A hoisting system for underground plant construction
By setting up multi-layer sliding support components and cantilever cranes in the underground factory building, combined with the avoidance mechanism, the insufficient lifting methods and equipment safety problems in the construction of the underground factory building are solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202411222405.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-09-02
AI Technical Summary
In the construction of underground factory buildings, insufficient lifting methods during the peak installation of the unit are caused by low construction efficiency and the lifting equipment is prone to impact damage due to misoperation, affecting construction safety.
Design an underground factory construction hoisting system including the first, second and third hoisting modules. By setting sliding support components and hoisting components on the inner side walls, ceiling side walls and bottom of the factory, combining cantilever cranes and avoiding mechanisms, multi-layer The lifting equipment works in concert, and cantilever cranes are avoided through electrical connections and drive components to avoid equipment impact.
It improves construction efficiency, solves the problem of insufficient lifting methods, enhances the safety of coordinated operation of lifting equipment during peak periods, avoids equipment damage, and improves construction efficiency and safety.
Smart Images

Figure CN118723824B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a hoisting system for underground plant construction. Background Art
[0002] In the construction of underground powerhouses, it is usually necessary to excavate the upper part of the powerhouse to form a rock platform, pour concrete to form a rock anchor beam, and then install a bridge crane as the main lifting equipment. This system is mainly used for the installation of powerhouse units, pouring of concrete, and subsequent operation and maintenance of the units.
[0003] However, during the peak period of unit installation, the workload in the plant increases significantly, such as concrete pouring, warehouse number preparation and material lifting tasks need to be carried out simultaneously. In this case, the lifting system in the relevant technology often has insufficient lifting means, resulting in a certain degree of suspension or delay in the construction process, which in turn affects the overall construction efficiency. Summary of the invention
[0004] The present application discloses a hoisting system for underground plant construction, which can at least be used to solve the problem of low construction efficiency in related technologies.
[0005] The present application provides a hoisting system for underground plant construction, which adopts the following technical solutions:
[0006] A hoisting system for underground factory building construction includes a first hoisting module, a second hoisting module and a third hoisting module; wherein the first hoisting module is located below the second hoisting module, the first hoisting module includes a first support assembly and a first hoisting assembly, the first support assembly is installed on the inner wall of the underground factory building, and the first hoisting assembly is slidably arranged on the first support assembly and spans the underground factory building; the second hoisting module includes a second support assembly and a second hoisting assembly, the second support assembly is installed on the inner wall of the underground factory building close to the ceiling side, and the second hoisting assembly is slidably arranged on the second support assembly and spans the underground factory building; the third hoisting module is located below the first hoisting module, the third hoisting module includes a third support assembly and a third hoisting assembly, the third support assembly is installed on the inner wall of the underground factory building close to the bottom, and the third hoisting assembly is slidably arranged on the third support assembly.
[0007] Preferably, the first supporting assembly includes a rock wall beam, which is arranged opposite to the side wall of the upper and middle part of the underground factory building, and both ends of the first hoisting assembly are respectively slidably matched with the rock wall beam.
[0008] Preferably, the first lifting assembly includes a first bridge crane, the first bridge crane has a first sliding wheel, the upper surface of the rock wall beam has a first sliding rail, the first sliding rail is arranged along the axial direction of the underground factory building, and the first sliding wheel is slidably matched with the first sliding rail.
[0009] Preferably, the second supporting assembly includes a column and a supporting portion, the column is arranged opposite to the upper side wall of the underground factory building, the supporting portion is arranged on the side wall of the column close to the top, and both ends of the second lifting assembly are respectively slidably matched with the supporting portion.
[0010] Preferably, the second lifting assembly includes a second bridge crane, the second bridge crane has a second sliding wheel, the upper surface of the support portion has a second slide rail, the second slide rail is arranged along the axial direction of the underground factory building, and the second sliding wheel is slidably matched with the second slide rail.
[0011] Preferably, the third supporting assembly includes a reinforcing anchor rod and a bracket. A plurality of reinforcing anchor rods are transversely inserted on the inner wall of the underground factory building near the bottom. The bracket is installed between the plurality of reinforcing anchor rods. The third lifting assembly slidably cooperates with the bracket.
[0012] Preferably, the third hoisting assembly includes a cantilever crane, the upper surface of the bracket has a third slide rail arranged along the axial direction of the underground factory building, and the cantilever crane is slidably arranged on the third slide rail.
