid level depth, wellhead oil pressure, wellhead casing pressure and relative density of the mixed liquid in the tubing are calculated to obtain the effective lifting height for monitoring;

[0119] The effective lifting height of the monitoring is calculated as follows:

[0120] ;

[0121] in, To monitor the effective lifting height, is the dynamic liquid level depth, is the wellhead oil pressure, is the wellhead casing pressure, is the relative density of the mixed liquid in the oil pipe;

[0122] The effective lifting height, the first power value, the actual mixed liquid production of the oil well, and the relative density of the mixed liquid in the oil pipe are monitored to obtain the actual effective power of the pumping wellhead corresponding to the second type of production monitoring period of the target oil well, and it is named as the period oil production efficiency value;

[0123] The actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period is calculated, and the specific formula configuration is as follows:

[0124] ;

[0125] Among them, Scg is the actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period, To monitor the effective lifting height, Yhy is the actual mixed liquid production of the oil well. is the relative density of the mixed liquid in the oil pipe, g is the gravity constant, is the first power value;

[0126] The oil production analysis module obtains the oil production efficiency value of the time period and transmits it to the injection and production regulation module;

[0127] The water injection analysis module performs water injection analysis on the target oil well according to the oil production period evaluation data of the oil well, and obtains the water injection efficiency value of the period;

[0128] Obtaining evaluation data based on oil well production time period;

[0129] When the mining monitoring period is the second type mining monitoring period, n water injection monitoring time points are marked respectively and named as the first to nth water injection monitoring time points respectively;

[0130] The real-time power values ​​of the water injection pump corresponding to the first to the nth water injection monitoring time points are obtained through the electric meter to obtain multiple water injection pump input power values, and the average of the multiple water injection pump input power values ​​is calculated to obtain the average value of the water injection pump input power;

[0131] Obtain outlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtain multiple outlet pressure values ​​of the water injection pump, average the multiple outlet pressure values ​​of the water injection pump, and obtain an average outlet pressure of the water injection pump;

[0132] Obtain the inlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtain multiple inlet pressure values ​​of the water injection pump, average the multiple inlet pressure values ​​of the water injection pump, and obtain the average inlet pressure of the water injection pump;

[0133] Obtain the cumulative drainage volume input into the target oil well by the water injection pump during the production monitoring period to obtain the water injection pump displacement;

[0134] The average value of water injection pump input power, average value of water injection pump outlet pressure, average value of water injection pump inlet pressure and water injection pump displacement are calculated to obtain the water injection efficiency value for the period;

[0135] The water injection efficiency value of the time period is calculated, and the specific formula configuration is as follows:

[0136] ;

[0137] Among them, Sxl is the water injection efficiency value of the period, Pbj is the average value of the water injection pump inlet pressure, Pbc is the average value of the water injection pump outlet pressure, Zsp is the water injection pump displacement, and Wsr is the average value of the water injection pump input power;

[0138] The water injection analysis module obtains the water injection efficiency value of the time period and transmits it to the injection and production regulation module;

[0139] The injection-production adjustment module adjusts the injection-production of the target oil well according to the oil production period evaluation data, the oil production efficiency value of the period and the water injection efficiency value of the period;

[0140] Obtaining the period evaluation data of the oil production of the oil well, and obtaining the period oil production efficiency value and the period water injection efficiency value corresponding to the second type of mining monitoring period according to the period evaluation data of the oil production of the oil well;

[0141] Obtaining a time period oil production efficiency threshold and a time period water injection efficiency threshold;

[0142] In the second type of production monitoring period, if the oil production efficiency value of the period is less than the oil production efficiency threshold of the period, the wellhead oil pressure of the injection and production system is adjusted upward, and the wellhead casing pressure is adjusted downward;

[0143] In the second type of mining monitoring period, if the water injection efficiency value of the period is less than the water injection efficiency threshold of the period, the inlet pressure of the water injection pump of the injection-production system is adjusted upward, and the outlet pressure of the water injection pump is adjusted downward;

[0144] During the process of adjusting the wellhead oil pressure, wellhead casing pressure, water injection pump inlet pressure and water injection pump outlet pressure of the injection-production system, the system efficiency of the injection-production system is monitored, and an injection-production efficiency balance warning is issued based on the monitoring results;

[0145] The details are as follows:

