Pressure-reducing anti-floating device for basement drainage and mounting method of pressure-reducing anti-floating device

By designing a pressure-reducing and anti-floating device in the basement and using a combination of steel pipes, filter components and water delivery components, the problem of floor floating caused by the buoyancy force of groundwater is solved, automatic precipitation and water accumulation are realized, and the stability of the underground structure is ensured. Safety and safety, suitable for anti-floating and drainage needs of basements.

CN118727795APending Publication Date: 2024-10-01SHANGHAI NANHUI BUILDING ENG LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410990808.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

During the construction process of the basement, because the buoyancy force of the groundwater exceeds the self-weight of the structure, the floor floats and becomes unstable. Existing technology is difficult to effectively solve this anti-floating problem, especially when the water level changes or rainfall is concentrated, the stability of the floor and the Security is compromised.

Method used

A pressure reducing and anti-floating device for basement drainage is designed, including steel pipes, filter components, iron mesh pipes, nylon filters and water delivery components. The steel pipe penetrates the basement floor, the filter assembly and the iron mesh pipe perform filtration, and the stabilizing component is rotated and fixed. , nylon filter mesh and gravel perform preliminary filtration, and the water delivery component introduces water into the water collection well to achieve automatic precipitation and anti-floating effects.

Benefits of technology

It effectively solves the floating problem of the basement floor, realizes automatic precipitation and water collection, and the collected water can be used for recycling, energy saving and environmental protection, ensuring the stability and safety of the underground structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727795A_ABST
    Figure CN118727795A_ABST
Patent Text Reader

Abstract

The invention relates to a pressure-reducing anti-floating device for basement drainage and a mounting method thereof, relates to the technical field of underground water pressure-reducing anti-floating devices, overcomes the defect that a bottom plate floats upwards due to the fact that a foundation bottom plate is completed but underground water is high, the dead weight of a basement is not enough and the like, and can effectively solve the possibility that the bottom plate floats upwards. And water and pressure are automatically reduced, and the anti-floating effect is achieved. The steel pipe is inserted into a basement bottom plate in a penetrating mode, and the bottom of the steel pipe extends into underground water. The filtering assembly is in threaded connection with the bottom of the steel pipe; the iron net pipe is detachably arranged in the filtering assembly; the stabilizing assembly is rotatably arranged at the bottom of the surface of the steel pipe and wraps the filtering assembly and the iron net pipe; the nylon filter screen is arranged in the middle of the surface of the steel pipe, wraps the iron net pipe, the filter assembly and the stabilizing assembly, and is filled with broken stones; and one end of the water delivery assembly is arranged at the top of the steel pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of groundwater decompression and anti-floating devices, and in particular to a decompression and anti-floating device for basement drainage and an installation method thereof. Background Art

[0002] In recent years, engineering accidents caused by anti-floating problems have attracted widespread attention. This is mainly because the buoyancy of underground water on underground structures. When this buoyancy exceeds the deadweight of the structure, the structure may arch or float up and become unstable. As the foundation of a building, the quality of its design and construction directly affects the stability and safety of the building. Among them, the anti-floating of the basement is particularly important because it is directly related to the safety of the building under changes in groundwater levels or other hydrogeological conditions. After the construction of the basement is completed, precipitation often stops. Before the main structure is fully constructed, the deadweight of the basement may not be able to resist the buoyancy of the groundwater, or when it happens to be a season with concentrated rainfall, the rising water level causes the bottom plate to float. Therefore, it is extremely important to take corresponding anti-floating measures after the basement structure is completed.

[0003] In view of the above, we provide a pressure-reducing and anti-floating device for basement drainage and an installation method thereof to solve the above problems. Summary of the invention

[0004] In view of the above situation, the present invention provides a pressure-reducing and anti-floating device for basement drainage and an installation method thereof.

[0005] A decompression and anti-floating device for basement drainage and an installation method thereof, through which groundwater can be transported to a water collection well, comprising:

[0006] Steel pipes are inserted through the basement floor;

[0007] The filter assembly is threadedly connected to the bottom of the steel pipe;

[0008] The iron mesh tube is detachably arranged in the filter assembly;

[0009] The stabilizing component can be rotatably arranged at the bottom of the steel pipe surface and wraps the filter component and the iron mesh pipe;

[0010] The nylon filter is located in the middle of the steel pipe surface and wraps the iron mesh pipe, the filter component and the stabilizing component, and is filled with gravel;

[0011] The water delivery component has one end arranged on the top of the steel pipe and the other end connected to the water collection well.