[0013] Preferably, there is an avoidance mechanism between the cantilever crane and the bracket, and the avoidance mechanism includes an electrically connected trigger component and a drive component, the trigger component is installed on the cantilever crane, and the drive component is installed between the cantilever crane and the bracket. When the lifting part of the first lifting module or the second lifting module is directly above the cantilever crane and moves vertically downward, the lifting part can drive the drive component to operate after contacting the trigger component in advance, so that the cantilever crane moves along the third slide rail to avoid the lifting part.
[0014] Preferably, the trigger assembly includes an insulating column, a movable plate, a first conductive block, a second conductive block and a battery; wherein the insulating column is vertically arranged on the main part of the cantilever crane, and a sliding cavity is provided along the length direction of the insulating column, and the first conductive block and the second conductive block are both slidably arranged in the sliding cavity; the first conductive block is suspended in the sliding cavity by a compression spring, and the second conductive block is supported in the sliding cavity by a tension spring, and in a natural state, the first conductive block and the second conductive block are spaced and opposite to each other; the insulating column is provided with a through groove along the length direction of the insulating column, one end of the movable plate is connected to the first conductive block, and the other end thereof laterally passes through the through groove and extends horizontally to above the hoisting part of the cantilever crane; the battery is installed on the main part of the cantilever crane, and is electrically connected to the first conductive block, and the second conductive block is electrically connected to the driving assembly.
[0015] Preferably, the drive assembly includes a drive motor and a gear, the drive motor is installed at the lower end of the main part of the cantilever crane, and the gear is coaxially arranged on the output shaft of the drive motor; the upper surface of the bracket is provided with a rack extending along the axial direction of the underground factory building, and the gear is meshed with the rack.
[0016] The present invention has the following advantages and beneficial effects:
[0017] (1) This application effectively solves the problem of insufficient or conflicting lifting means during the peak period of unit installation and concrete pouring in underground powerhouses by reasonably setting up three lifting means and equipment, namely the first lifting module, the second lifting module and the third lifting module. At the same time, since the second lifting module is close to the ceiling side of the underground powerhouse, the second lifting module can also take into account the construction of the factory ceiling; in this application, the temporary lifting system is close to the bottom of the underground powerhouse, which can also effectively solve the problem of material lifting during the construction period, thereby improving construction efficiency;
[0018] (2) Since the present application sets three kinds of lifting equipment at the top, middle and bottom, namely the first lifting module, the second lifting module and the third lifting module, during the peak period of use, due to the operator's misoperation, the lifting parts of the first lifting module and the second lifting module may collide with the third lifting module when they move downward, thereby damaging the lifting equipment. Based on this, through the avoidance mechanism in the present application, when the lifting part of the first lifting module or the second lifting module is located directly above the cantilever crane and moves vertically downward due to the operator's misoperation, the cantilever crane located below can actively avoid in the vertical direction to avoid the collision between the lifting part of the first lifting module or the second lifting module and the cantilever crane, which is beneficial to improve the operational safety of multiple lifting equipment during collaborative operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a schematic diagram of the structure of an underground plant disclosed in some embodiments of the present application;
[0021] Figure 2 yes Figure 1 A magnified view of part A in FIG.
[0022] Figure 3 It is a partial schematic diagram of the second lifting module;
[0023] Figure 4 is a partial structural schematic diagram of a third hoisting module disclosed in some embodiments of the present application;
[0024] Figure 5 yes Figure 4 A magnified view of part B in FIG.
[0025] Figure 6It is a partial structural schematic diagram of the avoidance mechanism disclosed in some embodiments of the present application.
[0026] The markings in the figure are:
[0027] 100, first hoisting module; 110, first supporting assembly; 1110, first slide rail; 120, first hoisting assembly; 1210, first sliding wheel; 200, second hoisting module;
[0028] 210, second supporting assembly; 2110, column; 2120, supporting portion; 2121, second slide rail; 220, second hoisting assembly; 2210, second sliding wheel;
[0029] 300, third hoisting module; 310, third supporting assembly; 3110, reinforcing anchor rod; 3120, bracket; 3121, third slide rail; 3122, sub-frame; 320, third hoisting assembly; 3210, cantilever crane;
[0030] 400, underground workshop; 410, suspended ceiling;
[0031] 500, temporary passage;
[0032] 600, avoidance mechanism; 610, trigger assembly; 6110, insulating column; 6111, sliding cavity; 6112, through slot; 6120, moving plate; 6130, first conductive block; 6131, compression spring; 6140, second conductive block; 6141, tension spring; 6150, battery; 620, drive assembly; 6210, drive motor; 6220, gear;
[0033] 700. Rack. DETAILED DESCRIPTION
[0034] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0035] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0036] In the related technology, bridge cranes are usually used as the main lifting equipment in the construction process of underground powerhouses. The installation steps of the crane include excavating a rock platform on the upper part of the powerhouse, pouring concrete to form a rock anchor beam, and then installing the bridge crane on the rock anchor beam. This lifting system is not only used for the installation of the unit, but also undertakes multiple tasks such as concrete pouring, material transportation and subsequent unit maintenance.
