Fabricated concrete offshore wind power floating platform and construction method thereof
Through the modular design and prestressed connections of the prefabricated concrete offshore wind power floating platform, the existing technology problems of high price and short life of steel structures and the lack of application of semi-submersible concrete platforms have been solved. Efficient concrete prefabrication and construction have been achieved, adapting to large-scale applications. The demand for wind turbines has improved the performance and life of the platform.
Patent Information
- Application Number
- CN202410984017.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-01
AI Technical Summary
Existing offshore wind power platforms are mainly steel structures, which have high cost, short service life, and are not suitable for the needs of large wind turbines. There is no precedent for the application of semi-submersible concrete offshore wind power floating platforms.
A prefabricated concrete offshore wind power floating platform is used, including modular prefabricated concrete pontoons, support connection components and pontoons, which are anchored and connected by prestressed tendons to form a semi-submersible structure to improve force-bearing and force-transmission performance, and adopt modularization Construction methods to improve efficiency.
It improves the efficiency of concrete prefabrication and construction, enhances the force-bearing and force-transmitting performance of the platform, adapts to large wind turbines, has better hydrodynamic characteristics, and reduces project costs.
Smart Images

Figure CN118722985A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of offshore wind power, and in particular to an assembled concrete offshore wind power floating platform and a construction method thereof. Background Art
[0002] As the mainstream marine renewable energy, offshore wind power is developing rapidly. At present, domestic and foreign offshore wind power is mainly fixed, including monopile, suction bucket, pipe frame and other structural forms, which are mainly suitable for sea areas with water depth less than 70m. When the water depth exceeds 70m, floating wind power will have more advantages. It is still in the demonstration stage. At present, various technical routes are in contention, and they are all innovating floating platform forms to reduce costs and increase efficiency. The structural forms that have been implemented include semi-submersible as the mainstream, but there are also Spar column type, barge type, TLP tension leg type; the materials are basically steel structure, and there are also concrete.
[0003] Currently, the manufacturing technology of steel structure floating platforms is mature, but its main shortcomings include high cost, short service life (25 years), and unsuitability for large wind turbines.
[0004] Concrete structures have better durability and are more suitable for future large-power units. Currently, Spar column-type structures have been used in Norway's Hywind Tampen, and barge-type structures have been used in France's Floatgen, but there is no precedent for the application of semi-submersible concrete offshore wind power floating platforms. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide an assembled concrete offshore wind power floating platform and a construction method thereof.
[0006] In a first aspect, the present invention provides an assembled concrete offshore wind power floating platform, comprising: a concrete pontoon, a support and connection assembly, a mooring anchor chain and a plurality of concrete buoys;
[0007] The concrete pontoon is a modular prefabricated part;
[0008] Each of the concrete pontoons is a modular prefabricated part; each of the concrete pontoons is connected to the top of the concrete pontoon through prestressed tendons, wherein the upper anchor head is located on the upper surface of the concrete pontoon, and the lower anchor head is located on the lower surface of the top plate of the concrete pontoon;
[0009] The support and connection assembly is a modular prefabricated component; the support and connection assembly is assembled and connected to the concrete pontoon and the concrete pontoon;
[0010] The mooring anchor chain is used for mooring the offshore wind power floating platform.
[0011] Preferably, the number of the concrete pontoons is three, and the three concrete pontoons form a triangular arrangement; or, the number of the concrete pontoons is four, and the four concrete pontoons form a quadrilateral arrangement; or, the number of the concrete pontoons is five, and the five concrete pontoons form a pentagonal arrangement.
[0012] Preferably, prestressed channels are reserved on the top plate of the concrete pontoon and the concrete pontoon, and the prestressed tendons pass through the prestressed channels.
[0013] Preferably, the concrete pontoon is divided into a plurality of compartments by pontoon transverse partition walls and vertical partition walls, and the pontoon side walls, pontoon top plate and pontoon bottom plate of the concrete pontoon are all provided with horizontal prestressed tendons.
[0014] Preferably, the concrete pontoon comprises a first concrete pontoon, and the support coupling assembly comprises a first oblique support and a second oblique support.
[0015] The first concrete buoy is used to connect the wind turbine tower. The first concrete buoy is provided with an inner partition wall, and the inner partition wall includes a first inner partition wall and a second inner partition wall.
[0016] The two ends of the first oblique support are respectively assembled and connected with the first concrete pontoon and the concrete pontoon, and the first oblique support and the first inner partition wall are arranged in the same plane; the two ends of the second oblique support are respectively assembled and connected with the first concrete pontoon and the concrete pontoon, and the second oblique support and the second inner partition wall are arranged in the same plane.
[0017] Preferably, the center line of the first inner partition wall and the center line of the first oblique support are arranged in the same plane, and the center line of the second inner partition wall and the center line of the second oblique support are arranged in the same plane.