[0012] Preferably, the filter assembly comprises a connecting shaft, a positioning frame, an arc-shaped shaft and a mesh member;

[0013] The connecting shaft is threadedly connected to the bottom of the inner cavity of the steel pipe;

[0014] The positioning frame is fixedly connected to the bottom of the connecting shaft, and its inner diameter is consistent with the inner diameter of the connecting shaft;

[0015] There are multiple arc-shaped shafts, which are distributed in an annular manner at the bottom of the positioning frame through a reset torsion spring;

[0016] The mesh piece is fixedly connected to a plurality of arc-shaped shafts, and the bottom is supported by the plurality of arc-shaped shafts to form a circle.

[0017] Preferably, the mesh member comprises a fine mesh and suspended balls;

[0018] A plurality of suspension balls are arranged on the top of the fine yarn net, and the fine yarn net is floated upward by the suspension balls when it is located in the groundwater. After floating, one side of the suspension balls is closely attached to the outer surface of the iron net tube.

[0019] . The decompression anti-floating device for basement drainage according to claim, characterized in that the stabilizing assembly comprises a rotating member and a protective cylinder;

[0020] The two ends of the inner cavity of the rotating member are connected to the steel pipe through a rotating shaft, and the middle part thereof is connected to the steel pipe;

[0021] The protective tube is arranged on the rotating part.

[0022] Preferably, the rotating member comprises an outer shaft and a rack;

[0023] The outer shaft is connected to the steel pipe and is used to connect and fix the protective tube;

[0024] The rack is arranged in the middle of the outer shaft, and one side edge of the rack is flush with the edge of the inner cavity of the steel pipe.

[0025] Preferably, the water delivery assembly includes a mounting shaft, a connecting pipe and a switch valve;

[0026] The installation shaft is detachably arranged on the top of the steel pipe;

[0027] One of the two ends of the connecting pipe has two interfaces, one of which is connected to the installation shaft and the other is connected to the steel pipe;

[0028] The switch valve is arranged at one end of the connecting pipe away from the installation shaft.

[0029] Preferably, a round tube is inserted into the steel tube, the bottom of the round tube is threadedly connected to the inner cavity of the connecting shaft, and the top of the round tube is fixedly connected to the top of the steel tube by bolts.

[0030] Installation method of pressure relief anti-floating device for basement drainage:

[0031] Step 1: Pre-embedding work: After the foundation pit is excavated to the design elevation of the bottom of the basement slab cushion layer, determine the number and location of the drainage pressure relief anti-floating devices to be installed, dig a sump at each determined location, put a nylon filter in the sump, insert the steel pipe with a stabilizing component into the nylon filter, fill the nylon filter with gravel, and then tighten and fix the top of the nylon filter to the middle of the steel pipe surface;

[0032] Step 2: Filling work: fill the remaining part of the sump in step 1, make a water stop ring plate on the top of the steel pipe after filling, and pour concrete flush with the rest of the basement floor, keeping the steel pipe in a vertical upright shape before pouring.

[0033] Step 3: Stand still: Cover the top of the steel pipe with a covering, and wait for groundwater to flow into the steel pipe until groundwater can be clearly seen gushing out from the top of the steel pipe.

[0034] Step 4: Filtration setting: Assemble the filter assembly and the iron mesh tube together and install them on the round tube. Then connect them to the round tube through an assembly device that fits the inner cavity of the round tube. Pass the filter assembly and the iron mesh tube out of the bottom of the steel pipe by rotating the round tube.

[0035] Step 5: Drainage work: After completing step 4, fix the round pipe with bolts, then connect the water delivery component and connect one end of the water delivery component to the water collection well to collect groundwater.