[0037] However, as the construction of the underground powerhouse progressed, especially during the peak period of unit installation, the construction tasks in the powerhouse became extremely heavy. During this period, multiple tasks such as concrete pouring, warehouse number preparation, and material lifting often needed to be carried out simultaneously, resulting in a sharp increase in the workload on the construction site.
[0038] The existing hoisting system has many shortcomings when dealing with this type of high-intensity, multi-task construction environment. Due to the limited hoisting means, it is often difficult to meet the needs of multiple tasks being carried out simultaneously, resulting in some construction tasks having to wait for the hoisting equipment to be idle, thus causing the construction progress to be suspended or delayed. This not only affects the overall efficiency of the construction, but may also lead to an extension of the construction period and an increase in construction costs. This problem is particularly prominent in large underground plant construction projects. Therefore, how to improve the working efficiency of the hoisting system within a limited construction space and ensure the smooth progress of multiple tasks has become a problem that needs to be solved urgently in the existing technology.
[0039] In view of this, some embodiments of the present application provide an underground plant construction hoisting system, wherein the construction hoisting system can be used for the construction of underground tunnels, underground storage rooms, and underground air-raid shelters, etc., and is certainly not limited to the field of underground building construction technology.
[0040] See also Figure 1 to Figure 6Some embodiments of the present application disclose an underground factory construction hoisting system including a first hoisting module 100, a second hoisting module 200 and a third hoisting module 300, wherein: the first hoisting module 100 is located in the underground factory 400 and below the second hoisting module 200, and the third hoisting module 300 is located below the first hoisting module 100.
[0041] It should be understood that the first hoisting module 100, as a basic hoisting device, can be used as the main hoisting device during the construction of the underground plant 400. In some embodiments of the present application, the first hoisting module 100 is mainly used for tasks such as unit installation and material hoisting, as the main equipment for large tasks. The second hoisting module 200, as an additional hoisting device, can be used as a secondary hoisting device during the construction of the underground plant 400. In some embodiments of the present application, the second hoisting module 200 is mainly used for the hoisting of small construction equipment and tools and materials, and can also be used for the later installation of the ceiling 410 of the underground plant 400. The third hoisting module 300 is used as a temporary hoisting device, which can be used as an auxiliary hoisting device during the construction of the underground plant 400, and will be dismantled after the construction of the underground plant 400 is completed. In some embodiments of the present application, the auxiliary hoisting equipment is mainly used for the lifting of materials during the construction period.
[0042] In some embodiments, in combination Figure 1 , Figure 2 The first hanging module 100 includes a first support assembly 110 and a first hanging assembly 120. The first support assembly 110 is installed on the inner wall of the underground factory building 400. The first hanging assembly 120 is slidably arranged on the first support assembly 110 and spans the underground factory building 400. Exemplarily, the sliding direction of the first hanging assembly 120 on the first support assembly 110 is parallel to the axis direction of the underground factory building 400. Therefore, the first hanging assembly 120 can move in the underground factory building 400 along the axis direction of the underground factory building 400 to achieve switching between different positions in the underground factory building 400.
[0043] In some embodiments, Figure 1 , Figure 2 As shown, the first support assembly 110 includes a rock wall beam, which is arranged opposite to the side wall of the middle and upper part of the underground factory building 400, and the two ends of the first hanging assembly 120 are respectively slidably matched with the rock wall beam. Exemplarily, the rock wall beam can be used as a permanent structural beam in the underground factory building 400, that is, it can be used as a supporting structure in the underground factory building 400, and can also provide an installation foundation for the movement of the first hanging assembly 120. In this way, in the limited space in the underground factory building 400, the space utilization rate in the underground factory building 400 can be greatly improved.
