Soil and water loss protection and water collection structure between foundation pit support piles

By using a combination structure of anchor plates, steel mesh and water-carrying bags between the foundation pit support piles, the problem of soil erosion was solved, water collection and effective utilization of resources were achieved, and the stability and support effect of the foundation pit were enhanced.

CN118704491BActive Publication Date: 2024-11-26SHAANXI CONSTR INFRASTRUCTURE GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411188861.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-26
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

Traditional soil and water loss prevention measures between foundation pit support piles have limited effectiveness, failing to effectively collect lost water, leading to resource waste and affecting the stability of the foundation pit.

Method used

The structure employs a combination of anchor plates, steel mesh, and water-carrying bags. The anchor plates are inserted deep into the soil layer of the pit sidewall, the steel mesh provides protective support, and the water-carrying bags collect lost water and gather it into a water container through a water collection hose. The addition of reinforced anchor rods and guide rails enhances stability.

Benefits of technology

It effectively reduced the loss of large areas of soil, collected and utilized the lost water, improved the stability and resource utilization of the foundation pit, and enhanced the support effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118704491B_ABST
    Figure CN118704491B_ABST
Patent Text Reader

Abstract

The present application relates to the field of foundation pit support, and in particular to a soil erosion protection and water collection structure between foundation pit support piles, comprising a plurality of anchoring plugs arranged between two support piles and distributed vertically at intervals, the anchoring plugs being inserted into the soil layer of the side wall of the foundation pit, a steel mesh and an internally hollow water-carrying bag being arranged between two vertically adjacent anchoring plugs, the steel mesh being located between the water-carrying bag and the soil layer of the side wall of the foundation pit, a water collection port being opened in the water-carrying bag and the water collection port facing the corresponding steel mesh, a water collection hose being connected between two vertically adjacent water-carrying bags, and a water container being connected to the lowest water-carrying bag. The present application has the advantage of improving the effect of soil erosion protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of foundation pit support, and in particular to a soil erosion protection and water collection structure between foundation pit support piles. Background Art

[0002] Foundation pit support piles are a type of support structure used in foundation pit projects. Their main function is to ensure the stability and safety of the foundation pit and prevent the collapse of the foundation pit and the sliding of the surrounding soil.

[0003] During the excavation of the foundation pit, the soil between the supporting piles is prone to soil erosion due to construction disturbance, groundwater flow and other factors, which in turn affects the stability of the foundation pit and the surrounding environment.

[0004] Traditional measures to prevent soil and water loss often use simple materials such as sandbags and geotextiles for temporary protection, or drive soil nails between supporting piles for reinforcement. However, these methods have limited effects on preventing soil and water loss, and cannot effectively collect lost water, which is obviously insufficient. Summary of the invention

[0005] In order to improve the serious problem of soil and water loss between supporting piles, the present application provides a soil and water loss protection and water collection structure between foundation pit supporting piles.

[0006] The present application provides a foundation pit support pile inter-pile soil erosion protection and water collection structure adopts the following technical solutions:

[0007] A soil erosion protection and water collection structure between foundation pit support piles, comprising a plurality of anchoring plugs arranged between two support piles and distributed at vertical intervals, the anchoring plugs being inserted into the soil layer of the foundation pit side wall, a steel mesh and an internally hollow water-carrying bag being arranged between two vertically adjacent anchoring plugs, the steel mesh being located between the water-carrying bag and the soil layer of the foundation pit side wall, a water collection port being opened on the water-carrying bag and the water collection port being oriented toward the corresponding steel mesh, a water collection hose being connected between two vertically adjacent water-carrying bags, and a water container being connected to the lowest water-carrying bag.

[0008] By adopting the above technical solution, one side of the anchor plug is inserted deep into the soil layer of the side wall of the foundation pit, so as to apply protective support force to the side wall of the foundation pit through the steel mesh, reducing the possibility of large-scale soil blocks falling off and losing. At the same time, because the anchor plug is inserted deep into the soil layer of the side wall of the foundation pit, the water collection port of the water-carrying bag is deformed by force to be close to the side wall of the foundation pit. When the water in the soil layer is lost, the muddy water flows into the water-carrying bag through the water collection port and is then collected in the water container, thereby reducing the waste of resources caused by water loss.

