Mesh belt continuous soft magnetic material treatment furnace and preparation process thereof
By combining a hot air preheater and a heating furnace in a soft magnetic material processing furnace, and using magnetic field induction heating and circulating fan technology, the problem of temperature instability during the heating process of soft magnetic materials is solved, achieving rapid and uniform heating and efficient production, improving improve material performance and production efficiency.
Patent Information
- Application Number
- CN202411230482.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-09-04
AI Technical Summary
It is difficult to ensure the stability of the temperature of soft magnetic materials during the heating process, resulting in local overheating or underheating, which affects the heat treatment effect.
A mesh belt continuous soft magnetic material processing furnace is designed, which uses a combination of hot air preheater and heating furnace, uses the principle of magnetic field induction heating and circulating fan to heat the fins, and preheats and heats the fins through multi-layer settings and The evacuation groove ensures the temperature uniformity and efficiency of the soft magnetic material during the heating process, and the anti-sticking device removes stuck materials on the conveyor belt.
It achieves rapid and uniform heating of soft magnetic materials during heat treatment, ensuring that the material reaches the required temperature in a short time, improving production efficiency and performance, reducing subsequent processing steps, and saving production costs and time.
Smart Images

Figure CN118726730A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of soft magnetic material processing furnaces, in particular to a mesh belt continuous soft magnetic material processing furnace and a preparation process thereof. Background Art
[0002] Soft magnetic materials are magnetic materials with low coercive force and high magnetic permeability. Soft magnetic materials are easy to magnetize and demagnetize, and are widely used in electrical and electronic equipment. Common soft magnetic materials include iron-silicon alloys (silicon steel sheets) and various soft ferrites. They have the characteristics of narrow and steep hysteresis loops, nearly reversible magnetization process, small hysteresis loss, high magnetic permeability, and low coercive force. Due to the particularity of soft magnetic materials, in order to adapt to mass production and continuous operation, mesh belt continuous soft magnetic material processing furnaces are often used to heat treat soft magnetic materials. Continuous operation is adopted, and the materials are conveyed by mesh belts in sequence through different heat treatment processes, such as annealing, quenching, tempering, etc., to achieve the purpose of changing the magnetic properties of the materials.
[0003] When soft magnetic materials are subjected to heat treatment, they need to be fed slowly to ensure the heat treatment efficiency. During this process, the temperature of the soft magnetic materials during heat treatment needs to be gradually adjusted. Therefore, it is difficult to ensure stable treatment of the materials during the entire processing process, which can easily lead to local overheating or underheating of the materials, thereby affecting the heat treatment effect. Summary of the invention
[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: In the first aspect, a mesh belt continuous soft magnetic material processing furnace includes a frame, which serves as a basic structure to support and fix the entire equipment. A conveyor mesh belt is installed on the frame, and the conveyor mesh belt is used to smoothly convey the soft magnetic material to ensure that it passes through each processing area continuously. The conveyor mesh belt includes a servo motor, a roller, a transmission chain, a heat-resistant mesh belt, etc., but is not limited to this. Among them, the heat-resistant mesh belt is made of heat-resistant steel sheets, and the heat-resistant mesh belt is sleeved on the outside of the roller, and the heat-resistant steel sheets are evenly spaced on the outer edge surface of the roller to form a heat-resistant mesh belt. The conveyor mesh belt is used to carry and convey the soft magnetic material. A pre- A heating furnace, wherein the preheating furnace is used to form a space for preheating soft magnetic materials, preliminarily heat the soft magnetic materials, and improve the efficiency of subsequent heating. A hot air preheater is installed on the top of the preheating furnace, and the hot air preheater is used to heat the soft magnetic materials sent to the preheating furnace. The gas is heated by electric heating to reduce energy consumption and environmental pollution, and improve the preheating effect of the soft magnetic materials. A heating furnace is fixedly installed on one side of the preheating furnace, and the heating furnace is used to heat the preheated soft magnetic materials, providing the main heating function so that the soft magnetic materials reach the required temperature. An anti-jamming device is installed at the feeding end of the frame, and the anti-jamming device is used to remove the soft magnetic materials stuck on the conveyor belt; Wherein, the hot air preheater comprises an electromagnetic hot air furnace, which provides an efficient heating source, the bottom surface of the electromagnetic hot air furnace is connected to the top of the preheating furnace, a circulating fan is installed on the top of the electromagnetic hot air furnace, the circulating fan promotes the gas circulation in the furnace and ensures the temperature uniformity, an air delivery pipe is installed on the outer edge surface of the electromagnetic hot air furnace, the air delivery pipe is used to deliver hot air, an air gathering pipe is installed on the output end of the air delivery pipe, the air gathering pipe is used to gather gas, an upper exhaust pipe is installed on the top of the inner surface of the air gathering pipe, and a lower exhaust pipe is installed on the bottom of the inner surface of the air gathering pipe, and the upper exhaust pipe and the lower exhaust pipe simultaneously blow air to preheat the soft magnetic material on the conveying mesh belt; The electromagnetic hot air furnace includes a furnace body, which forms a heating space to maintain a certain temperature and environment. The bottom surface of the furnace body is fixed to the top of the preheating furnace, the outer edge surface of the circulating fan is fixed to the top inner wall of the furnace body, and heating fins are fixedly installed on the inner edge surface of the furnace body. The heating fins are located below the circulating fan. The heating fins increase the heat exchange area and improve the heating effect. The heating fins are inclined, and the surfaces of the heating fins are provided with evacuation grooves arranged at equal intervals. The evacuation grooves are conducive to the evacuation and uniform distribution of gas. The inner walls of the evacuation grooves are provided with exhaust slots that are arranged through, and the exhaust slots are used to discharge gas to improve the heat exchange effect.