[0146] Obtain the daily cumulative liquid production and daily operation time of the injection-production system;

[0147] Obtaining samples of oil in the oil well to obtain sample oil, and obtaining the water content of the oil by chemically decomposing the sample oil;

[0148] The dynamic liquid level depth, wellhead oil pressure, wellhead casing pressure, and real-time input power of the water injection pump are obtained respectively;

[0149] The efficiency value of the injection-production system is obtained by calculating the daily cumulative liquid production, the system daily operation time, the dynamic liquid level depth, the wellhead oil pressure, the wellhead casing pressure, and the real-time input power of the injection pump;

[0150] The efficiency value Zcx of the injection-production system is obtained, and the specific formula configuration is as follows:

[0151] ;

[0152] Among them, Cyl is the daily cumulative liquid production, Rys is the daily operation time of the system, Hsl is the water content of the oil, Hd is the dynamic liquid level depth, is the wellhead oil pressure, is the wellhead casing pressure, Wsr is the average input power of the water injection pump;

[0153] Obtain the efficiency threshold of the injection-production system, compare the injection-production efficiency value with the injection-production system efficiency threshold, and issue an injection-production efficiency balance warning based on the comparison result;

[0154] The details are as follows:

[0155] When the injection-production system efficiency value is less than the injection-production system efficiency threshold, the injection-production system issues an injection-production efficiency imbalance warning;

[0156] When the injection-production system efficiency value is greater than or equal to the injection-production system efficiency threshold, the injection-production system operates normally.

[0157] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.

[0158] Embodiment 2

[0159] See also Figure 2 Based on another concept of the same invention, an intelligent injection and production method based on multivariable joint control is proposed, comprising the following steps:

[0160] Step K1: Obtaining the oil production period evaluation data of the oil well;

[0161] Step K11: during the production process of the target oil well, a plurality of different production monitoring periods are selected and marked as the first to kth production monitoring periods respectively;

[0162] Step K12: performing production analysis on the target oil well in the first oil well production period to obtain a production depth ratio corresponding to the first oil well production period;

[0163] The step K12 further includes the following specific steps:

[0164] Step K121: marking the start time of the first oil well production period as the first production mark time, and marking the end time of the first oil well production period as the second production mark time;

[0165] Step K122: obtaining the cumulative oil production of the target oil well corresponding to the first production mark time to obtain the first oil production, obtaining the cumulative oil production of the target oil well corresponding to the second production mark time to obtain the second oil production, calculating the difference between the first oil production and the second oil production, taking the absolute value of the obtained difference, obtaining the cumulative oil production of the target oil well in the first production mark time period, and naming it the first cumulative oil production;

[0166] Step K123: obtaining the oil production depth value corresponding to the first production mark time of the target oil well to obtain the first oil production depth value, obtaining the oil production depth value corresponding to the second production mark time of the target oil well to obtain the second oil production depth value, calculating the average value of the first oil production depth value and the second oil production depth value to obtain the average oil production depth value of the target oil well in the first production mark time period, and naming it as the first oil average production depth;

[0167] Step K124: obtaining the water injection depth value corresponding to the first production mark time of the target oil well to obtain the first water injection depth value, obtaining the water injection depth value corresponding to the second production mark time of the target oil well to obtain the second water injection depth value, calculating the average value of the first water injection depth value and the second water injection depth value to obtain the average water injection depth value of the target oil well in the first production mark time period, and naming it as the first average water injection depth;

[0168] Step K125: Calculate the first cumulative oil production, the first average oil production depth, and the first average water injection depth to obtain a production depth ratio corresponding to the target oil well in the first oil well production period, and name it the first production depth ratio;

[0169] The production depth ratio of the target oil well in the first oil well production period is calculated, and the specific formula configuration is as follows:

[0170] ;

[0171] Among them, Csb1 is the production depth ratio of the target oil well in the first oil well production period, is the first cumulative oil production, is the average production depth of the first oil liquid, is the first average water injection depth;

[0172] Step K126: Repeat the above process of acquiring the first production depth ratio, respectively acquire the production depth ratios corresponding to the second to k-th mining monitoring periods, and obtain the second to k-th production depth ratios;

[0173] Step K127: obtaining an upper limit of a production depth ratio reference interval and a lower limit of a production depth ratio reference interval;