[0018] Preferably, the center line of the projection of the first inner partition wall on the upper surface of the concrete pontoon and the center line of the projection of the first inclined support on the upper surface of the concrete pontoon are collinearly arranged, and the center line of the projection of the second inner partition wall on the upper surface of the concrete pontoon and the center line of the projection of the second inclined support on the upper surface of the concrete pontoon are collinearly arranged.
[0019] Preferably, the first concrete pontoon and the concrete pontoon are both pre-buried with corbels, and both ends of the first oblique support and the second oblique support are respectively connected to the corbels by welds or bolts.
[0020] Preferably, the first inner partition wall and the second inner partition wall are cross-arranged and extend upward; or, the inner partition wall also includes a third inner partition wall, and the first inner partition wall, the second inner partition wall and the third inner partition wall are arranged in a Y shape and extend upward, and the first inner partition wall and the second inner partition wall are respectively two bifurcated structures of the Y-shaped structure; or, the inner partition wall also includes a third inner partition wall, a fourth inner partition wall and a fifth inner partition wall, and the first inner partition wall, the second inner partition wall, the third inner partition wall, the fourth inner partition wall and the fifth inner partition wall are arranged radially.
[0021] Preferably, the remaining concrete pontoons other than the first concrete pontoon are not provided with the inner partition wall.
[0022] Preferably, each of the concrete pontoons is provided with an inner partition wall, and each of the inner partition walls comprises a first inner partition wall and a second inner partition wall.
[0023] The support connection assembly includes several groups of side support connection assemblies and one group of top support connection assemblies, each group of the side support connection assemblies includes a horizontal connection beam, a first diagonal brace and a second diagonal brace, the two ends of the horizontal connection beam are respectively connected to two adjacent concrete pontoons, the two ends of the first diagonal brace and the second diagonal brace are respectively connected to the horizontal connection beam and the concrete pontoons, each group of the side support connection assemblies is arranged coplanar with the first inner partition wall or the second inner partition wall, and the top support connection assembly is used to connect the horizontal connection beam.
[0024] Preferably, the center line of the projection of the side support connecting assembly on the upper surface of the concrete pontoon and the center line of the projection of the first inner partition wall on the upper surface of the concrete pontoon are collinearly arranged, or the center line of the projection of the side support connecting assembly on the upper surface of the concrete pontoon and the center line of the projection of the second inner partition wall on the upper surface of the concrete pontoon are collinearly arranged.
[0025] Preferably, the concrete pontoon and the concrete pontoon box are both pre-embedded with corbels, and the side support connection components are respectively connected to the corbels by welds or bolts.
[0026] Preferably, the first inner partition wall and the second inner partition wall are cross-arranged and extend upward; or, the inner partition wall also includes a third inner partition wall, and the first inner partition wall, the second inner partition wall and the third inner partition wall are arranged in a Y shape and extend upward, and the first inner partition wall and the second inner partition wall are respectively two bifurcated structures of the Y-shaped structure; or, the inner partition wall also includes a third inner partition wall, a fourth inner partition wall and a fifth inner partition wall, and the first inner partition wall, the second inner partition wall, the third inner partition wall, the fourth inner partition wall and the fifth inner partition wall are arranged radially.
[0027] Preferably, the concrete pontoon includes a first concrete pontoon, the first concrete pontoon is used to connect to a wind turbine tower, and the first concrete pontoon is connected to the wind turbine tower via flange bolts.
[0028] Preferably, the mooring anchor chain is arranged on a connecting flange between the first concrete buoy and the wind turbine tower, or the mooring anchor chain is arranged on an outer surface of the concrete buoy.
[0029] In a second aspect, the present invention provides a method for constructing a prefabricated concrete offshore wind power floating platform, which is used to construct any of the prefabricated concrete offshore wind power floating platforms, comprising the following steps:
[0030] S1: modular prefabricated concrete pontoons, support and connection components and several concrete pontoons;
[0031] S2: hoisting a plurality of the concrete buoys to the top of the concrete pontoon respectively, anchoring and connecting the prefabricated concrete pontoon and the concrete pontoon respectively through prestressed tendons, wherein the upper anchor head is located on the upper surface of the concrete pontoon, and the lower anchor head is located on the lower surface of the top plate of the concrete pontoon, and pouring cement slurry into the channel after anchoring;
[0032] S3: Assemble and connect the support and connection assembly to the concrete pontoon and the concrete pontoon;
[0033] S4: launching the structure assembled in S3 into water;
[0034] S5: Connect the first concrete buoy to the wind turbine tower through flange bolts, and install the wind turbine impeller;
[0035] S6: Setting up the mooring anchor chain for the offshore wind power floating platform.
[0036] Preferably, S1 further includes providing horizontal prestressed channels on the pontoon side walls, pontoon top plate and pontoon bottom plate of the concrete pontoon for prestressing, anchoring the two ends with anchor heads, and pouring cement slurry into the channels.