[0005] Preferably, the heating fins are symmetrically arranged about the center line of the furnace body, and a heat-conducting arc plate is fixedly connected between the symmetrically arranged heating fins, the heat-conducting arc plate is used to guide heat transfer to ensure uniform heating, the heat-conducting arc plates are evenly spaced and distributed on the sides of the heating fins, a connecting groove is opened on the outer edge surface of the furnace body, the inner wall of the connecting groove is fixed to the input end of the gas pipe, and the connecting groove realizes the connection between the furnace body and the gas pipe.
[0006] Preferably, the heating fins are provided in three groups arranged vertically, and sealing plates are fixedly connected between adjacent groups of the heating fins, the sealing plates serve as partitions, and the outer surface of the sealing plates is fixed to the inner edge surface of the furnace body.
[0007] Preferably, the gas gathering pipe includes an outer gas gathering shell, one side surface of the outer gas gathering shell is fixed to the outer edge surface of the frame, the output end of the gas transmission pipe extends to the interior of the outer gas gathering shell and is fixed to the top inner wall of the outer gas gathering shell, a gathering square tube is fixedly installed on the surface of the outer gas gathering shell in contact with the surface of the frame, the outer edge surface of the gathering square tube is fixed to the inner wall of the frame, and the inner side of the gathering square tube slides with the outer surface of the conveyor mesh belt, and the outer gas gathering shell and the gathering square tube are a gas gathering structure.
[0008] Preferably, the upper exhaust pipe includes a first transverse pipe, which is a gas delivery channel. The two end portions of the first transverse pipe are fixed to the top of the inner cavity surface of the gathering square tube. The first transverse pipe extends to the edge position inside the gathering square tube and is fixedly installed with an air guide inclined plate. The bottom surface of the first transverse pipe is fixedly installed with a first guide plate, which guides the flow direction of the gas. A first air supply port is provided on the outer edge surface of the first guide plate, which is a gas output port, and the first air supply ports are evenly spaced on the first guide plate. An adjusting arc plate is provided at the edge of the outlet of the first air supply port, which is used to adjust the direction of the airflow, and the top of the adjusting arc plate is fixed to the outer edge surface of the first guide plate.
[0009] Preferably, the lower exhaust pipe includes a second transverse pipe, both end portions of the second transverse pipe are fixed to the bottom end of the inner cavity surface of the gathering square tube, a second guide plate is fixedly installed on the top of the second transverse pipe, and second air supply ports arranged at equal intervals are opened on the outer edge surface of the second guide plate.
[0010] Preferably, the anti-jamming device includes a material guide plate, which guides the conveying direction of the material, and both ends of the material guide plate are fixed to the inner surface of the frame. A pushing clamp is installed on the inner side of the material guide plate, and a scraper is connected to the end of the pushing clamp away from the material guide plate. The scraper is used to remove soft magnetic materials stuck on the conveyor mesh belt, and the outer edge surface of the scraper is in contact with the outer edge surface of the conveyor mesh belt. The pushing clamp is used to push the scraper to make it close to the conveyor mesh belt.
[0011] Preferably, the scraper includes a rotating plate, which is a rotatable plate, and both ends of the rotating plate rotate with the inner surface of the frame, and the bottom surface of the rotating plate is fixedly installed with a first scraper and a second scraper, the inner arc surface of the first scraper slides with the outer edge surface of the conveyor mesh belt, the outer edge surface of the second scraper slides with the inner wall of the conveyor mesh belt, the outer edge surfaces of the first scraper and the second scraper are fixed, and the first scraper and the second scraper are used to scrape off the soft magnetic material stuck in the gap on the conveyor mesh belt.
[0012] Preferably, the pushing and clamping member includes an outer cylinder, which is an external cylindrical structure and plays a protective and supporting role. One end of the outer cylinder is fixed to the inner surface of the guide plate, and a limiting ring is fixedly installed on the inner edge surface of the end of the outer cylinder away from the guide plate. The inner edge surface of the limiting ring is adaptively slid with a push rod, one end of the push rod extends to the inside of the outer cylinder and is fixedly connected with a spring member, which provides an elastic restoring force, and the outer edge surface of the spring member slides with the inner edge surface of the outer cylinder, and one end of the spring member away from the push rod is fixed to the inner cavity surface of the outer cylinder, and the end of the push rod away from the outer cylinder is hinged with a bent plate, and one end of the bent plate away from the push rod is fixed to the outer surface of the first scraper.