[0174] The details are as follows:

[0175] Step K1271: selecting a number of oil wells of the same type as the target oil well and in normal working condition in the oil field where the target oil well is located, and naming them as the first to jth characteristic oil wells respectively;

[0176] Step K1272: respectively obtaining the production depth ratios corresponding to the first to j-th characteristic oil wells in the first oil well production period, and obtaining the first to j-th characteristic production depth ratios;

[0177] Step K1273: Arrange the first to j-th characteristic yield-to-depth ratios in descending order according to their numerical values, use the first characteristic yield-to-depth ratio as the upper limit of the yield-to-depth ratio benchmark interval, and use the j-th characteristic yield-to-depth ratio as the lower limit of the yield-to-depth ratio benchmark interval;

[0178] Step K128: performing interval range comparison on the first to kth production depth ratios with the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval respectively, to obtain the oil production time period evaluation data of the oil well;

[0179] The details are as follows:

[0180] Step K1281: when the production depth ratio is between the upper limit of the production depth ratio reference interval and the lower limit of the production depth ratio reference interval, the corresponding mining monitoring period is divided into a first type mining monitoring period;

[0181] Step K1282: when the production depth ratio is not between the upper limit of the production depth ratio reference interval and the lower limit of the production depth ratio reference interval, the corresponding mining monitoring period is divided into a second type mining monitoring period;

[0182] Step K2: Performing oil production analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the oil production efficiency value of the period;

[0183] Step K21: obtaining evaluation data based on the oil production period of the oil well;

[0184] Step K22: when the production monitoring period is the second type production monitoring period, the motor input power of the dragging pumping system corresponding to the target oil well is obtained to obtain a first power value;

[0185] Step K23: randomly extracting a unit mass of the solid-liquid mixture in the target oil well to obtain a sample solid-liquid mixture, performing mixture decomposition on the sample solid-liquid mixture, and obtaining the content of the solid-liquid mixture to obtain the sample mixed liquid production volume, which is named as the actual mixed liquid production volume of the oil well;

[0186] Step K24: obtaining the effective lifting height corresponding to the target oil well and the machine-produced well system during the second type of production monitoring period, and obtaining the monitored effective lifting height;

[0187] The details are as follows:

[0188] Step K241: obtaining the dynamic liquid level depth corresponding to the target oil well in the second type of production monitoring period;

[0189] Step K242: obtaining the wellhead oil pressure corresponding to the target oil well during the second type of production monitoring period;

[0190] Step K243: obtaining the wellhead casing pressure corresponding to the target oil well during the second type of production monitoring period;

[0191] Step K244: obtaining the liquid pumping pipeline of the dragging oil pumping system extending into the oil well as the oil well liquid pumping pipeline, obtaining the relative density of the mixed liquid corresponding to the oil well liquid pumping pipeline, and obtaining the relative density of the mixed liquid in the oil pipe;

[0192] Step K245: Calculate the dynamic liquid level depth, wellhead oil pressure, wellhead casing pressure and relative density of the mixed liquid in the oil pipe to obtain the monitored effective lifting height;

[0193] The effective lifting height of the monitoring is calculated as follows:

[0194] ;

[0195] Among them, Hj is the effective lifting height of monitoring, Hd is the dynamic liquid surface depth, is the wellhead oil pressure, is the wellhead casing pressure, is the relative density of the mixed liquid in the oil pipe;

[0196] Step K25: The actual effective power of the pumping wellhead corresponding to the target oil well in the second type of production monitoring period is calculated by monitoring the effective lifting height, the first power value, the actual mixed liquid production volume of the oil well, and the relative density of the mixed liquid in the oil pipe, and is named as the period oil production efficiency value;

[0197] The actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period is calculated, and the specific formula configuration is as follows:

[0198] ;

[0199] Among them, Scg is the actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period, Hj is the monitoring effective lifting height, and Yhy is the actual mixed liquid production of the oil well. is the relative density of the mixed liquid in the oil pipe, g is the gravity constant, Gl1 is the first power value;

[0200] Step K3: Perform water injection analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the period water injection efficiency value;

[0201] Step K31: obtaining evaluation data based on the oil production period of the oil well;

[0202] Step K32: when the mining monitoring period is the second type mining monitoring period, mark n water injection monitoring time points respectively, and name them as the first to nth water injection monitoring time points respectively;

