Bag type slowly-changing isolation type anti-drag cast-in-place pile and construction method thereof

By covering the surface of cast-in-place piles with a composite membrane structure, the problem of negative friction in construction in soft soil areas is solved, the stability and bearing capacity of the pile foundation are improved, the construction process is simplified and the cost is reduced.

CN118727720APending Publication Date: 2024-10-01BEIJING ZHONGYAN DADI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411039195.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When constructing in soft soil or filled areas, pile foundations are prone to negative friction, leading to increased load, reduced bearing capacity and uneven settlement, affecting structural safety and function. The existing technical methods have long construction period or high cost, and the effect of reducing negative friction is not complete.

Method used

The bladder-type slowly changing isolation type drag-reducing cast-in-place pile is used. By covering the surface of the cast-in-place pile with a composite membrane structure, including an isolation membrane, a support membrane and a reinforcing membrane, combined with the isolation bladder bag and grouting holes, an overall composite membrane structure is formed to reduce negative friction. Strength and enhance the bonding effect, using high-density sponge isolation membrane and geomembrane materials to enhance the concave and convex structure of the membrane and one-way check valve to achieve isolation and drag reduction between the pile body and the soil.

Benefits of technology

It effectively reduces negative friction, prevents the impact of pile foundation settlement on the structure, improves the bearing capacity and stability of the pile body, simplifies the construction process, reduces costs, and ensures the integrity of the drag reduction effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727720A_ABST
    Figure CN118727720A_ABST
Patent Text Reader

Abstract

The invention discloses a bag type slowly-changing isolation type anti-drag cast-in-place pile and a construction method thereof, and belongs to the technical field of pile foundation construction, the bag type slowly-changing isolation type anti-drag cast-in-place pile comprises a reinforcement cage, an isolation membrane, a supporting membrane, a reinforcing membrane and an isolation bag, the isolation membrane, the supporting membrane and the reinforcing membrane are bonded to form an integral composite membrane structure, and the isolation bag is connected with the reinforcing membrane through bonding. The width of the isolation bag after grouting is larger than the distance between the reinforcement cage and the in-situ soil body, the concrete is poured in the composite membrane structure and expands to form a cylindrical structure, and the tensile strength of the material of the isolation membrane is far smaller than the bonding strength between the isolation membrane and the supporting membrane and far smaller than the bonding strength between the isolation membrane and the outer surface of the cast-in-place pile. The construction method comprises the following steps: forming holes in the cast-in-place pile; lowering a reinforcement cage; grouting the isolation bag; and pouring concrete. The surface of the cast-in-place pile is covered with the composite film structure, so that the problem that the pile foundation is affected by settlement in the construction process of a soft soil area or a soil filling area and after construction is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pile foundation construction, and in particular relates to a capsule-type slowly changing isolation type drag reduction cast-in-place pile and a construction method thereof. Background Art

[0002] Pile foundations are widely used in the development of modern civil engineering because of their large vertical stiffness and bearing capacity, small settlement and ability to withstand certain horizontal loads. However, when constructing pile foundations in soft soil or special soil layers (such as deep fill layers), due to the self-weight consolidation of the soil around the pile body, collapsing or lowering of the groundwater level, surface overload and other reasons, the downward displacement of the soil around the pile is often greater than the downward displacement of the pile itself, so that the friction force acting on the pile body is downward, becoming a downward pull load acting on the side of the pile, that is, the so-called negative friction. The existence of negative friction increases the load on the pile, reduces the bearing capacity of the compressed pile, and may cause the building to tilt and crack due to excessive settlement, directly affecting the use function and safety performance of the engineering structure. Therefore, reducing the negative friction of the pile body has become a key issue of concern in the engineering community.

[0003] At present, the commonly used methods for eliminating negative friction resistance can be divided into two categories: one is to control the source of negative friction resistance, that is, to eliminate the harmfulness of the soil itself that is prone to generate negative friction through foundation treatment methods (strong compaction method, pre-compression consolidation, etc.). This method has a long construction period and is generally ineffective for deep soil layers; the second is to isolate the pile body from the soil around the pile. This method is more commonly used, including installing unloading sleeves, lowering protective casings, and driving isolation piles. This method has a more complicated processing technology, which increases the cost of pile production. While reducing negative friction, it also reduces positive friction.

