Dismantling method for cast-in-place stairs of built building

By reasonably setting the broken demolition points and damaged points during the demolition of the cast-in-place stairs, and using cutting means to gradually dismantle and process them, the problem of structural component damage in the existing technology is solved, and the effective recovery of resources and the reduction of construction costs are achieved. .

CN118728133APending Publication Date: 2024-10-01SICHUAN AGRI UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410734662.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When the existing technology dismantles the cast-in-place stairs of an existing building, the structural parts are damaged and cannot be put into use again, resulting in a waste of resources and high construction costs.

Method used

Reasonably set the crushing and dismantling points and damaged points according to the structural characteristics of the structural parts, use cutting means to gradually dismantle them, and conduct appropriate processing after dismantling for secondary use, including setting the crushing and dismantling points, damaged points, cutting processing and assembly welding operations.

Benefits of technology

It realizes secondary or even multiple recycling of structural parts, reduces building construction costs, and ensures the strength and integrity of structural parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728133A_ABST
    Figure CN118728133A_ABST
Patent Text Reader

Abstract

The invention discloses a method for dismantling a cast-in-place stair of a built building, which relates to the technical field of stair dismantling, and comprises the following steps: step 1, selecting a structural part of which the structure needs to be ensured to be complete, and dividing a cast-in-place stair to be dismantled into two parts, namely a structural part which needs to be kept complete and an unselected structural part; step 2, setting a crushing and dismantling point and a damaged point on an unselected structural part; thirdly, the handrails are dismantled firstly, then the stair platforms at the bottoms of the stair flights are dismantled, and finally the stair platforms at the tops of the stair flights are dismantled; and 4, assembling is carried out according to the sequence opposite to that of the step 3. According to the method, the positions of the breaking and dismantling points and the damaged points are reasonably set according to the structural characteristics of the structural parts needing to be reserved, then dismantling is carried out smoothly and sequentially according to the set positions, meanwhile, a reasonable cutting means is adopted, the structural parts cut through the method can be recycled for two times or even multiple times, waste of resources is avoided, and the economic benefit is improved. And the building construction cost can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of stair dismantling, in particular to a method for dismantling cast-in-place stairs of an existing building. Background Art

[0002] At present, there are several methods for demolishing existing buildings: 1. Manual demolition, which uses basic hand tools such as hammers and crowbars to dismantle and crush buildings. It is suitable for buildings with brick-wood structures, mixed structures, and some building structures that need to be retained. However, manual demolition is inefficient and is greatly affected by weather and climate. 2. Mechanical demolition, which uses large mechanical equipment such as excavators and crushing hammers to dismantle and crush buildings. Mechanical demolition is suitable for buildings with a height of no more than 30 meters, such as mixed structures, frame structures, and plate structures, as well as various foundations and underground structures. Compared with manual demolition, mechanical demolition is more efficient, but it also has higher requirements for operational safety and environmental protection. 3. Blasting demolition, which uses the high-temperature and high-pressure gas generated by explosives at the moment of explosion to work externally and destroy buildings. Blasting demolition is suitable for demolishing tall and solid buildings and structures, especially any buildings and structures other than brick-wood structures. However, blasting demolition has high requirements for the surrounding environment, and special protection is required for buildings near major traffic arteries, protective buildings, public places, and passing pipelines.

[0003] Moreover, existing multi-story buildings are all equipped with cast-in-place stairs, which refer to stairs in which staircase sections, platforms and platform beams are cast on site as a whole, and are formed by supporting formwork, tying steel bars and pouring concrete at the construction site. Such stairs have good integrity, high rigidity and are more favorable for earthquake resistance, so they are removed separately and reused during the demolition process. However, during the operation of the above demolition method, the original structural components (such as cast-in-place stairs) will be damaged due to the influence of the original design and demolition means, resulting in the inability to be put into use again after being removed. For this reason, we propose a method for dismantling cast-in-place stairs in existing buildings. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method for dismantling cast-in-place stairs in an existing building, by reasonably setting the positions of the crushing and demolition points and the damaged points according to the structural characteristics of the structural parts to be retained, and then dismantling them in sequence according to the set procedures, and at the same time using reasonable cutting means, the structural parts cut out by the present invention can be recycled for a second or even multiple times, thus avoiding waste of resources and reducing the cost of building construction.

