Coating equipment with waste gas treatment function
By using components such as gas storage tanks, catalytic combustion furnaces, and adsorption boxes in the painting equipment to pretreat and filter the exhaust gas, and using sealing mechanisms to prevent leakage, the problem of exhaust gas leakage in existing equipment is solved and a more efficient Exhaust gas treatment.
Patent Information
- Application Number
- CN202411074754.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing painting equipment cannot achieve good sealing during the waste gas treatment process, resulting in waste gas leaking through pipe gaps and unable to be effectively treated.
A painting equipment with exhaust gas treatment function is designed, which uses a gas storage tank, a catalytic combustion furnace, a lower adsorption tube, an adsorption box, a filter mechanism, a sealing mechanism, a protection mechanism and an installation mechanism. Through desorption pipes, screens, Activated carbon adsorbents and light filters pre-treat and filter exhaust gases, and components such as sealing rings and rings ensure sealing to prevent exhaust gas leakage.
It effectively prevents exhaust gas leakage, ensures that the exhaust gas can be thoroughly processed and filtered, and improves the exhaust gas treatment efficiency and sealing performance of the coating equipment.
Smart Images

Figure CN118718656A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field related to coating equipment, and in particular to coating equipment with an exhaust gas treatment function. Background Art
[0002] Coating is an important part of the surface manufacturing process. Rust prevention, corrosion prevention, aesthetics and changing the shortcomings of the material itself are important aspects of coating quality, which is one of the important aspects of the overall quality of the product. The appearance quality of the product not only reflects the protection and decorative performance of the product, but also is an important factor in the value of the product. The coating equipment is a vital part of the entire coating process. The main coating equipment is divided into surface pretreatment equipment before coating, painting equipment, coating drying and curing equipment, mechanized conveying equipment, dust-free constant temperature and humidity air supply equipment and other ancillary equipment. During the use of the coating equipment, the exhaust gas generated by it needs to be treated. Therefore, a coating equipment with exhaust gas treatment function is particularly needed.
[0003] However, most of the existing coating equipment cannot provide good sealing for the exhaust gas during the exhaust gas treatment process. The exhaust gas will leak through the gaps between the pipes, resulting in the inability to treat the exhaust gas, which will lead to the problem of partial exhaust gas leakage. Summary of the invention
[0004] The purpose of the present invention is to provide a coating equipment with exhaust gas treatment function to solve the problem raised in the above background technology that most of the currently available coating equipment cannot provide good sealing for the exhaust gas during the exhaust gas treatment process, and the exhaust gas will leak through the gaps between the pipes, resulting in the inability to treat the exhaust gas, thereby causing some exhaust gas leakage.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a coating equipment with exhaust gas treatment function, comprising a gas storage tank, a gas delivery pipe is installed on the upper surface of the gas storage tank, a catalytic combustion furnace is installed on one side of the gas delivery pipe, an electric control box is placed on one side of the catalytic combustion furnace, a lower adsorption pipe is installed on one side of the catalytic combustion furnace, an adsorption box is fixedly connected to the upper part of the lower adsorption pipe, an upper adsorption pipe is installed on the upper part of the adsorption box, an outlet pipe is fixedly connected to one end of the upper adsorption pipe, a filtering mechanism is provided on one side of the catalytic combustion furnace, a sealing mechanism is provided on the upper surface of the gas storage tank, a protective mechanism is provided on the upper surface of the outlet pipe, and a mounting mechanism is provided on the upper surface of the lower adsorption pipe;
[0006] The filtering mechanism includes a desorption pipe, a partition net, a first through-groove, an activated carbon adsorbent and a slight filter element. The desorption pipe is fixedly connected to one side surface of the catalytic combustion furnace, and the inner surface of the desorption pipe is fixedly installed with a partition net. The lower surface of the adsorption box is provided with a first through-groove, and the inner surface of the adsorption box is fixedly installed with an activated carbon adsorbent, and the inner surface of the first through-groove is fixedly installed with a slight filter element.