[0044] In some embodiments, in combination Figure 1 , Figure 2The first hoisting assembly 120 includes a first bridge crane, the first bridge crane has a first sliding wheel 1210, the upper surface of the rock wall beam has a first slide rail 1110, the first slide rail 1110 is arranged along the axial direction of the underground plant 400, and the first sliding wheel 1210 and the first slide rail 1110 are slidably matched. Exemplarily, the first bridge crane has a hoisting part, and the hoisting part can adjust the position along the length direction of the first bridge crane. In addition, the hoisting part can also be raised and lowered in the vertical direction, so that when hoisting materials, the hoisting part of the first bridge crane can be greatly improved by lifting and lowering the hoisting part itself, moving along the length direction of the first bridge crane, and combining the movement of the first bridge crane along the length direction of the first slide rail 1110. Exemplarily, the first bridge crane is a large bridge crane, which can hoist heavier materials.
[0045] In some embodiments, in combination Figure 1 , Figure 3 The second hanging module 200 includes a second supporting assembly 210 and a second hanging assembly 220. The second supporting assembly 210 is installed on the inner wall of the underground factory building 400 near the ceiling 410. The second hanging assembly 220 is slidably arranged on the second supporting assembly 210 and spans the underground factory building 400. Exemplarily, the sliding direction of the second hanging assembly 220 on the second supporting assembly 210 is parallel to the axial direction of the underground factory building 400. Therefore, the second hanging assembly 220 can also move in the underground factory building 400 along the axial direction of the underground factory building 400 to realize the switching of the second hanging assembly 220 in different positions in the underground factory building 400.
[0046] In some embodiments, Figure 1 , Figure 3 As shown, the second support assembly 210 includes a column 2110 and a support portion 2120, the column 2110 is arranged opposite to the side wall of the upper part of the underground factory building 400, the support portion 2120 is arranged on the side wall of the column 2110 close to the top, and the support portion 2120 is also arranged opposite, and the two ends of the second hoisting assembly 220 are respectively slidably matched with the support portion 2120. Exemplarily, the column 2110 is a concrete load-bearing column, which is a permanent structural column of the underground factory building 400, and its arrangement can be adaptively arranged according to the size of the underground factory building 400.
[0047] For example, the spacing between columns 2110 is 4m, and a connecting steel plate is embedded in the side of column 2110 near the top. The width of the connecting steel plate is consistent with the width of column 2110, generally not exceeding 60cm. The length of the connecting steel plate is set to 60cm, the thickness is set to 1cm, and anchor bars are arranged at the embedded ends of the connecting steel plates. The shape of the anchor bars is a hook shape, and the spacing between the anchor bars is 25cm.
[0048] At the same time, the support part 2120 is arranged at one end of the connecting steel plate away from the anchor bar. The support part 2120 is configured as a triangular steel plate. The width of the support part 2120 is 30 cm, the height is consistent with the height of the connecting steel plate, and the thickness of the support part 2120 is 1 cm.
[0049] In some embodiments, reference Figure 1 , Figure 3 The second hoisting assembly 220 includes a second bridge crane, the second bridge crane has a second sliding wheel 2210, the upper surface of the support part 2120 has a second slide rail 2121, the second slide rail 2121 is arranged along the axial direction of the underground factory building 400, and the second sliding wheel 2210 and the second slide rail 2121 are slidably matched. Exemplarily, the second bridge crane also has a hoisting part, and the hoisting part of the second bridge crane can be adjusted laterally along the length direction of the second bridge crane. In addition, the hoisting part of the second bridge crane can also be raised and lowered in the vertical direction, so that when hoisting materials, the hoisting part of the second bridge crane can be raised and lowered by itself, moved along the length direction of the second bridge crane, and combined with the movement of the second bridge crane along the length direction of the first slide rail 1110, The moving range of the hoisting part of the second bridge crane can be greatly improved. Exemplarily, the first bridge crane is a small bridge crane, which can hoist heavier materials.
[0050] In some embodiments, in combination Figure 1 , Figure 4 The third support assembly 310 includes a reinforcement anchor rod 3110 and a bracket 3120. A plurality of reinforcement anchor rods 3110 are inserted transversely on the inner wall of the underground powerhouse 400 near the bottom. The bracket 3120 is installed between the plurality of reinforcement anchor rods 3110. The third hoisting assembly 320 is slidably matched with the bracket 3120. For example, in order to improve the strength of the bracket 3120, the bracket 3120 can be made of steel. Of course, the bracket 3120 can also be made of other materials, that is, the strength of the bracket 3120 can be satisfied.