[0037] Preferably, in S2, the top plate of the concrete pontoon and the prestressed channels reserved in the concrete pontoon are first aligned, and then the prestressed tendons are inserted into the channels, tensioned, anchored at both ends with anchor heads, and cement slurry is poured into the channels.
[0038] Preferably, in S3, corbels are embedded in the concrete pontoon and the concrete pontoon, and the supporting connection assembly is connected to the corbels by welds or bolts.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] 1. The prefabricated concrete offshore wind power floating platform provided by the present invention can greatly improve the efficiency of concrete prefabrication and construction through modular prefabrication + prefabricated assembly. By prestressing the concrete pontoon and the concrete float, the upper anchor head is set on the upper surface of the concrete pontoon, and the lower anchor head is set on the lower surface of the concrete pontoon top plate, so that the prestressed connection is more direct, and the force-bearing and force-transmission performance of the overall structure is better. By setting a modular support and connection assembly, the force-bearing and force-transmission performance between the concrete pontoon and the concrete pontoon can be further improved. The use of a semi-submersible concrete offshore wind power floating platform has better hydrodynamic characteristics and is more suitable for large wind turbines.
[0041] 2. The construction method of the assembled concrete offshore wind power floating platform provided by the present invention first modularizes the prefabricated concrete pontoon, the supporting connection assembly and a plurality of concrete pontoons, and then performs on-site assembly and prestressed construction, which can greatly improve the efficiency of concrete prefabrication and platform construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 This is a front view of the assembled concrete offshore wind power floating platform described in Example 1 of the present invention.
[0043] Figure 2 This is a top view of the assembled concrete offshore wind power floating platform described in Example 1 of the present invention.
[0044] Figure 3 This is a front view of the assembled concrete offshore wind power floating platform described in Example 2 of the present invention.
[0045] Figure 4 This is a top view of the assembled concrete offshore wind power floating platform described in Example 2 of the present invention.
[0046] Figure 5 This is a schematic diagram of step S1 of the construction method of the assembled concrete offshore wind power floating platform described in Example 3 of the present invention.
[0047] Figure 6 This is a schematic diagram of step S2 of the construction method of the assembled concrete offshore wind power floating platform described in Example 3 of the present invention.
[0048] Figure 7 This is a schematic diagram of step S3 of the construction method of the assembled concrete offshore wind power floating platform described in Example 3 of the present invention.
[0049] Figure 8 This is a schematic diagram of step S4 of the construction method of the assembled concrete offshore wind power floating platform described in Example 3 of the present invention.
[0050] Markings in the figure:
[0051] 1-concrete pontoon, 11-pontoon top plate, 12-pontoon bottom plate, 13-pontoon vertical partition wall,
[0052] 21-first concrete pontoon, 22-second concrete pontoon, 23-third concrete pontoon,
[0053] 3-support connection assembly, 31-first oblique support, 32-second oblique support, 33-horizontal connection beam, 34-first oblique support, 35-second oblique support, 36-top support connection assembly,
[0054] 4-mooring anchor chain, 41-fairlead,
[0055] 5- Wind turbine tower,
[0056] 6- Fan impeller,
[0057] 7-Vertical prestressed tendons,
[0058] 8- Anchor head,
[0059] 9-inner partition wall, 91-first inner partition wall, 92-second inner partition wall, 93-third inner partition wall,
[0060] 10-Horizontal prestressed tendons,
[0061] 20-Semi-submersible barge,
[0062] 30-ox leg,
[0063] 40-Flange. DETAILED DESCRIPTION
[0064] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0065] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0066] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0067] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0068] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0069] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
[0070] Example 1
[0071] like Figure 1-2 As shown, an assembled concrete offshore wind power floating platform includes: a concrete pontoon 1, a first concrete buoy 21, a second concrete buoy 22, a third concrete buoy 23, a supporting connection assembly 3, and a mooring anchor chain 4.
[0072] The concrete pontoon 1 is a modular prefabricated component that is prefabricated in the factory in advance. The cross section of the concrete pontoon 1 can be a solid triangle or a Figure 2 The hollow triangle shown, that is, the outer shape is a triangle, and the interior encloses a triangular area, which is the pool.
[0073] In one or several embodiments, the concrete pontoon 1 may include a pontoon top plate 11, a pontoon bottom plate 12, a pontoon side wall, a pontoon transverse partition wall and a pontoon vertical partition wall 13. The pontoon top plate 11, the pontoon bottom plate 12 and the pontoon side wall are enclosed to form a box body, and the box body is divided into multiple compartments by the pontoon transverse partition wall and the pontoon vertical partition wall 13. By adjusting the weight of the ballast in each compartment, the buoyancy state of the concrete pontoon 1 can be adjusted to improve the stability of the concrete pontoon 1.