[0007] Preferably, the sealing mechanism includes a first mounting groove, a first sealing ring, a first connecting piece, a first placement groove, a second sealing ring, a second placement groove, a third sealing ring, a ring-shaped piece, a second mounting groove, an extension piece, a first through hole, a first bolt and a first nut, the outer surface of the gas pipe is provided with a first mounting groove, the inner surface of the first mounting groove is provided with a first sealing ring, the lower surface of the gas pipe is provided with a first connecting piece, the upper surface of the first connecting piece is provided with a first placement groove, the inner surface of the first placement groove is provided with a second sealing ring, the upper surface of the gas storage tank is provided with a second placement groove, the inner surface of the second placement groove is fixedly provided with a third sealing ring, the outer surface of the first connecting piece is wrapped with a ring-shaped piece, the inner surface of the ring-shaped piece is provided with a second mounting groove, the outer surface of the ring-shaped piece is fixedly connected with an extension piece, a first through hole is provided on one side surface of the extension piece, a first bolt is installed on the inner surface of the first through hole, and a first nut is installed on one end surface of the first bolt.
[0008] Preferably, the protective mechanism includes a mounting member, a protective net, an air diffusion hole, a force-bearing plate, a fixed block, a second through-groove, a spring and a clamping block; the outer surface of the air outlet pipe is mounted with a mounting member, the inner surface of the mounting member is fixedly mounted with a protective net, one side surface of the protective net is provided with air diffusion holes, the inner surface of the mounting member is fixedly connected with a force-bearing plate, the upper surface of the mounting member is fixedly mounted with a fixed block, the inner surface of the fixed block is provided with a second through-groove, the inner surface of the second through-groove is fixedly mounted with a spring, and one end surface of the spring is fixedly connected with a clamping block.
[0009] Preferably, the mounting mechanism includes a second connecting member, a second through hole, a third placement groove, a second bolt and a second nut. The lower surface of the adsorption box is fixedly connected with the second connecting member, a second through hole is provided on one side surface of the second connecting member, a third placement groove is provided on one side surface of the lower adsorption tube, a second bolt is fixedly installed on the inner surface of the second through hole, and a second nut is fixedly installed on the inner surface of the third placement groove.
[0010] Preferably, the adsorption boxes are installed at equal intervals on the upper surface of the lower adsorption tube, and the outer surface size of the partition mesh matches the inner surface size of the desorption pipe.
[0011] Preferably, the activated carbon adsorption elements are installed at equal intervals on the inner surface of the adsorption box, and the outer surface size of the slight filter element matches the inner surface size of the first through-groove.
[0012] Preferably, the outer surface size of the first sealing ring matches the inner surface size of the first mounting groove, the gas pipe is connected to the gas storage tank through a first connecting piece, the outer surface size of the second sealing ring matches the inner surface size of the first placement groove, and the outer surface size of the third sealing ring matches the inner surface size of the second placement groove.
[0013] Preferably, the air diffusion holes are opened at equal intervals on the upper surface of the protective net, and the force-bearing plates are installed at equal intervals on the inner surface of the mounting member.
[0014] Preferably, the second through holes are opened at equal intervals on a side surface of the second connecting member, and the third placement grooves are opened at equal intervals on an upper surface of the lower adsorption tube.
[0015] Preferably, a coating equipment with exhaust gas treatment function is characterized by the following steps:
[0016] S1. The waste gas to be discharged and treated is stored in a gas storage tank and transmitted through a gas pipeline;
[0017] S2. Connecting the gas pipes through a sealing mechanism;
[0018] S3. Install and fix the equipment through the installation mechanism for use;
[0019] S4, the waste gas is transmitted to the filtering mechanism through the gas pipe, so that the waste gas is treated and discharged;
[0020] S5. Discharge the treated waste gas and protect the exhaust pipe.