[0009] Optionally, the anchoring plug plate includes two unit plug plates bolted to each other, and the two unit plug plates are used to be inserted into the side walls of the soil layer on the side walls of the foundation pit and are arranged in a V-shape. The edges of the water carrying bag relative to the top and bottom of the water collection port are clamped between the two unit plug plates corresponding to the anchoring plug plates, and the unit plug plate is provided with a clearance groove for the water carrying bag to be inserted into the edge of the water collection port.

[0010] By adopting the above technical solution, during installation, the edge of the water-carrying bag relative to the water collection port is inserted between the two unit plug plates through the clearance groove, and then the two unit plug plates are bolted. Since the unit plug plates have a certain elastic deformation performance, the same anchor plug plate can be inserted into the side wall of the soil layer of the side wall of the foundation pit in a V-shaped manner, whether it is clamping only one water-carrying bag or clamping two adjacent water-carrying bags. This not only realizes the installation between the anchor plug plate and the water-carrying bag, but also facilitates the insertion of the anchor plug plate into the side wall of the foundation pit.

[0011] Optionally, filter gauze is attached to the water bag via Velcro.

[0012] By adopting the above technical solution, the filter gauze can filter the muddy water flowing into the water-carrying bag, thereby separating the mud and water. The filtered clean water will eventually be collected into the water container through the water collecting hose, thereby making it convenient for the workers to use the collected water during the construction process.

[0013] Optionally, a slide rail slidably engaged with the support pile is arranged at a position relative to the end of each anchor plug plate on the support pile, one end of the slide rail is open and the other end is closed, a limit slider is slidably engaged in the slide rail, a limit bolt extending into the support pile is threadedly connected to the limit slider, and the end of the anchor plug plate is located on the side of the limit slider facing the closed end of the slide rail.

[0014] By adopting the above technical solution, the slide rail cooperates with the end of the anchor plug, thereby guiding the anchor plug to be hammered into the soil layer on the side wall of the foundation pit. In addition, the limit bolt and the limit slider cooperate to limit the end of the anchor plug, reducing the possibility of the anchor plug inserted in the depth of the soil layer loosening due to construction vibration.

[0015] Optionally, the slide rail is bolted to the supporting pile.

[0016] By adopting the above technical solution, during construction, workers first drive the supporting piles deep into the soil layer, then dig out the foundation pit, and then install the sliding rails on the supporting piles, thereby reducing the possibility of the sliding rails hindering the driving of the supporting piles into the soil layer.

[0017] Optionally, a reinforcement anchor rod is slidably penetrated through the closed end of the slide rail for being inserted into the soil layer of the side wall of the foundation pit.

[0018] By adopting the above technical solution, workers hammer the reinforcement anchor rods deep into the soil layer on the side wall of the foundation pit. The compaction force of the reinforcement anchor rods on the soil layer reacts on the slide rail, thereby enhancing the holding force on the slide rail, and further improving the protective effect of protective structures such as anchor plates and steel mesh.

[0019] Optionally, the reinforcement anchor rod comprises an outer tube and an inner rod slidably inserted into the outer tube, a notch groove is provided between the inner and outer side walls of the outer tube along the axial direction thereof, a head anchor tip is arranged at one end of the outer tube, and an anchor tail block is arranged at the other end thereof, and anchor teeth are densely distributed and rotatably sleeved on the outer tube along its length direction, the cross-section of the outer wall of the anchor teeth is diamond-shaped, a protrusion located at the notch groove is arranged on the inner side wall of the anchor teeth, the protrusions on two adjacent anchor teeth are circumferentially staggered, the outer side wall of the inner rod protrudes into the notch groove and a staggered tooth groove with open ends is provided along its length direction, and a guiding inclined surface for guiding the protrusion into the staggered tooth groove is provided at a position of the inner rod relative to the end of the staggered tooth groove; when all the protrusions are located in the staggered tooth groove, all two adjacent anchor teeth on the outer tube are circumferentially staggered.