[0074] In order to further improve the durability of the structure and reduce the occurrence of concrete cracks, horizontal prestressed tendons 10 can be set on the pontoon top plate 11, the pontoon bottom plate 12, and the pontoon side wall. Prestressed pipes are reserved in the pontoon side wall and the pontoon bottom plate 12. When the concrete strength reaches 80% of the design value, prestressed steel strands are inserted and tensioned. After tensioning, cement slurry is poured into the pipe, and the anchor head is sealed for protection. Figure 2 shown.
[0075] In a preferred embodiment, the edge of the pontoon bottom plate 12 may extend outwards by a certain distance to form a heave plate to improve the hydrodynamic performance of the pontoon.
[0076] The first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 are modular prefabricated parts, which are prefabricated in the factory in advance. The first concrete pontoon 21 is used to connect to the wind turbine tower, while the second concrete pontoon 22 and the third concrete pontoon 23 are not connected to the wind turbine tower. The first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 are arranged in a triangle.
[0077] The first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 are respectively anchored to the top of the concrete pontoon 1 through vertical prestressed tendons 7. Each pontoon can be constructed using the climbing formwork method. The pontoon needs to reserve a vertical prestressed channel, and the vertical prestressed tendons 7 pass through the prestressed channel.
[0078] When the prestressed tendons are anchored, the upper anchor head 8 is located on the upper surface of the concrete pontoon, and the lower anchor head 8 is located on the lower surface of the top plate 11 of the concrete pontoon 1. There is no transition section or connector, which makes the prestressed connection setting more direct and the overall structure of the floating platform has better force bearing and force transmission performance.
[0079] In one or more embodiments, the first concrete pontoon 21 is provided with an inner partition wall 9, and the inner partition wall 9 includes a first inner partition wall 91, a second inner partition wall 92, and a third inner partition wall 93. The first inner partition wall 91, the second inner partition wall 92, and the third inner partition wall 93 are arranged in a Y-shaped cross section and extend vertically upward respectively. The first inner partition wall 91 and the second inner partition wall 92 are two branched structures of the Y-shaped structure. In a further optional embodiment, the second concrete pontoon 22 and the third concrete pontoon 23 may not be provided with an inner partition wall 9, that is, the second concrete pontoon 22 and the third concrete pontoon 23 are hollow cylinders.
[0080] In other embodiments, the inner partition wall 9 may also include a first inner partition wall 91 and a second inner partition wall 92 , and the first inner partition wall 91 and the second inner partition wall 92 are cross-arranged, for example, in an X-shape.
[0081] In other embodiments, the inner partition wall 9 may also include a first inner partition wall, a second inner partition wall, a third inner partition wall, a fourth inner partition wall, and a fifth inner partition wall, and the first inner partition wall, the second inner partition wall, the third inner partition wall, the fourth inner partition wall, and the fifth inner partition wall are arranged radially.
[0082] The support and connection assembly 3 is a modular prefabricated component, which is prefabricated in the factory in advance. The support and connection assembly 3 is assembled and connected to the concrete pontoon 1 and the concrete pontoon. The support and connection assembly 3 can be a steel structure, such as a steel beam. By setting a modular support and connection assembly 3, the force bearing and force transmission performance between the concrete pontoon 1 and the concrete pontoon can be further improved.
[0083] In one or several embodiments, the support coupling assembly 3 consists of a first oblique support 31 and a second oblique support 32 .
[0084] The two ends of the first inclined support 31 are respectively assembled and connected to the first concrete pontoon 21 and the concrete pontoon 1, and the first inclined support 31 and the first inner partition wall 91 are arranged in the same plane, that is, the center line of the first inner partition wall 91 and the center line of the first inclined support 31 are arranged in the same plane, that is, the center line of the projection of the first inner partition wall 91 on the upper surface of the concrete pontoon 1 and the center line of the projection of the first inclined support 31 on the upper surface of the concrete pontoon 1 are arranged in a colinear manner.
[0085] The two ends of the second oblique support 32 are respectively assembled and connected with the first concrete pontoon 21 and the concrete pontoon 1, and the second oblique support 32 and the second inner partition wall 92 are arranged in the same plane, that is, the center line of the second inner partition wall 92 and the center line of the second oblique support 32 are arranged in the same plane, that is to say, the center line of the projection of the second inner partition wall 92 on the upper surface of the concrete pontoon 1 and the center line of the projection of the second oblique support 32 on the upper surface of the concrete pontoon 1 are arranged in a colinear manner.
[0086] The present invention aligns the oblique support with the inner partition wall and sets them in the same plane, which can give full play to the overall force performance and improve the problem of excessive local force. Furthermore, the present invention only sets the inner partition wall and the oblique support at the first concrete pontoon 21, which can greatly simplify the structural form of the platform, optimize the force and force transmission of the platform, and further reduce the engineering cost on the basis of ensuring that the platform has better force and force transmission performance.