[0203] Step K33: obtaining the real-time power values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points through the electric meter, obtaining multiple water injection pump input power values, and averaging the multiple water injection pump input power values ​​to obtain the average water injection pump input power;

[0204] Step K34: obtaining the outlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtaining multiple outlet pressure values ​​of the water injection pump, and averaging the multiple outlet pressure values ​​of the water injection pump to obtain the average outlet pressure of the water injection pump;

[0205] Step K35: obtaining the inlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtaining multiple inlet pressure values ​​of the water injection pump, and averaging the multiple inlet pressure values ​​of the water injection pump to obtain the average inlet pressure of the water injection pump;

[0206] Step K36: Obtain the cumulative drainage volume input into the target oil well by the water injection pump during the production monitoring period to obtain the water injection pump displacement;

[0207] Step K37: Calculate the average value of the water injection efficiency for the time period by using the average value of the water injection pump input power, the average value of the water injection pump outlet pressure, the average value of the water injection pump inlet pressure and the water injection pump displacement;

[0208] The water injection efficiency value of the time period is calculated, and the specific formula configuration is as follows:

[0209] ;

[0210] Among them, Sxl is the water injection efficiency value of the period, Pbj is the average value of the water injection pump inlet pressure, Pbc is the average value of the water injection pump outlet pressure, Zsp is the water injection pump displacement, and Wsr is the average value of the water injection pump input power;

[0211] Step K4: adjusting the injection and production of the target oil well according to the period evaluation data of the oil production of the oil well, the period oil production efficiency value and the period water injection efficiency value;

[0212] Step K41: obtaining the period evaluation data of the oil production of the oil well, and obtaining the period oil production efficiency value and the period water injection efficiency value corresponding to the second type of production monitoring period according to the period evaluation data of the oil production of the oil well;

[0213] Step K42: Obtaining a time period oil production efficiency threshold and a time period water injection efficiency threshold;

[0214] Step K43: if the oil production efficiency value of the second type of production monitoring period is less than the oil production efficiency threshold, the wellhead oil pressure of the injection and production system is adjusted upward, and the wellhead casing pressure is adjusted downward;

[0215] Step K44: If the water injection efficiency value of the second type of mining monitoring period is less than the water injection efficiency threshold, the inlet pressure of the water injection pump of the injection-production system is adjusted upward, and the outlet pressure of the water injection pump is adjusted downward.

[0216] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well.

