Method for removing cast-in-place pile
By setting the positioning component and the casing assembly on the surface of the cast-in-place pile stratum, the cast-in-place pile is broken and dug out, which solves the weight and safety issues of the cast-in-place pile, realizes a simple and safe removal process, and improves the stability of the stratum.
Patent Information
- Application Number
- CN202410848853.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-01
AI Technical Summary
In the prior art, cast-in-place piles are heavier and larger in size, making them difficult to lift out and less safe.
A positioning component is set on the surface of the stratum where the cast-in-place pile is located, and the casing component is set on the outside of the cast-in-place pile through the positioning hole. The geological body is dug out and the cast-in-place pile is broken. The broken cast-in-place pile is dug out from the casing component and then backfilled with the geology. body and pull out the casing assembly.
The broken cast-in-place piles are used to excavate fragments, which avoids the difficulty of lifting out the entire pile and improves safety and reliability. The holes are closed by backfilling the geological body to prevent stratum instability and personnel danger.
Smart Images

Figure CN118727740A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a method for removing a cast-in-place pile. Background Art
[0002] The current method for removing bored piles is usually to bury a casing outside the bored pile in the stratum where the bored pile is located, dig out the geological body between the casing and the bored pile, and then lift the bored pile out with a lifting device to complete the removal of the bored pile. However, due to the heavy weight and large size of the bored pile, it is difficult to lift it out and the safety is low. Summary of the invention
[0003] The main purpose of the present invention is to provide a method for removing a cast-in-place pile, aiming to solve the technical problems in the prior art that the cast-in-place piles are heavy and large in size, making it difficult to lift them out and having low safety.
[0004] To achieve the above object, the present invention adopts the following technical solution:
[0005] In a first aspect, the present invention provides a method for removing a cast-in-place pile, the method comprising:
[0006] A positioning assembly is arranged on the surface of the stratum where the cast-in-place pile is located; wherein the positioning assembly is formed with a positioning hole, the hole diameter of the positioning hole is larger than the pile diameter of the cast-in-place pile, and the positioning hole ring is arranged on the outer side of the cast-in-place pile;
[0007] The casing assembly is passed through the positioning hole and placed downwardly in the stratum and sleeved on the outside of the cast-in-place pile; wherein the inner diameter of the casing assembly is larger than the pile diameter of the cast-in-place pile;
[0008] digging out the geological body between the casing assembly and the cast-in-place pile;
[0009] placing a breaker hammer into the casing assembly and breaking the cast-in-place pile;
[0010] digging the broken cast-in-place pile out of the casing assembly;
[0011] backfilling a geological body into the casing assembly;
[0012] The casing assembly is pulled upward out of the formation.
[0013] Optionally, the step of placing the casing assembly downwardly along the positioning hole into the stratum and sleeved on the outside of the cast-in-place pile comprises:
[0014] The casing assembly is driven to rotate by a full-rotation drilling rig, so that the casing assembly passes through the positioning hole, drills downward into the stratum, and is sleeved on the outside of the cast-in-place pile;
[0015] The step of placing a breaker hammer into the casing assembly and breaking the cast-in-place pile comprises:
[0016] placing a breaker hammer into the casing assembly;
[0017] The casing assembly is driven to rotate again by the full-rotation drilling rig to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile.
[0018] Optionally, before the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile, the step further includes:
[0019] A counterweight assembly is arranged around the surface of the stratum where the cast-in-place pile is located, and the full-rotation drilling rig is connected to the counterweight assembly to counterweight the full-rotation drilling rig.
[0020] Optionally, before the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile, the step further includes:
[0021] A reaction force assembly is arranged around the surface of the stratum where the cast-in-place pile is located, and the full-rotation drilling rig is connected to the reaction force assembly to offset the reaction force generated by the casing assembly on the full-rotation drilling rig when the full-rotation drilling rig rotates the casing assembly.