[0021] Compared with the prior art, the beneficial effects of the present invention are: the coating equipment with exhaust gas treatment function has the following effects:
[0022] 1. Through the arrangement of a desorption pipeline, a screen, a first through-trough, an activated carbon adsorbent and a slight filter, the exhaust gas is pre-treated by the catalytic combustion furnace and then transmitted to the lower adsorption tube through the desorption pipeline. During this process, the desorption pipeline adsorbs large particles in the exhaust gas through the internal screen, and then the organic exhaust gas is transmitted to the adsorption box through the lower adsorption tube. A slight filter is installed in the first through-trough below the adsorption box to preliminarily filter the exhaust gas, and then the organic exhaust gas in the gas is adsorbed by the activated carbon adsorbent;
[0023] 2. Through the arrangement of the first installation groove, the first sealing ring, the first connecting piece, the first placement groove, the second sealing ring, the second placement groove, the third sealing ring, the annular piece, the second installation groove, the extension piece, the first through hole, the first bolt and the first nut, when the gas pipe is connected to the gas storage tank, the first connecting piece is fitted at both ends. At this time, the second sealing ring is installed in the first placement groove above the first connecting piece to seal the gap between it and the gas pipe. Then, one end of the gas storage tank below is connected to the second placement groove, and then the third sealing ring is put in to seal the gap between the gas storage tanks. Then, the connection is wrapped by the annular piece, and the first sealing ring is installed on the inner side of the second installation groove in the annular piece to further seal it to prevent leakage of exhaust gas. Then, the first bolt penetrates the extension piece on one side of the annular piece and penetrates from the first through hole, and then it is installed and fixed by the first nut;
[0024] 3. Through the arrangement of the mounting piece, the protective net, the air diffusion holes, the force plate, the fixing block, the second through groove, the spring and the clamping block, the mounting piece is sleeved in the air outlet pipe, and then the clamping block is pressed so that it is temporarily stored in the second through groove through the force on the spring, and then the protective net is inserted into the mounting piece and placed on the force plate, and the clamping block is loosened to fix the protective net, and the gas is discharged through the air diffusion holes on the protective net to avoid entering the animal from above the air outlet pipe.
[0025] 4. Through the arrangement of the second connecting piece, the second through hole, the third placement groove, the second bolt and the second nut, the adsorption box is placed on the lower adsorption tube through the second connecting piece below, and then the second through hole is aligned with the third placement groove, the second nut is fixed in the third placement groove, and then the second bolt is passed through the second through hole to install it. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall appearance structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the structure of the filtering mechanism of the present invention;
[0028] Figure 3 It is a schematic diagram of the sealing mechanism structure of the present invention;
[0029] Figure 4 This is a schematic diagram of the structure of the force-bearing plate and the clamping block in cooperation with each other in the present invention;
[0030] Figure 5 It is a schematic diagram of the structure of the installation mechanism of the present invention;
[0031] Figure 6 For the present invention Figure 4 A is an enlarged structural diagram of FIG.