[0036] The above technical solution has the following beneficial effects:

[0037] (1) The present invention solves the problem of the baseboard floating due to the fact that the foundation baseboard is completed but the groundwater level is high, the basement has insufficient deadweight, etc. The present invention can effectively solve the possibility of the baseboard floating, and automatically reduce water and pressure to achieve an anti-floating effect. It can also automatically collect water, and the collected water can be used for circulating water, which is energy-saving and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0039] Figure 2 This is a schematic diagram of the structure of the filter assembly of the present invention;

[0040] Figure 3 This is a schematic diagram of the iron network management structure of the present invention;

[0041] Figure 4 The structure of the present invention Figure 1 The enlarged structural diagram is shown in the figure;

[0042] Figure 5 This is a schematic diagram of the structure of the water stop ring plate of the present invention;

[0043] Figure 6 It is a schematic diagram of the structure of the stabilizing assembly of the present invention;

[0044] Figure 7 It is a schematic diagram of the structure of the rotating part of the present invention;

[0045] Figure 8 A schematic diagram of the structure of external devices required for use in the present invention;

[0046] Fig. 9 This is a schematic diagram of the planar structure of the switch valve of the present invention;

[0047] Fig.10 This is a schematic diagram of the planar structure of the hose of the present invention;

[0048] Fig.11 It is a schematic diagram of the plane structure of the valve body of the present invention.

[0049] In the figure: 1. steel pipe; 2. filter assembly; 21. connecting shaft; 22. positioning frame; 23. arc shaft; 24. mesh piece; 241. fine yarn mesh; 242. suspension ball; 3. iron mesh tube; 4. stabilizing assembly; 41. rotating part; 411. outer shaft; 412. rack; 42. protective tube; 5. nylon filter; 6. water delivery assembly; 61. installation shaft; 62. connecting pipe; 63. switch valve; 611. valve body; 612. hose; 7. water collection well; 8. round pipe; 9. water stop ring plate; 10. basement floor. DETAILED DESCRIPTION

[0050] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0051] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more features. In the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0052] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or mutual communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0053] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0054] The present application proposes a decompression and anti-floating device for basement drainage and an installation method thereof, which are used to reduce the floating and sinking of the basement floor 10 caused by groundwater.

[0055] A pressure-reducing and anti-floating device for basement drainage is proposed, and its main structure includes a steel pipe 1, a filter assembly 2 threadedly connected to the bottom of the steel pipe 1, an iron mesh pipe 3 detachably arranged in the filter assembly 2, a stabilizing assembly 4 rotatably arranged at the bottom of the surface of the steel pipe 1, a nylon filter screen 5 arranged in the middle of the surface of the steel pipe 1, and a water delivery assembly 6 arranged at the top of the steel pipe 1. The device can realize the diversion of filtered water to a water source with relatively less impurities, and reduce the influence of groundwater on the basement floor 10 during drainage.

[0056] For reference Figure 1 , the steel pipe 1 and the stabilizing component 4 are connected to each other. When setting, the nylon filter 5 is first set in the hole sump where the steel pipe 1 is to be inserted (the hole sump is specifically as described in the following reference step 1), and the nylon filter 5 is first laid in the hole sump, and after a part of the gravel is filled in the nylon filter 5, the steel pipe 1 with the stabilizing component 4 is set in the middle of the filled gravel, and the steel pipe 1 is set vertically, and after vertically filling the gravel again, the steel pipe 1 is set upright inside, where the filling The height of the gravel submerges the stabilizing component 4 to the middle of the steel pipe 1, but does not exceed the hole sump and has a distance from the hole sump. Then the nylon filter 5 is closed and the closed end is wrapped and set in the middle position of the steel pipe 1. Then the gap in the hole sump is filled with soil for stabilization. During this period, the nylon filter 5 plays a role in reducing the gravel. When the soil water content is too high, the gravel will be integrated into the soil, causing the gravel to disperse, reducing the first layer of filtering effect of the gravel during the period.

[0057] When groundwater condenses, it will flow to places with gaps, and the setting of gravel has a good guiding effect. When groundwater appears, the surrounding water will be gathered and flow toward the gravel. When passing through the gravel, the gaps between the gravel are not large, which can effectively reduce some large impurities flowing toward the steel pipe 1.

[0058] For reference Figure 1-4 Considering that if only gravel is used for filtering, the filtering effect will be general. In order to improve the filtering effect during the flow, a filtering component 2 is set at the bottom of the steel pipe 1 and inside the stabilizing component 4. Considering that the filtering component 2 is a consumable structure, the filtering component 2 and the steel pipe 1 are set as a detachable threaded structure.