[0004] In summary, for deep soft soil layers and backfilled land areas, the elimination technology of negative friction resistance still needs further research. Although many scholars have conducted a lot of research and achieved some results, the method for eliminating negative friction resistance is still incomplete. Based on this, the present invention proposes a capsule-type slowly changing isolation type drag reduction cast-in-place pile and its construction method. Summary of the invention

[0005] In view of the above technical problems existing in the prior art, the present invention proposes a capsule-type slow-changing isolation type drag reduction bored pile and its construction method, which overcomes the shortcomings of the prior art. The composite membrane structure is covered on the surface of the bored pile to eliminate the problem of the influence of settlement during and after construction in soft soil areas or fill areas on the pile foundation.

[0006] In order to achieve the above object, the present invention adopts the following technical solution: A bladder-type slowly changing isolation drag reduction bored pile comprises a steel cage, an isolation membrane, a support membrane, a reinforcement membrane and an isolation bag. From the side close to the steel cage to the side gradually away from the steel cage, they are the isolation membrane, the support membrane and the reinforcement membrane respectively. The isolation membrane and the support membrane are bonded to each other, and the support membrane and the reinforcement membrane are bonded to each other. The isolation membrane, the support membrane and the reinforcement membrane are bonded to form an overall composite membrane structure. The isolation bag is connected to the reinforcement membrane by bonding. A grouting hole and a one-way check valve are provided on the isolation bag. The grouting pipe is connected to the grouting hole on the isolation bag. After grouting, the width of the isolation bag is greater than the distance between the steel cage and the original soil. Concrete is poured in the composite membrane structure and expands into a cylindrical structure. The material tensile strength of the isolation membrane itself is much smaller than the bonding strength between the isolation membrane and the support membrane and much smaller than the bonding strength between the isolation membrane and the outer surface of the bored pile.

[0007] Preferably, the isolation membrane is a high-density sponge, and lubricant is adsorbed inside the isolation membrane.

[0008] Preferably, the supporting membrane is a single-layer geomembrane, the reinforcing membrane is a single-layer geomembrane, and a concave-convex protrusion is provided on a side of the reinforcing membrane away from the steel cage.

[0009] Preferably, the isolation bag is an annular structure or an elliptical structure, and the breaking strength and breaking elongation generated when the isolation bag is subjected to pressure are less than the breaking strength and breaking elongation that the isolation bag itself can withstand; the breaking strength of the materials of the supporting membrane, the reinforcing membrane and the isolation bag is not less than 2500N / m, and the breaking elongation is not less than 25%. The one-way check valve on the isolation bag is a switch for flow from the inside of the isolation bag to the outside, and vice versa. The opening pressure of the one-way check valve is 0.1MPa-0.5MPa.

[0010] Preferably, the tensile strength and the tearing strength of the lower part of the support membrane are greater than those of the upper part.

[0011] A method for constructing a capsule-type slowly changing isolation type drag reduction cast-in-place pile is constructed according to the following method: Step 1: Cast-in-place pile drilling Determine the location of the bored pile according to the design, and use rotary excavation and long spiral excavation to form the bored pile hole; Step 2: Lower the steel cage Make a steel cage that matches the bored pile hole. First, lower the steel cage below the neutral point. When the lowered steel cage is the same distance from the pile end to the neutral point, fix the lowest end of the composite membrane structure to the steel cage through a fixing strip, and bond the isolation bag to the lowest end of the composite membrane structure. Ensure that the isolation bag is located at the neutral point of the bored pile. Connect the grouting pipe to the grouting hole on the isolation bag. As the steel cage is lowered, the composite membrane structure gradually wraps around the surface of the steel cage. When the two sections of the steel cage are connected, the composite membrane structure on the lower steel cage overlaps and bonds with the composite membrane structure on the upper steel cage until all the steel cages are lowered to the specified depth. Step 3: Grouting of the isolation bag Inject grout into the isolation bag through the grouting pipe until the grouting pressure stabilizes between 0.1MPa-0.5MPa, then stop grouting; Step 4: Concrete pouring Pour concrete into the isolation membrane through the conduit until the concrete pouring volume reaches the design requirements, then stop pouring and complete the construction.