[0013] In the second aspect, the mesh belt continuous soft magnetic material processing and preparation process comprises the following steps: Step 1: First, place the soft magnetic material to be processed on the conveyor mesh belt and convey it to the space where the preheating furnace is located. Then, the high-temperature resistant heating fins are heated by the magnetic field induction heating principle. Then, the circulating fan is used to blow cold air, which is converted into hot air through the heating fins. The heating fins and the evacuation slots are used to increase the retention time of the cold air on the heating fins. Then, the hot air is sent to the outer gas gathering shell and the gathering square tube through the gas delivery pipe. Step 2: utilize the connection between the gathering square tube and the first transverse tube and the second transverse tube, cooperate with the air guide inclined plate to divide the hot air, and then use the first air supply port and the second air supply port to blow the hot air to the soft magnetic material on the conveyor mesh belt, and at the same time use the direction adjustment arc plate to redirect the hot air discharged from the first air supply port so that it can stably blow to the soft magnetic material in the conveying process, so as to preheat the soft magnetic material, steadily increase the temperature of the soft magnetic material, and then use the conveyor mesh belt to gradually send the soft magnetic material into the space at the heating furnace to heat treat the soft magnetic material; Step three, after the soft magnetic material is heat treated in the heating furnace, the soft magnetic material is discharged by means of a conveyor mesh belt for storage or subsequent processing, and then the first scraper is fitted onto the surface of the conveyor mesh belt, and the second scraper is inserted into the conveyor mesh belt. Under the elastic force of the spring member, the push rod and the bent plate are pushed toward the first scraper, forcing the first scraper and the second scraper to be close to the conveyor mesh belt, thereby increasing the friction between the first scraper and the second scraper and the conveyor mesh belt, and removing the soft magnetic material stuck in the conveyor mesh belt, and then the conveyor mesh belt is used to circulate and transport the soft magnetic material for heat treatment.
[0014] The present invention provides a mesh belt continuous soft magnetic material processing furnace and a preparation process thereof. It has the following beneficial effects: 1. The mesh belt continuous soft magnetic material processing furnace and its preparation process provide uniform heating through a hot air preheater, blow hot air to the soft magnetic material on the conveyor mesh belt, preheat the soft magnetic material, ensure that the soft magnetic material can quickly reach the required temperature during the heat treatment process, cooperate with the heating furnace to perform subsequent heat treatment operations on the preheated soft magnetic material, ensure the stable processing of the soft magnetic material, and utilize the setting of the conveyor mesh belt to transport the soft magnetic material in the form of a continuous production line, which can continuously process large quantities of soft magnetic materials, and cooperate with the contact between the anti-jamming device and the conveyor mesh belt to effectively remove the soft magnetic material stuck on the conveyor mesh belt, thereby effectively improving production efficiency.
[0015] 2. The mesh-belt continuous soft magnetic material processing furnace and its preparation process, through the setting of the hot air preheater, can control the heat treatment process of the soft magnetic material in the heating furnace in a shorter time, so that the performance of the soft magnetic material can be improved in a shorter time, reducing the subsequent processing steps, saving production costs and time, and utilizing the magnetic field induction heating principle to heat the high-temperature resistant heating fins, and then using the circulating fan to blow in cold air, and passing through the heating fins, the cold air is turned into hot air. In this process, with the multi-layer setting of the heating fins and the opening of the evacuation slots, the residence time of the cold air on the heating fins can be effectively increased, thereby ensuring the heat lifting efficiency of the cold air, and with the setting of the exhaust slots, it is convenient to disturb the air in the furnace body through turbulent flow, thereby ensuring the heating effect of the cold air, thereby ensuring the efficiency of the subsequent preheating treatment of the soft magnetic material.
[0016] 3. The mesh belt continuous soft magnetic material processing furnace and its preparation process, through the connection groove and the air pipe, guides the hot air to the outer gas gathering shell and the gathering square tube, utilizes the connection between the gathering square tube and the first transverse tube and the second transverse tube, cooperates with the setting of the air guide inclined plate to separate the hot air, and then cooperates with the opening of the first air supply port and the second air supply port to blow the hot air to the soft magnetic material on the conveyor mesh belt. In addition, by using the setting of the adjustment arc plate, the hot air discharged from the first air supply port can be redirected to stably blow to the soft magnetic material in the conveying process, thereby effectively improving the preheating efficiency of the soft magnetic material.
[0017] 4. The mesh belt continuous soft magnetic material processing furnace and its preparation process, through the fitting of the first scraper with the surface of the conveyor mesh belt, and the insertion of the second scraper in the conveyor mesh belt, under the elastic force of the spring part, the push rod and the bent plate are pushed toward the first scraper, so that the first scraper and the second scraper are close to the conveyor mesh belt, ensuring the friction between the first scraper and the second scraper and the conveyor mesh belt, and then removing the soft magnetic material stuck in the conveyor mesh belt, thereby improving the utilization efficiency of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the external structure of the mesh belt continuous soft magnetic material processing furnace and its preparation process of the present invention; Figure 2 It is a partial cross-sectional structural schematic diagram of the preheating furnace and the hot air preheater of the present invention; Figure 3 It is a schematic diagram of the partial cross-section structure of the circulating fan and the electromagnetic hot air furnace of the present invention; Figure 4 It is a partial structural schematic diagram of the electromagnetic hot air furnace of the present invention; Figure 5 It is a partial structural schematic diagram of the electromagnetic hot air furnace of the present invention; Figure 6 It is a schematic diagram of the three-dimensional structure of the gas collecting pipe, the upper exhaust pipe and the lower exhaust pipe of the present invention; Figure 7 It is a schematic diagram of the cross-sectional structure of the gas collecting pipe, the upper exhaust pipe and the lower exhaust pipe of the present invention; Figure 8 It is a partial structural schematic diagram of the upper exhaust pipe of the present invention; Fig. 9 It is a partial structural schematic diagram of the frame, conveyor belt and anti-jamming device of the present invention; Fig.10 It is a partial cross-sectional structural schematic diagram of the conveyor mesh belt and the anti-jamming device of the present invention; Fig.11 It is a schematic diagram of the partial cross-sectional structure of the scraping member and the pushing and clamping member of the present invention; Fig.12 The figure is a flow chart of the method of the present invention.