[0020] By adopting the above technical solution, after the slide rail is installed on the support pile, the worker manually smoothes the outer wall of each anchor tooth to be flush, then passes it through the closed end of the slide rail and hammers it into the deep soil layer of the side wall of the foundation pit. After that, the worker hammers the inner rod into the outer tube. During the insertion process, the part of the inner rod protruding into the notch groove cooperates with the guiding inclined surface to gather all the protrusions into the staggered tooth groove. During this process, each anchor tooth rotates circumferentially at a certain angle and the circumferential rotation directions of two adjacent anchor teeth are opposite, thereby improving the bite and compaction strength of the reinforcement anchor rod on the soil layer of the side wall of the foundation pit, and further improving the anchoring effect of the reinforcement anchor rod.

[0021] Optionally, a clustering tooth groove with open ends is provided on the outer wall of the inner rod along its length direction, and the clustering tooth groove is slidably matched with the protrusion. A dividing strip is arranged in the clustering tooth groove which is parallel to the clustering tooth groove and divides the clustering tooth groove into two rows of tooth grooves. When all the protrusions are arranged in two rows and located in two rows of tooth grooves, the protrusions of two adjacent anchor teeth are located in different rows of tooth grooves, and the outer side walls of all the anchor teeth on the outer tube are axially flush.

[0022] By adopting the above technical solution, before the workers hammer the outer tube into the soil layer, they insert the inner rod into the inner tube in advance, insert the branch strips into the notched grooves, and the various protrusions are staggered into two rows and arranged in the tooth grooves on both sides of the branch strips, which reduces the possibility that the reinforcement anchor rod will be inserted into the soil layer due to the circumferential rotation and staggering of individual anchor teeth, which will increase the difficulty of inserting into the soil layer. In addition, when the construction is completed, the branch strips are also plugged into the notched grooves to smooth the outer side walls of each circumferentially staggered anchor tooth to be flush, thereby facilitating the pulling out of the reinforcement anchor rod from the side wall of the foundation pit.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] One side of the anchor plug is inserted deep into the soil layer of the side wall of the foundation pit, so as to apply protective support force to the side wall of the foundation pit through the steel mesh, reducing the possibility of large-scale soil blocks falling off and losing. At the same time, because the anchor plug is inserted deep into the soil layer of the side wall of the foundation pit, the water collection port of the water carrier bag is deformed by force to be close to the side wall of the foundation pit. When the water in the soil layer is lost, the muddy water flows into the water carrier bag through the water collection port and is then collected in the water container, thereby reducing the waste of resources caused by water loss;

[0025] During installation, the edge of the water bag relative to the water collection port is inserted between the two unit plug plates through the clearance groove, and then the two unit plug plates are bolted together. Since the unit plug plates have a certain elastic deformation performance, the same anchor plug plate can be inserted into the side wall of the soil layer of the side wall of the foundation pit in a V-shaped manner, whether it is clamping only one water bag or clamping two adjacent water bags. This not only realizes the installation between the anchor plug plate and the water bag, but also facilitates the insertion of the anchor plug plate into the side wall of the foundation pit;

[0026] After the slide rail is installed on the support pile, the worker manually smoothes the outer wall of each anchor tooth to be flush, then passes it through the closed end of the slide rail and hammers it into the deep soil layer of the foundation pit side wall. After that, the worker hammers the inner rod into the outer tube. During the insertion process, the part of the inner rod protruding into the notch groove cooperates with the guiding slope to gather all the protrusions into the staggered tooth groove. During this process, each anchor tooth rotates circumferentially at a certain angle and the circumferential rotation directions of two adjacent anchor teeth are opposite, thereby improving the bite and compaction strength of the reinforcement anchor rod on the soil layer of the foundation pit side wall, and further improving the anchoring effect of the reinforcement anchor rod;

[0027] Before the workers hammer the outer tube into the soil, they insert the inner rod into the inner tube in advance, insert the split strips into the notched grooves, and arrange the protrusions in two rows and in the tooth grooves on both sides of the split strips, which reduces the possibility that the reinforcement anchor rods will be inserted into the soil layer due to the circumferential rotation of individual anchor teeth, which will increase the difficulty of inserting into the soil layer. In addition, when the construction is completed, the split strips are also inserted into the notched grooves to smooth the outer walls of the circumferentially staggered anchor teeth to make them flush, which makes it easier to pull the reinforcement anchor rods out of the side walls of the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application.

