Self-learning optimization elevator dispatching method based on edge computing equipment
Through the self-learning of edge computing equipment, the elevator dispatching method is optimized, and face recognition and real-time monitoring are used to solve the problems of elevator dispatch delay and fault warning, achieve rapid response and efficient elevator allocation, and improve the efficiency and safety of elevator use.
Patent Information
- Application Number
- CN202411012585.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-01
AI Technical Summary
Existing elevator dispatching relies on manual or simple algorithms, which cannot respond to personnel needs in real time, resulting in large data transmission delays, inability to achieve real-time monitoring and fault warning, and affecting elevator efficiency and ride experience.
The self-learning optimization elevator dispatching method based on edge computing equipment is adopted. Through face recognition, real-time monitoring and self-learning system, real-time dispatching and data analysis, elevator allocation and fault warning are optimized, data transmission delay is reduced, and response speed and dispatching efficiency are improved.
Quickly respond to passenger needs, reduce waiting time, improve elevator usage efficiency, reduce energy consumption and maintenance costs, and ensure the safety of elevators and passengers.
Smart Images

Figure CN118723735A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of elevator dispatching, and in particular to a self-learning optimization elevator dispatching method based on edge computing equipment. Background Art
[0002] In existing elevator systems, elevator scheduling often relies on manual or simple scheduling algorithms, and cannot be intelligently scheduled according to real-time personnel needs and elevator status. At the same time, since monitoring data and sensor data need to be sent to the cloud for processing in traditional ways, data transmission delays are large, and real-time monitoring and fault warnings cannot be achieved. These problems have seriously affected the efficiency of elevator use and the riding experience. For this reason, we propose a self-learning optimization elevator scheduling method based on edge computing devices. Summary of the invention
[0003] Based on the technical problems existing in the background technology, the present invention proposes a self-learning optimization elevator scheduling method based on edge computing equipment.
[0004] The present invention proposes a self-learning optimization elevator scheduling method based on edge computing equipment, comprising the following steps:
[0005] S1: Face recognition and floor allocation: First, install the face recognition device in the park or at the door station and connect it to the edge computing device;
[0006] S2: Unified elevator calling and elevator scheduling: The edge computing device performs unified elevator calling operations based on the face recognition results and sends the elevator calling request to the elevator control system;
[0007] S3: Real-time monitoring and fault warning: The edge computing device is also responsible for real-time monitoring of the elevator's operating status. Once an abnormal situation is found, the edge computing device will immediately issue an alarm and take corresponding control measures to ensure the safety of the elevator and passengers;
[0008] S4: Edge computing and real-time scheduling: The edge computing device receives floor demand information from the face recognition device, and performs real-time scheduling through the built-in scheduling algorithm based on the current elevator status, passenger demand, and floor location information to allocate the best elevator to the passenger;
[0009] S5: Self-learning system optimizes scheduling: Introduce a self-learning system to continuously optimize the scheduling algorithm by collecting and analyzing elevator operation data, passenger waiting time, and elevator load;
[0010] S6: Data analysis and optimization: Edge computing devices will collect and analyze elevator operation data. By analyzing this data, the elevator scheduling algorithm can be further optimized to improve the operating efficiency of the elevator system.
[0011] Preferably, in S1, the face recognition device is used to identify the identity of the employee when the employee enters the park or the door machine, and transmits it to the edge computing device to calculate the office floor where the employee is located.
[0012] Preferably, in S3, the running status of the elevator includes information on the position, speed and load of the elevator.
[0013] Preferably, in S4, the edge computing device processes the received floor demand information locally through a built-in scheduling algorithm, thereby reducing data transmission delay and improving scheduling response speed.
[0014] Preferably, in S5, the self-learning system can identify the peak hours and off-peak hours of elevator operation and the difference in passenger demand on different floors, so as to adjust the scheduling strategy, improve the efficiency of elevator use, and reduce unnecessary waste of resources.
[0015] Preferably, in said S6, the elevator operation data includes passenger waiting time, elevator operation efficiency and the like.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] The present invention can quickly respond to passengers' floor demands and reduce the time people spend waiting for elevators through face recognition and real-time scheduling. It can adjust the elevator scheduling strategy according to real-time conditions and improve the efficiency of elevator use through real-time scheduling and self-learning system optimization. It can reduce the idle time and unnecessary stops of elevators and reduce the energy consumption and maintenance costs of elevators through self-learning system optimization scheduling strategy. It can timely detect abnormal situations and take corresponding control measures to ensure the safety of elevators and passengers through real-time monitoring of the elevator operation status. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a flow chart of a self-learning optimization elevator scheduling method based on edge computing devices proposed in the present invention. DETAILED DESCRIPTION
[0019] The present invention will be further explained below in conjunction with specific embodiments.
[0020] Example
[0021] Reference Figure 1 , this embodiment proposes a self-learning optimization elevator scheduling method based on edge computing devices, including the following steps:
[0022] S1: Face recognition and floor assignment: First, a face recognition device is installed at the campus or door station and connected to the edge computing device. The face recognition device is used to identify the employee when the employee enters the campus or door station, and transmits the information to the edge computing device to calculate the employee's office floor.