[0005] To achieve the above object, the technical solution adopted by the present invention is: a method for dismantling cast-in-place stairs of an existing building, comprising the following steps:

[0006] Step 1: Select the structural parts that need to be kept intact, and divide the cast-in-place stairs to be demolished into two parts: the structural parts that need to be kept intact and the unselected structural parts;

[0007] Step 2: Setting the broken demolition points and damaged points on the unselected structural parts;

[0008] Step 3: Remove the railings first, then the stair platform at the bottom of the stair section, and finally the stair platform at the top of the stair section;

[0009] Step 4: Assemble in the reverse order of step 3.

[0010] Preferably, when the handrail is configured as a structural member that needs to be kept intact, the crushing and demolition points and the damaged points are established at the intersection of the step surface of the step and the handrail.

[0011] Preferably, when the stair section is configured as a structural member that needs to be kept intact, the crushing and demolition points and the damaged points are set up at the intersection of the first stair tread and the stair platform at the upper and lower ends of the stair section.

[0012] Preferably, the cut length of the stair section is greater than the anchoring length of the internal steel bars of the staircase required by the code.

[0013] Preferably, the concrete of the first stair slabs at the upper and lower ends of the cut stair segment is broken and cut to form grooves as pin key holes of the stair segment, and the steel bar surface is exposed in the groove for welding during subsequent assembly.

[0014] Preferably, embedded steel bar fasteners are provided at four corners on the back side of the stair section at a distance of one quarter from the edge of the stair section, and steel wires for lifting the stair section are fixed in the fasteners.

[0015] Preferably, the specific process of step four is: after placing the stair section stably on the stair platform ladder beam ear, weld the embedded bolts at the grooves at the upper and lower ends of the stair section and the platform ladder beam ear platform, add auxiliary steel bars for welding during connection to ensure the stability of the stair connection, then remove the hoisted steel bar fasteners, and finally install the railings.

[0016] Preferably, the cutting tool used for dismantling includes a diamond-studded disc saw, a wire saw or a tube saw.

[0017] Compared with the prior art, the present invention provides a method for dismantling cast-in-place stairs of an existing building, which has the following beneficial effects:

[0018] 1. The present invention reasonably sets the positions of the crushing and demolition points and the damaged points according to the structural characteristics of the structural parts to be retained, and then demolishes them in sequence according to the set smoothness. At the same time, reasonable cutting means are used, so that the structural parts cut out by the present invention can be recycled twice or even multiple times, avoiding waste of resources and reducing the cost of building construction.

[0019] 2. The structural parts cut out by the present invention have a simple structure, and only minor changes need to be made to the original building structural parts when they are reused, so that the dismantled structural parts can be easily reused.

[0020] 3. The present invention only uniformly crushes the cement mortar at the surface joints during dismantling, thus ensuring the firmness of the stair sections and the alignment of most of the unexposed steel bars before reuse, thus preventing all the steel bars from being exposed to external forces, bending and rusting, and ensuring the strength of the structural members during secondary use. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the composition structure of cast-in-place stairs;

[0022] Figure 2 It is a schematic diagram of the stair section removal process of the present invention.

[0023] In the figure:

[0024] 1 railing, 2 flights of stairs, 3 stair landings. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0026] like Figure 1 As shown, the present invention provides a method for dismantling cast-in-place stairs of an existing building, comprising the following steps:

[0027] Before demolition, select the structural parts that need to be kept intact, and divide the cast-in-place stairs to be demolished into two parts: the structural parts that need to be kept intact and the unselected structural parts;

[0028] During demolition, the components are demolished in the order of first demolishing the handrail 3, then demolishing the stair platform 3 at the bottom of the stair section 2, and finally demolishing the stair platform 3 at the top of the stair section 2. During the demolition process, the integrity of the selected components is ensured, and the broken demolition points and damaged points are set on the unselected components to ensure the integrity of the selected components as much as possible;

[0029] If it is necessary to ensure the integrity of the structure of the railing 1, when dismantling, the broken and damaged points should be set at the connection between the stair surface and the railing;

[0030] If the complete structure of the stair section 2 needs to be ensured, the broken demolition point and the damaged point are set at the intersection of the first stair tread at the upper and lower ends of the stair section 2 and the stair platform 3;

[0031] If it is necessary to ensure that the ladder section 2 is easy to connect when it is reused, the first section of the ladder plate at the upper and lower ends of the ladder section 2 is processed by breaking the concrete and cutting the steel bars to cut out the grooves; if it is necessary to lift the ladder section 2 as a whole, before lifting, set the steel bar embedded fasteners at the four corners on the back of the ladder section 2, and fix the steel wire of the lifted ladder section in the fasteners to increase the stability of the connection and prevent sliding, and then perform the lifting operation to keep the complete structure of the ladder surface as much as possible;

[0032] During demolition, in order to limit the damage caused by demolition to the set crushing and demolition points and damaged points and reduce the degree of damage to the components, diamond-studded disc saws, rope saws or tube saws are used to repeatedly cut the parts of the components that need to be demolished, and the ultra-high strength of diamonds is used to cut through the reinforced concrete until the part is cut through. At the same time, water cooling is used to meet the cooling needs of the cutting equipment while preventing dust and reducing noise.

