Construction method and positioning device for improving centering degree of cast-in-situ bored pile reinforcement cage

Through the central positioning device of the bored pile steel cage, air bag inflation and electromagnetic control are used to achieve precise positioning of the steel cage, which solves the problem of offset during construction, improves the load-bearing capacity and construction efficiency of the pile foundation, and reduces costs.

CN118727757APending Publication Date: 2024-10-01JINAN ZHONGLU CONSTR ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410968913.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing bored pile construction, the steel cage is prone to deflection during pile insertion and pouring, resulting in a decrease in load-bearing capacity. It is difficult for existing technology to effectively solve the problem of position changes caused by the floating and horizontal displacement of the steel cage.

Method used

A central positioning device for bored cast-in-place steel cages is used, including ground lifting equipment, air compressors and positioning components installed in the pile holes. Through annular steel plates, annular air bags, annular skeletons, elastic brackets and electromagnetic blocks, the air bags are used to inflate and The electromagnetic control valve realizes the precise positioning and support of the steel cage, ensuring its stability during the pouring process.

Benefits of technology

It effectively avoids the floating and horizontal displacement of the steel cage during the pouring process, ensures the overall quality of the pile foundation, improves the load-bearing capacity of the cast-in-place piles, and reduces the impact force of the concrete through segmented pouring, thus reducing the construction cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727757A_ABST
    Figure CN118727757A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method and a positioning device for improving the centering degree of a reinforcement cage of a cast-in-situ bored pile. The construction method and the positioning device are used for solving the problem that the reinforcement cage possibly deviates from the center of the pile in the lowering process of the reinforcement cage in a pile hole and the concrete pouring process. An annular air bag is fixedly installed on the outer side of the annular steel plate, the annular air bag is provided with an inflation port and a deflation port, an electromagnetic control valve is installed at the inflation port, the annular air bag controlled by the electromagnetic control valve is inflated through the air compressor, and the deflation port is provided with an electromagnetic control valve and extends to the ground through a deflation pipe and a cable; the annular framework is mechanically connected with lifting equipment through steel wire ropes. In the process of injecting concrete into a pile hole, the positioning device is used for locally centering and positioning the reinforcement cage, so that the position of the reinforcement cage is kept unchanged, and the problems of floating and horizontal displacement of the reinforcement cage possibly occurring in the concrete pouring process are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cast-in-place concrete bored pile construction. Background Art

[0002] The deviation (eccentricity) value between the steel cage and the pile center in the pile foundation should be controlled within 5CM. In actual construction, due to the superposition of various factors, serious exceeding of the standard phenomenon will occur, that is, the deviation value between the steel cage and the pile center in the pile foundation will be much greater than 5CM, which is unqualified construction quality.

[0003] According to the different positions of the deviation, it can be divided into overall deviation and local deviation. The overall deviation phenomenon refers to the deviation of the central axis of the steel cage and the central axis of the pile hole from top to bottom. Figure 1 Local displacement means that only the lower half of the steel cage is displaced. Both of these displacements will seriously affect the bearing capacity of the pile foundation.

[0004] After analysis, the reasons for the excessive deviation between the steel cage and the pile center in the pile foundation include: (1) The initial positioning of the steel cage after entering the pile hole is not accurate.

[0005] (2) During the pouring process, the steel cage floats up and shifts horizontally, causing a change in position during construction.

[0006] The existing bored pile reinforcement cage centering technology can only ensure that the reinforcement cage is centered to meet the requirements at the initial stage of pile entry, that is, during the process of the reinforcement cage being below the pile, the consistency between the reinforcement cage in the pile foundation and the pile center is ensured to meet the specification requirements. It does not solve the problem of the reinforcement cage position change caused by the reinforcement cage floating up and shifting horizontally during the pouring process.