[0019] In the figure: 1, frame; 2, conveyor belt; 3, preheating furnace; 4, heating furnace; 5, hot air preheater; 51, circulating fan; 52, electromagnetic hot air furnace; 521, furnace body; 522, heating fins; 523, sealing plate; 524, evacuation slot; 525, connecting slot; 526, exhaust slot; 527, heat conduction arc plate; 53, gas transmission pipe; 54, gas gathering pipe; 541, outer gas gathering shell; 542, gathering square pipe; 55, upper exhaust pipe; 551, first horizontal pipe; 552 , the first guide plate; 553, the first air supply port; 554, the arc adjustment plate; 555, the air guide inclined plate; 56, the lower exhaust pipe; 561, the second transverse pipe; 562, the second guide plate; 563, the second air supply port; 6, the anti-jamming device; 61, the guide plate; 62, the scraper; 621, the rotating plate; 622, the first scraper; 623, the second scraper; 63, the push clamp; 631, the outer cylinder; 632, the bending plate; 633, the push rod; 634, the limit ring; 635, the spring member. DETAILED DESCRIPTION
[0020] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
[0021] The first embodiment, as Figures 1 to 5As shown, the present invention provides a technical solution: a mesh belt continuous soft magnetic material processing furnace, comprising a frame 1, a conveyor mesh belt 2 is installed on the frame 1, the conveyor mesh belt 2 is used to carry and transport soft magnetic materials, a preheating furnace 3 is fixedly installed on the top of the frame 1, the preheating furnace 3 is used to form a space for preheating soft magnetic materials, a hot air preheater 5 is installed on the top of the preheating furnace 3, the hot air preheater 5 is used to heat the soft magnetic materials sent to the preheating furnace 3, a heating furnace 4 is fixedly installed on one side of the preheating furnace 3, the heating furnace 4 is used to heat treat the preheated soft magnetic materials, and an anti-jamming device 6 is installed at the feeding end of the frame 1, and the anti-jamming device 6 is used to remove In addition to the soft magnetic materials stuck on the conveyor mesh belt 2, the hot air preheater 5 provides uniform heating, blows hot air to the soft magnetic materials on the conveyor mesh belt 2, and preheats the soft magnetic materials, ensuring that the soft magnetic materials can quickly reach the required temperature during the heat treatment process, and cooperates with the heating furnace 4 to perform subsequent heat treatment operations on the preheated soft magnetic materials to ensure stable processing of the soft magnetic materials. In addition, by using the setting of the conveyor mesh belt 2, the soft magnetic materials are transported in the form of a continuous production line, and a large number of soft magnetic materials can be continuously processed. In addition, the contact between the anti-jamming device 6 and the conveyor mesh belt 2 can effectively remove the soft magnetic materials stuck on the conveyor mesh belt 2; The hot air preheater 5 comprises an electromagnetic hot air furnace 52, the bottom surface of the electromagnetic hot air furnace 52 is connected to the top of the preheating furnace 3, a circulating fan 51 is installed on the top of the electromagnetic hot air furnace 52, an air supply pipe 53 is installed on the outer edge surface of the electromagnetic hot air furnace 52, an air collecting pipe 54 is installed at the output end of the air supply pipe 53, an upper exhaust pipe 55 is installed at the top of the inner surface of the air collecting pipe 54, and a lower exhaust pipe 56 is installed at the bottom of the inner surface of the air collecting pipe 54. Through the setting of the hot air preheater 5, the heat treatment process of the soft magnetic material in the heating furnace 4 is controlled in a relatively short time, so that the performance of the soft magnetic material can be improved in a relatively short time, and the subsequent processing steps are reduced. The electromagnetic hot air furnace 52 and the circulating fan 51 are used to heat the cold air, and then the air supply pipe 53 and the air collecting pipe 54 are used to guide the hot air, and the upper exhaust pipe 55 and the lower exhaust pipe 56 are used to blow to the soft magnetic material to perform preheating treatment on it. The electromagnetic hot air furnace 52 includes a furnace body 521, the bottom surface of the furnace body 521 is fixed to the top of the preheating furnace 3, the outer edge surface of the circulating fan 51 is fixed to the top inner wall of the furnace body 521, and heating fins 522 are fixedly installed on the inner edge surface of the furnace body 521. The heating fins 522 are located below the circulating fan 51, and the heating fins 522 are inclined. Evacuation grooves 524 arranged at equal intervals are opened on the surface of the heating fins 522, and the inner wall of the evacuation grooves 524 is opened with a through-set escape slot 526. The heating fins 522 are symmetrically arranged about the center line of the furnace body 521, and heat-conducting arc plates 527 are fixedly connected between the symmetrically arranged heating fins 522. The heat-conducting arc plates 527 are evenly spaced and distributed on the sides of the heating fins 522. A connecting groove 525 is opened on the outer edge surface of the furnace body 521. The inner wall of the connecting groove 525 is fixed to the input end of the air supply pipe 53, and the heating fins 522 are provided with three groups arranged up and down, and a sealing plate 523 is fixedly connected between adjacent groups of heating fins 522, and the outer surface of the sealing plate 523 is fixed to the inner edge surface of the furnace body 521. The high-temperature resistant heating fins 522 are heated by the principle of magnetic field induction heating, and then the circulating fan 51 is used to blow in cold air, and the cold air is converted into hot air through the heating fins 522. In this process, the multi-layer setting of the heating fins 522 and the opening of the evacuation grooves 524 can effectively increase the residence time of the cold air on the heating fins 522, thereby ensuring the heat lifting efficiency of the cold air, and the setting of the exhaust slots 526 can facilitate the turbulence treatment of the air in the furnace body 521 through turbulence, thereby ensuring the heating effect of the cold air.