Claims

1. An intelligent injection-production system based on multivariable joint control, It is characterized in that include: Data acquisition module: used to mark the mining monitoring period, obtain the production depth ratio corresponding to each mining monitoring period, obtain the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval and compare them with the production depth ratio to obtain the oil well production period evaluation data; Oil production analysis module: used to obtain the monitoring effective lifting height, the first power value, the actual production volume of the mixed liquid in the oil well, and the relative density of the mixed liquid in the oil pipe corresponding to the second type of production monitoring period according to the oil well production period evaluation data, and obtain the period oil production efficiency value; Water injection analysis module: used to obtain the average value of water injection pump input power, average value of water injection pump outlet pressure, average value of water injection pump inlet pressure and displacement of water injection pump corresponding to the target oil well according to the oil production period evaluation data of the oil well, and perform water injection analysis to obtain the water injection efficiency value of the period; Injection-production adjustment module: The injection-production adjustment module adjusts the injection-production of the target oil well according to the oil production period evaluation data, period oil production efficiency value and period water injection efficiency value; The process of the data acquisition module acquiring the oil well production period evaluation data is as follows: During the production process of the target oil well, a plurality of different production monitoring periods are selected and marked as the first to kth production monitoring periods respectively; Performing production analysis on a target oil well in a first oil well production period to obtain a first production depth ratio; The production depth ratios corresponding to the second to k-th mining monitoring periods are respectively obtained to obtain the second to k-th production depth ratios; Obtain the upper limit of the yield depth ratio benchmark interval and the lower limit of the yield depth ratio benchmark interval; Compare the first to kth production depth ratios with the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval respectively to obtain the oil production period evaluation data of the oil well; The process of the oil production analysis module obtaining the oil production efficiency value of a period is as follows: Obtaining evaluation data based on oil well production time period; When the production monitoring period is the second type of production monitoring period, the process of obtaining the efficiency of the machine production well system corresponding to the target oil well; The details are as follows: Obtain the input power of the motor of the dragging pumping system corresponding to the target oil well to obtain a first power value; A unit mass of solid-liquid mixture in the target oil well is randomly sampled to obtain a sample solid-liquid mixture, the sample solid-liquid mixture is decomposed, and the content of the solid-liquid mixture is obtained to obtain the sample mixed liquid production volume, which is named as the actual mixed liquid production volume of the oil well; Obtaining the effective lifting height corresponding to the target oil well and the machine-produced well system during the second type of production monitoring period, and obtaining the monitored effective lifting height; The effective lifting height, the first power value, the actual mixed liquid production of the oil well, and the relative density of the mixed liquid in the oil pipe are monitored to obtain the actual effective power of the pumping wellhead of the target oil well corresponding to the second type of production monitoring period, and it is named as the period oil production efficiency value; The actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period is calculated, and the specific formula configuration is as follows: ; Among them, Scg is the actual effective power of the target oil well at the pumping wellhead corresponding to the second type of production monitoring period, Hj is the monitoring effective lifting height, and Yhy is the actual mixed liquid production of the oil well. is the relative density of the mixed liquid in the oil pipe, g is the gravity constant, is the first power value; The process of obtaining the water injection efficiency value of a time period by the water injection analysis module is as follows: Obtaining evaluation data based on oil well production time period; When the mining monitoring period is the second type mining monitoring period, n water injection monitoring time points are marked respectively and named as the first to nth water injection monitoring time points respectively; The real-time power values ​​of the water injection pump corresponding to the first to the nth water injection monitoring time points are obtained through the electric meter to obtain multiple water injection pump input power values, and the average of the multiple water injection pump input power values ​​is calculated to obtain the average value of the water injection pump input power; Obtain outlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtain multiple outlet pressure values ​​of the water injection pump, average the multiple outlet pressure values ​​of the water injection pump, and obtain an average outlet pressure of the water injection pump; Obtain the inlet pressure values ​​of the water injection pump corresponding to the first to nth water injection monitoring time points, obtain multiple inlet pressure values ​​of the water injection pump, average the multiple inlet pressure values ​​of the water injection pump, and obtain the average inlet pressure of the water injection pump; Obtain the cumulative drainage volume input into the target oil well by the water injection pump during the production monitoring period to obtain the water injection pump displacement; The average value of water injection pump input power, average value of water injection pump outlet pressure, average value of water injection pump inlet pressure and water injection pump displacement are calculated to obtain the water injection efficiency value for the period; The water injection efficiency value of the time period is calculated, and the specific formula configuration is as follows: ; Among them, Sxl is the water injection efficiency value of the period, Pbj is the average value of the water injection pump inlet pressure, Pbc is the average value of the water injection pump outlet pressure, Zsp is the water injection pump displacement, and Wsr is the average value of the water injection pump input power; The process of the injection-production adjustment module adjusting the injection-production of the target oil well is as follows: Obtaining the period evaluation data of the oil production of the oil well, and obtaining the period oil production efficiency value and the period water injection efficiency value corresponding to the second type of mining monitoring period according to the period evaluation data of the oil production of the oil well; Obtaining a time period oil production efficiency threshold and a time period water injection efficiency threshold; In the second type of production monitoring period, if the oil production efficiency value of the period is less than the oil production efficiency threshold of the period, the wellhead oil pressure of the injection and production system is adjusted upward, and the wellhead casing pressure is adjusted downward; If the water injection efficiency value of the second type of mining monitoring period is less than the water injection efficiency threshold, the inlet pressure of the water injection pump of the injection-production system is adjusted upward and the outlet pressure of the water injection pump is adjusted downward.