[0007] For example, CN218204334U discloses a steel cage positioning device for construction engineering, wherein a left positioning clamp and a right positioning clamp are arranged on the top of the device base, and both ends of the left positioning clamp and the right positioning clamp are respectively fixedly connected with a connecting part, and a fastening bolt is arranged inside the connecting part, and an adjusting screw is respectively threadedly connected inside the left positioning clamp and the right positioning clamp. The utility model can play a certain anti-bias positioning role on the steel cage through the cooperation of the left positioning clamp, the right positioning clamp, and the arc-shaped limiting clamp and the limiting roller in contact with the steel cage, so that the steel cage is better confined in the device, and a large shaking and deviation during the lowering process of the steel cage is avoided. Summary of the invention

[0008] In order to solve the deficiencies of the prior art, the present invention provides a bored cast-in-place pile reinforcement cage centering device and a construction method thereof, which are used to solve the problem that the reinforcement cage and the pile center may be offset beyond the design specification size during the lowering of the reinforcement cage in the pile hole and the pouring of concrete.

[0009] The technical solution adopted by the present invention to solve the technical problem is: The invention discloses a cast-in-place construction method for centering the steel cage of bored piles, characterized in that the construction method is based on a centering positioning device for the steel cage of bored piles, the centering positioning device for the steel cage of bored piles comprises a lifting device on the ground, an air compressor and a positioning component installed in the pile hole, the lifting device is connected to the positioning component through a steel wire rope, the air compressor supplies compressed gas to the positioning component, the positioning component comprises an annular steel plate, an annular airbag, an annular skeleton, an elastic bracket and an electromagnetic block, wherein two annular skeletons are welded on the inner side of the annular steel plate, an annular airbag is fixedly installed on the outer side of the annular steel plate, the annular airbag has an inflation port and an deflation port, and the An electromagnetic control valve is installed at the inflation port and connected to an air compressor on the ground through an air pipe and a cable. The annular airbag controlled by the electromagnetic control valve is inflated through the air compressor. An electromagnetic control valve is installed at the deflation port and extends to the ground through a deflation pipe and a cable. A plurality of elastic brackets and lifting rings are evenly distributed circumferentially on the annular skeleton. The lifting rings are mechanically connected to the lifting equipment through steel wire ropes. Electromagnetic blocks are installed on the inner side of the annular steel plate. The number is at least three and they are evenly distributed along the circumference of the annular steel plate. When the electromagnetic block is powered on, the electromagnetic block maintains an attraction relationship with the steel cage. When the electromagnetic block is powered off, the electromagnetic block is separated from the steel cage. The steps are as follows: Step 1: Use a hoisting device to hoist the steel cage. During the hoisting process, make the steel cage vertical, and after the bottom of the steel cage just leaves the ground, put the positioning assembly from bottom to top on the lower end of the steel cage, and energize the electromagnetic block to fix the positioning assembly on the steel cage; Step 2: Slowly lower the steel cage into the pile hole. During the process, keep and make the steel cage in the center of the pile hole. Slowly lower it and make the bottom of the steel cage touch the bottom. After touching the bottom, lift the steel cage upward by 1 cm to 5 cm in the opposite direction, start the air compressor on the ground, open the electromagnetic control valve to inflate the annular air bag, and the inflated annular air bag gradually approaches the wall of the pile hole. Observe the pressure gauge. When the pressure gauge rises to a predetermined pressure, stop inflating and maintain the pressure. Under the pressure-maintaining state of the annular air bag, slowly lower it and make the bottom of the steel cage touch the bottom. After touching the bottom, install the grouting conduit. The lower end of the grouting conduit is located at the bottom of the pile hole. Remove the steel cage hoisting equipment. The steel cage is kept in a stable state under the action of its own weight. Step three, install the lifting equipment on the ground at the top of the pile hole, and deflate the annular airbag. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The overall height of the positioning assembly is lifted by the hoisting equipment on the ground. The effective lifting height is set to 8 meters. When it is lifted to this height, start the air compressor on the ground, open the electromagnetic control valve to inflate the annular airbag, and the inflated annular airbag gradually approaches the wall of the pile hole and forms a support. When the pressure gauge rises to a predetermined air pressure, stop inflating and maintain pressure. Under the pressure-maintaining state of the annular airbag, inject concrete into the 7-meter length range of the lower section of the pile hole through the concrete grouting conduit; Step 4: After the grouting of the first section is completed, the annular airbag is deflated. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning assembly is lifted by the hoisting equipment on the ground. The effective lifting height is set to 8 meters. When it is lifted to this height, the air compressor on the ground is started, and the electromagnetic control valve is opened to inflate the annular airbag. The inflated annular airbag gradually approaches the wall of the pile hole and forms a support. When the pressure gauge rises to a predetermined air pressure, the inflation is stopped and the pressure is maintained. Then, under the pressure-maintaining state of the annular airbag, the grouting pipe is lifted by 8 meters, so that the grouting port of the grouting pipe is located in the second section, and concrete is injected into the 8-meter length range of the middle and lower sections of the pile hole through the concrete grouting conduit; Step 5, repeat the above step 4 until the positioning assembly is lifted to the top of the pile hole; Step six, after the grouting of the last section is completed, the annular airbag is deflated. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning device is taken out from the pile hole, and the grouting pipe is taken out simultaneously. The grouting of the last section is carried out at the pile head. After the grouting is completed, the grouting catheter is removed and maintenance is carried out.