[0029] Figure 2 It is a cross-sectional view of an embodiment of the present application.

[0030] Figure 3 yes Figure 1 Enlarged view of part A.

[0031] Figure 4 yes Figure 2 Enlarged view of part B.

[0032] Figure 5 It is a schematic diagram of the structure of the reinforcement anchor rod in the embodiment of the present application.

[0033] Figure 6 Schematic diagram of the positional relationship of the protrusions on each anchor tooth in the embodiment of the present application.

[0034] Figure 7 It is a schematic diagram of the various anchor teeth interlaced in the embodiment of the present application.

[0035] Figure 8 It is a schematic diagram of the embodiment of the present application when all anchor teeth are aligned.

[0036] Explanation of the reference numerals: 1. Support pile; 2. Steel mesh; 3. Water-carrying bag; 4. Water-collecting hose; 5. Unit plug plate; 51. Make way groove; 6. Filter gauze; 7. Slide rail; 8. Limit slider; 9. Limit bolt; 10. Reinforcement anchor rod; 101. Outer tube; 1011. Notched groove; 112. Inner rod; 1121. Staggered tooth groove; 1123. Row tooth groove; 113. Anchor tip; 114. Anchor tail block; 115. Anchor tooth; 116. Protrusion; 117. Insert strip; 18. Pull ring. DETAILED DESCRIPTION

[0037] The following is combined with Figure 1-8 This application is described in further detail.

[0038] The embodiment of the present application discloses a soil and water loss protection and water collection structure between foundation pit support piles.

[0039] Reference Figure 1 , Figure 2 and Figure 3 The soil erosion protection and water collection structure between foundation pit support piles includes a plurality of anchoring plates arranged between two support piles 1 and distributed vertically at intervals, and a steel mesh 2 and a water bag 3 are also arranged between two vertically adjacent anchoring plates.

[0040] Reference Figure 1 , Figure 2 and Figure 4 The anchoring plug plate is used to be inserted into the soil layer of the side wall of the foundation pit. The anchoring plug plate includes two unit plug plates 5 bolted to each other. The two unit plug plates 5 are used to be inserted into the side wall of the soil layer of the side wall of the foundation pit and are arranged in a V shape.

[0041] Reference Figure 1 , Figure 2 and Figure 4A plurality of hooks (not shown in the figure) are welded on the unit plug plate 5, and the top and bottom of the steel mesh 2 are both hooked on the hooks on the unit plug plate 5. When the anchor plug plate is inserted into the soil layer, the steel mesh 2 is pressed against the side wall of the foundation pit, and the steel mesh 2 can reduce the possibility of large pieces of mud falling off, thereby playing a protective effect on the loss of soil.

[0042] Reference Figure 2 , Figure 3 and Figure 4 The steel mesh 2 is located between the water-carrying bag 3 and the side wall of the foundation pit. The water-carrying bag 3 is hollow inside and has a water collection port (not shown in the figure) on the side facing the corresponding steel mesh 2. Each unit plug plate 5 has a clearance groove 51 near both ends thereof. The edge of the water-carrying bag 3 relative to the water collection port is inserted between the corresponding two unit plug plates 5 through the clearance groove 51. After that, the two unit plug plates 5 are bolted together to realize the clamping assembly between the anchor plug plate and the water-carrying bag 3.

[0043] Reference Figure 2 , Figure 3 and Figure 4 A water collection hose 4 is connected between two vertically adjacent water-carrying bags 3, and the lowest water-carrying bag 3 is connected to a water container (not shown in the figure). The water seeping from the side wall of the foundation pit flows into the water-carrying bag 3, and under the action of the water collection hose 4, it is finally gathered in the water container. The water-carrying bag 3 cooperates with the water collection hose 4 to collect water, reducing the possibility of waste of resources caused by water loss.