[0087] In a preferred embodiment, the first concrete pontoon 21 and the concrete pontoon 1 are both pre-embedded with corbels 30, and the first oblique support 31 and the two ends of the first oblique support 31 are respectively connected to the corbels 30 by welds or bolts, thereby facilitating the assembled connection between the oblique support and the concrete pontoon and the concrete pontoon 1, with good force bearing and force transmission performance and convenient construction.
[0088] In a preferred embodiment, stiffening ribs or partition walls are respectively provided at the connection between the concrete pontoon 1 and the first oblique support 31 and the second oblique support 32. The stiffening ribs or partition walls can be provided throughout or across at least two compartments to enhance the structural strength of the connection.
[0089] In one or more embodiments, the first concrete pontoon 21 has a pre-embedded flange 40 when pouring the top layer for subsequent bolt connection with the wind turbine tower, making the connection between the concrete pontoon and the wind turbine easier and faster, and having good force bearing and transmission performance.
[0090] The mooring anchor chain 4 is used for mooring the offshore wind power floating platform.
[0091] In a preferred embodiment, the mooring anchor chain 4 is arranged at the connection interface between the first concrete buoy 21 and the wind turbine tower, or the mooring anchor chain 4 is arranged on the outer surface of the concrete pontoon 1. The mooring anchor chain 4 can be a catenary or a tension leg TLP.
[0092] The prefabricated concrete offshore wind power floating platform provided by the present invention can greatly improve the efficiency of concrete prefabrication and construction through modular prefabrication + prefabricated assembly. Specifically, the prefabrication of concrete components adopts large components, and the concrete pontoon 1, the first concrete pontoon 21, the second concrete pontoon 22, the third concrete pontoon 23, the support and connection assembly 3, and the mooring anchor chain 4 can be prefabricated in the factory respectively. During the assembly construction, it is only necessary to anchor the first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 to the top of the concrete pontoon 1 through the vertical prestressed tendons 7, and then fix the support and connection assembly 3 to the concrete pontoon 1 and the concrete pontoon, and finally install the mooring anchor chain 4. The overall assembly is very convenient, which greatly reduces the number of assembly times of the components.
[0093] The present invention adopts a combination of prestressed tendons and support connection components 3, so that the prestressed tendons and support connection components 3 can better participate in the overall force of the structure. The prestressed tendons and support connection components 3 can form a spatial overall force system, and can also achieve steel-concrete coordinated force, so that the present invention has good force bearing and force transmission performance.
[0094] The present invention adopts a semi-submersible concrete offshore wind power floating platform, which has better hydrodynamic characteristics and is more suitable for large wind turbines.
[0095] Example 2
[0096] The difference between this embodiment and Embodiment 1 lies in the setting mode of the inner partition wall of the concrete pontoon and the structural form of the supporting connection assembly 3.
[0097] Specifically, Figure 3-4 As shown, the first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 are all provided with inner partition walls 9, each of the inner partition walls 9 includes a first inner partition wall 91, a second inner partition wall 92, and a third inner partition wall 93, the first inner partition wall 91, the second inner partition wall 92, and the third inner partition wall 93 are arranged in a Y-shaped cross-section and extend vertically upward respectively, and the first inner partition wall 91 and the second inner partition wall 92 are respectively two forked structures of the Y-shaped structure.
[0098] The support coupling assembly 3 includes three groups of side support coupling assemblies and one group of top support coupling assemblies 36. Each group of the side support coupling assemblies is arranged between two adjacent concrete pontoons. Each group of the side support coupling assemblies includes a horizontal coupling beam 33, a first diagonal brace 34, and a second diagonal brace 35. The two ends of the horizontal coupling beam 33 are respectively connected to two adjacent concrete pontoons. The two ends of the first diagonal brace 34 and the second diagonal brace 35 are respectively connected to the horizontal coupling beam 33 and the concrete pontoon. The first diagonal brace 34 and the second diagonal brace 35 can be connected to the midpoint of the horizontal coupling beam 33. Each group of the side support coupling assemblies 3 is arranged coplanar with the first inner partition wall 91 or the second inner partition wall 92. The top support coupling assembly 36 is used to connect three horizontal coupling beams 33. The top support coupling assembly 36 can be three cross beams to form a triangular stable structure.
[0099] In a preferred embodiment, the center line of the projection of the side support coupling assembly on the upper surface of the concrete pontoon 1 and the center line of the projection of the first inner partition wall 91 on the upper surface of the concrete pontoon 1 are arranged in a collinear manner, or the center line of the projection of the side support coupling assembly on the upper surface of the concrete pontoon 1 and the center line of the projection of the second inner partition wall 92 on the upper surface of the concrete pontoon 1 are arranged in a collinear manner. In the present invention, the side support coupling assembly is aligned with the inner partition wall and arranged in the same plane, which can give full play to the overall force performance and improve the problem of excessive local force.
[0100] In a preferred embodiment, the first concrete pontoon 21 and the concrete pontoon 1 are both pre-buried with a corbel 30, and the side support coupling assembly is respectively connected to the corbel 30 by welding or bolts. This facilitates the assembly-type connection between the side support coupling assembly and the concrete pontoon and the concrete pontoon 1, and has good force bearing and force transmission performance and is convenient for construction.