[0010] In step 1, the distance between the positioning assembly and the lower end of the steel cage is 20 cm.

[0011] The elastic bracket is a shuttle-shaped structure consisting of two vertical straight ribs and a top elastic rib and a bottom elastic rib, wherein one vertical straight rib is attached to the annular frame on the inner side of the annular steel plate and fixed to the annular frame, and the other vertical straight rib is located on the outer side of the annular airbag, the top elastic rib is located above the annular airbag, and the bottom elastic rib is located below the annular airbag. In this structure, the top elastic rib and the bottom elastic rib are continuous W-shaped profiles, so that the two elastic ribs have deformation space in the length direction, and the initial state of the two elastic ribs is a compressed state.

[0012] The inner vertical straight reinforcement of the elastic bracket is welded to the annular frame, and a vertical raised slide rail is formed on the inner side of the annular frame. The raised slide rail forms a sliding fit with the spiral reinforcement in the steel cage.

[0013] A device for centering a steel cage of a bored pile comprises a lifting device on the ground, an air compressor and a positioning component installed in a pile hole, wherein the positioning component comprises an annular steel plate, an annular airbag, an annular skeleton, an elastic bracket and an electromagnetic block, wherein two annular skeletons are welded on the inner side of the annular steel plate, an annular airbag is fixedly installed on the outer side of the annular steel plate, the annular airbag has an inflation port and an deflation port, an electromagnetic control valve is installed at the inflation port and connected to an air compressor on the ground through an air pipe and a cable, the annular airbag controlled by the electromagnetic control valve is inflated through the air compressor, an electromagnetic control valve is installed at the deflation port and extends to the ground through an deflation pipe and a cable; a plurality of elastic brackets and lifting rings are evenly distributed circumferentially on the annular skeleton, the lifting rings are mechanically connected to the lifting device through steel wire ropes, the electromagnetic blocks are installed on the inner side of the annular steel plate, the number is at least three, and the electromagnetic blocks are evenly distributed along the circumference of the annular steel plate, when the electromagnetic block is powered on, the electromagnetic block maintains an attraction relationship with the steel cage, and when the electromagnetic block is powered off, the electromagnetic block is separated from the steel cage.

[0014] Furthermore, the elastic bracket is a shuttle shape composed of two vertical straight ribs and a top elastic rib and a bottom elastic rib, wherein one vertical straight rib is attached to the annular frame on the inner side of the annular steel plate and fixed to the annular frame, and the other vertical straight rib is located on the outside of the annular airbag, the top elastic rib is located above the annular airbag, and the bottom elastic rib is located below the annular airbag. In this structure, the top elastic rib and the bottom elastic rib are continuous W-shaped profiles, so that the two elastic ribs have deformation space in the length direction, and the initial state of the two elastic ribs is a compressed state.

[0015] Furthermore, the inner vertical straight ribs of the elastic bracket are welded to the annular frame, forming a vertical raised slide rail on the inner side of the annular frame, and the raised slide rail forms a sliding fit with the spiral ribs in the steel cage.

[0016] Furthermore, the annular steel plate is a circular ring structure formed by bending and welding a thick steel plate with a thickness of 1 cm to 2 cm.

[0017] The beneficial effects of the present invention are: The application of this construction method is to use a positioning device to locally center the steel cage during the process of injecting concrete into the pile hole. During this positioning process, the steel cage is temporarily supported and fixed to the inner wall of the pile hole by the positioning device, so that the position of the steel cage remains unchanged, which solves the problem of possible floating and horizontal displacement of the steel cage during the concrete pouring process and ensures the overall quality of the cast-in-place pile.