[0044] When the anchoring plug plate is hammered to a depth of the soil layer, the position of the water-carrying bag 3 relative to the water collection port will be driven to be close to the side wall of the foundation pit, thereby improving the water collection effect.

[0045] The water-carrying bag 3 is provided with a filter gauze 6 by Velcro, and the filter gauze 6 separates the water from the sediment. In the actual application site, the water container can be replaced by a faucet, so that the filtered water is directly used by the workers.

[0046] Reference Figure 3 A slide rail 7 is bolted to the support pile 1 at a position corresponding to the end of each anchor plug plate, and one end of the slide rail 7 is open and the other end is closed. A limit slider 8 is slidably fitted in the slide rail 7, and a limit bolt 9 is threadedly connected to the limit slider 8 to slide through the slide rail 7 and extend into the support pile 1. The end of the anchor plug plate is located on the side of the limit slider 8 facing the closed end of the slide rail 7.

[0047] Reference Figure 3 Since the anchoring plug is inserted into the deep soil layer of the side wall of the foundation pit by hammering, the sliding cooperation between the end of the anchoring plug and the slide rail 7 guides the insertion of the anchoring plug into the soil, reducing the possibility of the anchoring plug being tilted and twisted due to unstable force, resulting in poor anchoring effect.

[0048] Reference Figure 1 and Figure 5 The closed end of the slide rail 7 is also slidably penetrated with a reinforcement anchor rod 10 for inserting into the soil layer of the side wall of the foundation pit. When the reinforcement anchor rod 10 is inserted into the soil layer, the soil layer is compacted, and the reaction force acts on the anchor plug plate through the slide rail 7, further improving the anchoring effect between the anchor plug plate and the soil layer.

[0049] Reference Figure 5 , Figure 6 and Figure 7 The reinforcement anchor rod 10 comprises an outer tube 101, an anchor tip 113 welded to one end of the outer tube 101, and an anchor tail block 114 welded to the other end of the outer tube 101. A notch groove 1011 is provided between the inner and outer side walls of the outer tube 101 along its length direction, and an anchor tooth 115 is rotatably sleeved on the outer tube 101 along its length direction, and the cross section of the outer side wall of the anchor tooth 115 is rhombus-shaped.

[0050] Reference Figure 5 , Figure 6 and Figure 7 A protrusion 116 is integrally formed on the inner side wall of each anchor tooth 115 , and the protrusion 116 is located in the notch groove 1011 , and the protrusions 116 of two adjacent anchor teeth 115 are circumferentially staggered.

[0051] The outer tube 101 and the anchor tail block 114 are coaxially slidably penetrated by the inner rod 112, the outer side wall of the inner rod 112 protrudes into the notch groove 1011 and is provided with a staggered tooth groove 1121 with both ends open along its length direction, and the inner rod 112 is provided with a guiding inclined surface (not shown in the figure) at the position of the end of the staggered tooth groove 1121 for guiding the protrusion 116 into the staggered tooth groove 1121.

[0052] Reference Figure 5 , Figure 7 and Figure 8 A cluster tooth groove with both ends open is formed along the length of the other side of the outer wall of the inner rod 112 opposite to the staggered tooth groove 1121. The cluster tooth groove is slidably matched with the protrusion 116. A branching strip 117 is integrally formed in the cluster tooth groove, which is parallel to the cluster tooth groove and divides it into two rows of tooth grooves 1123. The end of the branching strip 117 facing the anchor tip 113 is V-shaped, and a placement groove for placing the branching strip 117 is formed on the inner wall of the outer tube 101.

[0053] Reference Figure 5 , Figure 7 and Figure 8 Before installing the reinforcement anchor rods 10, workers first manually smooth the outer side walls of each anchor rod until they are flush. At this time, each protrusion 116 is arranged in two rows along the axial direction of the outer tube 101, and the protrusions 116 on two adjacent anchor teeth 115 are staggered circumferentially.