[0022] During operation, the staff places the soft magnetic material to be processed on the conveyor mesh belt 2, and uses the conveyor mesh belt 2 to convey the soft magnetic material, and sends the soft magnetic material into the preheating furnace 3. At the same time, the high-temperature resistant heating fins 522 are heated by the magnetic field induction heating principle, and the circulating fan 51 blows in cold air, which is converted into hot air through the heating fins 522. The heating fins 522 and the evacuation slots 524 increase the retention time of the cold air on the heating fins 522, and the hot air is sent into the preheating furnace 3 through the air pipe 53. The air collecting pipe 54, and then the upper exhaust pipe 55 and the lower exhaust pipe 56 blow hot air to the soft magnetic material to preheat the soft magnetic material, and then the soft magnetic material is sent to the heating furnace 4 for heat treatment by the conveyor mesh belt 2. The conveyor mesh belt 2 is used to transport the soft magnetic material in the form of a continuous production line to continuously process large quantities of soft magnetic materials, and the anti-jamming device 6 is in contact with the conveyor mesh belt 2 to remove the soft magnetic material stuck on the conveyor mesh belt 2, and then the conveyor mesh belt 2 is used to circulate the soft magnetic material for heat treatment.
[0023] The second embodiment is based on the first embodiment. Figures 6 to 8As shown, the gas collecting pipe 54 includes an outer gas collecting shell 541, one side surface of the outer gas collecting shell 541 is fixed to the outer edge surface of the frame 1, the output end of the gas transmission pipe 53 extends to the inside of the outer gas collecting shell 541, and is fixed to the top inner wall of the outer gas collecting shell 541, and a collecting square tube 542 is fixedly installed on the surface of the outer gas collecting shell 541 that contacts the surface of the frame 1, the outer edge surface of the collecting square tube 542 is fixed to the inner wall of the frame 1, and the inner side of the collecting square tube 542 slides with the outer side surface of the conveyor mesh belt 2, and the hot air is guided and collected through the outer gas collecting shell 541 and the collecting square tube 542; The upper exhaust pipe 55 includes a first transverse pipe 551, and both ends of the first transverse pipe 551 are fixed to the top of the inner cavity surface of the gathering square pipe 542. The first transverse pipe 551 extends to the edge position of the gathering square pipe 542, and an air guide inclined plate 555 is fixedly installed. The bottom surface of the first transverse pipe 551 is fixedly installed with a first guide plate 552. The outer edge surface of the first guide plate 552 is provided with a first air supply port 553, and the first air supply ports 553 are evenly spaced on the first guide plate 552. The outlet edge position of the first air supply port 553 is provided with a direction adjustment arc plate 554, and the top of the direction adjustment arc plate 554 is fixed to the outer edge surface of the first guide plate 552. The lower exhaust pipe 56 includes a second transverse pipe 561, and both ends of the second transverse pipe 561 are fixed to the inner cavity of the gathering square pipe 542. The bottom ends of the surfaces are fixed, and a second guide plate 562 is fixedly installed on the top of the second transverse tube 561. Second air supply ports 563 arranged at equal intervals are provided on the outer edge surface of the second guide plate 562. The hot air is guided to the outer gas gathering shell 541 and the gathering square tube 542 through the connecting groove 525 and the air delivery pipe 53. The gathering square tube 542 is connected with the first transverse tube 551 and the second transverse tube 561, and the setting of the air guide inclined plate 555 is used to separate the hot air. The opening of the first air supply port 553 and the second air supply port 563 is used to blow the hot air toward the soft magnetic material on the conveying mesh belt 2. In addition, the setting of the adjustment arc plate 554 can be used to redirect the hot air discharged from the first air supply port 553 so that it can stably blow toward the soft magnetic material in the conveying process, thereby effectively improving the preheating efficiency of the soft magnetic material.
[0024] During operation, the hot air is guided to the outer gas gathering shell 541 and the gathering square tube 542 through the connection between the connecting groove 525 and the air delivery pipe 53, and the gathering square tube 542 is connected with the first transverse tube 551 and the second transverse tube 561, and the hot air is divided into directions in cooperation with the air guide inclined plate 555, and then the hot air is blown toward the soft magnetic material on the conveyor mesh belt 2 in cooperation with the opening of the first air supply port 553 and the second air supply port 563, and the hot air is redirected by the setting of the adjustment arc plate 554 so that it can be stably blown toward the soft magnetic material in the conveying process.