[0022] Optionally, before the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile, the step further includes:
[0023] A plurality of standard pipe sections are sequentially spliced together to form the casing assembly, wherein the standard pipe section located at the outermost end of the casing assembly is a cutter head section;
[0024] The step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole, drills downward into the stratum and is sleeved on the outside of the cast-in-place pile comprises:
[0025] Lifting the sleeve assembly so that the cutter head segment is located at the bottom of the sleeve assembly, and passing the cutter head segment through the positioning hole;
[0026] The casing assembly is driven to rotate by the full-rotation drilling rig, so as to drill downward into the formation through the rotation of the cutter head section, thereby driving the casing assembly to drill downward into the formation and be sleeved on the outside of the cast-in-place pile.
[0027] Optionally, the step of digging out the geological body between the casing assembly and the cast-in-place pile comprises:
[0028] The geological body between the casing assembly and the cast-in-place pile and located above the preset height of the bottom of the cutter head section is excavated.
[0029] Optionally, the preset height is greater than or equal to 6m.
[0030] Optionally, the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile includes:
[0031] The casing assembly is driven to rotate at a first rotation speed by a full-rotation drilling rig, so that the casing assembly passes through the positioning hole, drills downward into the stratum, and is sleeved on the outside of the cast-in-place pile;
[0032] The step of driving the casing assembly to rotate again by the full-rotation drilling rig to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile comprises:
[0033] The casing assembly is driven to rotate at a second rotation speed by the full-rotation drilling rig again, so as to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile;
[0034] Wherein, the first rotation speed and the second rotation speed are both 3 r / min to 5 r / min.
[0035] Optionally, before the step of setting a positioning assembly on the surface of the stratum where the cast-in-place pile is located, the method further comprises:
[0036] The surface of the stratum where the cast-in-place pile is located and the surface of the stratum around it are leveled.
[0037] Optionally, the step of backfilling the geological body into the casing assembly comprises:
[0038] The casing assembly is backfilled with geological bodies and concrete.
[0039] The above one or more technical solutions provided by the present invention may have the following advantages or at least achieve the following technical effects:
[0040] The present invention proposes a method for removing a cast-in-place pile. By setting a positioning component on the surface of the stratum where the cast-in-place pile is located, the casing component can be quickly positioned through the positioning hole of the positioning component, so that the casing component is sleeved on the outside of the cast-in-place pile. After the casing component is buried in the stratum and sleeved on the outside of the cast-in-place pile, the geological body between the casing component and the cast-in-place pile is dug out to the outside of the casing component, the cast-in-place pile is crushed by a breaker, and then the crushed cast-in-place pile is dug out, so as to complete the removal of the cast-in-place pile. By crushing the cast-in-place pile into fragments and then digging out the fragments, there is no need to hoist the entire cast-in-place pile, which is simple, convenient and relatively safe. After the crushed cast-in-place pile is dug out, the geological body is backfilled into the casing component, and the hole formed by the geological body dug out in the casing component and the crushed cast-in-place pile can be closed, providing support for the stratum where the cast-in-place pile is located and the surrounding stratum to prevent it from becoming unstable, with higher reliability, and after the hole is closed, people can be prevented from falling in, with higher safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0042] Figure 1 It is a schematic flow chart of a first embodiment of a method for removing a cast-in-place pile according to the present invention;
[0043] Figure 2 It is a detailed flow chart of step S400 in the first embodiment of the method for removing a cast-in-place pile of the present invention.
[0044] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] It should be noted that in the embodiments of the present invention, all directional indications (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0047] In the present invention, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "includes..." does not exclude the presence of other identical elements in the process, method, article or system including the element. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B.
[0048] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixed", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection between two elements or the interaction relationship between two elements.
[0049] In the present invention, if there is a description involving "first", "second", etc., the description of "first", "second", etc. is only used for descriptive purposes and cannot be understood as indicating or implying its relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.
[0050] In the present invention, suffixes such as "module", "component", "piece", "component" or "unit" used to represent elements are used only to facilitate the description of the present invention and have no specific meanings. Therefore, "module", "component" or "unit" may be used in a mixed manner.
[0051] For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, the technical solutions of various embodiments can be combined with each other, but this is based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the protection scope required by the present invention.
[0052] The inventive concept of the present invention is further described below in conjunction with some specific implementation methods.