[0054] At this time, the worker manually inserts the inner rod 112 into the outer tube 101, inserts the branch strip 117 into the notch groove 1011, and the two rows of protrusions 116 correspond to a row of tooth grooves 1123 respectively and are plugged in and matched, so as to assemble the outer tube 101 and the inner rod 112 together.

[0055] Afterwards, the worker passes the reinforcement anchor rod 10 through the closed end of the slide rail 7 and hammers it into the soil layer. Since the outer side walls of each anchor tooth 115 are flush at this time, the reinforcement anchor rod 10 can be hammered into the soil layer with less effort.

[0056] Reference Figure 5 , Figure 7 and Figure 8 After the reinforcement anchor rod 10 is hammered into a suitable depth, the worker manually pulls out the inner rod 112 and reinserts it into the outer tube 101. During the insertion process, the protruding part of the inner rod 112 is located in the notch groove 1011, and the forces of each protrusion 116 are all gathered into the staggered tooth groove 1121 under the action of the guiding slope, and each anchor tooth 115 is rotated circumferentially by a certain angle under the force, and the rotation directions of two adjacent anchor teeth 115 are opposite.

[0057] Through the above-mentioned method, the multiple anchor teeth 115 on the outer tube 101 are staggered in an X shape, thereby improving the bite anchoring strength between the reinforcement anchor rod 10 and the soil layer, and further improving the protection effect of the steel mesh 2 on the soil layer of the side wall of the foundation pit.

[0058] Reference Figure 5 , Figure 7 and Figure 8 After the construction is completed, the workers pull out the inner rod 112 again and reinsert it into the outer tube 101. At this time, the branch strips 117 are reinsert into the notched grooves 1011, so that the staggered anchor teeth 115 are restored to a flush state, which makes it easier for the workers to pull out the reinforcement anchor rod 10 from the side wall of the foundation pit.

[0059] Reference Figure 5 A pull ring 18 is hinged on the anchor tail block 114, and the pull ring 18 facilitates workers to pull the reinforcement anchor rod 10 out of the side wall of the foundation pit.

[0060] Reference Figure 2 , Figure 3 and Figure 4 During the excavation of the foundation pit, the support piles 1 are driven into the soil layer. After the excavation of the foundation pit is completed, the workers first remove the soil blocks at the side wall of the foundation pit relative to the installation position of the slide rail 7, and then install the slide rail 7 on the support piles 1.

[0061] Next, the worker passes the reinforcement anchor rod 10 through the closed end of the slide rail 7 and hammers it into the side wall of the foundation pit to a set depth.

[0062] Then, the workers assemble the steel mesh 2, the anchoring plug plate and the water-carrying bag 3 together in the foundation pit, and install the assembled structure between the supporting piles 1.

[0063] The implementation principle of the soil erosion protection and water collection structure between foundation pit support piles in the embodiment of the present application is as follows: workers pre-install the water-carrying bag 3 on the anchor plug plate relative to the water collection port, hang the steel mesh 2 on the anchor plug plate, and bolt the slide rail 7 to the support pile 1.

[0064] After that, the worker first manually smoothes the outer side walls of each anchor rod until they are flush, then inserts the inner rod 112 into the outer tube 101, inserts the branch strip 117 into the notch groove 1011, and the two rows of protrusions 116 correspond to a row of tooth grooves 1123 respectively and are plugged into each other, and the outer tube 101 and the inner rod 112 are assembled together.

[0065] Then, the worker passes the reinforcement anchor rod 10 through the closed end of the slide rail 7 and hammers it into the soil layer. After the reinforcement anchor rod 10 is hammered into the appropriate depth, the worker manually pulls out the inner rod 112 and reinserts it into the outer tube 101.

[0066] During the insertion process, the protruding portion of the inner rod 112 is located in the notched groove 1011, and the forces of each protrusion 116 are all gathered into the staggered tooth groove 1121 under the action of the guiding slope. Each anchor tooth 115 is rotated circumferentially through a certain angle under the force, and the multiple anchor teeth 115 on the outer tube 101 are staggered in an X shape.

[0067] Next, the workers use hammering to insert the anchoring plate into the side wall of the foundation pit, and tighten the limiting bolts 9 on the limiting slider 8 to complete the assembly of the entire structure.