[0032] In the figure: 1, gas storage tank; 2, gas transmission pipe; 3, catalytic combustion furnace; 4, electric control box; 5, lower adsorption tube; 6, adsorption box; 7, upper adsorption tube; 8, outlet pipe; 9, filtering mechanism; 901, desorption pipeline; 902, partition net; 903, first through groove; 904, activated carbon adsorption element; 905, slight filtering element; 10, sealing mechanism; 1001, first installation groove; 1002, first sealing ring; 1003, first connecting member; 1004, first placement groove; 1005, second sealing ring; 1006, second placement groove; 1007, third sealing ring; 100 8. Ring member; 1009. Second mounting groove; 1010. Extension member; 1011. First through hole; 1012. First bolt; 1013. First nut; 11. Protection mechanism; 1101. Mounting member; 1102. Protection net; 1103. Air diffusion hole; 1104. Force plate; 1105. Fixing block; 1106. Second through groove; 1107. Spring; 1108. Block; 12. Mounting mechanism; 1201. Second connecting member; 1202. Second through hole; 1203. Third placement groove; 1204. Second bolt; 1205. Second nut. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] See also Figure 1-6 The present invention provides a technical solution: a coating equipment with exhaust gas treatment function, comprising a gas storage tank 1, a gas delivery pipe 2 is installed on the upper surface of the gas storage tank 1, a catalytic combustion furnace 3 is installed on one side of the gas delivery pipe 2, an electric control box 4 is placed on one side of the catalytic combustion furnace 3, a lower adsorption pipe 5 is installed on one side of the catalytic combustion furnace 3, an adsorption box 6 is fixedly connected to the upper part of the lower adsorption pipe 5, an upper adsorption pipe 7 is installed above the adsorption box 6, an outlet pipe 8 is fixedly connected to one end of the upper adsorption pipe 7, a filtering mechanism 9 is arranged on one side of the catalytic combustion furnace 3, a sealing mechanism 10 is arranged on the upper surface of the gas storage tank 1, a protective mechanism 11 is arranged on the upper surface of the outlet pipe 8, and a mounting mechanism 12 is arranged on the upper surface of the lower adsorption pipe 5;
[0035] The filtering mechanism 9 includes a desorption pipe 901, a partition 902, a first through-groove 903, an activated carbon adsorbent 904 and a slight filter 905. The desorption pipe 901 is fixedly connected to the surface of one side of the catalytic combustion furnace 3, and the partition 902 is fixedly installed on the inner surface of the desorption pipe 901. The first through-groove 903 is opened on the lower surface of the adsorption box 6, and the activated carbon adsorbent 904 is fixedly installed on the inner surface of the adsorption box 6. The slight filter 905 is fixedly installed on the inner surface of the first through-groove 903. 03. The activated carbon adsorption element 904 and the slight filter element 905 are set up. After the exhaust gas is pre-treated by the catalytic combustion furnace 3, it is transmitted to the lower adsorption tube 5 through the desorption pipe 901. In this process, the desorption pipe 901 adsorbs large particles in the exhaust gas through the internal partition 902, and then the organic exhaust gas passes through the lower adsorption tube 5 to be transmitted to the adsorption box 6. The slight filter element 905 is installed in the first through groove 903 under the adsorption box 6 to perform preliminary filtration on the exhaust gas, and then the organic exhaust gas in the gas is adsorbed by the activated carbon adsorption element 904.
[0036] Furthermore, the sealing mechanism 10 includes a first mounting groove 1001, a first sealing ring 1002, a first connecting member 1003, a first placement groove 1004, a second sealing ring 1005, a second placement groove 1006, a third sealing ring 1007, an annular member 1008, a second mounting groove 1009, an extension member 1010, a first through hole 1011, a first bolt 1012 and a first nut 1013. The first mounting groove 1001 is provided on the outer surface of the gas delivery pipe 2, the first sealing ring 1002 is installed on the inner surface of the first mounting groove 1001, the first connecting member 1003 is installed on the lower surface of the gas delivery pipe 2, and the upper surface of the first connecting member 1003 is provided with a first sealing ring 1002. A first placement groove 1004 is provided on the square surface, a second sealing ring 1005 is installed on the inner surface of the first placement groove 1004, a second placement groove 1006 is provided on the upper surface of the gas storage tank 1, a third sealing ring 1007 is fixedly installed on the inner surface of the second placement groove 1006, an annular member 1008 is wrapped on the outer surface of the first