[0053] The present invention provides a method for removing a cast-in-place pile, and the method for removing a cast-in-place pile comprises:
[0054] Step S100, a positioning assembly is arranged on the surface of the stratum where the cast-in-place pile is located; wherein the positioning assembly is formed with a positioning hole, the diameter of the positioning hole is larger than the pile diameter of the cast-in-place pile, and the positioning hole ring is arranged on the outer side of the cast-in-place pile;
[0055] Step S200, placing a casing assembly through the positioning hole downward into the stratum and sleeved on the outside of the cast-in-place pile; wherein the inner diameter of the casing assembly is larger than the pile diameter of the cast-in-place pile;
[0056] Step S300, digging out the geological body between the casing assembly and the cast-in-place pile;
[0057] Step S400, placing a breaker hammer into the casing assembly and breaking the cast-in-place pile;
[0058] Step S500, digging out the broken cast-in-place pile from the casing assembly;
[0059] Step S600, backfilling the geological body into the casing assembly;
[0060] Step S700, pulling the casing assembly upward out of the formation.
[0061] Specifically, a positioning assembly is arranged on the surface of the stratum where the cast-in-place pile is located, and the casing assembly can be quickly positioned through the positioning hole of the positioning assembly, so that the casing assembly can be sleeved on the outside of the cast-in-place pile. After the casing assembly is buried in the stratum and sleeved on the outside of the cast-in-place pile, the geological body between the casing assembly and the cast-in-place pile is dug out to the outside of the casing assembly, the cast-in-place pile is crushed by a breaker, and then the crushed cast-in-place pile is dug out, so as to complete the removal of the cast-in-place pile. By crushing the cast-in-place pile into fragments and then digging out the fragments, there is no need to hoist the entire cast-in-place pile, which is simple, convenient and relatively safe. After the crushed cast-in-place pile is dug out, the geological body is backfilled into the casing assembly, and the hole formed by the geological body dug out in the casing assembly and the crushed cast-in-place pile can be closed, providing support for the stratum where the cast-in-place pile is located and the surrounding stratum to prevent it from becoming unstable, with higher reliability, and after the hole is closed, it can prevent people from falling in, with higher safety.
[0062] Reference Figure 1 , a schematic flow chart of a first embodiment of a method for removing a cast-in-place pile according to the present invention.
[0063] In one embodiment, step S200 includes:
[0064] Step S210, driving the casing assembly to rotate by a full-rotation drilling rig, so that the casing assembly passes through the positioning hole, drills downward into the stratum, and is sleeved on the outside of the cast-in-place pile;
[0065] Step S400 includes:
[0066] Step S410, placing a breaker hammer into the casing assembly;
[0067] Step S420, the casing assembly is driven to rotate again by the full-rotation drilling rig to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile.
[0068] Specifically, after placing the breaker hammer into the casing assembly, rotating the casing assembly can drive the breaker hammer in the casing assembly to rotate accordingly, thereby breaking the cast-in-place pile. There is no need to set up additional equipment to drive the breaker hammer to break the cast-in-place pile, which is convenient and simple.
[0069] In one embodiment, before step S210, the method further includes:
[0070] Step A001, arranging a counterweight assembly around the surface of the stratum where the cast-in-place piles are located, and connecting the full-rotation drilling rig to the counterweight assembly to counterweight the full-rotation drilling rig.
[0071] Specifically, by counterweighting the full-rotation drilling rig with the counterweight assembly, the full-rotation drilling rig can be installed on the formation more firmly and with higher safety.
[0072] In one embodiment, before step S210, the method further includes:
[0073] Step A002, setting a reaction force assembly around the surface of the stratum where the bored pile is located, and connecting the full-rotation drilling rig to the reaction force assembly to offset the reaction force generated by the casing assembly on the full-rotation drilling rig when the full-rotation drilling rig rotates the casing assembly.
[0074] Specifically, the reaction force generated by the full-rotation drilling rig when the casing assembly is driven to rotate can be offset by the reaction force assembly, and the full-rotation drilling rig can be prevented from overturning due to the reaction force, thereby improving reliability and safety.
[0075] Reference Figure 2 , Figure 2 It is a detailed flow chart of step S400 in the first embodiment of the method for removing a cast-in-place pile of the present invention.