[0018] This construction method adopts the method of pouring concrete from bottom to top in sections. The segmented pouring construction can effectively avoid the impact force generated by concrete pouring.

[0019] This device is a new structure construction, used for auxiliary construction, and is a special tool. The device relies on airbag inflation for positioning, can be quickly operated on the ground, and is assisted by a winch, which is a highly efficient construction method. And this device can be reused to reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram showing the misalignment between the reinforcement cage and the pile center in the pile foundation.

[0021] Figure 2 A perspective view of the positioning assembly.

[0022] Figure 3 A partial cross-sectional view of the positioning assembly.

[0023] Figure 4 for Figure 2 Top view of the .

[0024] Figure 5 for Figure 2 Side view of.

[0025] Figure 6 Schematic diagram of the combination of the positioning component and the steel cage.

[0026] Figure 7 This is a construction view of the present invention.

[0027] In the figure: 00 steel cage, 01 pile hole, 02 grouting pipe, 100 lifting equipment, 200 positioning assembly, 210 annular steel plate, 220 annular airbag, 221 inflation port, 222 deflation port, 230 annular frame, 240 elastic bracket, 250 electromagnetic block, 260 lifting ring, 300 air compressor. DETAILED DESCRIPTION

[0028] The bored pile reinforcement cage centering positioning device is used to position the reinforcement cage in the pile hole. The positioning is used in the reinforcement cage lowering stage and the concrete pouring stage. It can ensure the reinforcement cage is centered before concrete pouring and during concrete pouring.

[0029] In conjunction with the instruction manual Figure 2 To Attachment Figure 7 Make an introduction.

[0030] The positioning device comprises a lifting device 100 on the ground and a positioning assembly 200 installed in the pile hole, wherein the lifting device 100 can be a winch, etc., to raise the height of the above-mentioned positioning assembly.

[0031] The positioning assembly 200 includes an annular steel plate 210, an annular airbag 220, an annular skeleton 230, an elastic bracket 240, and an electromagnetic block 250, wherein the annular steel plate 210 is a circular ring structure formed by bending and welding a thick steel plate with a thickness of 1 cm to 2 cm, and two annular skeletons 230 are welded on the inner side of the annular steel plate 210. The annular skeleton is a standard series of square steel pipes, angle steels, or angle steels. The two annular skeletons 230 are arranged opposite to each other, one above and one below, and have two functions. First, they can form local reinforcement on the inner side of the annular steel plate to form a reinforcing rib plate to improve the circumferential stiffness of the annular steel plate. Second, they can provide a support point for the installation of the elastic bracket. An annular airbag 220 is fixed to the outside of the annular steel plate 210 by means of a high-strength adhesive. The annular airbag is sleeved on the outside of the annular steel plate. The annular airbag has an inflation port 221 and an deflation port 222. An electromagnetic control valve is installed at the inflation port and is connected to an air compressor 300 on the ground through an air pipe and a cable. The annular airbag controlled by the electromagnetic control valve is inflated by the air compressor 300. The inflation pressure is not less than two standard atmospheric pressures. An electromagnetic control valve is also installed at the deflation port 220 and extends to the ground through a deflation pipe and a cable. The airbag is deflated by controlling the electromagnetic control valve. After deflation, the annular airbag is in a deflated state.

[0032] The elastic bracket 240 is composed of two vertical straight ribs and a top elastic rib and a bottom elastic rib, and is shuttle-shaped as a whole. Among the two vertical straight ribs, one vertical straight rib is attached to the annular frame on the inner side of the annular steel plate and is welded and fixed to the annular frame. After welding, the vertical straight rib remains in a vertical state, the outer vertical straight rib is located on the outer side of the annular airbag, the top elastic rib is located above the annular airbag, and the bottom elastic rib is located below the annular airbag. In this structure, the top elastic rib and the bottom elastic rib are continuous W-shaped profiles, so that the two elastic ribs have deformation space in the length direction. The initial state of the two elastic ribs is a compressed state, that is, in the absence of external force, the top elastic rib and the bottom elastic rib are in a compressed state. The deformation process is that when the annular airbag is inflated, the two top elastic ribs and the bottom elastic rib are stretched under the action of the annular airbag. When the annular airbag is deflated, the volume of the annular airbag is reduced and compressed due to the rebound effect of the top elastic ribs and the bottom elastic ribs, so that the outer diameter is reduced as a whole. Under this effect, it is beneficial to slide the positioning component as a whole along the height direction. Another positive effect of the elastic bracket is that it has a guiding function and ensures that the positioning component maintains smooth sliding during the lifting process in the height direction. Specifically, the inner vertical straight ribs of the elastic bracket 240 are welded to the annular skeleton 230, and a vertical raised slide rail is formed on the inner side of the annular skeleton. The raised slide rail forms a sliding fit with the spiral ribs in the steel cage, that is, when the positioning component is pulled up, it can be easily lifted up through the sliding fit between the vertical straight ribs on the inner side of the elastic bracket and the steel cage.