[0051] In some embodiments, Figure 4 , Figure 5 As shown, the third hoisting assembly 320 includes a cantilever hanger 3210, and the upper surface of the bracket 3120 has a third slide rail 3121 arranged along the axial direction of the underground factory building 400, and the cantilever hanger 3210 is slidably arranged on the third slide rail 3121. Exemplarily, the cantilever hanger 3210 has a main body and a hoisting part, the main body of the cantilever hanger 3210 is slidably matched with the third slide rail 3121, and the hoisting part of the cantilever hanger 3210 extends out of the main body of the cantilever hanger 3210 and extends vertically downward.
[0052] With such arrangement, in some lifting operations near the bottom of the underground factory building 400, the cantilever crane 3210 can be used to assist in lifting materials. After the materials are lifted by the lifting part of the cantilever crane 3210, the main part of the cantilever crane 3210 is used to move them along the third slide rail 3121 to facilitate the transportation of auxiliary materials.
[0053] Exemplary, combined Figure 4 During the construction period, a temporary passage 500 is provided on the inner side wall of the underground powerhouse 400 near the bottom, and a side guardrail is provided on the outer side of the temporary passage 500, and the height of the guardrail is not less than 1.2m. At the same time, the bracket 3120 includes a plurality of sub-frames 3122, and the temporary passage 500 is supported by one of the sub-frames 3122. The temporary passage 500 is located above the cantilever 3210, that is, the upper layer is the temporary passage 500 during the construction period, and the lower layer is the hoisting foundation mechanism. At the same time, the sub-frames 3122 are all made of angle steel, and the sub-frames 3122 are all triangular trusses with a width of 120cm and a height of 200cm. The spacing along the axis of the underground powerhouse 400 is 100cm. The triangular trusses are fixed by reinforcing anchor rods 3110, the diameter of the reinforcing anchor rods 3110 is 32mm, the length of the anchor rods 3110 anchored in the inner wall of the underground powerhouse 400 is 480cm, and the exposed length is 120cm. With such arrangement, the temporary passage 500 can be used for operators to walk, so that the operators can direct or operate the lifting of the cantilever crane 3210, which is beneficial to improving the lifting safety during construction.
[0054] In some embodiments, in combination Figure 4 , and also includes an avoidance mechanism 600, which includes an electrically connected trigger component 610 and a drive component 620, the trigger component 610 is installed on the cantilever crane 3210, and the drive component 620 is installed between the cantilever crane 3210 and the bracket 3120. When the lifting part of the first lifting module 100 or the second lifting module 200 is directly above the cantilever crane 3210 and moves vertically downward, the lifting part can drive the drive component 620 to operate after being in contact with the trigger component 610 in advance, so that the cantilever crane 3210 moves along the third slide rail 3121 to avoid the lifting part.
[0055] Through the above scheme, it can be understood that, since the present application sets three kinds of hoisting equipment at the top, middle and bottom, namely the first hoisting module 100, the second hoisting module 200 and the third hoisting module 300, during the peak period of use, due to the operator's misoperation, the hoisting parts of the first hoisting module 100 and the second hoisting module 200 may collide with the third hoisting module 300 when they move downward, thereby damaging the hoisting equipment. Based on this, through the avoidance mechanism 600 in the present application, when the hoisting part of the first hoisting module 100 or the second hoisting module 200 is located directly above the cantilever crane 3210 and moves vertically downward due to the operator's misoperation, the cantilever crane 3210 located below can be actively avoided in the vertical direction to avoid the hoisting part of the first hoisting module 100 or the second hoisting module 200 from colliding with the cantilever crane 3210, which is beneficial to improve the operational safety of multiple hoisting equipment during collaborative operation.
[0056] In some embodiments, Figure 4 , Figure 6 As shown, the trigger assembly 610 includes an insulating column 6110, a movable plate 6120, a first conductive block 6130, a second conductive block 6140 and a battery 6150; wherein the insulating column 6110 is vertically arranged on the main part of the cantilever crane 3210, and the insulating column 6110 is provided with a sliding cavity 6111 along its own length direction, and the first conductive block 6130 and the second conductive block 6140 are both slidably arranged in the sliding cavity 6111.