[0012] Preferably, the composite membrane structure on the lower steel cage overlaps the composite membrane structure on the upper steel cage, and the overlap length is 0.5m-1.5m; the isolation membrane in the composite membrane structure on the lower steel cage is removed within the overlap length, and the supporting membrane is directly bonded to the reinforcing membrane in the composite membrane structure on the upper steel cage, and finally the isolation membrane in the lower composite membrane structure is butt-jointed with the isolation membrane in the upper composite membrane structure; the bonding strength of the overlapping parts is greater than the self-strength of the supporting membrane and the reinforcing membrane.

[0013] Preferably, in order to avoid loose fit between the composite membrane structure and the surrounding soil after concrete pouring, bentonite or casing material is poured into the gap between the composite membrane structure and the in-situ soil before concrete pouring.

[0014] Beneficial technical effects brought by the present invention: The problem of the influence of settlement on the pile foundation during and after construction in soft soil or fill areas is eliminated by covering the surface of the cast-in-place pile with a composite membrane structure. The isolation membrane is set as a high-density sponge, and the tensile strength of the material itself is much smaller than the bonding strength between the isolation membrane and the support membrane and much smaller than the bonding strength between the isolation membrane and the outer surface of the cast-in-place pile. When the surrounding soil settles, the isolation membrane breaks and separates from the surface of the cast-in-place pile, thereby reducing the negative friction resistance. In addition, lubricants are adsorbed in the isolation membrane, which further increases the slip between the isolation membrane and the cast-in-place pile.

[0015] By setting an isolation bag at the neutral point, the bag can isolate substances below the neutral point from entering the outside of the isolation membrane after grouting. Even when pouring concrete, the concrete will not enter the outside of the isolation membrane. This ensures that the drag reduction membrane will not be affected by other substances, and will not cause concrete to enter the outside of the isolation membrane due to pouring concrete, resulting in the composite membrane structure inside and outside forming a whole, and then causing the composite membrane structure to become the internal structure of the cast-in-place pile, losing the drag reduction effect.

[0016] In addition, the outer surface of the reinforcement membrane is set to a concave-convex structure to increase the bonding between the reinforcement membrane and the surrounding soil. The support membrane is set to have a lower tensile strength and crack resistance greater than the upper part to prevent the lower part from being subjected to a greater lateral extrusion force than the upper part during concrete pouring. Therefore, the support membrane is set to a gradient structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a cross-sectional schematic diagram of the overall structure of a capsule-type slowly changing isolation drag reduction bored pile and a construction method thereof of the present invention; Figure 2 It is a schematic diagram of a composite membrane structure fixed on a steel cage in a capsule-type slowly changing isolation drag reduction cast-in-place pile and a construction method thereof of the present invention; Among them, 1-reinforcement cage, 2-composite membrane structure, 3-isolation bag, 4-fixing strip, 5-grouting pipe. DETAILED DESCRIPTION

[0018] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments: Example

[0019] like Figure 1-2 As shown, a bladder-type slowly changing isolation type drag reduction bored pile comprises a steel cage 1, an isolation membrane, a support membrane, a reinforcement membrane and an isolation bag 3. From the side close to the steel cage 1 to the side gradually away from the steel cage 1, they are the isolation membrane, the support membrane and the reinforcement membrane respectively. The isolation membrane and the support membrane are bonded to each other, and the support membrane and the reinforcement membrane are bonded to each other. The isolation membrane, the support membrane and the reinforcement membrane are bonded to form an overall composite membrane structure 2. The isolation bag 3 is connected to the reinforcement membrane by bonding. A grouting hole and a one-way check valve are provided on the isolation bag 3. The grouting pipe 5 is connected to the grouting hole on the isolation bag 3. After grouting, the width of the isolation bag 3 is greater than the distance between the steel cage 1 and the original soil. Concrete is poured in the composite membrane structure 2 and expands into a cylindrical structure. The material tensile strength of the isolation membrane itself is much smaller than the bonding strength between the isolation membrane and the support membrane and much smaller than the bonding strength between the isolation membrane and the outer surface of the bored pile.