2. According to claim 1, an intelligent injection-production system based on multivariable joint control, It is characterized in that The process of the data acquisition module acquiring the first yield-to-depth ratio is specifically as follows: Marking the start time of the period corresponding to the first oil well production period as the first production mark time, and marking the end time of the period corresponding to the first oil well production period as the second production mark time; Obtain the cumulative oil production of the target oil well corresponding to the first production mark time to obtain the first oil production, obtain the cumulative oil production of the target oil well corresponding to the second production mark time to obtain the second oil production, calculate the difference between the first oil production and the second oil production, and take the absolute value of the obtained difference to obtain the cumulative oil production of the target oil well in the first production mark time period, and name it the first cumulative oil production; Obtaining the oil production depth value corresponding to the first production mark time of the target oil well to obtain the first oil production depth value, obtaining the oil production depth value corresponding to the second production mark time of the target oil well to obtain the second oil production depth value, calculating the average value of the first oil production depth value and the second oil production depth value, obtaining the average oil production depth value of the target oil well in the first production mark time period, and naming it as the first oil average production depth; Obtain the water injection depth value corresponding to the first production mark time of the target oil well to obtain the first water injection depth value, obtain the water injection depth value corresponding to the second production mark time of the target oil well to obtain the second water injection depth value, calculate the average value of the first water injection depth value and the second water injection depth value, obtain the average water injection depth value of the target oil well in the first production mark time period, and name it as the first average water injection depth; The first cumulative oil production, the first average oil production depth and the first average water injection depth are calculated to obtain the production depth ratio corresponding to the target oil well in the first oil well production period, and it is named the first production depth ratio.

3. According to claim 2, an intelligent injection-production system based on multivariable joint control, It is characterized in that The process of the data acquisition module acquiring the upper limit of the yield depth ratio benchmark interval and the lower limit of the yield depth ratio benchmark interval is as follows: In the oil field where the target oil well is located, several oil wells of the same type as the target oil well and in normal working conditions are selected, and they are named first to jth characteristic oil wells respectively; Respectively obtain the production depth ratios corresponding to the first to j-th characteristic oil wells in the first oil well production period, and obtain the first to j-th characteristic production depth ratios; Arrange the first to jth characteristic yield-depth ratios in descending order according to their numerical values, take the first-ranked characteristic yield-depth ratio as the upper limit of the yield-depth ratio benchmark interval, and take the j-ranked characteristic yield-depth ratio as the lower limit of the yield-depth ratio benchmark interval.

4. According to claim 2, an intelligent injection-production system based on multivariable joint control, It is characterized in that The process of comparing the first to kth yield depth ratios with the upper limit of the yield depth ratio benchmark interval and the lower limit of the yield depth ratio benchmark interval by the data acquisition module is as follows: When the production depth ratio is between the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval, the corresponding mining monitoring period is divided into the first type of mining monitoring period; When the production depth ratio is not between the upper limit of the production depth ratio benchmark interval and the lower limit of the production depth ratio benchmark interval, the corresponding mining monitoring period is divided into the second type of mining monitoring period.

5. According to claim 4, an intelligent injection-production system based on multivariable joint control, It is characterized in that The process of the oil production analysis module acquiring the monitoring effective lifting height is as follows: Obtaining the dynamic liquid level depth corresponding to the target oil well during the second type of production monitoring period; Obtaining the wellhead oil pressure corresponding to the target oil well during the second type of production monitoring period; Obtaining the wellhead casing pressure corresponding to the target oil well during the second type of production monitoring period; The liquid extraction pipeline of the dragging pumping system extending into the oil well is obtained as the oil well liquid extraction pipeline, the relative density of the mixed liquid corresponding to the oil well liquid extraction pipeline is obtained, and the relative density of the mixed liquid in the oil pipe is obtained; The dynamic liquid level depth, wellhead oil pressure, wellhead casing pressure and relative density of the mixed liquid in the tubing are calculated to obtain the effective lifting height for monitoring; The effective lifting height of the monitoring is calculated as follows: ; Among them, Hj is the effective lifting height of monitoring, Hd is the dynamic liquid surface depth, is the wellhead oil pressure, is the wellhead casing pressure, is the relative density of the mixed liquid in the oil pipe.

6. An intelligent injection-production method based on multivariable joint control, applicable to an intelligent injection-production system based on multivariable joint control as claimed in any one of claims 1 to 5, It is characterized in that The injection-production method comprises the following specific steps: Step K1: Obtaining the oil production period evaluation data of the oil well; Step K2: Performing oil production analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the oil production efficiency value of the period; Step K3: Perform water injection analysis on the target oil well according to the oil production period evaluation data of the oil well to obtain the period water injection efficiency value; Step K4: adjusting the injection and production of the target oil well according to the period evaluation data of the oil production of the oil well, the period oil production efficiency value and the period water injection efficiency value.