connecting member 1003, a second installation groove 1009 is provided on the inner surface of the annular member 1008, an extension member 1010 is fixedly connected to the outer surface of the annular member 1008, a first through hole 1011 is provided on one side surface of the extension member 1010, a first bolt 1012 is installed on the inner surface of the first through hole 1011, A first nut 1013 is installed on one end surface of the first bolt 1012. Through the arrangement of the first installation groove 1001, the first sealing ring 1002, the first connecting piece 1003, the first placement groove 1004, the second sealing ring 1005, the second placement groove 1006, the third sealing ring 1007, the annular piece 1008, the second installation groove 1009, the extension piece 1010, the first through hole 1011, the first bolt 1012 and the first nut 1013, when the gas delivery pipe 2 is connected to the gas storage tank 1, the first connecting piece 1003 is fitted on both ends thereof. At this time, the second sealing ring 1013 is installed in the first placement groove 1004 above the first connecting piece 1003. The sealing ring 1005 seals the gap between it and the gas pipe 2, and then a second placement groove 1006 is opened at one end of the gas tank 1 below, and then the third sealing ring 1007 is placed to seal the gap between the gas tanks 1, and then the connection is wrapped by the ring member 1008. The first sealing ring 1002 is installed on the inner side of the second installation groove 1009 in the ring member 1008 to further seal it to prevent leakage of exhaust gas, and then the first bolt 1012 is passed through the extension piece 1010 on one side of the ring member 1008, and penetrates through the first through hole 1011, and then it is installed and fixed by the first nut 1013.
[0037] Further, the protection mechanism 11 includes a mounting member 1101, a protection net 1102, an air diffusion hole 1103, a force-bearing plate 1104, a fixing block 1105, a second through-groove 1106, a spring 1107 and a clamping block 1108. The outer surface of the air outlet pipe 8 is mounted with the mounting member 1101, the inner surface of the mounting member 1101 is fixedly mounted with the protection net 1102, one side surface of the protection net 1102 is provided with an air diffusion hole 1103, the inner surface of the mounting member 1101 is fixedly connected with the force-bearing plate 1104, the upper surface of the mounting member 1101 is fixedly mounted with the fixing block 1105, the inner surface of the fixing block 1105 is provided with a second through-groove 1106, the inner surface of the second through-groove 1106 is fixedly mounted with a spring 1107, A clamping block 1108 is fixedly connected to the surface of one end of the spring 1107. Through the arrangement of the mounting member 1101, the protective net 1102, the air diffusion holes 1103, the force plate 1104, the fixing block 1105, the second through groove 1106, the spring 1107 and the clamping block 1108, the mounting member 1101 is sleeved in the air outlet pipe 8, and then the clamping block 1108 is pressed so that it is temporarily received in the second through groove 1106 by the force applied to the spring 1107. Then, the protective net 1102 is inserted into the mounting member 1101 and placed on the force plate 1104. The clamping block 1108 is released to fix the protective net 1102, and the gas is discharged through the air diffusion holes 1103 on the protective net 1102 to avoid entering the animal from above the air outlet pipe 8.
[0038] Furthermore, the mounting mechanism 12 includes a second connecting member 1201, a second through hole 1202, a third placement groove 1203, a second bolt 1204 and a second nut 1205. The lower surface of the adsorption box 6 is fixedly connected with the second connecting member 1201, a second through hole 1202 is provided on one side surface of the second connecting member 1201, a third placement groove 1203 is provided on one side surface of the lower adsorption tube 5, a second bolt 1204 is fixedly installed on the inner side surface of the second through hole 1202, and the inner side surface of the third placement groove 1203 is fixedly connected with the second bolt 1204. A second nut 1205 is fixedly installed on the side surface. Through the arrangement of the second connecting piece 1201, the second through hole 1202, the third placement groove 1203, the second bolt 1204 and the second nut 1205, the adsorption box 6 is placed on the lower adsorption tube 5 through the second connecting piece 1201 below, and then the second through hole 1202 is aligned with the third placement groove 1203, the second nut 1205 is fixed in the third placement groove 1203, and then the second bolt 1204 is passed through the second through hole 1202 to install it.