[0023] S2: Unified elevator calling and elevator scheduling: The edge computing device performs unified elevator calling operations based on the face recognition results and sends the elevator calling request to the elevator control system. After receiving the elevator calling request, the elevator control system uses an intelligent scheduling algorithm to allocate the best elevator to the passenger based on the current elevator status, passenger demand, floor location and other information;
[0024] S3: Real-time monitoring and fault warning: The edge computing device is also responsible for real-time monitoring of the elevator's operating status. Once an abnormal situation is found, the edge computing device will immediately issue an alarm and take corresponding control measures to ensure the safety of the elevator and passengers. The elevator's operating status includes information on the elevator's position, speed, and load.
[0025] S4: Edge computing and real-time scheduling: The edge computing device receives floor demand information from the face recognition device, and performs real-time scheduling through the built-in scheduling algorithm based on the current elevator status, passenger demand, and floor location information to allocate the best elevator to the passenger. The edge computing device processes the received floor demand information through the built-in scheduling algorithm for local processing, which reduces data transmission delay and improves scheduling response speed by using local processing.
[0026] S5: Self-learning system optimizes scheduling: Introduce a self-learning system to continuously optimize the scheduling algorithm by collecting and analyzing elevator operation data, passenger waiting time, and elevator load. The self-learning system can identify the peak and off-peak hours of elevator operation and the differences in passenger demand on different floors, thereby adjusting the scheduling strategy, improving elevator utilization efficiency, and reducing unnecessary waste of resources.
[0027] S6: Data analysis and optimization: Edge computing devices collect and analyze elevator operation data. By analyzing this data, the elevator scheduling algorithm can be further optimized to improve the operating efficiency of the elevator system. The elevator operation data includes passenger waiting time, elevator operation efficiency, etc.
[0028] Through face recognition and real-time dispatch, the system can quickly respond to passengers' floor demands and reduce the time people wait for elevators. Through real-time dispatch and self-learning system optimization, the elevator dispatch strategy can be adjusted according to real-time conditions to improve elevator utilization efficiency. By optimizing the dispatch strategy through the self-learning system, the elevator's idle time and unnecessary stops can be reduced, reducing elevator energy consumption and maintenance costs. By real-time monitoring of the elevator's operating status, abnormal situations can be discovered in a timely manner and corresponding control measures can be taken to ensure the safety of the elevator and passengers.
[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A self-learning optimization elevator scheduling method based on edge computing equipment, characterized in that: The following steps are involved: S1: Face recognition and floor allocation: First, install the face recognition device in the park or at the door station and connect it to the edge computing device; S2: Unified elevator calling and elevator scheduling: The edge computing device performs unified elevator calling operations based on the face recognition results and sends the elevator calling request to the elevator control system; S3: Real-time monitoring and fault warning: The edge computing device is also responsible for real-time monitoring of the elevator's operating status. Once an abnormal situation is found, the edge computing device will immediately issue an alarm and take corresponding control measures to ensure the safety of the elevator and passengers; S4: Edge computing and real-time scheduling: The edge computing device receives floor demand information from the face recognition device, and performs real-time scheduling through the built-in scheduling algorithm based on the current elevator status, passenger demand, and floor location information to allocate the best elevator to the passenger; S5: Self-learning system optimizes scheduling: Introduce a self-learning system to continuously optimize the scheduling algorithm by collecting and analyzing elevator operation data, passenger waiting time, and elevator load; S6: Data analysis and optimization: Edge computing devices will collect and analyze elevator operation data. By analyzing this data, the elevator scheduling algorithm can be further optimized to improve the operating efficiency of the elevator system.
2. A self-learning optimization elevator scheduling method based on edge computing equipment according to claim 1, characterized in that: In S1, the face recognition device is used to identify the employee's identity when the employee enters the park or the door machine, and transmits it to the edge computing device to calculate the employee's office floor.
3. A self-learning optimization elevator scheduling method based on edge computing equipment according to claim 1, characterized in that: In S3, the running status of the elevator includes information on the position, speed and load of the elevator.
4. The method for self-learning optimization of elevator scheduling based on edge computing equipment according to claim 1, characterized in that: In S4, the edge computing device processes the received floor demand information locally through a built-in scheduling algorithm.
5. The method for self-learning optimization of elevator scheduling based on edge computing equipment according to claim 1, characterized in that: In S5, the self-learning system can identify the peak hours and off-peak hours of elevator operation and the difference in passenger demand on different floors, and adjust the dispatching strategy.
6. A self-learning optimization elevator scheduling method based on edge computing equipment according to claim 1, characterized in that: In S6, the elevator operation data includes passenger waiting time and elevator operation efficiency.
Citation Information
Patent Citations
Human face recognizing elevator group management control system
CN108059049A
Elevator control method and system based on edge gateway scheduling and storage medium
CN113955595A
Elevator energy-saving dispatching system and method based on reinforcement learning algorithm
CN114873387A
Elevator control system and method based on edge calculation
CN117699603A
Method for reducing energy consumption of elevator
CN117699604A
Cited By
Face recognition elevator control system for office building
CN119160725A