[0076] In one embodiment, before step S420, the method further includes:
[0077] Step B001, splicing a plurality of standard pipe sections in sequence to form the casing assembly, wherein the standard pipe section located at the outermost end of the casing assembly is a cutter head section;
[0078] Step S420 includes:
[0079] Step S421, lifting the casing assembly so that the cutter head segment is located at the bottom of the casing assembly, and passing the cutter head segment through the positioning hole;
[0080] Step S422, driving the casing assembly to rotate by the full-rotation drilling rig, so as to drill downward into the formation by rotating the cutter head section, thereby driving the casing assembly to drill downward into the formation and be sleeved on the outside of the cast-in-place pile.
[0081] Specifically, the casing assembly is formed by assembling a plurality of standard pipe sections, which increases the flexibility and customizability of the casing assembly. According to actual needs, standard pipe sections of different lengths or different materials can be selected for splicing to adapt to strata of different depths and geological conditions, which is more flexible and versatile.
[0082] In one embodiment, step S300 includes:
[0083] Step S310: dig out the geological body between the casing assembly and the cast-in-place pile and located above a preset height at the bottom of the cutter head section.
[0084] Specifically, when digging out the geological body between the casing and the bored pile, only the geological body above the preset height at the bottom of the cutter head section can be dug out, which can effectively prevent groundwater from flowing into the casing assembly from the bottom of the cutter head section and causing instability in the stratum where the bored pile is located and the surrounding stratum, and has higher safety and reliability.
[0085] In one embodiment, the preset height is greater than or equal to 6m, and only the geological body more than 6m away from the bottom of the cutter head section can be excavated, which can further effectively prevent groundwater from flowing into the casing assembly from the bottom of the cutter head section and causing the stratum where the bored piles are located and the surrounding strata to become unstable, thereby improving safety and reliability.
[0086] In one embodiment, step S210 includes:
[0087] Step S2101, driving the casing assembly to rotate at a first rotation speed by a full-rotation drilling rig, so that the casing assembly passes through the positioning hole, drills downward into the stratum, and is sleeved on the outside of the cast-in-place pile;
[0088] Step S420 includes:
[0089] Step S4201, driving the casing assembly to rotate at a second rotation speed again by the full-rotation drilling rig, so as to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile;
[0090] Wherein, the first rotation speed and the second rotation speed are both 3 r / min to 5 r / min.
[0091] Specifically, the full-rotation drilling rig drives the casing assembly to rotate at 3r / min to 5r / min, so that the casing assembly passes through the positioning hole and drills downward into the formation and is sleeved on the outside of the bored pile. The full-rotation drilling rig drives the casing assembly to rotate at 3r / min to 5r / min, so as to drive the breaker hammer to rotate around the bored pile in the casing assembly to break the bored pile. This can avoid the casing assembly rotating too fast, causing the formation where the bored pile is located and the surrounding formation, and at the same time can ensure a certain drilling rig efficiency.
[0092] In one embodiment, before step S100, the method further includes:
[0093] Step B001, leveling the surface of the stratum where the bored pile is located and the surfaces of the stratum around it.
[0094] Specifically, leveling the surface of the stratum where the bored piles are located and the surface of the stratum surrounding them helps to improve construction efficiency and can also ensure construction safety with higher safety.
[0095] In one embodiment, step S600 includes:
[0096] Step S610, backfilling the geological body and concrete into the casing assembly, by backfilling the geological body and concrete into the casing assembly.
[0097] Specifically, backfilling the geological body and concrete into the casing assembly can provide better support effects for the stratum where the bored pile is located and the surrounding stratum, and has higher stability and reliability.
[0098] It should be noted that the serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages and disadvantages of the embodiments. The above embodiments are only optional embodiments of the present invention and do not limit the patent scope of the present invention. All equivalent structures or equivalent process changes made by using the contents of the present specification and drawings under the inventive concept of the present invention, or directly or indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.
Claims
1. A method for removing a cast-in-place pile, characterized in that: The method for removing the cast-in-place pile comprises: A positioning assembly is arranged on the surface of the stratum where the cast-in-place pile is located; wherein the positioning assembly is formed with a positioning hole, the hole diameter of the positioning hole is larger than the pile diameter of the cast-in-place pile, and the positioning hole ring is arranged on the outer side of the cast-in-place pile; The casing assembly is passed through the positioning hole and placed downwardly in the stratum and sleeved on the outside of the cast-in-place pile; wherein the inner diameter of the casing assembly is larger than the pile diameter of the cast-in-place pile; digging out the geological body between the casing assembly and the cast-in-place pile; placing a breaker hammer into the casing assembly and breaking the cast-in-place pile; digging the broken cast-in-place pile out of the casing assembly; backfilling a geological body into the casing assembly; The casing assembly is pulled upward out of the formation.