[0059] Among them, the filter assembly 2 includes a connecting shaft 21, a positioning frame 22, an arc shaft 23 and a mesh piece 24. The connecting shaft 21 is threadedly connected to the bottom of the inner cavity of the steel pipe 1; the positioning frame 22 is fixedly connected to the bottom of the connecting shaft 21, and its inner diameter is consistent with the inner diameter of the connecting shaft 21; there are multiple arc shafts 23, which are distributed in a ring shape at the bottom of the positioning frame 22 through a reset torsion spring; the mesh piece 24 is fixedly connected to multiple arc shafts 23, and the bottom is supported by multiple arc shafts 23 to form a circle.

[0060] During installation, first thread the connecting shaft 21 to the bottom of the steel pipe 1, expose the positioning frame 22 to the outside of the steel pipe 1, and set a shielding object at the end of the thread during setting. Thus, when it cannot be twisted, it can be judged that the positioning frame 22 has been exposed to the outside of the steel pipe 1. When the positioning frame 22 exposes the steel pipe 1, the arc shaft 23 is not restrained and rebounds to its original position. Because there are multiple arc shafts 23, when multiple arc shafts 23 are opened at the same time, the bottom supports a circle, and the mesh member 24 is connected to multiple arc shafts 23 at the same time.

[0061] The mesh member 24 includes a fine mesh 241 and a suspension ball 242. A plurality of suspension balls 242 are arranged on the top of the fine mesh 241. The suspension balls 242 are used to float the fine mesh 241 upward when it is located in the groundwater. After floating, one side of the suspension ball 242 is closely attached to the outer surface of the iron mesh tube 3. When the arc shaft 23 is opened, the fine mesh 241 is urged to be opened, because the distance between the fine mesh 241 and the positioning frame 22 is increased after opening. A circle of suspension balls 242 is arranged at the edge of the fine mesh 241. The suspension balls 242 will drive the edge of the fine mesh 241 to float upward, so that it is located outside the positioning frame 22 to do the wrapping work, which can further increase the filter plate effect.

[0062] It should be noted that when the suspension ball 242 is suspended, one side will be close to the detachable iron mesh tube 3 inside the positioning frame 22, thereby reducing the range of motion of the fine yarn mesh 241 when floating left and right inside the tube, and further increasing the stability of the fine yarn mesh 241 after being set. Secondly, when the iron mesh tube 3 is set, the bottom slightly exceeds the bottom of the positioning frame 22, which helps the subsequent floating work of the suspension ball 242.

[0063] When passing through the fine yarn mesh 241, a layer of filtration is performed, and then passing through the iron mesh tube 3, filtration is performed again, which can effectively reduce the impurities in the groundwater. At the same time, it is also further considered that the filter component 2 is convenient for disassembly and assembly, and a round tube 8 is set at the inner cavity maintenance of the connecting shaft 21. When setting the filter component 2, the round tube 8 is first connected to the connecting shaft 21 and then placed in the steel pipe 1 for connection. Secondly, the bottom of the round tube 8 is threadedly connected to the inner cavity of the connecting shaft 21, and the thread direction is opposite to the thread direction of the connecting shaft 21 and the steel pipe 1 to avoid loosening during torsion. The top of the round tube 8 is connected and fixed to the top of the steel pipe 1 by bolts, and the steel pipe 1 can be stabilized after the connecting shaft 21 is connected to the steel pipe 1, reducing the looseness of the connecting shaft 21 and the situation that it falls off the bottom of the steel pipe 1 during replacement and is difficult to pick up.

[0064] For reference Figure 5-7, the filter assembly 2 is located inside the stabilizing assembly 4 after being set, and the stabilizing assembly 4 will protect the filter assembly 2 to prevent the crushed stones from squeezing the filter assembly 2. The stabilizing assembly 4 includes a rotating member 41 and a protective cylinder 42. The two ends of the inner cavity of the rotating member 41 are connected to the steel pipe 1 through a rotating shaft, and the middle part is connected to the steel pipe 1. The protective cylinder 42 is arranged on the rotating member 41; the protective cylinder 42 is located outside to play a protective effect, and a plurality of water leakage holes are arranged on its surface, which can promote groundwater to enter the protective cylinder 42 through the water leakage holes, and then enter the steel pipe 1 after being filtered through the filter assembly 2 and the iron mesh pipe 3.