[0033] In the inflated state, the outer side of the elastic bracket 240 can be partially embedded in the inner wall of the pile hole, thereby increasing the fit strength with the inner wall of the pile hole and forming a partial constraint on the airbag, which is of positive significance for improving the safety and explosion resistance of the airbag.

[0034] The electromagnetic block 250 is installed on the inner side of the annular steel plate, and the number is at least three, which are evenly distributed along the circumference of the annular steel plate. When the electromagnetic block is powered on, the electromagnetic block 250 and the steel cage maintain an attraction relationship, thereby ensuring that the positioning component is relatively fixed to the predetermined position of the steel cage. When the electromagnetic block is powered off, the electromagnetic block and the steel cage are in a non-attractive state, and the height of the positioning component can be adjusted by a lifting winch on the ground.

[0035] In this embodiment, the above-mentioned positioning components can be used individually or in combination. When used in combination, a steel wire rope is used to connect the two positioning components, and the overall lifting is performed by a ground winch.

[0036] The annular frame 230 is welded with a lifting ring 260, and the number of the lifting rings is at least three. The lifting ring is fixedly connected to the lower end of the wire rope, and the upper end of the wire rope is wound on the rope-receiving cylinder of the winch, and the rope-receiving and rope-releasing actions of the wire rope are controlled by the winch.

[0037] The bored pile reinforcement cage centering cast-in-place construction method includes the following steps: Step 1: Use special lifting equipment and lifting tools to hoist the steel cage 00 as a whole. During the hoisting process, make the steel cage 00 vertical, and just after the vertical bottom is off the ground, put the positioning assembly 200 from bottom to top on the lower end of the steel cage, and about 20 cm away from the bottom of the steel cage, that is, the lowest point of the positioning assembly is about 20 cm from the lowest point of the steel cage, and energize the electromagnetic block so that the positioning assembly firmly fixes the lower end of the steel cage. This step is pre-installed at the lower end of the steel cage by assembling it in front of the pile hole below the steel cage, which is time-saving and labor-saving.

[0038] Step 2, slowly lower the above-mentioned steel cage 00. During the process, try to keep and make the steel cage in the middle position of the pile hole 01. Slowly lower and make the bottom of the steel cage 00 touch the bottom (the bottom of the pile hole). After touching the bottom, lift the steel cage upward in the opposite direction by 1-5 cm. Through this operation, the steel cage is slightly separated from the bottom of the pile hole, and the air compressor on the ground is started, and the electromagnetic control valve is opened to inflate the annular airbag 220. After the inflation, the annular airbag gradually approaches the wall of the pile hole and forms a support. It continues to be inflated. When the outer wall of the annular airbag 220 abuts against the wall of the pile hole, observing the pressure gauge will find that the air pressure rises sharply. When the pressure gauge rises to a predetermined air pressure, such as 3 standard atmospheric pressures, stop inflating and maintain the pressure. In the above-mentioned inflation process, since there is a gap of several centimeters between the bottom of the steel cage 00 and the bottom of the pile hole 01, the resistance is very small. Through the above-mentioned annular airbag inflation process, the bottom of the steel cage and the bottom of the pile hole can be kept in a concentric state, that is, in the initial state, it is ensured that the steel cage at the bottom of the pile hole and the center line of the bottom of the pile are basically overlapped, and the initial center positioning of the steel cage is achieved. This positioning is achieved quickly and has less resistance. Under the pressure-maintaining state of the annular airbag 220, the steel cage is slowly lowered and the bottom of the steel cage touches the bottom (the bottom of the pile hole). After the bottoming is completed, the grouting conduit is installed, that is, the grouting conduit 02 is inserted into the steel cage, and the lower end of the grouting conduit is located near the bottom of the pile hole. Finally, the steel cage hoisting equipment is removed, and the steel cage remains in a stable state under the action of its own weight.