[0033] like Figure 2 As shown, taking the retained stair section as an example, the above dismantling process is further explained, and the one-piece cast-in-place staircase is dismantled:

[0034] First, the railing 1 and the stair section 2 are cut to form an independent stair section 2;

[0035] Dismantle the independent stair section 2: When dismantling, cut the first treads at the upper and lower ends of the stair section 2 at the junction with the stair platform 3. The cut length must be greater than the internal steel bar anchoring length of the stairs required by the specification. Then crush the concrete and cut the steel bars at the first treads at the upper and lower ends of the stair section 2 to form grooves as the pin key holes of the stair section, which is convenient for connection when used again.

[0036] In order to preserve the integrity of step 2 to the greatest extent, the number and diameter of the pin holes can be increased during the dismantling process.

[0037] The dismantling step is now complete, and the next step is the secondary assembly step. The assembly steps are opposite to the disassembly steps, which are, in sequence, placing the stair section 2, connecting the upper and lower ends of the stair section 2, and connecting the handrail 1.

[0038] During assembly, first, the stair section 2 is placed steadily on the ladder beam ears of the stair platform 3 by hoisting, and then the embedded bolts at the grooves at the upper and lower ends of the stair section 2 and the ladder beam ears of the stair platform 3 are welded. Auxiliary steel bars are added for welding during connection to ensure the stability of the stair connection, and then the hoisted steel bar fasteners are removed, and finally the railing components are installed.

[0039] In order to avoid a significant reduction in the strength of the steel bars after cutting, auxiliary steel bars can be added and welded between the upper and lower grooves and the embedded bolt connections to increase the stability of the connections.

[0040] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. A method for dismantling cast-in-place stairs of an existing building, characterized in that: The steps include: Step 1: Select the structural parts that need to be kept intact, and divide the cast-in-place stairs to be demolished into two parts: the structural parts that need to be kept intact and the unselected structural parts; Step 2: Setting the broken demolition points and damaged points on the unselected structural parts; Step 3: Remove the railing (3) first, then remove the staircase (2) bottom staircase platform (3), and finally remove the staircase (2) top staircase platform (3); Step 4: Assemble in the reverse order of step 3.

2. The method for dismantling cast-in-place stairs of an existing building according to claim 1, characterized in that: When the handrail (1) is set as a structural member that needs to be kept intact, the crushing and demolition points and the damaged points are set at the intersection of the step surface of the step (2) and the handrail (3).

3. The method for dismantling cast-in-place stairs of an existing building according to claim 1, characterized in that: When the stair section (2) is set as a structural member that needs to be kept intact, the crushing and demolition points and the damaged points are set at the intersection of the first stair tread at the upper and lower ends of the stair section (2) and the stair platform (3).

4. The method for dismantling cast-in-place stairs of an existing building according to claim 3, characterized in that: The cut-off length of the stair section (2) is greater than the anchoring length of the internal steel bars of the staircase required by the specification.

5. The method for dismantling cast-in-place stairs of an existing building according to claim 4, characterized in that: The first stair slabs at the upper and lower ends of the cut stair segment (2) are subjected to concrete breaking and cutting to form grooves as pin key holes of the stair segment (2), with the steel bar surface exposed in the groove for welding during subsequent assembly.

6. The method for dismantling cast-in-place stairs of an existing building according to claim 5, characterized in that: The four corners on the back of the ladder section (2) are provided with embedded steel bar fasteners at a distance of one quarter of the distance from the edge of the ladder section (2), and the steel wire used to lift the ladder section (2) is fixed in the fasteners.

7. The method for dismantling cast-in-place stairs of an existing building according to claim 1, characterized in that: The specific process of step 4 is as follows: after the stair section (2) is stably placed on the ladder beam ear of the stair platform (3), the embedded bolts of the ladder beam ear platform are welded at the grooves at the upper and lower ends of the stair section (2) and the platform ladder beam ear platform, auxiliary steel bars are added for welding during the connection to ensure the stability of the stair connection, and then the hoisted steel bar fasteners are removed, and finally the railing (1) is installed.

8. The method for dismantling cast-in-place stairs of an existing building according to claim 1, characterized in that: Cutting tools used for demolition include diamond tipped disc saws, wire saws or cylinder saws.