2. The method for removing a cast-in-place pile according to claim 1, characterized in that: The step of placing the casing assembly along the positioning hole downward into the stratum and sleeved on the outside of the cast-in-place pile comprises: The casing assembly is driven to rotate by a full-rotation drilling rig, so that the casing assembly passes through the positioning hole, drills downward into the stratum, and is sleeved on the outside of the cast-in-place pile; The step of placing a breaker hammer into the casing assembly and breaking the cast-in-place pile comprises: placing a breaker hammer into the casing assembly; The casing assembly is driven to rotate again by the full-rotation drilling rig to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile.
3. The method for removing a cast-in-place pile according to claim 2, characterized in that: Before the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile, the step further includes: A counterweight assembly is arranged around the surface of the stratum where the cast-in-place pile is located, and the full-rotation drilling rig is connected to the counterweight assembly to counterweight the full-rotation drilling rig.
4. The method for removing a cast-in-place pile according to claim 2, characterized in that: Before the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile, the step further includes: A reaction force assembly is arranged around the surface of the stratum where the cast-in-place pile is located, and the full-rotation drilling rig is connected to the reaction force assembly to offset the reaction force generated by the casing assembly on the full-rotation drilling rig when the full-rotation drilling rig rotates the casing assembly.
5. The method for removing a cast-in-place pile according to claim 2, characterized in that: Before the step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole and drills downward into the stratum and is sleeved on the outside of the cast-in-place pile, the step further includes: A plurality of standard pipe sections are sequentially spliced together to form the casing assembly, wherein the standard pipe section located at the outermost end of the casing assembly is a cutter head section; The step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole, drills downward into the stratum and is sleeved on the outside of the cast-in-place pile comprises: Lifting the sleeve assembly so that the cutter head segment is located at the bottom of the sleeve assembly, and passing the cutter head segment through the positioning hole; The casing assembly is driven to rotate by the full-rotation drilling rig, so as to drill downward into the formation through the rotation of the cutter head section, thereby driving the casing assembly to drill downward into the formation and be sleeved on the outside of the cast-in-place pile.
6. The method for removing a cast-in-place pile according to claim 5, characterized in that: The step of digging out the geological body between the casing assembly and the cast-in-place pile comprises: The geological body between the casing assembly and the cast-in-place pile and located above the preset height of the bottom of the cutter head section is excavated.
7. The method for removing a cast-in-place pile according to claim 6, characterized in that: The preset height is greater than or equal to 6m.
8. The method for removing a cast-in-place pile according to claim 2, characterized in that: The step of driving the casing assembly to rotate by a full-rotation drilling rig so that the casing assembly passes through the positioning hole, drills downward into the stratum and is sleeved on the outside of the cast-in-place pile comprises: The casing assembly is driven to rotate at a first rotation speed by a full-rotation drilling rig, so that the casing assembly passes through the positioning hole, drills downward into the stratum, and is sleeved on the outside of the cast-in-place pile; The step of driving the casing assembly to rotate again by the full-rotation drilling rig to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile comprises: The casing assembly is driven to rotate at a second rotation speed by the full-rotation drilling rig again, so as to drive the breaker hammer to rotate around the cast-in-place pile in the casing assembly to break the cast-in-place pile; Wherein, the first rotation speed and the second rotation speed are both 3 r / min to 5 r / min.
9. The method for removing a cast-in-place pile according to claim 1, characterized in that: Before the step of setting a positioning assembly on the surface of the stratum where the cast-in-place pile is located, the method further comprises: The surface of the stratum where the cast-in-place pile is located and the surface of the stratum around it are leveled.
10. The method for removing a cast-in-place pile according to claim 1, characterized in that: The step of backfilling the geological body into the casing assembly comprises: The casing assembly is backfilled with geological bodies and concrete.