[0025] The third embodiment is based on the first and second embodiments. Figures 9 to 11As shown, the anti-jamming device 6 includes a guide plate 61, both ends of the guide plate 61 are fixed to the inner surface of the frame 1, a pushing clamp 63 is installed on the inner side of the guide plate 61, and a scraper 62 is connected to the end of the pushing clamp 63 away from the guide plate 61, and the outer edge surface of the scraper 62 contacts the outer edge surface of the conveyor mesh belt 2. The scraper 62 is pushed by the pushing clamp 63 so that the scraper 62 contacts the surface of the conveyor mesh belt 2 to remove the soft magnetic material stuck on the conveyor mesh belt 2; The scraper 62 includes a rotating plate 621, both ends of which rotate with the inner surface of the frame 1, and a first scraper 622 and a second scraper 623 are fixedly installed on the bottom surface of the rotating plate 621. The inner arc surface of the first scraper 622 slides with the outer edge surface of the conveyor mesh belt 2, and the outer edge surface of the second scraper 623 slides with the inner wall of the conveyor mesh belt 2. The outer edge surfaces of the first scraper 622 and the second scraper 623 are fixed, and the stuck soft magnetic material is removed by the first scraper 622 and the second scraper 623 being attached to the surface of the conveyor mesh belt 2. The push clamp 63 includes an outer cylinder 631, one end of the outer cylinder 631 is fixed to the inner surface of the guide plate 61, a limit ring 634 is fixedly installed on the inner edge surface of the end of the outer cylinder 631 away from the guide plate 61, and a push rod 633 is adaptively slidably provided on the inner edge surface of the limit ring 634. One end of the push rod 633 extends into the interior of the outer cylinder 631 and is fixedly connected to a spring member 635. The outer edge surface of the spring member 635 slides with the inner edge surface of the outer cylinder 631, and the end of the spring member 635 away from the push rod 633 is fixed to the inner cavity surface of the outer cylinder 631. The end of the push rod 633 away from the outer cylinder 631 is hinged with a bent plate 6 32. By fitting the first scraper 622 to the surface of the conveyor mesh belt 2 and cooperating with the insertion of the second scraper 623 in the conveyor mesh belt 2, the push rod 633 and the bent plate 632 are pushed toward the first scraper 622 under the elastic force of the spring member 635. The end of the bent plate 632 away from the push rod 633 is fixed to the outer surface of the first scraper 622. The first scraper 622 and the second scraper 623 are in close contact with the conveyor mesh belt 2 to ensure the friction between the first scraper 622 and the second scraper 623 and the conveyor mesh belt 2, thereby removing the soft magnetic material stuck in the conveyor mesh belt 2, thereby improving the utilization efficiency of the equipment.
[0026] During operation, through the fit between the first scraper 622 and the surface of the conveyor mesh belt 2, and the insertion of the second scraper 623 in the conveyor mesh belt 2, under the elastic force of the spring member 635, the push rod 633 and the bent plate 632 are pushed toward the first scraper 622, forcing the first scraper 622 and the second scraper 623 to be close to the conveyor mesh belt 2, thereby increasing the friction between the first scraper 622 and the second scraper 623 and the conveyor mesh belt 2, and removing the soft magnetic material stuck in the conveyor mesh belt 2.
[0027] The fourth embodiment, based on the first, second and third embodiments, please refer to Fig.12 As shown, the present invention also proposes a mesh belt continuous soft magnetic material processing and preparation process, comprising the following steps: Step 1: First, place the soft magnetic material to be processed on the conveyor mesh belt 2, and convey it to the space where the preheating furnace 3 is located. Then, the high-temperature resistant heating fins 522 are heated by the magnetic field induction heating principle. Then, the circulating fan 51 is used to blow cold air, and the cold air is converted into hot air through the heating fins 522. The heating fins 522 and the evacuation slots 524 are used to increase the retention time of the cold air on the heating fins 522. Then, the hot air is sent to the outer gas gathering shell 541 and the gathering square tube 542 through the gas delivery pipe 53. Step 2: utilize the connection between the gathering square tube 542 and the first transverse tube 551 and the second transverse tube 561, cooperate with the air guide inclined plate 555 to separate the hot air, and then use the first air supply port 553 and the second air supply port 563 to blow the hot air to the soft magnetic material on the conveyor mesh belt 2, and at the same time use the direction adjustment arc plate 554 to redirect the hot air discharged from the first air supply port 553 so that it stably blows to the soft magnetic material in the conveying process, so as to preheat the soft magnetic material, steadily increase the temperature of the soft magnetic material, and then use the conveyor mesh belt 2 to gradually send the soft magnetic material into the space of the heating furnace 4 to heat treat the soft magnetic material; Step three, after the soft magnetic material is heat treated in the heating furnace 4, the conveyor mesh belt 2 is used to discharge the soft magnetic material for storage or subsequent processing, and then the first scraper 622 is fitted with the surface of the conveyor mesh belt 2, and the second scraper 623 is inserted into the conveyor mesh belt 2. Under the elastic force of the spring member 635, the push rod 633 and the bent plate 632 are pushed toward the first scraper 622, forcing the first scraper 622 and the second scraper 623 to be close to the conveyor mesh belt 2, thereby increasing the friction between the first scraper 622 and the second scraper 623 and the conveyor mesh belt 2, and removing the soft magnetic material stuck in the conveyor mesh belt 2, and then the conveyor mesh belt 2 is used to circulate the soft magnetic material for heat treatment.
[0028] The working principle of the mesh belt continuous soft magnetic material processing furnace and its preparation process is described in detail below.