[0039] Step three, grouting at the lower end. Install the lifting device 100 on the ground at the top of the pile hole, and cooperate with the lifting device 100 to lift the height of the positioning component. Specifically, the process is to first deflate the above-mentioned annular airbag 220. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The overall height of the positioning component is lifted by the ground winch lifting device. The effective lifting height is set to 8 meters. When it is lifted to this height, start the air compressor 300 on the ground, open the electromagnetic control valve to inflate the annular airbag, and the inflated annular airbag gradually approaches the wall of the pile hole and forms a support. Continue to inflate. When the outer wall of the annular airbag abuts against the wall of the pile hole, observe the pressure gauge and you will find that the air pressure rises sharply. When the pressure gauge rises to a predetermined pressure, such as 3 standard atmospheric pressures, stop inflating and maintain the pressure. In this step, the positioning component temporarily centers the steel cage at a point 8 meters below, so that the lower section of the steel cage remains in a basically centered state. Then, under the pressure-maintaining state of the annular airbag, concrete is injected into the 7-meter length of the lower section of the pile hole through the concrete grouting conduit. The injection amount is obtained by calculation. According to the volume formula: cylinder volume = π*r²* h=S *h, the injection amount of concrete can be obtained, and the grouting operation is performed accordingly.

[0040] Step 4. After the grouting of the first section is completed, the annular airbag 220 is deflated. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning assembly is lifted as a whole by the ground winch lifting device 100. The effective lifting height is set to 8 meters. When it is lifted to this height, the air compressor on the ground is started, and the electromagnetic control valve is opened to inflate the annular airbag. The inflated annular airbag gradually approaches the wall of the pile hole and forms a support. It continues to be inflated. When the outer wall of the annular airbag abuts against the wall of the pile hole, observing the pressure gauge will find that the air pressure rises sharply. When the pressure gauge rises to a predetermined pressure, such as 3 standard atmospheric pressures, the inflation is stopped and the pressure is maintained. In this step, the positioning component temporarily centers the steel cage at a point 16 meters below, so that the middle and lower sections of the steel cage remain in a basically centered state. Then, under the pressure maintaining state of the annular air bag, the grouting pipe is lifted to a height of 8 meters, so that the grouting port of the grouting pipe is located in the second section, and concrete is injected into the 8-meter length of the middle and lower section of the pile hole through the concrete grouting conduit.

[0041] Step 5, repeat the above step 4 until the positioning device is lifted to the top of the pile hole. When the last section does not meet the 8-meter spacing, the positioning device must also be lifted to the top of the pile hole.

[0042] Step six, after the grouting of the last section is completed, the annular airbag is deflated. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning device is taken out from the pile hole, and the grouting pipe is taken out simultaneously. The grouting of the last section is carried out at the pile head. After the grouting is completed, maintenance can be carried out. During the maintenance process, the steel cage and concrete in the pile hole are in a relatively static state and no position deflection occurs. Therefore, the steel cage of the bored pile is centered.

[0043] The embodiments described above are merely descriptions of preferred implementations of the present invention and are not intended to limit the scope of the present invention. Without departing from the spirit of the present invention, various modifications and improvements to the present invention by relevant technical personnel in the field should fall within the scope of protection determined by the claims of the present invention.