[0057] The first conductive block 6130 is suspended in the sliding cavity 6111 by a compression spring 6131, and the second conductive block 6140 is supported in the sliding cavity 6111 by a tension spring 6141. In a natural state, the first conductive block 6130 and the second conductive block 6140 are spaced apart and face each other. Exemplarily, the outer peripheries of the first conductive block 6130 and the second conductive block 6140 are both covered with an insulating layer (not shown in the figure), but the insulating layer is opened at the position where the first conductive block 6130 and the second conductive block 6140 face each other, so that the first conductive block 6130 and the second conductive block 6140 can reduce the risk of leakage, improve construction safety, and do not affect the normal power transmission of the first conductive block 6130 and the second conductive block 6140 after bonding.
[0058] At the same time, the insulating column 6110 is provided with a through slot 6112 along its length direction, one end of the movable plate 6120 is connected to the first conductive block 6130, and the other end horizontally passes through the through slot 6112 and extends horizontally to the top of the hoisting part of the cantilever crane 3210. The battery 6150 is installed on the main part of the cantilever crane 3210, and the battery 6150 is electrically connected to the first conductive block 6130, and the second conductive block 6140 is electrically connected to the driving component 620. Exemplarily, the battery 6150 and the first conductive block 6130 are electrically connected through a spring wire (not shown in the figure), and similarly, the second conductive block 6140 and the driving component 620 are also electrically connected through a spring wire (not shown in the figure). In this way, since the spring wire itself has ductility, the first conductive block 6130 and the second conductive block 6140 can maintain a stable electrical connection with the battery 6150 and the driving component 620 when moving.
[0059] On this basis, when the first hoisting module 100 or the hoisting part of the hoisting module is not directly above the cantilever 3210, the first hoisting module 100 or the hoisting module can be hoisted normally without interfering with the cantilever 3210. During the peak period of use, the operator may make an error operation, causing the hoisting part of the first hoisting module 100 or the second hoisting module 200 to be directly above the cantilever 3210, and at the same time drive the hoisting part of the first hoisting module 100 or the second hoisting module 200 to move downward. At this time, the lifting part of the first lifting module 100 or the second lifting module 200 will contact the movable plate 6120 in advance during the downward movement, and will synchronously push the movable plate 6120 to move vertically downward as the lifting part of the first lifting module 100 or the second lifting module 200 continues to move. The downward movement of the movable plate 6120 will drive the first conductive block 6130 to move vertically downward in the sliding cavity 6111, and the compression spring 6131 will be forced to stretch under the thrust until the first conductive block 6130 is attached to the second conductive block 6140. The electric energy of the battery 6150 will be transmitted to the driving component 620, and then the driving component 620 will be started to drive the cantilever crane 3210 to move along the third slide rail 3121 to avoid the lifting part of the first lifting module 100 or the second lifting module 200.
[0060] At the same time, since the second conductive block 6140 is supported by the tension spring 6141, when the hanging part of the first hanging module 100 or the second hanging module 200 continues to move downward, the first conductive block 6130 will press down the second conductive block 6140 and compress the tension spring 6141, so that the first conductive block 6130 and the second conductive block 6140 will remain in contact for a period of time, and the battery 6150 and the driving assembly 620 will be electrically connected for a period of time. After the cantilever 3210 moves away along the third slide rail 3121, the movable plate 6120 will gradually change from a squeezed state to a separated state with the hanging part of the first hanging module 100 or the second hanging module 200. After the movable plate 6120 is completely separated from the hanging part of the first hanging module 100 or the second hanging module 200, the movable plate 6120 will no longer be compressed by the hanging part of the first hanging module 100 or the second hanging module 200. At this time, the stretched compression spring 6131 will drive the movable plate 6120 and the first conductive block 6130 to move vertically upward under the action of its own elastic force, and the compressed tension spring 6141 will also drive the second conductive block 6140 to move vertically upward under the action of its own elastic force, so that after the movable plate 6120 is separated from the lifting position, the first conductive block 6130 and the second conductive block 6140 will still be briefly attached for a period of time, and the cantilever crane 3210 will also move a distance at this time, so that the cantilever crane 3210 and the first lifting module 100 or the second lifting module 100 are in close contact with each other. The avoidance distance of the hanging part of the block 200 increases until the compression spring 6131 and the tension spring 6141 are both reset to the original state, and the first conductive block 6130 and the second conductive block 6140 are separated. At this time, the battery 6150 is disconnected from the driving component 620, and the driving component 620 no longer drives the cantilever crane 3210 to move, so as to avoid the situation that the avoidance distance of the cantilever crane 3210 is too small to a certain extent, so that the hanging part of the first hanging module 100 or the second hanging module 200 will still collide with the cantilever crane 3210. Therefore, it is beneficial to improve the probability of anti-collision. Exemplarily, the upper plate surface of the movable plate 6120 is coated with a Teflon layer. Since the Teflon layer has very small friction, the movable plate 6120 in abutment state and the hanging part can move more smoothly when relative movement occurs.