[0029] During use, the staff places the soft magnetic material to be processed on the conveyor mesh belt 2, and uses the conveyor mesh belt 2 to convey the soft magnetic material, and sends the soft magnetic material into the preheating furnace 3. At the same time, the high-temperature resistant heating fins 522 are heated by the magnetic field induction heating principle, and the circulating fan 51 is cooperated to blow cold air, and the cold air is turned into hot air through the heating fins 522. The heating fins 522 and the evacuation slots 524 are cooperated to increase the retention time of the cold air on the heating fins 522. The hot air is guided to the outer gas gathering shell 541 and the gathering square tube 542 through the connection between the connecting slot 525 and the air delivery pipe 53, and the gathering square tube 542 is connected with the first transverse tube 551 and the second transverse tube 561, and the air guide inclined plate 555 is cooperated to separate the hot air, and then the first air supply port 553 and the second air supply port 563 are opened to blow the hot air to the soft magnetic material on the conveyor mesh belt 2, and the arc adjustment plate 55 is used to adjust the direction of the hot air. 4 is set up, the hot air discharged from the first air supply port 553 is redirected to make it stably blow toward the soft magnetic material in the conveying process, the soft magnetic material is preheated, and then the soft magnetic material is sent to the heating furnace 4 for heat treatment by using the conveyor mesh belt 2, and the soft magnetic material is conveyed in the form of a continuous production line by using the conveyor mesh belt 2, and a large number of soft magnetic materials are continuously processed. Moreover, through the adhesion of the first scraper 622 to the surface of the conveyor mesh belt 2, and the insertion of the second scraper 623 in the conveyor mesh belt 2, under the elastic force of the spring member 635, the push rod 633 and the bent plate 632 are pushed toward the first scraper 622, forcing the first scraper 622 and the second scraper 623 to be close to the conveyor mesh belt 2, thereby increasing the friction between the first scraper 622 and the second scraper 623 and the conveyor mesh belt 2, and removing the soft magnetic material stuck in the conveyor mesh belt 2, and the conveyor mesh belt 2 is used to circulate and transport the soft magnetic material for heat treatment.
[0030] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.
Claims
1. Mesh belt continuous soft magnetic material processing furnace, characterized in that: The invention comprises a frame (1), a conveyor mesh belt (2) is installed on the frame (1), the conveyor mesh belt (2) is used to carry and convey soft magnetic materials, a preheating furnace (3) is fixedly installed on the top of the frame (1), the preheating furnace (3) is used to form a space for preheating soft magnetic materials, a hot air preheater (5) is installed on the top of the preheating furnace (3), the hot air preheater (5) is used to heat the soft magnetic materials sent to the preheating furnace (3), a heating furnace (4) is fixedly installed on one side of the preheating furnace (3), the heating furnace (4) is used to heat treat the preheated soft magnetic materials, and an anti-jamming device (6) is installed at the feeding end of the frame (1), the anti-jamming device (6) is used to remove the soft magnetic materials stuck on the conveyor mesh belt (2); The hot air preheater (5) comprises an electromagnetic hot air furnace (52), the bottom surface of the electromagnetic hot air furnace (52) is connected to the top of the preheating furnace (3), a circulating fan (51) is installed on the top of the electromagnetic hot air furnace (52), an air supply pipe (53) is installed on the outer edge surface of the electromagnetic hot air furnace (52), an air collecting pipe (54) is installed at the output end of the air supply pipe (53), an upper exhaust pipe (55) is installed at the top end of the inner surface of the air collecting pipe (54), and a lower exhaust pipe (56) is installed at the bottom end of the inner surface of the air collecting pipe (54); The electromagnetic hot air furnace (52) comprises a furnace body (521), the bottom surface of the furnace body (521) is fixed to the top of the preheating furnace (3), the outer edge surface of the circulating fan (51) is fixed to the top inner wall of the furnace body (521), heating fins (522) are fixedly installed on the inner edge surface of the furnace body (521), the heating fins (522) are located below the circulating fan (51), the heating fins (522) are inclined, and the surface of the heating fins (522) is provided with evacuation grooves (524) arranged at equal intervals, and the inner wall of the evacuation groove (524) is provided with a through-going escape notch (526).
2. The mesh belt continuous soft magnetic material processing furnace according to claim 1 is characterized in that: The heating fins (522) are symmetrically arranged about the center line of the furnace body (521), and heat-conducting arc plates (527) are fixedly connected between the symmetrically arranged heating fins (522). The heat-conducting arc plates (527) are evenly spaced and distributed on the sides of the heating fins (522). A connecting groove (525) is provided on the outer edge surface of the furnace body (521), and the inner wall of the connecting groove (525) is fixed to the input end of the gas supply pipe (53).
3. The mesh belt continuous soft magnetic material processing furnace according to claim 2 is characterized in that: The heating fins (522) are provided in three groups arranged vertically, and sealing plates (523) are fixedly connected between adjacent groups of the heating fins (522), and the outer surface of the sealing plate (523) is fixed to the inner edge surface of the furnace body (521).
4. The mesh belt continuous soft magnetic material processing furnace according to claim 1, characterized in that: The gas gathering pipe (54) comprises an outer gas gathering shell (541), one side surface of the outer gas gathering shell (541) is fixed to the outer edge surface of the frame (1), the output end of the gas delivery pipe (53) extends to the inside of the outer gas gathering shell (541) and is fixed to the top inner wall of the outer gas gathering shell (541), a gathering square tube (542) is fixedly installed on the surface of the outer gas gathering shell (541) that contacts the surface of the frame (1), the outer edge surface of the gathering square tube (542) is fixed to the inner wall of the frame (1), and the inner side of the gathering square tube (542) slides with the outer side surface of the conveyor mesh belt (2).
5. The mesh belt continuous soft magnetic material processing furnace according to claim 4, characterized in that: The upper exhaust pipe (55) comprises a first transverse pipe (551), the two end portions of the first transverse pipe (551) are fixed to the top of the inner cavity surface of the gathering square pipe (542), an air guide inclined plate (555) is fixedly installed on the edge position where the first transverse pipe (551) extends to the inside of the gathering square pipe (542), a first guide plate (552) is fixedly installed on the bottom surface of the first transverse pipe (551), a first air supply port (553) is provided on the outer edge surface of the first guide plate (552), and the first air supply ports (553) are evenly spaced on the first guide plate (552), and a direction adjusting arc plate (554) is provided at the air outlet edge position of the first air supply port (553), and the top of the direction adjusting arc plate (554) is fixed to the outer edge surface of the first guide plate (552).