[0039] Furthermore, the adsorption boxes 6 are installed at equal intervals on the upper surface of the lower adsorption tube 5, and the outer surface size of the partition 902 matches the inner surface size of the desorption pipe 901. Through the setting of the partition 902, it can adsorb large particulate matter in the exhaust gas.
[0040] Furthermore, the activated carbon adsorbents 904 are installed at equal intervals on the inner surface of the adsorption box 6, and the outer surface size of the slight filter 905 matches the inner surface size of the first through groove 903. Through the setting of the activated carbon adsorbents 904, the treated organic waste gas is adsorbed.
[0041] Furthermore, the outer surface size of the first sealing ring 1002 matches the inner surface size of the first installation groove 1001, the gas pipe 2 is connected to the gas storage tank 1 through the first connecting piece 1003, the outer surface size of the second sealing ring 1005 matches the inner surface size of the first placement groove 1004, and the outer surface size of the third sealing ring 1007 matches the inner surface size of the second placement groove 1006. Through the setting of the second sealing ring 1005, it can be further sealed.
[0042] Furthermore, the air diffusion holes 1103 are evenly spaced on the upper surface of the protective net 1102, and the force-bearing plates 1104 are evenly spaced on the inner surface of the mounting member 1101. The air diffusion holes 1103 are provided to discharge the purified gas.
[0043] Furthermore, the second through holes 1202 are opened at equal intervals on one side surface of the second connecting member 1201, and the third placement grooves 1203 are opened at equal intervals on the upper surface of the lower adsorption tube 5. Through the setting of the second through holes 1202, the second bolts 1204 can be installed.
[0044] Furthermore, a coating equipment with exhaust gas treatment function is characterized by the following steps:
[0045] S1, storing the waste gas to be discharged and treated in the gas storage tank 1 and transmitting it through the gas pipeline 2;
[0046] S2, completing the connection between the gas pipes 2 through the sealing mechanism 10;
[0047] S3, installing and fixing the device through the installation mechanism 12 for use;
[0048] S4, the exhaust gas is transferred to the filter mechanism 10 through the gas pipe 2, so that the exhaust gas is processed and discharged;
[0049] S5. Discharge the treated waste gas and protect the gas outlet pipe 8.
[0050] Working principle: First, the exhaust gas is pre-treated by the catalytic combustion furnace 3, and then transmitted to the lower adsorption tube 5 through the desorption pipe 901. During this process, the desorption pipe 901 adsorbs large particles in the exhaust gas through the internal partition 902. Then, the organic exhaust gas passes through the lower adsorption pipe 5 and is transmitted to the adsorption box 6. A slight filter 905 is installed in the first through groove 903 below the adsorption box 6 to perform preliminary filtration on the exhaust gas. Then, the organic exhaust gas in the gas is adsorbed by the activated carbon adsorption element 904. When the gas transmission pipe 2 is connected to the storage tank, the organic exhaust gas is transported to the adsorption box 6. When the gas tank 1 is connected, the first connecting piece 1003 is fitted at both ends. At this time, the second sealing ring 1005 is installed in the first placement groove 1004 above the first connecting piece 1003 to seal the gap between it and the gas pipe 2. Then, one end of the gas storage tank 1 below is connected to the second placement groove 1006, and then the third sealing ring 1007 is placed to seal the gap between the gas storage tanks 1. Then, the connection is wrapped by the ring 1008, and the inner part of the second installation groove 1009 in the ring 1008 is sealed. A first sealing ring 1002 is installed on the side to further seal it to prevent leakage of exhaust gas. Then, the first bolt 1012 penetrates the extension piece 1010 on one side of the annular piece 1008 and penetrates through the first through hole 1011. Then, the first nut 1013 is used to install and fix it. The mounting piece 1101 is sleeved in the exhaust pipe 8, and then the block 1108 is pressed to temporarily accommodate