[0061] In some embodiments, reference Figure 4 , Figure 5 The driving assembly 620 includes a driving motor 6210 and a gear 6220. The driving motor 6210 is installed at the lower end of the main body of the cantilever 3210. The gear 6220 is coaxially arranged on the output shaft of the driving motor 6210. The upper surface of the bracket 3120 is provided with a rack 700 extending along the axial direction of the underground plant 400. The gear 6220 is meshed with the rack 700. Exemplarily, the driving motor 6210 is a synchronous motor with a clutch or a synchronous motor with an idling function.
[0062] Thus, during operation, the gear 6220 on the output shaft of the drive motor 6210 can rotate synchronously with the rotor of the drive motor 6210, and when the drive motor 6210 is powered off, the gear 6220 can rotate freely (i.e., idle) by the force applied from the outside, without being hindered by the drive motor 6210. The purpose of such a setting is that the movement of the cantilever crane 3210 on the third slide rail 3121 when avoiding the hoisting position of the first hoisting module 100 or the second hoisting module 200 is realized by the drive motor 6210, and the movement in the process of hoisting materials is realized by the drive member of the cantilever crane 3210 itself. Thus, when the cantilever crane 3210 is moving on the third slide rail 3121 to hoist materials, the gear 6220 on the output shaft of the drive motor 6210 in the power-off state will be engaged with the rack 700 in rotation, but at this time the rotation of the gear 6220 is idle, so it will not affect the normal movement of the cantilever crane 3210 on the third slide rail 3121. Similarly, the driving components of the cantilever crane 3210 itself can also be configured to idle after power failure to reduce the driving influence on the driving motor 6210 when avoiding.
[0063] Exemplarily, the rotation speed of the driving motor 6210 is greater than the speed at which the lifting part of the first lifting module 100 or the second lifting module 200 moves downward, so that when the lifting part of the first lifting module 100 or the second lifting module 200 moves downward, the movable plate 6120 has not yet contacted the lifting part of the cantilever crane 3210, and the cantilever crane 3210 has already avoided the lifting part of the first lifting module 100 or the second lifting module 200, thereby preventing the movable plate 6120 from hitting the lifting part of the cantilever crane 3210.
[0064] Exemplarily, the lowest ends of the sliding cavity 6111 and the through groove 6112 are both located above the cantilever hanger 3210. In this way, when the movable plate 6120 moves to the lowest ends of the sliding cavity 6111 and the through groove 6112, it is not easy for the movable plate 6120 to contact the lifting part of the first lifting module 100 or the second lifting module 200, thereby avoiding the lifting part of the first lifting module 100 or the second lifting module 200 from colliding with the movable plate 6120.