[0065] Taking into account that a large amount of impurities in the groundwater may cause the leakage holes on the surface of the protective tube 42 to be blocked, a rotating part 41 structure is provided to connect with the steel pipe 1. The rotating part 41 structure includes an outer shaft 411 and a rack 412. The outer shaft 411 is connected to the steel pipe 1 and is used to connect and fix the protective tube 42. The rack 412 is arranged in the middle of the outer shaft 411, and one side edge thereof is flush with the inner cavity edge of the steel pipe 1, so that the outer shaft 411 can be rotatable. During the rotation, the dirt adhering to the protective tube 42 is thrown out. In order to increase the frequency during the throwing, an external device can be used to form a connection with the outer shaft 411, thereby prompting the outer shaft to rotate.

[0066] External devices (such as Figure 8 The rod is a rod adapted to the steel pipe 1, and has a trapezoidal connecting block at the bottom. The connecting block is connected to the rod through a reset spring, so that when the rod is inserted into the steel pipe 1 and reaches the position of the outer shaft 411, it pops out of the outer shaft 411 and contacts the rack 412 during the rotation process, causing the outer shaft 411 to rotate and drive the protective tube 42 to rotate to clean the surface. After the rotation, because the rod is a trapezoidal setting, pulling the rod upward will squeeze the connecting block into the rod. At this time, the connecting block no longer causes an obstacle, and the rod can be pulled out of the steel pipe 1.

[0067] Finally, in order to introduce the groundwater in the steel pipe 1 into the water collection well 7 for collection for subsequent use, a detachable water delivery component 6 is set on the top of the steel pipe 1. After the water delivery component 6 is disassembled, the filter component 2 and the iron mesh pipe 3 are disassembled and cleaned.

[0068] For reference Figure 1 and Fig. 9In one embodiment, when the construction period is long, in order to achieve timely drainage when cleaning the interior, the water delivery component 6 is configured to include a three-part structure including a mounting shaft 61, a connecting pipe 62 and a switch valve 63. The mounting shaft 61 is detachably arranged on the top of the steel pipe 1. One of the two ends of the connecting pipe 62 has two ports, and one of the two ports is connected to the mounting shaft 61, and the other is connected to the steel pipe 1. The other end of the connecting pipe 62 is connected to the water collection well 7. The switch valve 63 is arranged at one end of the connecting pipe 62 away from the mounting shaft 61, and is used to control the connection pipe 62 to discharge the groundwater in the water collection well 7 as a whole; when there is groundwater, it can be discharged into the water collection well 7 through the connecting pipe 62. When the connecting pipe 62 is transferred, the switch valve 63 can be closed.

[0069] It should be noted that the switch valve 63 has two fixed pipes at both ends, and the material of the fixed pipes is steel or iron. The switch valve 63 can be temporarily fixed from the positions of the fixed pipes on both sides through existing compatible mounting parts, thereby increasing the stability of the switch valve 63.

[0070] For reference Figure 10-11 In another embodiment, when the construction period is short, the water delivery assembly 6 is configured to include a valve body 611 and a hose 612. The simple structural parts reduce the structural cost. When it is not necessary to disassemble and maintain the interior of the steel pipe 1, this structure is selected for the best effect. When the valve body 611 is set at the top of the steel pipe 1, the other end is connected to the hose 612, and the end of the hose 612 away from the valve body is set in the water collection well 7. When the valve body 611 is opened, the groundwater automatically flows into the water collection well 7.

[0071] When it is necessary to dismantle and replace the filter component 2 and deal with the protective tube 42, the installation shaft 61 is removed. At this time, the connecting pipe 62 still has an interface at one end connected to the steel pipe 1, and the drainage work can be continued. During the replacement of the filter component 2, the discharge of groundwater will not be affected.