[0068] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A soil erosion protection and water collection structure between foundation pit support piles, characterized in that: It comprises a plurality of anchoring plugs arranged between two supporting piles (1) and distributed at intervals in a vertical direction, the anchoring plugs being inserted into the soil layer of the side wall of the foundation pit, a steel mesh (2) and a water-carrying bag (3) with a hollow interior are arranged between two vertically adjacent anchoring plugs, the steel mesh (2) is located between the water-carrying bag (3) and the soil layer of the side wall of the foundation pit, a water collection port is opened on the water-carrying bag (3) and the water collection port faces the corresponding steel mesh (2), a water collection hose (4) is connected between two vertically adjacent water-carrying bags (3), and the lowest water-carrying bag (3) is connected to a water container; A slide rail (7) slidably matched with the support pile (1) is arranged at a position relative to the end of each anchor plug plate, one end of the slide rail (7) is open and the other end is closed, a limit slider (8) is slidably matched in the slide rail (7), a limit bolt (9) is threadedly connected to the limit slider (8) and extends into the support pile (1), and the end of the anchor plug plate is located on the side of the limit slider (8) facing the closed end of the slide rail (7); The closed end of the slide rail (7) is also slidably provided with a reinforcement anchor rod (10) for inserting into the soil layer of the side wall of the foundation pit; The reinforcement anchor rod (10) comprises an outer tube (101) and an inner rod (112) slidably inserted into the outer tube (101); a notch groove (1011) is provided between the inner and outer side walls of the outer tube (101) along the axial direction thereof; an anchor tip (113) is arranged at one end of the outer tube (101) and an anchor tail block (114) is arranged at the other end; anchor teeth (115) are densely distributed and rotatably sleeved on the outer tube (101) along the length direction thereof; the cross section of the outer side wall of the anchor teeth (115) is in a rhombus shape; and a groove (113) is arranged on the inner side wall of the anchor teeth (115) at the mouth of the notch groove (1011). The protrusions (116) on two adjacent anchor teeth (115) are staggered in the circumferential direction; the outer wall of the inner rod (112) protrudes into the notch groove (1011) and is provided with a staggered tooth groove (1121) with both ends open along its length direction; the inner rod (112) is provided with a guiding inclined surface at a position relative to the end of the staggered tooth groove (1121) for guiding the protrusion (116) into the staggered tooth groove (1121); when all the protrusions (116) are located in the staggered tooth groove (1121), all two adjacent anchor teeth (115) on the outer tube (101) are staggered in the circumferential direction; The outer wall of the inner rod (112) is provided with a tooth-gathering groove with both ends open along its length direction. The tooth-gathering groove is slidably matched with the protrusion (116). A dividing strip (117) is arranged in the tooth-gathering groove and is parallel to the protrusion (116) and divides the protrusion into two rows of tooth grooves (1123). When all the protrusions (116) are arranged in two rows and located in the two rows of tooth grooves (1123), the protrusions (116) of two adjacent anchor teeth (115) are located in different rows of tooth grooves (1123), and the outer walls of all the anchor teeth (115) on the outer tube (101) are axially flush.

2. The soil and water loss protection and water collection structure between foundation pit support piles according to claim 1 is characterized by: The anchoring plug plate comprises two unit plug plates (5) bolted to each other, the two unit plug plates (5) being used to be inserted into the side wall of the soil layer of the foundation pit side wall and being arranged in a V-shape, the edges of the water carrying bag (3) relative to the top and bottom of the water collecting port are sandwiched between the two unit plug plates (5) corresponding to the anchoring plug plate, and the unit plug plate (5) is provided with a clearance groove (51) for the water carrying bag (3) to be inserted into the edge of the water collecting port.

3. The soil erosion protection and water collection structure between foundation pit support piles according to claim 1 is characterized by: The water-carrying bag (3) is provided with a filter gauze (6) by means of Velcro.

4. The soil erosion protection and water collection structure between foundation pit support piles according to claim 1 is characterized by: The slide rail (7) is bolted to the support pile (1).