[0101] In this embodiment, inner partition walls and supporting connection components are provided on the three concrete pontoons, so that the overall structural strength and rigidity of the platform are just right, the force receiving and force transmission paths are better, and it can be applied to marine environments with relatively harsh working conditions.
[0102] Example 3
[0103] The difference between this embodiment and embodiments 1 and 2 is that in this embodiment, the number of the concrete pontoons is four, and the four concrete pontoons form a quadrilateral arrangement; or, the number of the concrete pontoons is five, and the five concrete pontoons form a pentagonal arrangement.
[0104] In some specific implementations, the inner partition wall, the first inclined support 31 and the second inclined support 32 may be provided only on the first concrete pontoon 21 (a concrete pontoon for connecting the wind turbine tower).
[0105] In some specific implementations, inner partition walls may be provided on all concrete pontoons, and support and connection components 3 may be provided between two adjacent concrete pontoons.
[0106] Example 3
[0107] A method for constructing an assembled concrete offshore wind power floating platform, used for constructing an assembled concrete offshore wind power floating platform as described in Example 1, comprises the following steps:
[0108] S1: modular prefabricated concrete pontoon 1, first concrete pontoon 21, second concrete pontoon 22, third concrete pontoon 23 and support coupling assembly 3, reference Figure 5 .
[0109] In a preferred embodiment, the concrete pontoon 1 can be constructed by concrete climbing formwork. Concrete can be C50 or higher, or lightweight high-strength concrete (density less than 2000kg / m 3 ). From bottom to top, pour the pontoon bottom plate 12, pontoon side wall, pontoon vertical partition wall 13, pontoon horizontal partition wall, and pontoon top plate 11 in sequence. The pontoon top plate 11 should reserve a prestressed channel at the connection position with the upper buoy, and the concrete thickness should be thickened and the steel bars should be denser. Prestressed pipes should be reserved in the pontoon side wall and pontoon bottom plate 12. When the concrete strength reaches 80% of the design value, the horizontal prestressed steel strands are inserted and tensioned. After tensioning, cement slurry is poured into the pipe, and the anchor head 8 is sealed and protected.
[0110] In a preferred embodiment, the first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 can also be constructed using the climbing formwork method, and vertical prestressed channels need to be reserved. When pouring the top layer of the first concrete pontoon 21 (the pontoon with an inner partition wall), a flange 40 is embedded for subsequent bolt connection with the wind turbine tower 5. The first concrete pontoon 21 also needs to have denser annular stirrups or prestressed tendons.
[0111] In a preferred embodiment, the supporting and connecting assembly 3 may be a steel structure, may be welded from steel plates and steel beams, and may be circular, rectangular, I-shaped, or the like.
[0112] S2: hoist the first concrete pontoon 21, the second concrete pontoon 22, and the third concrete pontoon 23 to the top of the concrete pontoon 1, respectively, and anchor the prefabricated concrete pontoon 1 and the concrete pontoon through prestressed tendons, wherein the upper anchor head 8 is located on the upper surface of the concrete pontoon, and the lower anchor head 8 is located on the lower surface of the top plate 11 of the concrete pontoon 1. After anchoring, pour cement slurry into the channel. Figure 6 .
[0113] Specifically, the top plate of the concrete pontoon 1 and the prestressed channels reserved in the concrete pontoon are first aligned, and then the prestressed tendons are inserted into the channels, and then tensioned, and the two ends are anchored with anchor heads 8.
[0114] S3: Reference Figure 7 , the support coupling assembly 3 is assembled and connected to the concrete pontoon 1 and the concrete pontoon. During installation, the center line of the inner partition wall of the pontoon should be aligned with the oblique support (i.e., coplanar arrangement). Preferably, a corbel 30 is embedded in the concrete pontoon 1 and the concrete pontoon, and the support coupling assembly 3 is welded or bolted to the corbel 30. The anchor bars of the corbel 30 can be embedded or tension bolts can be used. The contact surface of the steel corbel 30 and the oblique support can be coated with structural adhesive before installation.
[0115] S4: The offshore wind power floating platform is launched into the water. The floating platform can be directly floated by injecting water into the dock, or the floating platform can be launched into the water by moving the floating platform from land via a semi-submersible barge 20. Figure 8 .
[0116] S5: Connect the first concrete buoy 21 to the wind turbine tower 5 through flange bolts and install the wind turbine impeller 6. To ensure good contact between the contact surfaces of the two, a grouting layer or epoxy resin is required for leveling.