[0065] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A hoisting system for underground plant construction, characterized in that: It comprises a first lifting module (100), a second lifting module (200) and a third lifting module (300); wherein, The first hoisting module (100) is located below the second hoisting module (200), the first hoisting module (100) comprises a first supporting assembly (110) and a first hoisting assembly (120), the first supporting assembly (110) is installed on the inner wall of the underground factory building (400), and the first hoisting assembly (120) is slidably arranged on the first supporting assembly (110) and spans the underground factory building (400); The second hanging module (200) comprises a second supporting assembly (210) and a second hanging assembly (220), wherein the second supporting assembly (210) is installed on the inner wall of the underground factory building (400) close to the ceiling (410), and the second hanging assembly (220) is slidably arranged on the second supporting assembly (210) and spans the underground factory building (400); The third hoisting module (300) is located below the first hoisting module (100), and the third hoisting module (300) comprises a third support assembly (310) and a third hoisting assembly (320), wherein the third support assembly (310) is installed on the inner wall of the underground factory building (400) close to the bottom, and the third hoisting assembly (320) is slidably arranged on the third support assembly (310); the third support assembly (310) comprises a reinforcement anchor rod (3110) and a bracket (3120), wherein the reinforcement anchor rod (3110) A plurality of brackets (3120) are inserted transversely on the inner wall of the underground factory building (400) near the bottom, the bracket (3120) is installed between the plurality of the reinforcement anchor rods (3110), the third hoisting assembly (320) is slidably matched with the bracket (3120), the third hoisting assembly (320) comprises a cantilever crane (3210), the upper surface of the bracket (3120) has a third slide rail (3121) arranged along the axial direction of the underground factory building (400), and the cantilever crane (3210) is slidably arranged on the third slide rail (3121); The device also includes an avoidance mechanism (600), wherein the avoidance mechanism (600) includes an electrically connected trigger component (610) and a drive component (620), wherein the trigger component (610) is installed on the cantilever crane (3210), and the drive component (620) is installed between the cantilever crane (3210) and the bracket (3120), and when the hanging part of the first hanging module (100) or the second hanging module (200) is located directly above the cantilever crane (3210) and moves vertically downward, the hanging part can drive the drive component (620) to operate after contacting the trigger component (610) in advance, so that the cantilever crane (3210) moves along the third slide rail (3121) to avoid the hanging part; The trigger assembly (610) comprises an insulating column (6110), a movable plate (6120), a first conductive block (6130), a second conductive block (6140) and a battery (6150); wherein the insulating column (6110) is vertically arranged on the main body of the cantilever hanger (3210); the insulating column (6110) is provided with a sliding cavity (6111) along its length direction; the first conductive block (6130) and the second conductive block (6140) are both slidably arranged in the sliding cavity (6111); the first conductive block (6130) is suspended in the sliding cavity (6111) by a compression spring (6131); the second conductive block (6140) is suspended in the sliding cavity (6111) by a tension spring (6131); 141) is supported on the sliding cavity (6111), and in a natural state, the first conductive block (6130) and the second conductive block (6140) are spaced apart and face each other; the insulating column (6110) is provided with a through slot (6112) along its length direction, one end of the movable plate (6120) is connected to the first conductive block (6130), and the other end thereof passes through the through slot (6112) horizontally and extends to the top of the hanging part of the cantilever crane (3210); the battery (6150) is installed on the main part of the cantilever crane (3210) and is electrically connected to the first conductive block (6130), and the second conductive block (6140) is electrically connected to the driving component (620).
2. The underground plant construction hoisting system according to claim 1, characterized in that: The first supporting assembly (110) comprises a rock wall beam, which is arranged opposite to the side wall of the upper middle part of the underground factory building (400), and the two ends of the first hoisting assembly (120) are respectively slidably matched with the rock wall beam.
3. The underground plant construction hoisting system according to claim 2 is characterized in that: The first hoisting assembly (120) includes a first bridge crane, the first bridge crane has a first sliding wheel (1210), the upper surface of the rock wall beam has a first sliding rail (1110), the first sliding rail (1110) is arranged along the axial direction of the underground factory building (400), and the first sliding wheel (1210) is slidably matched with the first sliding rail (1110).
4. The underground plant construction hoisting system according to claim 1 is characterized in that: The second supporting assembly (210) comprises a column (2110) and a supporting portion (2120); the column (2110) is arranged opposite to the upper side wall of the underground factory building (400); the supporting portion (2120) is arranged on the side wall of the column (2110) close to the top; and the two ends of the second lifting assembly (220) are respectively slidably matched with the supporting portion (2120).
5. The underground plant construction hoisting system according to claim 4 is characterized in that: The second lifting assembly (220) includes a second bridge crane, the second bridge crane has a second sliding wheel (2210), the upper surface of the support part (2120) has a second slide rail (2121), the second slide rail (2121) is arranged along the axial direction of the underground factory building (400), and the second sliding wheel (2210) is slidably matched with the second slide rail (2121).
6. The underground plant construction hoisting system according to claim 1, characterized in that: The driving assembly (620) comprises a driving motor (6210) and a gear (6220), wherein the driving motor (6210) is mounted on the lower end of the main body of the cantilever crane (3210), and the gear (6220) is coaxially arranged on the output shaft of the driving motor (6210); The upper surface of the bracket (3120) is provided with a rack (700) extending along the axial direction of the underground factory building (400), and the gear (6220) is meshed with the rack (700).