it in the second through groove 1106 through the force of the spring 1107. Then, the protective net 1102 is inserted into the mounting piece 1101. Place it on the force-bearing plate 1104, release the block 1108 to fix the protective net 1102, and the gas is discharged through the air holes 1103 on the protective net 1102 to avoid entering the animal from above the air outlet pipe 8. The adsorption box 6 is placed on the lower adsorption tube 5 through the second connecting piece 1201 below, and then the second through hole 1202 is aligned with the third placement groove 1203, and the second nut 1205 is fixed in the third placement groove 1203, and then the second bolt 1204 is passed through the second through hole 1202 to install it.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A coating equipment with exhaust gas treatment function, comprising a gas storage tank (1), characterized in that: A gas delivery pipe (2) is installed on the upper surface of the gas storage tank (1), a catalytic combustion furnace (3) is installed on one side surface of the gas delivery pipe (2), an electric control box (4) is placed on one side of the catalytic combustion furnace (3), a lower adsorption pipe (5) is installed on one side of the catalytic combustion furnace (3), an adsorption box (6) is fixedly connected to the upper side of the lower adsorption pipe (5), an upper adsorption pipe (7) is installed on the upper side of the adsorption box (6), an outlet pipe (8) is fixedly connected to one end surface of the upper adsorption pipe (7), a filtering mechanism (9) is provided on one side surface of the catalytic combustion furnace (3), a sealing mechanism (10) is provided on the upper surface of the gas storage tank (1), a protective mechanism (11) is provided on the upper surface of the outlet pipe (8), and a mounting mechanism (12) is provided on the upper surface of the lower adsorption pipe (5); The filtering mechanism (9) comprises a desorption pipe (901), a partition net (902), a first through groove (903), an activated carbon adsorbent (904) and a slight filter (905); a desorption pipe (901) is fixedly connected to a side surface of the catalytic combustion furnace (3); a partition net (902) is fixedly installed on the inner surface of the desorption pipe (901); a first through groove (903) is provided on the lower surface of the adsorption box (6); an activated carbon adsorbent (904) is fixedly installed on the inner surface of the adsorption box (6); and a slight filter (905) is fixedly installed on the inner surface of the first through groove (903).
2. The coating equipment with exhaust gas treatment function according to claim 1, characterized in that: The sealing mechanism (10) comprises a first mounting groove (1001), a first sealing ring (1002), a first connecting piece (1003), a first placement groove (1004), a second sealing ring (1005), a second placement groove (1006), a third sealing ring (1007), an annular piece (1008), a second mounting groove (1009), an extension piece (1010), a first through hole (1011), a first bolt (1012) and a first nut (1013); the first mounting groove (1001) is provided on the outer surface of the gas delivery pipe (2); the first sealing ring (1002) is installed on the inner surface of the first mounting groove (1001); the first connecting piece (1003) is installed on the lower surface of the gas delivery pipe (2); and the first placement groove (1004) is provided on the upper surface of the first connecting piece (1003). A second sealing ring (1005) is installed on the inner surface of the first placement groove (1004), a second placement groove (1006) is provided on the upper surface of the gas storage tank (1), a third sealing ring (1007) is fixedly installed on the inner surface of the second placement groove (1006), an annular member (1008) is wrapped around the outer surface of the first connecting member (1003), a second installation groove (1009) is provided on the inner surface of the annular member (1008), an extension member (1010) is fixedly connected to the outer surface of the annular member (1008), a first through hole (1011) is provided on one side surface of the extension member (1010), a first bolt (1012) is installed on the inner surface of the first through hole (1011), and a first nut (1013) is installed on one end surface of the first bolt (1012).