[0117] S6: Setting up the mooring chain of the offshore wind power floating platform 4, reference Figure 1 The anchor point of the mooring anchor chain 4 can be located at the connection interface between the concrete buoy and the wind turbine tower 5, or at the outer surface of the upper part of the concrete pontoon 1. The mooring anchor chain 4 can be moored by using a catenary or a tension leg TLP. For example, in some embodiments, the anchor point of the mooring anchor chain 4 can be located at the connection flange 40 between the concrete buoy and the wind turbine tower 5, which not only facilitates the setting of the system anchor chain 4, but also improves the overall force bearing and force transmission performance of the structure. In some embodiments, a cable guide 41 can be provided on the floating platform.
[0118] The construction method of the assembled concrete offshore wind power floating platform provided by the present invention first modularizes the concrete pontoon, the first concrete pontoon, the second concrete pontoon, the third concrete pontoon and the supporting connection assembly, and then performs on-site assembly and prestressed construction, which can greatly improve the efficiency of concrete prefabrication and platform construction.
[0119] The construction method of the assembled concrete offshore wind power floating platform described in Examples 2 and 3 is similar to that of this embodiment and can be carried out with reference to this embodiment, which will not be described in detail here.
[0120] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled concrete offshore wind power floating platform, characterized in that: include: Concrete pontoons, support coupling assemblies, mooring anchor chains and several concrete buoys; The concrete pontoon is a modular prefabricated part; Each of the concrete pontoons is a modular prefabricated part; each of the concrete pontoons is connected to the top of the concrete pontoon through prestressed tendons, wherein the upper anchor head is located on the upper surface of the concrete pontoon, and the lower anchor head is located on the lower surface of the top plate of the concrete pontoon; The support and connection assembly is a modular prefabricated component; the support and connection assembly is assembled and connected to the concrete pontoon and the concrete pontoon; The mooring anchor chain is used for mooring the offshore wind power floating platform.
2. The assembled concrete offshore wind power floating platform according to claim 1, characterized in that: The number of the concrete pontoons is three, and the three concrete pontoons form a triangular arrangement; or, the number of the concrete pontoons is four, and the four concrete pontoons form a quadrilateral arrangement; or, the number of the concrete pontoons is five, and the five concrete pontoons form a pentagonal arrangement.
3. The assembled concrete offshore wind power floating platform according to claim 1, characterized in that: Prestressed channels are reserved on the top plate of the concrete pontoon and the concrete buoy, and the prestressed tendons pass through the prestressed channels.
4. The assembled concrete offshore wind power floating platform according to claim 1, characterized in that: The concrete pontoon is divided into a plurality of compartments by pontoon transverse partition walls and vertical partition walls, and the pontoon side walls, pontoon top plate and pontoon bottom plate of the concrete pontoon are all provided with horizontal prestressed tendons.
5. The assembled concrete offshore wind power floating platform according to claim 1, characterized in that: The concrete buoy includes a first concrete buoy, and the support coupling assembly includes a first oblique support and a second oblique support. The first concrete buoy is used to connect the wind turbine tower. The first concrete buoy is provided with an inner partition wall, and the inner partition wall includes a first inner partition wall and a second inner partition wall. The two ends of the first oblique support are respectively assembled and connected with the first concrete pontoon and the concrete pontoon, and the first oblique support and the first inner partition wall are arranged in the same plane; the two ends of the second oblique support are respectively assembled and connected with the first concrete pontoon and the concrete pontoon, and the second oblique support and the second inner partition wall are arranged in the same plane.
6. The assembled concrete offshore wind power floating platform according to claim 5, characterized in that: The center line of the first inner partition wall and the center line of the first oblique support are arranged in the same plane, and the center line of the second inner partition wall and the center line of the second oblique support are arranged in the same plane.
7. The assembled concrete offshore wind power floating platform according to claim 5, characterized in that: The center line of the projection of the first inner partition wall on the upper surface of the concrete pontoon and the center line of the projection of the first inclined support on the upper surface of the concrete pontoon are collinearly arranged; the center line of the projection of the second inner partition wall on the upper surface of the concrete pontoon and the center line of the projection of the second inclined support on the upper surface of the concrete pontoon are collinearly arranged.
8. The assembled concrete offshore wind power floating platform according to claim 5, characterized in that: The first concrete pontoon and the concrete pontoon are both pre-buried with corbels, and both ends of the first oblique support and the second oblique support are respectively connected to the corbels by welds or bolts.
9. The assembled concrete offshore wind power floating platform according to claim 5, characterized in that: The first inner partition wall and the second inner partition wall are cross-arranged and extend upward; or, the inner partition wall also includes a third inner partition wall, and the first inner partition wall, the second inner partition wall and the third inner partition wall are arranged in a Y shape and extend upward, and the first inner partition wall and the second inner partition wall are respectively two bifurcated structures of the Y-shaped structure; or, the inner partition wall also includes a third inner partition wall, a fourth inner partition wall and a fifth inner partition wall, and the first inner partition wall, the second inner partition wall, the third inner partition wall, the fourth inner partition wall and the fifth inner partition wall are radially arranged.