[0072] In order to make the device play the best use state in use, the present application also proposes an installation method of the pressure-reducing anti-floating device for basement drainage, which is as follows:

[0073] Step 1, pre-embedding work: after the foundation pit is excavated to the design elevation of the bottom of the basement large floor cushion layer, determine the number and position of the drainage pressure relief anti-floating device to be installed, and dig a sump with a diameter of 2m and a depth of more than 1000mm at each determined position, put a nylon filter 5 in the sump, fill the nylon filter 5 with gravel, and the height range of the gravel after the overall setting is 300-350mm, and the gravel size is selected to be greater than 5mm and less than 20mm. After the steel pipe 1 with the stabilizing component 4 is inserted into the nylon filter 5 with gravel, the steel pipe 1 is temporarily fixed with a slanting steel bar. After fixing, the top of the nylon filter 5 is tightened and fixed to the middle of the surface of the steel pipe 1, and the tightening position does not exceed 350-360mm of the sump height, which includes the steel pipe 1 plus the stabilizing component 4. The range is not less than 250mm;

[0074] Step 2, filling work: fill the remaining part of the sump in step 1, weld the water stop ring plate 9 on the upper part of the steel pipe 1 and in the middle of the basement floor 10, and complete the basement floor cushion layer, waterproof layer, waterproof layer protection layer and reinforced concrete floor construction and maintenance processes in sequence, and keep the steel pipe 1 vertical before pouring, and control the height exposed on the foundation within 90-220mm. After the construction is stable, remove the steel bars used to stabilize the steel pipe 1;

[0075] Step 3: Stand still: Cover the top of the steel pipe 1 with a shielding material to block it, and wait for the groundwater to flow into the steel pipe 1 until groundwater can be clearly seen flowing out from the top of the steel pipe 1;

[0076] Step 4: Filtration setting: Assemble the filter assembly 2 and the iron mesh tube 3 together and install them on the round tube 8, then connect them to the round tube 8 through an assembly device adapted to the inner cavity of the round tube 8, and pass the filter assembly 2 and the iron mesh tube 3 out of the bottom of the steel pipe 1 by rotating the round tube 8;

[0077] Step 5, drainage work: After completing step 4, fix the circular pipe 8 with bolts, then connect the water delivery component 6 and connect one end of the water delivery component 6 to the water collection well 7. When the switch valve 63 is opened, when the groundwater level is high, but under pressure from the foundation bottom plate, the groundwater is automatically discharged through this device and enters the water collection well 7.

[0078] Working principle:

[0079] The gate valve is normally open. When the groundwater level is high, but the foundation bottom plate is under pressure, the groundwater is automatically discharged into the nearby water collection well 7 through this device. When the connecting pipe 62 needs to be moved, the switch valve 63 can be temporarily closed, and the switch valve 63 can be opened after the connecting pipe 62 moves into place. By discharging the water below the basement foundation bottom plate in real time, the water pressure is reduced to achieve the anti-floating effect. The groundwater containing impurities is filtered in sequence through the nylon filter 5, sand and gravel, the stabilizing component 4, the filtering component 2, and the iron mesh pipe 3, and is directly discharged into the water collection well 7 through the connecting pipe 62. The water in the water collection well 7 can also be used for circulating water. By setting the water stop ring plate 9, it is prevented that the groundwater leaks through the pipe wall to the top of the bottom plate. This device can be set up after the basement earthwork is excavated, and one is set up for every 1000m2 to ensure effective drainage and anti-floating, and it can be retained until the main structure is capped, and even removed and closed after completion.

[0080] The above description is only for illustrating the present invention. It should be understood that the present invention is not limited to the above embodiments, and various variations that conform to the concept of the present invention are within the protection scope of the present invention.

Claims

1. A decompression and anti-floating device for basement drainage, through which groundwater can be transported to a water collection well (7), characterized in that: include, A steel pipe (1) is inserted through the basement floor (10); A filter assembly (2) is threadedly connected to the bottom of the steel pipe (1); An iron mesh tube (3) is detachably arranged in the filter assembly (2); A stabilizing component (4) is rotatably disposed at the bottom of the surface of the steel pipe (1) and wraps the filtering component (2) and the iron mesh pipe (3); The nylon filter (5) is arranged in the middle of the surface of the steel pipe (1), and wraps the iron mesh pipe (3), the filter component (2) and the stabilizing component (4), and is filled with gravel; A water delivery component (6) has one end disposed on the top of the steel pipe (1) and the other end connected to a water collection well (7).