Claims

1. A construction method for improving the centering degree of bored pile reinforcement cage, characterized in that: The construction method is based on a bored cast-in-place pile reinforcement cage centering positioning device. The bored cast-in-place pile reinforcement cage centering positioning device comprises a lifting device (100) on the ground, an air compressor and a positioning component (200) installed in a pile hole. The lifting device is connected to the positioning component via a steel wire rope. The air compressor supplies compressed gas to the positioning component. The positioning component (200) comprises an annular steel plate (210), an annular airbag (220), an annular skeleton (230), an elastic bracket (240), and an electromagnetic block (250). Two annular skeletons (230) are welded on the inner side of the annular steel plate (210). The annular airbag (220) is fixedly installed on the outer side of the annular steel plate (210). The annular airbag has an inflation port (221) and an deflation port (250). 22), an electromagnetic control valve is installed at the inflation port and connected to an air compressor (300) on the ground through an air pipe and a cable, and the annular airbag controlled by the electromagnetic control valve is inflated through the air compressor (300), and the deflation port (220) is installed with an electromagnetic control valve and extends to the ground through the deflation pipe and the cable; a plurality of elastic brackets (240) and lifting rings are evenly distributed circumferentially on the annular skeleton (230), and the lifting rings are mechanically connected to the lifting equipment through steel wire ropes, and the electromagnetic blocks (250) are installed on the inner side of the annular steel plate, and the number is at least three and distributed along the circumference of the annular steel plate. When the electromagnetic block is powered on, the electromagnetic block (250) maintains an attraction relationship with the steel cage, and when the electromagnetic block is powered off, the electromagnetic block is separated from the steel cage. The construction steps are as follows: Step 1: Use a lifting device to lift the steel cage (00). During the lifting process, the steel cage (00) is made vertical, and after the bottom of the steel cage just leaves the ground, the positioning component (200) is inserted from bottom to top on the lower end of the steel cage, and the electromagnetic block is energized so that the positioning component is fixed on the steel cage; Step 2, slowly lowering the steel cage (00) into the pile hole, during the lowering process, keeping and making the steel cage located in the center of the pile hole (01), slowly lowering and making the bottom of the steel cage (00) touch the bottom, after touching the bottom, lifting the steel cage upward by 1 cm to 5 cm in the opposite direction, so that the bottom of the steel cage leaves the bottom of the pile hole, and starting the air compressor on the ground, opening the electromagnetic control valve to inflate the annular air bag (220), the inflated annular air bag gradually approaches the wall of the pile hole, observing the pressure gauge, when the pressure gauge rises to a predetermined air pressure, stopping the inflation, and maintaining the pressure, slowly lowering and making the bottom of the steel cage touch the bottom in the pressure-maintaining state of the annular air bag (220), after the completion of the bottoming, installing the grouting conduit in the space inside the steel cage, inserting the lower end of the grouting conduit into the pile hole below the annular air bag, removing the steel cage hoisting equipment, and keeping the steel cage in a stable state under the action of its own weight; Step 3, installing the lifting device (100) on the ground at the top of the pile hole, and deflate the annular airbag (220). After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning assembly is lifted as a whole by the lifting device on the ground. The effective lifting height is set to 8 meters. When the height is reached, the air compressor (300) on the ground is started, and the electromagnetic control valve is opened to inflate the annular airbag. After the inflated annular airbag gradually approaches the wall of the pile hole and forms a support. When the pressure gauge rises to a predetermined pressure, the inflation is stopped and the pressure is maintained. In the pressure-maintaining state of the annular airbag, the grouting conduit is lifted and positioned in the pile hole below the annular airbag, and concrete is injected into the pile hole through the concrete grouting conduit; Step 4: After the grouting of the first section is completed, the annular airbag (220) is deflated. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning component is lifted by a ground winch lifting device (100). The effective lifting height is set to 8 meters. When the lifting reaches the height, the air compressor on the ground is started, and the electromagnetic control valve is opened to inflate the annular airbag. The inflated annular airbag gradually approaches the wall of the pile hole and forms a support. When the pressure gauge rises to a predetermined pressure, the inflation is stopped and the pressure is maintained. Then, in the pressure-maintaining state of the annular airbag, the grouting pipe is lifted by 8 meters so that the grouting port of the grouting pipe is located in the second section, and concrete is injected into the 8-meter length of the middle and lower sections of the pile hole through the concrete grouting conduit; Step 5, repeat the above step 4 until the positioning assembly is lifted to the top of the pile hole; Step six, after the grouting of the last section is completed, the annular airbag is deflated. After deflation, the annular airbag shrinks and shrivels, and the electromagnetic block is powered off. The positioning device is taken out from the pile hole, and the grouting pipe is taken out simultaneously. The grouting of the last section is carried out at the pile head. After the grouting is completed, the grouting catheter is removed and maintenance is carried out.