10. The assembled concrete offshore wind power floating platform according to claim 9, characterized in that: The remaining concrete pontoons except the first concrete pontoon are not provided with the inner partition wall.
11. The assembled concrete offshore wind power floating platform according to claim 1, characterized in that: Each of the concrete pontoons is provided with an inner partition wall, and each of the inner partition walls comprises a first inner partition wall and a second inner partition wall. The support connection assembly includes several groups of side support connection assemblies and one group of top support connection assemblies, each group of the side support connection assemblies includes a horizontal connection beam, a first diagonal brace and a second diagonal brace, the two ends of the horizontal connection beam are respectively connected to two adjacent concrete pontoons, the two ends of the first diagonal brace and the second diagonal brace are respectively connected to the horizontal connection beam and the concrete pontoons, each group of the side support connection assemblies is arranged coplanar with the first inner partition wall or the second inner partition wall, and the top support connection assembly is used to connect the horizontal connection beam.
12. The assembled concrete offshore wind power floating platform according to claim 11, characterized in that: The center line of the projection of the side support connecting assembly on the upper surface of the concrete pontoon and the center line of the projection of the first inner partition wall on the upper surface of the concrete pontoon are collinearly arranged, or the center line of the projection of the side support connecting assembly on the upper surface of the concrete pontoon and the center line of the projection of the second inner partition wall on the upper surface of the concrete pontoon are collinearly arranged.
13. The assembled concrete offshore wind power floating platform according to claim 11, characterized in that: The concrete buoy and the concrete pontoon are both pre-buried with corbels, and the side support connection components are respectively connected to the corbels by welds or bolts.
14. The assembled concrete offshore wind power floating platform according to claim 11, characterized in that: The first inner partition wall and the second inner partition wall are cross-arranged and extend upward; or, the inner partition wall also includes a third inner partition wall, and the first inner partition wall, the second inner partition wall and the third inner partition wall are arranged in a Y shape and extend upward, and the first inner partition wall and the second inner partition wall are respectively two bifurcated structures of the Y-shaped structure; or, the inner partition wall also includes a third inner partition wall, a fourth inner partition wall and a fifth inner partition wall, and the first inner partition wall, the second inner partition wall, the third inner partition wall, the fourth inner partition wall and the fifth inner partition wall are radially arranged.
15. An assembled concrete offshore wind power floating platform according to any one of claims 1 to 14, characterized in that: The concrete buoy includes a first concrete buoy, which is used to connect to a wind turbine tower, and the first concrete buoy is connected to the wind turbine tower via flange bolts.
16. The assembled concrete offshore wind power floating platform according to claim 15, characterized in that: The mooring anchor chain is arranged on the connection flange between the first concrete buoy and the wind turbine tower, or the mooring anchor chain is arranged on the outer surface of the concrete buoy.
17. A construction method for an assembled concrete offshore wind power floating platform, characterized in that: Used for constructing an assembled concrete offshore wind power floating platform as described in any one of claims 1 to 16, The following steps are involved: S1: modular prefabricated concrete pontoons, support and connection components and several concrete pontoons; S2: hoisting a plurality of the concrete buoys to the top of the concrete pontoon respectively, anchoring and connecting the prefabricated concrete pontoon and the concrete pontoon respectively through prestressed tendons, wherein the upper anchor head is located on the upper surface of the concrete pontoon, and the lower anchor head is located on the lower surface of the top plate of the concrete pontoon, and pouring cement slurry into the channel after anchoring; S3: Assemble and connect the support and connection assembly to the concrete pontoon and the concrete pontoon; S4: launching the structure assembled in S3 into water; S5: Connect the first concrete buoy to the wind turbine tower through flange bolts, and install the wind turbine impeller; S6: Setting up the mooring anchor chain for the offshore wind power floating platform.
18. The construction method of a prefabricated concrete offshore wind power floating platform according to claim 17, characterized in that: In the S1, horizontal prestressed channels are also provided on the pontoon side walls, pontoon top plate and pontoon bottom plate of the concrete pontoon for prestressing, anchoring the two ends with anchor heads, and pouring cement slurry into the channels.
19. The construction method of a prefabricated concrete offshore wind power floating platform according to claim 17, characterized in that: In S2, the top plate of the concrete pontoon and the prestressed channels reserved in the concrete pontoon are first aligned, and then the prestressed tendons are inserted into the channels, tensioned, anchored at both ends with anchor heads, and cement slurry is poured into the channels.
20. The construction method of a prefabricated concrete offshore wind power floating platform according to claim 17, characterized in that: In S3, corbels are embedded in the concrete pontoon and the concrete pontoon, and the support and connection assembly is connected to the corbels by welding or bolts.
Citation Information
Cited By
Semi-submersible floating fan foundation, system and design method
CN119353164A
Semi-submersible floating wind turbine foundation, system and design method
CN119353164B
Floating type fan and offshore wind power generation system
CN120942503A