2. The decompression and anti-floating device for basement drainage according to claim 1, characterized in that: The filter assembly (2) comprises a connecting shaft (21), a positioning frame (22), an arc-shaped shaft (23) and a mesh member (24); The connecting shaft (21) is threadedly connected to the bottom of the inner cavity of the steel pipe (1); The positioning frame (22) is fixedly connected to the bottom of the connecting shaft (21), and its inner diameter is consistent with the inner diameter of the connecting shaft (21); There are a plurality of arc-shaped shafts (23), which are distributed in an annular manner at the bottom of the positioning frame (22) via a reset torsion spring; The mesh piece (24) is fixedly connected to a plurality of arc-shaped shafts (23), and the bottom is supported by the plurality of arc-shaped shafts (23) to form a circle.

3. The decompression and anti-floating device for basement drainage according to claim 2, characterized in that: The mesh piece (24) comprises a fine mesh (241) and suspended balls (242); A plurality of the suspension balls (242) are arranged on the top of the fine gauze net (241). The fine gauze net (241) is floated upward by the suspension balls (242) when located in groundwater. After floating, one side of the suspension balls (242) is closely attached to the outer surface of the iron mesh tube (3).

4. The decompression and anti-floating device for basement drainage according to claim 1, characterized in that: The stabilizing assembly (4) comprises a rotating member (41) and a protective tube (42); The two ends of the inner cavity of the rotating member (41) are connected to the steel pipe (1) via a rotating shaft, and the middle part thereof is connected to the steel pipe (1); The protective tube (42) is arranged on the rotating member (41).

5. The decompression and anti-floating device for basement drainage according to claim 4, characterized in that: The rotating member (41) comprises an outer shaft (411) and a rack (412); The outer shaft (411) is connected to the steel pipe (1) and is used to connect and fix the protective tube (42); The rack (412) is arranged in the middle of the outer shaft (411), and one side edge of the rack is flush with the inner cavity edge of the steel pipe (1).

6. The decompression and anti-floating device for basement drainage according to claim 1, characterized in that: The water delivery assembly (6) comprises a mounting shaft (61), a connecting pipe (62) and a switch valve (63); The installation shaft (61) is detachably arranged on the top of the steel pipe (1); One of the two ends of the connecting pipe (62) has two interfaces, one of which is connected to the installation shaft (61) and the other is connected to the steel pipe (1); The switch valve (63) is arranged at one end of the connecting pipe (62) away from the mounting shaft (61).

7. The decompression and anti-floating device for basement drainage according to claim 1, characterized in that: A round tube (8) is inserted into the steel tube (1), the bottom of the round tube (8) is threadedly connected to the inner cavity of the connecting shaft (21), and the top of the round tube (8) is connected and fixed to the top of the steel tube (1) by bolts.

8. The method for installing a decompression anti-floating device for basement drainage according to any one of claims 1 to 7, characterized in that: Step 1: Pre-embedding work: After the foundation pit is excavated to the designed elevation of the bottom of the cushion layer of the basement floor (10), the number and position of the drainage pressure relief and anti-floating devices to be installed are determined, and a sump is dug downward at each determined position, a nylon filter (5) is placed in the sump, gravel is filled in the nylon filter (5), and a steel pipe (1) with a stabilizing component (4) is inserted into the gravel, and then the top of the nylon filter (5) is tightened and fixed to the middle of the surface of the steel pipe (1); Step 2: Filling: Fill the sump in step 1, during which a water stop ring plate (9) is made on the top of the steel pipe (1), and then the construction and maintenance processes are carried out in sequence to form a basement floor (10), and the steel pipe 1 is kept in a vertical upright state before construction; Step 3: Stand still: Cover the top of the steel pipe (1) with a shielding material to block it, and wait for the groundwater to flow into the steel pipe 1 until groundwater can be clearly seen flowing out from the top of the steel pipe (1); Step 4: Filtration setting: assemble the filter assembly (2) and the iron mesh tube (3) together and install them on the round tube (8), then connect them to the round tube (8) through an assembly device adapted to the inner cavity of the round tube (8), and pass the filter assembly (2) and the iron mesh tube (3) out of the bottom of the steel pipe (1) by rotating the round tube (8); Step 5: drainage work: After completing step 4, fix the circular pipe (8) with bolts, then connect the water delivery component (6) and connect one end of the water delivery component (6) to the water collection well (7) to collect groundwater.