[0020] Preferably, the isolation membrane is a high-density sponge, and lubricant is adsorbed inside the isolation membrane.

[0021] Preferably, the supporting membrane is a single-layer geomembrane, the reinforcing membrane is a single-layer geomembrane, and a concave-convex protrusion is provided on the side of the reinforcing membrane away from the steel cage 1 .

[0022] Preferably, the isolation bag 3 is a circular ring structure or an elliptical structure, and the breaking strength and breaking elongation generated when the isolation bag 3 is subjected to pressure are less than the breaking strength and breaking elongation that the isolation bag 3 itself can withstand; the breaking strength of the materials of the supporting membrane, the reinforcing membrane and the isolation bag 3 is not less than 2500N / m, and the breaking elongation is not less than 25%. The one-way check valve on the isolation bag 3 is a switch for flow from the inside of the isolation bag to the outside, and vice versa. The opening pressure of the one-way check valve is 0.1MPa-0.5MPa.

[0023] Preferably, the tensile strength and the tearing strength of the lower part of the support membrane are greater than those of the upper part.

[0024] A method for constructing a capsule-type slowly changing isolation type drag reduction cast-in-place pile is constructed according to the following method: Step 1: Cast-in-place pile drilling Determine the location of the bored pile according to the design, and use rotary excavation and long spiral excavation to form the bored pile hole; Step 2: Lower the steel cage 1 Make a steel cage 1 that matches the bored pile hole. First, lower the steel cage 1 below the neutral point. When the lowered steel cage 1 is at the same distance from the pile end to the neutral point, fix the lowermost end of the composite membrane structure 2 on the steel cage 1 through the fixing strip 4, and bond the isolation bag 3 to the lowermost end of the composite membrane structure 2 to ensure that the isolation bag 3 is located at the neutral point of the bored pile. The grouting pipe 5 is connected to the grouting hole on the isolation bag 3. As the steel cage 1 is lowered, the composite membrane structure 2 is gradually wrapped around the surface of the steel cage 1. When the two sections of the steel cage 1 are connected, the composite membrane structure 2 on the lower steel cage 1 is overlapped and bonded to the composite membrane structure 2 on the upper steel cage 1 until all the steel cages 1 are lowered to the specified depth. Step 3: Grouting of Isolation Bag 3 Grouting is performed into the isolation bag 3 through the grouting pipe 5 until the grouting pressure stabilizes between 0.1 MPa and 0.5 MPa, and then the grouting is stopped; Step 4: Concrete pouring Pour concrete into the isolation membrane through the conduit until the concrete pouring volume reaches the design requirements, then stop pouring and complete the construction.

[0025] Preferably, the composite membrane structure 2 on the lower steel cage 1 overlaps the composite membrane structure 2 on the upper steel cage 1, and the overlap length is 0.5m-1.5m; the isolation membrane in the composite membrane structure 2 on the lower steel cage 1 is removed within the overlap length, and the supporting membrane is directly bonded to the reinforcing membrane in the composite membrane structure 2 on the upper steel cage 1, and finally the isolation membrane in the lower composite membrane structure 2 is butt-jointed with the isolation membrane in the upper composite membrane structure 2; the bonding strength of the overlapping parts is greater than the self-strength of the supporting membrane and the reinforcing membrane.

[0026] Preferably, in order to avoid loose fit between the composite membrane structure 2 and the surrounding soil after concrete pouring, bentonite or casing material is poured into the gap between the composite membrane structure 2 and the in-situ soil before concrete pouring.

[0027] All the physical position relationships between inside and outside, up and down in the text are the same as the actual situation in life.

[0028] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.