6. The mesh belt continuous soft magnetic material processing furnace according to claim 5, characterized in that: The lower exhaust pipe (56) comprises a second transverse pipe (561), the two end portions of the second transverse pipe (561) are fixed to the bottom end of the inner cavity surface of the gathering square tube (542), a second guide plate (562) is fixedly mounted on the top of the second transverse pipe (561), and second air supply ports (563) arranged at equal intervals are provided on the outer edge surface of the second guide plate (562).
7. The mesh belt continuous soft magnetic material processing furnace according to claim 1, characterized in that: The anti-jamming device (6) comprises a material guide plate (61), both ends of which are fixed to the inner surface of the frame (1), a push clamp (63) is installed on the inner side of the material guide plate (61), and an end of the push clamp (63) away from the material guide plate (61) is connected to a scraper (62), and the outer edge surface of the scraper (62) is in contact with the outer edge surface of the conveyor mesh belt (2).
8. The mesh belt continuous soft magnetic material processing furnace according to claim 7, characterized in that: The scraper (62) comprises a rotating plate (621), the two ends of which rotate with the inner surface of the frame (1), and the bottom surface of the rotating plate (621) is fixedly mounted with a first scraper (622) and a second scraper (623), the inner arc surface of the first scraper (622) slides with the outer edge surface of the conveyor mesh belt (2), the outer edge surface of the second scraper (623) slides with the inner wall of the conveyor mesh belt (2), and the outer edge surfaces of the first scraper (622) and the second scraper (623) are fixed.
9. The mesh belt continuous soft magnetic material processing furnace according to claim 8, characterized in that: The push-clamp member (63) comprises an outer cylinder (631), one end of the outer cylinder (631) is fixed to the inner surface of the guide plate (61), a limit ring (634) is fixedly installed on the inner edge surface of the end of the outer cylinder (631) away from the guide plate (61), a push rod (633) is adaptively slidably arranged on the inner edge surface of the limit ring (634), one end of the push rod (633) extends into the interior of the outer cylinder (631) and is fixedly connected to a spring A spring member (635) is provided, wherein the outer edge surface of the spring member (635) slides with the inner edge surface of the outer cylinder (631), one end of the spring member (635) away from the push rod (633) is fixed to the inner cavity surface of the outer cylinder (631), and the end of the push rod (633) away from the outer cylinder (631) is hinged with a bent plate (632), and one end of the bent plate (632) away from the push rod (633) is fixed to the outer surface of the first scraper (622).
10. A mesh belt continuous soft magnetic material processing and preparation process, characterized in that: The following steps are involved: Step 1: firstly, the soft magnetic material to be processed is placed on the conveyor mesh belt (2) and conveyed so that the soft magnetic material is conveyed to the space where the preheating furnace (3) is located, and then the high-temperature resistant heating fins (522) are heated by using the magnetic field induction heating principle, and then the circulating fan (51) is used to blow cold air, and the cold air is converted into hot air through the heating fins (522). The heating fins (522) and the evacuation slots (524) are used to increase the retention time of the cold air on the heating fins (522), and then the hot air is sent to the outer gas gathering shell (541) and the gathering square tube (542) through the gas transmission pipe (53); Step 2: utilizing the connection between the gathering square tube (542) and the first transverse tube (551) and the second transverse tube (561), cooperating with the air guide inclined plate (555) to separate the hot air, and then utilizing the first air supply port (553) and the second air supply port (563) to blow the hot air toward the soft magnetic material on the conveying mesh belt (2); at the same time utilizing the direction adjustment arc plate (554) to redirect the hot air discharged from the first air supply port (553) so that it is stably blown toward the soft magnetic material in the conveying process, so as to preheat the soft magnetic material and steadily increase the temperature of the soft magnetic material; and then utilizing the conveying mesh belt (2) to gradually deliver the soft magnetic material into the space at the heating furnace (4) to heat treat the soft magnetic material; Step 3: After the soft magnetic material is heat treated in the heating furnace (4), the soft magnetic material is discharged by means of the conveyor mesh belt (2) for storage or subsequent processing. Then, the first scraper (622) is fitted onto the surface of the conveyor mesh belt (2) and the second scraper (623) is inserted into the conveyor mesh belt (2). Under the elastic force of the spring member (635), the push rod (633) and the bent plate (632) are pushed toward the first scraper (622), forcing the first scraper (622) and the second scraper (623) to be in close contact with the conveyor mesh belt (2), thereby increasing the friction between the first scraper (622) and the second scraper (623) and the conveyor mesh belt (2), thereby removing the soft magnetic material stuck in the conveyor mesh belt (2), and then the conveyor mesh belt (2) is used to circulate and transport the soft magnetic material for heat treatment.
Citation Information
Patent Citations
Soft porcelain continuous type baking oven
CN107314653A
Heat treatment device for magnetic field of magnetic core of soft magnetic material
CN112779406A
Novel hot -blast tempering furnace
CN207811819U
Fin ventilation electromagnetism hot -blast furnace
CN207849740U
In succession mesh belt furnace's strickles device off
CN208087681U
Cited By
Heat treatment equipment and method for hexagonal nut production and processing
CN120210485A
Heat treatment mesh belt furnace for fastener treatment
CN122791152A