3. The coating equipment with exhaust gas treatment function according to claim 1 is characterized in that: The protective mechanism (11) comprises a mounting member (1101), a protective net (1102), an air diffusion hole (1103), a force-bearing plate (1104), a fixing block (1105), a second through slot (1106), a spring (1107) and a clamping block (1108); the outer surface of the air outlet pipe (8) is mounted with the mounting member (1101); the inner surface of the mounting member (1101) is fixedly mounted with the protective net (1102); and one side surface of the protective net (1102) is opened. An air diffusion hole (1103) is provided, the inner surface of the mounting member (1101) is fixedly connected to a force-bearing plate (1104), the upper surface of the mounting member (1101) is fixedly installed with a fixing block (1105), the inner surface of the fixing block (1105) is provided with a second through groove (1106), the inner surface of the second through groove (1106) is fixedly installed with a spring (1107), and one end surface of the spring (1107) is fixedly connected to a clamping block (1108).
4. The coating equipment with exhaust gas treatment function according to claim 1 is characterized in that: The mounting mechanism (12) comprises a second connecting member (1201), a second through hole (1202), a third placement groove (1203), a second bolt (1204) and a second nut (1205); the lower surface of the adsorption box (6) is fixedly connected with the second connecting member (1201); a second through hole (1202) is provided on one side surface of the second connecting member (1201); a third placement groove (1203) is provided on one side surface of the lower adsorption tube (5); a second bolt (1204) is fixedly installed on the inner surface of the second through hole (1202); and a second nut (1205) is fixedly installed on the inner surface of the third placement groove (1203).
5. The coating equipment with exhaust gas treatment function according to claim 1, characterized in that: The adsorption boxes (6) are installed at equal intervals on the upper surface of the lower adsorption tube (5), and the outer surface size of the partition net (902) matches the inner surface size of the desorption pipe (901).
6. The coating equipment with exhaust gas treatment function according to claim 1 is characterized in that: The activated carbon adsorption elements (904) are installed at equal intervals on the inner surface of the adsorption box (6), and the outer surface size of the slight filter element (905) matches the inner surface size of the first through groove (903).
7. The coating equipment with exhaust gas treatment function according to claim 2 is characterized in that: The outer surface size of the first sealing ring (1002) matches the inner surface size of the first installation groove (1001); the gas delivery pipe (2) is connected to the gas storage tank (1) via the first connecting piece (1003); the outer surface size of the second sealing ring (1005) matches the inner surface size of the first placement groove (1004); and the outer surface size of the third sealing ring (1007) matches the inner surface size of the second placement groove (1006).
8. The coating equipment with exhaust gas treatment function according to claim 3 is characterized in that: The air diffusion holes (1103) are arranged at equal intervals on the upper surface of the protective net (1102), and the force-bearing plates (1104) are installed at equal intervals on the inner surface of the mounting member (1101).
9. The coating equipment with exhaust gas treatment function according to claim 4, characterized in that: The second through holes (1202) are opened at equal intervals on a side surface of the second connecting member (1201), and the third placement grooves (1203) are opened at equal intervals on the upper surface of the lower adsorption tube (5).
10. A method for using a coating device with an exhaust gas treatment function, such as the coating device with an exhaust gas treatment function as described in claims 1 to 9, characterized in that Follow these steps: S1, storing the waste gas to be discharged and treated in a gas storage tank (1) and transmitting it through a gas transmission pipe (2); S2, completing the connection between the gas transmission pipes (2) through the sealing mechanism (10); S3, installing and fixing the device by means of the installation mechanism (12) for use; S4, the waste gas is transferred to the filtering mechanism (10) through the gas transmission pipe (2), so that the waste gas is processed and discharged; S5. The treated waste gas is discharged and the exhaust pipe (8) is protected.
Citation Information
Patent Citations
Activated carbon adsorption and desorption integrated machine waste gas treatment and purification equipment
CN209423280U
A vitamin E production waste gas purification device
CN215138066U
Waste gas catalysis device for environmental protection
CN215654698U
Pipeline connecting piece with good sealing performance
CN219994653U
RCO catalytic combustion equipment
CN221349177U