Claims

1. A capsule-type slowly changing isolation type drag reduction cast-in-place pile, characterized in that: It includes a steel cage, an isolation membrane, a support membrane, a reinforcement membrane, and an isolation bag. From the side close to the steel cage to the side gradually away from the steel cage, they are the isolation membrane, support membrane, and reinforcement membrane respectively. The isolation membrane and the support membrane are bonded and connected, and the support membrane and the reinforcement membrane are bonded and connected. The isolation membrane, the support membrane and the reinforcement membrane are bonded to form an overall composite membrane structure. The isolation bag is connected to the reinforcement membrane by bonding. Grouting holes and a one-way check valve are provided on the isolation bag. The grouting pipe is connected to the grouting holes on the isolation bag. The width of the isolation bag after grouting is greater than the distance between the steel cage and the original soil. Concrete is poured in the composite membrane structure and expands into a cylindrical structure. The material tensile strength of the isolation membrane itself is much smaller than the bonding strength between the isolation membrane and the support membrane and much smaller than the bonding strength between the isolation membrane and the outer surface of the cast-in-place pile.

2. The capsule-type slowly changing isolation drag reduction bored pile according to claim 1, characterized in that: The isolation membrane is a high-density sponge, and lubricant is adsorbed inside the isolation membrane.

3. The capsule-type slowly changing isolation drag reduction bored pile according to claim 1, characterized in that: The supporting membrane is a single-layer geomembrane, the reinforcing membrane is a single-layer geomembrane, and a concave-convex protrusion is arranged on the side of the reinforcing membrane away from the steel cage.

4. The capsule-type slowly changing isolation drag reduction bored pile according to claim 1, characterized in that: The isolation bag has a circular ring structure or an elliptical structure. The breaking strength and breaking elongation generated when the isolation bag is subjected to pressure are less than the breaking strength and breaking elongation that the isolation bag itself can withstand; the breaking strength of the supporting membrane, reinforcing membrane and isolation bag materials is not less than 2500N / m, and the breaking elongation is not less than 25%. The one-way check valve on the isolation bag is a switch for flow from the inside of the isolation bag to the outside, and vice versa. The opening pressure of the one-way check valve is 0.1MPa-0.5MPa.

5. The capsule-type slowly changing isolation drag reduction bored pile according to claim 1, characterized in that: The tensile strength and crack resistance of the lower part of the support membrane are greater than those of the upper part.

6. A method for constructing a capsule-type slowly changing isolation type drag reduction bored pile, characterized in that: Carry out construction as follows: Step 1: Cast-in-place pile drilling Determine the location of the bored pile according to the design, and use rotary excavation and long spiral excavation to form the bored pile hole; Step 2: Lower the steel cage Make a steel cage that matches the bored pile hole. First, lower the steel cage below the neutral point. When the lowered steel cage is the same distance from the pile end to the neutral point, fix the lowest end of the composite membrane structure to the steel cage through a fixing strip, and bond the isolation bag to the lowest end of the composite membrane structure. Ensure that the isolation bag is located at the neutral point of the bored pile. Connect the grouting pipe to the grouting hole on the isolation bag. As the steel cage is lowered, the composite membrane structure gradually wraps around the surface of the steel cage. When the two sections of the steel cage are connected, the composite membrane structure on the lower steel cage overlaps and bonds with the composite membrane structure on the upper steel cage until all the steel cages are lowered to the specified depth. Step 3: Grouting of the isolation bag Inject grout into the isolation bag through the grouting pipe until the grouting pressure stabilizes between 0.1MPa-0.5MPa, then stop grouting; Step 4: Concrete pouring Pour concrete into the isolation membrane through the conduit until the concrete pouring volume reaches the design requirements, then stop pouring and complete the construction.

7. The construction method of the capsule-type slowly changing isolation drag reduction bored pile according to claim 6 is characterized by: The composite membrane structure on the lower steel cage is overlapped with the composite membrane structure on the upper steel cage, and the overlap length is 0.5m-1.5m; the isolation membrane in the composite membrane structure on the lower steel cage is removed within the overlap length, and the supporting membrane is directly bonded to the reinforcing membrane in the composite membrane structure on the upper steel cage, and finally the isolation membrane in the lower composite membrane structure is butt-jointed with the isolation membrane in the upper composite membrane structure; the bonding strength of the overlapping parts is greater than the self-strength of the supporting membrane and the reinforcing membrane.

8. The construction method of the capsule-type slowly changing isolation drag reduction bored pile according to claim 6 is characterized by: In order to avoid the composite membrane structure from being loosely fitted to the surrounding soil after concrete pouring, bentonite or casing material is poured into the gap between the composite membrane structure and the in-situ soil before concrete pouring.