2. The construction method for improving the centering degree of bored pile reinforcement cage according to claim 1 is characterized in that: In step 1, the distance between the positioning assembly and the lower end of the steel cage is 20 cm.

3. The construction method for improving the centering degree of bored pile reinforcement cage according to claim 1 is characterized in that: The elastic support (240) is shuttle-shaped and is composed of two vertical straight ribs and a top elastic rib and a bottom elastic rib, wherein one vertical straight rib is attached to the annular frame inside the annular steel plate and is fixed to the annular frame, and the other vertical straight rib is located outside the annular airbag, the top elastic rib is located above the annular airbag, and the bottom elastic rib is located below the annular airbag. In this structure, the top elastic rib and the bottom elastic rib are continuous W-shaped profiles, so that the two elastic ribs have deformation space in the length direction, and the initial state of the two elastic ribs is a compressed state.

4. The construction method for improving the centering degree of bored pile reinforcement cage according to claim 3 is characterized in that: The inner vertical straight reinforcement of the elastic bracket (240) is welded to the annular frame (230), and a vertical raised slide rail is formed on the inner side of the annular frame, and the raised slide rail forms a sliding fit with the spiral reinforcement in the steel cage.

5. A positioning device for improving the centering of bored pile reinforcement cage, characterized in that: The invention comprises a lifting device (100) on the ground, an air compressor and a positioning assembly (200) installed in a pile hole, wherein the lifting device is connected to the positioning assembly via a steel wire rope, and the air compressor supplies compressed gas to the positioning assembly, wherein the positioning assembly (200) comprises an annular steel plate (210), an annular airbag (220), an annular skeleton (230), an elastic bracket (240), and an electromagnetic block (250), wherein two annular skeletons (230) are welded on the inner side of the annular steel plate (210), and the annular airbag (220) is fixedly installed on the outer side of the annular steel plate (210), and the annular airbag has an inflation port (221) and an deflation port (222), and an electromagnetic control valve is installed at the inflation port and is passed through the inflation port. The air compressor (300) on the ground is connected through an air pipe and a cable, and the annular air bag controlled by the electromagnetic control valve is inflated through the air compressor (300). The electromagnetic control valve is installed on the air release port (220) and extends to the ground through the air release pipe and the cable. A plurality of elastic brackets (240) and lifting rings are evenly distributed circumferentially on the annular skeleton (230), and the lifting rings are mechanically connected to the lifting equipment through steel wire ropes. The electromagnetic blocks (250) are installed on the inner side of the annular steel plate, and the number is at least three, and they are evenly distributed along the circumference of the annular steel plate. When the electromagnetic block is powered on, the electromagnetic block (250) maintains an attraction relationship with the steel cage, and when the electromagnetic block is powered off, the electromagnetic block is separated from the steel cage.

6. The positioning device for improving the centering degree of bored pile reinforcement cage according to claim 5, characterized in that: The elastic support (240) is shuttle-shaped and is composed of two vertical straight ribs and a top elastic rib and a bottom elastic rib, wherein one vertical straight rib is attached to the annular frame inside the annular steel plate and is fixed to the annular frame, and the other vertical straight rib is located outside the annular airbag, the top elastic rib is located above the annular airbag, and the bottom elastic rib is located below the annular airbag. In this structure, the top elastic rib and the bottom elastic rib are continuous W-shaped profiles, so that the two elastic ribs have deformation space in the length direction, and the initial state of the two elastic ribs is a compressed state.

7. The positioning device for improving the centering degree of bored pile reinforcement cage according to claim 6, characterized in that: The inner vertical straight reinforcement of the elastic bracket (240) is welded to the annular frame (230), and a vertical raised slide rail is formed on the inner side of the annular frame, and the raised slide rail forms a sliding fit with the spiral reinforcement in the steel cage.

8. The positioning device for improving the centering degree of bored pile reinforcement cage according to claim 7, characterized in that: The annular steel plate (210) is a circular ring structure formed by bending and welding a thick steel plate with a thickness of 1 cm to 2 cm.

Citation Information

Cited By

  • Pile foundation reinforcement cage in-hole fixing device and construction method

    CN120174837A

  • A kind of pile foundation reinforcement cage hole fixing device and construction method

    CN120174837B